37
1 Company Profile Tel. & Fax +39.0773.632819 mail: [email protected] [email protected] Web: www.siteckitaly.com

Company Profile - Siteck Power Solutions · conditioning, fire detection, intrusion, structured cabling Of environments (both copper and fiber optics). Installation and provision

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Company Profile - Siteck Power Solutions · conditioning, fire detection, intrusion, structured cabling Of environments (both copper and fiber optics). Installation and provision

1

Company Profile

Tel. & Fax +39.0773.632819

mail: [email protected]

[email protected]

Web: www.siteckitaly.com

Page 2: Company Profile - Siteck Power Solutions · conditioning, fire detection, intrusion, structured cabling Of environments (both copper and fiber optics). Installation and provision

2

Introduction: Siteck arises from some leading companies that supply products and services

with high technological profile in the field of industrial and

telecommunications, to meet the new requirements dictated by an increasingly

selective and highly competitive.

We introduce in the Italian market and abroad aware of being able to offer

companies a wide range of solutions and services.

Starting from an operational background technical and professional business

experience gained in the above, we tried more and more to refine the

production to optimize customer services.

In addition, thanks to new technical and professional figures, the company has

perfected the areas of design, production and certification of plants derived

from alternative sources, complete with distribution panels (made in the

company), with automatic data transmission, systems for remote diagnostics /

remote control.

In summary, we offer ourselves as manufacturers and installers of Power

Station, also known as conversion systems, AC / DC, used by companies

operating in the field of fixed and mobile telephony.

Our systems are used in rectifiers conversion (Rectifier) of various sizes and

power ratings from 50 to 200 amps, which are selected according to the rated

power of the same machine that you have to accomplish.

Page 3: Company Profile - Siteck Power Solutions · conditioning, fire detection, intrusion, structured cabling Of environments (both copper and fiber optics). Installation and provision

3

Rectifiers are used to nominal output voltage (OUT) at 48 Vdc and

conversion technology in high frequency (switching) systems that have an

efficiency of 97%, while with a variable load between 30% and 70% of the

rated current, you get to get an efficiency of 96.5%; all this makes the end

user gets a very high energy savings.

In addition to realize their Power Station, Siteck, it is also the manufacturer

of custom stations for multinational companies operating in the market:

Emerson Network Power, Eltek Valere, New Ave, General Electric,

Telecom, Wind, Huawei.

In addition, there is on the market as an installer of different types of

devices boasting a wealth of experience in distribution systems in DC for

the telecommunications market.

Today Siteck is able to realize and design Cabinet outdoor (Outdoor) for

the housing of the transmission equipment, constructed to be able to stay

at its internal systems to “19” or “21".

As regards the cooling system of the cabinet are used

different technologiestype:

Forced ventilation with fans powered at 48Vdc and lasting life of

75,000 hours at a temperature of 40 ° C.

Systems dissipating natural, made with an aluminum heatsink.

System dissipating Peltier.

System dissipating air / air. (Thelatterstillbeingfinalizedandprojectapproval.)

Page 4: Company Profile - Siteck Power Solutions · conditioning, fire detection, intrusion, structured cabling Of environments (both copper and fiber optics). Installation and provision

4

More generally, the areas of application, can substantially be

summed up in four areas of the field:

1. Electrician

2. Switchboards and Power Stations

3. Lighting

4. Technological

In particular, with regard to electrical installations, paintings

and power stations, will perform the following tasks:

I. Plants of central power in DC and AC;

II. Construction of power stations AC / DC 48 V DC;

III. Construction of outdoor cabinets;

IV. Construction of indoor cabinet;

V. Construction of electrical current distribution.

Page 5: Company Profile - Siteck Power Solutions · conditioning, fire detection, intrusion, structured cabling Of environments (both copper and fiber optics). Installation and provision

5

Project activity

- Research and acquire sites for Radio Base Stations (RBS);

- SRB design;

- Design, construction and maintenance of electrical installations;

- Design, construction and installation of intrusion detection systems;

- Design, construction and installation of video surveillance systems;

- Design and installation of telecommunications networks;

- Design and implementation of structured cabling;

- Design and implementation of LAN networks;

- Design and implementation of Wireless Networks;

- Design and implementation of remote management systems;

- Design and implementation of SCADA / HMI systems for

building automation.

Page 6: Company Profile - Siteck Power Solutions · conditioning, fire detection, intrusion, structured cabling Of environments (both copper and fiber optics). Installation and provision

6

TLC services

- Architectural design, authorization procedures and detailed design;

- Optical visibility and radio Radio Links;

- Search disruptors;

- Topographic Survey;

- Impact Analysis and Electromagnetic Measurements in narrow band;

- Geological and geotechnical Relations;

- Verification of lightning;

- Safety Coordination (D.M. 8,112,008);

- Works Management, High Surveillance;

- Appraisals relating to plants built;

- Designing metallic carpentry;

- Microcellular networks (shops, airports, corporate offices);

Risk assessment in the workplace

- Risk assessment in the workplace

- Educational activities arising both specific complements such as fire

training and first aid.

Page 7: Company Profile - Siteck Power Solutions · conditioning, fire detection, intrusion, structured cabling Of environments (both copper and fiber optics). Installation and provision

7

Environmental surveys

- Surveys microclimatic

- Lighting Measurements

- Surveys and noise and vibration assessment

- Surveys electromagnetic fields

Certification Fire Prevention

- For submission to the competent organs Activities (Fire Service) of the

documentation for the "Test Project" procedure

- Designs for any necessary adjustments of the places, ensure its job

management and subsequent certification of the same, in the accompanying

inspection phase certification by VV.F ..

Surveys of "V.I.A." (environmental impact occurs)

- Environmental impact checks in the manner provided for in current

legislation.

Page 8: Company Profile - Siteck Power Solutions · conditioning, fire detection, intrusion, structured cabling Of environments (both copper and fiber optics). Installation and provision

8

Testing of civil works and technological plants

Construction accounting

- Collaboration in the Works management for the accounting management

of the contracts with surveys, measurements and tests for issue of accounting

records, such as the booklet of the measures, the accounting ledger, the

progress been issued for all the types of contract is civilian technology.

Verification activities of the technological

infrastructure

- Knowledge of standards (ISO, UNI, IEC, ETSI, CENELEC etc.)

- Application approach in relation to the context

- Experience gained in environments TLC: fixed, mobile and data centers

- Know how state of the art for all aspects of energy

- Sizing criteria of technological systems in TLC:

power supplies to network (with or without cab) and static and rotary

UPS;

• Power supply (with or without cab) and static and rotary UPS;

Page 9: Company Profile - Siteck Power Solutions · conditioning, fire detection, intrusion, structured cabling Of environments (both copper and fiber optics). Installation and provision

9

• Backup power supply (GE both with internal combustion engines with

either turbine) and related auxiliary facilities;

• DC power supply 48V, 60V and 400V (HVDC);

• Energy storage (free electrolyte or adjusted by valve);

• Connections AC and DC; barraggi (CDT); distribution;

• Environmental conditioning: heat, cold production (active and passive)

and relative distribution;

• Free cooling;

• Noise control (for air conditioning systems and generators;

• Control systems, regulation and management.

Page 10: Company Profile - Siteck Power Solutions · conditioning, fire detection, intrusion, structured cabling Of environments (both copper and fiber optics). Installation and provision

10

1. Electrician

In particular, as regards the industrial electrical installations, paintings and

power stations, we will implement the following activities:

I. power plants in central and alternating current;

II. of energy stations construction AC / DC 48 V DC;

III. Outdoor cabinet construction;

IV. indoor cabinet construction;

V. Construction of electrical distribution panels into alternating and direct

current.

VI. Cabins processing;

VII. ordinary and extraordinary maintenance of electrical systems, electrical

panels and data transmission;

VIII. Creation data-center facilities;

IX. Realization of all the works in metal structural work, carried out directly

in our factory.

Page 11: Company Profile - Siteck Power Solutions · conditioning, fire detection, intrusion, structured cabling Of environments (both copper and fiber optics). Installation and provision

11

2. Electrical panels and Energy Station

The Power Station (Energy Station), also called AC / DC conversion systems

are used by the major companies operating in the field of fixed and mobile

telephony.

In our systems we are used rectifiers conversion (Rectifier) of various sizes

and powers, from 50 to 200 amperes, which are chosen according to the

rated power of the machine which must be realized.

Rectifiers are used at the rated output voltage (OUT) 48 VDC and the high

frequency conversion technology (switching); these systems have a 97%

efficiency, while with a variable load between 30% and 70% of the rated

current, is possible to produce an efficiency of 96.5%; all this means that the

end user obtains a very high energy saving.

In addition to making its Energy Station, Siteck, it is also a manufacturer of

customized power stations (castomized) of direct commission of

multinationals operating in the market:

Emerson Network Power, Eltek Valere, Newave, General Electric, Huawei,

AEG, 3W Power, Sirti, Hitrac Engineering Group.

In addition, there is on the market as an installer of different types of

equipment boasting extensive experience in distribution systems in direct

current for the telecommunications market.

Today Siteck is able to realize and design Cabinet (Outdoor) for the housing

of transmission equipment, constructed to be able to stay at its internal

systems to 19 "or 21".

Page 12: Company Profile - Siteck Power Solutions · conditioning, fire detection, intrusion, structured cabling Of environments (both copper and fiber optics). Installation and provision

12

Concerning the cabinet of the cooling system are used different

technologies type:

A forced ventilation with a fan to supply to 48Vdc and

with a life duration of 75,000 hours at a temperature

of 40 ° C.

natural dissipation systems, made with an aluminum heat sink.

to dissipation system Peltier.

air / air dissipation system

Design and manufacture of energy stations, on customer specification:

With the help of highly professional CAD programs all metal components are

engineered and designed by ours. Technical office, in order to comply with the

customers' specifications, functionality and ease of access.

Page 13: Company Profile - Siteck Power Solutions · conditioning, fire detection, intrusion, structured cabling Of environments (both copper and fiber optics). Installation and provision

13

Subsequently, we switch to CAD / CAM conversion for the development of

machine molding and folding programs executed in the Company with ours

machines .

Page 14: Company Profile - Siteck Power Solutions · conditioning, fire detection, intrusion, structured cabling Of environments (both copper and fiber optics). Installation and provision

14

The electrical installation is designed and manufactured in accordance with

current regulations.

Page 15: Company Profile - Siteck Power Solutions · conditioning, fire detection, intrusion, structured cabling Of environments (both copper and fiber optics). Installation and provision

15

All of our power stations are tested at the factory and are accompanied by all

necessary documentation required by the regulations and the Customer

(Manuals, Multifilary Electrical Schemes, Test Reports).

Page 16: Company Profile - Siteck Power Solutions · conditioning, fire detection, intrusion, structured cabling Of environments (both copper and fiber optics). Installation and provision

16

Machining in telephone exchange:

Installing Power Stations: After placing the station, all power and signal

connections are made before the next test with the Customer.

Page 17: Company Profile - Siteck Power Solutions · conditioning, fire detection, intrusion, structured cabling Of environments (both copper and fiber optics). Installation and provision

17

The company has gained considerable experience in the manufacture of

Copper Shells, performing artwork efficiently, through specific equipment and

highly qualified personnel.

Page 18: Company Profile - Siteck Power Solutions · conditioning, fire detection, intrusion, structured cabling Of environments (both copper and fiber optics). Installation and provision

18

Retrofit Power Stations:

Siteck, on Customer's request, for those sites where budgets are reduced or

where existing stations need to be expanded without necessarily replacing,

designing, engineering and implementing specific power stations that can

interface mechanically and electrically with existing systems .

In order to offer turnkey service, Siteck performs all the planting works that

are required in the modernization of the plants, from the installation of

electrical systems (FM, lights) to the technological installations, such as air

conditioning, fire detection, intrusion, structured cabling Of environments

(both copper and fiber optics).

Installation and provision of infrastructures for mobile radio base stations

(shelter, plinths, poles, etc.)

Page 19: Company Profile - Siteck Power Solutions · conditioning, fire detection, intrusion, structured cabling Of environments (both copper and fiber optics). Installation and provision

19

Technology swap:

Identification of the necessary activities for qualitative adaptation and / or for

housing new equipment:

1. site adaptation project: civil works, electromechanical equipment and radio

equipment;

2. Verification of adaptation and installation of the equipment;

3. Acceptance and testing.

Page 20: Company Profile - Siteck Power Solutions · conditioning, fire detection, intrusion, structured cabling Of environments (both copper and fiber optics). Installation and provision

20

Technological Plants

Siteck has a full set of cooling solutions that include the state of the most

efficient and reliable cooling technology for ICT environments.

Cooling and power management are the bulk of the consumption of a data

center, although they are not directly related to productivity.

Measuring such loads is the essential basis for designing high energy

efficiency computing centers. Siteck solutions are designed to fully

accommodate the benefits of such techniques.

Optimized airflow direction provides optimized design to send air under

raised floors and from there, through cold corridors, to racks.

Page 21: Company Profile - Siteck Power Solutions · conditioning, fire detection, intrusion, structured cabling Of environments (both copper and fiber optics). Installation and provision

21

Steel Structures

Siteck manufactures at its plant in Latin steel structures and operates in the

production of boxes, enclosures and prepared for installation and protection

of the equipment in the fields of automation, control and command,

communication and power distribution.

Our company is able to produce both standard products as products

according to customers' specifications, covering a wide range of market and

articulate. Today the activity of Siteck srl it develops from the study and

design of products, until their production and marketing.

The use of high quality materials, combined with careful control of all

phases of production, guarantee the customer, products of high reliability in

functional terms that security.

The protection in storage and transport, is ensured by cardboard packaging

or by thermo-retractable film, personalized according to the type of product.

Page 22: Company Profile - Siteck Power Solutions · conditioning, fire detection, intrusion, structured cabling Of environments (both copper and fiber optics). Installation and provision

22

The machinery used to accomplish the metal structures are the

following:

- Press brake AM Machinery synchronized 3000 x 100 Ton;

- Punching ITEK Model _Q2 X-TRIM

Page 23: Company Profile - Siteck Power Solutions · conditioning, fire detection, intrusion, structured cabling Of environments (both copper and fiber optics). Installation and provision

23

Company Management:

The Technical and Administrative Structure is made up of:

CEO: Mr. Mario Capozzi

Technical Manager: Mr. Mario Capozzi

Design Production Technological Equipment: Mr. Gianni Avvisati

Security and Prevention Manager: Eng. Francesca Bertone

Chairperson: Dr. Daniele Capozzi

Tax and Tax Area: Dr. Franco Mansutti

Commercial Area: Miss Daniela Cecconi

Page 24: Company Profile - Siteck Power Solutions · conditioning, fire detection, intrusion, structured cabling Of environments (both copper and fiber optics). Installation and provision

24

Among our major customers, direct and indirect, we include:

The legal and operational headquarters is located in Via della Dinamica, 13

(Industrial Zone), Location Tor Tre Ponti - 04013 Latina -.

Our contacts are:

Tel& Fax + 39 . 0773.632819

Mail: [email protected]

[email protected]

Page 25: Company Profile - Siteck Power Solutions · conditioning, fire detection, intrusion, structured cabling Of environments (both copper and fiber optics). Installation and provision

25

Certifications:

1) The Siteck has obtained UNI EN ISO 9001: 2008, UNI EN ISO 14001:2004

e OHSAS 18001:1999 which is attached below

Page 26: Company Profile - Siteck Power Solutions · conditioning, fire detection, intrusion, structured cabling Of environments (both copper and fiber optics). Installation and provision

26

2) The technicians who work with Siteck have all the certifications required by

Italian law specifically those provided for by Presidential Decree 207/2010 and

Justice Ministerial Decree 31 October 2013, n. 143

3) Our installers are all licensed for structured cabling systems.

Page 27: Company Profile - Siteck Power Solutions · conditioning, fire detection, intrusion, structured cabling Of environments (both copper and fiber optics). Installation and provision

27

Below are attached some pictures that illustrate how well these devices are

manufactured.

Page 28: Company Profile - Siteck Power Solutions · conditioning, fire detection, intrusion, structured cabling Of environments (both copper and fiber optics). Installation and provision

28

Page 29: Company Profile - Siteck Power Solutions · conditioning, fire detection, intrusion, structured cabling Of environments (both copper and fiber optics). Installation and provision

29

Page 30: Company Profile - Siteck Power Solutions · conditioning, fire detection, intrusion, structured cabling Of environments (both copper and fiber optics). Installation and provision

30

Page 31: Company Profile - Siteck Power Solutions · conditioning, fire detection, intrusion, structured cabling Of environments (both copper and fiber optics). Installation and provision

31

Page 32: Company Profile - Siteck Power Solutions · conditioning, fire detection, intrusion, structured cabling Of environments (both copper and fiber optics). Installation and provision

32

Page 33: Company Profile - Siteck Power Solutions · conditioning, fire detection, intrusion, structured cabling Of environments (both copper and fiber optics). Installation and provision

33

Power Center low voltage switchboards with custom-made carpentry of any power

Page 34: Company Profile - Siteck Power Solutions · conditioning, fire detection, intrusion, structured cabling Of environments (both copper and fiber optics). Installation and provision

34

Electric panels with inverter drive

Page 35: Company Profile - Siteck Power Solutions · conditioning, fire detection, intrusion, structured cabling Of environments (both copper and fiber optics). Installation and provision

35

Electrical automation panels with plc

Page 36: Company Profile - Siteck Power Solutions · conditioning, fire detection, intrusion, structured cabling Of environments (both copper and fiber optics). Installation and provision

36

Electrical panels made to measure with a stainless steel structure or painted galvanized

sheet of any RAL color, design of the wiring diagrams and application programs according to customer needs.

Page 37: Company Profile - Siteck Power Solutions · conditioning, fire detection, intrusion, structured cabling Of environments (both copper and fiber optics). Installation and provision

37

Fixed and mobile Medium Voltage / Low Voltage transformer cabins built on freight

containers for maritime, rail, road transport.