Company Profile

2013

www.jec.qa

Page 2: Company Profile 2013 · 2015-01-22 · Design and construction of central sewage collection system and construction of precast concrete boundary wall. Boom Construction Co. 4,000,000

Table of Contents

CEO's Message

Corporate Profile

Legal & Financial Statement

Key Personnel

Clients

Projects Summary

Selected Projects

Highways, Roads & Infrastructure

Oil & Gas, Petrochemical and Industrial

Pipeline Construction

Power Generation, Substations & Desalination Plants

Sewage Treatment Plants and Pumping Stations

Landmark Buildings

Projects Portfolio

Offices, Fabrication Workshop & PMV Facilities

Equipment Fleet

Staff & Manpower

02

Integrated Management System (IMS)

ISO & OHSAS Certifications

Quality & HSE Policies

Safety Certifications & Achievements

Appreciations

Introduction

Capabilities

Resources

Sustainability

66 - 71Affiliates

03 - 07

08 - 11

12 - 52

13 - 18

19 - 52

19 - 30

31 - 39

40 - 42

43 - 45

46 - 48

49 - 52

52 - 56

57 - 65

Company Profile 2013

Page 3: Company Profile 2013 · 2015-01-22 · Design and construction of central sewage collection system and construction of precast concrete boundary wall. Boom Construction Co. 4,000,000

Osama HadidChief Executive Officer

Al Jaber Engineering has been taking a leading role in providing general contracting services with uncompromised commitment to Quality, Health, Safety and Environment. We do this through the combination of an open relationship with our employees based on mutual trust, transparency, accountability and discipline.

In preparation to meet the growing market demands for diverse construction, JE has heavily invested in employing a highly qualified senior management team and staff to meet international standards and purchased state-of-the-art equipment to participate in upcoming, challenging large-scale projects.

Being proud of our achievements, we will continue to further enhance our commitment and capabilities in the construction industry with integrity and strive for business excellence.

CEO's Message

03Company Profile 2013

Page 4: Company Profile 2013 · 2015-01-22 · Design and construction of central sewage collection system and construction of precast concrete boundary wall. Boom Construction Co. 4,000,000

Corporate Profile

AlJaber Engineering (JE) is a leading general contractor based in the State of Qatar. Established in 1995 as part of Al Jaber Group - a major conglomerate with over 30 companies- JE has successfully completed numerous large-scale turnkey projects for many prestigious clients in different sectors including:

Our commitment to execute projects with highest quality, on schedule and within budget while adhering to excellent standards of health, safety and environmental positioned JE to be recognized as an icon in the construction community in Qatar. We have recently established an office in Iraq to undertake projects in contribution to the large ongoing developments. In line with the growing demands to build Qatar’s infrastructure and new developments, JE has invested in its resources to meet international standards and upgraded its fleet of equipment in preparation to participate in upcoming diverse projects.

04Company Profile 2013

Highways, Roads and InfrastructureEngineering, Procurement, Installation & Commissioning (EPIC)Oil, Gas, Petrochemical and IndustrialPipeline ConstructionPower Generation, Substations & Desalination PlantsSewage Treatment Plants and Pumping StationsMaintenance of Oil & Gas and Petrochemical InstallationsLandmark Buildings

Page 5: Company Profile 2013 · 2015-01-22 · Design and construction of central sewage collection system and construction of precast concrete boundary wall. Boom Construction Co. 4,000,000

Million Q.R.

Annual Turnover for the Last Five Years

Legal & Financial Statement

05

0

100

200

300

400

500

600

700

800

2007 2008 2009 2010 2011

900

1000

Trade License

Commercial Registration

Contractor's Classification Certificate

25964

21753

1602

KAHRAMAA Grade “A” Contractors Certificate 1028

Fire Alarm Certificate

Fire Protection (Defence) Certificate

1381

1381

14-11-2013

14-11-2013

1100

1200

09-06-2013

10-08-2013

09-01-2014

15-03-2013

Certificate Document No. Expiry DateDocument No. Expiry Date

1025694781522 1128

Company Profile 2013

Page 6: Company Profile 2013 · 2015-01-22 · Design and construction of central sewage collection system and construction of precast concrete boundary wall. Boom Construction Co. 4,000,000

Key Personnel

06

NameSL. Position01

02

03

04

05

07

08

09

10

11

12

Mr. Osama Hadid Chief Executive Officer (CEO)

Mr. Hisham Hadid Director

Mr. Alex Calfat Executive Manager – Commercial

06

Mr. Amr Nadim Executive Manager – Engineering

Mr. Mardig Djansezian Executive Manager – Operations M&E

Mr. Husam Orabi Corporate Business Development Manager

Mr. Derrick Anderson Commercial Manager

Mr. Mohammad Rizk Technical Manager

Mr. Thomas Anderson Corporate QHSE Manager

13

14

15

16

17

18

19

20

25

26

27

Mr. N. Benergy Projects Manager – M&E

Mr. Imad Samaha Projects Manager – Civil

Mr. Osama Al Tawil Finance Manager

Mr. Thaer Abu Shaikha Accounting Manager

Mr. Ghassan Wehbe HR & Admin Manager

Mr. Antonios Petrides Service Manager

Mr. Anas Al-Ereksousi Personnel Manager

Mr. Nicholas Andreopoulos PMV Manager

Mr. Ayman Amer Procurement Manager

Mr. Qais Dabbas Cost Control Manager

Mr. Amir Naguib Planning Manager

Mr. Ahmed Hadid Financial Planning & Analysis Manager

21

22

23

24

Mr. Asoka Lelwala Head of QS

Mr. Prakash Melwyn Serrao Head of IT

Mr. Mohan Lal Head of Recruitment

Mr. Wasseem Salah Head of Cost Control Department

Mr. Carlos Haddad Head of Estimation - Civil

Mr. Suhail Ismail Head of Estimation - M&E

Company Profile 2013

Page 7: Company Profile 2013 · 2015-01-22 · Design and construction of central sewage collection system and construction of precast concrete boundary wall. Boom Construction Co. 4,000,000

AlJaber Engineering has successfully associated with many prestigious clients from different industries such as:

Oil & Gas, Petrochemical & Industrial

Large International EPC Contractors

Large Developers

Government Clients

Clients

07Company Profile 2013

Page 8: Company Profile 2013 · 2015-01-22 · Design and construction of central sewage collection system and construction of precast concrete boundary wall. Boom Construction Co. 4,000,000

Capabilities

08Company Profile 2013

Page 9: Company Profile 2013 · 2015-01-22 · Design and construction of central sewage collection system and construction of precast concrete boundary wall. Boom Construction Co. 4,000,000

Highways, Roads and Infrastructure:Capabilities

09Company Profile 2013

JE focus areas are:• • • • • • • • • • • •

ALJABER ENGINEERING is a leading general contractor executing turnkey Highways, Roads, Infrastructure and mega earth moving projects.

JE strength includes;•

Asphalt works through JE Affiliated company Al Jaber Makhlouf with own fleet of equipment forproduction and delivery of Asphalt, total capacity of 10,000 tons/day.

• sub base and other crushed products.

Highways and roads.Underpasses, bridges and interchanges.Major earth and reclamation works.Turnkey Infrastructure Projects.Site development works for industrial and petrochemical plants.Pipeline construction (water, sewage and drainage).Treated sewage effluent system (TSE).Drainage and sewage systems.Electrical and telecommunication networks.Street lighting.Signalization and traffic light systems.Tunneling including related electrical and mechanical works.

JE owns the largest fleet of construction and earthmoving equipment in Qatar.

Concrete supply through JE affiliated company Al Wataniya, Total production capacity100,000m3 / Month in four different locations (Lusail, Doha, Mesaieed and Ras Laffan).

JE owns onsite crushing and screening plants utilized for production of fill, Structural fill,

Page 10: Company Profile 2013 · 2015-01-22 · Design and construction of central sewage collection system and construction of precast concrete boundary wall. Boom Construction Co. 4,000,000

ALJABER ENGINEERING has been a key contractor involved in design, Procurement and construction of turnkey Projects related to the following:

• • • • • •

• • • • • •

Waste management facilitiesWater treatment plantsWater transmission systemsTanks and reservoirsMaintenance of petrochemical and industrial installationsHV substations

• • • • • • • • • •

JE strength Includes:-

JE has a highly qualified technical team to manage the requirements and performance of design sub-contractors including any specialized services such as HAZOP.

Our Procurement team has extensive experience in man-aging and performing procurement activities for large EPIC contracts.

JE construction team has worked on complex projects and has technical experience to meet international contracting standards and capable to perform challeng-ing high-profile diverse projects.Civil Works: Mechanical Works:

• • • • •

• • • • •

Scada systemsStructural cablingSecurity systemsInstrumentation and control worksTelecommunication systems

• • •• • • • •

Supply, fabrication and erection of major process static equipmentProcess piping and PipelinesFire fighting systemsPipe gantry’s and support systemsCranesSupply and erection of rotary equipmentHVAC systemsInsulation, Painting and scaffolding works

Electrical and Instrumentation:

Engineering:

Procurement:

Construction

Oil & Gas, Petrochemical and Industrial:Capabilities

10Company Profile 2013

EPIC projectsOil & Gas facilities Power and desalination plantsPetrochemical plantsIndustrial plantsSewage treatment plants

Underground and elevated concrete structuresSilosCooling towersPrecast concrete Pipe racksCulvertsStructural Steel WorksIndustrial buildingsUnderground utility networksRoad worksFencing

Supply and erection of major electrical equipment.Power distribution systemsLighting and powerFire detection and alarm systemsProgrammable logic control systems (PLC)

Page 11: Company Profile 2013 · 2015-01-22 · Design and construction of central sewage collection system and construction of precast concrete boundary wall. Boom Construction Co. 4,000,000

CapabilitiesIndustrial and Landmark Buildings:

JE focus areas are:

• • • • •

JE strength Includes

CIVIL Works:• • • • • •

• • • • • • • • • • •

JE is a Kirby Certified builder to supply and erect Kirby Buildings in Qatar.

11Company Profile 2013

We have successfully executed various industrial buildings on design and build basis. In addition, JE currently executing construction of landmark buildings as part of a Joint Venture with international companies.

Drainage Plumbing HVAC systemsChilled water systemsWaste water treatments systemsElectrical (MV/HV/ELV networks)InstrumentalTelecommunicationLiftsFire fighting and fire alarm systemsBuilding management system (BMS)

MEP Works:

Enabling worksConcrete worksCurtain wall systemsStone cladding Steel structure Architectural finishes

Landmark buildingsStructural steel buildingsControl roomsBlast proof buildingsTemporary facilities

Page 12: Company Profile 2013 · 2015-01-22 · Design and construction of central sewage collection system and construction of precast concrete boundary wall. Boom Construction Co. 4,000,000

Projects Portfolio

12Company Profile 2013

Page 13: Company Profile 2013 · 2015-01-22 · Design and construction of central sewage collection system and construction of precast concrete boundary wall. Boom Construction Co. 4,000,000

Client Value: USD $Project Status of Completion

Qatar Petroleum

CCC / Teyseer JV

190,000,000

36,000,000

August, 201096,000,000

Early site earth works for Barzan onshore project at Ras Laffan. (See Page 22)

EPIC for southern perimeter industrial fence, security patrol access and other roads in Ras Laffan City.

Reconstruction of existing roads and construction of new roads with all associated services and infrastructure including upgrade of existing utilities and installation of new utilities at Mesaieed Community Area. (See Page 21)

January, 2011

July, 2011

February, 2012

Construction of road paving at Pearl GTL plant area. Strabag Qatar W.L.L. 1,272,000Strabag Qatar W.L.L. 1,272,000

Highways, Roads and Infrastructure

December, 201055,000,000

Qatar Petroleum November, 201082,000,000

October, 200918,071,000

February, 2009Site preparation and earth works for Elsewedy Cables factory at Mesaieed.

Elsewedy Cables 3,500,000

EPIC for new support services and site development of 3,000,000 m² land at Ras Laffan Industrial City. (See Page 24)

(cont.)

West Bay project, Zone 66: Construction of roads and infrastructure services such as foul sewage, surface water, potable water, TSE lines, pump stations and storm water system in New Diplomatic area. (See Page 23)

Construction of underground piping systems consist of installation of GRP sea water pipelines, firewater, process, potable water lines and major infrastructure civil works at Aluminium Smelter in Mesaieed. (See Page 25)

Site development of service areas and potroom building area including earth works, construction of roads, surface drainages supply and installation of potable water lines for Qatar Aluminium Smelter in Mesaieed. (See Page 26)

Public Works Authority (ASHGHAL)

Client: RasGasMain Contractor:

Qatar Petroleum 147,370,000

20,274,000

Ongoing

Qatar Petroleum 23,985,000 Ongoing

The Base Secondary Chanel Excavation and Disposal Works in LusailUrbaCon

General Contracting7,209,600 Ongoing

Ongoing

EPIC for wet utilities distribution network (Potable water supply, fire water and sewrage) for support services for an area of approximately 3000 Hectares complete with auxiliary facilities, sub-systems and mains network at West End extension, Ras Laffan Industrial City. (See Page 20)

Jawhara GreensCompany SPC

Qatar Aluminium Co. (Qatalum)

SNC-Lavalin

Al-Jawhara “Oasis of Life” Infrastructure in Al Erkyah District, Lusail. Infrastructure works consists of earthworks, asphalt works, surface drainage, foul sewerage, primary irrigation, portable water networks and street lighting.

13Company Profile 2013

Projects Summary

Page 14: Company Profile 2013 · 2015-01-22 · Design and construction of central sewage collection system and construction of precast concrete boundary wall. Boom Construction Co. 4,000,000

Public Works Authority (ASHGHAL)

Qatar Petroleum

Qatar Petroleum

September, 2003

February, 200730,400,000

12,500,000 September, 2006

6,600,000

October, 2005

Jan De Nul / Boskalis JV

February, 2007

New Doha International Airport (NDIA)

18,600,000

38,050,000

Environmental clean-up for New Doha International Airport project site including excavation and removal of waste, transportation from NDIA site and placement at engineered landfill site in Mesaieed. (See Page 29)

Underpass and access roads for Doha 2006 Asian Games Village and Hamad Medical City. (See Page 30)

Ras Laffan port expansion project: Excavation and site preparation to construct a lake within Ras Laffan port expansion and construction of access road and street lighting.

1,000,000

10,000,000

1,800,000

Qatar Petrochemical Co.(QAPCO)

March, 2000

May, 2006

March, 2004 3,300,000Qatar Petroleum

Construction of new waterfall at QAPCO site.

Excavation and stockpiling of hard material at Ras Laffan Cracker II project site.

Construction of paved walk ways, unpaved track road, landscaping and new boundary wall at Dukhan Township.

Design and construction of central sewage collection system and construction of precast concrete boundary wall.

Boom Construction Co.

4,000,000

QatarGas 3 & 4 project: Site preparation for camp and wastewater treatment (WWT) areas at Ras Laffan, in connection with Qatar Gas 3 project.

Chiyoda /Technip JV

Hamad Medical City surface and ground water scheme: Construction of surface and groundwater pipelines by microtunneling and construction of reinforced concrete outfall structure.

Technip April, 20068,000,000Ras Laffan Olefin project: Site preparation and installation of fence.

EPIC to upgrade existing wellhead track roads and to construct new approach roads at Dukhan oil fields.

October, 2006

May, 2007Soil Improvement for Boiler and Demin units in Qatar Vinyl Company. Qatar Vinyl Company 500,000

2,530,000Chiyoda /

Technip JVMarch, 2007

Al Khaleej gas project Phase 2 (AKG2): Site preparation for camp and waste water treatment area.

Public Works Authority (ASHGHAL)

625,000 February, 2008Jan De Nul / Boskalis JV

Construction of land water drain outfall at Ras Laffan Port.

Gas pipeline crossings for service area and potroom building.at Qatar Aluminium Smelter in Mesaieed. SNC-Lavalin April, 20081,730,000

October, 2005

Qatar Aluminium Co. (Qatalum)

December, 200834,446,000

Site preparation, ground improvement by dynamic compaction and installation of 8000 lm new security paliside fence for Qatar Aluminium Smelter and Power Plant in Mesaieed. (See Page 28)

Hyundai Engineering & Construction Co

December, 20088,410,000Site preparation and road works for QAFCO 5 project in Mesaieed.

Client Value: USD $Project Status of Completion

Highways, Roads and Infrastructure

14Company Profile 2013

Projects Summary

86,304,000 January, 2009Salwa International Highway interchanges and installation of water pipelines and street lighting. (See Page 27)

Public Works Authority (ASHGHAL)

Page 15: Company Profile 2013 · 2015-01-22 · Design and construction of central sewage collection system and construction of precast concrete boundary wall. Boom Construction Co. 4,000,000

Client Value: USD $Project Status of Completion

Oil & Gas, Petrochemical and Industrial Projects

15Company Profile 2013

Projects Summary

Fabrication and installation of above ground metal piping, installation of water supply pumps, emergency cooling towers, compressed air piping system and closed cooling medium system at Qatar Aluminium Smelter in Mesaieed. (See Page 32)

SNC-Lavalin 20,420,000 September, 2010

Mechanical and electrical works for Doha cable factory at Mesaieed Industrial City.

Doha Cables 2,986,000 June, 2010

Qatar Aluminium Co. (Qatalum)

24,240,000 February, 2010Major ground and civil works for rectifier stations at Qatar Aluminium Smelter in Mesaieed. (See Page 33)

31,336,000 March, 2009Qatar PetroleumEPIC for two new kangaroo cranes and upgrading of existing gabbro berths crane facilities including all mechanical and electrical works at Mesaieed Port. (See Page 34)

SNC-Lavalin 7,850,000 January, 2009

Installation of cathode roding equipment and induction furnace including supply and erection of all mechanical, electrical and instrumentation works at Qatar Aluminium Smelter in Mesaieed.(See Page 35)

Chiyoda /Technip JV

November, 200733,455,000

Al Khaleej Gas Project Phase 2 (AKG2): Civil, infrastructure and electromechanical works for camps and other facilities including underground piping networks, road works, installation of treated effluent tanks, waste water treatment units and sludge treatment units. (See Page 36)

9,985,634EPIC of desalinated water network including installation, testing and commissioning of 14 km GRP pipelines at Ras Laffan.

July, 2006Qatar Petroleum

1,600,000 August, 2007Engineering, procurement, fabrication and installation of dust collection towers and sunshades. (See Page 37)

580,000 June, 2004Qatar PetroleumConstruction of new access platforms and walkways in Dukhan oil fields.

March, 2002Extension of central control room building at QAFCO. Qatar FertilizerCo. (QAFCO)

1,800,000

RasGas 4,600,000

EPIC of waste management facility including construction of new landfill cells, HDPE membrane, access roads, weigh scale and concrete land treatment unit with a total capacity of 2800m3 of biodegradable waste at Ras Laffan Industrial City (RLIC). (See Page 39)

December,2002

January, 2004Construction of dry storage sunshades at Camp As Sayliyah. US Army 800,000

GeneralElectric (GE)

13,600,000Qatar Petroleum October 2005EPIC of potable water transmission system and landscaping mains to distribute water produced by RLPC to various facilities within Ras Laffan. (See Page 38)

Page 16: Company Profile 2013 · 2015-01-22 · Design and construction of central sewage collection system and construction of precast concrete boundary wall. Boom Construction Co. 4,000,000

Client Value: USD $Project Status of Completion

Client Value: USD $Project Status of Completion

GeneralElectric (GE)

December, 2006

VATECH March, 2006

20,437,000

4,350,000

4,900,000

May, 2003

Power Generation, Substations and Desalination Plants

March, 201075,500,000Fisia Italimpianti

Fisia Italimpianti / Enel Power

Ras Abu Fontas A1 new water plant– Onshore civil works execution related to the construction of distillers and boilers areas, intake structure and potable water reservoirs for 45 MIGD water desalination plant at Ras Abu Fontas. (See Page 44)

44,370,000

32,000,000

4,905,000

4,050,000

Qatar Electricity & Water Co. (KAHRAMAA)

January, 2006

November,2005

13,100,000 July, 2004

September, 2007

Supply and lay the extension of water distribution mains (58 km) in north Duhail Phase C & D.

Supply and lay the extension of water distribution mains (57 km) in north Duhail Phase A & B.

Extension of approx. 12 km of 600 mm diameter HDPE pipes to supply water to motor cycle race track.

Design and construction of 1200 mm of 30 Km transmission main from Doha West STW to Al Rakhiya farm. (See Page 41)

Upgrading of New and Old Salwa distillate and rising mains (22km of pipes). (See Page 42)

21,200,000CHIYODA -TECHNIP JV

February, 2007EPIC of potable water pipeline to west side camp area at Ras Laffan in connection with RasGas expansion project.

Public Works Authority (ASHGHAL)

RAFB2-site-0001, Ras Abu Fontas B, expansion project: Fabrication of pipe rack and large bore pipes (CS & SS).

Qatar transmission system – Phase VI, Substations: Civil works associated with various substations.

Ras Laffan power and desalination project - Water plant island desalination unit and auxiliaries: Civil works related to the construction of 40 MIGD desalination plant at Ras Laffan. (See Page 45)

.

Qatar Electricity & Water Co. (KAHRAMAA)

Qatar Electricity & Water Co. (KAHRAMAA)

Qatar Electricity & Water Co. (KAHRAMAA)

December, 2011

Pipeline Construction

15Company Profile 2013

Projects Summary

Page 17: Company Profile 2013 · 2015-01-22 · Design and construction of central sewage collection system and construction of precast concrete boundary wall. Boom Construction Co. 4,000,000

Client Value: USD $Project Status of Completion

Sewage Treatment Plants and Pumping Stations

17Company Profile 2013

Projects Summary

Long term fabrication and maintenance support on call off basis.Qatar Vinyl Company

(QVC) Completed

Shutdown associated works for Qatar Aluminium Smelter in Mesaieed. SNC-Lavalin

Civil work for rolling mill major repair.Qatar Steel Company

(QASCO) Completed

Refurbishment of administration building ground floor corridor flooring tiles. Qatar Fertilizer Co.(QAFCO) Completed

Revamp of closed cooling water cycle and civil works. Completed

Surface protection of buried sealine O.S.B.L. at Ras Laffan. Qatargas Completed

Repair of transformer DHTS 90000/140. ANSALDOIndustrial

Completed

Maintenance of Oil & Gas, Petrochemical and Industrial Installations

Qatar Fertilizer Co.(QAFCO)

Public Works Authority (Ashghal)

February, 2009

November, 2004

June, 2005

53,295,000

February, 2002

February, 2006

Ongoing

April, 2004

13,000,000Design and construction of sewage treatment plant and labour compound infrastructure including boundary wall, roadworks and chainlink fence.

Qatar Petroleum 5,120,000

13,000,000

Ministry of Municipal Affairs and Agriculture

(MMAA)4,000,000

Construction of treated sewage effluent network (TSE) T5 toT7 including 14 km of TSE mains.

1,251,000

Chiyoda Technip JV - QGE (CTJV)

10,800,000

Construction of treated sewage effluent network (TSE) T6 to T7 including 48 km of TSE mains. (See Page 48)

Construction of additional sludge drying beds and other labour accomodation facilities including one storey building.

Construction of treated sewage effluent permanent disposal system including 21 km of HDPE pipeline at Ras Laffan.

Ministry of Municipal Affairs and Agriculture

(MMAA)

Ministry of Municipal Affairs and Agriculture

(MMAA)

May, 2008Civil works and upgrading of pumping stations.Torishima Pump

Mfg. Co. Ltd. 2,045,000

Upgrade of sewage network and refurbishment of pumping stations and relocation of TSE distribution mains.

Refurbishment and upgrading works for various foul and stormwater pumping stations including civil, mechanical, electrical and HVAC works. (See Page 47)

New Doha International Airport (NDIA)

Completed

Client Status of CompletionProject

Page 18: Company Profile 2013 · 2015-01-22 · Design and construction of central sewage collection system and construction of precast concrete boundary wall. Boom Construction Co. 4,000,000

1,301,370,000

400,000,000 Ongoing

Ongoing

Sama Dubai

Barwa Real Estate Company

Barwa Financial District. (A Joint venture with Bouygues, and Midmac Contracting). (See Page 50)

Dubai Towers (A Joint venture with Al Habtoor). (See Page 51)

713,000 July, 2001Q-CHEMDesign, supply, installation and commissioning of Q-Chem prefab temporary training facility, with all associated civil and MEP works.

KBR / Technip 5,420,000EPIC of steel frame structure bagging and storage warehouse at Q-CHEM petrochemical complex including complete civil and electro-mechanical works at Mesaieed.

January, 2002

1,600,000EPIC of temporary facilities consist of prefabricated office with all associated power supply,mechanical and electrical works for Q-Chem project at Mesaieed.

KBR / Technip April, 2000

Other Buildings

1,615,000EPIC of 2600 m² pre-engineered steel structure store building with all associated electrical and mechanical works at QAFCO 4 expansion project in Mesaieed.

November, 2003Qatar Fertilizer Co.

(QAFCO)

2,500,000EPIC of 3240 m² new office building with all associated roads and external works including MEP, telecommunications, HVAC and fire fighting systems at Ras Laffan.

October, 2003RasGas

July, 2005Central warehouse at Mesaieed. Qatar Steel Co. 2,500,000

7,400,000 March, 2002RasGasAlwaha Club. (See Page 52)

Client Value: USD $Project Status of Completion

Landmark Buildings

18Company Profile 2013

Projects Summary

Client Value: USD $Project Status of Completion

Page 19: Company Profile 2013 · 2015-01-22 · Design and construction of central sewage collection system and construction of precast concrete boundary wall. Boom Construction Co. 4,000,000

Selected ProjectsHighways, Roads & Infrastructure

Site preparation, ground improvement by dynamic compaction and installation of 8000 lm new security paliside fence for Qatar Aluminium Smelter andPower Plant in Mesaieed

19Company Profile 2013

Salwa International Highway interchanges and installation of water pipelines and street lighting

Construction of underground piping systems consist of installation of GRP sea water pipelines, firewater, process, potable water lines and major infrastructure civil works at Aluminium Smelter in Mesaieed

Reconstruction of existing roads and construction of new roads with all associated services and infrastructure including upgrade of existing utilities and installation of new utilities at Mesaieed Community Area

Early site earth works for Barzan onshore project at Ras Laffan

Underpass and access roads for Doha 2006 Asian Games Village and Hamad Medical City

Environmental clean-up for New Doha International Airport project site including excavation and removal of waste, transportation from NDIA site and placement at engineered landfill site at Mesaieed

Construction of roads and infrastructure services such as foul sewage, surface water, potable water, TSE lines, pump stations and storm water system in NewDiplomatic area

Site development of service areas and potroom building area including earth works, construction of roads, surface drainages supply and installation of potable water lines for Qatar Aluminium Smelter in Mesaieed

EPIC for new support services and site development of 3,000,000 m² land at Ras Laffan Industrial City

EPIC for wet utilities distribution network (Potable water supply, fire water and sewrage) for support services for an area of approximately 3000 Hectares complete with auxiliary facilities, sub-systems and mains network at Ras Laffan Industrial City

28

27

25

21

22

29

30

23

26

24

20

Page 20: Company Profile 2013 · 2015-01-22 · Design and construction of central sewage collection system and construction of precast concrete boundary wall. Boom Construction Co. 4,000,000

Completion Date:

Client:

Project Scope:

Qatar Petroleum

February, 2013 (Ongoing)

Engineering, procurement and construction of major civil, mechanical, electrical, instrumentation and SCADA control works detailed as follows:

Excavation 873,300 m3 Imported fill material 111,000 TonPrecast concrete paving 28,000 m²Major RCC/Steel structure worksRoad crossing (Microtunneling)

Major Mechanical Works:

Civil Works:

Potable water pumping stationFire water pumping stationPotable water and fire water tanks 9 Tanks Overhead cranes and manual hoist cranes 31 Cranes

Major Electrical Installations: Power network (Transformers with panels, ups, etc) 30 Km Control System and Instrumentation: Telecommunication and SCADA control system Fire alarm system Fiber optic network 25 Km

20Company Profile 2013

147,370,000Value (USD$):

EPIC for wet utilities distribution network (Potable water supply, fire water and sewrage) for support services for an area of approximately 3000 Hectares complete with auxiliary facilities, sub-systems and mains network at Ras Laffan Industrial City.

Various utility pipeline Networks Sewage pumping stations

230 Km 29 Nos.

Highways, Roads & Infrastructure

Page 21: Company Profile 2013 · 2015-01-22 · Design and construction of central sewage collection system and construction of precast concrete boundary wall. Boom Construction Co. 4,000,000

Client:

Project Scope: The project scope includes all associated civil, mechanical, electrical, instrumentation and telecommunication works.

Qatar PetroleumValue (USD$): 190,000,000

Design Works:- Coordination of existing and future utility services- Traffic management strategy and traffic phasing- Reinforced concrete protection slab and culverts

Road Works and Street Lighting:

Electricity and Power Network (LV/MV/HV/EHV):

Conversion of existing Mesaieed Main Roundabout and Police Roundabout to Traffic Signal Junctions

Reconstruction of existing roads and construction of new roads with all associated services and infrastructure including upgrade of existing utilities and installation of new utilities at Mesaieed Community Area.

39 Km

187 Km 9 Km 34 Km29 Km18 Km70 Km5 Km200 Km250 Km

Potable Water Network:Telecommunication Network:

Treated Sewer Effluent Network (TSE):Utility Duct Network:

Completion Date: February, 2012

Landscaping Network:

Irrigation Network:

Surface Water Drainage Network:

Foul Sewer Network:

21Company Profile 2013

Highways, Roads & Infrastructure

Page 22: Company Profile 2013 · 2015-01-22 · Design and construction of central sewage collection system and construction of precast concrete boundary wall. Boom Construction Co. 4,000,000

Project Scope: Earth works for Barzan onshore early site project total area of 1,560,000 m² detailed as follows:

Client: RasGas

Completion Date: July, 2011

Grubbing, removal and transport vegetation 1,560,000 m²

Remove, transport and depose marine deposit 1,512,000 m3

Remove, transport and stockpile dune sand 400,000 m3

Excavation (suitable soil, soft rock and hard rock) 940,000 m3

Fill material 698,600 m3

Imported fill 1,521,000 m3

Main Contractor: CCC / Teyseer JV

Early site earth works for Barzan onshore project at Ras Laffan.

36,000,000Value (USD$):

22Company Profile 2013

Highways, Roads & Infrastructure

Page 23: Company Profile 2013 · 2015-01-22 · Design and construction of central sewage collection system and construction of precast concrete boundary wall. Boom Construction Co. 4,000,000

23Company Profile 2013

Highways, Roads & Infrastructure

Client:

Project Scope:

Public Works Authority (ASHGHAL)

Completion Date: December, 2010

Electrical work, storm drainage, telecommunication services, service water, TSE lines, irrigation and landscape works.

Security wall, CCTV cameras, gates, fiber optic cables, road blocks, security rooms, special signage and other necessary security items.

Hard and soft landscaping and irrigation system.

Construction of roads (12.1 km)

55,000,000Value (USD$):

Construction of roads and infrastructure services such as foul sewage, surface water, potable water, TSE lines, pump stations and storm water system in New Diplomatic area.

Page 24: Company Profile 2013 · 2015-01-22 · Design and construction of central sewage collection system and construction of precast concrete boundary wall. Boom Construction Co. 4,000,000

24Company Profile 2013

Highways, Roads & Infrastructure

Completion Date:

Client:

Project Scope: Design, procurement and construction of storm water drainage system, duct banks, road grading and sabkha treatment and construction of internal and external roads detailed as follows:

Qatar Petroleum

82,000,000

November, 2010

Excavation 435,000 m3

Imported fill 2,060,000 m3

Concrete 42,000 m3

Concrete culverts (600 & 1000mm diameter) 13 Km

Construction of roads 145,000 m²

Value (USD$):

EPIC for new support services and site development of 3,000,000 m² land at Ras Laffan Industrial City.

Page 25: Company Profile 2013 · 2015-01-22 · Design and construction of central sewage collection system and construction of precast concrete boundary wall. Boom Construction Co. 4,000,000

25Company Profile 2013

Highways, Roads & Infrastructure

Client:

Project Scope:

Construction of underground piping systems consist of installation of GRP sea water pipelines, firewater, process, potable water lines and major infrastructure civil works at Aluminium Smelter in Mesaieed.

Qatar Aluminium Co. (Qatalum)EPC Contractor: SNC-Lavalin

Completion Date: August, 2010

Total excavation 325,000 m3

Dewatering 74,000 m3

Sheet piling 38,500 m²

Concrete works 15,500 m3

Piping works 73 Km

Ducting works 58 Km

This project includes underground piping works and major civil works for Qatar Aluminium plant detailed as follows:

96,000,000Value (USD$):

Page 26: Company Profile 2013 · 2015-01-22 · Design and construction of central sewage collection system and construction of precast concrete boundary wall. Boom Construction Co. 4,000,000

Completion Date: October, 2009

Engineering and Technical Services:Engineering and details design Compaction test of the existing sub grade and newly constructed roadsSurvey of existing utility services

Grading and leveling Sub grade of road system and the drainage ditches Site filling of utility corridor and underground pipelines

Earth Works:

Construction of Road System and Surface DrainageRoad base with well graded crushed stone (0-25mm) Lining of the open ditches with well graded crushed stone Surfacing of the road base with a layer of 70mm of compacted asphalt for roads Curbstone, temporary road signs, chain-link fence

Concrete Works

Project Scope:

Site development of service areas and potroom building area including earth works, construction of roads, surface drainages supply and installation of potable water lines for Qatar Aluminium Smelter in Mesaieed.

Supply & Installation of Potable Water LinePermanent pipelineTemporary pipeline including fire hydrants

18,071,000Value (USD$):

3,000 m3

25,000 m3

10,000 m3

52,000 m3 9,000 m3

87,000 m3

300 Lm4,000 Lm1,100 m3

Client: Qatar Aluminium Co. (Qatalum)EPC Contractor: SNC-Lavalin

26Company Profile 2013

Highways, Roads & Infrastructure

Page 27: Company Profile 2013 · 2015-01-22 · Design and construction of central sewage collection system and construction of precast concrete boundary wall. Boom Construction Co. 4,000,000

27Company Profile 2013

Highways, Roads & Infrastructure

Client:

Project Scope:

Salwa International Highway interchanges and installation of water pipelines and street lighting.

Public Works Authority (ASHGHAL)

86,304,000

Completion Date: January, 2009

Water Pipes:

Cable trenches

Site clearance, demolition and earthworksSub-base and road baseFlexible surfacingRoad markingBridge structure works

Laying of D.I pipes from 200mm to 400mm diameter Removal of existing water D.I. pipes 400mm & 500mm diameter

Street Lighting Columns Foundation:

Construction works for ten (10) Interchanges:

Value (USD$):

2300 LM15,000 LM

1200 sets34,000 Lm

Page 28: Company Profile 2013 · 2015-01-22 · Design and construction of central sewage collection system and construction of precast concrete boundary wall. Boom Construction Co. 4,000,000

Client:

Project Scope:

Site preparation, ground improvement by dynamic compaction and installation of 8000 lm new security paliside fence for Qatar Aluminium Smelter and Power Plant in Mesaieed.

Site clearance (180 Hectares), scarification and compaction of existing ground (179 Hectares).

Ground improvement for the power plant area (25 Hectares) using wick drains and surcharge loading (placing and relocating to power plant area) of (750,000 m3).

Removal of existing security fence (3,000 M) and installation of new security palisade fence (8,000 M) to the perimeter of the aluminium and power plant.

Qatar Aluminium Co. (Qatalum)

Completion Date: December, 2008

Placing and compaction of fill materials for the platform construction of the aluminium and power plant (4,540,000 m3).

Ground improvement for the carbon plant (12 Hectares), using dynamic compaction.

34,446,000Value (USD$):

28Company Profile 2013

Highways, Roads & Infrastructure

Page 29: Company Profile 2013 · 2015-01-22 · Design and construction of central sewage collection system and construction of precast concrete boundary wall. Boom Construction Co. 4,000,000

Client:

Project Scope: Transformation of the existing Al Razi Roundabout into a large elliptical roundabout with two underpasses including all associated road works, concrete works and diversion/replacement of existing underground utilities.

Upgrade of Ahmed Bin Ali Street (C Ring Road) between the existing Bin Omran Roundabout and Rayyan Street including all associated diversions and replacement of existing underground utilities.

Excavation works for the overall car park, situated within the boundaries of the large elliptical roundabout.

Completion Date: October, 2005

18,600,000Value (USD$):

Public Works Authority (ASHGHAL)

Underpass and access roads for Doha 2006 Asian Games Village and Hamad Medical City.

29Company Profile 2013

Highways, Roads & Infrastructure

Page 30: Company Profile 2013 · 2015-01-22 · Design and construction of central sewage collection system and construction of precast concrete boundary wall. Boom Construction Co. 4,000,000

30Company Profile 2013

Highways, Roads & Infrastructure

Environmental clean-up for New Doha International Airport project site including excavation and removal of waste, transportation from NDIA site and placement at engineered landfill site at Mesaieed.

Client:

Project Scope:

New Doha International Airport (NDIA)

Completion Date: October, 2005

Excavation and removal of 8,000,000 m3 waste from the NDIA site and placement at engineered landfill site at Mesaieed.

Demolition and removal of all direct structures.

Removal of stagnant water from the northern lagoon and leachate from the made ground with all associated environmental aspects.

Stock piling of the waste removed to the new landfill site until the landfill is ready to receive waste materials.

Fencing for stock piling areas and wheel washing systems for transporting trucks.

38,050,000Value (USD$):

Page 31: Company Profile 2013 · 2015-01-22 · Design and construction of central sewage collection system and construction of precast concrete boundary wall. Boom Construction Co. 4,000,000

Oil & Gas, Petrochemical and Industrial ProjectsSelected Projects

31Company Profile 2013

32

Fabrication and installation of above ground metal piping, installation of water supply pumps, emergency cooling towers, compressed air piping system and closed cooling medium system at Qatar Aluminium Smelter in Mesaieed

34EPIC for two new kangaroo cranes and upgrading of existing gabbro berths crane facilities including all mechanical and electrical works at Mesaieed Port

38EPIC of potable water transmission system and landscaping mains to distribute water produced by RLPC to various facilities within Ras Laffan

37Engineering, procurement, fabrication and installation of dust collection towers and sunshades

39

EPIC of waste management facility including construction of new landfill cells, HDPE membrane, access roads, weigh scale and concrete land treatment unit with a total capacity of 2800m3 of biodegradable waste at Ras Laffan Industrial City (RLIC)

35

Installation of cathode roding equipment and induction furnace including supply and erection of all mechanical, piping, electrical and instrumentation works at Qatar Aluminium Smelter in Mesaieed

33Major ground and civil works for rectifier stations at Qatar Aluminium Smelter in Mesaieed

36

Civil, infrastructure and electromechanical works for camps and other facilities including underground piping networks, road works, installation of treated effluent tanks, waste water treatment units and sludge treatment units

Page 32: Company Profile 2013 · 2015-01-22 · Design and construction of central sewage collection system and construction of precast concrete boundary wall. Boom Construction Co. 4,000,000

Completion Date:

Project Scope: Fabrication and erection of pipes and connection to potable, process and fire water tanks.

In water supply area.

Installation of water supply pumps.

Installation of emergency cooling tower.

Fabrication and erection of compressed air piping system.

Fabrication and erection of closed cooling medium system.

20,420,000Value (USD$):

September, 2010

Fabrication and installation of above ground metal piping, installation of water supply pumps, emergency cooling towers, compressed air piping system and closed cooling medium system at Qatar Aluminium Smelter in Mesaieed.

Client: Qatar Aluminium Co. (Qatalum)

EPC Contractor: SNC-Lavalin

Oil & Gas, Petrochemical and Industrial Projects

Company Profile 2013 32

Page 33: Company Profile 2013 · 2015-01-22 · Design and construction of central sewage collection system and construction of precast concrete boundary wall. Boom Construction Co. 4,000,000

33Company Profile 2013

Oil & Gas, Petrochemical and Industrial Projects

Completion Date:

Client:

Project Scope: Excavation for foundations

Filling to structures and embankment

Fire rated concrete works and surface painting

Water proofing, and fencing works

Miscellaneous metal works

Qatar Aluminium Company (Qatalum)

March, 2010

24,240,000Value (USD$):

Major ground and civil works for rectifier stations at Qatar Aluminium Smelter in Mesaieed.

Page 34: Company Profile 2013 · 2015-01-22 · Design and construction of central sewage collection system and construction of precast concrete boundary wall. Boom Construction Co. 4,000,000

34Company Profile 2013

Oil & Gas, Petrochemical and Industrial Projects

Completion Date:

Client:

Project Scope:

Location: Mesaieed Port

The scope includes engineering, procurement, construction and commissioning of two kangaroo cranes with a rated capacity of 1,100 ton/hour each including all related electrical and mechanical works as follows:

Qatar Petroleum

March, 2009

Two kangaroo crane with a rated capacity of 1,100 ton/hour

HV electrical power supply for the new kangaroo cranes

Four new grabs and ropes for the two existing kangaroo cranes

Fresh-water based dust suppression systems for the two existing kangaroo cranes

Video camera system

The scope also includes all related mechanical and electrical works to upgrade the following:

A mobile harbour crane

A hopper

LV electrical power supply and sockets for mobile hopper

31,336,000Value (USD$):

EPIC for two new kangaroo cranes and upgrading of existing gabbro berths crane facilities including all mechanical and electrical works at Mesaieed Port.

Page 35: Company Profile 2013 · 2015-01-22 · Design and construction of central sewage collection system and construction of precast concrete boundary wall. Boom Construction Co. 4,000,000

35Company Profile 2013

Oil & Gas, Petrochemical and Industrial Projects

Completion Date:

Project Scope: All associated mechanical, piping, electrical and instrumentation works to install the following:

Cathode roding equipment

Induction furnace

Overhead cranes

Emergency water pumps

January, 2009

7,850,000Value (USD$):

Installation of cathode roding equipment and induction furnace including supply and erection of all mechanical, piping, electrical and instrumentation works at Qatar Aluminium Smelter in Mesaieed.

Client: Qatar Aluminium Co. (Qatalum)

EPC Contractor: SNC-Lavalin

Page 36: Company Profile 2013 · 2015-01-22 · Design and construction of central sewage collection system and construction of precast concrete boundary wall. Boom Construction Co. 4,000,000

36Company Profile 2013

Oil & Gas, Petrochemical and Industrial Projects

Client: Chiyoda - Technip J.V.

Project Scope: This project consists of the following:

Civil and infrastructure works:Underground networks (HDPE 40 to 410 mm)

GRP pipeline 10" diameter

Foundations for the waste water treatment, potable water / firewater and

power generation units

Road works and street lighting

Sludge building

Galvanized fence

Construction of secondary substations and diesel generators buildings

Mechanical, electrical and instrumentation works:

Completion Date: November, 2007

Installation of secondary package substations

Cable laying

Instrumentation works

Diesel storage tanks

Structural steel works

Above ground galvanized steel piping

Supply and installation of 2 Nos. vertical, GLS bolted potable water tanks

(3200 m3) each, with aluminium dome cover

Supply and installation of 4 Nos. vertical, GLS bolted treated effluent tanks

(1600 m3) each, with aluminium dome cover

Installation of the waste water treatment units

Installation of sludge treatment unit

33,455,000Value (USD$):

Civil, infrastructure and electromechanical works for camps and other facilities including underground piping networks, road works, installation of treated effluent tanks, waste water treatment units and sludge treatment units.

Page 37: Company Profile 2013 · 2015-01-22 · Design and construction of central sewage collection system and construction of precast concrete boundary wall. Boom Construction Co. 4,000,000

Completion Date:

Client:

Project Scope: Fabrication and erection of structural steel

"Dust Collection Towers" 201 Ton

Checkered plates 18 Ton

Gratings 190 m²

Supply and installation of H2 sunshade 28 Ton

Aluminium sheeting 430 m²

General Electric (GE)

August, 2007

1,600,000Value (USD$):

Engineering, procurement, fabrication and installation of dust collection towers and sunshades.

37Company Profile 2013

Oil & Gas, Petrochemical and Industrial Projects

Page 38: Company Profile 2013 · 2015-01-22 · Design and construction of central sewage collection system and construction of precast concrete boundary wall. Boom Construction Co. 4,000,000

38Company Profile 2013

Completion Date:

Client:

Project Scope: Detailed engineering, procurement, construction, installation, testing and commissioning of:

Qatar Petroleum

October, 2005

Water potable (WP) transmission system (FRP) to distribute the water produced by Ras Laffan Power Company to existing reservoirs in Ras Laffan City, with all associated control and monitoring systems.

Water landscaping (WL) transmission system (FRP, uPVC and CS) to distribute water from Ras Laffan Power Company, Oryx GTL plant, Ras Laffan City camp waste water treatment plant and the JGC waste water treatment plant to various facilities.

13,600,000Value (USD$):

EPIC of potable water transmission system and landscaping mains to distribute water produced by RLPC to various facilities within Ras Laffan.

Oil & Gas, Petrochemical and Industrial Projects

Page 39: Company Profile 2013 · 2015-01-22 · Design and construction of central sewage collection system and construction of precast concrete boundary wall. Boom Construction Co. 4,000,000

39Company Profile 2013

Client:

Project Scope:

RasGas

The scope consists of the following:

Completion Date: December, 2002

4,600,000Value (USD$):

EPIC of waste management facility including construction of new landfill cells, HDPE membrane, access roads, weigh scale and concrete land treatment unit with a total capacity of 2800m3 of biodegradable waste at Ras Laffan Industrial City (RLIC).

Oil & Gas, Petrochemical and Industrial Projects

Construction of new landfill containing three equal cells with an approximate capacity of 60,000 m3. The cells were lined internally with HDPE membrane.

Access road of 4.00m wide with an approximate length of 2500 M.

Guard house of 6.00 x 9.00 (M) concrete building.

Weigh scale area.

Concrete land treatment unit with an approximate total capacity of 2800 m3 of biodegradable waste.

Page 40: Company Profile 2013 · 2015-01-22 · Design and construction of central sewage collection system and construction of precast concrete boundary wall. Boom Construction Co. 4,000,000

Pipeline Construction

41

42Upgrading of New and Old Salwa distillate and rising mains (22km of pipes)

Design and construction of 1200 mm of 30 Km transmission main from Doha West STW to Al Rakhiya farm

Selected Projects

40Company Profile 2013

.

Page 41: Company Profile 2013 · 2015-01-22 · Design and construction of central sewage collection system and construction of precast concrete boundary wall. Boom Construction Co. 4,000,000

Completion Date:

Client:

Project Scope: The project consists of design, procurement and construction of 1200 mm diameter GRP mains detailed as follows:

Public Works Authority (Ashghal)

December, 2011

Pipeline Construction

1200 mm diameter GRP main 30 Km

500 mm diameter GRP main 720 M

Air valves, washout and connection chambers

Flow control valves and flow meters.

41Company Profile 2013

44,370,000Value (USD$):

Design and construction of 1200 mm of 30 Km transmission main from Doha West STW to Al Rakhiya farm.

Page 42: Company Profile 2013 · 2015-01-22 · Design and construction of central sewage collection system and construction of precast concrete boundary wall. Boom Construction Co. 4,000,000

Completion Date:

Client:

Project Scope: Replacement of 1200 mm, 900 mm rising mains and associated pipe works from Old Salwa reservoir station and New Salwa reservoir station.

Replacement of existing 1200 and 1400 mm pipe works and construction of new 1400 mm distillate main segment including all associated pipe works from New Salwa to immigration interchange.

Extension of new 600 mm rising main and associated pipe works along Waab Street, from Fourosiyah to Khalifa Stadium.

Qatar Electricity & Water Co. (KAHRAMAA)

September, 2007

32,000,000Value (USD$):

42Company Profile 2013

Upgrading of New and Old Salwa distillate and rising mains (22 Km of pipes)

Pipeline Construction

Page 43: Company Profile 2013 · 2015-01-22 · Design and construction of central sewage collection system and construction of precast concrete boundary wall. Boom Construction Co. 4,000,000

Power Generation, Substations and Desalination Plants

45Civil works related to the construction of 40 million gallons per day water desalination plant at Ras Laffan

44

Major civil works related to the construction of distillers and boilers areas, intake structure and potable water reservoirs for 45 million gallons per day water desalination plant at Ras Abu Fontas

Selected Projects

43Company Profile 2013

Page 44: Company Profile 2013 · 2015-01-22 · Design and construction of central sewage collection system and construction of precast concrete boundary wall. Boom Construction Co. 4,000,000

44Company Profile 2013

Client:

Project Scope: 75,500,000Value (USD$): Fisia Italimpianti

Intake and outfall structuresRoad worksPipe trenchesLocal control room, Chlorination building and CO2 production buildingEquipment and pipe rack foundationsWater basins and pumps wellSeawater screening and pumping station

Distillers area and intake structure

Major civil works related to the construction of distillers and boilers areas, intake structure and potable water reservoirs for 45 million gallons per day water desalination plant at Ras Abu Fontas.

Completion Date: March, 2010

Potable water reservoirs Potable water reservoirs 102,000 m3 (2 Nos.) Potable water pumping station Equipment foundations Flow meters and valve pits

Storage tanksLocal control roomsPipe rack and equipment foundationsBoilers and stack foundations (3 Nos.) Switchgear and control room buildings

Boilers area

Power Generation, Substations and Desalination Plants

Page 45: Company Profile 2013 · 2015-01-22 · Design and construction of central sewage collection system and construction of precast concrete boundary wall. Boom Construction Co. 4,000,000

45Company Profile 2013

Completion Date:

Client:

Project Scope: All associated civil works to build 40 million gallons per day desalination, blending and demineralization plants.

20,437,000Value (USD$):

Fisia Italimpianti and Enel Power

May, 2003

Power Generation, Substations and Desalination Plants

Installation of temporary facilities and lay down area for this projectand future expansionBulk earth worksConcrete foundations for 4 main desalination unitsSupply and discharge stations including U.G. GRP pipe worksOnsite GRP pipelines of various diametersMain pumps structure and chemical dosing unitsRe-mineralization structure including water tight structureMain switchgear and control buildings (3 Nos.) Electro-chlorination building (1 No.) New roads and walkways with all associated civil worksConstruction of cooling towerConstruction of 220 KVA cable corridor involves 80,000 m3 of excavation

Civil works related to the construction of 40 million gallons per day water desalination plant at Ras Laffan.

Page 46: Company Profile 2013 · 2015-01-22 · Design and construction of central sewage collection system and construction of precast concrete boundary wall. Boom Construction Co. 4,000,000

Sewage Treatment Plants and Pumping Stations

48Construction of treated sewage effluent network (TSE) T6 to T7 including 48 km of TSE mains

Selected Projects

46Company Profile 2013

Refurbishment and upgrading works for various foul and stormwater pumping stations including civil, mechanical, electrical and HVAC works 47

Page 47: Company Profile 2013 · 2015-01-22 · Design and construction of central sewage collection system and construction of precast concrete boundary wall. Boom Construction Co. 4,000,000

Sewage Treatment Plants and Pumping Stations

Client:

Project Scope:

Public Works Authority (Ashghal)

Completion Date: January, 2014 (Ongoing)

The refurbishment and upgrading of four (4) foul pumping stations and two (2) storm water pumping stations including:

53,295,000Value (USD$):

Refurbishment and upgrading works for various foul and stormwater pumping stations including civil, mechanical, electrical and HVAC works.

- Civil works

- Temporary bypass works, wet and dry well works

- Rising main works and mechanical works

47Company Profile 2013

Page 48: Company Profile 2013 · 2015-01-22 · Design and construction of central sewage collection system and construction of precast concrete boundary wall. Boom Construction Co. 4,000,000

Completion Date:

Client:

Project Scope: Construction of 48 Km of treated sewage effluent network to service the north of Doha area including:

Ministry of Municipal Affairs and Agriculture (MMAA)

April, 2004

Various TSE mains HDPE pipes 300 – 600 (mm) D.I. pipes laid over the channel hung on the parapet of the bridge Air valves circular type Gate valves circular type Washouts circular type Distribution chambers rectangular type TSE pipes installed by non-disruptive method Partial TSE mains HDPE ducts installed by NDM Remote control irrigation systems for primary and secondary roads

13,000,000Value (USD$):

Construction of treated sewage effluent network (TSE) T6 to T7 including 48 km of TSE mains

Sewage Treatment Plants and Pumping Stations

48Company Profile 2013

Page 49: Company Profile 2013 · 2015-01-22 · Design and construction of central sewage collection system and construction of precast concrete boundary wall. Boom Construction Co. 4,000,000

Landmark Buildings 50

51

52Alwaha Club

Dubai Towers

Selected Projects

49Company Profile 2013

Barwa Financial District

Page 50: Company Profile 2013 · 2015-01-22 · Design and construction of central sewage collection system and construction of precast concrete boundary wall. Boom Construction Co. 4,000,000

Completion Date:

Project Scope:

April, 2014 (Ongoing)

Landmark Buildings

Elevated car parking15 Podiums : Retail + Technical9 Towers : Offices – Shell & CoreHotel & Convention CenterPrimary substationEnergy Center

The Barwa Financial District (BFD) is situated in Doha’s new business district in West Bay with approximately built-up area of 700,000 m² as detailed below:

Client: Barwa Real Estate Company

1,301,370,000Value (USD$):

Barwa Financial District A Joint Venture with Bouygues and Midmac Contracting.

50Company Profile 2013

Page 51: Company Profile 2013 · 2015-01-22 · Design and construction of central sewage collection system and construction of precast concrete boundary wall. Boom Construction Co. 4,000,000

Project Scope: Construction of a new mixed-use corporate tower in the West Bay district of Doha. It will contain world-class retail, offices, hotel, serviced apartments and residential units. It has been envisioned that upon completion, the project will be the tallest building in Doha housing both residential and commercial establishments.

Sama Dubai

Residential space 31 floorsOffice space 29 floorsFive-star boutique hotel 13 floorsRetail space 2 floorsBallroomMeeting facilitiesBusiness centerSwimming pool and SpaAssociated facilities

The scope consists an 84-storey tower with total built-up area of 295,000 m² detailed as below:

Client:

400,000,000Value (USD$):

Dubai TowersA Joint Venture with Al Habtoor

Landmark Buildings

Completion Date: Ongoing

51Company Profile 2013

Page 52: Company Profile 2013 · 2015-01-22 · Design and construction of central sewage collection system and construction of precast concrete boundary wall. Boom Construction Co. 4,000,000

Completion Date:

Client:

Project Scope: Construction of one storey concrete structure building with a total buit-up area of 7300 m² includes a metal decking roofing for the multipurpose hall with all associated MEP, telecommunications, HVAC and fire fighting system.

RasGas

March, 2002

52Company Profile 2013

Restaurant, snack bar and private dining room Lounge and meeting rooms Recreational rooms Multi-purpose hall that functions as a theatre Gymnasium Children’s nurseryAdministration offices External swimming pool Shaded paddling pools Play areas and mini golf course

7,400,000Value (USD$):

Alwaha Club

Landmark Buildings

Page 53: Company Profile 2013 · 2015-01-22 · Design and construction of central sewage collection system and construction of precast concrete boundary wall. Boom Construction Co. 4,000,000

Resources

53Company Profile 2013

Page 54: Company Profile 2013 · 2015-01-22 · Design and construction of central sewage collection system and construction of precast concrete boundary wall. Boom Construction Co. 4,000,000

Fabrication Workshop

OfficesJE’s head office is located close to the airport on Museum Road. Our offices are equipped with latest IT infrastructure to meet the international standards and requirements in order to meet our local and international clients’ expectations.

JE’s philosophy is to achieve maximum efficiency of fabrication productivity. JE has established state of art fabrication workshop facilities equipped with new machines, equipment and tools.

Our fabrication workshop is situated in Al Khor Industrial Area close to the Ras Laffan Industrial City where all the major clients are located.

PMV FacilitiesJE has invested heavily in purchasing new equipment to be able to execute the upcoming mega projects. In addition, JE has established two central PMV workshops located in Salwa Indus-trial Area and Al Khor Industrial Area. Our continuous preventative maintenance is carried out by a dedicated and trained team. JE has the largest fleet count in the State of Qatar exceeding 1,700 pieces of machinery.

Resources

54Company Profile 2013

Page 55: Company Profile 2013 · 2015-01-22 · Design and construction of central sewage collection system and construction of precast concrete boundary wall. Boom Construction Co. 4,000,000

Mobile Crane

Tower Crane

Man Lift

Forklift

Self Loader

Trencher

Bulldozer

Back Hoe

Loader

Uni-Loader

Roller

Compactor

Grader

Tipper Truck/Trailer – 19m³

Tipper Truck/Trailer – 32m³

6

18

24

84

52

26

58

73

14

157

140

Generator

Tower Lights

Concrete Mixer

Power Floats

High Water Pressure Pump

Vibrators

Asphalt Cutters

Hydro Testing Pump

Air Compressor

Dewatering Pump

Welding Machine

Power Screen & Vibratory Screen

Kerb Casting Machine

Interlock Laying MachineTransit Mixer

Buses

Pickups

Cars

70

146

141

Trailer with Low Bed/High Bed / Container

19

Tracked Jaw Crusher & Impact Crushers

Excavator

Descriptions No. Descriptions No.

Vehicles 357

Lifting Equipment

19

3

3

10

15

50 Others 622

Earth Works 652

Transport Equipment 19

150

166

19

12

7

63

18

12

18

93

33

17

1

11

11

Grand Total 1700

No. Descriptions50 Others50 Others50 Others

55Company Profile 2013

Equipment Fleet

Page 56: Company Profile 2013 · 2015-01-22 · Design and construction of central sewage collection system and construction of precast concrete boundary wall. Boom Construction Co. 4,000,000

Staff & Manpower

Top Management

Estimation Department

Procurement Department

Contracts Department

Projects Control Department

Accounts Department

Human Resources Department

Projects Staff

Operation MEP

Quality, Health, Safety & Environment

Project Technical Staff

HR Department Support Staff (Site Admin & Camps)

Project Workforce (Skilled & Unskilled Labor)

Drivers & Operators

15

Operation Civil

Descriptions No.

575

Management Staff 191

Management Information System (MIS) Department

MEP Fabrication Workshop

PMV Department

8

31

17

23

15

20

23

54

6,852

460

65

3,870

52

1,400

70

345

56

Grand Total 7, 043

Company Profile 2013

Page 57: Company Profile 2013 · 2015-01-22 · Design and construction of central sewage collection system and construction of precast concrete boundary wall. Boom Construction Co. 4,000,000

Sustainability

57Company Profile 2013

Page 58: Company Profile 2013 · 2015-01-22 · Design and construction of central sewage collection system and construction of precast concrete boundary wall. Boom Construction Co. 4,000,000

Integrated Management System (IMS)

58Company Profile 2013

The protection of human health, personal safety and environmental rank at the highest level of importance to JE. We operate in a diligent and responsible manner consistent with other world-class corporations and aligned with our stated QHSE business goals and policy.

JE empowers and supports our associates in their ongoing efforts to prevent accidents of all kinds and to promote a safe environment wherever they go. We use comprehensive management systems to demonstrate our commitment to Quality, Health, Safety and the protection of our Environment and to the principles of our QHSE Policy, bringing value to our associates, customers and the community.

Responsibility for Quality, Health, Safety and Envi-ronment rests at the top management level of AlJaber Engineering and is transferred to down the line for implementation. Everyone in our organiza-tion is accountable for QHSE performance in their respective area. JE embarked upon a number of behavioral safety initiatives to complement our procedures and to seek to ensure that everyone engages fully in matters.

Quality, Health, Safety and EnvironmentJE places emphasis on internally improving the physical and social environments in which employ-ees operate in. We constantly perform risk man-agement techniques to identify the dangers employees can encounter in the workplace. Preventing these problems are highly beneficial and results have shown that a safe and hygienic environment has led to a higher productivity. Our standards of procedure and policies are imple-mented to ensure employee safety and health is an action taken proactively and controlled by the top management.

In QHSE (quality, health, safety and environment), JE continues to be one of the leading performers within our industry sectors.

JE is striving to continually improve the perfor-mance in QHSE management system and continu-ally improving our quality, health, safety and environment performance is one of our key strate-gic objectives. AlJaber Engineering’s QHSE objec-tives are given equal value with other business objectives and being monitored by top manage-ment.

The quality of everything we make and do brings value to our customers and justifies their decision to do business with us.

Page 59: Company Profile 2013 · 2015-01-22 · Design and construction of central sewage collection system and construction of precast concrete boundary wall. Boom Construction Co. 4,000,000

ISO & OHSAS Certifications

59Company Profile 2013

Page 60: Company Profile 2013 · 2015-01-22 · Design and construction of central sewage collection system and construction of precast concrete boundary wall. Boom Construction Co. 4,000,000

Quality & HSE Policies

60Company Profile 2013

QUALITY POLICY

OSAMA HADID

CHIEF EXECUTIVE OFFICER

It is the policy of AlJaber Engineering Company to provide Quality Economical, Engineering and Construction Services to the customer’s satisfaction. In order to achieve this Policy, the following shall be established and complied with:

* Identify customer requirements, meet the requirements and carry out the services with team spirit.

* Ensure compliance with all applicable regulations and requirements regarding the services provided.

* Provide efficient services to meet customer specifications and need by procuring the proper materials and maintaining equipment and necessary infrastructure in a high state of repair.

* Recruit highly qualified staff and improve the skills of employees in order to maintain the quality of products and services that meet, or exceed, the customer expectations.

* Optimize the performance and maintain strict monitoring of the project throughout its duration in order to meet the client requirements.

* Continually identify, assess and implement the measures and steps that improve the company’s Quality Management System.

JEC/IMS/PL/02 Rev. 5 Dated: 01.11.12

Page 61: Company Profile 2013 · 2015-01-22 · Design and construction of central sewage collection system and construction of precast concrete boundary wall. Boom Construction Co. 4,000,000

Quality & HSE Policies

61Company Profile 2013

HSE POLICY

OSAMA HADID

CHIEF EXECUTIVE OFFICER

AlJaber Engineering is dedicated to the concept that all accidents are preventable and we are committed to a zero accident policy. To achieve and enhance this commitment to our policy, and foster a culture of continuous improvement of our safety health and environment duties, the following shall be followed:

* Comply with applicable legal and other business requirements. In those areas specific to the Civil Engineering Construction Industry, seek to apply more stringent standards and procedures where appropriate.

* Emphasize the awareness and training of all persons working for, or on behalf of AlJaber Engineering.

* The Health and Safety of its employees, subcontractors and other persons who may be affected by the company’s activities, are of foremost consideration.

* Take appropriate precautions to prevent all incidents, which may harm people, damage property and pollute the environment.

* Taking care of health of employees, ensuring safety at work places and protecting the environment is everyone’s responsibility. The HSE personnel will work as catalysts to ensure that all sites’ personnel fulfill their respective responsibilities.

* Protect the Environment by maintaining low levels of generated waste through various activities, and minimize the consumption of resources.

* Ensure the safe operation of all industrial equipment machinery and plant.

* Continually identify the potential areas for HSE Management System improvement and establish the necessary measures to implement such improvements.

* Ensure that any party performing business with AlJaber Engineering is complying with all of the above.

JEC/IMS/PL/01 Rev. 5 Dated: 01.11.12

Page 62: Company Profile 2013 · 2015-01-22 · Design and construction of central sewage collection system and construction of precast concrete boundary wall. Boom Construction Co. 4,000,000

2 Million Man Hours without a lost time incident. Presented By NDIA.

20,000,000 Man Hours with no lost time incidents . Presented by CTJV.

1,000,000 Man Hours without lost time accident at NDIA. Presented by NDIA.

5,000,000 Man Hours without lost time injury at Ras Abu Fontas - A1 Project. Presented by Fisia Italimpianti.

Safety Certifications & Achievements

62Company Profile 2013

Page 63: Company Profile 2013 · 2015-01-22 · Design and construction of central sewage collection system and construction of precast concrete boundary wall. Boom Construction Co. 4,000,000

Safety Certifications & Achievements

63Company Profile 2013

Page 64: Company Profile 2013 · 2015-01-22 · Design and construction of central sewage collection system and construction of precast concrete boundary wall. Boom Construction Co. 4,000,000

Safety Certifications & Achievements

64Company Profile 2013

Page 65: Company Profile 2013 · 2015-01-22 · Design and construction of central sewage collection system and construction of precast concrete boundary wall. Boom Construction Co. 4,000,000

Appreciations

65Company Profile 2013

Page 66: Company Profile 2013 · 2015-01-22 · Design and construction of central sewage collection system and construction of precast concrete boundary wall. Boom Construction Co. 4,000,000

Affiliates

66Company Profile 2013

Page 67: Company Profile 2013 · 2015-01-22 · Design and construction of central sewage collection system and construction of precast concrete boundary wall. Boom Construction Co. 4,000,000

Formwork and scaffoldingGarbage and linen chutes BMU window cleaning systemsGlass-reinforced plastics (GRP)

Al Wataniya Concrete

Al Wataniya Concrete offers the following products and services:

Contact Details:P.O. Box: 24381 Tel: +974 4483 8751 Fax: +974 4483 2334 Email: [email protected] Website: www.watancon.com

Ready-mix concretePrecast concreteProduct testing laboratories

Arabian Specialized Materials

ASMA provides a wide range of products such as:

High-density polyethylene (HDPE)PPR PipesConstruction chemicalsDecking, flooring and floor coating Stainless steel worksWater and drainage valvesBearing pads and gasketsDuctile iron pipes and fittings and many more

Contact Details:P.O. Box: 55289 Tel: +974 4421 3636 Fax: +974 4421 3737 Email: [email protected] Website: www.asmaqatar.com

67

Al Wataniya is the leading producer and supplier ofReady-mix concrete in Qatar. They operate twelveplants in four strategic locations across the country(Lusail, Mesaieed, Salwa and Ras Laffan) to fulfill theescalating demand of their products. They implement adynamic quality control program to deliver durable andhigh performance concrete (HPC). Furthermore, theyhave a total production capacity of more than 100,000m³/month.

ASMA is the trading arm of AlJaber Engineering andthey have been serving the market over the last fifteenyears with a variety of specialty products, fixtures andequipment. They have provided construction materialsand solutions to numerous clients in several industriesincluding infrastructure, buildings, water, electricity, oil &gas, and petrochemicals.

Company Profile 2013

Page 68: Company Profile 2013 · 2015-01-22 · Design and construction of central sewage collection system and construction of precast concrete boundary wall. Boom Construction Co. 4,000,000

Confidence Equipment and Transportation Company

Confidence handles the following activities:

Contact Details:P.O. Box: 24430Tel: +974 4469 0714Fax: +974 4469 0735Email: [email protected]

Rental of treated water tankers Rental of water tankersSupply of waterRemoval of sewage waterRemoval of garbage material

AlJaber & Makhlouf

Contact Details:P.O. Box: 23792 Tel: +974 4432 4661 Fax: +974 4432 3319 Email: [email protected] Website: www.jabmak.com

Their primary activities include:

Earth and sub-base worksAsphalt worksInfrastructure developmentRoad markingIntegrated paving solutionsAsphalt stamping and coding

68

Confidence Equipment and Transportation (CET) offerssolutions for water tankers, sewage removal, garbagematerial as well as the transportation of these activities.With more than 170 employees at their disposable,they are one of the market leaders in catering tovarious sectors and provide assistance for any rental ofequipment that aid companies in their operations.

Al Jaber & Makhlouf is one of Qatar’s leading companiesin the production and laying of asphalt materials, roadworks and related services in the oil & gas fields, petro-chemicals, water, electricity and infrastructure forgovernment, public and private entities. They haveover 33 years of experience in undertaking andcompleting projects for international clients.

Company Profile 2013

Page 69: Company Profile 2013 · 2015-01-22 · Design and construction of central sewage collection system and construction of precast concrete boundary wall. Boom Construction Co. 4,000,000

Arabian Supply Center

Contact Details:P.O. Box: 10882 Tel: +974 4458 0623, +974 4458 0635Fax: +974 4458 0562Email: [email protected]: asc.com.qa

ASC offers the following products:ClutchesAir Brake SystemBatteriesBearings

Hand ToolsFiltersCooling SystemsTires

Engine PartsTransmissionUndercarriageGearboxes

Arabian Projects Development Company

Establishing all ground work needed to facilitate daily operations for a new company.

Contact Details:P.O. Box: 55289Tel: +974 4421 3636Fax: +974 4421 3737E-mail: [email protected]: www.asmaqatar.com

ADPC offers the following services:

Provides support in understanding legislation and legal systems in Qatar.

Offers expertise in analyzing short - term and long - term trends. Assistance in development of planning to foster growth in a dynamic environment.

69

APDC is involved in Business Development and offersmarketing strategies for foreign companies aiming tosell their products and services in the Qatari Market.They have partnered with many international companiesin the Qatari market and have a standing reputationthat has attracted more companies within the region.

Arabian Supply Center (ASC) has been supplying spareparts for the construction industry and transportationsector, since 2008. Recently we have added heavyequipment spare parts to our portfolio.

ASC has built its reputation on the sound principles ofquality products and customer service. Our teams ofexperts have years of extensive experience in thismarket. Our professional management team and trainedsales personnel are highly qualified to meet your needs.

Our global supply base and exclusive distributorshiprights in Qatar offers us an added advantage to providequality parts at the right price. We import high qualityparts and accessories from original equipment manufac-turers (OEM) and trusted sources in Italy, Switzerland,Australia, Germany, Holland, France, and the U.S.for brands such as Mercedes Benz trucks & trailers,MAN trucks, Caterpillar, Komatsu, etc.

Company Profile 2013

Contact Details:P.O Box: 22804Tel: + 974 4467 6086Fax: +974 4467 6082E-mail: [email protected]

Tremix Al Jaber is a joint venture company formed in 2005 between Technical Readymix (Tremix), a leading concrete supplier based in the United Arab Emirates and AlJaber Group, a well-established contracting company in Qatar, in order to supply the total ready-mix concrete requirement of the New Doha International Airport.

To date, over 2 million cubic meters of concrete have been supplied making the project one of the largest infrastruc-ture projects in Qatar.

Tremix AlJaber

Page 70: Company Profile 2013 · 2015-01-22 · Design and construction of central sewage collection system and construction of precast concrete boundary wall. Boom Construction Co. 4,000,000

Delmon Scaffolding

Contact Details:

Access scaffolding systemQuick strike decking systemWall formwork systemTower scaffold system (mobile & stationary)Consulting and engineering services Contracting services Personnel training Operation and maintenance services

Delmon Scaffolding has the following scope of work:

P.O. Box: 17096Tel: +974 4435 3131 Fax: +974 4435 3232 Email: [email protected] Website: www.delmongroup.net

Contact Details:P.O Box: 24761Tel: +974 4477 1779Fax: +974 4467 8410Email: [email protected]: www.bimtechnologies.net

BIMTEC

70

BIMTEC has initiated operations in an effort to supportthe Building Information Modeling (BIM) boom that israpidly impacting all phases of the Architecture,Engineering, and Construction (AEC) industry. We leadwith Building Information Modeling Training/ Productionservices /and BIM Projects management to thearchitectural and engineering design disciplines(Structural, MEPFF, Civil), construction managers,Project managers and owner representatives firms, onthe concepts of gauging a project throughout the buildingslife-cycle rather than simply a picture in time.

Delmon Scaffolding has diverse expertise in themanufacturing, supply, and hiring of various types ofscaffolding and formwork systems in the majordevelopments in Qatar. Their abilities cover bothsteel and aluminum works and along with theirtechnical expertise, Delmon is widely renowned fortheir high-quality finishes.

Company Profile 2013

Page 71: Company Profile 2013 · 2015-01-22 · Design and construction of central sewage collection system and construction of precast concrete boundary wall. Boom Construction Co. 4,000,000

International Drilling Group

Horizontal directional drilling

Consultation, planning, management and execution of related construction works

Their services include the following:

Contact Details:P.O. Box: 47530Tel: +974 4435 8738Fax: +974 4462 6067Email: [email protected]: www.intdrillinggroup-co.com

International Drilling Group (IDG) is a leading companyin the horizontal directional drilling (HDD) field andexperienced and capable of dealing with all kinds ofsoil conditions (soft, hard, rock, etc.,) and in the mostremote and difficult places. IDG has established a widereputation for serving the HDD pipeline industry andcabling as a competent contractor using the mostadvanced technology for the gas, fuel, water, fiberoptical, electrical and telephone cables projects.

71Company Profile 2013

EMCON

Contact Details:P.O Box: 124288Tel: +971 4347 3400Fax: +971 4347 3402Email: [email protected]: www.emconblocks.com

Emirates Concrete & Steel Protective Coating Works(EMCON) was established in 1978 and started itsPainting and Special Coating Division in 1987. TodayEMCON is one of the leaders in UAE in the followingfields:

Application of Specialized protective coating systemand flooring system from Jotun, BASF, Fosroc,Henkel-Polybit, Hempel and Corrotech.

All types of Epoxy Spray Systems on buildings, Plants and Structures.

Special effect paints, Calligraphy and Multicolor paints.

EMCON has manpower exceeding 300 highly skilled employees and access to additional workforce in Dubai/Doha. EMCON has Airless Spray equipment, Blast Track Machines, Water Jetting equipment, Compressors, Sand Blasting equipment, Guniting and Shotcreting equipments.

Page 72: Company Profile 2013 · 2015-01-22 · Design and construction of central sewage collection system and construction of precast concrete boundary wall. Boom Construction Co. 4,000,000

General ContractorTel: +974 4444 6206, Fax: +974 4444 6361P.O. Box: 22801, Doha - QatarE-mail: [email protected]

LLC