City Wastewater: Performance
• Wastewater Coverage: anagement serv ces an
facilities– 80% Area
–
• Goals and targets – to cover
100%
coverage
by
year
2020• Investment s Needed to Meet
Goals – i)Rehabilitation as
system exceeds its’ technical life,
xpans on an
rea men
o
prevent deterioration of urban
environment and health
7/29/2019 Colombo, Sri Lanka : Understanding Current Conditions of Cities
http://slidepdf.com/reader/full/colombo-sri-lanka-understanding-current-conditions-of-cities 3/5
Wastewater Policy and Planning
• Existing Wastewater Policy
– D sc arge to n an an mar ne env ronment s
controlled through
legislations
under
National
Environmental Act . Trade waste policy is yet to come
– Monitoring is based on the above legislations by
respective agencies
– n orcement s t roug , etc.
• Existing Plans
–
–
,
2013
– Financin – on oin discussions with ADB for the 2nd
phase
7/29/2019 Colombo, Sri Lanka : Understanding Current Conditions of Cities
http://slidepdf.com/reader/full/colombo-sri-lanka-understanding-current-conditions-of-cities 4/5
Focus Areas:
• Enabling Environment ‐ weak law enforcement, no incentive
, ,
capacity
at
managerial
and
operational
level,
–
cooperation, un‐acceptance of water reuse and opportunities
for reuse
• Technology ‐ inadequate opportunities in the past resulted
• Financing – less incentive for private sector participation on
,
,
of understanding on ability to pay, inadequacy of performance
monitoring
7/29/2019 Colombo, Sri Lanka : Understanding Current Conditions of Cities
http://slidepdf.com/reader/full/colombo-sri-lanka-understanding-current-conditions-of-cities 5/5
Action Planning Summary
Under the on‐going Greater Colombo Wastewater Management Project
•
Improve
enabling
environment
• Increase enforcement through introducing Trade waste policy and
• Remedy social issues through Community participation and Public
education programme
• ress tec no ogy an capac ty eve opment o t e operat ona sta
• Address financial aspects on recovery of operational expenses by ring‐
fencing of sewerage expenditure, cost recovery policy, mechanism and
mon or ng opera ona
an
nanc a
per ormance
roug
per ormance
based budgeting
• Private sector involvement – the need/opportunity of PPP has not been
assesse
ye
e
oppor un es
emerge
roug
e
nves men
• Sector requirement is high and the continues support from ADB for the
2nd phase of the project