City CouncilMarch 22, 2011
Roller Compacted Concrete
• What is Roller Compacted Concrete (RCC)
• Where has RCC been used
• RCC Construction Process
• 50th Street & Grape Creek Bid Tab
• Street Life Cycle
Roller Compacted Concrete
RCC Pavement
• No Slump
• Consistency of damp gravel
• No forms
• No reinforcing steel
• No finishing
• Placed with asphalt pavers
• Compacted with vibratory rollers
• Normal cement hydration
• Low W/C ratio = limited shrinkage cracks
Reynoldsburg, OH
RCC Construction Projects
Street Projects
• Collector & Residential
• Several in S. Carolina
• 100+ in Columbus, OH
• S. Carolina DOT – 8 Projects
• Interstate Projects
• I-285 Atlanta, GA
• I-385 Greenville, SC
Aiken, SC
RCC Construction Projects
S. Carolina DOT US Hwy 2009
• 10” RCC reconstruction
• 6000 ADT, 4 lanes
• 45 mph
• Replaced 1 mile in 15 days
• Re-opened in 24 hours
RCC Construction Projects
Ohio State University 2002
• 8” RCC reconstruction
• 150 buses/day
• Reconstructed in 1 weekend
• RCC selected for fast
construction process to
complete by 1st football game
RCC Construction Process
•Mid size applications
•200 to 300 tons/hr
•Available at some locations
•Fixed locations
•Capacity reduced due to low
water content of mixture
Central Mix
RCC Construction Process
•High-volume applications
•Excellent mixing efficiency
for dry materials
•250 to 900+ tons/hr
•Mobile, erected on site
•Mobilization costs
Continuous Flow Pugmill
RCC Construction ProcessAsphalt Paver Placement
• High density
• High initial density (85% to 95%)
• Smooth surface depends on initial density
• High-production (1900 LF/day)
• Max lift thick – 8 to 10 in. Lane Ave – Columbus, OH
RCC Construction ProcessAsphalt Paver Placement
• Proper compaction is critical for strength and durability
• Compact to 98% of modified proctor
• 10 to 12 Ton vibratory roller
• Eliminate long. cold joints through compaction process
Reynoldsburg, OH
RCC Construction ProcessRCC Asphalt
RCC
Diamond
Ground
RCC
Diamond
Ground
Conventional
Concrete
Conventional
Concrete
75 Year Useful Life Maintenance Cost Asphalt RCC
Sealcoat $939,680.28 $0.00
(Every 8yrs)
Mill & Overlay $6,556,466.24 $0.00
(Every 24yrs)
Overlay $0.00 $1,416,103.69
(RCC at 60yrs)
Maintenance Cost $7,496,146.52 $1,416,103.69
(75yrs)
Asphalt Street Life Cycle
0
5
10
15
20
25
0 25 50 75
Time (Yrs)
Use
ful
Lif
e (Y
rs)
50th & Grape Creek Bid TabPrice Construction Reece Albert
50th $2,267,261.73 $2,353,428.01
Grape Ck “A” $1,431,937.80 $1,174,202.99
Grape Ck “B” $1,352,668.32 $1,193,184.85
“A”= Asphalt “B”= Roller Compacted Concrete
50th & “A” $3,699,199.53 $3,527,631.00
50th & “B” $3,619,930.05 $3,546,612.86
Difference $79,269.48 $18,981.86
Roller Compacted Concrete
Questions