Clinch Working Group Schematics

Embed Size (px)

Citation preview

  • 8/4/2019 Clinch Working Group Schematics

    1/9

    SCALE:1 = 400 20

    Scheme A Advantages

    Removes train station and fenced yard from ConFoster building, opening views into the parkAccess to shoreline and view point at peninsulathrough parking relocationCon Foster Building as park anchorArtesian well element focal point of Con FosterGardens, with shortened water routeOpportunity for events programming and rental ofpark spaces to communityInformal amphitheater and plaza on west endBath house integrated into park settingUniversal design throughout, with only one stair assecondary access route from tunnel

    No added costs sssociated with train

    Scheme A Disadvantages

    TART trail moving through si te may result in pedestrianconficts

    Parking moves further from beach area

    SCHEME AClinch ParkTraverse City

  • 8/4/2019 Clinch Working Group Schematics

    2/9

    SCALE:1 = 400 20

    Scheme B Advantages

    Removes train station and fenced yard from ConFoster building, opening views into the parkAccess to shoreline and view point at peninsulathrough parking relocationCon Foster Building as park anchorArtesian well element focal point of Con FosterGardens, with shortened water routeOpportunity for events programming and rental ofpark spaces to communityInformal amphitheater and plaza on west endBath house integrated into park settingUniversal design throughout, with only one stair assecondary access route from tunnel

    Scheme B Disadvantages

    Aligns TART trail with train route, minimizing crossingconficts,butaddingpotentialadjacencyconficts240 lineal feet of train track through Bath House Plaza- train noise loudest at turns- diesel fumes in food service area150 lineal feet of double train track across Con Foster entryand beside TART trail8 pedestrian crossings2 vehicular crossingsSplashplayareaadjacenttotrainAdded costs associated with train:- construct new train track- construct new train yard and platform

    - construct new track in paved areas vs. lawn- does not accommodate on site seasonal train storageTART trail moving through si te may result in pedestrianconficts

    SCHEME BClinch ParkTraverse City

  • 8/4/2019 Clinch Working Group Schematics

    3/9

    SCALE:1 = 400 20

    Scheme C Advantages

    Incorporates Train in its current track locationRemoves train station and fenced yard from ConFoster building, opening views into the parkUtilizes ex. zoo building for train maintenance,seasonal train storage, and Marina storageSeparates TART trail from train routeAccess to shoreline and view point at peninsulaCon Foster Building as park anchorArtesian well element focal point of Con FosterGardens, with shortened water routeOpportunity for events programming and rental ofpark spaces to communityInformal amphitheater and plaza on west end

    Bath house integrated into park settingUniversal design throughout, with only one stair assecondary access route from tunnel

    Scheme C Disadvantages

    280 lineal feet of train track through Bath House Plaza- train noise loudest at turns- diesel fumes in food service area8 pedestrian crossings2 vehicular crossingsSplashplayareaadjacenttotrainAdded costs associated with train:- construct new train yard and platform- relocate two sections of track- construct new track in paved areas vs. lawnProhibits relocation of 30 parking spaces from pointto entry driveTART trail moving through site may result inpedestrianconficts

    SCHEME CClinch ParkTraverse City

  • 8/4/2019 Clinch Working Group Schematics

    4/9

    INFORMAL

    AMPHITHEATERClinch ParkTraverse City

  • 8/4/2019 Clinch Working Group Schematics

    5/9

    CONFOSTER

    GARDENSClinch ParkTraverse City

  • 8/4/2019 Clinch Working Group Schematics

    6/9

    BATHHOUSE

    PLAZAClinch ParkTraverse City

  • 8/4/2019 Clinch Working Group Schematics

    7/9

    THE POINTClinch ParkTraverse City

  • 8/4/2019 Clinch Working Group Schematics

    8/9Clinch ParkTraverse CityPLAN DIAGRAMS

  • 8/4/2019 Clinch Working Group Schematics

    9/9Clinch ParkTraverse CityPLAN DIAGRAMS