Concerto Ethelred tower blocks - low carbon refurbishment Challenges and successes Jon Lissimore Environment Manager

Concerto Ethelred tower blocks - low carbon refurbishment Challenges and successes Jon Lissimore Environment Manager

Embed Size (px)

Citation preview

Page 1: Concerto Ethelred tower blocks - low carbon refurbishment Challenges and successes Jon Lissimore Environment Manager

Concerto

Ethelred tower blocks - low carbon refurbishment Challenges and successes

Jon Lissimore Environment Manager

Page 2: Concerto Ethelred tower blocks - low carbon refurbishment Challenges and successes Jon Lissimore Environment Manager

Council policy - promote sustainable design and construction

Design for energy efficiency -reducing C02 & fuel poverty

Promote use of environmentally friendly materials -reducing pollution and environmental damage

Require sustainable accredited timber -avoids deforestation / loss of biodiversity, etc

 

Page 3: Concerto Ethelred tower blocks - low carbon refurbishment Challenges and successes Jon Lissimore Environment Manager

Ethelred tower blocks• Ward, Brittany and

Elkington • Required major

improvements• Decent homes work

needed

Page 4: Concerto Ethelred tower blocks - low carbon refurbishment Challenges and successes Jon Lissimore Environment Manager

Ethelred’s problems

• Spalling concrete• Ineffective heating and ventilation • Generic heating and hot water

charge for residents but high energy costs for Lambeth as landlord

• Socio-economic study May 2009:– 53% of respondents suffered

condensation– 38% could not keep their homes

comfortably warm due to draughty windows.

Page 5: Concerto Ethelred tower blocks - low carbon refurbishment Challenges and successes Jon Lissimore Environment Manager

Funding

• Lambeth had prior experience of carbon reduction projects

• Positive track record on sustainability helped us secure additional funding– Government Office London £6.8m

Page 6: Concerto Ethelred tower blocks - low carbon refurbishment Challenges and successes Jon Lissimore Environment Manager

Sustainable design and construction

Holles house refurbishment- proven 50% energy use reduction via a range of sustainability measures

Page 7: Concerto Ethelred tower blocks - low carbon refurbishment Challenges and successes Jon Lissimore Environment Manager

Sustainable legal timber

Fairfax House – the first construction project in Britain to be independently certified by the Forest Stewardship Council for its use of sustainable timber.

Page 8: Concerto Ethelred tower blocks - low carbon refurbishment Challenges and successes Jon Lissimore Environment Manager

Boatemah Walk

Page 9: Concerto Ethelred tower blocks - low carbon refurbishment Challenges and successes Jon Lissimore Environment Manager

Before…

Page 10: Concerto Ethelred tower blocks - low carbon refurbishment Challenges and successes Jon Lissimore Environment Manager

After!

Page 11: Concerto Ethelred tower blocks - low carbon refurbishment Challenges and successes Jon Lissimore Environment Manager
Page 12: Concerto Ethelred tower blocks - low carbon refurbishment Challenges and successes Jon Lissimore Environment Manager
Page 13: Concerto Ethelred tower blocks - low carbon refurbishment Challenges and successes Jon Lissimore Environment Manager

Ethelred tower block refurbishment

• New double glazed windows• Insulated external cladding• 63KWp Solar PV• New Communal boilers• CHP plant (310KWe)• New wet radiators with room

thermostats and heating

programmers

Page 14: Concerto Ethelred tower blocks - low carbon refurbishment Challenges and successes Jon Lissimore Environment Manager

Green roofsSedum roofs • Promoting Biodiversity• Reducing storm water run- off• Improving air quality• Insulation / cooling benefits

Page 15: Concerto Ethelred tower blocks - low carbon refurbishment Challenges and successes Jon Lissimore Environment Manager

Challenges

• PV system output

• Cladding - delays

Page 16: Concerto Ethelred tower blocks - low carbon refurbishment Challenges and successes Jon Lissimore Environment Manager

Challenges

Working with residents in occupation

Page 17: Concerto Ethelred tower blocks - low carbon refurbishment Challenges and successes Jon Lissimore Environment Manager

Successes

• Significantly improved conditions for residents

• 80% CO2 reduction in landlords footprint

• Reduced energy costs for residents and Lambeth• Blocks renewed to give a minimum 30 years of further life

Page 18: Concerto Ethelred tower blocks - low carbon refurbishment Challenges and successes Jon Lissimore Environment Manager

The new look towers

Page 19: Concerto Ethelred tower blocks - low carbon refurbishment Challenges and successes Jon Lissimore Environment Manager