IIM-CD-2013-16.01 August 1, 2013 Page 1 of 29
1
VIRGINIA DEPARTMENT OF TRANSPORTATION
CONSTRUCTION DIVISION (CD) INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM (IIM)
GENERAL SUBJECT:
SPECIFICATIONS
NUMBER: IIM-CD-2013-16.01
SPECIFIC SUBJECT:
AUTHORIZED REPRESENTATIVES OF THE CHIEF ENGINEER
DATE: August 1, 2013
SUPERCEDES: CD-2012-01
APPROVED:
Signature On File --------------------------------------------------
Mark E. Cacamis, P.E., CCM State Construction Engineer
DATE: August 1, 2013
DIRECTED TO: All users of the Road and Bridge Specifications.
PURPOSE: To authorize representatives of the Chief Engineer to fulfill the requirements of the Road and Bridge Specifications.
BACKGROUND: The Road and Bridge Specifications defines Engineer as:
“The Chief Engineer, as designated by the Commonwealth Transportation Commissioner, who acts directly or through his duly authorized representative(s) [emphasis added] and who is responsible for highway design, construction, and maintenance. The Engineer, or his representative(s), [emphasis added] acts within the scope of the particular duties assigned to him or the authority given to him by the Code of Virginia, the Commonwealth Transportation Commissioner, these Specifications, supplemental specifications, and the Contract Documents.”
IIM-CD-2013-16.01 August 1, 2013 Page 2 of 29
2
RESPONSIBILITIES OF REGISTERED PROFFESSIONAL ENGINEERS:
"Direct control and personal supervision," shall be that degree of supervision by a person overseeing the work of another whereby the supervisor has both control over and detailed professional knowledge of the work prepared under his supervision and words and phrases of similar import mean that the professional shall have control over the decisions on technical matters of policy and design, and exercises his professional judgment in all professional matters that are embodied in the work and the drawings, specifications [emphasis added], or other documents involved in the work;…” 18VAC10-20-10. Definitions, Regulations, Board of Architects, Professional Engineers, Land Surveyors, Certified Interior Designers & Landscape Architects
DIRECTIVE:
Those Registered Professional Engineers noted herein are the authorized representative of the Chief Engineer. With assistance from subject matter experts, they are responsible for the development and maintenance of their respective section(s) of the Road and Bridge Specifications in current and future editions, associated special provisions, special provision copied notes, supplemental specifications, and revisions.
AUTHORIZED REPRESENTATIVES
SPECIFICATION SECTION REGISTERED
PROFESSIONAL ENGINEER
DIVISION I-GENERAL PROVISIONS SECTION 101—DEFINITIONS OF ABBREVIATIONS, Mark E. Cacamis 101.01—Abbreviations and Acronyms Mark E. Cacamis
101.02—Terms Mark E. Cacamis
SECTION 102—BIDDING REQUIREMENTS AND CONDITIONS Mark E. Cacamis
102.01—Prequalification of Bidders Mark E. Cacamis
102.02—Content of Proposal Mark E. Cacamis
102.03—Interpretation of Quantities in Proposal Mark E. Cacamis
102.04—Examination of Site of Work and Proposal Mark E. Cacamis
IIM-CD-2013-16.01 August 1, 2013 Page 3 of 29
3
102.05—Preparation of Bid Mark E. Cacamis
102.06—Irregular Bids Mark E. Cacamis
102.07—Proposal Guaranty Mark E. Cacamis
102.08—Disqualification of Bidder Mark E. Cacamis
102.09—Submission of Bid Mark E. Cacamis
102.10—Withdrawal of Bid Mark E. Cacamis 102.11—eVA Business-To-Government Vendor Registration Mark E. Cacamis
102.12—Public Opening of Bids Mark E. Cacamis
SECTION 103—AWARD AND EXECUTION OF CONTRACTS Mark E. Cacamis
103.01—Consideration of Bids Mark E. Cacamis
103.02—Award of Contract Mark E. Cacamis
103.03—Cancellation of Award Mark E. Cacamis
103.04—Forfeiture of Proposal Guaranty Mark E. Cacamis
103.05—Requirements of Contract Bond Mark E. Cacamis
103.06—Contract Documents Mark E. Cacamis
103.07—Failure to Furnish Bonds or Certificate of Insurance Mark E. Cacamis
103.08—Contract Audit Mark E. Cacamis
103.09—Execution of Contract Mark E. Cacamis
SECTION 104—SCOPE OF WORK Mark E. Cacamis
104.01—Intent of Contract Mark E. Cacamis
104.02—Alteration of Quantities or Character of Work Mark E. Cacamis
104.03—Differing Site Conditions Mark E. Cacamis
SECTION 105—CONTROL OF WORK Mark E. Cacamis
105.01—Notice to Proceed Mark E. Cacamis
105.02—Pre-Construction Conference Mark E. Cacamis
105.03—Authorities of Project Personnel Mark E. Cacamis
105.04—Gratuities Mark E. Cacamis
105.05—Character of Workers, Work Methods, and Equipment Mark E. Cacamis
105.06—Subcontracting Mark E. Cacamis
105.07—Cooperation of Contractor Mark E. Cacamis
105.08—Cooperation with Regard to Utilities Mark E. Cacamis
105.09—Cooperation among Contractors Mark E. Cacamis
105.10—Plans and Working Drawings Mark E. Cacamis, Julius F.J. Volgyi
105.11—Conformity with Plans and Specifications Mark E. Cacamis, Julius F.J. Volgyi
IIM-CD-2013-16.01 August 1, 2013 Page 4 of 29
4
105.12—Coordination of Plans, Standard Drawings, Specifications, Supplemental Specifications, Special Provisions, and Special Provision Copied Notes Mark E. Cacamis
105.13—State Force Construction Surveying Mark E. Cacamis
105.14—Maintenance During Construction Mark E. Cacamis
105.15—Removing and Disposing of Structures and Obstructions Mark E. Cacamis
105.16—Cleanup Mark E. Cacamis
105.17—Inspection of Work Mark E. Cacamis
105.18—Removal of Unacceptable and Unauthorized Work Mark E. Cacamis
105.19—Submission and Disposition of Claims Mark E. Cacamis
SECTION 106—CONTROL OF MATERIAL Mark E. Cacamis
106.01—Source of Supply and Quality Requirements Mark E. Cacamis, William R. Bailey
106.02—Material Delivery Mark E. Cacamis, William R. Bailey
106.03—Local Material Sources (Pits and Quarries) Mark E. Cacamis , Carl P. Benson
106.04—Disposal Areas Mark E. Cacamis
106.05—Rights for and Use of Materials Found on Project Mark E. Cacamis
106.06—Samples, Tests, and Cited Specifications Mark E. Cacamis, William R. Bailey
106.07—Plant Inspection Mark E. Cacamis, William R. Bailey
106.08—Storing Materials Mark E. Cacamis
106.09—Handling Materials Mark E. Cacamis, William R. Bailey
106.10—Unacceptable Materials Mark E. Cacamis , Carl P. Benson
106.11—Material Furnished by the Department Mark E. Cacamis
106.12—Critical Materials Mark E. Cacamis, Charles A. Babish
SECTION 107—LEGAL RESPONSIBILITIES Mark E. Cacamis
107.01—Laws To Be Observed Mark E. Cacamis
107.02—Permits, Certificates, and Licenses Mark E. Cacamis, Mohammad Mirshahi
107.03—Federal-Aid Provisions Mark E. Cacamis
107.04—Furnishing Right of Way Mark E. Cacamis
IIM-CD-2013-16.01 August 1, 2013 Page 5 of 29
5
107.05—Patented Devices, Materials, and Processes Mark E. Cacamis
107.06—Personal Liability of Public Officials Mark E. Cacamis
107.07—No Waiver of Legal Rights Mark E. Cacamis
107.08—Protecting and Restoring Property and Landscape Mark E. Cacamis
107.09—Contractor’s Responsibility for Utility Property and Services Mark E. Cacamis
107.10—Restoration of Work Performed by Others Mark E. Cacamis
107.11—Use of Explosives Mark E. Cacamis
107.12—Responsibility for Damage Claims Mark E. Cacamis
107.13—Labor and Wages Mark E. Cacamis
107.14—Equal Employment Opportunity Mark E. Cacamis
107.15—Use of Minority Business Enterprises (MBEs) Mark E. Cacamis
107.16—Environmental Stipulations Mark E. Cacamis, Mohammad Mirshahi
107.17—Construction Safety and Health Standards Mark E. Cacamis
107.18—Sanitary Provisions Mark E. Cacamis
107.19—Railway-Highway Provisions Mark E. Cacamis
107.20—Construction Over or Adjacent to Navigable Waters Mark E. Cacamis
107.21—Size and Weight Limitations Mark E. Cacamis
SECTION 108—PROSECUTION AND PROGRESS OF WORK Mark E. Cacamis
108.01—Prosecution of Work Mark E. Cacamis
108.02—Limitation of Operations Mark E. Cacamis
108.03—Progress Schedule General Requirements Mark E. Cacamis
108.04—Determination and Extension of Contract Time Limit Mark E. Cacamis
108.05—Suspension of Work Ordered by the Engineer Mark E. Cacamis
108.06—Failure To Complete on Time Mark E. Cacamis
108.07—Default of Contract Mark E. Cacamis
108.08—Termination of Contract Mark E. Cacamis
108.09—Acceptance Mark E. Cacamis
108.10—Termination of Contractor’s Responsibilities Mark E. Cacamis
SECTION 109—MEASUREMENT AND PAYMENT Mark E. Cacamis
109.01—Measurement of Quantities Mark E. Cacamis
109.02—Plan Quantities Mark E. Cacamis
109.03—Scope of Payment Mark E. Cacamis
109.04—Compensation for Altered Quantities Mark E. Cacamis
109.05—Extra and Force Account Work Mark E. Cacamis
109.06—Common Carrier Rates Mark E. Cacamis
109.07—Eliminated Items Mark E. Cacamis
IIM-CD-2013-16.01 August 1, 2013 Page 6 of 29
6
109.08—Partial Payments Mark E. Cacamis
109.09—Payment for Material on Hand Mark E. Cacamis
IIM-CD-2013-16.01 August 1, 2013 Page 7 of 29
7
109.10—Final Payment Mark E. Cacamis
DDIIVVIISSIIOONN IIII——MMAATTEERRIIAALLSS
SECTION 200—GENERAL William R. Bailey
200.01—Description William R. Bailey
200.02—Conformance with Specifications William R. Bailey
200.03—General Sampling and Testing Procedures William R. Bailey
200.04—Acceptance Procedures for Aggregates William R. Bailey
200.05—Handling and Storing Aggregates William R. Bailey
200.06—Technician and Batcher Certification William R. Bailey SECTION 201—MINERAL FILLER Tommy P. Schinkel
201.01—Description Tommy P. Schinkel
201.02—Detail Requirements Tommy P. Schinkel SECTION 202—FINE AGGREGATE Larry J. Lundy
202.01—Description Larry J. Lundy 202.02—Materials Larry J. Lundy
202.03—Detail Requirements Larry J. Lundy SECTION 203—COARSE AGGREGATE Larry J. Lundy
203.01—Description Larry J. Lundy 203.02—Materials Larry J. Lundy
203.03—Detail Requirements Larry J. Lundy
SECTION 204—STONE FOR MASONRY, RIPRAP, POROUS BACKFILL, AND GABIONS John J. Schuler
204.01—Description John J. Schuler
204.02—Detail Requirements John J. Schuler SECTION 205—CRUSHER RUN AGGREGATE John J. Schuler
205.01—Description John J. Schuler 205.02—Materials John J. Schuler
205.03—Detail Requirements John J. Schuler SECTION 206—LIGHTWEIGHT AGGREGATE Larry J. Lundy
206.01—Description Larry J. Lundy
206.02—Detail Requirements Larry J. Lundy SECTION 207—SELECT MATERIAL John J. Schuler
207.01—Description John J. Schuler 207.02—Detail Requirements John J. Schuler 207.03—Job-Mix Formula for Select Material, Type I John J. Schuler 207.04—Mixing John J. Schuler 207.05—Acceptance of Select Material, Type I John J. Schuler 207.06—Referee System for Select Material, Type I John J. Schuler
207.07—Payment Adjustment System for Select Material, Type I John J. Schuler SECTION 208—SUBBASE AND AGGREGATE BASE MATERIAL John J. Schuler
IIM-CD-2013-16.01 August 1, 2013 Page 8 of 29
8
208.01—Description John J. Schuler 208.02—Materials John J. Schuler 208.03—Detail Requirements John J. Schuler 208.04—Job-Mix Formula John J. Schuler 208.05—Mixing John J. Schuler 208.06—Acceptance John J. Schuler 208.07—Referee System John J. Schuler
208.08—Payment Adjustment System John J. Schuler SECTION 209—OPEN-GRADED SHOULDER MATERIAL John J. Schuler
209.01—Description John J. Schuler 209.02—Detail Requirements John J. Schuler 209.03—Mixing John J. Schuler
SECTION 210—ASPHALT MATERIALS Robert Crandol, P.E. 210.01—Description Robert Crandol, P.E. 210.02—Materials Robert Crandol, P.E. 210.03—Detail Requirements Robert Crandol, P.E.
210.04—Payment Adjustment System Robert Crandol, P.E. SECTION 211—ASPHALT CONCRETE Robert Crandol, P.E.
211.01—Description Robert Crandol, P.E. 211.02—Materials Robert Crandol, P.E. 211.03—Job-Mix Formula Robert Crandol, P.E. 211.04—Asphalt Concrete Mixtures Robert Crandol, P.E. 211.05—Testing Robert Crandol, P.E. 211.06—Tests Robert Crandol, P.E. 211.07—Plant Inspection Robert Crandol, P.E. 211.08—Acceptance Robert Crandol, P.E. 211.09—Adjustment System Robert Crandol, P.E. 211.10—Referee System Robert Crandol, P.E. 211.11—Handling and Storing Aggregates Robert Crandol, P.E. 211.12—Asphalt Concrete Mixing Plant Robert Crandol, P.E. 211.13—Preparation of Mixture Robert Crandol, P.E. 211.14—Storage System Robert Crandol, P.E.
211.15—Initial Production Robert Crandol, P.E. SECTION 212—JOINT MATERIALS Larry J. Lundy , Milton B. Pritchett
212.01—Description Larry J. Lundy
212.02—Detail Requirements Larry J. Lundy
SECTION 213—DAMP-PROOFING AND WATERPROOFING MATERIALS Larry J. Lundy
213.01—Description Larry J. Lundy
213.02—Detail Requirements Larry J. Lundy SECTION 214—HYDRAULIC CEMENT Larry J. Lundy
214.01—Description Larry J. Lundy
214.02—Detail Requirements Larry J. Lundy SECTION 215—HYDRAULIC CEMENT CONCRETE ADMIXTURES Larry J. Lundy
215.01—Description Larry J. Lundy 215.02—Materials Larry J. Lundy
IIM-CD-2013-16.01 August 1, 2013 Page 9 of 29
9
215.03—Detail Requirements Larry J. Lundy SECTION 216—WATER FOR USE WITH CEMENT OR LIME Larry J. Lundy
216.01—Description Larry J. Lundy 216.02—Detail Requirements Larry J. Lundy
IIM-CD-2013-16.01 August 1, 2013 Page 10 of 29
10
SECTION 217—HYDRAULIC CEMENT CONCRETE Larry J. Lundy, Bruce G. Shepard 217.01—Description Larry J. Lundy 217.02—Materials Larry J. Lundy 217.03—Handling and Storing Materials Larry J. Lundy 217.04—Measurement of Materials Larry J. Lundy 217.05—Equipment Larry J. Lundy 217.06—Classification of Concrete Mixtures Larry J. Lundy 217.07—Proportioning Concrete Mixtures Larry J. Lundy 217.08—Acceptance Larry J. Lundy 217.09—Mixing Larry J. Lundy
217.10—Placement Limitations Larry J. Lundy SECTION 218—HYDRAULIC CEMENT MORTAR AND GROUT Larry J. Lundy
218.01—Description Larry J. Lundy 218.02—Materials Larry J. Lundy
218.03—Detail Requirements Larry J. Lundy SECTION 219—RIGHT-OF-WAY MONUMENTS Larry J. Lundy
219.01—Description Larry J. Lundy
219.02—Detail Requirements Larry J. Lundy SECTION 220—CONCRETE CURING MATERIALS Larry J. Lundy
220.01—Description Larry J. Lundy
220.02—Detail Requirements Larry J. Lundy SECTION 221—GUARDRAIL T. Ed Darby
221.01—Description T. Ed Darby
221.02—Detail Requirements T. Ed Darby SECTION 222—MASONRY UNITS Larry J. Lundy
222.01—Description Larry J. Lundy
222.02—Detail Requirements Larry J. Lundy
SECTION 223—STEEL REINFORCEMENT Larry J. Lundy, Julius F. J. Volgyi, Debbie Mangiaracina
223.01—Description Larry J. Lundy
223.02—Detail Requirements Larry J. Lundy, Jeff C. Hill, Andy M. Zickler
SECTION 224—CASTINGS William R, Bailey 224.01—Description William R, Bailey 224.02—Materials William R, Bailey
224.03—Detail Requirements William R, Bailey
SECTION 225—STEEL FORGINGS AND STEEL SHAFTING T. Ed Darby, Jeff C. Hill, Andy M. Zickler
225.01—Description T. Ed Darby
225.02—Detail Requirements T. Ed Darby
SECTION 226—STRUCTURAL STEEL T. Ed Darby, Jeff C. Hill, Andy M. Zickler
226.01—Description T. Ed Darby
226.02—Detail Requirements T. Ed Darby
SECTION 227—STEEL GRID FLOORING T. Ed Darby, Russell L. Martin, Jim W. Long
IIM-CD-2013-16.01 August 1, 2013 Page 11 of 29
11
227.01—Description T. Ed Darby 227.02—Materials T. Ed Darby
227.03—Detail Requirements T. Ed Darby
SECTION 228—STEEL PILES T. Ed Darby, Ashton D. Lawler, Mike J. Hall, Kevin K. Lee
228.01—Description T. Ed Darby
228.02—Detail Requirements T. Ed Darby SECTION 229—ALUMINUM ALLOY T. Ed Darby
229.01—Description T. Ed Darby
229.02—Detail Requirements T. Ed Darby SECTION 230—BRONZE AND COPPER ALLOY T. Ed Darby
230.01—Description T. Ed Darby
230.02—Detail Requirements T. Ed Darby
SECTION 231—PAINT William R. Bailey, Adam D. Matteo 231.01—Description William R. Bailey 231.02—Materials William R. Bailey
231.03—Detail Requirements William R. Bailey SECTION 232—PIPE AND PIPE ARCHES William R. Bailey, Charlie E. Pettie
232.01—Description William R. Bailey
232.02—Detail Requirements William R. Bailey SECTION 233—GALVANIZING William R. Bailey, Jeff C. Hill
233.01—Description William R. Bailey 233.02—Detail Requirements William R. Bailey
233.03—Repair of Galvanized Surfaces William R. Bailey
SECTION 234—GLASS BEADS FOR REFLECTORIZING TRAFFIC MARKINGS William R. Bailey
234.01—Description William R. Bailey
234.02—Detail Requirements William R. Bailey SECTION 235—RETROREFLECTORS William R. Bailey
235.01—Description William R. Bailey
235.02—Detail Requirements William R. Bailey SECTION 236—WOOD PRODUCTS William R. Bailey, Brian J. Silvis
236.01—Description T. Ed Darby
236.02—Detail Requirements T. Ed Darby SECTION 237—BEDDING MATERIAL AND BEARING PADS Larry J. Lundy
237.01—Description Larry J. Lundy
237.02—Detail Requirements Larry J. Lundy
SECTION 238—ELECTRICAL AND SIGNAL COMPONENTS Vanloan Q. Nguyen 238.01—Description Vanloan Q. Nguyen
238.02—Detail Requirements Vanloan Q. Nguyen SECTION 239—SODIUM CHLORIDE AND CALCIUM CHLORIDE William R. Bailey
239.01—Description William R. Bailey
239.02—Detail Requirements William R. Bailey SECTION 240—LIME John J. Schuler
IIM-CD-2013-16.01 August 1, 2013 Page 12 of 29
12
240.01—Description John J. Schuler
240.02—Detail Requirements John J. Schuler SECTION 241—FLY ASH Larry J. Lundy
241.01—Description Larry J. Lundy
241.02—Detail Requirements Larry J. Lundy SECTION 242—FENCES William R. Bailey, Charlie E. Pettie
242.01—Description William R. Bailey
242.02—Detail Requirements William R. Bailey SECTION 243—EPOXY-RESIN SYSTEMS Larry J. Lundy
243.01—Description Larry J. Lundy 243.02—Detail Requirements Larry J. Lundy 243.03—Handling and Storing Materials Larry J. Lundy
243.04—Acceptance Larry J. Lundy SECTION 244—ROADSIDE DEVELOPMENT MATERIALS Emmett R. Heltzel
244.01—Description Emmett R. Heltzel
244.02—Detail Requirements Emmett R. Heltzel
SECTION 245—GEOSYNTHETICS John J. Schuler, Ashton D. Lawler, Mike J. Hall, Kevin K. Lee
245.01—Description John J. Schuler 245.02—Detail Requirements John J. Schuler
245.03—Testing and Documentation John J. Schuler SECTION 246—PAVEMENT MARKING William R. Bailey
246.01—Description William R. Bailey
246.02—Detail Requirements William R. Bailey SECTION 247—REFLECTIVE SHEETING William R. Bailey
247.01—Description William R. Bailey 247.02—Detail Requirements William R. Bailey
247.03—Warranty Requirements TBD-Traffic Engineering SECTION 248—STONE MATRIX ASPHALT CONCRETE Tommy P. Schinkel
248.01—Description Tommy P. Schinkel 248.02—Materials Tommy P. Schinkel 248.03—Composition of SMA Mixture Tommy P. Schinkel 248.04—Acceptance Tommy P. Schinkel
248.05—SMA Mixing Plant Tommy P. Schinkel
DIVISION III—ROADWAY CONSTRUCTION SECTION 301—CLEARING AND GRUBBING Mohammad Mirshahi
301.01—Description Mohammad Mirshahi 301.02—Procedures Mohammad Mirshahi
301.03—Measurement and Payment Mark E. Cacamis
SECTION 302—DRAINAGE STRUCTURES John J. Schuler, Larry G. Hedgepeth, Karl W. Larson
302.01—Description John J. Schuler 302.02—Materials Larry J. Lundy 302.03—Procedures John J. Schuler
302.04—Measurement and Payment Mark E. Cacamis, John J. Schuler SECTION 303—EARTHWORK John J. Schuler
IIM-CD-2013-16.01 August 1, 2013 Page 13 of 29
13
303.01—Description John J. Schuler 303.02—Materials John J. Schuler 303.03—Erosion and Siltation Control Mohammad Mirshahi 303.04—Procedures Carl P. Benson 303.05—Tolerances John J. Schuler
303.06—Measurement and Payment Mark E. Cacamis
IIM-CD-2013-16.01 August 1, 2013 Page 14 of 29
14
SECTION 304—CONSTRUCTING DENSITY CONTROL STRIPS John J. Schuler 304.01—Description John J. Schuler 304.02—Materials John J. Schuler 304.03—Equipment John J. Schuler 304.04—Procedures John J. Schuler 304.05—Tolerances John J. Schuler
304.06—Measurement and Payment Mark E. Cacamis SECTION 305—SUBGRADE AND SHOULDERS John J. Schuler
305.01—Description John J. Schuler 305.02—Materials John J. Schuler 305.03—Procedures John J. Schuler
305.04—Measurement and Payment Mark E. Cacamis SECTION 306—LIME STABILIZATION John J. Schuler
306.01—Description John J. Schuler 306.02—Materials John J. Schuler 306.03—Procedures John J. Schuler
306.04—Measurement and Payment Mark E. Cacamis SECTION 307—HYDRAULIC CEMENT STABILIZATION John J. Schuler
307.01—Description John J. Schuler 307.02—Materials John J. Schuler 307.03—Field Laboratory John J. Schuler 307.04—Weather Limitations John J. Schuler 307.05—Procedures John J. Schuler
307.06—Measurement and Payment Mark E. Cacamis SECTION 308—SUBBASE COURSE John J. Schuler
308.01—Description John J. Schuler 308.02—Materials John J. Schuler 308.03—Procedures John J. Schuler 308.04—Tolerances John J. Schuler
308.05—Measurement and Payment Mark E. Cacamis SECTION 309—AGGREGATE BASE COURSE John J. Schuler
309.01—Description John J. Schuler 309.02—Materials John J. Schuler 309.03—Equipment John J. Schuler 309.04—Procedures John J. Schuler 309.05—Density Requirements John J. Schuler
309.06—Measurement and Payment Mark E. Cacamis, John J. Schuler SECTION 310—TACK COAT Tommy P. Schinkel
310.01—Description Tommy P. Schinkel 310.02—Materials Tommy P. Schinkel 310.03—Procedures Tommy P. Schinkel
310.04—Measurement and Payment Mark E. Cacamis, Tommy P. Schinkel SECTION 311—PRIME COAT Tommy P. Schinkel
311.01—Description Tommy P. Schinkel
IIM-CD-2013-16.01 August 1, 2013 Page 15 of 29
15
311.02—Materials Tommy P. Schinkel 311.03—Procedures Tommy P. Schinkel
311.04—Measurement and Payment Tommy P. Schinkel SECTION 312—SEAL COAT Mark E. Cacamis, Tommy P. Schinkel
312.01—Description Tommy P. Schinkel 312.02—Materials Tommy P. Schinkel 312.03—Equipment Tommy P. Schinkel 312.04—Procedures Tommy P. Schinkel
312.05—Measurement and Payment Mark E. Cacamis, Tommy P. Schinkel SECTION 313—ASPHALT-STABILIZED OPEN-GRADED MATERIAL Tommy P. Schinkel
313.01—Description Tommy P. Schinkel 313.02—Materials Tommy P. Schinkel 313.03—Proportioning Tommy P. Schinkel 313.04—Acceptance Tommy P. Schinkel 313.05—Placing limitations Tommy P. Schinkel 313.06—Procedures Tommy P. Schinkel
313.07—Measurement and Payment Mark E. Cacamis, Tommy P. Schinkel SECTION 314—PENETRATION SURFACE COURSES Tommy P. Schinkel
314.01—Description Tommy P. Schinkel 314.02—Materials Tommy P. Schinkel 314.03—Weather Limitations Tommy P. Schinkel 314.04—Equipment Tommy P. Schinkel 314.05—Procedures Tommy P. Schinkel
314.06—Measurement and Payment Mark E. Cacamis, Tommy P. Schinkel SECTION 315—ASPHALT CONCRETE PAVEMENT Tommy P. Schinkel
315.01—Description Tommy P. Schinkel 315.02—Materials Tommy P. Schinkel 315.03—Equipment Tommy P. Schinkel 315.04—Placement Limitations Tommy P. Schinkel 315.05—Procedures Tommy P. Schinkel 315.06—Pavement Samples Tommy P. Schinkel 315.07—Pavement Tolerances Tommy P. Schinkel
315.08—Measurement and Payment Mark E. Cacamis SECTION 316—HYDRAULIC CEMENT CONCRETE PAVEMENT Mohamad K. Elfino
316.01—Description Mohamad K. Elfino 316.02—Materials Larry J. Lundy 316.03—Equipment Mohamad K. Elfino 316.04—Procedures Mohamad K. Elfino 316.05—Thickness and Finished Grade Tolerances Mohamad K. Elfino
316.06—Measurement and Payment Mark E. Cacamis SECTION 317— STONE MATRIX ASPHALT CONCRETE PAVEMENT Tommy P. Schinkel
317.01—Description Tommy P. Schinkel 317.02—Materials Tommy P. Schinkel 317.03—Composition of SMA Mixture Tommy P. Schinkel 317.04—Acceptance Tommy P. Schinkel 317.05—SMA Mixing Plant Tommy P. Schinkel
IIM-CD-2013-16.01 August 1, 2013 Page 16 of 29
16
317.06—Weather Restrictions Tommy P. Schinkel 317.07—Placing and Finishing Tommy P. Schinkel 317.08—Compaction Tommy P. Schinkel 317.09—Trial Section Tommy P. Schinkel 317.10—Prepaving Conference Tommy P. Schinkel
317.11—Measurement and Payment Mark E. Cacamis
DIVISION IV—BRIDGES AND STRUCTURES
SECTION 401—STRUCTURE EXCAVATION Ashton D. Lawler, Deryck J. Krafft, Mike J. Hall, Kevin K. Lee
401.01—Description Ashton D. Lawler, Deryck J. Krafft, Mike J. Hall, Kevin K. Lee
401.02—Materials Ashton D. Lawler, Deryck J. Krafft, Mike J. Hall, Kevin K. Lee
401.03—Procedures Ashton D. Lawler, Deryck J. Krafft, Mike J. Hall, Kevin K. Lee
401.04—Measurement and Payment Mark E. Cacamis
SECTION 402—SHEET PILES Ashton D. Lawler, Mike J. Hall, Kevin K. Lee
402.01—Description Ashton D. Lawler, Mike J. Hall, Kevin K. Lee
402.02—Materials Ashton D. Lawler, Mike J. Hall, Kevin K. Lee, T. Ed Darby
402.03—Procedures Ashton D. Lawler, Mike J. Hall, Kevin K. Lee
402.04—Measurement and Payment Mark E. Cacamis
SECTION 403—BEARING PILES Ashton D. Lawler, Mike J. Hall, Kevin K. Lee
403.01—Description Ashton D. Lawler, Mike J. Hall, Kevin K. Lee
403.02—Materials Ashton D. Lawler, Mike J. Hall, Kevin K. Lee, T. Ed Darby
403.03—Pile Types Ashton D. Lawler, Mike J. Hall, Kevin K. Lee
403.04—Determination of Pile Lengths Ashton D. Lawler, Mike J. Hall, Kevin K. Lee
403.05—Order List Ashton D. Lawler, Mike J. Hall, Kevin K. Lee
403.06—Procedures Ashton D. Lawler, Mike J. Hall, Kevin K. Lee
403.07—Determination of Bearing Capacities Ashton D. Lawler, Mike J. Hall, Kevin K. Lee
403.08—Measurement and Payment Ashton D. Lawler, Mike J. Hall, Kevin K. Lee, Mark E. Cacamis
SECTION 404—HYDRAULIC CEMENT CONCRETE OPERATIONS Bruce G. Shepard, Deryck J. Krafft 404.01—Description Bruce G. Shepard, Deryck J. Krafft
404.02—Materials Bruce G. Shepard, Deryck J. Krafft, Larry J. Lundy
404.03—Procedures Bruce G. Shepard, Deryck J. Krafft 404.04—Bridge Deck Construction Bruce G. Shepard, Deryck J. Krafft 404.05—Expansion and Fixed Joints Bruce G. Shepard, Deryck J. Krafft
IIM-CD-2013-16.01 August 1, 2013 Page 17 of 29
17
404.06—Bridge Seat Bearing Areas Bruce G. Shepard, Deryck J. Krafft 404.07—Finishing Concrete Surfaces Bruce G. Shepard, Deryck J. Krafft
404.08—Measurement and Payment Bruce G. Shepard, Deryck J. Krafft, Mark E. Cacamis
IIM-CD-2013-16.01 August 1, 2013 Page 18 of 29
18
SECTION 405—PRESTRESSED CONCRETE Bruce G. Shepard, John H. Martin, Andy M. Zickler
405.01—Description Bruce G. Shepard, John H. Martin, Andy M. Zickler
405.02—Materials Bruce G. Shepard, John H. Martin, Andy M. Zickler, Larry J. Lundy
405.03—Plant Review Bruce G. Shepard, John H. Martin, Andy M. Zickler
405.04—Concrete Controls Bruce G. Shepard, John H. Martin, Andy M. Zickler
405.05—Procedures Bruce G. Shepard, John H. Martin, Andy M. Zickler
405.06—Tolerances Bruce G. Shepard, John H. Martin, Andy M. Zickler
405.07—Measurement and Payment Bruce G. Shepard, John H. Martin, Andy M. Zickler, Mark E. Cacamis
SECTION 406—REINFORCING STEEL Julius F. J. Volgyi, Debbie Mangairacina
406.01—Description Julius F. J. Volgyi, Debbie Mangairacina
406.02—Materials Julius F. J. Volgyi, Debbie Mangairacina, Larry J. Lundy
406.03—Procedures Julius F. J. Volgyi, Debbie Mangairacina
406.04—Measurement and Payment Julius F. J. Volgyi, Debbie Mangairacina, Mark E. Cacamis
SECTION 407—STEEL STRUCTURES Jeff C. Hill, Andy M. Zickler 407.01—Description Jeff C. Hill, Andy M. Zickler
407.02—Materials Jeff C. Hill, Andy M. Zickler, T. Ed Darby
407.03—Working Drawings Jeff C. Hill, Andy M. Zickler 407.04—Fabrication Procedures Jeff C. Hill, Andy M. Zickler 407.05—Handling, Storing, and Shipping Materials Jeff C. Hill, Andy M. Zickler 407.06—Erection Procedures Jeff C. Hill, Andy M. Zickler
407.07—Measurement and Payment Jeff C. Hill, Andy M. Zickler, Mark E. Cacamis
SECTION 408—BEARING DEVICES AND ANCHORS Larry G. Hedgepeth 408.01—Description Larry G. Hedgepeth 408.02—Materials and Fabrication Larry G. Hedgepeth, T. Ed Darby 408.03—Procedures Larry G. Hedgepeth
408.04—Measurement and Payment Larry G. Hedgepeth SECTION 409—STEEL GRID FLOORS Russell L. Martin, Jim W. Long
409.01—Description Russell L. Martin, Jim W. Long
409.02—Materials Russell L. Martin, Jim W. Long, T. Ed Darby
409.03—Procedures Russell L. Martin, Jim W. Long
409.04—Measurement and Payment Russell L. Martin, Jim W. Long, Mark E. Cacamis
IIM-CD-2013-16.01 August 1, 2013 Page 19 of 29
19
SECTION 410—RAILINGS AND PARAPETS Julius F. J. Volgyi, Russell L. Martin, Andy M. Zickler
410.01—Description Julius F. J. Volgyi, Russell L. Martin, Andy M. Zickler
410.02—Materials Julius F. J. Volgyi, Russell L. Martin, Andy M. Zickler, T.Ed Darby
410.03—Procedures Julius F. J. Volgyi, Russell L. Martin, Andy M. Zickler
410.04—Measurement and Payment Julius F. J. Volgyi, Russell L. Martin, Andy M. Zickler, Mark E. Cacamis
SECTION 411—PROTECTIVE COATING OF METAL IN STRUCTURES Adam D. Matteo, Milton B. Pritcett,
411.01—Description Adam D. Matteo, Milton B. Pritcett,
411.02—Materials Adam D. Matteo, Milton B. Pritcett,
411.03—Certifications Adam D. Matteo, Milton B. Pritcett,
411.04—General Surface Preparation and Application Standards Adam D. Matteo, Milton B. Pritcett,
411.05—Existing Structures Adam D. Matteo, Milton B. Pritcett,
411.06—New Structures Adam D. Matteo, Milton B. Pritcett,
411.07—Galvanized Surfaces Adam D. Matteo, Milton B. Pritcett,
411.08—Environmental Protection Adam D. Matteo, Milton B. Pritcett,
411.09—Health and Safety Adam D. Matteo, Milton B. Pritcett,
411.10—Measurement and Payment Adam D. Matteo, Milton B. Pritcett,
SECTION 412—WIDENING, REPAIRING, AND RECONSTRUCTING Claude S. Napier, Adam D. Matteo, Deryck J. Krafft, Andy M. Zickler
412.01—Description Claude S. Napier, Adam D. Matteo, Deryck J. Krafft, Andy M. Zickler
412.02—Materials
Claude S. Napier, Adam D. Matteo, Deryck J. Krafft, Andy M. Zickler, Larry J. Lundy
412.03—Procedures Claude S. Napier, Adam D. Matteo, Deryck J. Krafft, Andy M. Zickler
412.04—Measurement and Payment
Claude S. Napier, Adam D. Matteo, Deryck J. Krafft, Andy M. Zickler, Mark E. Cacamis
SECTION 413—DISMANTLING AND REMOVING EXISTING STRUCTURES OR REMOVING PORTIONS OF EXISTING STRUCTURES
Claude S. Napier, Adam D. Matteo, Deryck J. Krafft
413.01—Description Claude S. Napier, Adam D. Matteo, Deryck J. Krafft
413.02—Procedures Claude S. Napier, Adam D. Matteo, Deryck J. Krafft
IIM-CD-2013-16.01 August 1, 2013 Page 20 of 29
20
413.03—Measurement and Payment Claude S. Napier, Adam D. Matteo, Deryck J. Krafft, Mark E. Cacamis
IIM-CD-2013-16.01 August 1, 2013 Page 21 of 29
21
SECTION 414—RIPRAP Charlie S. Pettie 414.01—Description Charlie S. Pettie 414.02—Materials Charlie S. Pettie
414.03—Procedures Charlie S. Pettie
414.04—Measurement and Payment Charlie S. Pettie, Mark E. Cacamis SECTION 415—CONCRETE SLOPE PROTECTION Charlie S. Pettie
415.01—Description Charlie S. Pettie 415.02—Materials Charlie S. Pettie 415.03—Procedures Charlie S. Pettie, Larry J. Lundy
415.04—Measurement and Payment Charlie S. Pettie, Mark E. Cacamis SECTION 416—WATERPROOFING Charlie S. Pettie
416.01—Description Charlie S. Pettie 416.02—Materials Charlie S. Pettie, Larry J. Lundy 416.03—Procedures Charlie S. Pettie
416.04—Measurement and Payment Charlie S. Pettie, Mark E. Cacamis SECTION 417—DAMP-PROOFING
417.01—Description Larry J. Lundy 417.02—Materials Larry J. Lundy 417.03—Procedures Larry J. Lundy
417.04—Measurement and Payment Mark E. Cacamis SECTION 418—TIMBER STRUCTURES Brian J. Silvis
418.01—Description Brian J. Silvis 418.02—Materials Brian J. Silvis, T. Ed Darby 418.03—Procedures Brian J. Silvis
418.04—Measurement and Payment Brian J. Silvis, Mark E. Cacamis SECTION 419—BRIDGE CONDUIT SYSTEMS AND LIGHTING SYSTEMS Annette F. Adams
419.01—Description Annette F. Adams 419.02—Materials Annette F. Adams 419.03—Procedures Annette F. Adams
419.04—Measurement and Payment Annette F. Adams, Mark E. Cacamis SECTION 420—PREFORMED ELASTOMERIC JOINT SEALER Milton B. Pritchett
420.01—Description Milton B. Pritchett 420.02—Materials Milton B. Pritchett, Larry J. Lundy 420.03—Procedures Milton B. Pritchett
420.04—Measurement and Payment Milton B. Pritchett, Mark E. Cacamis SECTION 421—ELASTOMERIC EXPANSION DAMS Milton B. Pritchett
421.01—Description Milton B. Pritchett 421.02—Materials Milton B. Pritchett, Larry J. Lundy 421.03—Procedures Milton B. Pritchett
421.04—Measurement and Payment Milton B. Pritchett, Mark E. Cacamis
SECTION 422—NAVIGATION LIGHTS Annette F. Adams, Jim W. Long 422.01—Description Annette F. Adams, Jim W. Long
IIM-CD-2013-16.01 August 1, 2013 Page 22 of 29
22
422.02—Materials Annette F. Adams, Jim W. Long 422.03—Procedures Annette F. Adams, Jim W. Long
422.04—Measurement and Payment Annette F. Adams, Jim W. Long, Mark E. Cacamis
DIVISION V—INCIDENTAL CONSTRUCTION
SECTION 501—UNDERDRAINS Affan Habib, Ashton D. Lawler, Mike J. Hall, Kevin K. Lee
501.01—Description Affan Habib, Ashton D. Lawler, Mike J. Hall, Kevin K. Lee
501.02—Materials Affan Habib, Ashton D. Lawler, Mike J. Hall, Kevin K. Lee
501.03—Procedures Affan Habib, Ashton D. Lawler, Mike J. Hall, Kevin K. Lee
501.04—Measurement and Payment Affan Habib, Ashton D. Lawler, Mike J. Hall, Kevin K. Lee, Mark E. Cacamis
SECTION 502—INCIDENTAL CONCRETE ITEMS Mohammad Mirshahi 502.01—Description Mohammad Mirshahi 502.02—Materials Larry J. Lundy 502.03—Procedures Contact Mohammad Mirshahi
502.04—Measurement and Payment Mark E. Cacamis
SECTION 503—Reserved for Future Use SECTION 504—SIDEWALKS, STEPS, AND HANDRAILS
504.01—Description Mohammad Mirshahi
504.02—Materials Larry J. Lundy 504.03—Procedures Mohammad Mirshahi
504.04—Measurement and Payment Mark E. Cacamis SECTION 505—GUARDRAIL AND STEEL MEDIAN BARRIERS Julius F. J. Volgyi, Russell L. Martin
505.01—Description Julius F. J. Volgyi, Russell L. Martin
505.02—Materials Julius F. J. Volgyi, Russell L. Martin, T. Ed Darby
505.03—Procedures Julius F. J. Volgyi, Russell L. Martin
505.04—Measurement and Payment Julius F. J. Volgyi, Russell L. Martin, Mark E. Cacamis
SECTION 506—RETAINING WALLS Ashton D. Lawler, Mike J. Hall, Kevin K. Lee
506.01—Description Ashton D. Lawler, Mike J. Hall, Kevin K. Lee
506.02—Materials Ashton D. Lawler, Mike J. Hall, Kevin K. Lee
506.03—Procedures Ashton D. Lawler, Mike J. Hall, Kevin K. Lee
506.04—Measurement and Payment Ashton D. Lawler, Mike J. Hall, Kevin K. Lee, Mark E. Cacamis
SECTION 507—FENCES Charlie S. Pettie 507.01—Description Charlie S. Pettie 507.02—Materials Charlie S. Pettie, William R. Bailey
507.03—Procedures Charlie S. Pettie
507.04—Measurement and Payment Charlie S. Pettie, Mark E. Cacamis
IIM-CD-2013-16.01 August 1, 2013 Page 23 of 29
23
SECTION 508—DEMOLITION OF PAVEMENT AND OBSCURING ROADWAY Mohammad Mirshahi
508.01—Description Mohammad Mirshahi 508.02—Procedures Mohammad Mirshahi
508.03—Measurement and Payment Mark E. Cacamis
SECTION 509—PATCHING HYDRAULIC CEMENT CONCRETE PAVEMENT Affan Habib
509.01—Description Affan Habib 509.02—Materials Affan Habib 509.03—Procedures Affan Habib
509.04—Measurement and Payment Affan Habib, Mark E. Cacamis
SECTION 510—RELOCATING OR MODIFYING EXISTING MISCELLANEOUS ITEMS Mohammad Mirshahi
510.01—Description Mohammad Mirshahi 510.02—Materials Mohammad Mirshahi 510.03—Procedures Mohammad Mirshahi
510.04—Measurement and Payment Mark E. Cacamis SECTION 511—ALLAYING DUST Mohammad Mirshahi
511.01—Description Mohammad Mirshahi 511.02—Procedures Mohammad Mirshahi
511.03—Measurement and Payment Mark E. Cacamis SECTION 512—MAINTAINING TRAFFIC Robert E. O'Connor
512.01—Description Robert E. O'Connor 512.02—Materials Robert E. O'Connor 512.03—Procedures Robert E. O'Connor
512.04—Measurement and Payment Robert E. O'Connor, Mark E. Cacamis SECTION 513—MOBILIZATION Mark E. Cacamis
513.01—Description Mark E. Cacamis
513.02—Measurement and Payment Mark E. Cacamis SECTION 514 – FIELD OFFICE Mark E. Cacamis
514.01—Description Mark E. Cacamis 514.02—Procedures Mark E. Cacamis
514.03—Measurement and Payment Mark E. Cacamis SECTION 515—PLANING PAVEMENT Mark E. Cacamis
515.01—Description Mark E. Cacamis 515.02—Procedures Mark E. Cacamis
515.03—Measurement and Payment Mark E. Cacamis SECTION 516—DEMOLITION OF BUILDINGS AND CLEARING PARCELS Mohammad Mirshahi
516.01—Description Mohammad Mirshahi 516.02—Procedures Mohammad Mirshahi
516.03—Measurement and Payment Mohammad Mirshahi SECTION 517—CONTRACTOR CONSTRUCTION SURVEYING Mohammad Mirshahi
517.01—Description Mohammad Mirshahi 517.02—General Requirements Mohammad Mirshahi
IIM-CD-2013-16.01 August 1, 2013 Page 24 of 29
24
517.03—Contractor Responsibility for Examination of Data Mohammad Mirshahi 517.04—Construction (C) projects Mohammad Mirshahi 517.05—Minimum Plan (M) projects Mohammad Mirshahi
517.06—Measurement and payment Mohammad Mirshahi
IIM-CD-2013-16.01 August 1, 2013 Page 25 of 29
25
SECTION 518—TRAINEES ON CONSTRUCTION PROJECTS Mark E. Cacamis 518.01—Description Mark E. Cacamis 518.02—Procedures Mark E. Cacamis
518.03—Measurement and Payment Mark E. Cacamis SECTION 519—SOUND BARRIER WALLS Larry G. Hedgepeth, Ashton D. Lawler
519.01—Description Larry G. Hedgepeth, Ashton D. Lawler
519.02—Materials Larry G. Hedgepeth, Ashton D. Lawler, T. Ed Darby
519.03—Procedures Larry G. Hedgepeth, Ashton D. Lawler
519.04—Measurement and Payment Larry G. Hedgepeth, Ashton D. Lawler, Mark E. Cacamis
SECTION 520—WATER AND SANITARY SEWER FACILITIES Mohammad Mirshahi 520.01—Description Mohammad Mirshahi 520.02—Materials Mohammad Mirshahi 520.03—Procedures Mohammad Mirshahi 520.04—Testing Mohammad Mirshahi 520.05—Disinfecting Water Mains Mohammad Mirshahi
520.06—Measurement and Payment Mohammad Mirshahi SECTION 521—MAILBOX POST Mohammad Mirshahi
521.01—Description Mohammad Mirshahi 521.02—Materials Mohammad Mirshahi 521.03—Procedures Mohammad Mirshahi
521.04—Measurement and Payment Mohammad Mirshahi
DIVISION VI—ROADSIDE DEVELOPMENT SECTION 601—SELECTIVE TREE REMOVAL, TRIMMING, AND CLEANUP Emmet R. Heltzel
601.01—Description Emmet R. Heltzel 601.02—Materials Emmet R. Heltzel 601.03—Procedures Emmet R. Heltzel
601.04—Measurement and Payment Emmet R. Heltzel SECTION 602—TOPSOIL Emmet R. Heltzel
602.01—Description Emmet R. Heltzel 602.02—Materials Emmet R. Heltzel 602.03—Procedures Emmet R. Heltzel
602.04—Measurement and Payment Emmet R. Heltzel SECTION 603—SEEDING Emmet R. Heltzel
603.01—Description Emmet R. Heltzel 603.02—Materials Emmet R. Heltzel 603.03—Procedures Emmet R. Heltzel
603.04—Measurement and Payment Emmet R. Heltzel SECTION 604—SODDING Emmet R. Heltzel
604.01—Description Emmet R. Heltzel 604.02—Materials Emmet R. Heltzel 604.03—Procedures Emmet R. Heltzel
IIM-CD-2013-16.01 August 1, 2013 Page 26 of 29
26
604.04—Measurement and Payment Emmet R. Heltzel
IIM-CD-2013-16.01 August 1, 2013 Page 27 of 29
27
SECTION 605—PLANTING Emmet R. Heltzel 605.01—Description Emmet R. Heltzel
605.02—Materials Emmet R. Heltzel
605.03—Procedures Emmet R. Heltzel 605.04—Care of Plants Emmet R. Heltzel 605.05—Establishment Period Emmet R. Heltzel 605.06—Guarantee Emmet R. Heltzel
605.07—Measurement and Payment Emmet R. Heltzel SECTION 606—SOIL RETENTION COVERINGS Emmet R. Heltzel
606.01—Description Emmet R. Heltzel 606.02—Materials Emmet R. Heltzel 606.03—Procedures Emmet R. Heltzel
606.04—Measurement and Payment Emmet R. Heltzel SECTION 607—HERBICIDE SPRAYING Emmet R. Heltzel
607.01—Description Emmet R. Heltzel 607.02—Materials Emmet R. Heltzel 607.03—Procedures Emmet R. Heltzel
607.04—Measurement and Payment Emmet R. Heltzel SECTION 608—MOWING Emmet R. Heltzel
608.01—Description Emmet R. Heltzel 608.02—Equipment Emmet R. Heltzel
608.03—Measurement and Payment Emmet R. Heltzel SECTION 609—TREE WELLS AND TREE WALLS Emmet R. Heltzel
609.01—Description Emmet R. Heltzel 609.02—Materials Emmet R. Heltzel 609.03—Procedures Emmet R. Heltzel
609.04—Measurement and Payment Emmet R. Heltzel SECTION 610—GABIONS Mohammad Mirshahi
610.01—Description Mohammad Mirshahi 610.02—Materials Carl P. Benson 610.03—Procedures Mohammad Mirshahi
610.04—Measurement and Payment Mohammad Mirshahi
DIVISION VII—TRAFFIC CONTROL DEVICE
SECTION 700—GENERAL Vanloan Q. Nguyen, Karl W. Larson 700.01—Description Vanloan Q. Nguyen 700.02—Materials Vanloan Q. Nguyen 700.03—Working Drawings Vanloan Q. Nguyen 700.04—Procedures Vanloan Q. Nguyen
700.05—Measurement and Payment Vanloan Q. Nguyen, Mark E. Cacamis SECTION 701—TRAFFIC SIGNS Vanloan Q. Nguyen, Karl W. Larson
701.01—Description Vanloan Q. Nguyen 701.02—Materials Vanloan Q. Nguyen 701.03—Procedures Vanloan Q. Nguyen
IIM-CD-2013-16.01 August 1, 2013 Page 28 of 29
28
701.04—Measurement and Payment Vanloan Q. Nguyen, Mark E. Cacamis
IIM-CD-2013-16.01 August 1, 2013 Page 29 of 29
29
SECTION 702—DELINEATORS Vanloan Q. Nguyen
702.01—Description Vanloan Q. Nguyen 702.02—Materials Vanloan Q. Nguyen 702.03—General Requirements Vanloan Q. Nguyen 702.04—Procedures Vanloan Q. Nguyen
702.05—Measurement and Payment Vanloan Q. Nguyen, Mark E. Cacamis SECTION 703—TRAFFIC SIGNALS Vanloan Q. Nguyen, Karl W. Larson
703.01—Description Vanloan Q. Nguyen 703.02—Equipment Vanloan Q. Nguyen 703.03—Procedures Vanloan Q. Nguyen
703.04—Measurement and Payment Vanloan Q. Nguyen, Mark E. Cacamis SECTION 704—PAVEMENT MARKINGS AND MARKERS Vanloan Q. Nguyen
704.01—Description Vanloan Q. Nguyen 704.02—Materials Vanloan Q. Nguyen 704.03—Procedures Vanloan Q. Nguyen
704.04—Measurement and Payment Vanloan Q. Nguyen, Mark E. Cacamis
SECTION 705—LIGHTING SYSTEMS Vanloan Q. Nguyen, Karl W. Larson 705.01—Description Vanloan Q. Nguyen 705.02—Materials Vanloan Q. Nguyen 705.03—Procedures Vanloan Q. Nguyen
705.04—Measurement and Payment Vanloan Q. Nguyen, Mark E. Cacamis Revised 10.26.12- Deleted non-PE assignee.