Naval Medical Center San Diego Naval Medical Center San Diego Co-Generation Project Co-Generation Project Karen Jackson, SDG&E Karen Jackson, SDG&E Project Manager Project Manager Edward Thibodo, NAVFAC SW Edward Thibodo, NAVFAC SW Energy Team Contract’s Lead Energy Team Contract’s Lead Success Story Success Story

Co Gen Presentation Final

Embed Size (px)

Citation preview

Page 1: Co Gen Presentation Final

Naval Medical Center San DiegoNaval Medical Center San DiegoCo-Generation ProjectCo-Generation Project

Karen Jackson, SDG&E Karen Jackson, SDG&E Project ManagerProject Manager

Edward Thibodo, NAVFAC SW Edward Thibodo, NAVFAC SW Energy Team Contract’s LeadEnergy Team Contract’s Lead

Success StorySuccess Story

Page 2: Co Gen Presentation Final

NAVFAC Contractor’s Guide:NAVFAC Contractor’s Guide: Partnering Philosophy –Partnering Philosophy – “We are partners “We are partners

in every contract we award. Partnering is in every contract we award. Partnering is an attitude that we both work hard to an attitude that we both work hard to develop, an it requires both of us to take develop, an it requires both of us to take some extra risk and trust one another.”some extra risk and trust one another.”

Page 3: Co Gen Presentation Final

Co-Generation TeamCo-Generation Team

Page 4: Co Gen Presentation Final

Balboa Naval Medical Center Balboa Naval Medical Center Co-GenerationCo-Generation

Public Works Requested Survey of Hospital Performed by LSW Engineers

– Initially 20 Options– 5 Options Analyzed

Result:– One 4.3 MW Solar Centaur 50 – Two Caterpillar Emergency Gen Sets

SDG&E Proposed UESC

Page 5: Co Gen Presentation Final

Balboa Naval Medical Center Balboa Naval Medical Center Co-GenerationCo-Generation

Phase I – Feasibility StudyPhase II – Contract NegotiationsPhase III – Equipment PurchasePhase IV – Contractor ReleasePhase V – ConstructionPhase VI – CommissioningPhase VII – Close out

Page 6: Co Gen Presentation Final

Co-Gen Project EquipmentCo-Gen Project Equipment

MAJOR COMPONETS

Page 7: Co Gen Presentation Final

4.3 MW Solar Centaur 504.3 MW Solar Centaur 50

Page 8: Co Gen Presentation Final

Heat Recovery Steam GeneratorHeat Recovery Steam Generator

Page 9: Co Gen Presentation Final

Hawthorne Diesel Hawthorne Diesel Generator SetsGenerator Sets

Page 10: Co Gen Presentation Final

Exterior view Exterior view of Hawthorne Switchgearof Hawthorne Switchgear

Page 11: Co Gen Presentation Final

Interior view Interior view of Hawthorne Switchgearof Hawthorne Switchgear

Page 12: Co Gen Presentation Final

Project ScopeProject Scope

Co-Gen Project Scope– Demo of all of the existing equipment including turbines, heat

recovery boilers, controls and switchgear.– Turbine had to be inside – created unexpected exhaust

challenges– Additional stack constructed for diesel generators. Existing stack

reused for gas turbine– New Steam header and condensate system modifications to

accommodate existing boilers– New Controls and switchgear for the cogeneration equipment

and emergency generation equipment. – New gas line to turbine. Existing line could not be reused.

Added a gas compressor for the long run length.– Diesel fuel purifier and filter system, to re-circulate the fuel oil

within the existing 150,000-gallon underground storage tank system.

Page 13: Co Gen Presentation Final

Technical IssuesTechnical Issues

CHALLENGES & 

RISKS

Page 14: Co Gen Presentation Final

First Turbine RemovedFirst Turbine Removed

Page 15: Co Gen Presentation Final

Working Space ConstraintsWorking Space Constraints

Page 16: Co Gen Presentation Final

Existing Piping Under Central Plant Existing Piping Under Central Plant FlooringFlooring

Page 17: Co Gen Presentation Final

New Central Plant FlooringNew Central Plant Flooring

Page 18: Co Gen Presentation Final

New Tower InfrastructureNew Tower Infrastructure

Page 19: Co Gen Presentation Final

Old and New Exhaust StacksOld and New Exhaust Stacks

Page 20: Co Gen Presentation Final

Gas Line from CompressorGas Line from Compressor

Page 21: Co Gen Presentation Final

Emergency GeneratorsEmergency Generators

Page 22: Co Gen Presentation Final

Heat Recovery Steam Generator Heat Recovery Steam Generator Leak RepairsLeak Repairs

Page 23: Co Gen Presentation Final

Exhaust Leak RepairsExhaust Leak Repairs

Page 24: Co Gen Presentation Final

Basic Contract AwardBasic Contract Award

Total Contract Value $16,069,895.00 – design portion $1,263,250.00 – construction portion $14,806,635.00

Basic Buy Down of $6,838,000.00 – financed with 180 day buy out option

Basic Financed Value of $9,231,885.00 Interest Rate of 9.24% was

– negotiated with option to buy out contract with no penalty Total Savings $1,610,012.00 Year Payback 9.98 Years

Page 25: Co Gen Presentation Final

Mod 001 - Buy DownMod 001 - Buy Down

Basic Buy Down $6,838,000.00– Payment Stream paid for in full– Government saved $1,030,412.00 in finance

charges.

Page 26: Co Gen Presentation Final

Mod 002 – Scope RefinementMod 002 – Scope Refinement

Total Contract Value of – $16,069,895.00 decreased by $1,195,062.00 to

$14,874,823.00

Additional Buy Down of $607,564.00 Basic Financed Value

– $9,231,885.00 decreased by $1,802,626.00 to $7,429,259.00

Interest Rate – 9.24% decreased by 3.8% to 5.44%

Page 27: Co Gen Presentation Final

Mod 002 – Scope RefinementMod 002 – Scope Refinement

Payments Changed– $131,776.63 a month for 120 months

($15,813,195.00) – $1,420,760.70 a year for 6 years ($8,514,438.80)

Total Savings $1,578,563.00 Payback 9.42 Years

Page 28: Co Gen Presentation Final

Mod 003 – Medical AirMod 003 – Medical Air

Replaced – two existing medical air compressors

high efficient Ingersoll-Rand L60W oil free rotary screw type units

– refrigerated air dryers. cycling thermal mass dryers, saving energy by operating only

at the power needed for the air flow at the time.

Modification Cost $394,689.24 Savings $41,222.00 Pay Back 9.57 Years

Page 29: Co Gen Presentation Final

Mod 004 - Assignment of ClaimsMod 004 - Assignment of Claims

Incorporated into contract– In accordance with FAR 52.232.23 (Assignment

of Claims).– “Notice of Assignment” – “Instrument of Assignment”

Signed by Contracting Officer

Page 30: Co Gen Presentation Final

Mod 005 – Emission Reduction Mod 005 – Emission Reduction Credit (ERC)Credit (ERC)

ERC’s generated by removal of Pollution and Emission Producing Equipment

– (3) 800kW Solar Saturn Turbines

– NOx 14.72 tons/year

– CO 13.83 tons/year

Page 31: Co Gen Presentation Final

Mod 005 - ERC LanguageMod 005 - ERC Language

Emission Reduction Credit language identifies SDG&E as the Governments agent to bank and sell the emission credits. – Language refers to the value of all ERCs as a

component of the salvage value of the equipment being removed and replaced under the contract.

– Did not set a firm value on the credits but set a shared savings formula for ERCs when sold.

Page 32: Co Gen Presentation Final

Mod 005 - ERC FormulaMod 005 - ERC Formula

ERC Fair Market Value (FMV) $0 to $1,500,000.00

– SDG&E Share 28% of the ERC FMV

– Government Share 72% of the ERC FMV

Page 33: Co Gen Presentation Final

Mod 005 - ERC FormulaMod 005 - ERC Formula

ERC Fair Market Value (FMV) $1,500,000.00 and Above

– SDG&E Share 0.07 X ERC FMV + $315,000.00 Fixed Fee

– Government Share ERC FMV – (0.07 X ERC FMV + $315,000.00 Fixed

Fee)

Page 34: Co Gen Presentation Final

Mod 005 - ERC GraphMod 005 - ERC Graph

$k

$100k

$200k

$300k

$400k

$500k

$600k

$M $1M $2M $3M $4M

ERC's Value

SD

G&

E C

om

mis

sio

n

Page 35: Co Gen Presentation Final

Mod 006 – Extended WarrantyMod 006 – Extended Warranty

Diesel Generators Failed to Meet Contract Requirements

– Units met current San Diego Air Pollution Control District (SDAPCD) requirements.

– Incorporated an extended warranty and additional liabilities upon Hawthorne

– Protect the Government if the SDAPCD invoked retroactive requirements on the emissions of the Gas Turbines.

Page 36: Co Gen Presentation Final

Mod 007 & 008 AdministrativeMod 007 & 008 Administrative

Mod 007 formalized miscellaneous minor changes to the scope of work and contract.

Mod 008 prepaid the financed portion of the contract providing an interest savings to the customer.

Page 37: Co Gen Presentation Final

Mod 009 – Documentation of Mod 009 – Documentation of ERC SaleERC Sale

ERCs Sold for $95,000.00 per ton

Total Value of ERCs $1,398,4000.00

Navy’s Share 72% or $1,006,848.00

Modification Closed out the Contract

Page 38: Co Gen Presentation Final

THE CHECKTHE CHECK

Page 39: Co Gen Presentation Final

Contract SummaryContract Summary

14.8 Million Cost 1.5 Million SavingsDec 01 – Apr 04 Improved Infrastructure Improved Reliability

Page 40: Co Gen Presentation Final

Questions & AnswersQuestions & Answers

Questions ……. Free

Answers……….Minor Fee

Discussion…….Might even pay you