FLOOR FRAMING PLANDRAWN NOT TO SCALE
2.5000 2.5000 1.5000
2.5000
2.5000
Given the framing plan shown above, spacing floor joist is0.45m on center,design the circular (C2) post.
Use Dao Lumber at 50% stress grade:
fc = 10.1 MPa
Roof Load = 1.44 KPa
Live Load = 1.90 KPa
Unit weight of 34 Height of Post = 3.5m