Compressor station of LHC 18 kW @ 4.5 K. Bldg: 15 x 45 X 9 Pinput : 4.5 MW Cool: 500 m3/h Noise: 105 dBA. Compressor station flow scheme. Indiv. Filters (40µm) and fine filters (20µm). Main filters (100µm) and oil pumps. GHe Oil H2O. - PowerPoint PPT Presentation
Citation preview
SC - 21Jun'11 LHCCryo P8 oil filters
Compressor station of LHC 18 kW@ 4.5 KBldg: 15 x 45 X 9 Pinput : 4.5 MW Cool: 500 m3/h Noise: 105 dBA
SC - 21Jun'11 LHCCryo P8 oil filters
Compressor station flow scheme
Main filters (100µm) and oil pumps
Indiv. Filters (40µm) and fine filters (20µm)
1st signs on CP6 seen Fri 17/06, on CP7 Sat, and cause found Monday 20/06 CP7 is the origin of pollution, presently stopped, to be looked at TechStop
…
GHe
Oil
H2O
SC - 21Jun'11 LHCCryo P8 oil filters
QUI
Leaky HX (Jan’11)
TuA (Spring11)
P8 configuration, last week
CCs CCs
CV615 valve (P2)Tests for relocation
Validated for P2 (TS) !
Sector 78 Sector 81
SC - 21Jun'11 LHCCryo P8 oil filters
QUI
Leaky HX (Jan’11)
TuA (Spring11)
P8 configuration, week-end
CCs CCs
CV615 valve (P2)Tests for relocation
Validated for P2 (TS) !
Sector 78 Sector 81
Extra flow
Until next Tech. Stop if CP6 oil filter OK,
otherwise …
Similar to CP6_P4 ? Some 35’000 hrs since Jan’07 !!!
Limitations
SC - 21Jun'11 LHCCryo P8 oil filters
P8 oil filters
Looking stable now !
CP6 filter
global filter
CP7 restart
SC - 21Jun'11 LHCCryo P8 oil filters
0
10
20
30
40
50
60
70
20-Jun-1109:00
20-Jun-1110:00
20-Jun-1111:00
20-Jun-1112:00
Temperature [K], heating [W], Valve [%]
1.00E-10
1.00E-09
1.00E-08
1.00E-07
1.00E-06
1.00E-05
LQXAB_01L8_EH847.POSST
LQXAB_01L8_TT847A.POSST
QRLGF_03L8_CV947.POSST
QRLGF_03L8_CV947AO.POSST
QRLGF_03L8_TT947.POSST
VGPB.120.4L8.X.PR
VGPB.222.1L8.X.PR
Cryo bake-out L8During stop: Temp BS >> Temp Mag
=> Bearly visible effect, re-cooling process confirmed ?
“Bake-out” at 35K-40K
Heater
Tinlet Toutlet
Vac. gauges