IIM-CD-2013-16.01 August 1, 2013 Page 1 of 29 1 VIRGINIA DEPARTMENT OF TRANSPORTATION CONSTRUCTION DIVISION (CD) INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM (IIM) GENERAL SUBJECT: SPECIFICATIONS NUMBER: IIM-CD-2013-16.01 SPECIFIC SUBJECT: AUTHORIZED REPRESENTATIVES OF THE CHIEF ENGINEER DATE: August 1, 2013 SUPERCEDES: CD-2012-01 APPROVED: Signature On File -------------------------------------------------- Mark E. Cacamis, P.E., CCM State Construction Engineer DATE: August 1, 2013 DIRECTED TO : All users of the Road and Bridge Specifications. PURPOSE : To authorize representatives of the Chief Engineer to fulfill the requirements of the Road and Bridge Specifications. BACKGROUND : The Road and Bridge Specifications defines Engineer as: “The Chief Engineer, as designated by the Commonwealth Transportation Commissioner, who acts directly or through his duly authorized representative(s) [emphasis added] and who is responsible for highway design, construction, and maintenance. The Engineer, or his representative(s), [emphasis added] acts within the scope of the particular duties assigned to him or the authority given to him by the Code of Virginia, the Commonwealth Transportation Commissioner, these Specifications, supplemental specifications, and the Contract Documents.”

CONSTRUCTION DIVISION (CD)

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

Page 1: CONSTRUCTION DIVISION (CD)

IIM-CD-2013-16.01 August 1, 2013 Page 1 of 29

1

VIRGINIA DEPARTMENT OF TRANSPORTATION

CONSTRUCTION DIVISION (CD) INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM (IIM)

GENERAL SUBJECT:

SPECIFICATIONS

NUMBER: IIM-CD-2013-16.01

SPECIFIC SUBJECT:

AUTHORIZED REPRESENTATIVES OF THE CHIEF ENGINEER

DATE: August 1, 2013

SUPERCEDES: CD-2012-01

APPROVED:

Signature On File --------------------------------------------------

Mark E. Cacamis, P.E., CCM State Construction Engineer

DATE: August 1, 2013

DIRECTED TO: All users of the Road and Bridge Specifications.

PURPOSE: To authorize representatives of the Chief Engineer to fulfill the requirements of the Road and Bridge Specifications.

BACKGROUND: The Road and Bridge Specifications defines Engineer as:

“The Chief Engineer, as designated by the Commonwealth Transportation Commissioner, who acts directly or through his duly authorized representative(s) [emphasis added] and who is responsible for highway design, construction, and maintenance. The Engineer, or his representative(s), [emphasis added] acts within the scope of the particular duties assigned to him or the authority given to him by the Code of Virginia, the Commonwealth Transportation Commissioner, these Specifications, supplemental specifications, and the Contract Documents.”

Page 2: CONSTRUCTION DIVISION (CD)

IIM-CD-2013-16.01 August 1, 2013 Page 2 of 29

2

RESPONSIBILITIES OF REGISTERED PROFFESSIONAL ENGINEERS:

"Direct control and personal supervision," shall be that degree of supervision by a person overseeing the work of another whereby the supervisor has both control over and detailed professional knowledge of the work prepared under his supervision and words and phrases of similar import mean that the professional shall have control over the decisions on technical matters of policy and design, and exercises his professional judgment in all professional matters that are embodied in the work and the drawings, specifications [emphasis added], or other documents involved in the work;…” 18VAC10-20-10. Definitions, Regulations, Board of Architects, Professional Engineers, Land Surveyors, Certified Interior Designers & Landscape Architects

DIRECTIVE:

Those Registered Professional Engineers noted herein are the authorized representative of the Chief Engineer. With assistance from subject matter experts, they are responsible for the development and maintenance of their respective section(s) of the Road and Bridge Specifications in current and future editions, associated special provisions, special provision copied notes, supplemental specifications, and revisions.

AUTHORIZED REPRESENTATIVES

SPECIFICATION SECTION REGISTERED

PROFESSIONAL ENGINEER

DIVISION I-GENERAL PROVISIONS SECTION 101—DEFINITIONS OF ABBREVIATIONS, Mark E. Cacamis 101.01—Abbreviations and Acronyms Mark E. Cacamis

101.02—Terms Mark E. Cacamis

SECTION 102—BIDDING REQUIREMENTS AND CONDITIONS Mark E. Cacamis

102.01—Prequalification of Bidders Mark E. Cacamis

102.02—Content of Proposal Mark E. Cacamis

102.03—Interpretation of Quantities in Proposal Mark E. Cacamis

102.04—Examination of Site of Work and Proposal Mark E. Cacamis

Page 3: CONSTRUCTION DIVISION (CD)

IIM-CD-2013-16.01 August 1, 2013 Page 3 of 29

3

102.05—Preparation of Bid Mark E. Cacamis

102.06—Irregular Bids Mark E. Cacamis

102.07—Proposal Guaranty Mark E. Cacamis

102.08—Disqualification of Bidder Mark E. Cacamis

102.09—Submission of Bid Mark E. Cacamis

102.10—Withdrawal of Bid Mark E. Cacamis 102.11—eVA Business-To-Government Vendor Registration Mark E. Cacamis

102.12—Public Opening of Bids Mark E. Cacamis

SECTION 103—AWARD AND EXECUTION OF CONTRACTS Mark E. Cacamis

103.01—Consideration of Bids Mark E. Cacamis

103.02—Award of Contract Mark E. Cacamis

103.03—Cancellation of Award Mark E. Cacamis

103.04—Forfeiture of Proposal Guaranty Mark E. Cacamis

103.05—Requirements of Contract Bond Mark E. Cacamis

103.06—Contract Documents Mark E. Cacamis

103.07—Failure to Furnish Bonds or Certificate of Insurance Mark E. Cacamis

103.08—Contract Audit Mark E. Cacamis

103.09—Execution of Contract Mark E. Cacamis

SECTION 104—SCOPE OF WORK Mark E. Cacamis

104.01—Intent of Contract Mark E. Cacamis

104.02—Alteration of Quantities or Character of Work Mark E. Cacamis

104.03—Differing Site Conditions Mark E. Cacamis

SECTION 105—CONTROL OF WORK Mark E. Cacamis

105.01—Notice to Proceed Mark E. Cacamis

105.02—Pre-Construction Conference Mark E. Cacamis

105.03—Authorities of Project Personnel Mark E. Cacamis

105.04—Gratuities Mark E. Cacamis

105.05—Character of Workers, Work Methods, and Equipment Mark E. Cacamis

105.06—Subcontracting Mark E. Cacamis

105.07—Cooperation of Contractor Mark E. Cacamis

105.08—Cooperation with Regard to Utilities Mark E. Cacamis

105.09—Cooperation among Contractors Mark E. Cacamis

105.10—Plans and Working Drawings Mark E. Cacamis, Julius F.J. Volgyi

105.11—Conformity with Plans and Specifications Mark E. Cacamis, Julius F.J. Volgyi

Page 4: CONSTRUCTION DIVISION (CD)

IIM-CD-2013-16.01 August 1, 2013 Page 4 of 29

4

105.12—Coordination of Plans, Standard Drawings, Specifications, Supplemental Specifications, Special Provisions, and Special Provision Copied Notes Mark E. Cacamis

105.13—State Force Construction Surveying Mark E. Cacamis

105.14—Maintenance During Construction Mark E. Cacamis

105.15—Removing and Disposing of Structures and Obstructions Mark E. Cacamis

105.16—Cleanup Mark E. Cacamis

105.17—Inspection of Work Mark E. Cacamis

105.18—Removal of Unacceptable and Unauthorized Work Mark E. Cacamis

105.19—Submission and Disposition of Claims Mark E. Cacamis

SECTION 106—CONTROL OF MATERIAL Mark E. Cacamis

106.01—Source of Supply and Quality Requirements Mark E. Cacamis, William R. Bailey

106.02—Material Delivery Mark E. Cacamis, William R. Bailey

106.03—Local Material Sources (Pits and Quarries) Mark E. Cacamis , Carl P. Benson

106.04—Disposal Areas Mark E. Cacamis

106.05—Rights for and Use of Materials Found on Project Mark E. Cacamis

106.06—Samples, Tests, and Cited Specifications Mark E. Cacamis, William R. Bailey

106.07—Plant Inspection Mark E. Cacamis, William R. Bailey

106.08—Storing Materials Mark E. Cacamis

106.09—Handling Materials Mark E. Cacamis, William R. Bailey

106.10—Unacceptable Materials Mark E. Cacamis , Carl P. Benson

106.11—Material Furnished by the Department Mark E. Cacamis

106.12—Critical Materials Mark E. Cacamis, Charles A. Babish

SECTION 107—LEGAL RESPONSIBILITIES Mark E. Cacamis

107.01—Laws To Be Observed Mark E. Cacamis

107.02—Permits, Certificates, and Licenses Mark E. Cacamis, Mohammad Mirshahi

107.03—Federal-Aid Provisions Mark E. Cacamis

107.04—Furnishing Right of Way Mark E. Cacamis

Page 5: CONSTRUCTION DIVISION (CD)

IIM-CD-2013-16.01 August 1, 2013 Page 5 of 29

5

107.05—Patented Devices, Materials, and Processes Mark E. Cacamis

107.06—Personal Liability of Public Officials Mark E. Cacamis

107.07—No Waiver of Legal Rights Mark E. Cacamis

107.08—Protecting and Restoring Property and Landscape Mark E. Cacamis

107.09—Contractor’s Responsibility for Utility Property and Services Mark E. Cacamis

107.10—Restoration of Work Performed by Others Mark E. Cacamis

107.11—Use of Explosives Mark E. Cacamis

107.12—Responsibility for Damage Claims Mark E. Cacamis

107.13—Labor and Wages Mark E. Cacamis

107.14—Equal Employment Opportunity Mark E. Cacamis

107.15—Use of Minority Business Enterprises (MBEs) Mark E. Cacamis

107.16—Environmental Stipulations Mark E. Cacamis, Mohammad Mirshahi

107.17—Construction Safety and Health Standards Mark E. Cacamis

107.18—Sanitary Provisions Mark E. Cacamis

107.19—Railway-Highway Provisions Mark E. Cacamis

107.20—Construction Over or Adjacent to Navigable Waters Mark E. Cacamis

107.21—Size and Weight Limitations Mark E. Cacamis

SECTION 108—PROSECUTION AND PROGRESS OF WORK Mark E. Cacamis

108.01—Prosecution of Work Mark E. Cacamis

108.02—Limitation of Operations Mark E. Cacamis

108.03—Progress Schedule General Requirements Mark E. Cacamis

108.04—Determination and Extension of Contract Time Limit Mark E. Cacamis

108.05—Suspension of Work Ordered by the Engineer Mark E. Cacamis

108.06—Failure To Complete on Time Mark E. Cacamis

108.07—Default of Contract Mark E. Cacamis

108.08—Termination of Contract Mark E. Cacamis

108.09—Acceptance Mark E. Cacamis

108.10—Termination of Contractor’s Responsibilities Mark E. Cacamis

SECTION 109—MEASUREMENT AND PAYMENT Mark E. Cacamis

109.01—Measurement of Quantities Mark E. Cacamis

109.02—Plan Quantities Mark E. Cacamis

109.03—Scope of Payment Mark E. Cacamis

109.04—Compensation for Altered Quantities Mark E. Cacamis

109.05—Extra and Force Account Work Mark E. Cacamis

109.06—Common Carrier Rates Mark E. Cacamis

109.07—Eliminated Items Mark E. Cacamis

Page 6: CONSTRUCTION DIVISION (CD)

IIM-CD-2013-16.01 August 1, 2013 Page 6 of 29

6

109.08—Partial Payments Mark E. Cacamis

109.09—Payment for Material on Hand Mark E. Cacamis

Page 7: CONSTRUCTION DIVISION (CD)

IIM-CD-2013-16.01 August 1, 2013 Page 7 of 29

7

109.10—Final Payment Mark E. Cacamis

DDIIVVIISSIIOONN IIII——MMAATTEERRIIAALLSS

SECTION 200—GENERAL William R. Bailey

200.01—Description William R. Bailey

200.02—Conformance with Specifications William R. Bailey

200.03—General Sampling and Testing Procedures William R. Bailey

200.04—Acceptance Procedures for Aggregates William R. Bailey

200.05—Handling and Storing Aggregates William R. Bailey

200.06—Technician and Batcher Certification William R. Bailey SECTION 201—MINERAL FILLER Tommy P. Schinkel

201.01—Description Tommy P. Schinkel

201.02—Detail Requirements Tommy P. Schinkel SECTION 202—FINE AGGREGATE Larry J. Lundy

202.01—Description Larry J. Lundy 202.02—Materials Larry J. Lundy

202.03—Detail Requirements Larry J. Lundy SECTION 203—COARSE AGGREGATE Larry J. Lundy

203.01—Description Larry J. Lundy 203.02—Materials Larry J. Lundy

203.03—Detail Requirements Larry J. Lundy

SECTION 204—STONE FOR MASONRY, RIPRAP, POROUS BACKFILL, AND GABIONS John J. Schuler

204.01—Description John J. Schuler

204.02—Detail Requirements John J. Schuler SECTION 205—CRUSHER RUN AGGREGATE John J. Schuler

205.01—Description John J. Schuler 205.02—Materials John J. Schuler

205.03—Detail Requirements John J. Schuler SECTION 206—LIGHTWEIGHT AGGREGATE Larry J. Lundy

206.01—Description Larry J. Lundy

206.02—Detail Requirements Larry J. Lundy SECTION 207—SELECT MATERIAL John J. Schuler

207.01—Description John J. Schuler 207.02—Detail Requirements John J. Schuler 207.03—Job-Mix Formula for Select Material, Type I John J. Schuler 207.04—Mixing John J. Schuler 207.05—Acceptance of Select Material, Type I John J. Schuler 207.06—Referee System for Select Material, Type I John J. Schuler

207.07—Payment Adjustment System for Select Material, Type I John J. Schuler SECTION 208—SUBBASE AND AGGREGATE BASE MATERIAL John J. Schuler

Page 8: CONSTRUCTION DIVISION (CD)

IIM-CD-2013-16.01 August 1, 2013 Page 8 of 29

8

208.01—Description John J. Schuler 208.02—Materials John J. Schuler 208.03—Detail Requirements John J. Schuler 208.04—Job-Mix Formula John J. Schuler 208.05—Mixing John J. Schuler 208.06—Acceptance John J. Schuler 208.07—Referee System John J. Schuler

208.08—Payment Adjustment System John J. Schuler SECTION 209—OPEN-GRADED SHOULDER MATERIAL John J. Schuler

209.01—Description John J. Schuler 209.02—Detail Requirements John J. Schuler 209.03—Mixing John J. Schuler

SECTION 210—ASPHALT MATERIALS Robert Crandol, P.E. 210.01—Description Robert Crandol, P.E. 210.02—Materials Robert Crandol, P.E. 210.03—Detail Requirements Robert Crandol, P.E.

210.04—Payment Adjustment System Robert Crandol, P.E. SECTION 211—ASPHALT CONCRETE Robert Crandol, P.E.

211.01—Description Robert Crandol, P.E. 211.02—Materials Robert Crandol, P.E. 211.03—Job-Mix Formula Robert Crandol, P.E. 211.04—Asphalt Concrete Mixtures Robert Crandol, P.E. 211.05—Testing Robert Crandol, P.E. 211.06—Tests Robert Crandol, P.E. 211.07—Plant Inspection Robert Crandol, P.E. 211.08—Acceptance Robert Crandol, P.E. 211.09—Adjustment System Robert Crandol, P.E. 211.10—Referee System Robert Crandol, P.E. 211.11—Handling and Storing Aggregates Robert Crandol, P.E. 211.12—Asphalt Concrete Mixing Plant Robert Crandol, P.E. 211.13—Preparation of Mixture Robert Crandol, P.E. 211.14—Storage System Robert Crandol, P.E.

211.15—Initial Production Robert Crandol, P.E. SECTION 212—JOINT MATERIALS Larry J. Lundy , Milton B. Pritchett

212.01—Description Larry J. Lundy

212.02—Detail Requirements Larry J. Lundy

SECTION 213—DAMP-PROOFING AND WATERPROOFING MATERIALS Larry J. Lundy

213.01—Description Larry J. Lundy

213.02—Detail Requirements Larry J. Lundy SECTION 214—HYDRAULIC CEMENT Larry J. Lundy

214.01—Description Larry J. Lundy

214.02—Detail Requirements Larry J. Lundy SECTION 215—HYDRAULIC CEMENT CONCRETE ADMIXTURES Larry J. Lundy

215.01—Description Larry J. Lundy 215.02—Materials Larry J. Lundy

Page 9: CONSTRUCTION DIVISION (CD)

IIM-CD-2013-16.01 August 1, 2013 Page 9 of 29

9

215.03—Detail Requirements Larry J. Lundy SECTION 216—WATER FOR USE WITH CEMENT OR LIME Larry J. Lundy

216.01—Description Larry J. Lundy 216.02—Detail Requirements Larry J. Lundy

Page 10: CONSTRUCTION DIVISION (CD)

IIM-CD-2013-16.01 August 1, 2013 Page 10 of 29

10

SECTION 217—HYDRAULIC CEMENT CONCRETE Larry J. Lundy, Bruce G. Shepard 217.01—Description Larry J. Lundy 217.02—Materials Larry J. Lundy 217.03—Handling and Storing Materials Larry J. Lundy 217.04—Measurement of Materials Larry J. Lundy 217.05—Equipment Larry J. Lundy 217.06—Classification of Concrete Mixtures Larry J. Lundy 217.07—Proportioning Concrete Mixtures Larry J. Lundy 217.08—Acceptance Larry J. Lundy 217.09—Mixing Larry J. Lundy

217.10—Placement Limitations Larry J. Lundy SECTION 218—HYDRAULIC CEMENT MORTAR AND GROUT Larry J. Lundy

218.01—Description Larry J. Lundy 218.02—Materials Larry J. Lundy

218.03—Detail Requirements Larry J. Lundy SECTION 219—RIGHT-OF-WAY MONUMENTS Larry J. Lundy

219.01—Description Larry J. Lundy

219.02—Detail Requirements Larry J. Lundy SECTION 220—CONCRETE CURING MATERIALS Larry J. Lundy

220.01—Description Larry J. Lundy

220.02—Detail Requirements Larry J. Lundy SECTION 221—GUARDRAIL T. Ed Darby

221.01—Description T. Ed Darby

221.02—Detail Requirements T. Ed Darby SECTION 222—MASONRY UNITS Larry J. Lundy

222.01—Description Larry J. Lundy

222.02—Detail Requirements Larry J. Lundy

SECTION 223—STEEL REINFORCEMENT Larry J. Lundy, Julius F. J. Volgyi, Debbie Mangiaracina

223.01—Description Larry J. Lundy

223.02—Detail Requirements Larry J. Lundy, Jeff C. Hill, Andy M. Zickler

SECTION 224—CASTINGS William R, Bailey 224.01—Description William R, Bailey 224.02—Materials William R, Bailey

224.03—Detail Requirements William R, Bailey

SECTION 225—STEEL FORGINGS AND STEEL SHAFTING T. Ed Darby, Jeff C. Hill, Andy M. Zickler

225.01—Description T. Ed Darby

225.02—Detail Requirements T. Ed Darby

SECTION 226—STRUCTURAL STEEL T. Ed Darby, Jeff C. Hill, Andy M. Zickler

226.01—Description T. Ed Darby

226.02—Detail Requirements T. Ed Darby

SECTION 227—STEEL GRID FLOORING T. Ed Darby, Russell L. Martin, Jim W. Long

Page 11: CONSTRUCTION DIVISION (CD)

IIM-CD-2013-16.01 August 1, 2013 Page 11 of 29

11

227.01—Description T. Ed Darby 227.02—Materials T. Ed Darby

227.03—Detail Requirements T. Ed Darby

SECTION 228—STEEL PILES T. Ed Darby, Ashton D. Lawler, Mike J. Hall, Kevin K. Lee

228.01—Description T. Ed Darby

228.02—Detail Requirements T. Ed Darby SECTION 229—ALUMINUM ALLOY T. Ed Darby

229.01—Description T. Ed Darby

229.02—Detail Requirements T. Ed Darby SECTION 230—BRONZE AND COPPER ALLOY T. Ed Darby

230.01—Description T. Ed Darby

230.02—Detail Requirements T. Ed Darby

SECTION 231—PAINT William R. Bailey, Adam D. Matteo 231.01—Description William R. Bailey 231.02—Materials William R. Bailey

231.03—Detail Requirements William R. Bailey SECTION 232—PIPE AND PIPE ARCHES William R. Bailey, Charlie E. Pettie

232.01—Description William R. Bailey

232.02—Detail Requirements William R. Bailey SECTION 233—GALVANIZING William R. Bailey, Jeff C. Hill

233.01—Description William R. Bailey 233.02—Detail Requirements William R. Bailey

233.03—Repair of Galvanized Surfaces William R. Bailey

SECTION 234—GLASS BEADS FOR REFLECTORIZING TRAFFIC MARKINGS William R. Bailey

234.01—Description William R. Bailey

234.02—Detail Requirements William R. Bailey SECTION 235—RETROREFLECTORS William R. Bailey

235.01—Description William R. Bailey

235.02—Detail Requirements William R. Bailey SECTION 236—WOOD PRODUCTS William R. Bailey, Brian J. Silvis

236.01—Description T. Ed Darby

236.02—Detail Requirements T. Ed Darby SECTION 237—BEDDING MATERIAL AND BEARING PADS Larry J. Lundy

237.01—Description Larry J. Lundy

237.02—Detail Requirements Larry J. Lundy

SECTION 238—ELECTRICAL AND SIGNAL COMPONENTS Vanloan Q. Nguyen 238.01—Description Vanloan Q. Nguyen

238.02—Detail Requirements Vanloan Q. Nguyen SECTION 239—SODIUM CHLORIDE AND CALCIUM CHLORIDE William R. Bailey

239.01—Description William R. Bailey

239.02—Detail Requirements William R. Bailey SECTION 240—LIME John J. Schuler

Page 12: CONSTRUCTION DIVISION (CD)

IIM-CD-2013-16.01 August 1, 2013 Page 12 of 29

12

240.01—Description John J. Schuler

240.02—Detail Requirements John J. Schuler SECTION 241—FLY ASH Larry J. Lundy

241.01—Description Larry J. Lundy

241.02—Detail Requirements Larry J. Lundy SECTION 242—FENCES William R. Bailey, Charlie E. Pettie

242.01—Description William R. Bailey

242.02—Detail Requirements William R. Bailey SECTION 243—EPOXY-RESIN SYSTEMS Larry J. Lundy

243.01—Description Larry J. Lundy 243.02—Detail Requirements Larry J. Lundy 243.03—Handling and Storing Materials Larry J. Lundy

243.04—Acceptance Larry J. Lundy SECTION 244—ROADSIDE DEVELOPMENT MATERIALS Emmett R. Heltzel

244.01—Description Emmett R. Heltzel

244.02—Detail Requirements Emmett R. Heltzel

SECTION 245—GEOSYNTHETICS John J. Schuler, Ashton D. Lawler, Mike J. Hall, Kevin K. Lee

245.01—Description John J. Schuler 245.02—Detail Requirements John J. Schuler

245.03—Testing and Documentation John J. Schuler SECTION 246—PAVEMENT MARKING William R. Bailey

246.01—Description William R. Bailey

246.02—Detail Requirements William R. Bailey SECTION 247—REFLECTIVE SHEETING William R. Bailey

247.01—Description William R. Bailey 247.02—Detail Requirements William R. Bailey

247.03—Warranty Requirements TBD-Traffic Engineering SECTION 248—STONE MATRIX ASPHALT CONCRETE Tommy P. Schinkel

248.01—Description Tommy P. Schinkel 248.02—Materials Tommy P. Schinkel 248.03—Composition of SMA Mixture Tommy P. Schinkel 248.04—Acceptance Tommy P. Schinkel

248.05—SMA Mixing Plant Tommy P. Schinkel

DIVISION III—ROADWAY CONSTRUCTION SECTION 301—CLEARING AND GRUBBING Mohammad Mirshahi

301.01—Description Mohammad Mirshahi 301.02—Procedures Mohammad Mirshahi

301.03—Measurement and Payment Mark E. Cacamis

SECTION 302—DRAINAGE STRUCTURES John J. Schuler, Larry G. Hedgepeth, Karl W. Larson

302.01—Description John J. Schuler 302.02—Materials Larry J. Lundy 302.03—Procedures John J. Schuler

302.04—Measurement and Payment Mark E. Cacamis, John J. Schuler SECTION 303—EARTHWORK John J. Schuler

Page 13: CONSTRUCTION DIVISION (CD)

IIM-CD-2013-16.01 August 1, 2013 Page 13 of 29

13

303.01—Description John J. Schuler 303.02—Materials John J. Schuler 303.03—Erosion and Siltation Control Mohammad Mirshahi 303.04—Procedures Carl P. Benson 303.05—Tolerances John J. Schuler

303.06—Measurement and Payment Mark E. Cacamis

Page 14: CONSTRUCTION DIVISION (CD)

IIM-CD-2013-16.01 August 1, 2013 Page 14 of 29

14

SECTION 304—CONSTRUCTING DENSITY CONTROL STRIPS John J. Schuler 304.01—Description John J. Schuler 304.02—Materials John J. Schuler 304.03—Equipment John J. Schuler 304.04—Procedures John J. Schuler 304.05—Tolerances John J. Schuler

304.06—Measurement and Payment Mark E. Cacamis SECTION 305—SUBGRADE AND SHOULDERS John J. Schuler

305.01—Description John J. Schuler 305.02—Materials John J. Schuler 305.03—Procedures John J. Schuler

305.04—Measurement and Payment Mark E. Cacamis SECTION 306—LIME STABILIZATION John J. Schuler

306.01—Description John J. Schuler 306.02—Materials John J. Schuler 306.03—Procedures John J. Schuler

306.04—Measurement and Payment Mark E. Cacamis SECTION 307—HYDRAULIC CEMENT STABILIZATION John J. Schuler

307.01—Description John J. Schuler 307.02—Materials John J. Schuler 307.03—Field Laboratory John J. Schuler 307.04—Weather Limitations John J. Schuler 307.05—Procedures John J. Schuler

307.06—Measurement and Payment Mark E. Cacamis SECTION 308—SUBBASE COURSE John J. Schuler

308.01—Description John J. Schuler 308.02—Materials John J. Schuler 308.03—Procedures John J. Schuler 308.04—Tolerances John J. Schuler

308.05—Measurement and Payment Mark E. Cacamis SECTION 309—AGGREGATE BASE COURSE John J. Schuler

309.01—Description John J. Schuler 309.02—Materials John J. Schuler 309.03—Equipment John J. Schuler 309.04—Procedures John J. Schuler 309.05—Density Requirements John J. Schuler

309.06—Measurement and Payment Mark E. Cacamis, John J. Schuler SECTION 310—TACK COAT Tommy P. Schinkel

310.01—Description Tommy P. Schinkel 310.02—Materials Tommy P. Schinkel 310.03—Procedures Tommy P. Schinkel

310.04—Measurement and Payment Mark E. Cacamis, Tommy P. Schinkel SECTION 311—PRIME COAT Tommy P. Schinkel

311.01—Description Tommy P. Schinkel

Page 15: CONSTRUCTION DIVISION (CD)

IIM-CD-2013-16.01 August 1, 2013 Page 15 of 29

15

311.02—Materials Tommy P. Schinkel 311.03—Procedures Tommy P. Schinkel

311.04—Measurement and Payment Tommy P. Schinkel SECTION 312—SEAL COAT Mark E. Cacamis, Tommy P. Schinkel

312.01—Description Tommy P. Schinkel 312.02—Materials Tommy P. Schinkel 312.03—Equipment Tommy P. Schinkel 312.04—Procedures Tommy P. Schinkel

312.05—Measurement and Payment Mark E. Cacamis, Tommy P. Schinkel SECTION 313—ASPHALT-STABILIZED OPEN-GRADED MATERIAL Tommy P. Schinkel

313.01—Description Tommy P. Schinkel 313.02—Materials Tommy P. Schinkel 313.03—Proportioning Tommy P. Schinkel 313.04—Acceptance Tommy P. Schinkel 313.05—Placing limitations Tommy P. Schinkel 313.06—Procedures Tommy P. Schinkel

313.07—Measurement and Payment Mark E. Cacamis, Tommy P. Schinkel SECTION 314—PENETRATION SURFACE COURSES Tommy P. Schinkel

314.01—Description Tommy P. Schinkel 314.02—Materials Tommy P. Schinkel 314.03—Weather Limitations Tommy P. Schinkel 314.04—Equipment Tommy P. Schinkel 314.05—Procedures Tommy P. Schinkel

314.06—Measurement and Payment Mark E. Cacamis, Tommy P. Schinkel SECTION 315—ASPHALT CONCRETE PAVEMENT Tommy P. Schinkel

315.01—Description Tommy P. Schinkel 315.02—Materials Tommy P. Schinkel 315.03—Equipment Tommy P. Schinkel 315.04—Placement Limitations Tommy P. Schinkel 315.05—Procedures Tommy P. Schinkel 315.06—Pavement Samples Tommy P. Schinkel 315.07—Pavement Tolerances Tommy P. Schinkel

315.08—Measurement and Payment Mark E. Cacamis SECTION 316—HYDRAULIC CEMENT CONCRETE PAVEMENT Mohamad K. Elfino

316.01—Description Mohamad K. Elfino 316.02—Materials Larry J. Lundy 316.03—Equipment Mohamad K. Elfino 316.04—Procedures Mohamad K. Elfino 316.05—Thickness and Finished Grade Tolerances Mohamad K. Elfino

316.06—Measurement and Payment Mark E. Cacamis SECTION 317— STONE MATRIX ASPHALT CONCRETE PAVEMENT Tommy P. Schinkel

317.01—Description Tommy P. Schinkel 317.02—Materials Tommy P. Schinkel 317.03—Composition of SMA Mixture Tommy P. Schinkel 317.04—Acceptance Tommy P. Schinkel 317.05—SMA Mixing Plant Tommy P. Schinkel

Page 16: CONSTRUCTION DIVISION (CD)

IIM-CD-2013-16.01 August 1, 2013 Page 16 of 29

16

317.06—Weather Restrictions Tommy P. Schinkel 317.07—Placing and Finishing Tommy P. Schinkel 317.08—Compaction Tommy P. Schinkel 317.09—Trial Section Tommy P. Schinkel 317.10—Prepaving Conference Tommy P. Schinkel

317.11—Measurement and Payment Mark E. Cacamis

DIVISION IV—BRIDGES AND STRUCTURES

SECTION 401—STRUCTURE EXCAVATION Ashton D. Lawler, Deryck J. Krafft, Mike J. Hall, Kevin K. Lee

401.01—Description Ashton D. Lawler, Deryck J. Krafft, Mike J. Hall, Kevin K. Lee

401.02—Materials Ashton D. Lawler, Deryck J. Krafft, Mike J. Hall, Kevin K. Lee

401.03—Procedures Ashton D. Lawler, Deryck J. Krafft, Mike J. Hall, Kevin K. Lee

401.04—Measurement and Payment Mark E. Cacamis

SECTION 402—SHEET PILES Ashton D. Lawler, Mike J. Hall, Kevin K. Lee

402.01—Description Ashton D. Lawler, Mike J. Hall, Kevin K. Lee

402.02—Materials Ashton D. Lawler, Mike J. Hall, Kevin K. Lee, T. Ed Darby

402.03—Procedures Ashton D. Lawler, Mike J. Hall, Kevin K. Lee

402.04—Measurement and Payment Mark E. Cacamis

SECTION 403—BEARING PILES Ashton D. Lawler, Mike J. Hall, Kevin K. Lee

403.01—Description Ashton D. Lawler, Mike J. Hall, Kevin K. Lee

403.02—Materials Ashton D. Lawler, Mike J. Hall, Kevin K. Lee, T. Ed Darby

403.03—Pile Types Ashton D. Lawler, Mike J. Hall, Kevin K. Lee

403.04—Determination of Pile Lengths Ashton D. Lawler, Mike J. Hall, Kevin K. Lee

403.05—Order List Ashton D. Lawler, Mike J. Hall, Kevin K. Lee

403.06—Procedures Ashton D. Lawler, Mike J. Hall, Kevin K. Lee

403.07—Determination of Bearing Capacities Ashton D. Lawler, Mike J. Hall, Kevin K. Lee

403.08—Measurement and Payment Ashton D. Lawler, Mike J. Hall, Kevin K. Lee, Mark E. Cacamis

SECTION 404—HYDRAULIC CEMENT CONCRETE OPERATIONS Bruce G. Shepard, Deryck J. Krafft 404.01—Description Bruce G. Shepard, Deryck J. Krafft

404.02—Materials Bruce G. Shepard, Deryck J. Krafft, Larry J. Lundy

404.03—Procedures Bruce G. Shepard, Deryck J. Krafft 404.04—Bridge Deck Construction Bruce G. Shepard, Deryck J. Krafft 404.05—Expansion and Fixed Joints Bruce G. Shepard, Deryck J. Krafft

Page 17: CONSTRUCTION DIVISION (CD)

IIM-CD-2013-16.01 August 1, 2013 Page 17 of 29

17

404.06—Bridge Seat Bearing Areas Bruce G. Shepard, Deryck J. Krafft 404.07—Finishing Concrete Surfaces Bruce G. Shepard, Deryck J. Krafft

404.08—Measurement and Payment Bruce G. Shepard, Deryck J. Krafft, Mark E. Cacamis

Page 18: CONSTRUCTION DIVISION (CD)

IIM-CD-2013-16.01 August 1, 2013 Page 18 of 29

18

SECTION 405—PRESTRESSED CONCRETE Bruce G. Shepard, John H. Martin, Andy M. Zickler

405.01—Description Bruce G. Shepard, John H. Martin, Andy M. Zickler

405.02—Materials Bruce G. Shepard, John H. Martin, Andy M. Zickler, Larry J. Lundy

405.03—Plant Review Bruce G. Shepard, John H. Martin, Andy M. Zickler

405.04—Concrete Controls Bruce G. Shepard, John H. Martin, Andy M. Zickler

405.05—Procedures Bruce G. Shepard, John H. Martin, Andy M. Zickler

405.06—Tolerances Bruce G. Shepard, John H. Martin, Andy M. Zickler

405.07—Measurement and Payment Bruce G. Shepard, John H. Martin, Andy M. Zickler, Mark E. Cacamis

SECTION 406—REINFORCING STEEL Julius F. J. Volgyi, Debbie Mangairacina

406.01—Description Julius F. J. Volgyi, Debbie Mangairacina

406.02—Materials Julius F. J. Volgyi, Debbie Mangairacina, Larry J. Lundy

406.03—Procedures Julius F. J. Volgyi, Debbie Mangairacina

406.04—Measurement and Payment Julius F. J. Volgyi, Debbie Mangairacina, Mark E. Cacamis

SECTION 407—STEEL STRUCTURES Jeff C. Hill, Andy M. Zickler 407.01—Description Jeff C. Hill, Andy M. Zickler

407.02—Materials Jeff C. Hill, Andy M. Zickler, T. Ed Darby

407.03—Working Drawings Jeff C. Hill, Andy M. Zickler 407.04—Fabrication Procedures Jeff C. Hill, Andy M. Zickler 407.05—Handling, Storing, and Shipping Materials Jeff C. Hill, Andy M. Zickler 407.06—Erection Procedures Jeff C. Hill, Andy M. Zickler

407.07—Measurement and Payment Jeff C. Hill, Andy M. Zickler, Mark E. Cacamis

SECTION 408—BEARING DEVICES AND ANCHORS Larry G. Hedgepeth 408.01—Description Larry G. Hedgepeth 408.02—Materials and Fabrication Larry G. Hedgepeth, T. Ed Darby 408.03—Procedures Larry G. Hedgepeth

408.04—Measurement and Payment Larry G. Hedgepeth SECTION 409—STEEL GRID FLOORS Russell L. Martin, Jim W. Long

409.01—Description Russell L. Martin, Jim W. Long

409.02—Materials Russell L. Martin, Jim W. Long, T. Ed Darby

409.03—Procedures Russell L. Martin, Jim W. Long

409.04—Measurement and Payment Russell L. Martin, Jim W. Long, Mark E. Cacamis

Page 19: CONSTRUCTION DIVISION (CD)

IIM-CD-2013-16.01 August 1, 2013 Page 19 of 29

19

SECTION 410—RAILINGS AND PARAPETS Julius F. J. Volgyi, Russell L. Martin, Andy M. Zickler

410.01—Description Julius F. J. Volgyi, Russell L. Martin, Andy M. Zickler

410.02—Materials Julius F. J. Volgyi, Russell L. Martin, Andy M. Zickler, T.Ed Darby

410.03—Procedures Julius F. J. Volgyi, Russell L. Martin, Andy M. Zickler

410.04—Measurement and Payment Julius F. J. Volgyi, Russell L. Martin, Andy M. Zickler, Mark E. Cacamis

SECTION 411—PROTECTIVE COATING OF METAL IN STRUCTURES Adam D. Matteo, Milton B. Pritcett,

411.01—Description Adam D. Matteo, Milton B. Pritcett,

411.02—Materials Adam D. Matteo, Milton B. Pritcett,

411.03—Certifications Adam D. Matteo, Milton B. Pritcett,

411.04—General Surface Preparation and Application Standards Adam D. Matteo, Milton B. Pritcett,

411.05—Existing Structures Adam D. Matteo, Milton B. Pritcett,

411.06—New Structures Adam D. Matteo, Milton B. Pritcett,

411.07—Galvanized Surfaces Adam D. Matteo, Milton B. Pritcett,

411.08—Environmental Protection Adam D. Matteo, Milton B. Pritcett,

411.09—Health and Safety Adam D. Matteo, Milton B. Pritcett,

411.10—Measurement and Payment Adam D. Matteo, Milton B. Pritcett,

SECTION 412—WIDENING, REPAIRING, AND RECONSTRUCTING Claude S. Napier, Adam D. Matteo, Deryck J. Krafft, Andy M. Zickler

412.01—Description Claude S. Napier, Adam D. Matteo, Deryck J. Krafft, Andy M. Zickler

412.02—Materials

Claude S. Napier, Adam D. Matteo, Deryck J. Krafft, Andy M. Zickler, Larry J. Lundy

412.03—Procedures Claude S. Napier, Adam D. Matteo, Deryck J. Krafft, Andy M. Zickler

412.04—Measurement and Payment

Claude S. Napier, Adam D. Matteo, Deryck J. Krafft, Andy M. Zickler, Mark E. Cacamis

SECTION 413—DISMANTLING AND REMOVING EXISTING STRUCTURES OR REMOVING PORTIONS OF EXISTING STRUCTURES

Claude S. Napier, Adam D. Matteo, Deryck J. Krafft

413.01—Description Claude S. Napier, Adam D. Matteo, Deryck J. Krafft

413.02—Procedures Claude S. Napier, Adam D. Matteo, Deryck J. Krafft

Page 20: CONSTRUCTION DIVISION (CD)

IIM-CD-2013-16.01 August 1, 2013 Page 20 of 29

20

413.03—Measurement and Payment Claude S. Napier, Adam D. Matteo, Deryck J. Krafft, Mark E. Cacamis

Page 21: CONSTRUCTION DIVISION (CD)

IIM-CD-2013-16.01 August 1, 2013 Page 21 of 29

21

SECTION 414—RIPRAP Charlie S. Pettie 414.01—Description Charlie S. Pettie 414.02—Materials Charlie S. Pettie

414.03—Procedures Charlie S. Pettie

414.04—Measurement and Payment Charlie S. Pettie, Mark E. Cacamis SECTION 415—CONCRETE SLOPE PROTECTION Charlie S. Pettie

415.01—Description Charlie S. Pettie 415.02—Materials Charlie S. Pettie 415.03—Procedures Charlie S. Pettie, Larry J. Lundy

415.04—Measurement and Payment Charlie S. Pettie, Mark E. Cacamis SECTION 416—WATERPROOFING Charlie S. Pettie

416.01—Description Charlie S. Pettie 416.02—Materials Charlie S. Pettie, Larry J. Lundy 416.03—Procedures Charlie S. Pettie

416.04—Measurement and Payment Charlie S. Pettie, Mark E. Cacamis SECTION 417—DAMP-PROOFING

417.01—Description Larry J. Lundy 417.02—Materials Larry J. Lundy 417.03—Procedures Larry J. Lundy

417.04—Measurement and Payment Mark E. Cacamis SECTION 418—TIMBER STRUCTURES Brian J. Silvis

418.01—Description Brian J. Silvis 418.02—Materials Brian J. Silvis, T. Ed Darby 418.03—Procedures Brian J. Silvis

418.04—Measurement and Payment Brian J. Silvis, Mark E. Cacamis SECTION 419—BRIDGE CONDUIT SYSTEMS AND LIGHTING SYSTEMS Annette F. Adams

419.01—Description Annette F. Adams 419.02—Materials Annette F. Adams 419.03—Procedures Annette F. Adams

419.04—Measurement and Payment Annette F. Adams, Mark E. Cacamis SECTION 420—PREFORMED ELASTOMERIC JOINT SEALER Milton B. Pritchett

420.01—Description Milton B. Pritchett 420.02—Materials Milton B. Pritchett, Larry J. Lundy 420.03—Procedures Milton B. Pritchett

420.04—Measurement and Payment Milton B. Pritchett, Mark E. Cacamis SECTION 421—ELASTOMERIC EXPANSION DAMS Milton B. Pritchett

421.01—Description Milton B. Pritchett 421.02—Materials Milton B. Pritchett, Larry J. Lundy 421.03—Procedures Milton B. Pritchett

421.04—Measurement and Payment Milton B. Pritchett, Mark E. Cacamis

SECTION 422—NAVIGATION LIGHTS Annette F. Adams, Jim W. Long 422.01—Description Annette F. Adams, Jim W. Long

Page 22: CONSTRUCTION DIVISION (CD)

IIM-CD-2013-16.01 August 1, 2013 Page 22 of 29

22

422.02—Materials Annette F. Adams, Jim W. Long 422.03—Procedures Annette F. Adams, Jim W. Long

422.04—Measurement and Payment Annette F. Adams, Jim W. Long, Mark E. Cacamis

DIVISION V—INCIDENTAL CONSTRUCTION

SECTION 501—UNDERDRAINS Affan Habib, Ashton D. Lawler, Mike J. Hall, Kevin K. Lee

501.01—Description Affan Habib, Ashton D. Lawler, Mike J. Hall, Kevin K. Lee

501.02—Materials Affan Habib, Ashton D. Lawler, Mike J. Hall, Kevin K. Lee

501.03—Procedures Affan Habib, Ashton D. Lawler, Mike J. Hall, Kevin K. Lee

501.04—Measurement and Payment Affan Habib, Ashton D. Lawler, Mike J. Hall, Kevin K. Lee, Mark E. Cacamis

SECTION 502—INCIDENTAL CONCRETE ITEMS Mohammad Mirshahi 502.01—Description Mohammad Mirshahi 502.02—Materials Larry J. Lundy 502.03—Procedures Contact Mohammad Mirshahi

502.04—Measurement and Payment Mark E. Cacamis

SECTION 503—Reserved for Future Use SECTION 504—SIDEWALKS, STEPS, AND HANDRAILS

504.01—Description Mohammad Mirshahi

504.02—Materials Larry J. Lundy 504.03—Procedures Mohammad Mirshahi

504.04—Measurement and Payment Mark E. Cacamis SECTION 505—GUARDRAIL AND STEEL MEDIAN BARRIERS Julius F. J. Volgyi, Russell L. Martin

505.01—Description Julius F. J. Volgyi, Russell L. Martin

505.02—Materials Julius F. J. Volgyi, Russell L. Martin, T. Ed Darby

505.03—Procedures Julius F. J. Volgyi, Russell L. Martin

505.04—Measurement and Payment Julius F. J. Volgyi, Russell L. Martin, Mark E. Cacamis

SECTION 506—RETAINING WALLS Ashton D. Lawler, Mike J. Hall, Kevin K. Lee

506.01—Description Ashton D. Lawler, Mike J. Hall, Kevin K. Lee

506.02—Materials Ashton D. Lawler, Mike J. Hall, Kevin K. Lee

506.03—Procedures Ashton D. Lawler, Mike J. Hall, Kevin K. Lee

506.04—Measurement and Payment Ashton D. Lawler, Mike J. Hall, Kevin K. Lee, Mark E. Cacamis

SECTION 507—FENCES Charlie S. Pettie 507.01—Description Charlie S. Pettie 507.02—Materials Charlie S. Pettie, William R. Bailey

507.03—Procedures Charlie S. Pettie

507.04—Measurement and Payment Charlie S. Pettie, Mark E. Cacamis

Page 23: CONSTRUCTION DIVISION (CD)

IIM-CD-2013-16.01 August 1, 2013 Page 23 of 29

23

SECTION 508—DEMOLITION OF PAVEMENT AND OBSCURING ROADWAY Mohammad Mirshahi

508.01—Description Mohammad Mirshahi 508.02—Procedures Mohammad Mirshahi

508.03—Measurement and Payment Mark E. Cacamis

SECTION 509—PATCHING HYDRAULIC CEMENT CONCRETE PAVEMENT Affan Habib

509.01—Description Affan Habib 509.02—Materials Affan Habib 509.03—Procedures Affan Habib

509.04—Measurement and Payment Affan Habib, Mark E. Cacamis

SECTION 510—RELOCATING OR MODIFYING EXISTING MISCELLANEOUS ITEMS Mohammad Mirshahi

510.01—Description Mohammad Mirshahi 510.02—Materials Mohammad Mirshahi 510.03—Procedures Mohammad Mirshahi

510.04—Measurement and Payment Mark E. Cacamis SECTION 511—ALLAYING DUST Mohammad Mirshahi

511.01—Description Mohammad Mirshahi 511.02—Procedures Mohammad Mirshahi

511.03—Measurement and Payment Mark E. Cacamis SECTION 512—MAINTAINING TRAFFIC Robert E. O'Connor

512.01—Description Robert E. O'Connor 512.02—Materials Robert E. O'Connor 512.03—Procedures Robert E. O'Connor

512.04—Measurement and Payment Robert E. O'Connor, Mark E. Cacamis SECTION 513—MOBILIZATION Mark E. Cacamis

513.01—Description Mark E. Cacamis

513.02—Measurement and Payment Mark E. Cacamis SECTION 514 – FIELD OFFICE Mark E. Cacamis

514.01—Description Mark E. Cacamis 514.02—Procedures Mark E. Cacamis

514.03—Measurement and Payment Mark E. Cacamis SECTION 515—PLANING PAVEMENT Mark E. Cacamis

515.01—Description Mark E. Cacamis 515.02—Procedures Mark E. Cacamis

515.03—Measurement and Payment Mark E. Cacamis SECTION 516—DEMOLITION OF BUILDINGS AND CLEARING PARCELS Mohammad Mirshahi

516.01—Description Mohammad Mirshahi 516.02—Procedures Mohammad Mirshahi

516.03—Measurement and Payment Mohammad Mirshahi SECTION 517—CONTRACTOR CONSTRUCTION SURVEYING Mohammad Mirshahi

517.01—Description Mohammad Mirshahi 517.02—General Requirements Mohammad Mirshahi

Page 24: CONSTRUCTION DIVISION (CD)

IIM-CD-2013-16.01 August 1, 2013 Page 24 of 29

24

517.03—Contractor Responsibility for Examination of Data Mohammad Mirshahi 517.04—Construction (C) projects Mohammad Mirshahi 517.05—Minimum Plan (M) projects Mohammad Mirshahi

517.06—Measurement and payment Mohammad Mirshahi

Page 25: CONSTRUCTION DIVISION (CD)

IIM-CD-2013-16.01 August 1, 2013 Page 25 of 29

25

SECTION 518—TRAINEES ON CONSTRUCTION PROJECTS Mark E. Cacamis 518.01—Description Mark E. Cacamis 518.02—Procedures Mark E. Cacamis

518.03—Measurement and Payment Mark E. Cacamis SECTION 519—SOUND BARRIER WALLS Larry G. Hedgepeth, Ashton D. Lawler

519.01—Description Larry G. Hedgepeth, Ashton D. Lawler

519.02—Materials Larry G. Hedgepeth, Ashton D. Lawler, T. Ed Darby

519.03—Procedures Larry G. Hedgepeth, Ashton D. Lawler

519.04—Measurement and Payment Larry G. Hedgepeth, Ashton D. Lawler, Mark E. Cacamis

SECTION 520—WATER AND SANITARY SEWER FACILITIES Mohammad Mirshahi 520.01—Description Mohammad Mirshahi 520.02—Materials Mohammad Mirshahi 520.03—Procedures Mohammad Mirshahi 520.04—Testing Mohammad Mirshahi 520.05—Disinfecting Water Mains Mohammad Mirshahi

520.06—Measurement and Payment Mohammad Mirshahi SECTION 521—MAILBOX POST Mohammad Mirshahi

521.01—Description Mohammad Mirshahi 521.02—Materials Mohammad Mirshahi 521.03—Procedures Mohammad Mirshahi

521.04—Measurement and Payment Mohammad Mirshahi

DIVISION VI—ROADSIDE DEVELOPMENT SECTION 601—SELECTIVE TREE REMOVAL, TRIMMING, AND CLEANUP Emmet R. Heltzel

601.01—Description Emmet R. Heltzel 601.02—Materials Emmet R. Heltzel 601.03—Procedures Emmet R. Heltzel

601.04—Measurement and Payment Emmet R. Heltzel SECTION 602—TOPSOIL Emmet R. Heltzel

602.01—Description Emmet R. Heltzel 602.02—Materials Emmet R. Heltzel 602.03—Procedures Emmet R. Heltzel

602.04—Measurement and Payment Emmet R. Heltzel SECTION 603—SEEDING Emmet R. Heltzel

603.01—Description Emmet R. Heltzel 603.02—Materials Emmet R. Heltzel 603.03—Procedures Emmet R. Heltzel

603.04—Measurement and Payment Emmet R. Heltzel SECTION 604—SODDING Emmet R. Heltzel

604.01—Description Emmet R. Heltzel 604.02—Materials Emmet R. Heltzel 604.03—Procedures Emmet R. Heltzel

Page 26: CONSTRUCTION DIVISION (CD)

IIM-CD-2013-16.01 August 1, 2013 Page 26 of 29

26

604.04—Measurement and Payment Emmet R. Heltzel

Page 27: CONSTRUCTION DIVISION (CD)

IIM-CD-2013-16.01 August 1, 2013 Page 27 of 29

27

SECTION 605—PLANTING Emmet R. Heltzel 605.01—Description Emmet R. Heltzel

605.02—Materials Emmet R. Heltzel

605.03—Procedures Emmet R. Heltzel 605.04—Care of Plants Emmet R. Heltzel 605.05—Establishment Period Emmet R. Heltzel 605.06—Guarantee Emmet R. Heltzel

605.07—Measurement and Payment Emmet R. Heltzel SECTION 606—SOIL RETENTION COVERINGS Emmet R. Heltzel

606.01—Description Emmet R. Heltzel 606.02—Materials Emmet R. Heltzel 606.03—Procedures Emmet R. Heltzel

606.04—Measurement and Payment Emmet R. Heltzel SECTION 607—HERBICIDE SPRAYING Emmet R. Heltzel

607.01—Description Emmet R. Heltzel 607.02—Materials Emmet R. Heltzel 607.03—Procedures Emmet R. Heltzel

607.04—Measurement and Payment Emmet R. Heltzel SECTION 608—MOWING Emmet R. Heltzel

608.01—Description Emmet R. Heltzel 608.02—Equipment Emmet R. Heltzel

608.03—Measurement and Payment Emmet R. Heltzel SECTION 609—TREE WELLS AND TREE WALLS Emmet R. Heltzel

609.01—Description Emmet R. Heltzel 609.02—Materials Emmet R. Heltzel 609.03—Procedures Emmet R. Heltzel

609.04—Measurement and Payment Emmet R. Heltzel SECTION 610—GABIONS Mohammad Mirshahi

610.01—Description Mohammad Mirshahi 610.02—Materials Carl P. Benson 610.03—Procedures Mohammad Mirshahi

610.04—Measurement and Payment Mohammad Mirshahi

DIVISION VII—TRAFFIC CONTROL DEVICE

SECTION 700—GENERAL Vanloan Q. Nguyen, Karl W. Larson 700.01—Description Vanloan Q. Nguyen 700.02—Materials Vanloan Q. Nguyen 700.03—Working Drawings Vanloan Q. Nguyen 700.04—Procedures Vanloan Q. Nguyen

700.05—Measurement and Payment Vanloan Q. Nguyen, Mark E. Cacamis SECTION 701—TRAFFIC SIGNS Vanloan Q. Nguyen, Karl W. Larson

701.01—Description Vanloan Q. Nguyen 701.02—Materials Vanloan Q. Nguyen 701.03—Procedures Vanloan Q. Nguyen

Page 28: CONSTRUCTION DIVISION (CD)

IIM-CD-2013-16.01 August 1, 2013 Page 28 of 29

28

701.04—Measurement and Payment Vanloan Q. Nguyen, Mark E. Cacamis

Page 29: CONSTRUCTION DIVISION (CD)

IIM-CD-2013-16.01 August 1, 2013 Page 29 of 29

29

SECTION 702—DELINEATORS Vanloan Q. Nguyen

702.01—Description Vanloan Q. Nguyen 702.02—Materials Vanloan Q. Nguyen 702.03—General Requirements Vanloan Q. Nguyen 702.04—Procedures Vanloan Q. Nguyen

702.05—Measurement and Payment Vanloan Q. Nguyen, Mark E. Cacamis SECTION 703—TRAFFIC SIGNALS Vanloan Q. Nguyen, Karl W. Larson

703.01—Description Vanloan Q. Nguyen 703.02—Equipment Vanloan Q. Nguyen 703.03—Procedures Vanloan Q. Nguyen

703.04—Measurement and Payment Vanloan Q. Nguyen, Mark E. Cacamis SECTION 704—PAVEMENT MARKINGS AND MARKERS Vanloan Q. Nguyen

704.01—Description Vanloan Q. Nguyen 704.02—Materials Vanloan Q. Nguyen 704.03—Procedures Vanloan Q. Nguyen

704.04—Measurement and Payment Vanloan Q. Nguyen, Mark E. Cacamis

SECTION 705—LIGHTING SYSTEMS Vanloan Q. Nguyen, Karl W. Larson 705.01—Description Vanloan Q. Nguyen 705.02—Materials Vanloan Q. Nguyen 705.03—Procedures Vanloan Q. Nguyen

705.04—Measurement and Payment Vanloan Q. Nguyen, Mark E. Cacamis Revised 10.26.12- Deleted non-PE assignee.