Upload
emily-wagner
View
232
Download
0
Embed Size (px)
Citation preview
8/10/2019 Connectify Dispatch
1/38
1 Copyright 2014 EMC Corporation. All rights reserved. Copyright 2014 EMC Corporation. All rights reserved.
Copyright 2014 EMC Corporation. All rights reserved.
Partner Update21st Oct 2014
Copyright 2014 EMC Corporation. All rights reserved.
8/10/2019 Connectify Dispatch
2/38
2 Copyright 2014 EMC Corporation. All rights reserved. Copyright 2014 EMC Corporation. All rights reserved.
Agenda
Install Compliance Goal
8/10/2019 Connectify Dispatch
3/38
3 Copyright 2014 EMC Corporation. All rights reserved. Copyright 2014 EMC Corporation. All rights reserved.
8/10/2019 Connectify Dispatch
4/38
4 Copyright 2014 EMC Corporation. All rights reserved. Copyright 2014 EMC Corporation. All rights reserved.
APJ Install Compliance Goal What is Install Compliance Goal
An Install Compliance goal introduced in Q2 14 with the aim to encourage the field to ensure
products are installed as per EMC Best Practices . The tracking helps to increase Recently Installedsystems install compliance %.
What is MeasuredA single Target that measures install compliance per region. Percentage Compliant = (Exceptions / Total in Period) Qualifying period = Install date + 90 days Exclusion Period = Install date < 30 days (no other exceptions) Exception = Missing Code, missing Primary Contact, invalid Connection Record, missing Connect homeand missing Connected To.
How is it measured
Weekly Region Exception Reports available from:https://inside.emc.com/docs/DOC-54990
8/10/2019 Connectify Dispatch
5/38
5 Copyright 2014 EMC Corporation. All rights reserved. Copyright 2014 EMC Corporation. All rights reserved.
Tasks measured for Install compliance Goal1) Contact InformationPrimary and Secondary contact information of the end customer should be correctly updated.
2) Code Currency
Code should be upgraded to latest target code or to the customer approved code in case of global customers.Contact ASE / ASR / PM for additional information on the code levels. However, EOSL / missing / wrong codeupdation should be strictly avoided.
3) Connected TO (wherever applicable)
Connected TO is a SSID number for all the nodes connected in that cluster. This is applicable to all products likeAvamar and it should not be left blank.For Avamar: Using the CLI, mccli server show-prop | grep system ID
4) Valid RC
We should have a valid RC connectivity option of ESRS / email home. For all successful configuration, we should
have a test SR in SYR. If not CCAF process should be followed. Full procedure of CCAF should be followed.
5) RC Dial Home / Config
The system should be dialing home on a weekly basis. Date of last dial home will be checked. CheckHome / Config Home will be checked.
8/10/2019 Connectify Dispatch
6/38
6 Copyright 2014 EMC Corporation. All rights reserved. Copyright 2014 EMC Corporation. All rights reserved.
CCAF Process Engineer should explain the ESRS option during installation pre-work. Should send the related documents through email after the discussion. Engineer to provide the demo / presentation based on the need. Material is available in One EMC. Contact ASE / ASR / CSE for any assistance in explaining the process to customer. Explain the pre-requisites like port requirements, OS required to customer.
If no response within one week, please send the first reminder and copy EMC ASR /ASE.
Please call up customer before sending the email.
If no response even after 2 weeks, please send the second reminder and add CCAFform.
Please call up customer before sending the email. Explain the CCAF document process. Copy the respective ASR / ASE & CSE of the region / account. We need signed document or reply to the email where CCAF document was sent.
One CCAF document for one TLA. Multiple TLA in form is not allowed.
After getting the CCAF / confirmation email, please inform Iyaz Khan / PavithraGanapathy.
8/10/2019 Connectify Dispatch
7/38
7 Copyright 2014 EMC Corporation. All rights reserved. Copyright 2014 EMC Corporation. All rights reserved.
Template for closing the InstallDetails Required EMC CE / Partner inputs
Customer Name (in short)
System Serial Number
Code Level
Primary contact Name
Email id
Phone number
Alteranate Contact NameEmail id
Phone number
RC Type (ESRS/Email/CCAF)
Test RC SR
CCAF uploaded as per process Mention Refuser Name & Reason
Connected to SN (Avamar & RP)
Final Logs uploaded in the SR Yes or No
Logs upload Date Date mandatory
Site checked before power ON Yes or No
UAT Done Yes or No
8/10/2019 Connectify Dispatch
8/38
8 Copyright 2014 EMC Corporation. All rights reserved. Copyright 2014 EMC Corporation. All rights reserved.
APJ Install Compliance Trend
8/10/2019 Connectify Dispatch
9/38
9 Copyright 2014 EMC Corporation. All rights reserved. Copyright 2014 EMC Corporation. All rights reserved.
8/10/2019 Connectify Dispatch
10/38
10 Copyright 2014 EMC Corporation. All rights reserved. Copyright 2014 EMC Corporation. All rights reserved.
Install Compliance
8/10/2019 Connectify Dispatch
11/38
11 Copyright 2014 EMC Corporation. All rights reserved. Copyright 2014 EMC Corporation. All rights reserved.
Install Compliance Q4 Goal OverviewAim: Installation is complete when the system is updated withall relevant elements to:
facilitate smooth service request handling
reduce counter productivelyenhance customer experience.
Solution: a single target that measures installation compliance(completeness) for a defined set of metrics.
either all metrics are valid or installation is non-Compliant.
8/10/2019 Connectify Dispatch
12/38
12 Copyright 2014 EMC Corporation. All rights reserved. Copyright 2014 EMC Corporation. All rights reserved.
Install Compliance Q4 Goal OverviewTarget: This will be measured as a single regional target whereour aspiration is 100% success but in Q4 the regional target willbe set to 90%.
Measurement: metrics all need to be valid to be compliant: Code Level
Remote Connection record
Primary Contact and email address
ASR Name and ASR email
Connect-Home received for remotely-connected TLAs
TLA Connected To relationships where applicable
8/10/2019 Connectify Dispatch
13/38
13 Copyright 2014 EMC Corporation. All rights reserved. Copyright 2014 EMC Corporation. All rights reserved.
Install Compliance Q4 Goal OverviewGoal Measurement criteria:
Measurement begins when TLA is set to Install status in CSI
Non-Compliant TLAs
8/10/2019 Connectify Dispatch
14/38
14 Copyright 2014 EMC Corporation. All rights reserved. Copyright 2014 EMC Corporation. All rights reserved.
Install Compliance Summary Reporting Summary Page - all Product TLAs recently set to Install will
appear in the Summary report.
The Summary shows TLAcounts per product
Drill-down by clicking on a link
Geo, Region, and Districtreports available
8/10/2019 Connectify Dispatch
15/38
15 Copyright 2014 EMC Corporation. All rights reserved. Copyright 2014 EMC Corporation. All rights reserved.
Install Compliance Detail Reporting Detail Page each Product TLA shows details & issues
8/10/2019 Connectify Dispatch
16/38
16 Copyright 2014 EMC Corporation. All rights reserved. Copyright 2014 EMC Corporation. All rights reserved.
Install Compliance Detail Reporting Detail Page each Product TLA shows details & issues
8/10/2019 Connectify Dispatch
17/38
17 Copyright 2014 EMC Corporation. All rights reserved. Copyright 2014 EMC Corporation. All rights reserved.
Goal - CSI Connection Record Values
Connect-In Connect-Home
Compliant
Not CompliantCompliantCompliantCompliant
Not compliantNot compliant
CompliantNot compliant
CompliantCompliantCompliantCompliantCompliant
Not compliantNot compliantNot compliant
8/10/2019 Connectify Dispatch
18/38
18 Copyright 2014 EMC Corporation. All rights reserved. Copyright 2014 EMC Corporation. All rights reserved.
Goal intended to be ProactiveMetric Can these be completed Prior
setting Install in CSI?
Code Level Yes
Primary Contact and email address Yes
ASR Name and ASR email YesConnected To relationships(where applicable)
Yes although this is normally completed as partof an install form sent to IBG
Remote Connection record No - This should be set to Not Configured Set to Customer Refused if this is going to bethe final position ASAP and make sure CCAFprocess is followed.
Connect-Home received forremotely-connected TLAs
No - Can only be completed after theConnection Record update and physical installof the Connectivity
8/10/2019 Connectify Dispatch
19/38
19 Copyright 2014 EMC Corporation. All rights reserved. Copyright 2014 EMC Corporation. All rights reserved.
Proactive not Reactive Proactive means: (0- 30 days)
Planning before the actual install
Update CSI (Contacts, IB) before Install is considered complete
Install and test connectivity before Install is considered complete
Send Template & Raise PNT (after confirmation from EMC ) once all work is
complete
Reactive means: (31 180 days)
You didnt do the install so you may not know who at the customer you should be
talking to, so this can take additional time and add a degree of difficulty
If the customer is happy with the current connectivity status, changing it after
install is considerably harder and more time consuming
8/10/2019 Connectify Dispatch
20/38
20 Copyright 2014 EMC Corporation. All rights reserved. Copyright 2014 EMC Corporation. All rights reserved.
LinksDescription Link
ESRS Solution Tools and Reference https://inside.emc.com/docs/DOC-54534
ESRS Collateral & Resources https://inside.emc.com/docs/DOC-76305
CCAF Process, forms and repository http://gcsdocs.corp.emc.com/
8/10/2019 Connectify Dispatch
21/38
21 Copyright 2014 EMC Corporation. All rights reserved. Copyright 2014 EMC Corporation. All rights reserved.
Partner Process Training
8/10/2019 Connectify Dispatch
22/38
22 Copyright 2014 EMC Corporation. All rights reserved. Copyright 2014 EMC Corporation. All rights reserved.
Partner Process Training
Installation and Implementation Process Overview
Installation : Step 1 Physical Installation and configuration
Partner Engineer
Conduct Site Survey &
inventory check
Configure Remote
Support
Upgrade Box to latest
Code and Install
Create Product
Procedure Generator
Upload Config Files
To EMC, Eg. EIP1
Installation : Step 2 Transfer of Box to EMC and Admin Closure
Partner to fill in the PNT
Form for each box
Submit PSQ Survey
To the Customer
Implementation: Step 1 Configuration of hardware to customers Host
Create the Scope
Of Work
Testing and Hand
Over Training
Implement the
Scope of Work
Submit the Change
Control using CCA
Documentation
8/10/2019 Connectify Dispatch
23/38
23 Copyright 2014 EMC Corporation. All rights reserved. Copyright 2014 EMC Corporation. All rights reserved.
PNT Process
Partner Process Training
8/10/2019 Connectify Dispatch
24/38
24 Copyright 2014 EMC Corporation. All rights reserved. Copyright 2014 EMC Corporation. All rights reserved.
PNT stands for Partner Notifi cation Tool . This option is available to Partners for the notification to EMC of work performed -
such as platform installs, hardware upgrades, software upgrades, remote connections, and relocations.
Partner Process Training
Features of PNT
What is PNT?
8/10/2019 Connectify Dispatch
25/38
25 Copyright 2014 EMC Corporation. All rights reserved. Copyright 2014 EMC Corporation. All rights reserved.
Login to Partner Portal (www.emc.com/auth/partnerportal.htm) ->Services andSupport Delivery Resources
Partner Process Training
8/10/2019 Connectify Dispatch
26/38
26 Copyright 2014 EMC Corporation. All rights reserved. Copyright 2014 EMC Corporation. All rights reserved.
Partner Process Training
Select Quick Links-> EMC Services Partner Web
8/10/2019 Connectify Dispatch
27/38
27 Copyright 2014 EMC Corporation. All rights reserved. Copyright 2014 EMC Corporation. All rights reserved.
EMC Service Partner Web -> Tools & Forms
Available Product view dependsOn Partners Contract
Partner Process Training
8/10/2019 Connectify Dispatch
28/38
28 Copyright 2014 EMC Corporation. All rights reserved. Copyright 2014 EMC Corporation. All rights reserved.
Partner Process Training
Tools & Forms -> PNT Tool
8/10/2019 Connectify Dispatch
29/38
29 Copyright 2014 EMC Corporation. All rights reserved. Copyright 2014 EMC Corporation. All rights reserved.
Partner Process Training
8/10/2019 Connectify Dispatch
30/38
30 Copyright 2014 EMC Corporation. All rights reserved. Copyright 2014 EMC Corporation. All rights reserved.
Partner Process Training
8/10/2019 Connectify Dispatch
31/38
31 Copyright 2014 EMC Corporation. All rights reserved. Copyright 2014 EMC Corporation. All rights reserved.
Partner Process Training
8/10/2019 Connectify Dispatch
32/38
32 Copyright 2014 EMC Corporation. All rights reserved. Copyright 2014 EMC Corporation. All rights reserved.
Mandatory
Mandatory
Mandatory
Partner Process Training
8/10/2019 Connectify Dispatch
33/38
33 Copyright 2014 EMC Corporation. All rights reserved. Copyright 2014 EMC Corporation. All rights reserved.
Partner Process Training
8/10/2019 Connectify Dispatch
34/38
34 Copyright 2014 EMC Corporation. All rights reserved. Copyright 2014 EMC Corporation. All rights reserved.
Partner Process Training
8/10/2019 Connectify Dispatch
35/38
35 Copyright 2014 EMC Corporation. All rights reserved. Copyright 2014 EMC Corporation. All rights reserved.
Partner Process Training
Email Notification on the PNT Output New Partner Notification
8/10/2019 Connectify Dispatch
36/38
36 Copyright 2014 EMC Corporation. All rights reserved. Copyright 2014 EMC Corporation. All rights reserved.
Partner Process Training
Email Notification on the PNT Output Update
Email Notification on the PNT Output Closed
8/10/2019 Connectify Dispatch
37/38
37 Copyright 2014 EMC Corporation. All rights reserved. Copyright 2014 EMC Corporation. All rights reserved. Copyright 2014 EMC Corporation. All rights reserved. Copyright 2014 EMC Corporation. All rights reserved.
8/10/2019 Connectify Dispatch
38/38