CLWC Water System Improvement Project Overview

CLWC Water System Improvement Project Overview. Project Elements Phase 1 Portable Generator Install Flowmeters New SCADA for Existing System New Well

Embed Size (px)

Citation preview

Page 1: CLWC Water System Improvement Project Overview. Project Elements Phase 1 Portable Generator Install Flowmeters New SCADA for Existing System New Well

CLWC Water System Improvement Project

Overview

Page 2: CLWC Water System Improvement Project Overview. Project Elements Phase 1 Portable Generator Install Flowmeters New SCADA for Existing System New Well

Project Elements

Phase 1• Portable Generator• Install Flowmeters• New SCADA for Existing

System• New Well #7

Phase 2• New Well 7 house/pump

station • New Tank 1 (450,000 gal)• New Tank 1 BPS• New Tank 3 (450,000 gal)• New Big Bend BPS• Additional Hydrants• Complete SCADA

Page 3: CLWC Water System Improvement Project Overview. Project Elements Phase 1 Portable Generator Install Flowmeters New SCADA for Existing System New Well
Page 4: CLWC Water System Improvement Project Overview. Project Elements Phase 1 Portable Generator Install Flowmeters New SCADA for Existing System New Well

Phase 1 Status

Element

• Portable Generator• Install Flowmeters• New SCADA for Existing

System• New Well #7

Status

• Complete – in place• Underway – 31 May• Complete – operational • Cased to 695’, water

level at 590’ – pump test pending

Page 5: CLWC Water System Improvement Project Overview. Project Elements Phase 1 Portable Generator Install Flowmeters New SCADA for Existing System New Well

Phase 2 Status

• Final Design near completion– Well 7 House/Pump Station design dependent

upon pump test results • Anticipate going to bid end of May– Award by end of Jun– Construction underway by end of Jul

• Project completion (including O&M manual) by Apr 2016