Chiller Terminal Unit Performance 1

Embed Size (px)

Citation preview

  • 8/3/2019 Chiller Terminal Unit Performance 1

    1/79

    Dr. A.Dr. A. HammoudHammoud

    BAUBAU--20072007

    Terminal Unit PerformanceTerminal Unit Performance

    ControlControl

  • 8/3/2019 Chiller Terminal Unit Performance 1

    2/79

    Type of Chilledwater s stem

    Air cooled chilled water systemAir cooled chilled water system a er coo e c e wa er sys ema er coo e c e wa er sys em

    MiniMini--Chilled Water SystemChilled Water System

  • 8/3/2019 Chiller Terminal Unit Performance 1

    3/79

    Air Cooled Water Chiller

    ,,

    areaarea)

  • 8/3/2019 Chiller Terminal Unit Performance 1

    4/79

    Chilled water systemHeavy Duty & Long life cycleHeavy Duty & Long life cycleAir Cooled Lar e Ca acit Chiller Ran eAir Cooled Lar e Ca acit Chiller Ran eEconomical for large systems (highEconomical for large systems (high

    Efficiency).Efficiency). ow oiseow oise an coi in ooran coi in oor

    Part Load or full load (Part Load or full load (2525--5050--7575--100100%)%)

    for capacity control.for capacity control.

    Extra control & AccessoriesExtra control & Accessories

    Application:Application:, ,, ,

    Commercial Centre & Hotel,etcCommercial Centre & Hotel,etc

  • 8/3/2019 Chiller Terminal Unit Performance 1

    5/79

    ii

    Closed area ( basement or very Hot place)Closed area ( basement or very Hot place)

  • 8/3/2019 Chiller Terminal Unit Performance 1

    6/79

    Water cooled chillerWater cooled chiller

    a er coo e c er sys ema er coo e c er sys em

  • 8/3/2019 Chiller Terminal Unit Performance 1

    7/79

    Hot Air out

    Fan stack

    ,,shaft and motorshaft and motor

    Drifteliminator

    Spray Nozzle

    Spray area

    Air InAir In

    Cooling Tower Components

  • 8/3/2019 Chiller Terminal Unit Performance 1

    8/79

    COMPACT DESIGN SHELL AND TUBECOMPACT DESIGN SHELL AND TUBE

    WATER COOLERSWATER COOLERS

  • 8/3/2019 Chiller Terminal Unit Performance 1

    9/79

    Air cooled-Condensingunit chillerwith multi-com ressors

    for capacity control.

  • 8/3/2019 Chiller Terminal Unit Performance 1

    10/79

    Fan coil units

    The Fan coil air flow rate in CFM rangesThe Fan coil air flow rate in CFM rangesucte

    ,, ,, ,, ,, ..

    33 speeds (L ,M ,H)speeds (L ,M ,H)

  • 8/3/2019 Chiller Terminal Unit Performance 1

    11/79

    Chiller E uationsChiller E uations

    Summerummer 2004004

  • 8/3/2019 Chiller Terminal Unit Performance 1

    12/79

    T iT iin Chiller systemin Chiller system

    The size of the chiller is rated in tonnage or tons of refrigeration, where

    the historic definition of a ton comes from making one ton of ice in 24:

    Bth/hr)(TQ(gpm)500qW 11 ton =ton = 1212,,000000BtuIh; tons xBtuIh; tons x 1212,,000000== 500500 gpmgpm TT

    2400012

    Tons==

    This is a good formula for estimating flows versusThis is a good formula for estimating flows versus TT..

    T=T=1010..88FF

  • 8/3/2019 Chiller Terminal Unit Performance 1

    13/79

    In the condenserIn the condenser, the heat transferred to the condenser, the heat transferred to the condenser

    wa er nc u es e ea rom e vapora or, p us e eawa er nc u es e ea rom e vapora or, p us e eaof compression.of compression.-- ,,

    value ofvalue of 1414,,400400 Btu/h may be used as the total heatBtu/h may be used as the total heat

    transferred to the condenser watertransferred to the condenser water..

    Bth/hr)(TQ(gpm)500q W

    TQ(gpm)50040041

    T

    Tons28.8gpm

    =

  • 8/3/2019 Chiller Terminal Unit Performance 1

    14/79

    ExampleExample 11::

    What chilled water flow will a 100 -ton chiller handle for a12F rise in water temperature and a 8F drop in tower

    ,(chiller flow):

    ;24

    gpmTons

    =

    200F12Tgpm ===

    T

    Tons28.8gpm

    =The flow in the condenser:The flow in the condenser:

    36000128.8

    gpm ==

  • 8/3/2019 Chiller Terminal Unit Performance 1

    15/79

    Chiller Pump discharge & PipeChiller Pump discharge & Pipesizingsizing

    We could also using the basic equation:We could also using the basic equation:

    ./.. hrBTUinloadcoolingtheisLC

    oun

    arg edischpumporflowratetheisgpm

    oropeempera uresoutinoo

    .,

  • 8/3/2019 Chiller Terminal Unit Performance 1

    16/79

    ExampleExample

    Suppose you want to calculate the required flow rateSuppose you want to calculate the required flow rate, ,, ,

    required C.L. isrequired C.L. is 11 TonsTons--ref andref and T =T =1010..88 F, ( F, (66 CC ))

    24Tons124Tons

    ;24

    TgpmTons

    =

    o.

    F10.8

    T

    gpm =

    OrOr

    gpm22.2RateflowThe=

    issizepipeingcorrespondThe "2/1

    artrom Black steel pipe is recommendedBlack steel pipe is recommended

  • 8/3/2019 Chiller Terminal Unit Performance 1

    17/79

  • 8/3/2019 Chiller Terminal Unit Performance 1

    18/79

    er u e ec oner u e ec on

    11-- The re uired flow rate & headThe re uired flow rate & head

    22-- U feed or down feed , If U feed s stem isU feed or down feed , If U feed s stem is

    used ,the shut off head of the pump must beused ,the shut off head of the pump must be

    to highest level, However if down feed system isto highest level, However if down feed system isused remember to include gravity assist flowused remember to include gravity assist flow

    ..

  • 8/3/2019 Chiller Terminal Unit Performance 1

    19/79

    Exam leExam le

    Su ose ou want to calculate the re uired flow rateSu ose ou want to calculate the re uired flow rate

    for a chiller centrifugal pump ,assuming that, the C.L.for a chiller centrifugal pump ,assuming that, the C.L.

    .. . .. . --

    included in the calculation of the total Cooling Load.included in the calculation of the total Cooling Load.

    o ut on:o ut on:

    F.810gpm50012000180 o

    =

    =

    sizei encores ondiThe

    gpmsc argeumpe

  • 8/3/2019 Chiller Terminal Unit Performance 1

    20/79

    y ca an co arrange eny ca an co arrange en

  • 8/3/2019 Chiller Terminal Unit Performance 1

    21/79

    The Fan coil inlet cold water temperature isThe Fan coil inlet cold water temperature is

    ..

    water temperature inlet is aboutwater temperature inlet is about 4040 C.C.

    Practically, the temperature change across thePractically, the temperature change across the

    Fan coil varies fromFan coil varies from 55 --77 C C in the summer.in the summer.

    difference is aboutdifference is about 1111CC..

    Maximum water operating pressure is aboutMaximum water operating pressure is about 33 Bars.Bars.

  • 8/3/2019 Chiller Terminal Unit Performance 1

    22/79

    e an co a r ow rate n ranges rome an co a r ow rate n ranges rom

    200200 300300 400400 600600 800800 andand12001200..

    The Fan coil m is about =The Fan coil m is about = 22..44 m/tonm/ton. Based. Based

    on temperature difference betweenon temperature difference between inin && outout

    1010 F,F, which is aboutwhich is about 55..55 C.C.

  • 8/3/2019 Chiller Terminal Unit Performance 1

    23/79

    Pipe Systems

    Two pipe Systems Three pipe Systems Four pipe Systems

    23

  • 8/3/2019 Chiller Terminal Unit Performance 1

    24/79

    TwoTwo--pipe systemspipe systems

    BoilerBoiler -- OffOff

    Consists of one supply and one return pipe for eitherConsists of one supply and one return pipe for either

    chilledchilled oror hot water su l . The twohot water su l . The two-- i e s stem is limitedi e s stem is limitedduring changeover season.during changeover season.

    24

  • 8/3/2019 Chiller Terminal Unit Performance 1

    25/79

    TwoTwo--pipe systemspipe systems

    ChillerChiller -- OffOff

    25

  • 8/3/2019 Chiller Terminal Unit Performance 1

    26/79

    Three-Pi e S stem

    It has three pipes to each terminal unit. These pipes are aIt has three pipes to each terminal unit. These pipes are a,, ..

    The return pipe has a mixture of chilled & hot water duringThe return pipe has a mixture of chilled & hot water during

    26

    ..

    because they consume excess energy.because they consume excess energy.

    F P

  • 8/3/2019 Chiller Terminal Unit Performance 1

    27/79

    Four-Pipe System

    FourFour--pipe systems have a cold water supply, cold waterpipe systems have a cold water supply, cold waterreturn, ot water supp y, an ot water return. ereturn, ot water supp y, an ot water return. eterminal unit usually has two independent secondaryterminal unit usually has two independent secondary

    27

    ,,

    cold watercold water..

    C iC i

  • 8/3/2019 Chiller Terminal Unit Performance 1

    28/79

    ComparisonComparison

    TheThe fourfour--pipepipe systemsystem hashas thethe followingfollowing advantagesadvantages::

    11-- RespondingResponding quicklyquickly toto loadload changeschanges..

    -- pera espera es ww ee summersummer--w n erw n er c angeoverc angeover..

    ,,

    initialinitial costcost isis generallygenerally higherhigher..

    44--TheThe systemsystem cancan bebe designeddesigned withwith nono interconnectioninterconnection ofof thethe

    hothot andand coldcold waterwater secondarysecondary circuitscircuits..

    28

  • 8/3/2019 Chiller Terminal Unit Performance 1

    29/79

    Two & Three way -valve

    29

    Types of valvesTypes of valves

  • 8/3/2019 Chiller Terminal Unit Performance 1

    30/79

    Types of valves.Types of valves.Control of water flow through the coil is typically

    accomp s e us ng e t er two-way va ves or t ree-way va ves.Two-way valves are available in single-seat or double-seat.

    but require adequate actuator size to overcome water system

    differential ressures.

    -Figure 1-b

    30

    ThreeThree--way valveway valveTwoTwo--way valveway valve

  • 8/3/2019 Chiller Terminal Unit Performance 1

    31/79

    ThreeThree--way valvesway valves,, available as a mixing or a diverting pattern,available as a mixing or a diverting pattern,

    are somet mes cons ere w ere cont nuous system ow sare somet mes cons ere w ere cont nuous system ow sdesired (seedesired (see FigureFigure 11--bb). However, this will have increased). However, this will have increased

    load. Another application is where flow diversion is required,load. Another application is where flow diversion is required,

    such as condenser flow to or b assin a coolin tower. Threesuch as condenser flow to or b assin a coolin tower. Three--way control valves used in this manner throttle the flowway control valves used in this manner throttle the flowthrough the coil fromthrough the coil from 100100% down to minimum and increase flow% down to minimum and increase flown e ypass rom m n mum up on e ypass rom m n mum up o ..A balancing valve is provided in the bypass to set a pressureA balancing valve is provided in the bypass to set a pressure

    ..controlling the flow through the terminal should be chosencontrolling the flow through the terminal should be chosen

    with an e ual ercenta e characteristic and the b ass ortwith an e ual ercenta e characteristic and the b ass ortselected with a complimentary linear characteristic toselected with a complimentary linear characteristic tomaintain nearly constant total flowmaintain nearly constant total flow..

    31

  • 8/3/2019 Chiller Terminal Unit Performance 1

    32/79

    Controlling Water Flow

    Figure 1-a

    Two way-Valve

    32

  • 8/3/2019 Chiller Terminal Unit Performance 1

    33/79

    Fi ure 1-b

    Three wa -Valve

    33

  • 8/3/2019 Chiller Terminal Unit Performance 1

    34/79

    Figure 1-b

    Three wa -Valve

    34

  • 8/3/2019 Chiller Terminal Unit Performance 1

    35/79

    Figure 1-b

    Three way-Valve

    35

    Fl ff

  • 8/3/2019 Chiller Terminal Unit Performance 1

    36/79

    Flow coefficient Cv

    The flow coefficient Cv is defined as the volume flowrate of water at 60 F, in gallons per minute (gpm), that

    Psi across the valve.

    Where:

    PCvQ

    =Q= flow rate gpm

    =Sg = Specific gravity of water =1

    Now

    eetindwhered

    Cv4300

    2=36

    Kv

    Th Fl h h h l l

  • 8/3/2019 Chiller Terminal Unit Performance 1

    37/79

    The Flow rate through the control valve

    Where:

    . = ow rate gpm

    H= Pressure drop ft

    Note that ; the control valve size is not necessaril the same as the i esize, but is based on the control valve Cv and may be one or two sizes smallerthan pipe size.

    The Cv is based on the control manufacturer's valve test data. This Cv rating mayvary when comparing different manufacturers' valve sizes.

    37

    PP dd

  • 8/3/2019 Chiller Terminal Unit Performance 1

    38/79

    PrimaryPrimary Secondary pumpingSecondary pumping

    systemsystem

    38

  • 8/3/2019 Chiller Terminal Unit Performance 1

    39/79

    -

    39

  • 8/3/2019 Chiller Terminal Unit Performance 1

    40/79

    Primaryrimary-secondary pumpingecondary pumpingControlling water temperature in a primaryControlling water temperature in a primary--secondary pumpingsecondary pumpingarrangement with a two way valve is another approach toarrangement with a two way valve is another approach to

    improving valve coil control, as shown figure (improving valve coil control, as shown figure (33--a )in thea )in therev ou gurerev ou gure .. erm con an ow a a me a aerm con an ow a a me a avariable temperature in the coil circuit, at the design velocity,variable temperature in the coil circuit, at the design velocity,

    ..

    A common pipe (aA common pipe (a--b )is connected to both the primary andb )is connected to both the primary andsecondary circuits with no pressure drop. This commonsecondary circuits with no pressure drop. This common--pipe ispipe isusually located in a bridge between the supply and returnusually located in a bridge between the supply and returnmains of the primary.mains of the primary. The common pipe is selected with "noThe common pipe is selected with "no--

    "" ..

    40

  • 8/3/2019 Chiller Terminal Unit Performance 1

    41/79

  • 8/3/2019 Chiller Terminal Unit Performance 1

    42/79

    gure -

    42

    The primary-secondary concept allows the distribution

  • 8/3/2019 Chiller Terminal Unit Performance 1

    43/79

    The primary-secondary concept allows the distribution.

    (see Figure4-a) or distributing the pumping to remotebuildings or zones of a large facility (see Figure4-b).

    The primaryprimary--secondary concept allows continual flowsecondary concept allows continual flow

    throu h the source and still ermits twothrou h the source and still ermits two--wa valve control inwa valve control inthe loads. There is flexibility in dedicating a pump to athe loads. There is flexibility in dedicating a pump to achiller or boiler or manifolding the pumps. This mightchiller or boiler or manifolding the pumps. This mights mp y t e nee or av ng ac up pumps or every system.s mp y t e nee or av ng ac up pumps or every system.Pumps, manifolds, accessories and associated pumpingPumps, manifolds, accessories and associated pumping

    ,,or can be factory prepackaged as an assembly for aor can be factory prepackaged as an assembly for a

    desi nated mountin location. The desi ner must wei h thedesi nated mountin location. The desi ner must wei h thepros and cons of cost, flexibility and installationpros and cons of cost, flexibility and installationrequirements of the various concepts to determine the bestrequirements of the various concepts to determine the best

    43

    arrangemen .arrangemen .

  • 8/3/2019 Chiller Terminal Unit Performance 1

    44/79

    gure -a

    44

  • 8/3/2019 Chiller Terminal Unit Performance 1

    45/79

    45

    -

  • 8/3/2019 Chiller Terminal Unit Performance 1

    46/79

    46

  • 8/3/2019 Chiller Terminal Unit Performance 1

    47/79

  • 8/3/2019 Chiller Terminal Unit Performance 1

    48/79

    Chiller PumpsChiller Pumps&&

    Cent r i fugal Pum p Basic s

  • 8/3/2019 Chiller Terminal Unit Performance 1

    49/79

    Cent r i fugal Pum p Basic s

    Closed Syst emBalancing

    Valve

    3-Way

    Control Valve

    Isolating

    Valve

    LOAD

    LOAD

    LOADBUILDINGHEIGHT

    LOAD

    EXPANSION

    SOURCE

    Cent r i fugal Pum p Basic s

  • 8/3/2019 Chiller Terminal Unit Performance 1

    50/79

    Cent r i fugal Pum p Basic s

    Closed Syst em Resis t anc e Cur ve

    Friction

    CAPACITY

    Cent r i fugal Pum p Basic s

  • 8/3/2019 Chiller Terminal Unit Performance 1

    51/79

    g p

    Open Syst em

    Static Head

    StaticSuction Head

    CONDENSER

    Cent r i fugal Pum p Basic s

  • 8/3/2019 Chiller Terminal Unit Performance 1

    52/79

    g p

    Open Syst em Resis t anc e Cur ve

    System Head Curve

    D

    Losses

    HE

    TotalStaticHead

    CAPACITY

    Cent r i fugal Pum p Basic s

  • 8/3/2019 Chiller Terminal Unit Performance 1

    53/79

    g p

    Closed Syst em w i th

    BALANCINGVALVE

    2 WAY CONTROLVALVE

    ISOLATINGVALVE

    LOAD

    LOADBUILDING

    LOAD

    HEIGHT

    EXPANSION

    SOURCE

    Cent r i fugal Pum p Basic s

  • 8/3/2019 Chiller Terminal Unit Performance 1

    54/79

    g p

    Closed Syst em Res ist anc e Cur ve w i t h

    Friction

    Losses

    HEA

    MaintainedPressure

    CAPACITY

  • 8/3/2019 Chiller Terminal Unit Performance 1

    55/79

    Refer to the Fundamental of pumps by Dr. Hammoud

    Each pump operatesEach pump operates

  • 8/3/2019 Chiller Terminal Unit Performance 1

    56/79

    Each pump operatesEach pump operatest is pointt is point

    Both pumpsBoth pumps--ONON

    ystem operat ngystem operat ng

    pointpointBoth pumpsBoth pumps--ONON

    SingleSingleumum

    OperatingOperatingpointpoint

    Parallel pump operationParallel pump operation

    Single pumpSingle pumpSystemSystem

    O i P iO i P i

  • 8/3/2019 Chiller Terminal Unit Performance 1

    57/79

    Single pumpSingle pumpO eratin PointO eratin Point

    opera ngopera ng

    PointPointOne pump isOne pump is

    Both pumpBoth pump --OnOn

    --

    Each pumpEach pumpoperates @ thisoperates @ this

    pointpoint

    o pumpo pump -- nn

  • 8/3/2019 Chiller Terminal Unit Performance 1

    58/79

  • 8/3/2019 Chiller Terminal Unit Performance 1

    59/79

    with Speed?with Speed?

    So:

    ow c anges near w

    Head changes as a SQUARE of RPM

    Power is proportional to Flow times Head it changes as CUBE of

    RPM

    Q ~ RPMQ ~ RPMH ~ RPMH ~ RPM22

    SP ~ RPMSP ~ RPM33

  • 8/3/2019 Chiller Terminal Unit Performance 1

    60/79

    Affinity laws (For the same pump)

  • 8/3/2019 Chiller Terminal Unit Performance 1

    61/79

    ff y w (F m pump)

  • 8/3/2019 Chiller Terminal Unit Performance 1

    62/79

    AffinitAffinit lawslaws

    Doublin the um rotational s eedDoublin the um rotational s eed

    leads to:leads to:-- ..

    22-- Increase the total head value by aIncrease the total head value by a

    ac or oac or o ..33-- Increase the power by a factor ofIncrease the power by a factor of 88..

    TwoTwo Speed pumpingSpeed pumping

  • 8/3/2019 Chiller Terminal Unit Performance 1

    63/79

    Multiple-speed motors can be used to reducesystem overover--pressure at reduced flowpressure at reduced flow. Inthis example standard two-speed motors areavailable in models with speeds of 1750/1150rpm, 1750/850 rpm, 1150/850rpm and

    3500/1750 rpm. The corresponding figures ows t e per ormance o a system wit a1750/1150 rpm multiple speed pump. In thefigure, curve AA shows the system's responsew en e pump runs a rpm. en e

    pump runs at 1150rpm, operation is at point1 and not at point 2 .

    shown in curve B, the pump would operate ator above the shut-off , it will be damaged if

    .designer must analyze the system carefullyto determine the pump's limitations and the

    .

    Two multiTwo multi--speed pumps in parallelspeed pumps in parallel

  • 8/3/2019 Chiller Terminal Unit Performance 1

    64/79

    It can Replace the use ofIt can Replace the use of MultiMulti--speed (speed (33 speeds)speeds)manual ad usted circulated um b VFDmanual ad usted circulated um b VFD

  • 8/3/2019 Chiller Terminal Unit Performance 1

    65/79

    operation in heating system. (operation in heating system. (heating systemheating systemcirculated um

    He

    H u y po n

    22ndnd duty pointduty point

    33ndnd duty pointduty point

    Q1

    Radiators OnRadiators On--off !!!off !!!

    Refer to the VFD by Dr. Hammoud

  • 8/3/2019 Chiller Terminal Unit Performance 1

    66/79

    reductionreduction

    PumpsPumps

    powerpower

    Pump & System curvesPump & System curves

  • 8/3/2019 Chiller Terminal Unit Performance 1

    67/79

  • 8/3/2019 Chiller Terminal Unit Performance 1

    68/79

    A lication of chiller um sA lication of chiller um s

    4 pipe systems

  • 8/3/2019 Chiller Terminal Unit Performance 1

    69/79

  • 8/3/2019 Chiller Terminal Unit Performance 1

    70/79

    own ee pump systemDown - feed pumping system

    Operating point

    stat c = egat ve

    Shut off headFan Coil Shutoffhead

  • 8/3/2019 Chiller Terminal Unit Performance 1

    71/79

    pera ng pon

    Qstat c = zero

    Up Fee pump systemUpUp--feed pumping systemfeed pumping system

    Standb uStandb u

  • 8/3/2019 Chiller Terminal Unit Performance 1

    72/79

    a way goo rac ce o con er a ac u um o equaa way goo rac ce o con er a ac u um o equacapacity and proper valves to permit operation when the normal pumpcapacity and proper valves to permit operation when the normal pumpis inoperable. Usually this is an application for a parallel pump.is inoperable. Usually this is an application for a parallel pump.

    ai ure can occur in extreme y co weat er or eating or in t eai ure can occur in extreme y co weat er or eating or in t emiddle of a hot spell during the cooling season, and the originalmiddle of a hot spell during the cooling season, and the originalinvestment cost of a by ass will be trivial com ared to theinvestment cost of a by ass will be trivial com ared to theinconvenience for the building occupants or the operator.inconvenience for the building occupants or the operator.

    Depending on the system curve and the pump curve and how manyDepending on the system curve and the pump curve and how manyum s are in the full s stem a standb um can rovide u toum s are in the full s stem a standb um can rovide u to 8080%%

    of design flow.of design flow.

    Types of Pumps neededTypes of Pumps needed

  • 8/3/2019 Chiller Terminal Unit Performance 1

    73/79

    entire characteristic curve. Centrifugal pumps are available with steep curves thatdrop from high head at low flow to low head at high flow versus those with flat

    Some designers like to limit this to a 15% to 25% rise-to-shut off curve. Theseflat curve pumps are always recommended where two-way valves are applied to

    unit terminals. At part-loads, the valves will be operating at lower flows and thiswill move the system operating differential pressure up the pump curve.

  • 8/3/2019 Chiller Terminal Unit Performance 1

    74/79

    Pum s selectionPum s selection

    When selecting a pump for chiller application,When selecting a pump for chiller application,the ollowin uestions actors should bethe ollowin uestions actors should beconsidered:considered:

    Pumps selectionPumps selection

  • 8/3/2019 Chiller Terminal Unit Performance 1

    75/79

    11-- h i h h i ih i h h i i

  • 8/3/2019 Chiller Terminal Unit Performance 1

    76/79

    (Water or antifreeze liquids , cold or hot etc.. ).(Water or antifreeze liquids , cold or hot etc.. ).22-- hat is the re uired volu e low rate dischar e ?hat is the re uired volu e low rate dischar e ?

    What is the diversity factor?, what is theWhat is the diversity factor?, what is the

    maximum and minimum amount of liquid to bemaximum and minimum amount of liquid to bepumped?pumped?33-- What is the head required from the um and theWhat is the head required from the um and the

    pipe system curve ?. For circulating pump the headpipe system curve ?. For circulating pump the headrequired from the pump is to overcome the totalrequired from the pump is to overcome the totalea oss on y.ea oss on y.

    44--What are the conditions on the suction (inlet) sideWhat are the conditions on the suction (inlet) side

    o e pump an on e sc arge ou e s e oo e pump an on e sc arge ou e s e othe pump? check the NPSH. That is to saythe pump? check the NPSH. That is to say ..

    55-- Check the specific speed. Read the correspondingCheck the specific speed. Read the corresponding. .. .

  • 8/3/2019 Chiller Terminal Unit Performance 1

    77/79

    66--Flat curve pumps rather than steep curve pumps is selectedFlat curve pumps rather than steep curve pumps is selected77--Plot the i e s stem curve on each selected umPlot the i e s stem curve on each selected umcharacteristic curve and then compare the headcharacteristic curve and then compare the head --discharge relationship, efficiency and power of thedischarge relationship, efficiency and power of thei erent pumps rom cata ogues . T e pump, w ic isi erent pumps rom cata ogues . T e pump, w ic is

    operating at or near the point of B.E.P, (operating at or near the point of B.E.P, ( maximummaximum. ,. ,

    able to identify one or two pumps that are suitable.able to identify one or two pumps that are suitable.88-- Choose theChoose the lowestlowest initial and runnin cost of the um i.e.initial and runnin cost of the um i.e.(power requirements).(power requirements).99-- What is the type of power source (electric motor, dieselWhat is the type of power source (electric motor, diesel

    engine, etc. ?engine, etc. ?1010-- Check the space, weight, and location ( indoors or outdoorsCheck the space, weight, and location ( indoors or outdoors

    ..

    1111-- Refer to the governing codes and standards.Refer to the governing codes and standards.

    --

    Remember thisRemember this

    ..

  • 8/3/2019 Chiller Terminal Unit Performance 1

    78/79

    with trimmed impellerwith trimmed impeller Optimizing pump capacityOptimizing pump capacity forforaaspecific application. . Single pump with backup pumpspecific application. . Single pump with backup pump-- InIn,, ..

    TwoTwo--speed pumpspeed pump -- Provides limited variable flow steps withProvides limited variable flow steps withan added investment.an added investment.

    ara e pumpsara e pumps-- exi e capacity contro wit out increasingexi e capacity contro wit out increasingsystem head; goodsystem head; good forfortwotwo--way valve control. Series pumpsway valve control. Series pumps-- Stee head chan e with limited flow chan e; twoStee head chan e with limited flow chan e; two--wawavalves would require high differential pressure operationvalves would require high differential pressure operation

    and capability.and capability.- - ,,

    minimum pumping energy.minimum pumping energy.Distributed pumpsDistributed pumps -- Special application of primarySpecial application of primary--secondarysecondary

    ..Variable speed pumpsVariable speed pumps-- Applied to pumping systems to reduceApplied to pumping systems to reduce

    ower b lowerin um s eed to meet control differentialower b lowerin um s eed to meet control differentialpressure in se ecte ocations; usua y app ie to para epressure in se ecte ocations; usua y app ie to para e

    pumping distribution systems employing primarypumping distribution systems employing primary--secondarysecondaryor distributed um in , with twoor distributed um in , with two--wa control valves.wa control valves.

  • 8/3/2019 Chiller Terminal Unit Performance 1

    79/79

    nd o t e lect rend o t e lect re