Upload
ceyhan-damcidag
View
158
Download
0
Embed Size (px)
Citation preview
Ceyhan DAMCIDAG - [email protected] - (+ 90) 535 7819280 Page No: 1
First Name : CEYHAN
Last Name : DAMCIDAG
Birth Date / Place : 10/07/1979–Izmir/Turkiye`
Nationality : Turkish
Education : Celal Bayar University, Civil Engineering – Manisa /1998 ~ 2003
Telephone / Mobile : (+ 90) 535 7819280 – TURKEY / (+966) 595 20 50 75 - KSA
E - Mail : [email protected], [email protected]
Adress : Kazımdirik Mahallesi Istiklal Cad. No: 114/ PZ01 – PO Box: 35800
Aliaga / IZMIR (TURKEY)
Summery
I'm a NACE II Certified Civil Engineer worked almost in all main engineering fields including
Engineering & Design, Manufacturing, Research & Development, Construction, Site, Project
Management and Controls, currently employed as Steel Structure, Insulation, Fireproofing & Painting
Works Division Manager at Tekfen Construction.
Being a team member of a company that sustains its position in the ‘ENR’s Top 225 International
Contractors List’ was not only a chance to reach my career goals through continued professional
development, but also a promoting experience to work in fully structured multicultural environments
on the most challenging and impactful projects around the world. Through these challenging projects
I also had the opportunity to review and discuss projects in the Oil & Gas, Petrochemical, and Power
industries for both commercial and technical point of view. Working closely with multiple
departments; Engineering, Procurement, Logistics, Project Controls, Contracts, HSE&Q, Finance,
HR, Operations and Project Management to ensure accuracy and coordination in the collection of
data for preparing accurate and competitive outcomes.
Summary of Experience :
Years : (20.05.2014 – continue)
Company : TEKFEN Construction
Job Title : Steel Structure, Insulation, Fireproof & Painting Works Chief
(Division Manager)
Brief Description
of Responsibilities : Management of Painting, Insulation and Fireproofing activities.
Exhibits strong People Management skills coupled with professional
competencies in mobilizing and judiciously managing resources with
structured inputs in the domains of project planning, scheduling and
monitoring to ensure project accomplishment within defined
time/cost parameters.
Project Name : SADARA Proplyene Oxide Project (SAUDI ARABIA)
Project Value : 280 million USD
Country / Location : Jubail (Khobar) – Kingdom of Saudi Arabia
Client : DOW CHEMICAL Company /ARAMCO-KBR, Foster Wheeler
Ceyhan DAMCIDAG - [email protected] - (+ 90) 535 7819280 Page No: 2
Project Description : Construction of Proplyene Oxide Plant.
Years : (20.08.2011 – 15.03.2014)
Company : TEKFEN Construction
Job Title : Painting & Insulation, Scaffolding Group Chief
Brief Description
of Responsibilities : Responsible for co-coordinating all site activities with a multi-
cultural workforce through office staff, supervisors and foremen.
Liaised with client. Ensured all scaffolding activities were conducted
in a safe and efficient manner. Ensure that all sub-contractors and
labours adhere to the agreed project procedures- to create a safe
working environment and improving work standards.
Management of Sand Blasting & Painting Works, Insulation and
Scaffolding Activities. Exhibits excellence in providing complex
critical coating solution and selection of Anti-corrosion coating
system as per the project and site requirement. Mobilizing and
judiciously managing resources with structured inputs in the domains
of project planning, scheduling and monitoring to ensure project
accomplishment within defined time/cost parameters.
Project Name : South Yoloten GAS Development Project (TURKMENISTAN)
Project Value : 500 million USD
Country / Location : Mary (Yoloten) – TURKMENISTAN
Client : PETROFAC (PIUL) LTD
Project Description : Construction of GAS Field Development Plant.
Summary of Experience :
Years : (25.01.2009 – 24.07.2011)
Company : TEKFEN Construction
Job Title : Painting & Insulation Group Chief
Brief Description
of Responsibilities : Manangement of Sand Blasting & Painting Works, Insulation and
Acid Lining Applications. Seting priorities for the team to ensure task
completion; coordinating work activities with other disciplines
Manages performance of employees through task assignments,
ongoing skill assessment and coaching. Assuring coordination and
liaison between the different disciplines and contractors. Monitoring
the workforce in terms of competence, quantity and planning.
Project Name : Ma’aden Phosphate Project Phosphoric Acid Plant
Project Value : 240 million USD
Country / Location : Jeddah (Rabigh) – Kingdom of Saudi Arabia
Client : Ma’aden Phosphate Company (MPC) – Worley Parson (WP)
Project Description : Construction of Wet Phosphoric Acid Plant.
Years : (01.04-2008 – 25.01.2009)
Company : TEKFEN Construction.
Job Title : Coating Engineer (NACE Level II Certified)
Brief Description
Ceyhan DAMCIDAG - [email protected] - (+ 90) 535 7819280 Page No: 3
of Responsibilities : Responsible for the Manangment and execution of the Company’ s
Field Joint Coating Services. Providing Technical Support, Witness
and supervise blasting activities and coating application activities to
ensure compliance to requirements Monitor Progress and Report on
Painting Progress Status. Management of Technical and Operational
requirements for Field Coating operations. Well versed with
preparation of method statement, Inspection Test plan (ITP), QCP,
Job safety analysis, Risk assessment, QA/QC procedures, Manning
chart, project planning, Scheduling, work progress report, Deviation
and discrepancy reports, Incident & Accident reporting, Appropriate
tool box talk topics, Response and close-out related to CAR
(corrective action report) & NCR (Non conformance report) and
project post-mortem repor
Project Name : PetroRabigh Utilities & Offside Umbrella Project
Project Value : 215 million USD
Country / Location : Jeddah (Rabigh) – Kingdom of Saudi Arabia
Client : Saudi Aramco Company & Petrorabigh Company
Project Description : Expension Programme
Years : (20.10.2006 / 01.04.2008)
Company : TEKFEN Construction.
Job Title : Planning Engineer (Cost Control Engineer)
Brief Description
of Responsibilities : Responsible to control and monitor project total expenditure
including verifying and checking of invoices and claims from
vendors and subcontractors to ensure that all project expenditures are
captured and properly recorded. Provide planning and cost controlling
support for all projects.Variation reporting, monitoring of milestones
Project Name : PetroRabigh Utilities & Offside Umbrella Project
Project Value : 215 million USD
Country / Location : Rabigh – Kingdom of Suudi Arabia.
Client : Saudi Aramco Company & Petrorabigh Company
Project Description : Expension Programme
Years : (01.11.2005 / 20.10.2006)
Company : Remko Construction Company./TÜPRAŞ İZMİT REFINERY
Job Title : Piping Site Manager
Brief Description
of Responsibilities : Steel Construction and Erection, Insulation, Painting, Piping,
Support Erection and Sand Blasting Works.
Project Name : TÜPRAŞ İZMİT REFINERY –DHRP & CCR Project
Project Value : 450 million USD
Country : TURKEY / IZMIT
Client : Alarko, Akfen & TR Co.
Project Description : DHRP & CCR Units Construction & Erection Works
Years : (11-2003 / 05-2005)
Company : Remko Co. Steel Factory
Job Title : Technical Office Manager
Brief Description
Ceyhan DAMCIDAG - [email protected] - (+ 90) 535 7819280 Page No: 4
of Responsibilities : Turkmenistan Steel Manufacturing Plant Project Stl-Str Fabrication
Project Name : Asmaş Heavy Machining C.O. Turkmenistan Steel Manufacturing
Plant Project
Project Value : 15 million USD
Country : TURKEY / IZMIR
Client : Asmaş Heavy Machining C.O.
Project Description : Steel Manufacturing Plant Project Fabrication Work
Years : (08-2003 / 011-2003)
Company : Remko Construction Company./TÜPRAŞ İZMİR REFINERY
Job Title : Technical Office Manager
Brief Description
of Responsibilities : Turkmenistan Steel Manufacturing Plant Project Stl-Str Fabrication
Project Name : Maintenance Work for Tank Area of TUPRAS Refinery
Project Value : 0,5 million USD
Country : TURKEY / IZMIR
Client : TÜPRAŞ İZMİR REFINERY.
Project Description : Maintenance of the Tanks at TUPRAS Refinery
Years : (04-2003 / 08-2003)
Company : Remko Construction Company./TÜPRAŞ İZMİR REFINERY
Job Title : Construction Manager
Brief Description
of Responsibilities : Diesel Hydrosessing Project Construction Works
Project Name : TÜPRAŞ İZMİR REFINERY DHP Project
Project Value : 350 million USD
Country : TURKEY / IZMIR
Client : TÜPRAŞ İZMİR REFINERY.
Project Description : Civil work ,Steel construction and Erection ,Chemical Cleaning ,
Precommisioning and Commisioning ,Catalyst Loading ,Insulation,
Painting , Piping , Instrumentation works for new DHP Unit
Years : (01-2003 / 04-2003)
Company : Remko Construction Company./GAMA A.S.
Job Title : Construction Chief
Brief Description
of Responsibilities : NSC Revamping Project Construction Manangement
Project Name : PETKİM ALİAĞA PETROCHEMİCAL PLANT NSC Project
Project Value : 100 million USD
Country : TURKEY / IZMIR
Client : PETKİM ALİAĞA PETROKIMYA A.S.
Project Description : Mechanical erection , steel construction , piping,Flake glass
lining,sand blasting and painting work
Years : (11-2002 / 01-2003)
Company : PASINER A.S.
Job Title : Technical Office Engineer
Brief Description
of Responsibilities : Payment Certificate Preperation, Matarial Balance, Final Invoice
Project Name : PETKİM ALİAĞA PETROCHEMICAL PLANT ACID
PRUDUCTION & VCM UNIT
Ceyhan DAMCIDAG - [email protected] - (+ 90) 535 7819280 Page No: 5
Project Value : 250 million USD
Country : TURKEY / IZMIR
Client : PETKİM ALİAĞA PETROKIMYA A.S.
Project Description : Construction Works for the Acid Production & VCM Unit
Years : (10-1997 / 12-1997)
Company : DOGAN INS. A.S.
Job Title : Site Engineer
Brief Description
of Responsibilities : Supervision of Maintanance works for Admin. Building
Project Name : PETKİM ALİAĞA PETROCHEMICAL PLANT
ADMINISTRATON BUILDING MAINTANANCE WORKS
Project Value : 0,3 million USD
Country : TURKEY / IZMIR
Client : PETKİM ALİAĞA PETROKIMYA A.S.
Project Description : Maintanance Works for Administration Building at PETKIM
PETROKIMYA PLANT
Language(s) :
English (Fluent) , German (Beginner) , Turkish (Main Language)
Courses/Trainings Attended:
Subject Duration (Day or Hour)
NACE Coating Inspector Level-2 Certified CIP No: 17947 15 Days
NACE Coating Inspector Level-1 Certified CIP No: 17947 15 Days
BREAU VERITAS (Scaffolding Inspection Training) 07 Days
JOTUN Training Program (Pre-treatment Application Paint) 03 Days
Safety Awareness Certificate (PETROFAC & TEKFEN) 01 Day
ARAMCO & PETRORabigh Certificate of Attendance Lock out-Tag out Training 1Day
Computer Skills :
MS Office Programs, (Microsoft Word, Microsoft Excel, Microsoft Power Point, Access, Outlook), Internet, AUTOCAD 2007, SAP 2000
Hobbie(s) / Interests :
Knowledgeable in shop fabrication, erection, painting and civil related work for Piping, Storage Tank, Structural Steel & Mechanical Equipment Installation. Capable of preparing & producing Project Quality Plan (PQP), Inspection & Test Plan (ITP), Fabrication & Erection Procedure, Painting Procedure, Inspection Formats/Checklist. Also quite familiar with most construction code, standards & requirement such as ASME V, ASME VIII, ASME IX, ASME B31.1, ASME B31.3, API-1104, AWS D1.1 & ISO 9001: 2000
Swimming, Diving, listening Music, Soccer
Ceyhan DAMCIDAG - [email protected] - (+ 90) 535 7819280 Page No: 6
REFERANCES :
SUKRU AYTEMIZ : BP Oil & Energy, Project Services Construction Manager Tel:+90 530 4164146 (TR)
RAMIZ KOZAKCI : TEKFEN Construction, Project Manager Tel:+90 5301406948 (TURKEY)
NURI KAYSERILI : REMKO Construction Company, Vice President Tel:+90 5334637360 (TURKEY)
MUSTAFA MUTLU : PETKIM Petrochemical HOLDING AS., Vice President Tel:+905324258082 (TURKEY)
OSMAN BALKAN : TEKFEN Construction, Construction Manager Tel:+97 433847208 (KATAR)
FAHRİ DOĞAN : DOĞAN INSAAT ve Ticaret Ltd Şti., Vice President Tel:+0232 616 37 85 - 616 00 02 (TURKEY)