    Agenda

    Install Compliance Goal

  • 8/10/2019 Connectify Dispatch

    3/38

    3 Copyright 2014 EMC Corporation. All rights reserved. Copyright 2014 EMC Corporation. All rights reserved.

  • 8/10/2019 Connectify Dispatch

    4/38

    4 Copyright 2014 EMC Corporation. All rights reserved. Copyright 2014 EMC Corporation. All rights reserved.

    APJ Install Compliance Goal What is Install Compliance Goal

    An Install Compliance goal introduced in Q2 14 with the aim to encourage the field to ensure

    products are installed as per EMC Best Practices . The tracking helps to increase Recently Installedsystems install compliance %.

    What is MeasuredA single Target that measures install compliance per region. Percentage Compliant = (Exceptions / Total in Period) Qualifying period = Install date + 90 days Exclusion Period = Install date < 30 days (no other exceptions) Exception = Missing Code, missing Primary Contact, invalid Connection Record, missing Connect homeand missing Connected To.

    How is it measured

    Weekly Region Exception Reports available from:https://inside.emc.com/docs/DOC-54990

  • 8/10/2019 Connectify Dispatch

    5/38

    5 Copyright 2014 EMC Corporation. All rights reserved. Copyright 2014 EMC Corporation. All rights reserved.

    Tasks measured for Install compliance Goal1) Contact InformationPrimary and Secondary contact information of the end customer should be correctly updated.

    2) Code Currency

    Code should be upgraded to latest target code or to the customer approved code in case of global customers.Contact ASE / ASR / PM for additional information on the code levels. However, EOSL / missing / wrong codeupdation should be strictly avoided.

    3) Connected TO (wherever applicable)

    Connected TO is a SSID number for all the nodes connected in that cluster. This is applicable to all products likeAvamar and it should not be left blank.For Avamar: Using the CLI, mccli server show-prop | grep system ID

    4) Valid RC

    We should have a valid RC connectivity option of ESRS / email home. For all successful configuration, we should

    have a test SR in SYR. If not CCAF process should be followed. Full procedure of CCAF should be followed.

    5) RC Dial Home / Config

    The system should be dialing home on a weekly basis. Date of last dial home will be checked. CheckHome / Config Home will be checked.

  • 8/10/2019 Connectify Dispatch

    6/38

    6 Copyright 2014 EMC Corporation. All rights reserved. Copyright 2014 EMC Corporation. All rights reserved.

    CCAF Process Engineer should explain the ESRS option during installation pre-work. Should send the related documents through email after the discussion. Engineer to provide the demo / presentation based on the need. Material is available in One EMC. Contact ASE / ASR / CSE for any assistance in explaining the process to customer. Explain the pre-requisites like port requirements, OS required to customer.

    If no response within one week, please send the first reminder and copy EMC ASR /ASE.

    Please call up customer before sending the email.

    If no response even after 2 weeks, please send the second reminder and add CCAFform.

    Please call up customer before sending the email. Explain the CCAF document process. Copy the respective ASR / ASE & CSE of the region / account. We need signed document or reply to the email where CCAF document was sent.

    One CCAF document for one TLA. Multiple TLA in form is not allowed.

    After getting the CCAF / confirmation email, please inform Iyaz Khan / PavithraGanapathy.

  • 8/10/2019 Connectify Dispatch

    7/38

    7 Copyright 2014 EMC Corporation. All rights reserved. Copyright 2014 EMC Corporation. All rights reserved.

    Template for closing the InstallDetails Required EMC CE / Partner inputs

    Customer Name (in short)

    System Serial Number

    Code Level

    Primary contact Name

    Email id

    Phone number

    Alteranate Contact NameEmail id

    Phone number

    RC Type (ESRS/Email/CCAF)

    Test RC SR

    CCAF uploaded as per process Mention Refuser Name & Reason

    Connected to SN (Avamar & RP)

    Final Logs uploaded in the SR Yes or No

    Logs upload Date Date mandatory

    Site checked before power ON Yes or No

    UAT Done Yes or No

  • 8/10/2019 Connectify Dispatch

    8/38

    8 Copyright 2014 EMC Corporation. All rights reserved. Copyright 2014 EMC Corporation. All rights reserved.

    APJ Install Compliance Trend

  • 8/10/2019 Connectify Dispatch

    9/38

    9 Copyright 2014 EMC Corporation. All rights reserved. Copyright 2014 EMC Corporation. All rights reserved.

  • 8/10/2019 Connectify Dispatch

    10/38

    10 Copyright 2014 EMC Corporation. All rights reserved. Copyright 2014 EMC Corporation. All rights reserved.

    Install Compliance

  • 8/10/2019 Connectify Dispatch

    11/38

    11 Copyright 2014 EMC Corporation. All rights reserved. Copyright 2014 EMC Corporation. All rights reserved.

    Install Compliance Q4 Goal OverviewAim: Installation is complete when the system is updated withall relevant elements to:

    facilitate smooth service request handling

    reduce counter productivelyenhance customer experience.

    Solution: a single target that measures installation compliance(completeness) for a defined set of metrics.

    either all metrics are valid or installation is non-Compliant.

  • 8/10/2019 Connectify Dispatch

    12/38

    12 Copyright 2014 EMC Corporation. All rights reserved. Copyright 2014 EMC Corporation. All rights reserved.

    Install Compliance Q4 Goal OverviewTarget: This will be measured as a single regional target whereour aspiration is 100% success but in Q4 the regional target willbe set to 90%.

    Measurement: metrics all need to be valid to be compliant: Code Level

    Remote Connection record

    Primary Contact and email address

    ASR Name and ASR email

    Connect-Home received for remotely-connected TLAs

    TLA Connected To relationships where applicable

  • 8/10/2019 Connectify Dispatch

    13/38

    13 Copyright 2014 EMC Corporation. All rights reserved. Copyright 2014 EMC Corporation. All rights reserved.

    Install Compliance Q4 Goal OverviewGoal Measurement criteria:

    Measurement begins when TLA is set to Install status in CSI

    Non-Compliant TLAs

  • 8/10/2019 Connectify Dispatch

    14/38

    14 Copyright 2014 EMC Corporation. All rights reserved. Copyright 2014 EMC Corporation. All rights reserved.

    Install Compliance Summary Reporting Summary Page - all Product TLAs recently set to Install will

    appear in the Summary report.

    The Summary shows TLAcounts per product

    Drill-down by clicking on a link

    Geo, Region, and Districtreports available

  • 8/10/2019 Connectify Dispatch

    15/38

    15 Copyright 2014 EMC Corporation. All rights reserved. Copyright 2014 EMC Corporation. All rights reserved.

    Install Compliance Detail Reporting Detail Page each Product TLA shows details & issues

  • 8/10/2019 Connectify Dispatch

    16/38

    16 Copyright 2014 EMC Corporation. All rights reserved. Copyright 2014 EMC Corporation. All rights reserved.

    Install Compliance Detail Reporting Detail Page each Product TLA shows details & issues

  • 8/10/2019 Connectify Dispatch

    17/38

    17 Copyright 2014 EMC Corporation. All rights reserved. Copyright 2014 EMC Corporation. All rights reserved.

    Goal - CSI Connection Record Values

    Connect-In Connect-Home

    Compliant

    Not CompliantCompliantCompliantCompliant

    Not compliantNot compliant

    CompliantNot compliant

    CompliantCompliantCompliantCompliantCompliant

    Not compliantNot compliantNot compliant

  • 8/10/2019 Connectify Dispatch

    18/38

    18 Copyright 2014 EMC Corporation. All rights reserved. Copyright 2014 EMC Corporation. All rights reserved.

    Goal intended to be ProactiveMetric Can these be completed Prior

    setting Install in CSI?

    Code Level Yes

    Primary Contact and email address Yes

    ASR Name and ASR email YesConnected To relationships(where applicable)

    Yes although this is normally completed as partof an install form sent to IBG

    Remote Connection record No - This should be set to Not Configured Set to Customer Refused if this is going to bethe final position ASAP and make sure CCAFprocess is followed.

    Connect-Home received forremotely-connected TLAs

    No - Can only be completed after theConnection Record update and physical installof the Connectivity

  • 8/10/2019 Connectify Dispatch

    19/38

    19 Copyright 2014 EMC Corporation. All rights reserved. Copyright 2014 EMC Corporation. All rights reserved.

    Proactive not Reactive Proactive means: (0- 30 days)

    Planning before the actual install

    Update CSI (Contacts, IB) before Install is considered complete

    Install and test connectivity before Install is considered complete

    Send Template & Raise PNT (after confirmation from EMC ) once all work is

    complete

    Reactive means: (31 180 days)

    You didnt do the install so you may not know who at the customer you should be

    talking to, so this can take additional time and add a degree of difficulty

    If the customer is happy with the current connectivity status, changing it after

    install is considerably harder and more time consuming

  • 8/10/2019 Connectify Dispatch

    20/38

    20 Copyright 2014 EMC Corporation. All rights reserved. Copyright 2014 EMC Corporation. All rights reserved.

    LinksDescription Link

    ESRS Solution Tools and Reference https://inside.emc.com/docs/DOC-54534

    ESRS Collateral & Resources https://inside.emc.com/docs/DOC-76305

    CCAF Process, forms and repository http://gcsdocs.corp.emc.com/

  • 8/10/2019 Connectify Dispatch

    21/38

    21 Copyright 2014 EMC Corporation. All rights reserved. Copyright 2014 EMC Corporation. All rights reserved.

    Partner Process Training

  • 8/10/2019 Connectify Dispatch

    22/38

    22 Copyright 2014 EMC Corporation. All rights reserved. Copyright 2014 EMC Corporation. All rights reserved.

    Partner Process Training

    Installation and Implementation Process Overview

    Installation : Step 1 Physical Installation and configuration

    Partner Engineer

    Conduct Site Survey &

    inventory check

    Configure Remote

    Support

    Upgrade Box to latest

    Code and Install

    Create Product

    Procedure Generator

    Upload Config Files

    To EMC, Eg. EIP1

    Installation : Step 2 Transfer of Box to EMC and Admin Closure

    Partner to fill in the PNT

    Form for each box

    Submit PSQ Survey

    To the Customer

    Implementation: Step 1 Configuration of hardware to customers Host

    Create the Scope

    Of Work

    Testing and Hand

    Over Training

    Implement the

    Scope of Work

    Submit the Change

    Control using CCA

    Documentation

  • 8/10/2019 Connectify Dispatch

    23/38

    23 Copyright 2014 EMC Corporation. All rights reserved. Copyright 2014 EMC Corporation. All rights reserved.

    PNT Process

    Partner Process Training

  • 8/10/2019 Connectify Dispatch

    24/38

    24 Copyright 2014 EMC Corporation. All rights reserved. Copyright 2014 EMC Corporation. All rights reserved.

    PNT stands for Partner Notifi cation Tool . This option is available to Partners for the notification to EMC of work performed -

    such as platform installs, hardware upgrades, software upgrades, remote connections, and relocations.

    Partner Process Training

    Features of PNT

    What is PNT?

  • 8/10/2019 Connectify Dispatch

    25/38

    25 Copyright 2014 EMC Corporation. All rights reserved. Copyright 2014 EMC Corporation. All rights reserved.

    Login to Partner Portal (www.emc.com/auth/partnerportal.htm) ->Services andSupport Delivery Resources

    Partner Process Training

  • 8/10/2019 Connectify Dispatch

    26/38

    26 Copyright 2014 EMC Corporation. All rights reserved. Copyright 2014 EMC Corporation. All rights reserved.

    Partner Process Training

    Select Quick Links-> EMC Services Partner Web

  • 8/10/2019 Connectify Dispatch

    27/38

    27 Copyright 2014 EMC Corporation. All rights reserved. Copyright 2014 EMC Corporation. All rights reserved.

    EMC Service Partner Web -> Tools & Forms

    Available Product view dependsOn Partners Contract

    Partner Process Training

  • 8/10/2019 Connectify Dispatch

    28/38

    28 Copyright 2014 EMC Corporation. All rights reserved. Copyright 2014 EMC Corporation. All rights reserved.

    Partner Process Training

    Tools & Forms -> PNT Tool

  • 8/10/2019 Connectify Dispatch

    29/38

    29 Copyright 2014 EMC Corporation. All rights reserved. Copyright 2014 EMC Corporation. All rights reserved.

    Partner Process Training

  • 8/10/2019 Connectify Dispatch

    30/38

    30 Copyright 2014 EMC Corporation. All rights reserved. Copyright 2014 EMC Corporation. All rights reserved.

    Partner Process Training

  • 8/10/2019 Connectify Dispatch

    31/38

    31 Copyright 2014 EMC Corporation. All rights reserved. Copyright 2014 EMC Corporation. All rights reserved.

    Partner Process Training

  • 8/10/2019 Connectify Dispatch

    32/38

    32 Copyright 2014 EMC Corporation. All rights reserved. Copyright 2014 EMC Corporation. All rights reserved.

    Mandatory

    Mandatory

    Mandatory

    Partner Process Training

  • 8/10/2019 Connectify Dispatch

    33/38

    33 Copyright 2014 EMC Corporation. All rights reserved. Copyright 2014 EMC Corporation. All rights reserved.

    Partner Process Training

  • 8/10/2019 Connectify Dispatch

    34/38

    34 Copyright 2014 EMC Corporation. All rights reserved. Copyright 2014 EMC Corporation. All rights reserved.

    Partner Process Training

  • 8/10/2019 Connectify Dispatch

    35/38

    35 Copyright 2014 EMC Corporation. All rights reserved. Copyright 2014 EMC Corporation. All rights reserved.

    Partner Process Training

    Email Notification on the PNT Output New Partner Notification

  • 8/10/2019 Connectify Dispatch

    36/38

    36 Copyright 2014 EMC Corporation. All rights reserved. Copyright 2014 EMC Corporation. All rights reserved.

    Partner Process Training

    Email Notification on the PNT Output Update

    Email Notification on the PNT Output Closed