Upload
others
View
11
Download
0
Embed Size (px)
Citation preview
Ma
Quanh
150m “D
ead Level”
Co Me B
ridge
Trung Son Dam260MW capacity
height 84.5 mcrest length 513 m
Spillway
Powerhouse
PenStocks
ConstructionCamp
ConstructionCamp
Co MeVillage
BorrowPit
BorrowPit
Co Me to Co LuongAccess Road
Fusegate andEmergency Spillway
0 250 500 Meters
104°45’E104°45’E104°30’E104°30’E 105°00’E105°00’E
Trung Son HydroTrung Son HydroProject SiteProject Site
Trung Son HydroProject Site
XUAN NHA
TAN XUANTRUNG SONG
TEN TANTAM CHUNG
TRUNG LYN
TT. MUONGGLATLLALALAL
M U O N G L A T
Q U A N H O A
M A I C H A U
M O C C H A U
S O N L A
H O A B I N H
T H A N H H O A
LAO PEOPLE’SDEM. REP.
LAO PEOPLE’SDEM. REP.
Co Me Village
Muong Lat
Co LuongVillage
Mai Chau
Ma
Ma
M
a
Song Pu
K
il
Houei O
n
San Lu
LipCha Loc
Can
Lal
Hou
ay H
en
Ngh
iau
Quanh
104°45’E104°30’E 105°00’E
20 °45’N 20 °45’N
20°30’N20°30’N
104°45’E104°30’E 105°00’E
0 2 4 6 8 10 Kilometers
15A
6
15A
35kV line(Second Rural Energy Project,
Cr. 4000 VN)
110/35kVSubstation
Hydrologicalgauging station
35kV line
104°45’E104°45’EE104°30’E 105°00’E105°00’E
Trung Son HydroTrung Son HydroProject SiteProject Site
Trung Son HydroProject Site
M U O N G L A T
Q U A N H O A
M A I C H A U
M O C C H A U
S O N L A
H O A B I N H
T H A N H H O A
Khu BTTNXuân Nha
Khu BTTNPù Hu
Khu BTTNHang Kia-Pà Cò
LAO PEOPLE’SDEM. REP.
LAO PEOPLE’SDEM. REP.
Co Me Village
Muong Lat
Co LuongVillage
Mai Chau
Ma
M
a
Ma
Quanh
104°45’EE
105°00’E
20 °45’N 20 °45’N
20°30’N20°30’N
104°45’E 105°00’E
0 2 4 6 8 10 Kilometers
15A
6
15A
Ma
HANOI
Trung Son HydroProject Site
CHINA
THAILAND
CAMBODIA
LAOPEOPLE'SDEM. REP.
This map was produced by the Map Design Unit of The World Bank. The boundaries, colors, denominations and any other informationshown on this map do not imply, on the part of The World BankGroup, any judgment on the legal status of any territory, or anyendorsement or acceptance of such boundaries.
IBRD 37776
DECEMBER 2010
PROJECT DAM SITE
CORE RLDP PROJECT AREA
FUTURE RESERVOIR (160 meter contour)
DEAD LEVEL (150 meter contour)
PROJECT ROAD
TEMPORARY ROAD/USED ONLY DURINGCONSTRUCTION PHASE OF THE PROJECT
MAIN ROADS
35 kV TRANSMISSION LINES
BORROW PITS
NATURE AREAS
COMMUNE BOUNDARIES
DISTRICT BOUNDARIES
PROVINCE BOUNDARIES
INTERNATIONAL BOUNDARIES
VIETNAMTRUNG SON HYDROPOWER PROJECT
Map 2: Area of Project Activities
Reservoir tail at 160m level is 9.5kmReservoir tail at 160m level is 9.5kmfrom international boundaryfrom international boundary
Reservoir tail at 160m level is 9.5kmfrom international boundary