Checklist Execution

Embed Size (px)

Citation preview

  • 8/11/2019 Checklist Execution

    1/13

    Name of Work: Drgs Ref:

    Employer:

    Contract No.:

    Contractor:

    Item Dscrpt ` Inspection Requested by:

    Strata: Strata: Strata: Soil Type

    Req. on: Req. on: Req. on:

    Location By.: By.: By.: Quantity

    Date: Date: Date: Ref. Below:

    Time: Time: Time:

    Points to CheckO

    PO

    PO

    P

    1. Drawings & Spec. Details Finalised

    2. Method Statement Approved

    3. Excavation Plan Approval

    4. Co-ordinates, Bench Mark & Grids

    5. Initial Ground Levels are Checked

    6. Depth of Excavation finalised

    7. Identification of existing Service Lines

    8. Excavation lines Marked on Ground

    9. Statutory Approvals if required

    10. Disposal area approved

    11. Arrangements for Dewatering

    Endorsement from Contractor

    Approved for Execution Task Start Date:

    1. Shoring / Nailing done as Stated

    2. Relocation of Existing Services

    3. Final Trimming

    4. Side Surface clearance from exc. Line

    5. Depth of Excavation Checked

    6. Final levels are Checked

    7. Safety Norms complied

    8. Anit-termite treatment if any

    Strata Classification

    Relevent BOQ No.

    Qty. Executed [Cum]

    Work Approval Approved Approved subject to Rectifications Listed Not Approved [See Remarks]

    Work approval date Task End Date

    Main Contractor: Client Engineer - Project Manager (PMC)

    Yeskay Promag Consultancy Pvt Ltd

    POSTEXECUTION

    CHECKLIST - EARTH WORKS

    EXCAVATION

    Section Level

    BOQ No.

    Checklist No.

    REMARKSAction Req.

    REMARKS

    Action Req.Action Req.

    BEFOREEX

    CAVATION

    ORDINARY SOIL HARD SOIL SOFT ROCK HARD ROCK

  • 8/11/2019 Checklist Execution

    2/13

    Name of Work:

    Employer:

    Contract No.:

    Contractor:

    Item Dscrptn: Inspection Requested by: BOQ No.

    1ST INSPECTION 2ND INSPECTION 3RD INSPECTION Mix Grade:

    Req. on: Req. on: Req. on:

    Location By.: By.: By.: Quantity

    Date: Date: Date:

    Time: Time: Time:

    Points to Check

    1. Size & Length

    2. Horizontal Profile & Sequence

    3. Vertical Profile & Sequence

    4. Chairs Position

    5. Jointing & Taping

    6. Fixing

    1. Size2. Numbers

    3. Dead End Anchorage Type

    4. Dead End Bulb & Position

    5. Live End Position

    6. Rusting

    1. Casting & block-out Position & Taping

    2. Bursting Reinf. Spacing & Position

    3. Grout Tube & Grout Vent Position

    4. Duct Visual condition

    NameMain Contractor

    Electrical

    ACMV

    Fire Protection

    Plumbing

    Others[Specify]]

    Approved for Concreting Task Start Date:

    Cube Strength Pour Start Date & Time:

    Approved for Post Tensioning Concreting End Date & Time:

    Post Tensioning Joint Record:

    Tendons Cutting Red Line Marking on Slab Soffit

    Packing

    Grouting

    Action Required:- Remarks: Rectifications done as specified:

    Task End Date:

    Main Contractor: Project Engineer Project Manager

    Section Level

    Agency

    ENDORSEMENTS

    Action Req.Action Req.

    GENERAL

    DUCTS

    STRANDS

    To Rectify

    POSTCONCRETING

    CHECKLIST

    Checklist No. Date:

    POST TENSIONINGYeskay Promag Consultancy Pvt Ltd

    To Rectify

    To Rectify

    To Rectify

    Acceptable

    Acceptable

    Acceptable To Rectify

    REMARKS

    Sign with Date

    Action Req.

    Acceptable

    Acceptable

    Acceptable

    To Rectify

  • 8/11/2019 Checklist Execution

    3/13

    Name of Work: Drgs Ref:

    Employer:

    Contract No.:

    Contractor:

    Item Dscrptn: Inspection Requested by: BOQ No.

    1ST INSPECTION 2ND INSPECTION Mix Grade:

    Req. on: Req. on:

    Location By.: By.: Quantity

    Date: Date:

    Time: Time:

    Points to Check

    1. Dimensions, level & Plumb

    2. Tightness & Rigidity

    3. Stop / Drop Formwork

    4. Cleanliness

    5. Shutter Release Agent

    1. Bar Size & Nos.

    2. Bar Spacing & Laps

    3. Cleanliness

    4. Covers, Hooks & Binding Rigidity

    5. Starter & Bonding Bars

    1. Box Outs

    2. Pipe Sleeves

    3. Embedded Items

    4. Quality of Bulk Materials / RMC

    5. Plastisizers / Additives

    6. Expansion Joint Provisions if any

    7. Existing Concrete Hacking & Cleaning

    8. Special treatments in existing surface

    Clearance for Concreting Clearance Date

    Details of Additional Steel Provided if any:[Other than specified in Drg.] Pour Start Date & Time:

    Pour End Date & Time:

    No. of Cubes Taken:

    Average Slump:

    Method of Pouring & Vibration Arrangement for Curing / Ponding

    Stability of Formwork after Pour Others[Specify]

    Line, Level & finishing

    Sch. date for formwork removal with supports Actual Date of Removal

    Sch. date for form work removal entirely Actual Date of Removal

    Line, Level & finishing of Concrete surface

    Removal of Battens, Maskin tape etc.

    Act ion Required i f any:- Remarks: Rectifications done as specified:

    Dry finish

    Wet finish

    Grouting Task End Date:

    Epoxy Treatment

    Contractor: Client Engineer Project Manager (PMC)

    DESHUTTER

    To Improve

    To Improve

    Checklist No. Date:

    CLEAR

    ANCE

    Action Req.Action Req.

    GENERAL

    FORMWORK

    REBAR

    CONCRETE WORKSYeskay Promag Consultancy Pvt Ltd

    Section Level

    POSTCONCRETING

    Acceptable

    Acceptable

    Acceptable

    CHECKLIST

    REMARKS

    ContractorEngineer

    Acceptable

    Acceptable

    Acceptable To Rectify

    To Rectify To Rectify

    To Rectify

    Acceptable

    Acceptable

    To Improve

    To Improve

    To Improve

    Acceptable

    AcceptableTo Improve

  • 8/11/2019 Checklist Execution

    4/13

    Name of Work: Drgs Ref:

    Employer:

    Contract No.:

    Contractor:

    Item Dscrptn: Inspection Requested by:

    Type of Masonry

    Req. on: Req. on: Req. on:

    Location By.: By.: By.: Quantity

    Date: Date: Date:

    Time: Time: Time:

    Points to Check

    1. Drawings & Details Finalised

    2. Method Statement Approved

    3. Bulk Materials Approval

    4. Mortar Mix as per Spec. confirmed

    5. Clearance of Area

    6. Availability of Materials [Daily Req.]

    7. Stability & Safety of Scaffolding

    1. Removal of Mortar flakes & Cleaning

    2. Hacking of connected RCC Surfaces

    3. Room / Floor Layout Markings checked

    4. Location of Openings Confirmed

    5. Verticality in line with lower floors

    6. Availability of Water

    7. W etting of Stones/Blocks/Bricks

    8. Availability of Meas boxes & Platforms

    9. Availability of Tech. Supervision

    Endorsement from Contractor

    Approved for Execution Task Start Date:

    1. Method of Construction

    2. Internal Packing of Masonry walls

    3. Plumb, line, level & Right Angles

    4. Thickness & evenness of Mortar Joints

    5. Staggering of Vertical Joints

    6. Bond between old & new Masonry

    7. Reinforcement in Specified Layers

    8. Mortar Packing at junction of top layer

    9. Racking of Mortar Joints

    10. Location & Size of Lintels

    11. Location & Size of Openings

    12. Clearing of Debris

    13. Curing for Specified Duration

    14. Room dimensions & Diagonal Check

    Work Approval Approved Approved subject to Rectifications Listed Not Approved [See Remarks]

    Work approval date Task End Date

    Main Contractor: Project Engineer Project Manager

    ABOVE LINTEL

    BOQ No.

    GENERAL

    PREPARATIONS

    REMARKS

    Action Req.

    CHECKLIST

    MASONRY WORKSChecklist No. Date

    Yeskay Promag Consultancy Pvt Ltd

    UP TO SILL LINTEL LEVEL

    REMARKSAction Req.

    Section Level

    Action Req.

    POSTEXECUTION

  • 8/11/2019 Checklist Execution

    5/13

    Name of Work: Drgs Ref:

    Employer:

    Contract No.:

    Contractor:Inspection Requested by:

    UPTO SILL ABOVE LINTEL

    Req. on: Req. on: Req. on:

    y.: y.: y.:

    Date: Date: Date:

    Time: Time: Time:

    oints to Check ed RoomMaster

    ed roomLiving hall Foyer Kitchen Utility

    Guest

    roomSingle Toilet

    Double

    Toiletalcony Wardrobe

    Common

    Area

    1. ulk m aterials Approval

    2. Mortar mix ratio Confirmed

    3. Clearance of area

    4. Availability of Materials

    5. Stability and Safety of Scaffolding

    1. Hacking of connected RCC Surfaces

    2. Room/Floor Layout markings checked

    3.Location of openings confirmed

    4. Wetting of ricks

    5. Availability of measurement boxes

    6. Availability of technical supervision

    Task Start Date

    1.Method of construction

    2. Plumb, line, level and right angles

    3. Staggering of vertical joints

    4. Reinforcement in specified layers

    5. Racking of mortar joints

    6. Location & size of lintels

    7. Location & Size of openings

    8. Curing for specified du ration

    9. Clearing of debris

    10.Room dimensions & diagonal check

    Work Approval Approved Approved subject to Rectifications Listed Not Approved [See Remarks]

    Work approval date Task End Date

    FOR YESKAY PROMAG: FOR HALLMARK

    FOR YESKAY PROMAG:OR PSK: FOR HALLMARK:

    LevelSection

    OR PSK:

    GENERAL

    PREPARATION

    pproved for Execution

    REMARKS

    REMARKS

    POSTEXECUTION

    Location

    em Dscrptn:

    TYPE OF MASONRY

    QUANTITY

    LINTEL LEVEL

    CHECKLIST

    MASONRY WORKSChecklist No. Date

    BOQ No.

    Yeskay Promag Consultancy Pvt Ltd

  • 8/11/2019 Checklist Execution

    6/13

    Name of Work: Drgs Ref:

    Employer:

    Contract No.:

    Contractor:

    Item Dscrptn: Inspection Requested by:

    BASE COAT 1ST COAT 3RD INSPECTION Type of Finish

    Req. on: Req. on: Req. on:

    Location By.: By.: By.: Quantity

    Date: Date: Date:

    Time: Time: Time:

    Points to Check

    1. Drawings & Spec. Details Finalised

    2. Method Statement Approved

    3. Material Approvals

    4. Completion of Masonry in all respect

    5. Doors & Window frames fixed as req.

    6. All Services lines laid and approved

    7. Mortar mix ratio Confirmed

    8. Identified the area of cladding

    9. Check for Architectural features

    10. Hacking of related RCC Surfaces

    11. Racking of Masonry Joints

    12. Fixing of Wire mesh at interfaces

    13. Button Marks fixed around walls

    14. Old mortar flakes removal & cleaning

    15. Availability of adaquate lighting

    16. Wetting of base masonry surface

    17. Stability of Scaffolding / frame work

    Name

    Main Contractor

    Electrical

    ACMV

    Fire ProtectionPlumbing

    Others[Specify]]

    Approved for Execution Task Start Date:

    1. Line, level & Verticality

    2. Plastering Pattern laid as per Drg.

    3. Surface finish & evenness

    4. Making of grooves as specified if any

    5. Thickness of Grooves & Evenness

    6. Cleaning of Joints & Corners finishing

    7. Provision for skirting

    8. Cleaning of Splashing in adj. surface

    9. Rough finish for Cladding area if any

    10. Curing as specifiedWork Approval Approved Approved subject to Rectifications Listed Not Approved [See Remarks]

    Work approval date Task End Date

    Main Contractor: Project Engineer Project Manager

    CHECKLIST

    PLASTERINGChecklist No. Date

    BOQ No.

    Yeskay Promag Consultancy Pvt Ltd

    Agency

    Action Req.

    Sign with Date

    REMARKS

    Action Req.Action Req.

    Section Level

    REMARKS

    BEFOREPLASTERING

    POSTEXECUTION

    ENDORSEMENTS

  • 8/11/2019 Checklist Execution

    7/13

    me of Work: Drgs Ref:

    mployer:

    ntract No.:

    ntractor:Inspection Requested by:

    1ST INSPECTION

    Bed Room

    Bed Living hall Foyer Kitchen UtilityGuest

    room

    Single

    Toilet

    Double

    ToiletBalcony Wardrobe

    Common

    Area

    1. Completion of Masonry in all respect

    2. Doors & Window frames fixed as req.

    3. All Services lines laid and approved

    4. Mortar mix ratio Confirmed

    5. Identified the area of cladding

    6. Hacking of related RCC Surfaces

    7. Fixing of Wire mesh at interfaces

    8. Button Marks fixed around walls

    9. Availability of adaquate lighting

    10. Wetting of base masonry surface

    11. Stability of Scaffolding / frame work

    Electrical

    Plumbing

    Others[Specify]]

    proved for Execution

    1. Line, level & Verticality2. Plastering Pattern laid as per Drg.

    3. Surface finish & evenness

    4. Making of grooves as specified if any

    5. Thickness of Grooves & Evenness

    6. Cleaning of Joints & C orners finishing

    7. Provision for skirting

    8. Cleaning of Splashing in adj. surface

    9. Rough finish for Cladding area if any

    10. Curing as specified

    rk Approval Approved Approved subject to Rectifications Listed Not Approved [See Remarks]

    rk approval date Task End Date

    FOR YESKAY PROMAG: FOR HALLMARK

    CHECKLIST

    PLASTERINGChecklist No. Date

    BOQ No.

    Yeskay Promag Consultancy Pvt Ltd

    REMARKS

    BEFORE

    PLASTERING

    POSTEXECUTION

    Signature

    REMARKS

    m Dscrptn:

    NTS

    Agency

    Location Level

    Req. on:

    By.:

    FOR YESKAY PROMAG:R PSK:

    Date:

    Req. on:

    By.:Section

    R PSK:

    Time:

    Points to Check

    FOR HALLMARK:

    Task Start Date:

    Date:

    Time:

    Name

    QUANTITYFINAL CLEARING

  • 8/11/2019 Checklist Execution

    8/13

    Name of Work: Drgs Ref:

    Employer:

    Contract No.:

    Contractor:

    Item Dscrptn: Inspection Requested by:

    BASE COAT 2ND COAT PROTVE. COAT Type

    Req. on: Req. on: Req. on:

    Location By.: By.: By.:

    Date: Date: Date: Quantity

    Time: Time: Time:

    Points to Check

    1. Drawings & Spec. Details Finalised

    2. Agency Approval

    3. Material Approvals

    4. Method Statement Approved

    5. Area Clearance from Civil & Services

    6. Pre-WP Grouting done [If req.]

    7. Underdeck Insulation complete

    8. Flakes removal & Surface cleaning

    9. WP Mix Ratio confirmed

    10. Availability of Materials [Daily Req.]

    11. Manufacturer's Spec. understood

    Name

    Main Contractor

    Electrical

    ACMV

    Fire Protection

    Plumbing

    Others[Specify]]

    Approved for Execution Task Start Date:

    1. Executed as per Specifications

    2. Line, level & slopes as required

    3. Curing as required being done

    4. Corners & Edges finished properly

    5. Dressing around Pipes & RW Outlets

    6. Expansion Joints

    7. Polystyrene Foam

    5. Ponding done and Tested

    6. Water tightness achieved

    Work Approval Approved Approved subject to Rectifications Listed Not Approved [See Remarks]

    Work approval date Task End Date

    Indemnities Submitted & Accepted Submitted but Corrections Required Not Submitted

    Main Contractor: Client Engineer Project Manager(PMC)

    Yeskay Promag Consultancy Pvt Ltd

    Section Level

    Date:

    Action Req. REMARKS

    Sign with Date

    CHECKLIST

    WATER PROOFINGChecklist No. Date

    REMARKS

    Action Req.Action Req.

    BEFOREEXECUTION

    POSTEXECUTION

    ENDORSEMENTS

    Agency

  • 8/11/2019 Checklist Execution

    9/13

    Name of Work: Drgs Ref:

    Employer:

    Contract No.:

    Contractor:

    Item Dscrptn: Inspection Requested by:

    1ST INSPECTION 2ND INSPECTION 3RD INSPECTION Type of Finish

    Req. on: Req. on: Req. on:

    Location By : By : By : Quantity

    Date: Date: Date:

    Time: Time: Time:

    Points to Check

    1. Drawings & Spec. Details Finalised

    2. Method Statement Approved

    3. Material Approvals

    4. Base Coat of Plastering

    5. Doors & Window frames fixed as req.

    6. All Services lines laid and approved

    7. Mortar mix ratio Confirmed

    8. Identified the area of cladding

    9. Check for Architectural features

    10. Hacking of related RCC Surfaces

    11. Fixing of Wire mesh at interfaces

    12. Grid Line setting & level mark set up

    13. Location of Brackets

    14. Type of Adhesive for fixing

    15. Availability of adaquate lighting

    16. Wetting of base surface

    17. Stability of Scaffolding / frame work

    Name

    Main Contractor

    Electrical

    Plumbing

    Others[Specify]]

    Approved for Execution Task Start Date:

    1. Line, level & Verticality & evenness

    2. Cladding Pattern laid as per Drg.

    3. Strips / Beads as specified if any

    4. Thickness of Strips & Evenness

    5. Cleaning of Joints & Corners finishing

    6. Skirting as specified

    7. Cleaning of Splashing in adj. surface

    8. Rough finish for Cladding area if any

    9. Anchor fasteners & Brackets

    10. Joint Sealants as specified

    11. Cladding finish around various fittings

    12. Curing as specified

    Work Approval Approved Approved subject to Rectifications Listed Not Approved [See Remarks]

    Work approval date Task End Date

    Main Contractor: Project Engineer Project Manager

    CHECKLIST

    WALL CLADDINGChecklist o Date

    Yeskay Promag Consultancy Pvt Ltd

    BOQ o

    ENDORSEMEN

    TS

    Section Level

    Agency

    REMARKSAction Req.

    Sign with Date

    REMAR

    Action Req.Action Req.

    BEFOREPLASTERING

    POSTEXECUTION

  • 8/11/2019 Checklist Execution

    10/13

    Name of Work: Drgs Ref:

    Employer:

    Contract No.:

    Contractor:

    Item Dscrptn: Inspection Requested by:

    1ST INSPECTION 2ND INSPECTION 3RD INSPECTION Type of Finish

    Req. on: Req. on: Req. on:

    Location By.: By.: By.: Quantity

    Date: Date: Date:

    Time: Time: Time:

    Points to Check

    1. Drawings & Spec. Details Finalised

    2. Method Statement Approved

    3. Material Approvals

    4. Grid line Setting

    5. Offset Line

    6. Level mark setup

    7. Location of rackets

    Contractor's Endorsement

    Approved for Execution Task Start Date:

    Anchor Fasteners

    G I rackets

    Aluminium Panels

    Horizontal Panels

    Verticality

    Spandrel panel

    Horizontal level

    GI Flashing

    Verticality

    Sealant

    Work Approval Approved Approved subject to Rectifications Listed Not Approved [See Remarks]

    Work approval date Task End Date

    ain Contractor: Project Engineer Project anager

    Yeskay Promag Consultancy Pvt LtdCHECKLIST

    STRUCTUR ZI & CP

    REMARKS

    Action Req.Action Req.

    BEFO

    REEXECUTION

    POSTEXECUTION

    Checklist o Date

    BOQ o

    Section Level

    REARKSAction Req.

  • 8/11/2019 Checklist Execution

    11/13

    Name of Work: Drgs Ref:

    Employer:

    Contract No.:

    Contractor:

    Item Dscrptn: Inspection Requested by:

    BASE COAT INTERMEDIATE FINAL COAT Type of Finish

    Req. on: Req. on: Req. on:

    Location By.: By.: By.: Quantity

    Date: Date: Date:

    Time: Time: Time:

    Points to Check

    1. Drawings & Spec. Details Finalised

    2. Method Statement Approved

    3. Material Approvals

    4. Colour & Shade approval

    5. Mix Proportions finalised

    6. Stability of Scaffolding

    7. Completion of Plastering in all respect

    8. Check for Architecture Designs

    9. Availability of Materials [Daily req.]

    10. Floor surface Protection ensured

    Contractor's Endorsement

    Approved for Execution Task Start Date:

    Surface finishEvenness

    Colour/ Shade as per approved Sample

    Removal of Scaffolding

    Cleaning of flooring and surroundings

    Work Approval Approved Approved subject to Rectifications Listed Not Approved [See Remarks]

    Work approval date Task End Date

    Main Contractor: Project Engineer Project Manager

    REMARKSAction Req.

    REMARKS

    Action Req.Action Req.

    BEFOREEXECU

    TION

    POSTEXECUTION

    CHECKLIST

    PAINTINGChecklist o Date

    Yeskay Promag Consultancy Pvt Ltd

    Level

    BOQ o

    Section

  • 8/11/2019 Checklist Execution

    12/13

    Name of Work: Drgs Ref:

    Employer:

    Contract No.:

    Contractor:

    Item Dscrptn: Inspection Requested by:

    1ST INSP. 2ND INSP 3RD INSP Type

    Req. on: Req. on: Req. on:

    Location By.: By.: By.:

    Date: Date: Date: Quantity

    Time: Time: Time:

    Points to Check

    1. Drawings & Spec. Details Finalised

    2. Agency Approval

    3. Material Approvals as per Sample

    4. Method Statement Approved

    5. Area Clearance from Civil & Services

    6. Underdeck Insulation complete

    7. Availability of Materials [Daily Req.]

    8. All Service lines laid and approved

    Main Contractor

    Electrical

    ACMV

    Fire Protection

    Plumbing

    Others[Specify]]

    CLARANCE FOR GRID LAYING Task Start Date:

    GRID ALIGNMENT APPROVAL

    CLEARANCE FOR SERVICES FIXTURE FIXING

    Line, level & Alignment of Grids

    Pressure test for Service lines Complete

    Cleaning/Dusting of Flooring is done

    Fixing of All Service Fixtures Complete

    Main Contractor

    Electrical

    ACMV

    Fire Protection

    Plumbing

    Others[Specify]]

    CLEARANCE FOR TILE FIXING

    Work Approval Approved Approved subject to Rectifications Listed Not Approved [See Remarks]

    Work approval date Task End Date

    Main Contractor: Project Engineer Project Manager

    FOR

    GRIDS&ALIGNMENT

    FOR

    TILEFIXING

    ENDORSEMENTS

    FROM NSC FOR GRID LINING

    CHECKLIST

    FALSECEILINGChecklist o Date

    Yeskay Promag Consultancy Pvt Ltd

    ENDORSEMENTS

    FROM NSC FOR TILE FIXING

    Date:

    Action Req. REMARKS

    Sign with Date

    Section Level

    Sign with Date

    REM

    ARKS

    Action Req.Action Req.

  • 8/11/2019 Checklist Execution

    13/13

    Name of Work: Drgs Ref:

    Employer:

    Contract No.:

    Contractor:

    Item Dscrptn: Inspection Requested by:

    1ST INSPECTION 2ND INSPECTIONReq. on: Req. on:

    Location By.: By.:

    Date: Date:

    Time: Time:

    Points to Check

    1. Drawings & Spec. Details Finalised

    2. Method Statement Approved

    3. Type & Design of flooring confirmed

    4. Sample Approved for Stone/Tile

    5. Availability of Materials [Daily Req.]

    6. Old mortar flakes removal & cleaning

    7. Confirmation of Floor level as per Drg.

    8. Floor Conduites laid & approved

    9. Plumbing & San. lines laid & approved

    10. Availability of adaquate lighting

    11. Floor finish levels marked as required

    12. Tiling Pattern / Dry Laying Approved

    13. Wetting of base floor surface

    14. Base Mortar mix ratio Confirmed

    15. Provision of Required slopes if any.

    Name

    Main Contractor

    Electrical

    ACMV

    Fire Protection

    PlumbingOthers[Specify]]

    Approved for Execution Task Start Date:

    1. Line, level & Visual finish

    2. Flooring Pattern laid as approved

    3. Joint Strips as specified if any

    4. Thickness of joints & Evenness

    5. Joint fillants

    6. Cleaning of Joints & Corners finishing

    7. Matching of tile/stone joints

    8. Tiling around various fixtures

    9. Finish of Cut tiles / Stones

    10. Check for loose tiles/Stones

    11. Barricading of Wet Floor area

    12. Curing as specified

    Work Approval Approved Approved subject to Rectifications Listed Not Approved [See Remarks]

    Task End Date

    Main Contractor: Project Engineer Project Manager

    CHECKLIST

    FLOOR FINISHESChecklist No. Date

    Yeskay Promag Consultancy Pvt Ltd

    BEFOREFLOORING

    POSTEXECUTION

    ENDO

    RSEMENTSIFANY Agency

    BOQ No.

    Quantity

    Type of Flooring

    REMARKS

    Section Level

    Sign with Date

    REMARKS

    Action Req.Action Req.