1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 • DESY and the LC • What could DESY contribute to a LC?

Comments concerning DESY and TESLA

Embed Size (px)

DESCRIPTION

Comments concerning DESY and TESLA. DESY and the LC What could DESY contribute to a LC?. Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004. Dedication of DESY to the LC. - PowerPoint PPT Presentation

Citation preview

1

Comments concerning DESY and TESLA

Albrecht WagnerComments for the 5th meeting of the ITRP at Caltech

28 June 2004

• DESY and the LC

• What could DESY contribute to a LC?

2

Dedication of DESY to the LC

DESY is firmly committed to a strong participation in a global Linear Collider, independent of the recommended technology :

In the five year programme of DESY 2005-2009 (in the framework of our new funding scheme) the participation in a global Linear Collider will be one of the core activities in particle physics at DESY, especially after the end of HERA.

The reviewers strongly endorsed this programme, as did the DESY Scientific Council.

As a consequence DESY will receive a budget for the LC (amount to be decided by the Helmholtz Association in fall).

This strategy is in accordance with the Research Policy Requirements issued by the Federal Government for DESY.

3

Next Steps towards the LC

DESY will submit a bid to host the Central Team of the GDI.

DESY, as coordinator together with CERN, and European institutes and universities have submitted a proposal for a Linear Collider Design Study within the 6th framework programme of the EU.

The LC Design Study was ranked in first position among 130 proposal, together with the XFEL Design Study (focusing among other things on cryomodule technology)

Scope: Technology independent aspects

Key comments of the evaluations are:

4

Overall Remarks EUROTeV

This is an outstanding proposal, complete and compelling in every regard.

It will prepare for major European participation and leadership in the most technically challenging accelerator ever built.

The tasks are very well organised and the complementarity of the participants is fully exploited.

Furthermore the anticipated scientific productivity of this machine is as high as any infrastructure of comparable scale in any field.

The budgetary needs for this project are significant but justified.

5

Special Remark EUROTeV

The choice of the main linac technology by the International Technology Review Panel (ITRP), to be made shortly, will play a determining role in the prioritisation and exact technical description of the eight Work Packages.

It should be emphasized also that this proposal should only be supported insofar as the EUROTeV collaboration is firmly committed to support and work within the framework of the international process for selection of the technology, leading to the construction of the ILC at the earliest possible time.

EUROTeV will supply

• 100 FTEs over 3 years across 22 institutes, 50% from EU

• spending ~30 MEuro (of which 9 MEuro from EU funds)

6

General Comments

Independent of choice of technology

• Detailed planning / implementation must be made by an International Collaboration of Equal Partners– responsibility of GDI

• Exact details of such planning rely on available funds and resources of participating laboratories, and the World political stage

7

DESY Actions if Technology Choice is COLD

• Actions will mostly be specific to LINAC technology• Goals:

– Participation in the implementation / construction of one or more SRF Module Test Facilities (wherever they are built) for testing LC-type prototype cryomodules

– This facility should support the rapid transition from the TTF Cryomodule (CM) LC CM

– Participation in large scale industrialisation in all three world regions (in Europe this process was begun with the TESLA TDR, and its continuation is now funded through the EU FEL Design Study and the XFEL project)

Nicholas Walker
Suggestion from Helen to pluralise the SMTF: We should support the possibility of more than one such facility (one per region).My own view: unlikely (uneccessary?) for more than one. However it doesn't hurt to word it this way for now.
Nicholas Walker
I have a comment written down for slide 7 saying "push industry connection" - I think this was from Hasan (?)However, I'm no longer sure what he meant by the comment. I have added a little bit of text to the last bullet point, attempting to stress (as we always have) that this industry has been involved with TESLA from the start. As always, you can take this or leave as you see fit.Do we want a stronger word than 'partly'?

8

TESLA Collaboration Role as part of the GDI

• DESY (TESLA collaboration) role:– A large part of XFEL preparatory work & R&D is directly

applicable (transferable) to LC• industrialisation• cavity production • Klystrons & RF distribution• LLRF, tuners etc.• cryoplants• reliability

– ~30% TTF-II beam time available for LC workNote: 100% of time will provide invaluable experience for a future cold LC, especially the ~40% stable operation of FEL users

• Will integrate interested LC collaborators in this process

Nicholas Walker
This one comes from me. We should not forget that operating a 5 CM 800 MeV linac as a demanding state-of-the-art user facility is a 100% benefit for a future LC.

9

Cryomodule Work

• LC specific work:

– Work on high gradient programme continues, main emphasis will be on yield (= quality control), procedures are established

– CM with >35MV/m construction & test

This will be done by TESLA collaboration over next 1-2 years

– design of LC CM (quad position, length etc.) will require additional efforts

Engineering only (not fundamental R&D)can be ramped up quicklyconnection with CARE SCRF Joint Research Activity

Nicholas Walker
the CARE JRA is specific to Europe, but clear maintains strong links with collaborators in the other two regions.
Nicholas Walker
Strong comment here that we spend an entire slide on EUROTeV but only one sentence on CARE. Perhaps one slide on the CARE SCRF JRA would be useful. I will ask Dieter Proch to send you a summary slide
Nicholas Walker
On the technical side, the (converging) message we want to send the ITRP is that the procedures to produce 35MV/m cavities and transfer them without significant degradation to a CM has been successfully established; the remaining 'engineering' now remains in the realm of Quality Control of these processes. You may want to make that point here. Just specifying "high graduent programme", while technically not incorrect, may give an impression that "we're not there yet": we have 5 cavities with >=35MV/m.It is important to re-state the committment to the 35MV/m CM however.

10

Superconducting RF(SRF)

CARE is funded at the level of 15.2 M€ over 5 years

~.7M€ ~0.3M€

~0.45M€

3.6M€

3.6M€~1M€

~5M€

EU Funding - CARE

11

Other Actions

• TESLA collaboration can supply TTF-like CM with 35MV/m cavities with current infrastructure/manpower/expertise (some additional resources are needed)

– in parallel / synergy with XFEL preparation– to be shipped to new LC test facility

• In parallel (ramped up), R&D (within GDI context) on LC CM design

• In parallel work on large scale industrialisation– with industry (XFEL will play an important role in

Europe)– with collaborating labs (US collaboration and Japan)

12

DESY Actions if Technology Choice is WARM

There is no detailed plan yet of what DESY would contribute to the design and construction of a warm LC.

Some possible aspects of the work are defined within the scope of the EUROTeV proposal

WG1: Overall Coordination *WG2: Beam Delivery System

WG3: Damping Rings WG4: Polarised Positron Source WG5: Diagnostics WG6: Beam Dynamics Simulations WG7: Metrology & Stabilisation WG8: Controls (GAN)

Participation Coordinating Role

EUROTeVWork Packages

* together with CERN

Nicholas Walker
Generally feeling at the end was this was a little weak.I have added some EUROTeV information here to strengthen DESY's (now committed and funded) role over the next three years to the LC.