1
M a Q u a n h 1 50 m Dead LevelCo Me Bridge Trung Son Dam 260MW capacity height 84.5 m crest length 513 m Spillway Powerhouse Pen Stocks Construction Camp Construction Camp Co Me Village Borrow Pit Borrow Pit Co Me to Co Luong Access Road Fusegate and Emergency Spillway 0 250 500 Meters 104°45’E 104°45’E 104°30’E 104°30’E 105°00’E 105°00’E Trung Son Hydro Trung Son Hydro Project Site Project Site Trung Son Hydro Project Site XUAN NHA TAN XUAN TRUNG SON G TEN TAN TAM CHUNG TRUNG LY N TT. MUONG G LAT L LA LA LA L MUONG LAT QUAN HOA MAI CHAU MOC CHAU SON LA HOA BINH THANH HOA LAO PEOPLE’S DEM. REP. LAO PEOPLE’S DEM. REP. Co Me Village Muong Lat Co Luong Village Mai Chau M a M a M a Song P u K i l H o u e i O n Sa n L u Lip Cha Loc C a n La l Ho u ay H e n N ghia u Q u a n h 104°45’E 104°30’E 105°00’E 20 °45’N 20 °45’N 20°30’N 20°30’N 104°45’E 104°30’E 105°00’E 0 2 4 6 8 10 Kilometers 15A 6 15A 35kV line (Second Rural Energy Project, Cr. 4000 VN) 110/35kV Substation Hydrological gauging station 35kV line 104°45’E 104°45’E E E 105°00’E 105°00’E Trung Son Hydro Trung Son Hydro Project Site Project Site Trung Son Hydro Project Site MUONG LAT QUAN HOA MAI CHAU MOC CHAU SON LA HOA BINH THANH HOA Khu BTTN Xuân Nha Khu BTTN Pù Hu Khu BTTN Hang Kia-Pà Cò LAO PEOPLE’S DEM. REP. LAO PEOPLE’S DEM. REP. Co Me Village Muong Lat Co Luong Village Mai Chau M a M a M a Q u a n h 104°45’E E 105°00’E 20 °45’N 20 °45’N 20°30’N 20°30’N 104°45’E 105°00’E 0 2 4 6 8 10 Kilometers 15A 6 15A Ma HANOI Trung Son Hydro Project Site CHINA THAILAND CAMBODIA LAO PEOPLE'S DEM. REP. This map was produced by the Map Design Unit of The World Bank. The boundaries, colors, denominations and any other information shown on this map do not imply, on the part of The World Bank Group, any judgment on the legal status of any territory, or any endorsement or acceptance of such boundaries. IBRD 37776 DECEMBER 2010 PROJECT DAM SITE CORE RLDP PROJECT AREA FUTURE RESERVOIR (160 meter contour) DEAD LEVEL (150 meter contour) PROJECT ROAD TEMPORARY ROAD/USED ONLY DURING CONSTRUCTION PHASE OF THE PROJECT MAIN ROADS 35 kV TRANSMISSION LINES BORROW PITS NATURE AREAS COMMUNE BOUNDARIES DISTRICT BOUNDARIES PROVINCE BOUNDARIES INTERNATIONAL BOUNDARIES VIETNAM TRUNG SON HYDROPOWER PROJECT Map 2: Area of Project Activities Reservoir tail at 160m level is 9.5km Reservoir tail at 160m level is 9.5km from international boundary from international boundary Reservoir tail at 160m level is 9.5km from international boundary

CHINA VIETNAM TRUNG SON HYDROPOWER PROJECT...104°30’E104°30’E 104°45’E104°45’E 105°00’E105°00’E Trung Son HydroTrung Son Hydro Project SiteProject Site Trung Son

  • Upload
    others

  • View
    11

  • Download
    0

Embed Size (px)

Citation preview

Page 1: CHINA VIETNAM TRUNG SON HYDROPOWER PROJECT...104°30’E104°30’E 104°45’E104°45’E 105°00’E105°00’E Trung Son HydroTrung Son Hydro Project SiteProject Site Trung Son

Ma

Quanh

150m “D

ead Level”

Co Me B

ridge

Trung Son Dam260MW capacity

height 84.5 mcrest length 513 m

Spillway

Powerhouse

PenStocks

ConstructionCamp

ConstructionCamp

Co MeVillage

BorrowPit

BorrowPit

Co Me to Co LuongAccess Road

Fusegate andEmergency Spillway

0 250 500 Meters

104°45’E104°45’E104°30’E104°30’E 105°00’E105°00’E

Trung Son HydroTrung Son HydroProject SiteProject Site

Trung Son HydroProject Site

XUAN NHA

TAN XUANTRUNG SONG

TEN TANTAM CHUNG

TRUNG LYN

TT. MUONGGLATLLALALAL

M U O N G L A T

Q U A N H O A

M A I C H A U

M O C C H A U

S O N L A

H O A B I N H

T H A N H H O A

LAO PEOPLE’SDEM. REP.

LAO PEOPLE’SDEM. REP.

Co Me Village

Muong Lat

Co LuongVillage

Mai Chau

Ma

Ma

M

a

Song Pu

K

il

Houei O

n

San Lu

LipCha Loc

Can

Lal

Hou

ay H

en

Ngh

iau

Quanh

104°45’E104°30’E 105°00’E

20 °45’N 20 °45’N

20°30’N20°30’N

104°45’E104°30’E 105°00’E

0 2 4 6 8 10 Kilometers

15A

6

15A

35kV line(Second Rural Energy Project,

Cr. 4000 VN)

110/35kVSubstation

Hydrologicalgauging station

35kV line

104°45’E104°45’EE104°30’E 105°00’E105°00’E

Trung Son HydroTrung Son HydroProject SiteProject Site

Trung Son HydroProject Site

M U O N G L A T

Q U A N H O A

M A I C H A U

M O C C H A U

S O N L A

H O A B I N H

T H A N H H O A

Khu BTTNXuân Nha

Khu BTTNPù Hu

Khu BTTNHang Kia-Pà Cò

LAO PEOPLE’SDEM. REP.

LAO PEOPLE’SDEM. REP.

Co Me Village

Muong Lat

Co LuongVillage

Mai Chau

Ma

M

a

Ma

Quanh

104°45’EE

105°00’E

20 °45’N 20 °45’N

20°30’N20°30’N

104°45’E 105°00’E

0 2 4 6 8 10 Kilometers

15A

6

15A

Ma

HANOI

Trung Son HydroProject Site

CHINA

THAILAND

CAMBODIA

LAOPEOPLE'SDEM. REP.

This map was produced by the Map Design Unit of The World Bank. The boundaries, colors, denominations and any other informationshown on this map do not imply, on the part of The World BankGroup, any judgment on the legal status of any territory, or anyendorsement or acceptance of such boundaries.

IBRD 37776

DECEMBER 2010

PROJECT DAM SITE

CORE RLDP PROJECT AREA

FUTURE RESERVOIR (160 meter contour)

DEAD LEVEL (150 meter contour)

PROJECT ROAD

TEMPORARY ROAD/USED ONLY DURINGCONSTRUCTION PHASE OF THE PROJECT

MAIN ROADS

35 kV TRANSMISSION LINES

BORROW PITS

NATURE AREAS

COMMUNE BOUNDARIES

DISTRICT BOUNDARIES

PROVINCE BOUNDARIES

INTERNATIONAL BOUNDARIES

VIETNAMTRUNG SON HYDROPOWER PROJECT

Map 2: Area of Project Activities

Reservoir tail at 160m level is 9.5kmReservoir tail at 160m level is 9.5kmfrom international boundaryfrom international boundary

Reservoir tail at 160m level is 9.5kmfrom international boundary