Upload
others
View
2
Download
0
Embed Size (px)
Citation preview
CITY MUNICIPAL COUNCIL, SIDLAGHATTA
Public Disclosure Schedule
2014 - 2015
UP TO MARCH 2015
Manual on Public Disclosure Schedules
CMC, SIDLAGHATTA
Content
Sl.no Particulars
1 Urban planning including town planning
2 Regulation of Land- use and Construction of Buildings
3 Planning for Economic and Social development
4 Roads and Bridges
5 Water Supply- Domestic, Industrial and Commercial
6 Public Health, Sanitation, Conservancy and SWM
8 Urban forestry, protection of environment and ecology
10 Slum Improvement & Up-gradation
11 Urban Poverty Alleviation
12 Provision of urban amenities and facilities- parks, gardens and
playgrounds
13 Promotion of cultural, educational, and aesthetic aspects
14 Burials and burial grounds, cremations, cremation grounds and electric
crematoriums
15 Cattle pounds, prevention of cruelty to animals
16 Vital Statistics including registration of births and deaths
17 Public amenities including street lighting, parking lots, bus stops and
public conveniences
18 Regulation of slaughter houses and tanneries
Manual on Public Disclosure Schedules
CMC, SIDLAGHATTA
Formats for Disclosure
Manual on Public Disclosure Schedules
CMC, SIDLAGHATTA
Functions under 12th Schedule
1. URBAN PLANNING INCLUDING TOWN PLANNING
Sl.
No
Functions as
per 12th
Schedule
Agency
Responsible
with in their
jurisdiction
Data to be Disclosed Period for which
information has to
be disclosed
Level of
Disclosure
(ULB/Ward)
Frequency of
Disclosure
Reference Remarks
1 Urban
Planning
including
town
Planning
1. Town
Planning
Authority
2. Urban
Development
Authority
(UDA)
3. Municipal
Planning
Authority
(i) Report and Maps of
Master Plans including
Zoning Regulations
Plan in force now ULB 1. Annually
2. To be
notified as
and when
changes done
Table 1.1
(ii) Maps of Planning
Districts
Plan in force now ULB 1. Annually
2. To be
notified as
and when
changes done
(iii) Details of
provisional and finally
approved layouts
(Survey No, name of
owner, Site details)
Previous three
financial years
including current
year
ULB Half Yearly Table.1.2
4. ULB (iv) Report and maps of
Comprehensive
Development Plan (CDP)
Current plan ULB 1. Annually
2. To be
notified as
and when
changes done
Manual on Public Disclosure Schedules
CMC, SIDLAGHATTA
Table 1.1: Report and Maps of Master Plans including Zoning Regulations
(Please fill in following information)
Sl.
No
Name of the reports related to Master
Plan, Zoning Regulation and CDP
Enclosure in
Maps related to Master Plan, Zoning
Regulations, Planning District and
CDP
Enclosure in PDF
1
- Enclosure
- Enclosure
2
- Enclosure
- Enclosure
3
- Enclosure
- Enclosure
Table 1.2: Number of provisional and final approved layouts
(Please fill in following information)
Years Number of provisional layouts Number of approved layouts Details of layout as enclosure
Current year -2014-15
- - Enclosure as per the format
Current year 11-2013-14
- - Enclosure as per the format
Current year 1- 2012-13
- - Enclosure as per the format
Manual on Public Disclosure Schedules
CMC, SIDLAGHATTA
Format:
Details of Provisional and final approved layouts
Sl. No Name of
Layout
Whether provisional/approved Number of sites in the approved layout Name of the
owner/developer of the
layout 30*40 40*60 Odd sites
1 - - - - - -
2. REGULATION OF LAND-USE AND CONSTRUCTION OF BUILDINGS
Sl.
No
Functions as
per 12th
Schedule
Agency
Responsible
with in their
jurisdiction
Data to be Disclosed Period for which
information has
to be disclosed
Level of
Disclosure
(ULB/Ward)
Frequency of
Disclosure
Reference Remarks
2 Regulation of
Land- use and
Construction of
Buildings
UDA/ULB (i) Details of Building
Commencement &
Completion Certificate
(Total application
received, total
permission granted,
location details)
Previous three
years including
current year-
2012-13
ULB Annually Table 2.1 (a)
& Table.2.1
(b)
(ii) Details of Industries
and commercial
complexes approved
(Survey No., Type,
Name of the owner)
Previous three
Financial years
including current
year-2013-14
ULB Annually Table 2.2
Manual on Public Disclosure Schedules
CMC, SIDLAGHATTA
Table 2.1 (a): Details of Building Commencement & Completion Certificate
Total number of application received for building
plan approval from past three years
Total number of License granted from past three
years
2014-15 2013-14 2012-13 2014-15 2013-14 2012-13
11 26 19 11 26 19
Table 2.1 (b): Details of the building plan approval for three years
2014-15
Enclosure
2013-14
Enclosure
2012-13
Enclosure
-
-
Manual on Public Disclosure Schedules
CMC, SIDLAGHATTA
Format for enclosure Ref Table 2.1.b
Table 2.2: Details of approved Industries/Commercial Areas
2014-2015
Nil
2013-2014
Nil
2012-2013
Nil
Mention year
Site area(Sq/feet) Built-up
area(Sq/feet)
Location details
Ward Street name Property Number/ Survey Number
-
- - - - -
Manual on Public Disclosure Schedules
CMC, SIDLAGHATTA
Format reference to table 2.2
Details Ward Number Street Name Survey Number Site
Area(Sq/feet)
Built-up area
(Sq/feet)
Owner name
Curr
ent
FY
1
Curr
ent
FY
-1
Curr
ent
FY
-2
Curr
ent
FY
1
Curr
ent
FY
-1
Curr
ent
FY
-2
Curr
ent
FY
1
Curr
ent
FY
-1
Curr
ent
FY
-2
Curr
ent
FY
1
Curr
ent
FY
-1
Curr
ent
FY
-2
Curr
ent
FY
1
Curr
ent
FY
-1
Curr
ent
FY
-2
Curr
ent
FY
1
Curr
ent
FY
-1
Curr
ent
FY
-2
Details in
enclosure
- - - - - - - - - - - - - - - - - -
Manual on Public Disclosure Schedules
CMC, SIDLAGHATTA
3. PLANNING FOR ECONOMIC AND SOCIAL DEVELOPMENT
Sl.
No
Functions as per
12th Schedule
Agency
Responsible
with in their
jurisdiction
Data to be Disclosed Period for which
information has to
be disclosed
Level of
Disclosure
(ULB/War
d)
Frequency
of
Disclosure
Referenc
e
Remark
s
3 Planning for
Economic and
Social
development
ULB List and brief of the Social and
Economic Development Schemes.-
eg; 18% scheme, Ashraya and such
other Govt. programs
Details of budget allocation and
expenditure of these schemes
Details of Beneficiaries
Previous three
financial years
including current
year
ULB Annually Table 3.1
Table 3.1
List and brief of the social and economic Development Schemes for three years
Current FY 2014-15
Sl. No Name of the Scheme Budget allocated Expenditure List of beneficiaries to be enclosed
1 22.75% Scheme 43.85 9.51 Enclosure
2 SULM 9.42 Enclosure
3 Vajpayee - - Enclosure
Current FY-1 2013-14
Sl. No Name of the Scheme Budget allocated Expenditure List of beneficiaries to be enclosed
1 22.75 40.25 34.10 Enclosure
2 SJSRY 10.40 10.40 Enclosure
3 Vajpayee - - Enclosure
Manual on Public Disclosure Schedules
CMC, SIDLAGHATTA
Current FY-2 2012-13
Sl. No Name of the Scheme Budget allocated
Expenditure
List of beneficiaries to be enclosed
1 22.75% Scheme 54.82 51.00 Enclosure
2 SJSRY 12.53 12.50 Enclosure
3 Vajpayee - - Enclosure
Manual on Public Disclosure Schedules
CMC, SIDLAGHATTA
4. ROADS & BRIDGES 2014-15
Sl.
No
Functions as per
12th Schedule
Agency
Responsible
with in their
jurisdiction
Data to be Disclosed Period for which
information has
to be disclosed
Level of
Disclosure
(ULB/Ward)
Frequency
of
Disclosure
Reference Remarks
4 Roads and
Bridges
ULBs & UDA (i) Total Road Length
(type of road, its length
and width)
Current status ULB/Ward Annually Table 4.1 MIS
(ii) Details of Roads
proposed & executed for
carpeting/ re-carpeting.
Current year ULB Annually Table 4.2
(a) and 4.2
(b)
(iii) Percentage of
footpath to the total road
length of main roads
current status ULB Annually Table 4.3
Table 4.1: Road types
Total existing road length in kms
Water bound macadam
(WBM)
Bituminous Cement Concrete (CC) Mud road Total
- - 0.25KM - 0.25KM
Manual on Public Disclosure Schedules
CMC, SIDLAGHATTA
Table 4.2.a: Abstract of roads approved for carpeting and re-carpeting in 2014-2015 Year
(year to be mentioned numeric like 2010-11)
Type of road Total Road length approved and
tendered for carpeting in kms
Total Road length
approved and tendered for
re-carpeting in km
Water bound macadam (WBM) - - Bituminous - -
Cement Concrete (CC) 0.25 0.25
Mud road
Total 0.25 0.25
Table 4.2.b: Details of roads approved and tendered for carpeting and recarpeting in 2014-2015 year (year to be
mentioned numeric like 2010-11)
Type of road Total Road length
approved and tendered for
carpeting in kms
Total Road length approved and
tendered for re-carpeting in km
Water bound macadam (WBM) - Enclosure as per the format given below
Bituminous - Enclosure as per the format given below
Cement Concrete (CC) 0.3KM
Enclosure as per the format given below
Mud road - Enclosure as per the format given below
Manual on Public Disclosure Schedules
CMC, SIDLAGHATTA
Format for enclosure reference table 4.2.b
Road length Approved and tendered for carpeting, WBM,
Bituminous and CC road (newly surfacing of the roads)
Road length Approved and Tendered for
re-carpeting, WBM, Bituminous and CC
road
Type of road Ward Number Street Name Length of
road in Kms
Type of
Road
Ward
Number
Street Name Length of road
in Kms
- - - - - - - -
Table 4.3: Footpath coverage to main roads
Total length of the main roads in ULB Jurisdiction : 70KM
Total length of the footpath built against main road : -
Manual on Public Disclosure Schedules
CMC, SIDLAGHATTA
5. WATER SUPPLY DOMESTIC, COMMERCIAL & INDUSTRIAL
Sl.
No
Functions as per
12th Schedule
Agency
Responsible
with in their
jurisdiction
Data to be Disclosed Period for which
information has
to be disclosed
Level of
Disclosure
(ULB/Ward)
Frequency
of
Disclosure
Reference Remarks
5 Water Supply-
Domestic,
Industrial and
Commercial
Water Board/
ULB
(i) Percentage of total water
supply (Surfaced,
Underground and external
source)
current status ULB Level Half yearly Table 5.1 SLB1
(ii)Total number of
connection & percentage of
Coverage (Household/
public stand posts/
Commercial and Industrial
Connection), quantity of w/s
current status ULB Level Half yearly Table 5.2 SLB
(iii) Frequency and Timing
for Water Supply.
current status ULB Level Half yearly Table 5.3 SLB
(iv) Quality of Water Supply
(percentage of samples
complied with the Water
Act norms)
current status ULB Level Half yearly Table 5.4 SLB
(v) Cost Recovery in Water
Supply Services (Revenue
Generated per KL of
water/Cost incurred per KL
of Water Supplied)
Previous three
financial years
including current
year
ULB Level Annually Table 5.5 SLB
(vi) Water tariff Current status ULB Level Annually Table 5.6
Manual on Public Disclosure Schedules
CMC, SIDLAGHATTA
Format 5.1 -Per capita production of water
Water supplied through Surface Source 5.13 in MLD
Water Supplied through Underground Source ---1.77---in MLD
Water supplied through external source - in MLD
Format 5.2- Water Supply Coverage
Total Number of Households _6900____ in numbers
Number of house holds with direct water supply connections __2610___ in numbers
Total number of Public Stand Posts ---190------- in numbers
Total number of industrial connections - in numbers
Format 5.3- frequency & Timings of water supply
Frequency and Timing for Water Supply
Number of days of water supply per week in
Normal season
Number of hours of water supply on any supplied day (Normal
season)
3 1hr
Manual on Public Disclosure Schedules
CMC, SIDLAGHATTA
Format 5.4- Quality of water supply
Total number of water samples collected at the consumer end - in Numbers/6 months
Number of water samples that meet potable water standards - in Numbers/6 months
Format 5.5- Cost recovery in water supply (same as in SLB)
Manual on Public Disclosure Schedules
CMC, SIDLAGHATTA
Expenditure
1 Total contractual (if outsourced) cost for Bore wells, O & M of
piped network, O & M of vented dam/ Impounding structure/
Jack well/ Intake well, valves, replacement of distribution
network, supplying of spare materials, salaries of Contract
labours, vehicles etc)
Current
Year
(2014-
2015)
Current
FY-1
(2013-14)
Current
FY -2
(2012-
2013)
2 Total expenditure borne by ULB on Bore wells, O & M of
piped network, O & M of vented dam/ Impounding structure/
Jack well/ Intake well, valves, replacement of distribution
network, supplying of spare materials, vehicles etc
68.30 55.0
3 Salaries of employees under water supply (Permanent and Daily
wages 9.34 81.18
4 Purchase of items (for water treatment, for pumping machinery
and spare parts if any
5 Electricity Bill for water supply (Surface source and Ground
water)
Revenue
1 Amount collected out of current year demand 33.02 43.12 -
2
Amount collected for providing new connection 0.55 0.45 -
Manual on Public Disclosure Schedules
CMC, SIDLAGHATTA
Format 5.6- Water Tariff
Water Tariff
Present water charges (which ever is applicable)
Flat rate ( mention the rate)
slab Rate (Mention the slab)
Rs.80/- per month for Residential Rs.160/- per month for Commercial
Manual on Public Disclosure Schedules
CMC, SIDLAGHATTA
6. PUBLIC HEALTH, SANITATION, CONSERVANCY and SOLID WASTE MANAGEMENT YEAR -2014-15
Sl.
N
o
Functions as per
12th Schedule
Agency
Responsible
with in their
jurisdiction
Data to be Disclosed Period for which
information has
to be disclosed
Level of
Disclosure
(ULB/Ward)
Frequency
of
Disclosure
Reference Remarks
6 Public Health,
Sanitation,
Conservancy and
SWM
ULBs/ Water
Board/ UDA
(i) Street Sweeping
(road wise street
sweeping schedule)
Current status as
per action plan
ULB/Ward Half
Yearly
Table
6.(a).1 &
6.(a).2
SWM
Action
Plan
(ii) General statistics on
Solid Waste Management
(Generation quantity,
Details of the Secondary
Collection Points, landfill
location, user fee)
current status ULB Annually Table
6.(a).3.1&
6.(a).3.2
SWM MIB
(iii) Percentage of HH
covered under Door-to-
Door Collection
current status ULB Half
Yearly
Table
6.(a).4
SLB and
MIB
(iv) Percentage of
households participating
in segregation
current status ULB Half
Yearly
Table
6.(a).5
(v) Extent of Scientific
treated and Disposal of
MSW (%)
current status ULB Annually Table
6.(a).5
SLB and
MIB
(vi) Cost recovery under
SWM (Revenue
generated per ton of SW/
Expenditure per ton of
SWM (in Rs.))
Previous three
financial years
including current
year
ULB Annually Table
6.(a).6
SLB
Sewerage & Drainage:
Manual on Public Disclosure Schedules
CMC, SIDLAGHATTA
(vii) Percentage of
coverage of UGD
current status ULB Annually Table
6.(b).1
SLB
(viii) Percentage of Waste
Water Treated
current status ULB Annually Table
6.(b).2
SLB
(ix) Percentage of extent
of reuse and recycle of
treated waste water
current status ULB Annually Table
6.(b).3
SLB
(x) Cost recovery under
UGD (Revenue generated
under UGD/ Expenditure
under UGD (in Rs.))
previous three
financial years
including current
year
ULB Annually Table
6.(b).4
SLB
Storm Water Drains
(xi) Statistics of storm
Water Drains ( location,
length and its cleaning
frequency)
current status ULB Annually Table
6.(c).1
(xii) % age roadside
drains to road length (
Paved and unpaved)
current status ULB Annually Table
6.(c).2
SLB
(xiii) Incidences of
Water Logging and
Flooding (No.s of cases
per year/ total number of
identified points)
current status ULB Annually Table
6.(c).3
SLB
Public Health (if applicable)
Manual on Public Disclosure Schedules
CMC, SIDLAGHATTA
(xiv) No of Municipal
Hospitals and its location
details
Current Status ULB Annually Table
6.(d).1.1
And 1.2
(xv) Facilities available &
OPD Timings
Current Status ULB Annually
(xvi) Number of cases of
vector Born Diseases per
1000 population
ULB Annually Table
6.(d).2
(xvii) Number of cases of
Water Born Diseases per
1000 population
Annually
Manual on Public Disclosure Schedules
CMC, SIDLAGHATTA
Table 6(a).1 Private sector participation details for SWM
Package Number Scope of work Name of the
contractor
Contract period (dd/mm/yyyy to
dd/mm/yyyy)
Contract value in
Rs. In lakhs
1& 2 Street sweeping ,Lifting
of Garbage ,Cleaning of
Drains
- - 1:- 39.20 & 2:-34.0
Table 6(a).2
Street Sweeping Schedule
Package
number
ward number Road ID
if
available
Road
name
Road length
in Kms
Sun Mon Tue Wed Thu Fri Sat
01 A* type
..
…
A type 1:-5.80
.. 2;-3.90
…
B type 1:-11.90
.. 2:-9.10
…
C type 1:-14.80
.. 2:-10.70
…
D type -
..
Source: SWM Action Plan
Manual on Public Disclosure Schedules
CMC, SIDLAGHATTA
Table 6(a).3.1
Details Handled by SHG
(No.s)
Handled by Service Provider, if
applicable (No.s)
Handled by ULB
(No.s)
Handled by
RWA/NGO (No.s)
Non slum Household‟s - - 7912 -
Slum Household‟s - - - -
commercial establishments - - 658 -
Bulk generators - - 06 -
Expected User fee generation (demand)
Table.6 (a) 3.2
General statistics on Solid Waste Management
Total Quantity of waste
generated in the city per
day(TPD)
Total Quantity of waste
Collected (TPD)
User fee Slab details
enclosed
Resolution date
passed from
Council
Land fill location Number of
secondary
transportation
vehicles under
SWM
20 12 - - Hitlahalli Village 02
Secondary storage
containers Location Map Enclosure
Manual on Public Disclosure Schedules
CMC, SIDLAGHATTA
Source: SWM Action Plan
Table 6(a).4
Number of Households participating in segregation -
Table 6(a).5 Scientific Disposal of MSW
Total waste collected & transported to disposal sites 14 tons/day
Total waste processed in scientific manner 4 tons/day
Table 6(a).6 Cost recovery under SWM in Rs Lakhs
Expenditure
1. Salary of the employees under SWM
71.0
2 Total Contractual cost if outsourced under
MSWM for hiring services, vehicles or
equipments, O& M of vehicles, fuel cost, labour
cost etc.
35.0
3 Total expenditure borne by ULB on SWM for O
& of M vehicles, purchase of tools and
equipments, insurance cost for vehicles, landfill
management cost like tipping fee etc.
2.0
Revenue
1 Total Revenue generated under SWM
0.0
Manual on Public Disclosure Schedules
CMC, SIDLAGHATTA
Sewerage
Table.6 (b) 1. UGD Coverage
Total Number of households with direct UGD Connections ……6900…… in Numbers
Table.6 (b) 2 Percentage Waste Water treated
Total waste water collected at sewage treatment plant 0.5 …in MLD
Quantity of waste water treated 0.5 … in MLD
Table.6 (b) 3 extent of reuse and recycle of waste water
Quantity of waste water recycled & reused out of treated waste water -- in MLD (when mouse is moved on MLD then it
should show “million Liters per day”)
Table.6 (b) 4 Cost recoveries under UGD (Input screen)
Expenditure In Rs Lakhs
1. Electricity bill for sewage treatment plant 1.0
2 Total salaries of ULB employees working in STP & UGD system
3 Total O& M Contractual cost (if Outsourced) under UGD and STP (purchase of items,
repair and replacement of spares, labor cost etc.)
-
Total O& M cost born by ULB under UGD and STP (purchase of items, repair and
replacement of spares etc.)
-
Revenue
1 Total revenue collected from UGD 15.5
Manual on Public Disclosure Schedules
CMC, SIDLAGHATTA
Storm Water Drains
Table.6(c).1
Statistics of storm water drains
Name of major storm water drains Length in kms Cleaning frequency per annum
Settuguni Drain 0.8
Bye pass Drain 1.2
Ashoka Raod Drain(Both sides) 1.2
T.B.Raod(Both Sides) 1.4
2nd
Karmik Nagar Main Road(Both Sides) 3.1
3rd
Karmik Nagar Main Road(Both Sides) 3.1
Junior College Back Side 0.8
Table.6 (c) 2
Length of road side drains 59.3kms
Table.6 (c) 3
Number of water logging and flooding cases per year in numbers 07
Total number of identified points in Numbers 03
Manual on Public Disclosure Schedules
CMC, SIDLAGHATTA
Public Health to be filled by the ULBs if they are managing this function
Table 6 (d).1.1
Public Health
Name of the Municipal
hospitals
Location details Detail of facilities
Number of
beds
Number of
staff
OPD2
Timings of
the OPD
Lab Facility
(yes/No)
Others if any
- - - - - -
- Table 6(d). 1.2
Number of vector borne disease cases per 1000 population Number of water borne disease cases per 1000
population
- -
2 Out Patient department
Manual on Public Disclosure Schedules
CMC, SIDLAGHATTA
8. URBAN FORESTRY, PROTECTION OF ENVIRONMENT AND ECOLOGY
Sl.
No
Functions as
per 12th
Schedule
Agency
Responsible
with in their
jurisdiction
Data to be Disclosed Period for
which
information
has to be
disclosed
Level of
Disclosure
(ULB/Ward)
Frequency of
Disclosure
Reference Remarks
8 Urban
forestry,
protection of
environment
and ecology
ULB Trees (if applicable)
(i) Number of tree cut/uprooted
to the number of existing trees
current
status
ULB Half Yearly Table 8.1
(ii) Number of sapling planted
to the number of trees
cut/uprooted to the number of
existing trees
Current year ULB Half Yearly
Water bodies (if applicable)
(iii) Existing number, New
Proposals for Revival of water
bodies, budget and expenditure
current
status
ULB Annual Table 8.2
Table.8.1 (To be filled by the ULBs if they are managing this function)
Urban forestry
Total Number of existing trees Total Number of trees cut/uprooted Total Number of new saplings planted
- - -
Manual on Public Disclosure Schedules
CMC, SIDLAGHATTA
Table.8.2
Protection of Environment and Ecology
Sl. No Name existing water bodies
like lake, tanks, pond etc.
Proposed for revival in Yes/No Amount budgeted for revival in Rs.
in lakhs
Expenditure
met in Rs. in
Lakhs
1 - No - -
Function 9 is not managed by ULB in Karnataka State hence the details are not mentioned
Manual on Public Disclosure Schedules
CMC, SIDLAGHATTA
10. SLUM IMPROVEMENT & UP-GRADATION YEAR 2014-15
Sl.
No
Functions as per
12th
Schedule
Agency
Responsible
with in their
jurisdiction
Data to be Disclosed Period for which
information has
to be disclosed
Level of
Disclosure
(ULB/Ward)
Frequency
of
Disclosure
Reference Remarks
10 Slum
Improvement &
Up-gradation
ULB/UDA (i) Details on declared
and undeclared slums
(numbers, location,
number of households,
population, area)
current status ULB/Ward Half yearly Table 10.1
(ii) Details of slum
improvement schemes
(schemes, slums
benefited, budget and
expenditure)
Previous three
financial years
including current
year
ULB/Ward Half yearly Table 10.2.
(iii) Beneficiary list under
each scheme
current status ULB/Ward Half yearly Table 10.2
(iv) Status of Basic
Services in Slums
(a) No of connections -
Water Supply &
sanitation (% coverage)
(b) Length of Roads and
drains (paved and
unpaved)
(c) No and % of houses
(pacca and katcha houses)
current status ULB/Ward Half yearly Table 10.3
Manual on Public Disclosure Schedules
CMC, SIDLAGHATTA
Table 10.1 Details on declared and undeclared slums (Input Screen & Output screen are same)
Details of declared slums Enclosure as per the format given Below
Details of un declared slums Enclosure as per the format given Below
Format for enclosure as mentioned in table 10.1
Details of declared and undeclared slums
Name of the slum Declared/
Undeclared
Extent in Sq. mt Population Number of Households
A.K. Colony Ward
No.8
Declared
0.2
1300
525
A.K. Colony Ward
No.9
Declared
0.2
1015
626
2nd Karmik Nagar
Undeclared
0.15
798
450
Mehaboob Nagar
Undeclared
0.18
777
387
1st Karmik Nagar
Undeclared
0.2
648
390
Rehamath Nagar
Undeclared
0.15
716
703
Ashraya Layout
Undeclared
0.25
774
257
Manual on Public Disclosure Schedules
CMC, SIDLAGHATTA
Nisar palya Undeclared 0.2 977 497
3rd Karmik Nagar Undeclared 0.14 883 622
Table.10.2 Details of slum improvement Schemes (Input & Output Screen are same)
Current Year
Name of the slum Improvement Schemes
Total Number of Budget and under each Scheme (in Rs Lakhs)
Expenditure met under each scheme( in Rs Lakhs)
Beneficiary list as enclosure Slums Beneficiaries
- - - enclosure Current Year – 1
Name of the slum Improvement Schemes
Total Number of Budget and under each Scheme (in Rs Lakhs)
Expenditure met under each scheme( in Rs Lakhs)
Beneficiary list as enclosure
Slums Beneficiaries
enclosure
Current Year – 2
Name of the slum Improvement Schemes
Total Number of Budget and under each Scheme (in Rs Lakhs)
Expenditure met under each scheme( in Rs Lakhs)
Beneficiary list as enclosure
Slums Beneficiaries
- - enclosure
Manual on Public Disclosure Schedules
CMC, SIDLAGHATTA
Table 10.3 Basic Service status in Slums
Status of Basic services in Slums
Total number of
households with
direct water
supply
connections
(numeric)
Total number
of public
taps/mini
water cisterns
(numeric)
Total length
of roads
paved and
unpaved in
Kms
Total
households
connected to
UGD
(numeric)
Total
length of
road
side
drains in
Kms
Total
number of
HH with
individual
toilets
(numeric)
Number of
Functional
Community
Toilets
(numeric)
Total number of
pacca/kaccha
houses
(numeric)
800 30 800
Note: ULBs needs to disclose information under table 10.2, 10.3 and 10.4 with a note that “All the information in this table are the works undertaken by ULB” (plz Insert this without fail)
Manual on Public Disclosure Schedules
CMC, SIDLAGHATTA
11. URBAN POVERTY ALLEVIATION
Sl.
No
Functions as per
12th Schedule
Agency
Responsible
with in their
jurisdiction
Data to be Disclosed Period for which
information has
to be disclosed
Level of
Disclosure
(ULB/Ward)
Frequency
of
Disclosure
Reference Remarks
11 Urban Poverty
Alleviation
ULBs
/DMA/UDA
(i) Details of the Urban
Poverty Alleviation
Schemes (eg.
Components of SJSRY )
Current status ULB Annually Table 11.1
Table 11.1 Details of Urban Poverty Alleviation
Name of Schemes
under urban
poverty alleviation
(multiple entries)
Budget for
the schemes
Expenditure
met for the
scheme
Number of beneficiaries
under the scheme
list of the beneficiaries to be
enclosed
All the information in this table are the works undertaken by ULB” (plz Insert this without fail)
Manual on Public Disclosure Schedules
CMC, SIDLAGHATTA
12. PROVISION OF URBAN AMENITIES AND FACILITIES-PARKS, GARDENS & PLAY GROUNDS
Sl.
No
Functions as per
12th
Schedule
Agency
Responsible
with in their
jurisdiction
Data to be Disclosed Period for which
information has
to be disclosed
Level of
Disclosure
(ULB/Ward)
Frequency
of
Disclosure
Reference Remarks
12 Provision of
urban amenities
and facilities-
parks, gardens
and playgrounds
ULBs/UDAs Playground/ Parks/Gardens
(i) Percentage of area
under parks and gardens
to the total ULB area
Current status ULB Annually Table 12.1
(ii) Percentage of
developed parks and
gardens (%)
Current status ULB Annually Table 12.1
(iii) Number, Location,
Area, Amenities, details
of the maintaining agency
Current Status ULB Annually Table 12.2
(a) and 12.2
(b)
Table.12.1. Area reserved under Parks & Gardens
1. Total ULB area 5.0 in Sq.kms
2. Area reserved under Parks & Gardens 4372.93 Sq.meters
3. Area of developed parks and gardens 195.04 in sq. mts
Manual on Public Disclosure Schedules
CMC, SIDLAGHATTA
Table.12.2 (a) Amenities under parks & Gardens
Locations of
the park
Park Area in
sq. mt
Amenities available under each park (yes/no) Contact details of the
Maintaining Agency
Children
play area
Seating
facility
Track for
walking/joggin
g
Facility for
exercise
Name Contact
number(n
umeric)
2Nd TMC
Layout
4177.89
No
No
No
No
-
-
Municipal Park
@ Pump
House
Chintamani
Road
195.04
Yes
Yes
Yes
No
TMC
Sidlaghatta
08158-
254404
Table 12.3.(b) Play ground details
Locations of the
playgrounds
playground Area in sq. mt Contact details of the Maintaining
Agency
NIL
NIL
--
--
Manual on Public Disclosure Schedules
CMC, SIDLAGHATTA
13. PROMOTION OF CULTURAL, EDUCATIONAL AND AESTHETIC ASPECTS
Sl.
No
Functions as per
12th Schedule
Agency
Responsible
with in their
jurisdiction
Data to be Disclosed Period for which
information has
to be disclosed
Level of
Disclosure
(ULB/Ward)
Frequency
of
Disclosure
Reference Remarks
13 Promotion of
cultural,
educational, and
aesthetic aspects
ULBs (i) Details of Community
halls, Cultural Centers,
marriage halls, municipal
educational institutes
Current Status ULB Annually Table 13.1
(a) and 13.1.
(b)
(ii) Details of
advertisement hoardings,
rates, revenue generated
Current Status ULB Annually Table 13.2.1
and 13.2.2
Table 13.1.a Details of cultural Centers
Community halls/Auditorium Details
Name Address Booking office
address and
contact details
NIL
NIL
Name of the Municipal Educational Institutes Number of teachers in each
municipal Educational Institutes(in
numbers)
NIL
NIL
Manual on Public Disclosure Schedules
CMC, SIDLAGHATTA
Table 13.1 (b) Details of educational institutes (only if applicable)
Table13.2.1 Details of Advertisement Hoardings (Input & Output screens are same)
Details of Advertisement hoardings
Number of Hoardings Slab rates for advertisement
(As Enclosure)
Advertisement tax demand
for the current year in Rs. in
lakhs
Advertisement tax collected
in the current year in Rs. in
lakhs
2
5000
5000
5000
14. BURIALS AND BURIAL GROUNDS, CREMATIONS, CREMATION GROUNDS AND ELECTRIC CREMATORIUMS
Sl.N
o
Functions as per
12th
Schedule
Agency
Responsible
with in their
jurisdiction
Data to be Disclosed Period for which
information has
to be disclosed
Level of
Disclosure
(ULB/Ward)
Frequency
of
Disclosure
Reference Remarks
14 Burials and
burial grounds,
cremations,
cremation
grounds and
electric
crematoriums
ULBs (i) Numbers, type,
Location of burial
grounds and cremation
facilities available, fee
charged if any
Current Status ULB Annually Table 14.1
(a). and
14.1(b)
(ii) Details of facility of
“Herse/ Corpse
Vehicles”(number and
contact details)
Current Status ULB Annually Table 14.2
Manual on Public Disclosure Schedules
CMC, SIDLAGHATTA
Table.14.1 (a) Details of Burial grounds, cremation grounds & electric crematoriums
Details of Burial grounds, cremation grounds & electric crematoriums
Name of the
Community
burial ground
with locations
Name and
location of the
Crematoriums/B
urial ground
Facilities available in the Crematoriums ( Yes / No)
Electri
c
Burning Burial Availabili
ty of
wood
Water
facility
Cleaning
facility
Others
if any
Maintaining agency
Name Contact
details
Multiple
(entries)
1) Bypass Road No Yes Yes No Yes Yes No - -
2)Chintamani
Road
No No Yes No No No No - -
3)Behind
Pojamma
Temple
No No Yes No No No No - -
4)Behind
MUWSS
No No Yes No No No No - -
5)Behind
Sewage
treatment plant
road
No No Yes No No No No - -
Table 14.1 (b) Fee slab for each crematorium (Input and Out put screens are same)
Fee slab for each crematoriums and burial grounds Enclosure
- -
Manual on Public Disclosure Schedules
CMC, SIDLAGHATTA
Table 14.2: Details of Hearse Vehicles
Hearse/Corpse vehicle details
Number of hearse vehicles
available
Fee details for the vehicle(
in Rs)
Contact details
to hire the
vehicle
Maintaining agency
Contact Number Name Contact
Number
- - - -
Manual on Public Disclosure Schedules
CMC, SIDLAGHATTA
15. CATTLE PONDS, PREVENTION OF CRUELTY TO ANIMALS
Sl.
No
Functions as per
12th Schedule
Agency
Responsible
with in their
jurisdiction
Data to be Disclosed Period for which
information has
to be disclosed
Level of
Disclosure
(ULB/Ward)
Frequency
of
Disclosure
Reference Remarks
15 Cattle ponds,
prevention of
cruelty to
animals
ULBs (i) Numbers of stray
animals, vaccinated
Current Status ULB Annually Table 15.1
(a) and 15.1
(b)
(ii) List of „Kanji House‟
(care centers for stray
animals).
Current Status ULB Annually Table 15.1
(a)
Table.15.1.1 Details of stray animals (input & output screen are same)
Number of stray animals Number of stray dogs
vaccinated
Location of Kanji House
(care centers for Stray
animals) if applicable Dogs Cows Pig Others if applicable
- - - - - -
Table 15.1.2 Details of Veterinary & Animal Welfare Centers (input & output screen are same)
List of location of Veterinary hospitals As Enclosure
List of Animal Welfare Association (if available) As Enclosure
Name and location of NGOs working for animal
welfare( if available)
As Enclosure
Manual on Public Disclosure Schedules
CMC, SIDLAGHATTA
16. VITAL STATISTICS INCLUDING REGISTRATION OF BIRTHS AND DEATHS
Sl.
No
Functions as per
12th
Schedule
Agency
Responsible
with in their
jurisdiction
Data to be Disclosed Period for which
information has
to be disclosed
Level of
Disclosure
(ULB/Ward)
Frequency
of
Disclosure
Reference Remarks
16 Vital Statistics
including
registration of
births and deaths
ULBs (i) General information
pertaining to city
(population, area,
households etc.)
Current Status
and recent census
details
ULB Annually Table 16.1 City
website
(ii) List of citizen service
centers with location
Current status ULB Annually Table 16.2
(iii) Total Births and
Deaths recorded along
with Birth and Death
rates.
Current status ULB Half
Yearly
Table 16.3
(iv) Citizen Charter to be
published
Current status ULB Annually Table 16.4
Table 16.1: City General information as per recent census details (should be added in their respective ULB website
City General information
Present
population
Present area in
sq.km
Total number
of households
Population
density
Total male
population
Total female
population
Total SC/ST
Population
Total Slum
population
Literacy rate
51.159 5.0 8835 26065 25094 6120 7888 32888
Table 16.2: List of Citizen Service centers
Sl. No Address of the Citizen Service centers if applicable
enclosure
Manual on Public Disclosure Schedules
CMC, SIDLAGHATTA
Table 16.3: Details of Birth & Death
Total births recorded Total deaths recorded
Table 16.4 Citizen Charter (ULBs who have already maintaining the Charter can enclose the same, other ULBs can follow the below format
Service Details Period of catering the
service
Procedure to
Apply
Officer incharge
Designation Contact Number
Birth Certificate 06 working days Application SHI 9739392416
Death certificate 06 working days Application
Property Tax Application 40 Days Application RO 9483489048
Khatha Certificate 15 Days Application RO 9483489048
others - - - -
Enclosure if already citizen
charter being maintained
enclosure
Manual on Public Disclosure Schedules
CMC, SIDLAGHATTA
17. PUBLIC AMENITIES INCLUDING STREETLIGHTING, PARKING LOTS, BUS STOPS AND PUBLIC CONVENIENCES
Sl.
No
Functions as per
12th Schedule
Agency
Responsible
with in their
jurisdiction
Data to be Disclosed Period for which
information has
to be disclosed
Level of
Disclosure
(ULB/Ward)
Frequency
of
Disclosure
Reference Remarks
17 Public amenities
including street
lighting, parking
lots, bus stops
and public
conveniences
ULBs (i) number of street lights Current status ULB Annually Table 17.1 SLB
(ii) No. of Street Lights/
Km of Road Length
(No.s)
Current status ULB Annually Table 17.1 SLB
(iv) Details of agency
maintaining street lights
(name and contact details)
Current status ULB Annually Table 17.2
(v) List of Authorized
Parking Areas along with
parking capacities and fee
Current status ULB Annually Table 17.3
(vi) Number and locations
of bus stops and public
toilets (Community and
commercial) with its user
charge.
Current status ULB Annually Table 17.4
Table.17.1: Details of streetlights
Total number of streetlights Types of streetlights with number
Tube light High Mast Incandescent
CFL
Mercury vapor Sodium vapor
2523 405 9 800 0 680
Manual on Public Disclosure Schedules
CMC, SIDLAGHATTA
Table 17.2: Details of Agency Maintaining Streetlight
Package Number Wards Covered details of the agency Maintaining the streetlights
Name Phone Number
- 27 ULB 08158-254404
Table.17.3: Details of Parking Lots
Details of parking lots
Enclosure as per the format
Format
Parking lot location Parking Capacity Fee Slab
Two
wheeler
Four
wheeler
Two
wheeler
Four
wheeler
- - - - -
Table.17.4 Details of toilets
Table17.5: Details of Bus stop
Public toilets Community Toilets
Location Fee slab Location Fee slab
Bustand Near Ksrtc bustand sidlaghatta
Taluk Office Near taluk office sidlaghatta
Location of Bus stop( As Enclosure)
Area:Ward no 1 Address:-kolapuramma temple.
Manual on Public Disclosure Schedules
CMC, SIDLAGHATTA
18. REGULATION OF SLAUGHTER HOUSES AND TANNERIES
Table.18.1 (a): list of Slaughter houses
Table 18.1 (b): Details of
Slaughter House
Sl.
No
Functions as
per 12th
Schedule
Agency
Responsible
with in their
jurisdiction
Data to be Disclosed Period for
which
information
has to be
disclosed
Level of
Disclosure
(ULB/Ward
)
Frequenc
y of
Disclosur
e
Reference Remarks
18 Regulation of
slaughter
houses and
tanneries
ULBs (i) Number, Location
of Slaughter House /
Tanneries along with
facilities available and
capacity
Current status ULB Annually Table
18.1(a)
and (b)
Number of Slaughter Houses
Functional
Number of slaughter houses
Non functional
--
Location of
the
slaughter
House
Whether the
Slaughter
house is been
regulated by
KSCB
(Yes/No)
Capacity Number of
animals
slaughtered
per week
Facilities
Washing Medical
Examin
ation
Remo
val of
Waste
Others
if any
- - - - - - - -