Upload
nguyenhanh
View
214
Download
0
Embed Size (px)
Citation preview
Commercial
Aviation
Safety
Team
In the United States, our focus was set by the White House Commission on Aviation Safety, and The National Civil Aviation Review Commission (NCARC)
1.1 . . . Reduce Fatal Accident Rate . . .
• . . . Strategic Plan to Improve Safety . . . • . . . Improve Safety Worldwide . . .
CAST brings together key stakeholders to cooperatively develop and implement a prioritized safety agenda.
* Representing P&W and RR ** Observer
A4A AIA Airbus ALPA ACI-NA CAPA IATA** NACA Boeing GE* RAA FSF
DOD FAA NASA ICAO** TCCA NATCA NTSB** EASA**
Industry Government
Commercial Aviation Safety Team
CAST Goal
CAST came together in 1997 to form an unprecedented Industry-Government partnership… Voluntary commitments, Consensus decision-making, Data-driven risk
management, Implementation-focused. Goal:
Reduce the U.S. commercial aviation fatality risk by at least 50 percent from 2010 to 2025.
New
Reduce the US commercial aviation fatal accident rate 80% by 2007.
Original
CAST Safety Strategy
Influence Safety Enhancements -
Worldwide
Data Analysis
Set Safety Priorities
Achieve consensus on Priorities
Integrate into existing work and distribute
Implement Safety Enhancements –
United States
Agree on problems and interventions
APPROVED PLAN
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
Res
ourc
e C
ost (
$ M
illio
ns)
Risk Reduction Total Cost in $ (Millions)
2007 2020
0%
25%
50%
75%
100%
Ris
k El
imin
ated
by
Safe
ty E
nhan
cem
ents
CAST-050
Dol
lars
/Flt.
Cyc
Part 121 Aviation Industry Cost Due to Fatal/Hull Loss Accidents
100
80
60
40
20
0
Historic cost of accidents/flt. cyc
Savings ~ $58/Flt. Cyc
Or
~ $540 Million Dollars/Yr.
Cost of Accident fatalities following implementation of the CAST plan @ 2007 levels
2002 2007
Lives Lost
0
50
100
150
200
250
300
350
400
450
500
1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015
Fata
litie
s Predicted vs. Actual Part 121 Onboard Fatalities
Actual Predicted
Net reduction of 2,251 fatalities 1998-2015
CAST Safety Enhancements
CAST Established
Voluntary Safety Reporting Programs
Six-Axis Simulator FDR
Safety Management Systems
ASIAS Established
International Aviation Safety Collaboration World Regional Accident Rates* / Million Landings (10-year rolling average)
United States & Canada
0.6 0.4
Latin America and Caribbean
3.4 2.0
Regional Aviation Safety Groups
Regional Aviation Safety Teams
Regional Expert Safety Team
Information Analysis Team Safety Enhancement Working
Group
Europe 0.7
0.5
Africa 7.7
6.3
World 1.4
1.0
Asia 1.7
1.2 Middle East
2.1 1.4
Russia / C.I.S. 1.4
2.3
Annual Safety Report Team Annual Safety Training Team
Accident Investigation Group
Regional Coordination Group
Planning and Implementation Regional Group
*Western-built transports, hull loss accidents, by airline domicile
2001–2010 2007–2016
Commercial Aviation Safety Team
Study Prioritization(Fleet Risk)
0
5
10
15
20
25
30
1% 10% 100%Fatality Risk - (Severity)
Yrs
to 1
or m
ore
expe
cted
acc
iden
ts
Risk Level Appropriate for Study
1 accident in 20 yrs
RR SEs Risk Levels
Fatality Accident Expectation @ Current Accident Rate
Risk Level Appropriate for Monitoring
Safety Plan Development Accident
JSATs Accident
JSITs Safety
Enhancements CAST Plan
Incident Analysis Process
Metrics JIMDAT Process
Emerging Risk
Changing Risk
Safety Enhancements
Aviation System
Changes Present
In Master Factors
Yes
No Demographic
Changes Identify Hazards
Identify Factors
Develop Contributing
Factors (new or
emerging)
Safety Enhancements
Identify Hazards
Identify Factors
Master Contributing
Factors
CAST Plan Rev.
FAST Hazards
Metrics
Metrics
CAST Process Flow
Training & support
R&D
CAST approves
Revised tactical/ strategic
Plan “G”
Approve analysis
plan
Conduct analysis
Initiate/ approve
Implementation development
“C”
Report Review/ Approve analysis
report “B””
Modified Strategic
& Tactical
Plans
Define Safety enhancements,
develop schedule, resources and scores
CAST reviews
to approve concepts
“D”
CAST integrates
Into tactical
and strategic plans
CAST reviews modified
plans
JIMDAT • Scoring process • Implementation tracking • Future work plan
PLANS ARE IMPLEMENTED
DIPs developed
Score – Sensitivity analysis
Comments
Training & support Future work plan recommendations
CAST coordinates
With stakeholders
Comments Plans
Yes
No CAST approves
Preparation of DIP or R&D/
Study Plans “E”
No
R&D/ Study plan developed
DIP
Study
Guidance
Comments CAST
Area of interest
Plans
CAST approves
R&D/Study plans
No
R&D/ Study
conducted
Yes Results CAST
reviews to approve concepts
CAST approves
Preparation of DIP for
implementation of R&D/Study
results “F”
No Team develops
DIP
Yes
Comments
[CATEGORY NAME] [VALUE]
[CATEGORY NAME] [VALUE]
Underway, 25
Underway (R&D), 11
CAST – Safety Enhancements
Safety Portfolio Monitoring
SE Title Output Lead Organization Due Date
SE 127 Cargo - Cargo Fire Management Output 5 JIMDAT 8/31/2017
SE 186 TCAS - Sensitivity Level Command Output 4 FAA AJI 12/31/2017
SE 199 ASA - Training - Enhanced Crew Resource Management Training Output 2 A4A 8/31/2017
SE 213 RNAV - Safe Operating and Design Practices for STARs and RNAV Departures Output 2 FAA AFS/A4A 8/31/2017
SE 213 RNAV - Safe Operating and Design Practices for STARs and RNAV Departures Output 3 FAA ATO 8/31/2017
SE 213 RNAV - Safe Operating and Design Practices for STARs and RNAV Departures Output 4 FAA ATO 8/31/2017
SE 217 RE - Airline Operations and Training - Takeoff Procedures and Training Output 2 A4A 7/31/2017
SE 218 RE - Design - Overrun Awareness and Alerting Systems Output 3 A4A 6/30/2017
SE 219 RE - Air Traffic Operations - Policies, Procedures, and Training to Prevent Runway Excursions Output 1 FAA ATO 6/30/2017
SE 219 RE - Air Traffic Operations - Policies, Procedures, and Training to Prevent Runway Excursions Output 2 FAA ATO 6/30/2017
SE 227 TOMC - Air Carrier Procedures for Takeoff Configuration Output 1 A4A 4/30/2017
SE 227 TOMC - Air Carrier Procedures for Takeoff Configuration Output 3 FAA AFS-200 8/1/2017
SE 227 TOMC - Air Carrier Procedures for Takeoff Configuration Output 4 AIA 4/30/2017
SE 228 TOMC - Airplane Design Features to Facilitate Proper Takeoff Configuration Output 1 AIA 10/31/2017
SE 229 TOMC - Takeoff Configuration Warning System Maintenance and Operational Assurance Output 1 AIA 10/31/2017
Summary
Unprecedented partnership and positive impact
Long-term industry and government commitment
Committed to continue to drive future safety improvements.