C-001
VICINITY MAP Scale: 1 "=2000'
INTERCEPTOR TRENCH CONCEPTUAL DESIGN
BENNETT'S DUMP BLOOMINGTON, INDIANA
Drawing Index: Cover Sheet C-001 Notes and Legend C-002 Site Plan - Interceptor Trench Layout C-003 Middle Spring Interceptor Trench C-004 Mid-North Interceptor Trench C-005 North Area Interceptor Trench C-006 Typical Interceptor Trench Elevation View C-007 Pump Vault Details C-008 Building Foundation C-009 Miscellaneous Details C-010
LOCATION MAP Scale: 1 "=200'
Site Address: 2090 Hunter Valley Road Bloomington, Indiana 47404
Engineer: Jim Ekedahl, P.E.
Structural Engineer: Robert Mohlin, P .E.
~
i!!i
i
~
I-w w ::r:: (/)
D:::: w > 0 u
JOB NO.: o,ee?B.DO DAlE: FEBRUARY 2018
SCALE: AS SHOWN
SHEET: OF
~
~ "'~ Iii N
~ ~ ~ ~ ~;
"o!l me
" ; ~ i!!i i ~ ~
C-002
LEGEND:
~
$
d 0
• EE
~
• •
----0---
II II II II
-----0---------
- 728 -
Existing Monitoring Well
Existing Piezometer Location
Springs
Submersible Pump Vault
Interceptor Trench Cleanout
Interceptor Trench Monitoring Point
Interceptor Trench
Filter Tubes
Utility Pole
Silt Fence
Conveyance Pipe
Spring Surface flow
Discharge Pipe
Proposed Chain-Link Fence
Existing Chain - Link Fence
Potentiometric Surface Contour -March 18, 2015
Notes : 1. Contractor is responsible to review all notes and specifications prior to
commencement of construction activities.
2. Contractor responsible for permits required from Federal, State, and local regulatory agencies. All permits shall be approved prior to construction activities.
3. The site is subject to inspection by United States Environmental Protection Agency (U .S. EPA), Indiana Department of Environmental Management (IDEM) , and local agencies. All work performed shall meet local, state, and federal regulations.
4. Contractor responsible for verifying field elevations prior to work commencement.
5.
6.
7.
8.
Two survey control points are located at the project site. Points are in the State Plane coordinate system, Indiana West NAO 83, US survey feet as follows:
BO-382 Description: MagNail Northing: 1436411.88 Easting: 3100847.59 Elevation: 744.56
BD-385 (See Sheet C-003) Description: Rebar Northing: 1436414.92 Easting: 3100682.59 Elevation: 740.06
Contractor responsible for verifying locations of underground utilities located within the project area .
Electrical service is not available at the site.
Excavated soils and rock from interceptor trench, utility trench, and foundation excavation areas shall be stockpiled nearby. Excavated topsoil (0- to 6-inch depth) shall be segregated from other overburden materials. Remaining (non-topsoil) overburden soils shall be segregated from weathered bedrock, to the extent practicable, in stockpiles of 120 cubic yards or less. See specification sections 02 60 00 - Contaminated Site Material Removal and 31 00 00 - Earthwork requirements for managing excavation spoils. Spoils with PCB concentrations of 50 ppm or greater shall be disposed of at the Heritage Environmental Services Landfill in Roachdale, IN.
Any existing wells or piezometers encountered in the trench locations shall be removed and associated construction materials disposed of off site in accordance with federal , state, and local regulations.
9. In the event that excavations need to be dewatered during construction, Contractor shall be responsible for pumping excavation water to mobile storage tanks to be provided by the owner.
10. A pilot interceptor trench currently exists at the location of the Mid-North interceptor trench. This pilot shall be removed and replaced with a new permanent interceptor trench. As-built information for the pilot interceptor trench is provided in Appendix G of the Design Report for Bennett's Dump OU-2.
11 . A metal V-notch weir currently exists at the location of the Middle Spring interceptor trench. This weir shall be removed and stored for future use.
12. Contractor shall restore trench excavation areas to match existing adjacent grade.
References: 1. Base map provided by CBS Corporation via electronic mail from Mr. Ray Taylor
dated January 19, 2016.
2. Potentiometric surface contours provided by PSARA Technologies, Inc. via electronic mail from Mr. Patrick Kneip, P.E . dated June 10, 2016.
Seeding and Mulching Information: 1. Any disturbed area on which activity has ceased and which will remain exposed for
more than 45 days shall be seeded and mulched within 7 days of last activity. During non-germinating periods, mulch shall be applied at the recommended rates.
2. Until the site is stabilized, all erosion and sedimentation controls shall be maintained properly per Specification Section 31 25 00 - Erosion and Sedimentation Controls. Maintenance shall include inspections of all erosion and sedimentation controls after each storm event and on a weekly basis. All preventative and maintenance work, including clean out, repair, replacement, regrading, reseeding, remulching , and blanket replacement, shall be performed as soon as practical after identification of damage .
0 z w C) w _J
0 z <t: (I) w lo z
JOB NO.: 0111878.00 DAlE: FEBRUARY 2018
SCALE: AS SHOWN
SHEET: OF
I
C
-
0
1
0
J
C
-
0
1
0
728
732
724
C-003
0
iC91$
) \
Middle Spring Interceptor
Trench
GP-1
738
~$-F10
F1011_$011A
F1~$
,,,,,,- ~ Buried 12" Dia.
Corrugated Culvert Pipe ~ with Flared Inlet
Fence (5 ft. from building sides) (See Drawing C-010 for
o Details)
?44
740 Fence
0
7
734
738 ----------
~
e
!:l ~~ E :::, ~-., ~ w ~~ "'
g u, i w ~· ~ a•
co~~ C ·~ ,San ni:
~ !; J:; g iii -" ~ "' -g 1 i w ·e >-~~ :!a .. !!i ii~ >- ;. z u.c~ w ~i .. C: e>C"'? >-.fli :a ~: .. g~g 0 .., "- 00 " ~~ ..
•B fez ~. a::~ •3
~. ~a:: :s~ ·~ ~o=, ~§ 00
3:c.21 ~;
"-I mo
" ms.;
f-+-+-++-+-+.:, I i ~ C Q
z <( __J
Q_
w I-(I)
"' l!!z < i12< z of!Jz ~ zc:5 is~ :::, C C:::Ez Fv,
ffi I!!-: <z "'z
11.~is Ow ll.ll.
:::E Vl >- "' :::, >- (.!) 0 -Cz~ ui§ v,W:::E Vl"' ]::j;!!8 a,:J
~i'.'.:Sffi u~ 151!= ;;: IIl
JOB NO.: 018678.00
DATE: FEBRUARY 2015
SCALE: AS 9-IOWN
SHEET: OF
B
1
C
-0
0
4
720
730
Scale: 1"=10'
Middle Spring Interceptor Trench Elevation View
B1
715
733
725
720
730
715
733
725
720
PDI-1
PDI-2
730
Scale: 1"=10'
Middle Spring Interceptor Trench Elevation View
A2
715
733
725
PDI-1 PDI-3
725
730
Scale: 1"=10'
Middle Spring Interceptor Trench Elevation View
A1
720
715
733
720
730
715
733
725
TW-4
Notes:
1. The Middle Spring interceptor trench shall consist of three sections. The first will extend fromTW-4 (Northing: 1436288.89; Easting: 3100534.55) 25-feet to the southeast, parallel to the generalflow of Stout's Creek. The second leg will be perpendicular to the first leg and will extend in theflow direction of Middle Spring into the head of the spring. The third leg will turn 40-degrees to thenortheast from the first leg at the location of TW-4 and be 25-feet in length. The third leg of thetrench will terminate approximately 5-feet northwest of GP-11.
2. As a contingency for artesian conditions at the Middle Spring area that may otherwise causetemporary sump overflow, a buried drain will be installed through the concrete manhole section atelevation 730-feet and terminate approximately 60 feet west of the sump with an invert elevation729-feet. The drain pipe shall consist of 6-inch diameter, solid-wall HDPE.
3. All elevation data is based on the ground surface elevations at temporary well TW-4 andpre-design investigation borings PDI-1 through PDI-3, as well as geologic conditions encounteredat these locations. The bottom of the trench shall be placed directly on top of competent bedrockand shall slope toward the pump vault. In cases where bedrock does not slope toward the pumpvault location, rockwork may be required to create a minimum 0.5 percent slope, or the sumplocation may be modified at the direction of the Engineer.
4. Clay and gravel backfill elevations may need to be field adjusted to ensure the capture of MiddleSpring.
5. Refer to Drawings C-007 and C-008 for additional construction details.
C-004
728
Middle Spring Interceptor Trench
15.00' (approx.)
BC91$-Graphic Scale
O 5 10
, - • -ii ( in Feet )
Clay to Ground Surface
Weathered Bedrock Elev. 722.92•
Bedrock Elev. 719.22•
Bedrock
Tee Pipe Connection
MW-BC10 ~
Woven Geotextile Fabric Enveloping Gravel
6" Dia. Perforated Corrugated HOPE Pipe
Topsoil
Undisturbed Soil
Woven Geotextile Fabric Enveloping Gravel
Weathered Bedrock
6" Dia. Perforated Corrugated HOPE Pipe
~ -0-GP11 ~
Woven Geotextile Fabric Enveloping Gravel
Undisturbed Soil
Weathered Bedrock
Bedrock
,x .··.·· ~--,/ ' '
730
720
6" Dia. Perforated Corrugated HDPE Pipe
::r:: u
C)z zw _O::: 0::: I-Q_ 0::: (/) 0 wl_J Q_ ow ou - 0::: LW
1-z
.KlB NO.: 016878.00
DAlE: FEBRUARY 2018
SCALE:AS 9-IOWN
SHEET: OF
Scale: 1"=10'
Mid-North Interceptor Trench Elevation View
C1
720
730
715
733
725
720
730
715
733
725
710 710
C-005
Notes:
1. The Mid-North Interceptor Trench shall be a 20-foot longtrench parallel to the flow of Stout's Creek. The pump vaultshall be located on the south end of the trench. PDI-4(Northing: 1436404.19; Easting: 3100504.39) is located atthe south end of the sump. As shown on the Site Plan, thetrench will extend through piezometer TPZ-5 (Northing:1436416.341; Easting: 3100501.401).
2. All elevation data is based on the ground surface elevationsat temporary well TW-1, temporary piezometer TPZ-5,pre-design investigation boring PDI-4, and geologicconditions encountered at each of these locations. Thebottom of the trench shall be placed directly on top ofcompetent bedrock and shall slope toward the pump vault.In cases where bedrock does not slope toward the pumpvault location, rockwork may be required to create a gradualslope, or the sump location may be modified at the directionof the engineer.
3. Pump vault location shown is subject to change pendingresults of an additional boring near the southern terminus ofthe interceptor trench.
4. Refer to Drawings C-007 and C-008 for additionalconstruction details.
724
PZ-2 w
Clay to Ground Surface
Grovel
Approximate Weathered Bedrock Elev. 721.5'
Approximate Bedrock Elev. 716.0'
Bedrock
Existing Mid-North Spring Flow
-$-81213
• • • • • ~
Relocated Mid-North Spring Flow
0
'
• • • • • • • • ..... . ..... . ...... . Graphic Scale
5 --( In F..t)
Topsoil
Undisturbed Soil
• • 10 . -· • • ..
Woven Geotextile Fabric Enveloping Gravel
Weathered Bedrock
6" Dia. Perforated Corrugated HDPE Pipe
Woven Geotextile Fabric Enveloping Grovel
6" Dia. Perforated Corrugated HDPE Pipe
Bedrock
730
Undisturbed Soil
720
Weathered Bedrock
710
Mid-North Interce tor Trench Elevation View Scale: 1"=10'
::r:: u z
<(w wO'.:'. O'.:'. I-<( O'.:'.
::r::o I- 1-0'.:'. o_
0 t'3 Zer:::
w 1-z
..OS NO.: 016678.00
DAlE: FEBRUARY 2016
SCALE: AS 9-IOWN SHEET: OF
730
725
715
720
730
720
Scale: 1"=10'
North Interceptor Trench Elevation View
D1
733
715
725
733
Notes:
1. The North Area Interceptor Trench shall be 40-feet in length andextend through the locations of TW-2 (Northing: 1436481.06;Easting: 3100479.39) and TW-3 (Northing: 1436500.66; Easting:3100483.02). The pump vault shall be located on the south end ofthe trench.
2. All elevation data is based on the ground surface elevations attemporary wells TW-2 and TW-3, piezometer PZ-9, and geoprobeboring GP-25, as well as geologic conditions encountered at each ofthese locations. The bottom of the trench shall be placed directly ontop of competent bedrock and shall slope toward the pump vault. Incases where bedrock does not slope toward the pump vault location,rockwork may be required to create a gradual slope, or the sumplocation may be modified at the direction of the engineer.
3. Refer to Drawings C-007 and C-008 for additional constructiondetails.
C-006
• • • I • • •
• •
Clay ta Ground Surface
Gravel
Weathered Bedrock Elev. 720.34'
Bedrock Elev. 718.34'
Bedrock
4t::-
Topsoil
Undisturbed Soil
Woven Geotextile Fabric Enveloping Gravel
Weathered Bedrock
6" Dia. Perforated Corrugated HDPE Pipe
North Interceptor Trench
Graphic Scale 0 5 10 , ---ii
( In F..t)
North Interce tor Trench Elevation View
Woven Geotextile Fabric Enveloping Gravel
6" Dia. Perforated Corrugated HDPE Pipe
Scale: 1"=10'
~
~
i
::r:: u z
<(w wO'.:'. O'.:'. I-<( O'.:'.
::r::o I- 1-0'.:'. 0.... 0 t'3 Zer:::
w 1-z
..OS NO.: 016678.00
~
DAlE: FEBRUARY 2016
SCALE: AS 9-IOWN SHEET: OF
~ ~ "~ ffi N
/;i -Iii i ~ ' u
"'.i m c i,!
ei ~ 3 i ~ ~
Not to Scale
Typical Interceptor Trench Elevation View
E
Notes:
1. Geological conditions including depths of weathered and competentbedrock are based upon subsurface evaluations at specific locations andtimes. Conditions may vary, including undulations of competent bedrock,requiring modifications during construction and shall be subject to approvalby Engineer. If nodules of bedrock exist within the trench locations,rockwork may be required to facilitate a minimum 0.5% slope of the pipetoward the pump vault.
2. Geotextile fabric shall be draped over the sides of the trench prior to backfilland shall completely encapsulate the gravel fill. Edges shall be overlappeda minimum of 1 foot.
3. Clay shall be placed in 1-foot loose lifts and compacted to 95% maximumdensity of the Standard Proctor. Backfill shall be excavation spoils that arefree of debris and rock over 2-inches maximum dimension and approved bythe Engineer. Compaction testing may be requested.
4. 6-inch diameter slotted corrugated plastic piping shall be installed in thetrench after placement of geotextile and prior to backfill. Pipe shall besingle wall corrugated pipe constructed of high-density polyethylene(HDPE). It shall conform to AASHTO M294 type C specifications.Perforated piping shall have 1.5 to 3.5 square inches of opening per foot.Sections of pipe shall be joined together with connectors of the samematerial.
5. Gravel fill shall be clean and between 0.5 and 1.5-inches in diameter. Theinitial gravel lift shall be evenly placed to 12 inches above the pipe prior toplacement of subsequent lifts.
6. Pipe trench shall be approximately 36-inches wide. Excavations at sumplocations will be at least 72-inches wide. If at any time an excavation needsto be wider than specified to facilitate work, Contractor shall obtainEngineer approval. Excavations over 4-feet below grade shall be sloped orstepped back or a trench box must be utilized to meet OSHA regulations.Install orange construction/safety fencing to limit access to openexcavations.
C-007
Cleanout 8" Dia. Protective Steel
Casing With Locking Lid
Solid End Cap
High Early Strength Concrete
Pad
Topsoil
6" Dia. Solid HOPE Corrugated Pipe
Undisturbed Earth
Top of Weathered Bedrock (Elevation
Varies)
Weathered Bedrock
Bedrock Transition (Elevation Varies )
Transition Coupling from Perforated
to Solid
Geotextile Fabric
24" x 36" Channel Frame, Pedestrian Rated, Spring Loaded Aluminum Hatch
Monitoring Point 8" Dia. Protective Steel
Casing With Locking Lid
2" Dia. SCH. 40 PVC Solid Riser
Fence
2" Dia. SCH. PVC Screen
o>---------
Area Light
48" I.D. Flat Top Type 1 Manhole With 24" x 36" Opening (Meets H-20 Loading)
48" I.D. Type 1 Pre-Cast Concrete Manhole Section (Meets H-20 Loading, Height Varies)
Undisturbed Earth
Woven Geotextile Fabric
Top of Weathered Bedrock (Elevation Varies)
Weathered Bedrock
Bedrock Transition (Elevation Varies) Pump Vault bottom Elevation 2' Below Top of Competent Bedrock (Elevation Varies)
Concrete
6" Dia. Solid HDPE Corrugated Pipe
6" Dia. Perforated HDPE Corrugated Pipe
I!! .!
i!i
!! ! i h
i "oil me
iii" lil m
~ i'i i u
~ o::::w o-1-> o_z WO u_ 0:::: I-w<t: I-> zw - __J
__J w <(::r:: Uu o_z >-- w I- 0::::
I-
JOB NO.: 0115878.00
DATE: FEBRUARY 2018
SCALE: AS SHOYIN
SHEET: OF
F
C-008
F
G
C-008
Interceptor
Trench
Middle Spring
Mid-North
North
El. Bottom of
Pump Vault
717.3
713.5
714.0
El. Top of
Pump Vault
732.3
729.5
729.0
El. Ground Surface
731.5
729.25
728.4
E ~ ., u ~
" a. a:
48" I.D. Manhole Cover
Electrical Conduit From Treatment Building
6" Dia. Perforated Corrugated HDPE Pipe
Ground
Geotextile Fabric
i---------8' Excavation---------i
Submersible Pump Vault - Plan View Not to Scale
Discharge Pipe To Cistern
Undisturbed
2" Golva n ized Steel Guide Pipe (2 Per Pump)
Ball Check Valve
Submersible Pump
Weathered Bedrock
2'
Junction Box / Service Outlet
Electrical Conduit (Controls) From Treatment Building
Clay to Ground Surface
Discharge Pipe To Cistern
6' Below Surface
Fabric
Concrete
Transducer Level Monitor /Switch
Submersible Pum Vault Elevation View Not to Scale
24" x 36" Channel Frame, Pedestrian Rated, Spring Loaded
Aluminum Hatch
Clay to Ground Surface
6' (Typ.)
Gravel Grade
6" Dia. Perforated Corrugated HDPE Pipe
2'
Bedrock
6" Dia. Solid Corrugated HDPE Pipe
1' Min.
Electrical Conduit from Treatment Building
PVC Discharge Pipe
Undisturbed Soil
Pump Discharge
2" Galv. Steel Pipe Guide Pipe (2 Per pump)
Geotextile Fabric
Weathered Bedrock
Geotextile Fabric
Check Valve
Base Elbow Connection
Concrete
Submersible Pum Vault Elevation View Not to Scale
ti) _J
<( 1-w 0
1-_J
=:> <(
> Q_
2 =:> Q_
.KlB NO., 016678.00
~
i!i Ii:
I
~
DAlE: FEBRUARY 2016
SCAJEAS SHOWN SHEET: <F
I! "5! ~: mi 1,1 I
~; Ii -
"-! m C
" m ~ Iii m i!i i ~ i
H
C-009
H
C-009
I-· --------------h63'-o"-----------
---------------------------------------------ic"o'-o"-------------------------------------------
------------------------------------------58'-o"------------------------------------------
Backwash Water Tank
Building Foundation / Plan View Notto Scale
~ .... ·i..~ ·,· ·.=·
!_.
•'.
;~_i :·.,,,
-.:t ·,-,, ·. ·-·~
Treated Water Tank
--------------------------------------------o'-o"-------------------------------------------
1-----------------------28' -6"--------------------.i 12" (Typ.) -----15' -0"----------14' -6"------. ~
-----------------------------------------58'-o"------------------------------------------
.---,,-,..,,.,....,.,.- --~ 1 2" r t
#6 Rebar O g• (Typ.)
10'-o" Raw Water Tank
Waterstop (Typ.)
·;.. :1
.. · ~
8'-4" , . Backwash Water Tank
#6 Rebar O g• (Typ.)
Foundation/ Under round Tank Elevation View Not to Scale
Treated Water Tank
18"
Ground Surface
Clay Backfill
AASHTO No. 57 Aggregate
Top of Bedrock
z 0 I<( 0 z =:)
0 LL
(_')
z 0 __J
=:)
DJ
JOB NO.: 016678.00
< z < z>
0~ F(I) <z <>=z Ow o..o.. "' 0. oi§
"'"' ID::,
0~
a:
DA.TE: FEBRUARY 2015
SHEET: OF
C-010
"" 5 N
.r N C
'l
I
I
i i 1 I ;
TOP lENSION WIRE (TYP.)
BOTTOM lENSION WIRE -7 (TYP.)
APPROXIW.TE EX/s:nNG GROUND SURFACE:
Q Double Swing Gate
NOMINAL 1 1/4" DIA. (MIN.) BRACE RAIL (1YP;J
3" NOMINAL 0.0. (MIN.)
LINE POST
8'-0" MAX.
.)°.··,
w (MIN.)
0 i-----------------•Varie..-------------------<
0 Parking Area I Access Road Section
2' in.
1' in.
2" Dia, Sch.80 PIIC Dlecharge Pipe
0 Utility Trench Section
SECURE END OF EEL TOT-POST AS DIRECTED.
.llfm: j ~Fli~c:~~rws PROVIDE SCOUR PROTECTION 0 DOWNSLOPE SIDE OF N..L EEL CHECK DAMS.
6" INDOT 43 OOMSE AOORE~TE
Ml~ FIIPE: SPACING· 3 Between Pipe• 4 • From Trench Wall 12• Between Control and Power Condult11 12• Betwean Conduit and Conveyance Pipe
Graw! Bedclng (min. 4" below/6" above pipe)
2" Dia. PVC Conduit - Control
PIIC Conduit - 120V
PIIC Conduit - 20/H
DITCH WIDTH
.IQIE: APPLICABLE TO SMALL WIDTH DITCHES WITH TDTN.. WIDTH THAT REQUIRES ONLY ONE 10' SPAN,
EXTEND EELS AT SIDES OF DITCH TO PREVENT IM'ASSING.
,.
STABUZE I/IA MEl"N.. T-POSTS ON DOWNHILL SIDE AT THE CENTER, AT EACH END, AND AT ADDmONAL POINTS AS NEEDED (2' MAX. SPACING), OR AS DIRECTED BY THE ENGINEER.
.MllIEI
T-POST ON DOWNHLL SIDE AT THE CENTER, AT EACH END1 AND AT ADDmONN.. POINTS AS NEEDED TO STABLIZE B~ }i' D:::cr:~ING),
.l!lllIE: SLIGHTLY ANGIL£ STAKES WITH TOP FACING TOWARDS DIRECTION OF Fl.CM.
APPLICABLE TO SMALL WIDTH DITCHES WrTH TDTN.. WIDTH THAT REQUIRES ONLY ONE 10' EEL TO SPAN.
F SOIL BENEATH IS SOFT OR LOOSE, COMPACT BY HAND TAMPING OR OTHER APPROVED MEANS.
DITCH CHECKS SINGLE N.T.S. A-A DITCH CHECKS
N.T.S. 0 Filter Tubes
~J:;l~k,
Fence Post Details
El.£VA110N
----71iJ ~ . . .
BOTTOM T~NSION t :; _:~ WIRE (TYP.) •· ·'. · ' 'io
9 GAUGE CHAIN LINK t · J "' FENCE FABRIC
(1YP .) i)-: :.,
w (MIN.)
. .
~- NOMINAL a.a. (MIN.) LINE POST
9 GAUGE CHAIN LINK FENCE FABRIC
(TYP.)
:'.: ,'. • ~2" (MIN.)/=11" (MA)(J .. -~ t :,. BOTTOM raNSION •··. ~ lo WIRE (TYP.)
~ J "' APPROXIW.TE EX/s:nNG ·.. ,. GROUND SURFACE:
.} .... ,
w (MIN.)
GENERAL NOTES:
1. CONTRACTOR MAY SUBMIT ALlERNAlE FENCE DESIGN FOR APPRO\/AL BY THE SITE MANAGER.
2. GAlE, CORNER, LINE AND PULL POSTS SHALL BE PLACED IN CONCRETE.
J. CONCRETE SHALL CONFORM TO NJDOT SPECIFICATIONS.
EXTEND FABRIC INTO EXCAVATED TRENCH
PETNL A ANCHORING SILT FENCE
REINFORCEMENT H
FABRIC
ctJrAWAY VIEW
o Silt Fence~=~
SPECIFIC NOTES:
1.
2.
J.
4.
5.
POST SHALL BE 2" X 2" WOOD STAKES PLACED A MAXIMUM OF 8.0' CENTER TO CENTER. GEOTEXTILE MATERIAL SHALL BE FASTENED SECURELY TO FENCE POSTS WITH WIRE TIES OR STAPLES. WHEN lWO SECTIONS OF GEOTEXTILE MATERIAL ADJOIN EACH OlHER, THE GEOTEXTILE SHALL BE WRAPPED AROUND THE lWO STAKES AND THE STAKES SHALL BE DRIVEN INTO THE GROUND AS ONE UNIT •
MAINTENANCE SHALL BE PERFORMED AS NEEDED AND MATERIAL REMOVED WHEN "BULGES" DEVELOP IN THE SILT FENCE.
INSPECTION SHALL BE WEEKLY AND AFTER EVERY STORM EVENT, REPAIR OR REPLACEMENT SHALL BE MADE WHEN ACCUMULATIONS REACH 1 /2 THE ABOVE GROUND HEIGHT OF SILT FENCING, OR AS REQUIRED BY THE SITE MANAGER.
S. SILT FENCING SHALL BE INSTALLED PARALLEL TO EXISTING CONTOURS OR CONSTRUCTED LEVEL ALIGNMENTS. ENDS OF FENCING MUST BE EXTENDED 8.0 FEET, TRAVELING UPSLOPE AT 45 DEGREES TO THE ALIGNMENT OF THE MAIN FENCING SECTION.
7. MAXIMUM DRAINAGE AREA />BOVE SILT FENCE SHALL BE LESS THAN ONE ACRE.
B. LENGTH OF SLOPE ABOVE SILT FENCE SHALL BE LESS THAN 150 FEET.
(/) =:)
0 w (/) z_j <( <( _J 1-_J w Wo u (/)
~
JOB NO.: 0118711.0D DAlE: FEBRUARY 2018
9CALE: AS SHOWN
SHEET: OF
~ ,,.L-------------------.-------------------..-------------------""T------------------....---------------------,------------------.l!:======:::::!..1