Colchester Interceptor System Improvements Project

Community Meeting #2July 24, 2017

SA Project Manager:Debbie J. Maxwell, P.E., CCM

Design Engineer: Michael Baker International, Inc.

Construction Management: Arcadis U.S., Inc.

Construction Contractor:Garney Companies, Inc.

Page 2: Colchester Interceptor System Improvements Project€¦ · Colchester Interceptor System Improvements Project Community Meeting #2 July 24, 2017 SA Project Manager: Debbie J. Maxwell,

Agenda

Purpose of the ProjectOverview of the Limits of ServiceDefinitionsPurpose and Benefits of the Project

Existing System ConditionsProposed System Improvements

Project DetailsSite Activities & Notes of InterestAnticipated Construction ScheduleContactsQ&A

Page 3: Colchester Interceptor System Improvements Project€¦ · Colchester Interceptor System Improvements Project Community Meeting #2 July 24, 2017 SA Project Manager: Debbie J. Maxwell,

Purpose of the Project

Limits of Service7 Service AreasNumerous Lift StationsMiles of Gravity SewersMiles of Force Mains

Featherstone Lift Station

H.L. Mooney Water Reclamation Facility

Project Limits

Belmont Lift Station

Page 4: Colchester Interceptor System Improvements Project€¦ · Colchester Interceptor System Improvements Project Community Meeting #2 July 24, 2017 SA Project Manager: Debbie J. Maxwell,

Purpose of the Project

DefinitionsGravity Sewer Lines

Sewer lines constructed to allow the wastewater to flow based on a downward slope

Interceptor SewersGravity Sewer mains which receive the flow from collector sewers and conveys the wastewater to treatment facilities

Lift StationA gravity sewer sump with a pump to lift accumulated sewage to a higher elevation

Force MainsA pressurized sewer line to convey wastewater from a lift station to another service level and gravity sewer

Page 5: Colchester Interceptor System Improvements Project€¦ · Colchester Interceptor System Improvements Project Community Meeting #2 July 24, 2017 SA Project Manager: Debbie J. Maxwell,

Purpose of the Project

Purpose of the ProjectReplace an existing and aged Interceptor Sewer SystemIncrease system capacityReduce or eliminate stormwater and groundwater from entering the system

Benefits of the ProjectProvide environmental benefits by relief of potential surcharge conditionsMaintain service reliability

Page 6: Colchester Interceptor System Improvements Project€¦ · Colchester Interceptor System Improvements Project Community Meeting #2 July 24, 2017 SA Project Manager: Debbie J. Maxwell,

Existing System Conditions

Featherstone Lift Station

Belmont Lift Station

Colchester Road Gravity Sewer

Discharge

Belmont Force Main

48” Interceptor Sewer

Page 7: Colchester Interceptor System Improvements Project€¦ · Colchester Interceptor System Improvements Project Community Meeting #2 July 24, 2017 SA Project Manager: Debbie J. Maxwell,

Existing System Conditions

Approximately 7,600 linear feet of 36” - 48” gravity interceptor sewerApproximately 1,500 linear feet of 8” and 12” gravity sewer

Page 8: Colchester Interceptor System Improvements Project€¦ · Colchester Interceptor System Improvements Project Community Meeting #2 July 24, 2017 SA Project Manager: Debbie J. Maxwell,

Proposed System Improvements

Install approximately 5,411 linear feet of 30” and 36” force mainReplace approximately 2,132 linear feet of 48” gravity sewer with 54” gravity sewerInstall approximately 1,530 linear feet of 8” and 12” gravity sewerConstruct a new lift station

Page 9: Colchester Interceptor System Improvements Project€¦ · Colchester Interceptor System Improvements Project Community Meeting #2 July 24, 2017 SA Project Manager: Debbie J. Maxwell,

Proposed System Improvements

Featherstone Lift Station

Belmont Lift Station

Colchester Road Gravity Sewer

Discharge

Belmont Force Main

54” Interceptor Sewer

Marumsco Acres Lake Lift Station

Page 10: Colchester Interceptor System Improvements Project€¦ · Colchester Interceptor System Improvements Project Community Meeting #2 July 24, 2017 SA Project Manager: Debbie J. Maxwell,

Proposed System Improvements

Page 11: Colchester Interceptor System Improvements Project€¦ · Colchester Interceptor System Improvements Project Community Meeting #2 July 24, 2017 SA Project Manager: Debbie J. Maxwell,

Proposed System ImprovementsMarumsco Acres Lake Lift Station

Page 12: Colchester Interceptor System Improvements Project€¦ · Colchester Interceptor System Improvements Project Community Meeting #2 July 24, 2017 SA Project Manager: Debbie J. Maxwell,

Proposed System ImprovementsMarumsco Acres Lake Lift Station

Lift Station DetailsThe building is 14’ x 14’

Brick sidingShingled roof

The Station capacity is 350 gpm

Emergency diesel engine generator as back-up powerOdor Control

Carbon FiltersBioxide (calcium nitrate)

Page 13: Colchester Interceptor System Improvements Project€¦ · Colchester Interceptor System Improvements Project Community Meeting #2 July 24, 2017 SA Project Manager: Debbie J. Maxwell,

Proposed System ImprovementsMarumsco Acres Lake Lift Station

Page 14: Colchester Interceptor System Improvements Project€¦ · Colchester Interceptor System Improvements Project Community Meeting #2 July 24, 2017 SA Project Manager: Debbie J. Maxwell,

Site Activities

ActivitiesThe Contractor will determine the final sequence of constructionThe Lift Station is limited to a 10 month construction periodOpen cutting of trenches

Force Mains and some gravityTrenchless installation

Boring under Featherstone Road to avoid road closuresMicrotunnelling for a portion of the 54” gravity mainInstallation of new manholesTie-in of existing systems

Page 15: Colchester Interceptor System Improvements Project€¦ · Colchester Interceptor System Improvements Project Community Meeting #2 July 24, 2017 SA Project Manager: Debbie J. Maxwell,

Notes of Interest

Construction Notes of InterestNotifications will be provided by the Service Authority and the Contractor for any anticipated interruptionsAccess will not be interrupted

Emergency Services, school buses, trash, mail and other services will not be disrupted

Temporary parking areas will be coordinated with land owners, the Department of Parks and Recreation, and HOAs if needed by the Contractor prior to constructionDaily clean-up by the Contractor is requiredA Service Authority Inspector will cover this project and others close by and will be on site on a daily basisA Construction Manager / SA Project Representative will be onsite fulltime for the duration of the project

Page 16: Colchester Interceptor System Improvements Project€¦ · Colchester Interceptor System Improvements Project Community Meeting #2 July 24, 2017 SA Project Manager: Debbie J. Maxwell,

Final Layout

Featherstone Lift Station

Belmont Lift Station

Colchester Road Gravity Sewer

Discharge

Belmont Force Main

54” Interceptor Sewer

Marumsco Acres Lake Lift Station

SummaryRedirect flows to Belmont Lift StationConstruct a new Lift StationExtend the force mainEnlarge the gravity sewer size

BenefitsIncrease system capacityEnvironmental benefits

Relief of potential surcharge conditions

Reduce or eliminate InflowImprove system reliability

Page 17: Colchester Interceptor System Improvements Project€¦ · Colchester Interceptor System Improvements Project Community Meeting #2 July 24, 2017 SA Project Manager: Debbie J. Maxwell,

Anticipated Construction Schedule

Project Duration660 days / 21 months

Anticipated Start Date:Award Contract in July 2017Notice to Proceed in September 2017On-site Construction start anticipated for October 2017

Anticipated End Date:July 2019

Weekday Hours of Operations7:00 a.m. to 5:00 p.m. Previously negotiated and approved night time hours

Certain business parcels

Page 18: Colchester Interceptor System Improvements Project€¦ · Colchester Interceptor System Improvements Project Community Meeting #2 July 24, 2017 SA Project Manager: Debbie J. Maxwell,

Contacts

Community Relations & Outreach LiaisonMarlo Thomas Watson571.285.8127Email: [email protected] Specific Website: http://www.pwcsa.org/colchester-project

Page 19: Colchester Interceptor System Improvements Project€¦ · Colchester Interceptor System Improvements Project Community Meeting #2 July 24, 2017 SA Project Manager: Debbie J. Maxwell,

Q & A

Any Questions?

Page 20: Colchester Interceptor System Improvements Project€¦ · Colchester Interceptor System Improvements Project Community Meeting #2 July 24, 2017 SA Project Manager: Debbie J. Maxwell,

Proposed Layout