CITY SCHOOLS OF DECATUR
COMMUNITY MEETING
CITY SCHOOLS OF DECATUR
MARCH 13, 2017
CITY SCHOOLS OF DECATUR
AGENDA
CITY SCHOOLS OF DECATUR 2
H I S T O RY
• A community engagement process kicked off the discussion about the GO Bond
• Master Planning Facilities Task Force assembled to Review the impact of the GOBond and how it could shape the future look of Elementary schools in the CitySchools of Decatur
• The task force developed options based on background data-
4 initial options
• The Superintendent and Board of Education (BOE) were given two options, one ofwhich had a new grade configuration.
• The BOE asked that the committee look into additional options.
• The BOE requested that staff develop a process to bring additional feedback fromthe community to the BOE on the options presented by the Facilities PlanningTask Force.
• Note: Facility plans are always evolving to meet our needs. It has always been our stated intention to develop andimplement the master plan in phases to allow the district to react to any changes we experience over time. Since it isso difficult to predict the future it is critical that we allow ourselves the flexibility to make changes as we evolve.
SEPTEMBER 2016 - NOVEMBER 2016
CITY SCHOOLS OF DECATUR 3
F A C I L I T I E S P L A N N I N G & G R A D E C O N F I G U R A T I O N
THE PROCESS
Plan For
Planning
Assemble Steering Committee
Data Review & Analysis
Community Transparency
Options AnalysisDevelop
Recommendations
CITY SCHOOLS OF DECATUR 4
C O M M U N I T Y M E E T I N GTONIGHT’S PURPOSE
Communicate the Process
Share Facility Grade Configuration Options with the Community
Collect Individual and Group Feedback through written surveys and small group discussion
Communicate Online Survey Availability
CITY SCHOOLS OF DECATUR 5
C O M M U N I T Y M E E T I N GPROJECT WEBSITE
Project Website
• On District Website
• Meeting agendas & presentations
• Background Reports
• Community Meeting Results
CITY SCHOOLS OF DECATUR 6
S T E E R I N G C O M M I T T E EROLES & RESPONSIBILITIES
Review Previous Process
• Validation of Options Previously Presented
• Assist in Review of Options that will be Presented at Community Meeting
Review & Validate Data
• Establish and Follow Guidelines for Development of Options
Assist in Community Process
• Table Facilitation to Convey Reasoning of Options Presented
Review Community Response with Data
• Assist in Drafting Recommendations to the Board of Education & Superintendent
CITY SCHOOLS OF DECATUR 7
P L A N N I N G G U I D E L I N E SPRIORITIES*
*Priorities are in no particular order
Cost
Operational Cost Efficiency & Effectiveness
Minimal Disruption to the Educational Process
EL Education vs IB
Current Grade configuration operates very well
Equity among schools
Geography
Neighborhood elementary schools
Walkability
Teacher & Grade Level Collaboration
Specialty teachers
Cost associated with sharing specials teachers vs. having one per building
Transportation
2 tier vs 3 tier bus system
Safety & Security
Demands on facility
Capability of school to serve grade levels it house
Example: having a kindergartener in a CR designed for a 5th grader
Diversity
Race/ethnicity, socio economic, special needs
CITY SCHOOLS OF DECATUR 8
D E M O G R A P H I C SHISTORICAL ENROLLMENT
2,681 2,811 2,838 2,597 2,639 2,502 2,447 2,397 2,397 2,412 2,360 2,366 2,476 2,659 2,687 2,894
3,256 3,649
3,968 4,345 4,661
5,010
-
1,000
2,000
3,000
4,000
5,000
6,000
Historical Enrollment
CITY SCHOOLS OF DECATUR 9
D E M O G R A P H I C SPROJECTED ENROLLMENT
3,9684,345
4,6615010
5,4175,792
6,1546,526
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21
District-Wide Enrollment by Year
Actual Enrollment Projected Enrollment
2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21
Clairemont ES 379 319 309 319 314 312 318 319
Glennwood ES 289 275 265 285 300 327 338 344
Oakhurst ES 435 465 468 456 502 538 568 603
Westchester ES 0 232 285 293 314 332 345 353
Winnona Park ES 396 376 396 434 443 431 437 419
4/5 Academy @ 5th Ave. 619 671 767 872 924 957 1003 1060
Renfroe MS 860 934 1013 1114 1250 1391 1516 1599
Decatur HS 990 1073 1158 1237 1370 1504 1629 1829
Projected EnrollmentActual EnrollmentSchool
CITY SCHOOLS OF DECATUR 10
D E M O G R A P H I C SBLOCK GROUP PROJECTIONS
Source: ESRI
Based on 2010 census & yearly county-specific data
CITY SCHOOLS OF DECATUR 11
W E R E O T H E R G R A D E C O N F I G U R A T I O N O P T I O N S C O N S I D E R E D ?
OTHER CONSIDERATIONS
Yes, other options were considered:
Status Quo
Realign the District in current configuration and fix capacity with modular solutions
K to 5 Grade Configuration
All elementary schools in the District would house grades kindergarten to 5
Combination School
New elementary school would be a combination K-3 and 4-5, remainder of schools would remain as current grade configuration
CITY SCHOOLS OF DECATUR 12
T H E R E H A S B E E N A L O T O F D I S C U S S I O N P A R T I C U L A R L Y O N K - 5 , W H Y W A S T H I S O P T I O N N O T B R O U G H T F O R W A R D ?
DISCUSSION ITEMS
Both Steering Committees (Fall 2016 & Current) reviewed carefully and both Committees, based on the challenges presented, decided not to bring option forward
Bus Tiers - Would go from 3 tier to 2 tier system…additional busses, routes and costs
Teacher Collaboration- Current configuration allows for larger grade level grouping of teachers in one building
Variance of School Sizes- Capacity ranges from 272 to 661. Could lead to programmatic inequity because of size of school
Small School Resources Challenges- State funding formula that would limit full time participation at each school for certain program offerings (ie. Art Teacher, Music Teacher, full time Media Specialist)
Geography- Balancing enrollment for K-5 among all schools would likely mean breaking up traditional “neighborhoods” in the City.
IB & EL Programs- If grade bands change dramatically there would be extensive professional development to retrain, leading to additional costs
Space Implications- Some schools would need a certain amount of renovation to accommodate different grade levels, specifically kindergarten classrooms
CITY SCHOOLS OF DECATUR 13
O P T I O N SOPTION 1A
K-2, 3-5 GRADE CONFIGURATION
• College Heights ES would change from the ECLC to a K-2 school
• A new Early Learning Center would be built
• Clairemont ES, Glennwood ES, Winnona Park ES, and Westchester ES would change to K-2 schools
• Fifth Avenue ES and Oakhurst ES would both change to 3-5 schools
• A new 3-5 elementary school would be built on Talley St. property at approximately 525 capacity
Refer to page 3 in options packet
CITY SCHOOLS OF DECATUR 14
O P T I O N SOPTION 1B
K-2, 3-5 GRADE CONFIGURATION
• College Heights ES would change from the ECLC to a K-2 school
• A new Early Learning Center would be built at 330 capacity
• Clairemont ES, Oakhurst ES, Winnona Park ES, and Westchester ES would change to K-2 schools
• Fifth Avenue ES and Glennwood ES would become 3-5 schools
• A new 3-5 elementary school would be built on Talley St. at approximately 525 capacity
Refer to page 4 in options packet
CITY SCHOOLS OF DECATUR 15
O P T I O N SOPTION 2
K-3, 4-5 GRADE CONFIGURATION
Refer to page 5 in options packet
• College Heights ES would change from the ECLC to a K-3 school
• A new Early Learning Center would be built at 330 capacity
• Clairemont ES, Glennwood ES, Oakhurst ES, Winnona Park ES, and Westchester ES would remain K-3 schools
• Fifth Avenue ES would remain a 4-5 school
• A new 4-5 elementary school would be built at approximately 525 capacity
CITY SCHOOLS OF DECATUR 16
S U RV E Y & S M A L L G R O U P D I S C U S S I O N
Please take time to review (and complete) Individual Questionnaire
Work as a small group to complete Group Questionnaire
If you do not wish to hand in your individual Questionnaire-
Please go Online to complete-Open until Sunday, March 26th, 11:59 p.m.
Goto:
https://www.snapsurveys.com/wh/s.asp?k=148917472781
CITY SCHOOLS OF DECATUR
Visit Project Website
Tracy Richter
www.csdecatur.net
FOLLOW THE ELEMENTARY FACILITY ENGAGEMENT WEBSITE LINK