34
( Fig. in `000' of Rs.) Sl No Plan Head PB/ LB NO 11-12 Divn Agency Name of Work Yr. of sanction Allocation Estimated Cost Expend. Upto March '11 Outlay 11-12 Balance Expend. during the year Cumm. Expend. Till date Plan Estimate Tender T.D.C. % progress- Phy % progress- Fin Remarks/Status RE 1 16 L18 CKP Sr.DEE/TRD Rajkharswan station - Wiring on the unwired portion on line no. 13. 08-09 DF-3 4833 3356 2002 -525 1467 4823 Yes No Yes Completed 100 99.79 Work completed. 1496 2 16 L19 CKP Sr.DEE/TRD Dongaposi Yard - OHE on the shunting neck of UP and down Grid of at Maluka end. 08-09 DF-3 4799 3430 1842 -473 1467 4897 Yes No Yes Completed 100 102.04 Work completed. 1467 3 16 L27 CKP Sr.DEE/TRD OHE modification in connection with isolation of loop lines from main line at Sonakhan (UP & DN), Garposh (DN), Bamra (DN), Dharuadih (UP), Bagdehi (UP & DN) & Dhutra(DN). 08-09 DF-3 4423 1954 2377 92 340 2294 Yes Yes Yes Completed 100 51.87 Work completed. 1650 4 16 L37 CKP Sr DEE/G Illumination of loading point at Deojhar, Dongoaposi, & Bimlagarh. 08-09 DF-3 4163 3397 766 0 0 3397 Yes Yes Yes Completed 100 81.60 Work completed. Final payment under process. 766 ELECTRICAL DEPARTMENT STATUS OF WORKS IN PROGRESS UNDER D- 16 MONTH-DECEMBER- 2011 1 H:\CEE-DEC'11-Progress of all works.xls 1 of 34

CEE-DEC'11-Progress of all worksTower for various division over S.E. Rly. 09-10 DF-3 7422 32 3000 4390 2390 2422 Yes Yes Yes 31.3.12 10 32.63 Detailed Estimate sanctioned on 19.1.10

  • Upload
    others

  • View
    19

  • Download
    0

Embed Size (px)

Citation preview

( Fig. in `000' of Rs.)Sl

No

Pla

n H

ead

PB

/ LB

NO

11-1

2

Div

n

Agency Name of Work

Yr.

of

sanction

Allo

cation

Estim

ate

d C

ost

Expend.

Upto

Marc

h '1

1

Outlay 1

1-1

2

Bala

nce

Expend.

during t

he y

ear

Cum

m.

Expend.

Till

date

Pla

n

Estim

ate

Tender

T.D

.C.

% p

rogre

ss-

Phy

% p

rogre

ss-

Fin Remarks/Status RE

1 16 L18

CK

P

Sr.

DE

E/T

RD Rajkharswan station -

Wiring on the unwired

portion on line no. 13.08-0

9

DF

-3

4833

3356

2002

-525

1467

4823

Yes

No

Yes

Com

ple

ted

100

99.7

9 Work completed. 1496

2 16 L19

CK

P

Sr.

DE

E/T

RD Dongaposi Yard - OHE

on the shunting neck of

UP and down Grid of at

Maluka end.

08-0

9

DF

-3

4799

3430

1842

-473

1467

4897

Yes

No

Yes

Com

ple

ted

100

102.0

4 Work completed. 1467

3 16 L27

CK

P

Sr.

DE

E/T

RD OHE modification in

connection with isolation

of loop lines from main

line at Sonakhan (UP &

DN), Garposh (DN),

Bamra (DN), Dharuadih

(UP), Bagdehi (UP &

DN) & Dhutra(DN).

08-0

9

DF

-3

4423

1954

2377

92

340

2294

Yes

Yes

Yes

Com

ple

ted

100

51.8

7 Work completed. 1650

4 16 L37

CK

P

Sr

DE

E/G Illumination of loading

point at Deojhar,

Dongoaposi, &

Bimlagarh.

08-0

9

DF

-3

4163

3397

766 0 0

3397

Yes

Yes

Yes

Com

ple

ted

100

81.6

0 Work completed. Final payment under process. 766

ELECTRICAL DEPARTMENT

STATUS OF WORKS IN PROGRESS UNDER D- 16

MONTH-DECEMBER- 2011

1 H:\CEE-DEC'11-Progress of all works.xls 1 of 34

Sl

No

Pla

n H

ead

PB

/ LB

NO

11-1

2

Div

n

Agency Name of Work

Yr.

of

sanction

Allo

cation

Estim

ate

d C

ost

Expend.

Upto

Marc

h '1

1

Outlay 1

1-1

2

Bala

nce

Expend.

during t

he y

ear

Cum

m.

Expend.

Till

date

Pla

n

Estim

ate

Tender

T.D

.C.

% p

rogre

ss-

Phy

% p

rogre

ss-

Fin Remarks/Status RE

5 16 L51

KG

P

Sr.

DE

E/T

RD Extension of CSL and

top wiring of UL-3 at

shalimar in connection

with stabling of

coaching empty rakes

with 24 coaches.10-1

1

DF

-3

5004

NA

1000

NA

NA

NA

NA

NA

NA

NA

NA

NA No work required, Work to be dropped. Work to be

dropped.

0

6 16 L52

KG

P

Sr.

DE

E/T

RD Extension of CSL and

top wiring of Gunner line

No.3 at Shalimer in

connection with stabling

of coaching empty rakes

with 24 coaches.

10-1

1

DF

-3

5619

NA

250

NA

NA

NA

NA

NA

NA

NA

NA

NA No work required, Work to be dropped. 0

7 16 L69

RN

C

Sr

DE

E/G Provison of high Mast in

Ranchi division

(Tatisilwai, Lohardaga,

Bano, Jhalida, Suisa,

Hatia, Ranchi)

09-1

0

DF

-3

8303 0

5000

3303

5543

5543

yes

Yes

Yes

31.0

3.1

2

10

66.7

6 Contractual: LOA issued on 10.05.11. Work in progress.

Materials supplied.8303

8 16 L73

RN

C

Sr.

DE

E/T

RD Ranchi: Yard isolation

for enhancement of

operational facility.

09-1

0

DF

-3

9308

2355

3000

3953

808

3163

Yes

Yes

Yes

31.0

3.1

2

55

33.9

8 Stores: All materials received. Bill to be cleared-8.5 lacs.

Contractual: contract awarded on 20.7.10. to M/s. Electronics

India/BKSC. (T/value -Rs.42.86 L). 129 Cum (0/0 131)

completed. 10 MT Mast & Dwarf Mast erected (0/0 17.4 MT). All

materials received. RE-1110.

8500

2 H:\CEE-DEC'11-Progress of all works.xls 2 of 34

Sl

No

Pla

n H

ead

PB

/ LB

NO

11-1

2

Div

n

Agency Name of Work

Yr.

of

sanction

Allo

cation

Estim

ate

d C

ost

Expend.

Upto

Marc

h '1

1

Outlay 1

1-1

2

Bala

nce

Expend.

during t

he y

ear

Cum

m.

Expend.

Till

date

Pla

n

Estim

ate

Tender

T.D

.C.

% p

rogre

ss-

Phy

% p

rogre

ss-

Fin Remarks/Status RE

9 16 L74

CK

P

Sr

DE

E/G Provision of High Mast

Tower for various

division over S.E. Rly.

09-1

0

DF

-3

7422

32

3000

4390

2390

2422

Yes

Yes

Yes

31.3

.12

10

32.6

3 Detailed Estimate sanctioned on 19.1.10 & communicated to

Division. CKP- LOA issued to M/s S. Gayen, Kol on 18.4.11.

Materials supplied on 27.9.11. One no. foundation at TATA

completed.

7142

70559

14524

29237

12015

26539 29324

1 33 P333

KG

P

Sr.

DE

E/T

RS

/TP

KR Kolkata Area - Public

Address System in

Suburban train (50

rakes)

09-1

0

DF

-1

57000

100

20000

36900 0

100

Yes

Yes

Yes

31.3

.13

10

0.1

8 Two part tender. Technical part opened on 26/07/11 where 8

parties participated. Financial bid was opened on 29/11/11 for two

parties who were technically qualified. The tender is under TC.

5000

1 36 P350

CK

P

CO

N Banspani- 132/25 KV

Rly. Owned TSS

04-0

5

DF

(3)

107809

105309

3557

-1057

620

105929

Yes

Yes

Yes

31.3

.12

99

98.2

6 1) EIG approval received. 2) OPTCL's work: Transmission Line

completed. Commissioning of Relay Panelis under progress.2000

2 36 P351

KG

P

CO

N Hijli & Dalbhumgarh -

New Railway owned

Traction sub-stations.

06-0

7

DR

F

217365

191367

11736

14262

11874

203241

Yes

Yes

Yes

HIJ

-31.3

.12,

D

VM

-

Com

pl.

HIJ

- 80

& D

VM

- 100

100.0

0 DVM- Work completed. TSS commissioned on March 2010.

HIJLI- Revised Estimate under vetting. 1) Contract awarded to

M/s Ranjit & Co on 05.0109. TSS is ready for commissioning. 2)

Rs. 4.1 Cr. deposited to WBSEB for transmission line and bay

extension. Foundation work for the 4th Tower(the last one) under

progress. Structure for LILO at TSS under progress by

WBSETCL.

Constraints- LILO arrangement by WBSEB.

15368

3 H:\CEE-DEC'11-Progress of all works.xls 3 of 34

Sl

No

Pla

n H

ead

PB

/ LB

NO

11-1

2

Div

n

Agency Name of Work

Yr.

of

sanction

Allo

cation

Estim

ate

d C

ost

Expend.

Upto

Marc

h '1

1

Outlay 1

1-1

2

Bala

nce

Expend.

during t

he y

ear

Cum

m.

Expend.

Till

date

Pla

n

Estim

ate

Tender

T.D

.C.

% p

rogre

ss-

Phy

% p

rogre

ss-

Fin Remarks/Status RE

3 36 P352

CK

P

CO

N Bondamunda- - 2nd

High Tension 33 KV

Feeder from Rourkela

GSS & Rourkela- 33/11

KV supply at Railway

Colony. 07-0

8

DF

3

54970

30100

5000

19870

128

30228

Yes

Yes

Yes

31.0

3.1

2

65

54.9

9 Contractual: Contract awarded to M/s Hindustan Cons./RNC on

04.10.08. 1)2X 250 KVA Sub-Station completed 2) 33Kv cable &

33/11 Kv, 2x2MVA transformer received. 3) 33kV Cable laying

under progress & 33/11KV Sub-Station levelling work & Fencing

completed.

Constraints:- Approval of drawing for laying cable through

SAIL/Rourkela township awaited.

2000

4 36 P353

KG

P

CO

N Kolaghat- Replacement

of State Electriicity

Board operated/

maintained traction sub-

station by railway

owned sub-station.

08-0

9

DR

F

143400

103840

17567

21993

9030

112870

Yes

Yes

Yes

31.0

3.1

2

80

78.7

1 Contractual : Contract for TSS awarded to M/S Maruti/Kolkata

on 23.7.09. 1) All equipments including transformers erected. 2)

Rs.3.66 cr deposted to WBSEB to Tr.line & bay extension on

5.2.10. 3) Gantry on Rly side completed. 4) WBSEB's work under

progress.

Constraints- Tr.line & bay extension by WBSEB.

17567

5 36 P354

CK

P

Sr.

DE

E/T

RD Dongaposi-Bolani-

Barajamda-Gua-

Padapahar-Banspani -

Conversion of

unregulated overhead

equipment to regulated

one.

07-0

8

DR

F

41231

29160

5000

7071 0

29160

Yes

Yes

Yes

31.0

3.1

2

85

70.7

2 Stores:- All materials received. Contractual- LOA issued to

M/s U.K Construction on 11.11.08. 80% work completed.

Contract short closed as he was not willing to extend the validity

further. Revised Estimate sanctioned. Fresh Tender opened on

21.09.11. Under TC.

3500

6 36 P355

CK

P

Sr.

DE

E/T

RD Chakradharpur Divn-

Replacement of contact

wire with associated

items.

08-0

9

DR

F

33657

31014

2000

643 0

31014

Yes

Yes

Yes

31.3

.12

93

92.1

5 Stores: All materials received except contact splice. PO issued

on 16.3.11 with DP-31.3.12 (M/s Eastern works). Works under

progress departmentally.

1292

4 H:\CEE-DEC'11-Progress of all works.xls 4 of 34

Sl

No

Pla

n H

ead

PB

/ LB

NO

11-1

2

Div

n

Agency Name of Work

Yr.

of

sanction

Allo

cation

Estim

ate

d C

ost

Expend.

Upto

Marc

h '1

1

Outlay 1

1-1

2

Bala

nce

Expend.

during t

he y

ear

Cum

m.

Expend.

Till

date

Pla

n

Estim

ate

Tender

T.D

.C.

% p

rogre

ss-

Phy

% p

rogre

ss-

Fin Remarks/Status RE

7 36 P356

KG

P

Sr.

DE

E/T

RD Kharagpur Divn-

Rehabilitation of

overhead equipment

components (Phase-II)

08-0

9

DR

F

52875

11573

10000

31302

246

11819

yes

Yes

Yes

31.3

.13

45

22.3

5 Stores Counter Weight (40 Kg)- Covered with PO no /70124 &

/70128, DP expired - 30.9.11. RP action taken by Stores.

Contractul: LOA issued to M/s Premco on 14.9.09. 80 ATD & 80

Double Termination erected.(o/o 383 sets), All (190) SI supplied.

All C/Lever supplied (o/o 500) and 300 erected.

Constraints:- Stores items

9446

8 36 P357

CK

P

Sr.

DE

E/T

RD Chakradharpur Divn-

Improvement of

horizontal

clearance.(Phase-VI)

08-0

9

DR

F

57010

32873

5000

19137 0

32873

Yes

Yes

Yes

31.3

.12

100

57.6

6 Works completed. Final bill to be cleared. 15000

9 36 P358

KG

P

Sr.

DE

E/T

RD Kharagpur Divn.-

Improvement of

horizontal clearance

and replacement of

leaning masts(Phase-II)

08-0

9

DR

F

40165

28290

1281

10594

768

29058

Yes

Yes

Yes

31.0

9.1

2

70

72.3

5 Stores:1) Bracket Insulator [478Nos]- Covered by PO 4610/5019/

1/70007 dtd.15.4.11, DP expired- 30.9.11. Contractual: Erection

work awarded to M/s U.K.Con on 27.10.08. Foundation

completed. 150 Masts (o/o 283) erected & load shifted at 140

locations. All C/levers supplied. Contract short closed for want

of material. Final payment cleared. LOA for the balance work

awarded to M/s Bose Enterprise, Kolkata on 25.10.11.

4068

10 36 P359

AD

A

Sr.

DE

E/T

RD Adra-Bhojudih -

Conversion of un-

regulated overhead

equipment into

regulated one

'09-1

0

DR

F

61445 0

5000

56445

8720

8720

Yes

Yes

Yes

31.3

.13

15

14.1

9 Stores-1) PO for Contact wire (11.54 MT6) 4611.50051.90041,

dt.9.12.11, DP-30.4.12 Bill for Rs.71 Lacs pending for supply of

Catenary Wire.ing excess funds since 16.8.11. Bill for Rs 71

Lacs pending for supply of Catenary Wire. Contractual- LOA

issued- 19.7.10 to M/s CAIS Engineering/ KOL. PDC- 18.1.12. T/

value- 313 Lacs. LOP & SED approved except for Yards at ADA,

RUI, SNTD & BJE which are yet to be submitted by contractor. 7

days' notice issued to the firm on 04.7.11 & on 30.12.11.Work

started.

11000

5 H:\CEE-DEC'11-Progress of all works.xls 5 of 34

Sl

No

Pla

n H

ead

PB

/ LB

NO

11-1

2

Div

n

Agency Name of Work

Yr.

of

sanction

Allo

cation

Estim

ate

d C

ost

Expend.

Upto

Marc

h '1

1

Outlay 1

1-1

2

Bala

nce

Expend.

during t

he y

ear

Cum

m.

Expend.

Till

date

Pla

n

Estim

ate

Tender

T.D

.C.

% p

rogre

ss-

Phy

% p

rogre

ss-

Fin Remarks/Status RE

11 36 P360

AD

A

Sr.

DE

E/T

RD Adra Division-

Improvement

implantation of

overhead equipment

mast having critical

implantation (750 Nos)09-1

0

DR

F

52271 0

10000

42271

750

750

Yes

Yes

Yes

31.3

.13

10 1 Stores- All materials received. Contractual- Tender awarded to

M/s. Enterprise, Kolkata on 07.09.11 (Value-Rs.5.03 Cr.) PDC-

18 months. Work started.

10138

12 36 P361

CK

P

Sr.

DE

E/T

RD Chakradharpur Division-

25kv Sub-sectioning

posts( 8 stations)

09-1

0

DF

-3

35157

12

5000

30145

7855

7867

Yes

Yes

Yes

31.3

.13

30

22 Stores-1) Mast T-150 (16 Nos.)-5619410042, 20.8.10 (5.71 MT)

T/opened-29.11.11. 2)Mast SI(42 Nos.) 5619410043,(25.56 MT)

(4610/5100). 3) Mast S6 (8 Nos.), 5619410044 (5.30 MT)

(4610/5099), 4) Mast B 150 (103 Nos.),(38.23 MT)

4609/5032/1/80051 dt.13.10.10, M.A. No.050055, dt.28.4.11, DP-

expired 10.11.2011, 5) Mast B 200(6 Nos.),(2.89 MT)), PO-

4609/5032/1/80051, dt.13.10.2010 & M.A. -050055, dt.28.4.11,

DP-expired 10.11.11 6) Intrerruptor [20Nos] PO-

4610.5088.1.80019, dt.26.5.11, DP-10.2.12, 7) 110 V Battery

charger (5619410030)- Waiting for due date of retender

(4510/5014); 8) 25 KV D.O fuse 19 Nos. (5619410026)-

(4611.5028) opened on 22.5.11; 9) 42 Kv LA (22 Nos.)

(56194100027 - (4610/5065) Re-tender for the 4th time under

process; 10) ACSR (5619410031)- Opened on 22.5.11;

(4610/5064) 11) Jumper wire-PO.4610.5109.1.80025,

dt.16.6.2011 DP-20.12.11 . Contractual-LOA issued to M/s

Binode Cons. on 26.10.10. Cost -1.8 Crores (PDC-26.1.12).

Foundation & Construction of Control building completed at TUX,

MLKA, KZU.& KXN. Constraints:- Stores

items

17000

13 36 P362

AD

A

CO

N Purulia- 132/25 Kv

railway owned traction

sub-station in

replacement of feeding

post

10-1

1

DR

F

176400

482

30000

145918

1251

1733

Yes

Yes

Yes

31.0

3.1

3

15

0.9

8 Stores- 1) PO for 2 X 21.6 MVA Transformers issued. DP-

15.5.12( Rs 3.23 Cr) 2) CBs received. Contractual- Contract

awarded to M/s SGI Power on 01.4.11. GA Drawing approved.

50000

6 H:\CEE-DEC'11-Progress of all works.xls 6 of 34

Sl

No

Pla

n H

ead

PB

/ LB

NO

11-1

2

Div

n

Agency Name of Work

Yr.

of

sanction

Allo

cation

Estim

ate

d C

ost

Expend.

Upto

Marc

h '1

1

Outlay 1

1-1

2

Bala

nce

Expend.

during t

he y

ear

Cum

m.

Expend.

Till

date

Pla

n

Estim

ate

Tender

T.D

.C.

% p

rogre

ss-

Phy

% p

rogre

ss-

Fin Remarks/Status RE

14 36 P363

CK

P

CO

N Rajkharswan - Repl of

sub-stations

10-1

1

DF

-3

177336

3121

5000

169215

10150

13271

Yes

Yes

Yes

31.3

.13

15

7.4

8 Stores Tender for 2 X 30 MVA Transformer opened on 20.6.11.

PO held up for want of fund. PO for CB issued. Contractual

Contract awarded to M/s Binod Constructions on 11.11.10. Major

materials supplied by contactor. 80% fencing completed.

Diversion of 11 KV overhead line under progress.

Constraints: Inadequate funds.

20000

15 36 P364

KG

P

Sr.

DE

E/T

RD Kharagpur Division -

Renewal of overhead

equipment.

10-1

1

DR

F

80000 0

10000

70000 0 0

Yes

Yes

Yes

31.3

.13 0

0.0

0 Stores- Requisition for 1) Mast (143.35 MT)- Returned to division

for correction 2) TTC (22.07 MT)-Returned to division for

correction, 3) 'R' Portal (17 MT) (1643311013, dt.10.2.11) opened

on 20.10.11, 4) 'O' Portal (17 MT) (- -196, dt.--) opened on

dt.20.10.11 5) 'N' portal(10.15 MT) (- -1017, dt.-) opened on

dt.20.10.11, 6) Mast for AT (10.89 MT)-Returned to division for

correction, 7) Catenary (23.66 MT), 8) Contact (38.07 MT), 9)

Stay Insulator (601 nos)-, (1643311010, dt.10.2.11) T/Opened on

13.10.11 10) Bracket Insulator (601 nos) (164110 -Tender

opened on 13.10.11 11) Dropper Wire-Under (....014, dt.10..2.11)

due date from COS & 12) Jumper Wire(160m)-Under due date

from COS (1643311015, dt.10.2.11)-. Contractual: Yet to

finalise.

Constraints: Stores items.

24200

16 36 P365

CK

P

CO

N Salgajhari -

Augmentation of power

transformer with

switchgear.

10-1

1

DR

F

96286 0

30000

66286

1220

1220

Yes

Yes

Due

31.0

3.1

3

10

1.2

7 Stores- Tender for 2x30 MVA Transformer opened on 20.6.11.

LOI for one Transformer issued on 18.10.11. PO for CB issued.

Contractual- Location Plan finalised. Revised estimate under

preparation Tender awarded to M/s Binod Construction on 8.9.11.

2000

17 36 P366

CK

P

CO

N Bondamunda- 220/25

KV railway owned

traction sub-station.

10-1

1

DF

-3

377115

280

10000

366835

128

408

Yes

Yes

Due

31.0

3.1

3

10

0.1

1 Stores: 1) Tender for (2 X 21.6 MA, 220/25 KV) Transformers

opened on 24.10.11. Under TC at Stores. 2) CBs - Tender

opened on 24.9.11. Retender under process. Contractual

Location Plan finalised. Tender schedule- MIC - approved by

CAO CON.

Constraints: Inadequate fund.

1000

7 H:\CEE-DEC'11-Progress of all works.xls 7 of 34

Sl

No

Pla

n H

ead

PB

/ LB

NO

11-1

2

Div

n

Agency Name of Work

Yr.

of

sanction

Allo

cation

Estim

ate

d C

ost

Expend.

Upto

Marc

h '1

1

Outlay 1

1-1

2

Bala

nce

Expend.

during t

he y

ear

Cum

m.

Expend.

Till

date

Pla

n

Estim

ate

Tender

T.D

.C.

% p

rogre

ss-

Phy

% p

rogre

ss-

Fin Remarks/Status RE

18 36 P367

AD

A

CO

N Chandrakona Road

Traction Sub-station -

Second 132/25 Kv, 21.6

mva traction

transformer. 10-1

1

DF

-3

39779 0

5000

34779 0 0

Yes

Yes

Due

31.3

.13

10

0.0

0 Stores: Tender for 1 X 21.6 MVA transformer opened on 10.5.11

by COS. PO under finalisation. Contractual: Re-Tender under

process.

200

19 36 P368

KG

P

Sr.

DE

E/

TR

D Kharagpur Divn -

Replacement of

overhead equipment

components.

06-0

7

DR

F

36699

40306

100

-3707

60

40366

Yes

Yes

Yes

Com

ple

ted

Com

ple

ted

110 Work completed. Dropped from IRPSM. 260

20 36 P369

AD

A

Sr.

DE

E/T

RD Adra Divn-

Replacement/

Rehabilitation of

cantilever assembly,

winch type auto

tensioning device,

isolator, jumper, section

insulator.

08-0

9

DR

F

54630

28895

5000

20735

3541

32436

Yes

Yes

Yes

31.0

3.1

2

85

59.3

7 Stores- All materials received. Contractual- LOA issued on

17.2.09 to M/s Enterprises/Kolkata. Contract value-Rs.261.36

lacs. All ATD supplied (60 sets) & 59 erected. All Cantilever (o/o

1700) supplied & 1186 Nos erected. All Double Termination sets

supplied and 22 (0/0 35) erected. . Work in progress.

10000

21 36 P370

KG

P

Sr.

DE

E/T

RD Kharagpur Divn-

Replacement of contact

& catenary wire (Phase-

II)

08-0

9

DR

F

58209

52724

100

5385

9951

62675

Yes

Yes

NA

Com

ple

ted

100

107.6

7 Stores: All materials received. Work to be done

departmentally.1000

22 36 P372

KG

P

Sr.

DE

E/T

RD Kharagpur-Tatanagar-

Renewal of overhead

equipment for up & dn

lines.

11-1

2

DR

F

60000

500

59500 0 0

Yes

Yes

Due

31.3

.14 5

0.0

0 Detailed Estimate sanctioned. 1

8 H:\CEE-DEC'11-Progress of all works.xls 8 of 34

Sl

No

Pla

n H

ead

PB

/ LB

NO

11-1

2

Div

n

Agency Name of Work

Yr.

of

sanction

Allo

cation

Estim

ate

d C

ost

Expend.

Upto

Marc

h '1

1

Outlay 1

1-1

2

Bala

nce

Expend.

during t

he y

ear

Cum

m.

Expend.

Till

date

Pla

n

Estim

ate

Tender

T.D

.C.

% p

rogre

ss-

Phy

% p

rogre

ss-

Fin Remarks/Status RE

23 36 P373

KG

P

Sr.

DE

E/T

RD Howrah -Kharagpur-

Tatanagar-

Improvement of

horizontal clearance

(250 masts) (Ph-III) 11-1

2

DR

F

25000

500

24500 0 0

Yes

Yes

Due

31.3

.14 5

0.0

0 Detailed Estimate sanctioned. 1

24 36 P374

CK

P

Sr.

DE

E/T

RD Chakradharpur Division-

Improvement of

horizontal clearance of

traction masts (Phase-

VII)

11-1

2

DR

F

52000

500

51500 0 0

Yes

Due

Due

31.3

.14 0

0.0

0 Detailed Estimate under preparation. 500

25 36 P375

KG

P

Sr.

DE

E/G Kharagpur &

Santragachi -

Replacement of high

tension panels

11-1

2

DR

F

38987 0

500

38487

500

500

Yes

Yes

Due

31.1

2.1

2 5

1.2

8 Detailed estimate has been vetted.Tender kept pending for want

of fund.1500

26 36 P376

KG

P

CO

N Jharagram - New

railway owned traction

sub-station.

11-1

2

DF

-3

188700

500

188200 0 0

Yes

Due

Due

31.3

.14 0

0.0

0 Site survey under progress. Detailed Estimate under preparation. 200

27 36 P377

CK

P

Sr.

DE

E/T

RD Chakradharpur Division -

Replacement of

regulating equipment.

11-1

2

DR

F

65300

500

64800 0 0

Yes

Due

Due

31.3

.13 0

0.0

0 Detailed Estimate under preparation. 500

28 36 P378

CK

P

Sr.

DE

E/T

RD Chakradharpur Division -

Replacement of

cantilever assembley.

11-1

2

DR

F

101587

500

101087 0 0

Yes

Due

Due

31.3

.14 0

0.0

0 Detailed Estimate under vetting at division. 500

9 H:\CEE-DEC'11-Progress of all works.xls 9 of 34

Sl

No

Pla

n H

ead

PB

/ LB

NO

11-1

2

Div

n

Agency Name of Work

Yr.

of

sanction

Allo

cation

Estim

ate

d C

ost

Expend.

Upto

Marc

h '1

1

Outlay 1

1-1

2

Bala

nce

Expend.

during t

he y

ear

Cum

m.

Expend.

Till

date

Pla

n

Estim

ate

Tender

T.D

.C.

% p

rogre

ss-

Phy

% p

rogre

ss-

Fin Remarks/Status RE

29 36 L518

AD

A

DE

E(G

)

ADA Div.- Replacement

of LT power line cable

from AT to station to

both cabins of 15

stations.08-0

9

DR

F

4498

2953

1000

545 0

2953

Yes

Yes

Yes

Com

ple

ted

100

65.6

5 Work completed.

Work should not have appeared in LB-11-12.1

30 36 L519

AD

A

DE

E/G ADA Div.- Replacement

of worn out old HT 11

KV panels at Adra &

Bhojudih.

08-0

9

DR

F

4498

3773

800

-75 0

3773

Yes

Yes

Yes

31.3

.12

85

83.8

8 XLPE Cable (3 x 120 sq mm x 150 m) received. Two 11 KV

Panels with 5-VCB & 6 VCB received.Physically work

completed

1

31 36 L520

AD

A

Sr.

DE

E/T

RD Adra divn.- Modification

of OHE for conversion

of cross type OHE to

overlap type in Adra-

Chandil section for

raising of sectional

speed.

09-1

0

DR

F

9845 0

1000

8845

2275

2275

Yes

Yes

Yes

31.3

.12

20

23.1

1 Stores- PO for Contact Wire (3 MT) 441.50051.90041,

dt.9.12.11,. Bill for Rs 13 Lacs pending for supply of Catenary

Wire. Contractual- LOA issued on 03.6.10. T/Value-Rs.41.44L

All sketch approved. Work yet to start. M/s.DAWN Engg.asked

for extension for 6 more months. Extention granted. Materials

under RITES' inspection. 7 days' notice given on 16.8.11. Firm

asked for extension for 6 more month. PDC extended upto

02.3.12.

4232

32 36 L521

AD

A

Sr.

DE

E/T

RD Adra divn.-OHE

modification work for

conversion of

unregulated to regulated

OHE and cross type to

over lap type OHE in

Bhojudih-Bhaga section

for raising of sectional

speed.

09-1

0

DR

F

9752 0

1000

8752

951

951

Yes

Yes

Yes

31.3

.12

10

9.7

5 Stores:- All materials received. Contractual:- LOA issued on

7.6.10. to M/s DAWN. T/value- 59.03 Lacs. All Sketches,

approved. Contractor applied for extension upto 6 more months

since 1.9.11. Materials under RITES inspection. 7 day's notice

issued to firm on 16.8.11. PDC extended upto 06.3.12.

Foundation work started.

2534

10 H:\CEE-DEC'11-Progress of all works.xls 10 of 34

Sl

No

Pla

n H

ead

PB

/ LB

NO

11-1

2

Div

n

Agency Name of Work

Yr.

of

sanction

Allo

cation

Estim

ate

d C

ost

Expend.

Upto

Marc

h '1

1

Outlay 1

1-1

2

Bala

nce

Expend.

during t

he y

ear

Cum

m.

Expend.

Till

date

Pla

n

Estim

ate

Tender

T.D

.C.

% p

rogre

ss-

Phy

% p

rogre

ss-

Fin Remarks/Status RE

33 36 L522

AD

A

Sr.

DE

E/T

RD Adra Divn- Provision of

2nd Bay for

accommodation of

additional Power

Transformer at Bankura

& Chandrakona Rd

TSS.

09-1

0

DF

(3)

8489

3923

300

7839

2337

6260

Yes

Yes

Yes

31.3

.12

95

73.7

4 Stores- PO for cable issued by AMM/ADA. Contractual:- LOA

issued on 7.7.10. to M/s Binod Construction. T/value- 72.15 Lacs.

All materials supplied. Work under progress. Contractor applied

for extension upto 06.11.11 which was granted.

Constraints: Funds.

5000

34 36 L523

AD

A

Sr.

DE

E/T

RD Adra - Asansol section -

Conversion of cross

type OHE to overlap

type for raising of

sectional speed .

09-1

0

DR

F

11260 0

1000

3760

2053

2053

Yes

Yes

Yes

31.3

.13

20

18.2

3 Stores- Reqn. for 1) PO for Contact wire(2.78 MT)

4611.5005.1.9004i dt.9.12.11 DP-30.4.12. Supplier bill of

Rs.10.37 lakhs for catenary wire pending. Contractual- LOA

issued on 4.6.10. T/Value-52.71L. PDC- 3.3.11.(25 locations).

Sketches approved. Foundation at RKI, MDKD & BURN Yds

completed. Materials under RITES' inspection. 7 day's notice

given on 16.8.11.Firm requested extension for 6 more months

since 1.9.11. Extention granted upto 03.03.12. Constraints-

Funds.

5304

35 36 L524

AD

A

Sr.

DE

E/T

RD Adra Divn.-

Replacement of Winch

type ATD by 3:1 ratio 3

Pulley type ATD (120

nos)

10-1

1

DR

F

11653 0

1000

10653 0 0

Yes

Yes

Due

31.3

.12 0

0.0

0 Tender awarded on 29.09.11 to M/s Takwal, BSL. (T/Value-Rs.71

lacs). Letter for inspection of materials received on 03.11.11 (150

nos.)

7500

36 36 L525

CK

P

Sr.

DE

N C

O Banspani- Provision of

OHE depot and Tower

Wagon shed.

07-0

8

DF

-3

3520

424

200

2896 0

424

Yes

Yes

Yes

31.3

.12

60

12.0

5 LOA awarded to M/s. Makhanlal Agarwal/CKP on 21.01.2010 by

Engg. CKP-Work under progress. 1500

11 H:\CEE-DEC'11-Progress of all works.xls 11 of 34

Sl

No

Pla

n H

ead

PB

/ LB

NO

11-1

2

Div

n

Agency Name of Work

Yr.

of

sanction

Allo

cation

Estim

ate

d C

ost

Expend.

Upto

Marc

h '1

1

Outlay 1

1-1

2

Bala

nce

Expend.

during t

he y

ear

Cum

m.

Expend.

Till

date

Pla

n

Estim

ate

Tender

T.D

.C.

% p

rogre

ss-

Phy

% p

rogre

ss-

Fin Remarks/Status RE

37 36 L526

CK

P

Sr.

DE

E/T

RD CKP Divn:-

Replacement of old P.C.

based SCADA system

by advanced P.C.

based SCADA system

at RCC.08-0

9

DR

F

20293

8312

5671

6310

5464

13776

Yes

Yes

Yes

Com

ple

ted

100

67.8

9 Work completed. Dropped in IRPSM. 5671

38 36 L527

CK

P

Sr.

DE

E/T

RD Chakradharpur Divn:

OHE modification in

connection with

provision of overlap type

cross over in place of X

type OHE in between

Salgajhari – Rourkela

main line.

08-0

9

DR

F

13333

9374

1000

2959

1702

11076

Yes

Yes

Yes

Com

ple

ted

100

83.0

7 Work completed. Dropped in IRPSM. 1702

39 36 L528

CK

P

Sr.

DE

N C

O BJMD- Provision of

OHE depot and Tower

Wagon Shed

08-0

9

DF

- 3

3520

423

200

2897 0

423

Yes

Yes

Yes

31.3

.12

60

12.0

2 LOA awarded to M/s. Makhanlal Agarwal /CKP on 21.01.2010 by

Engg.CKP . Work under progress.1500

40 36 L529

CK

P

Sr.

DE

E/T

RD Bamra - Provision of

tower wagon siding &

tower wagon shed.

08-0

9

DF

3

4730

1311

200

3219 0

1311

Yes

Yes

Yes

31.3

.12

65

27.7

2 LOA awarded to M/s. L.S. Bajpai/ GOL on 15.01.2009 by Engg/

CKP. Work under progress. 2500

41 36 L530

CK

P

Sr.

DE

E/T

RD CKP Divn: Replacement

of standard annealed

copper jumper wire 105

sq. mm and catenary

splice.

08-0

9

DR

F

4638

1100

1100

2438

938

2038

Yes

NA

Com

ple

ted

Com

ple

ted

23.7

1 Work completed. To be dropped. 938

12 H:\CEE-DEC'11-Progress of all works.xls 12 of 34

Sl

No

Pla

n H

ead

PB

/ LB

NO

11-1

2

Div

n

Agency Name of Work

Yr.

of

sanction

Allo

cation

Estim

ate

d C

ost

Expend.

Upto

Marc

h '1

1

Outlay 1

1-1

2

Bala

nce

Expend.

during t

he y

ear

Cum

m.

Expend.

Till

date

Pla

n

Estim

ate

Tender

T.D

.C.

% p

rogre

ss-

Phy

% p

rogre

ss-

Fin Remarks/Status RE

42 36 L531

CK

P

Sr.

DE

E/T

RD CKP Divn:-

Rehabilitation of ATD

and associated items.

08-0

9

DR

F

4497

3939

400

158 0

3939

Yes

Yes

NA

Com

ple

ted

Com

ple

ted

87.5

9 Work completed. To be dropped. 374

43 36 L532

CK

P

Sr.

DE

E/T

RD CKP Divn: Replacement

of HD Copper wire 5

mm dia.

08-0

9

DR

F

4876

4674

1186

-984

410

5084

Yes

Yes

Yes

Com

ple

ted

Com

ple

ted

104.2

7 Work completed. To be dropped. 410

44 36 L533

CK

P

Sr.

DE

E/T

RD CKP Divn:

Replacement of Section

Insulator complete

assembly with

termination

arrangement.

08-0

9

DR

F

4481

3103

500

878 0

3103

Yes

Yes

Yes

Com

ple

ted

Com

ple

ted

69.2

5 Work completed. To be dropped. 100

45 36 L534

CK

P

Sr.

DE

E/G Chakradharpur -

Improvement of power

supply at Railway

Complex.

08-0

9

DF

-1

4861

3267

400

1194 0

3267

Yes

Yes

Yes

Com

ple

ted

100

67.2

1 Work completed. Debit for cable not yet received. 1582

46 36 L535

CK

P

Sr.

DE

E/G Dongaposi -

Rehabilitation of existing

power supply system at

Railway complex.

09-1

0

DF

(2)

16455 0

2000

14455 0 0

Yes

Yes

Yes

30.0

6.1

2 0

0.0

0 Stores- Reqns for- i) 33KV VCB (3 nos) (5667409039 dtd.

05.02.10)- Case No. 4610/5051 is being retendered.TCdone on

29.6.11P.O. under issue. ii) 1.6 MVA Transformer (2 nos).P.O

NO. S/4710/5026/1/80027 dt. 20.6.11 on M/S Century

Transformer dp-21.8.11 3) Cable 3 X 120 sqmm- 5667409041 dt

4.2.10 (4610.5051) is being retendered. ACSR conductor

received and bill paid in 2010-11. Contractual- Tender

discharged twice due to no participation.

Constraints - Funds.

10000

13 H:\CEE-DEC'11-Progress of all works.xls 13 of 34

Sl

No

Pla

n H

ead

PB

/ LB

NO

11-1

2

Div

n

Agency Name of Work

Yr.

of

sanction

Allo

cation

Estim

ate

d C

ost

Expend.

Upto

Marc

h '1

1

Outlay 1

1-1

2

Bala

nce

Expend.

during t

he y

ear

Cum

m.

Expend.

Till

date

Pla

n

Estim

ate

Tender

T.D

.C.

% p

rogre

ss-

Phy

% p

rogre

ss-

Fin Remarks/Status RE

47 36 L536

CK

P

Sr.

DE

E/G Chakradharpur & Sini -

Replacement of over

aged supply system

09-1

0

DR

F

8652 0

500

8152

1440

1440

Yes

Yes

Yes

30.6

.12

40

16.6

4 Contractual- LOA issued to M/s Electro Engineers, Raipur on

20.9.10. 15 Panels received. Stores- Reqn for i) 33KV VCB (1

nos)-, 1 Store ii) 1.6 MVA Transformer (1 No. PO. placed. iii) 4 X

150 sqmm (2300 mts) XLPE Cable- (5662509002, dt

5.2.10).Fund provided.

6211

48 36 L537

CK

P

Sr.

DE

E/T

RD Goilkera/FP -Provision

of PTFE type neutral

section.

09-1

0

DF

(3)

8854

2255

200

6399

699

2954

Yes

Yes

Yes

31.3

.13

35

33.3

6 Stores:1) Jumper wire 160 Sq mm.(320 Kg.) PO-

4610.5109.1.80025, dt.16.6.11, DP-20.12.2011 2) Mast

(5619409056 dt. 08.01.10) T/opened on 01.2.11 TR-10.02.11 3)

TTC with 8 mt Boom (5619409055 dt.8.1.2010) (6.275 MT)-

.Retender opened on 01.12.11 4) ACSR (5619409057, dt.

8.1.10) [6 Km] Club procument is under process. Waiting for due

date. Contractual: LOA issued to M/s.Maruti Enterprises on

19.4.10. Mast erection completed. Work held up due to non

availability of ACSR, PO of which is pending for want of fund.

Constrainst:-Stores & Funds.

4500

49 36 L538

CK

P

Sr.

DE

E/T

RD Chakradharpur Divn.-

Shifting of Neutral

section of

Monoharpur/SP &

Rajkharswan/FP.

09-1

0

DF

(3)

8854

2255

1300

5299

1090

3345

Yes

Yes

Yes

31.3

.13

40

37.7

8 Stores:1) Jumper wire 160 Sq mm.(320 Kg.) PO-

4610.5109.1.80025, dt.16.6.11, DP-20.12.2011 2) Mast

(5619409056 dt. 08.01.10) T/opened on 01.2.11 TR-10.02.11 3)

TTC with 8 mt Boom (5619409055 dt.8.1.2010) (6.275 MT)-

.Retender opened on 01.12.11 4) ACSR (5619409057, dt.

8.1.10) [6 Km] Club procument is under process. Waiting for due

date. Contractual: LOA issued to M/s.Maruti Enterprises on

19.4.10. Mast erection completed. Work held up due to non

availability of ACSR, PO of which is pending for want of fund.

Constrainst:-Stores & Funds.

4500

50 36 L539

CK

P

Sr.

DE

E/G CKP-Provision of solar

light at 16 Nos. of non-

electrified LC gates.

09-1

0

DF

(3)

3526

10

100

3416

1829

1839

No

Yes

30.3

.12

50

52.1

6 No requisition. Contractual- LOA issued on 03.6.11 on M/S

Sourasakti,Malda. 5 Nos.. LC Gate completed..3526

14 H:\CEE-DEC'11-Progress of all works.xls 14 of 34

Sl

No

Pla

n H

ead

PB

/ LB

NO

11-1

2

Div

n

Agency Name of Work

Yr.

of

sanction

Allo

cation

Estim

ate

d C

ost

Expend.

Upto

Marc

h '1

1

Outlay 1

1-1

2

Bala

nce

Expend.

during t

he y

ear

Cum

m.

Expend.

Till

date

Pla

n

Estim

ate

Tender

T.D

.C.

% p

rogre

ss-

Phy

% p

rogre

ss-

Fin Remarks/Status RE

51 36 L540

CK

P

Sr.

DE

E/T

RD Provision of Feeder Line

from Manikui/FP to

Chandil/SP in CKP DIV.

09-1

0

DF

(3)

8696

2258

300

6138

669

2927

Yes

Yes

Yes

31.3

.13

30

33.6

6 Stores:1) Jumper wire 160 Sq mm.(320 Kg.) PO-

4610.5109.1.80025, dt.16.6.11, DP-20.12.2011 2) Mast

(5619409056 dt. 08.01.10) T/opened on 01.2.11 TR-10.02.11 3)

TTC with 8 mt Boom (5619409055 dt.8.1.2010) (6.275 MT)-

.Retender opened on 01.12.11 4) ACSR (5619409057, dt.

8.1.10) [6 Km] Club procument is under process. Waiting for due

date. Contractual: LOA issued to M/s.Maruti Enterprises on

19.4.10. Mast erection completed. Work held up due to non

availability of ACSR, PO of which is pending for want of fund.

Constrainst:-Stores & Funds.

4500

52 36 L541

CK

P

Sr.

DE

E/T

RD Provision of PTFE type

Neutral Section at

Salgachari/TSS. In CKP

DIV.

09-1

0

DF

(3)

7010

2255

300

4455

669

2924

Yes

Yes

Yes

31.3

.13

35

41.7

1 Stores:1) Jumper wire 160 Sq mm.(320 Kg.) PO-

4610.5109.1.80025, dt.16.6.11, DP-20.12.2011 2) Mast

(5619409056 dt. 08.01.10) T/opened on 01.2.11 TR-10.02.11 3)

TTC with 8 mt Boom (5619409055 dt.8.1.2010) (6.275 MT)-

.Retender opened on 01.12.11 4) ACSR (5619409057, dt.

8.1.10) [6 Km] Club procument is under process. Waiting for due

date. Contractual: LOA issued to M/s.Maruti Enterprises on

19.4.10. Mast erection completed. Work held up due to non

availability of ACSR, PO of which is pending for want of fund.

Constrainst:-Stores & Funds.

4500

53 36 L542

CK

P

SrD

EE

/G Chkradharpur:

Rehabilitation of power

supply arrangement of

signal system under

SSE(G)/Tata & DPS's

jurisdiction

10-1

1

DR

F

9568 0

200

9368 0 0

Yes

Yes

Yes

31.3

.13 0

0.0

0 Contractual:Tender opened on 02.08.11. Tender discharged on

16.9.11. Re-tender due on 30.11.11Stores-Reqn. Of about 50

lakhs to be placed (2x70 sq. mm Cable, LT distribution panel,

Auto change over panel).

5000

15 H:\CEE-DEC'11-Progress of all works.xls 15 of 34

Sl

No

Pla

n H

ead

PB

/ LB

NO

11-1

2

Div

n

Agency Name of Work

Yr.

of

sanction

Allo

cation

Estim

ate

d C

ost

Expend.

Upto

Marc

h '1

1

Outlay 1

1-1

2

Bala

nce

Expend.

during t

he y

ear

Cum

m.

Expend.

Till

date

Pla

n

Estim

ate

Tender

T.D

.C.

% p

rogre

ss-

Phy

% p

rogre

ss-

Fin Remarks/Status RE

54 36 L543

CK

P

SrD

EE

/G Rehabilitation of power

supply arrangement of

signal system under

SSE(G)/BNDM, ROU,

JSG, CKP & SNY's

jurisdiction10-1

1

DR

F

9691 0

200

9491 0 0

Yes

Yes

Yes

31.3

.13 0

0.0

0 Tender opened on 02.08.11.Under T.C from 26.8.11. Tender

discharged.Stores-Reqn. Of about 50 lakhs to be placed(20 x 70

sq. mm cable, LT distribution panel, Auto Change-over panel)

Constraints - Funds.

5000

55 36 L544

CK

P

SrD

EE

/G Tata-Rehabilitation of

power supply

arrangement.

10-1

1

DR

F

9876 0

200

9676 0 0

Yes

Yes

Yes

31.3

.13 0

0.0

0 Tender opened on 25.07.11.T.C under preparation from

12.8.11.Stores-Cables.3000

56 36 L545

CK

P

SrD

EE

/G Tata-Renovation of

power supply

arrangement in

CTRC(Tata Shed

Repair Shop) & TATA.

10-1

1

DR

F

8475 0

200

8275 0 0

Yes

Due

Due

31.3

.13 0

0.0

0 Estimate under preparation. 1000

57 36 L546

CK

P

Sr.

DE

E/T

RD Provision of additional

capacitor banks at

OPTCL supply based

Traction Substations

and Feeding posts.

10-1

1

DF

(3)

9276

10

100

9166

545

555

Yes

Yes

Yes

31.3

.12 0

5.9

8 Detailed estimate sanctioned. Tender awarded to M/s Binode

Con./RNC on 3.3.11. Stores: Post Insulator( 120 nos.)

(5619410057, dt.3.2.11.) Requisition with division for fund.

Constraints - Funds.

7100

58 36 L547

CK

P

Sr.

DE

E/T

RD Provision of additional

capacitor banks at

JSEB supply based

Traction Substations

and Feeding posts.

10-1

1

DF

(3)

9283

10

100

9173

545

555

Yes

Yes

Yes

31.3

.12 0

5.9

8 Detailed estimate sanctioned. Tender awarded to M/s Binode

Con./RNC on 3.3.11. Stores: Post Insulator( 120 nos.)

(5619410057, dt.3.2.11.) Requisition with division for fund.

Constraints - Funds.

7100

16 H:\CEE-DEC'11-Progress of all works.xls 16 of 34

Sl

No

Pla

n H

ead

PB

/ LB

NO

11-1

2

Div

n

Agency Name of Work

Yr.

of

sanction

Allo

cation

Estim

ate

d C

ost

Expend.

Upto

Marc

h '1

1

Outlay 1

1-1

2

Bala

nce

Expend.

during t

he y

ear

Cum

m.

Expend.

Till

date

Pla

n

Estim

ate

Tender

T.D

.C.

% p

rogre

ss-

Phy

% p

rogre

ss-

Fin Remarks/Status RE

59 36 L548

CK

P

Sr.

DE

E/T

RD Replacement of old

cadmium copper

catenary wire (19/2.10

mm) 656 sq.mm in

between Noamundi-

Barajamda section

including BJMD Yard

Lines.

10-1

1

DR

F

9265 0

300

8965

623

623

Yes

Yes

Due

31.3

.13

10

6.7

2 Stores:Requisitions for 1)Catenary (22 MT) (561940048), Fund

provided for issue of PO.9100

60 36 L549

CK

P

Sr.

DE

E/T

RD Mahadevshal- Provision

of 25KV sub sectioning

post.

10-1

1

DF

3

5501 0

100

5401 0 0

Due

Yes

Due

31.3

.13 0

0.0

0 Estimate vetted by finance. Finalisation of drawing will be done as

per scheme of RVNL 100

61 36 L550

CK

P

Sr.

DE

E/T

RD Replacement of over

aged ATDs including

termination

assemblies(Ph-I)

10-1

1

DR

F

8994 0

500

8494 0 0

Yes

Yes

Yes

31.3

.13 0

0.0

0 LOA issued to M/s.Goswami Ent./ASN on 2.12.11. 5000

62 36 L551

CK

P

Sr.

DE

E/T

RD Chkradharpur :

Replacement of over

aged cantilever

assemblies.

10-1

1

DR

F

8838 0

400

8438 0 0

Yes

Yes

Yes

31.3

.13 0

0.0

0 LOA issued to M/s.Goswami Ent./ASN on 2.12.11. 5000

63 36 L552

CK

P

Sr.

DE

E/T

RD Chkradharpur

:Replacement of leaning

mast.

10-1

1

DR

F

9190 0

300

8890 0 0

Yes

Yes

Yes

31.3

.13 0

0.0

0 Tender opened on 15.12.10. but discharged. Re-tender opened

on 17.6.11 & under TC.5000

64 36 L553

CK

P

SrD

EE

/G Chakradharpur-

Replacement of Central

AC plant

10-1

1

DR

F

5854 0

200

5654 0 0

Yes

Yes

Yes

31.3

.12 0

0.0

0 Tender opened on 04.08.11. TC minutes under preparation from

28.9.11 No Stores items to be procured.1

17 H:\CEE-DEC'11-Progress of all works.xls 17 of 34

Sl

No

Pla

n H

ead

PB

/ LB

NO

11-1

2

Div

n

Agency Name of Work

Yr.

of

sanction

Allo

cation

Estim

ate

d C

ost

Expend.

Upto

Marc

h '1

1

Outlay 1

1-1

2

Bala

nce

Expend.

during t

he y

ear

Cum

m.

Expend.

Till

date

Pla

n

Estim

ate

Tender

T.D

.C.

% p

rogre

ss-

Phy

% p

rogre

ss-

Fin Remarks/Status RE

65 36 L

554 KG

P

Sr.

DE

E/T

RD KGP Divn: Replacement

of Insulators (Ph-II).

08-0

9

DR

F

15209

338

3000

11871

4341

4679

Yes

Yes

NA

Com

ple

ted

Com

ple

ted

30.7

6 Work completed. Bill to be cleared. 7141

66 36 L555

KG

P

Sr.

DE

E/T

RD KGP Divn:

Replacement of Jumper

wire (105 sq. mm & 130

sq. mm).

08-0

9

DR

F

4482 0

1000

3482 0 0

Yes

Yes

NA

31.3

.13

10

0.0

0 Stores: CU Jumper [160 Sq mm] [7.5MT].- PO

4610.5109.1.70030, dt 15.6.11. DP expired on 30.12.11. Work to

be done departmentally.

4500

67 36 L556

KG

P

Sr.

DE

E/T

RD KGP Divn- HAUR :

Setting up a Sub-

sectioning post.

04-0

5

DF

-3

5000

3660

343

997 0

3660

Yes

Yes

Yes

31.3

.12

80

73.2

0 SSP Energisation work completed. SCADA work tender under

process. Final bill to be cleared. Work to be dropped.500

68 36 L557

KG

P

Sr.

DE

E/T

RD Shyamchak & Duan -

Provision of switching

post.

09-1

0

DF

(3)

8944 0

100

8294 0 0

Yes

Yes

Yes

31.3

.12 0

0.0

0 Contractual: Tender for Supply & erection, testing &

commissioning of SSP delayed due to third line conducted by

RVNL. LOA issued on 28..11.11. Stores : No reqquisition

required to be made..

3000

69 36 L558

KG

P

Sr.

DE

E/T

RD Kharagpur Divn.- Repl.

of catenary wire

between Balichak/TSS

& Haur on Up and Dn

line.

09-1

0

DR

F

8449

353

4922

7296

2971

3324

Yes

Yes

NA

31.3

.12

20

39.3

4 Stores: Requisition for 1) Dropper Wire, 2) Jumper (150 sq. mm)

3) Miscelleanous item under process at division. 4) Catenary Wire

(14 MT)-po 4610.5020.1.70113, dt.12.1.11 for 9.14 MT, DP

expired on 20.7.11. Balance wire received. Work to be done

departmentally.

8971

18 H:\CEE-DEC'11-Progress of all works.xls 18 of 34

Sl

No

Pla

n H

ead

PB

/ LB

NO

11-1

2

Div

n

Agency Name of Work

Yr.

of

sanction

Allo

cation

Estim

ate

d C

ost

Expend.

Upto

Marc

h '1

1

Outlay 1

1-1

2

Bala

nce

Expend.

during t

he y

ear

Cum

m.

Expend.

Till

date

Pla

n

Estim

ate

Tender

T.D

.C.

% p

rogre

ss-

Phy

% p

rogre

ss-

Fin Remarks/Status RE

70 36 L559

KG

P

Sr.

DE

E/T

RD Khagarapur Div.

Enhancement of

Capacitor Bank at

different TSS/FP

(Hijli/FP,

Santragachi/FP &

Dhalbhumgarh/FP)

10-1

1

DF

(3)

8933 0

100

8833 0 0

Yes

Yes

Yes

31.3

.13 0

0.0

0 Stores: Requisitions yet to finalise. Contractual- LOA issued on

28.11.115000

71 36 L560

KG

P

SrD

EE

/G Kharagpur- HT power

augmentation at SM sub-

station & Micro wave

sub-station at South

Settlement.

10-1

1

DR

F

8058 0

200

7858 0 0

Yes

Yes

Due

31.3

.13 0

0.0

0 Detail estimate sanctioned. MIC under process. 2000

72 36 L561

KG

P

SrD

EE

/G Ulberia-Augmentation of

HT Power Supply

arrangement

10-1

1

DR

F

5305 0

200

5105 0 0

Yes

Yes

Due

31.3

.13 0

0.0

0 Detail estimate sanctioned. MIC under process. 1500

73 36 L562

KG

P

Sr.

DE

E/T

RD Howrah-Kharagpur

section-Replacement of

battery and battery

charger in different

switching stations

10-1

1

DR

F

7975 0

500

7475 0 0

Yes

Yes

Yes

31.3

.13 0

0.0

0 Stores: Requisitions yet to finalise. Contractual- Tender opened-

2.6.11. TC under finalisation.5000

74 36 L563

RN

C

DE

E/T

RD RNC Divn- Provision of

PTFE Neutral section at

overlap of TSSs.

07-0

8

DR

F

3890

3485

405 0 0

3485

Yes

Yes

Yes

Com

ple

ted

100

89.5

9 Final Bill under process. 566

19 H:\CEE-DEC'11-Progress of all works.xls 19 of 34

Sl

No

Pla

n H

ead

PB

/ LB

NO

11-1

2

Div

n

Agency Name of Work

Yr.

of

sanction

Allo

cation

Estim

ate

d C

ost

Expend.

Upto

Marc

h '1

1

Outlay 1

1-1

2

Bala

nce

Expend.

during t

he y

ear

Cum

m.

Expend.

Till

date

Pla

n

Estim

ate

Tender

T.D

.C.

% p

rogre

ss-

Phy

% p

rogre

ss-

Fin Remarks/Status RE

75 36 L564

RN

C

Sr.

DE

E/T

RD Modification of OHE due

to shifting of insulated

overlap at various

stations over Ranchi

division.09-1

0

DF

(3)

9090

2421

100

6569 0

2998

Yes

Yes

Yes

31.3

.12

40

32.9

8 Stores:All Material received. Contractual: Tender awarded to

M/s Electromax/Ranchi on 21.7.10 T/value- Rs. 75.39Lacs. All

Mast & Dwarf Masts supplied. 89 Cum foundation (o/o 320 Cum)

completed. 3 MT (o/o 28 MT).Mast erected.Contr. Bill 7.87 lakh

pending.

9090

76 36 L565

RN

C

Sr.

DE

E/T

RD Ranchi Division-

Replacement of existing

3:1 pulley ATD (140 MM

dia) by modified 3:1

pulley ATD(250 mm

dia)(450 Nos.)

10-1

1

DR

F

9188 0

500

8688 0 0

Yes

Yes

Due

31.3

.13 0

0.0

0 LOA issued on 06.6.11. 5 MT SPS suplied, bill of Rs.14 lakhs +

4.05=18 lakhs pending. 50 ATDs supplied and erected (O/O 450).9188

77 36 L566

GR

C

AD

EE

/G Garden Reach complex -

Replacement of HT, LT

cables, transformers

and accessories.

10-1

1

DR

F

9652 0

500

9152 0 0

Yes

Yes

Yes

31.3

.13 0

0.0

0 Estimate of the work vetted by the finance. Works Tender due on

13.1.12.5300

78 36 L567

GR

C

AD

EE

/G Garden Reach complex -

Replacement of sub-

station equipments

including HT, LT switch

gears.

10-1

1

DR

F

9809 0

500

9309 0 0

Yes

Yes

Yes

31.3

.13 0

0.0

0 Due to augmentation of load, CESC was advised to send their

estimate for the work.SD and Service connection charges has

been deposited to CESC. Detailed erstimate vetted . Ternder

under process. Work of CESC will be processed by completion of

switch room by Engg. Deptt. NIT -31.12.11. MIC approved.

2600

79 36 L568

GR

C

AD

EE

/G Garden Reach - Repl. of

40 TR Centralised AC

Plant at EDP centre.

10-1

1

DR

F

9564 0

500

9064 0 0

Yes

Due

Due

31.3

.13

0.0

0 Detailed estimate under preparation. 1

20 H:\CEE-DEC'11-Progress of all works.xls 20 of 34

Sl

No

Pla

n H

ead

PB

/ LB

NO

11-1

2

Div

n

Agency Name of Work

Yr.

of

sanction

Allo

cation

Estim

ate

d C

ost

Expend.

Upto

Marc

h '1

1

Outlay 1

1-1

2

Bala

nce

Expend.

during t

he y

ear

Cum

m.

Expend.

Till

date

Pla

n

Estim

ate

Tender

T.D

.C.

% p

rogre

ss-

Phy

% p

rogre

ss-

Fin Remarks/Status RE

80 36 L569

SE

R

Dy.C

ES

E/G

RC SER- Use of renewable

energy sources for

improving energy

efficiency and energy

conservation(Part of PB

264/10-11 264 of CR) 09-1

0

DF

- 3

22609 0

500

22109 0 0

Yes

Yes

Yes

31.3

.12 0

0.0

0 Stores:Requisitions for Solar Geyser Tender Case No.

43/11/5024 under process. & Solar LED street light sent to stores.

Contractual: Supply, erection and commissioning of solar power

plants of 10 KW awarded on 28.09.11to M/s Conergy, Hyderabad

(Cost 91 Lacs). LOA issued to Conergy Energy Systems(I) (P)

Ltd. value 90.13 lakh.

6580

81 36 L571

CK

P

Sr

DE

E/G Bondamunda Rly.

Complex- Rehabilitation

of existing 33 KV Power

Supply System.

11-1

2

DF

-2

24997 0

1000

23997 0 0

Yes

Yes

Due

31.1

2.1

2

0

0.0

0 Estimate vetted.Tender schedule under preparation. 1

2991139

755232

218668

2017884

98343

854152 422166

21 H:\CEE-DEC'11-Progress of all works.xls 21 of 34

Sl

No

Pla

n H

ead

PB

/ LB

NO

11-1

2

Div

n

Agency Name of Work

Yr.

of

sanction

Allo

cation

Estim

ate

d C

ost

Expend.

Upto

Marc

h '1

1

Outlay 1

1-1

2

Bala

nce

Expend.

during t

he y

ear

Cum

m.

Expend.

Till

date

Pla

n

Estim

ate

Tender

T.D

.C.

% p

rogre

ss-

Phy

% p

rogre

ss-

Fin Remarks/Status RE

1 42 P383

AD

A

CO

N Bokaro - Setting up of

Electric Loco Shed to

home 100 locos.

96-9

7

CA

P,C

F

422126

283034

53085

86007

56232

339266

Yes

Yes

Yes

31.3

.12

65 80 Civil:- 1) Auxiliary Shed:- Foundation, RCC flooring, Inspection

Pit, Column & Roof casting work completed. 2) Main Shed:- Work

is going on heavy & medium lifting bay. Foundation, RCC flooring,

Inspection Pit completed. 50% Column casting work of heavy &

medium lifting bay completed. 3) Service Building:- Ground floor

roof casting completed.1st floor casting completed. Sub-Station,

DG room & canteen completed. 4) ADMN Building:- Completed.

5) Shed for PWL- Construction yet to start. Electrical:- OHE-

Work completed. GS- Sub-station for power supply completed.

Contract ‘short closed’ as shed not ready. Tender for balance

work awarded to M/s Associated Engineers RNC. M&P:- All

Major items received. Pending major item- Lathe, Magnaflux M/c

for Coil Spring, Hydraulic Jack, Tan-Delta testing M/c, Surge

Comparison Tester, Lifting Tackle, Battery Charger, Oil Filtration

Plant, Demineralizing Plant. M/s. AVON crane have been advised

for installation of 50/6T EOT crane.

Constraints- Inadequate funds.

160000

2 42 P389

KG

P

CO

N Santragachi - Extension

of Elect. Loco Shed for

homing 50 locos

06-0

7

DF

-3

31826

15746

8326

7754

6035

21781

Yes

Yes

Yes

31.3

.12

95 68 All M&P items received.Civil contract terminated. Further

contract awarded to M/s Samir Bhuson Dutta, Kolkata on

28.02.2010. Balance work to be done 1) Construction of Toilet 2)

cable trenching of switch room, elecrical panel shifting. Crane

received but not commissioned.

8000

3 42 P392

CK

P

CO

N Bondamunda (Electric

Loco Shed)- Extension

at Chakradharpur end

by 28.5m to increase

loco holding to 175

09-1

0

CA

P

102120

10628

6085

85407

9813

20441

Yes

Yes

Yes

31.3

.13

45 20 Indent for Major M&P sent to COFMOW /COS on 31.5.10. Civil-

Contract awarded by Engg.Department. Electrical (General)- LOA

issued to M/s Hind Electric & for OHE LOA issued on M/s Electro

Engineers/Raipur on 31.03.11. Work started.

Constraints:Inadequate fund.

62000

22 H:\CEE-DEC'11-Progress of all works.xls 22 of 34

Sl

No

Pla

n H

ead

PB

/ LB

NO

11-1

2

Div

n

Agency Name of Work

Yr.

of

sanction

Allo

cation

Estim

ate

d C

ost

Expend.

Upto

Marc

h '1

1

Outlay 1

1-1

2

Bala

nce

Expend.

during t

he y

ear

Cum

m.

Expend.

Till

date

Pla

n

Estim

ate

Tender

T.D

.C.

% p

rogre

ss-

Phy

% p

rogre

ss-

Fin Remarks/Status RE

4 42 P395

CK

P

CO

N Tatanagar- Extension of

wheel shop at

centralised traction

repair centre

09-1

0

CA

P

59515

98

1085

58332

350

448

Yes

Yes

Due

31.0

3.1

3 5 0.8 Detailed Estimate sanctioned on 17.12.2009. CAO CON is not

calling the tender due to in-adequate funds. Earlier tender called

on 22.06.10 but discharged on 13.08.2010. Stores:CNC axle

turning lathe LOA issued by COFMOW. AT is pending for want of

fund. Other small items sent to COS on 25.6.10.

6500

5 42 P398

CK

P

CO

N Tatanagar (Electric

Loco Shed):Extension

of heavy & lightlifting

bay and creation of

maintenance facilities

for horning of WAG-9

locos.

10-1

1

CA

P

96701 0

2585

94116 0 0

Yes

Yes

Due

31.0

3.1

3 5 0 Detailed estimate sanctioned on 09.03.11.Tender fro Engg works

opened on 03.11.11. Electrical tender schedule under

preparation. If Civil tender is decided within Jan,'12, Rs 1 Cr. may

be booked & for Electrical about Rs 12 lacs.

Constraints:Inadequate fund.

10000

6 42 P399

KG

P

CO

N Tikiapara - Extension of

inspection/stabling pit,

covered shed with

lighting arrangement

and modification of car

shed for maintenance of

12-car rakes.

10-1

1

DF

-3

63927 0

6357

57570 0

Yes

Yes

Due

31.0

3.1

3 5 0 Engineering contract awarded for shed. The P-way works are yet

to be finalised.10000

7 42 L597

KG

P

Dy.C

EE

(WS

) Kharagpur Workshop-

Retrofitment of existing

energy with shed

efficient lighting.

08-0

9

DR

F

3633

1153

1600

880 0

1153

Yes

Yes

Yes

31.3

.12

45

31.7

4 Stores- Requision (9182009046, dt 20.01.09) for 1 X 28 W

TL(Tender Case No.S/42095002) pending with COS.

Contractual- LOA issued on 09.4.09. Contractor part of supply &

erection is completed but balance work is waiting for supply of

material through stores.

900

23 H:\CEE-DEC'11-Progress of all works.xls 23 of 34

Sl

No

Pla

n H

ead

PB

/ LB

NO

11-1

2

Div

n

Agency Name of Work

Yr.

of

sanction

Allo

cation

Estim

ate

d C

ost

Expend.

Upto

Marc

h '1

1

Outlay 1

1-1

2

Bala

nce

Expend.

during t

he y

ear

Cum

m.

Expend.

Till

date

Pla

n

Estim

ate

Tender

T.D

.C.

% p

rogre

ss-

Phy

% p

rogre

ss-

Fin Remarks/Status RE

779848

310659

79123

390066

72430

383089 257400

1 52 L619

AD

A

Sr.

DE

E/G Bokaro Steel City -

Rewiring of staff

quarters at settlement

(Qrs considered - Type-I

575 nos, Type-II 250

nos, Type-III 30 nos and

Type-IV 8 nos = Total

863 nos)

09-1

0

DR

F

9499

446

2000

7053 0

446

Yes

Yes

Due

31.1

2.1

2

30

4.7

0 Contractual- .LOA issued to M/s. Associated Engineers, RNC

on 29.08.11. Stotres: Indent for XL PE Cable 4X16X2675 mtr.

P.O. issued . D.P. - 26.01.2012.

2500

2 52 L620

AD

A

Sr.

DE

E/G Adra - Rewiring of staff

quarters at settlement

(Qrs considered - Type-I

500 nos, Type-II 320

nos, Type-III 30 nos and

Type-IV 10 nos = Total

860 nos)

09-1

0

DR

F

9498

456

2000

7042 0

456

Yes

Yes

Due

31.1

2.1

2

30

10.0

0 Stores- Transformers 2 X 250KVA received on 1.2.11. Revised

estimate sanctioned on 7.2.11. Contractual- LOA issued to M/s.

R..S.Engg., BQA on 29.08.11.

2500

3 52 L621

AD

A

Sr.

DE

E/G Rewiring of staff

quarters of Adra division

except ADA & BKSC

(Qrs considered - Type-I

600 nos, Type-II 250

nos & Type-III 25 nos =

Total 875 nos)

09-1

0

DR

F

9499

446

2000

7053

446

892

Yes

Yes

Due

31.1

2.1

2

30

9.3

9 Stores: XLPE cable 600 mtrs. P.O. issued . DP extended up to

31.12.11. Contractural: Re-tender opned on 21.10.11. T.C.

finalized on 03.01.12.

500

24 H:\CEE-DEC'11-Progress of all works.xls 24 of 34

Sl

No

Pla

n H

ead

PB

/ LB

NO

11-1

2

Div

n

Agency Name of Work

Yr.

of

sanction

Allo

cation

Estim

ate

d C

ost

Expend.

Upto

Marc

h '1

1

Outlay 1

1-1

2

Bala

nce

Expend.

during t

he y

ear

Cum

m.

Expend.

Till

date

Pla

n

Estim

ate

Tender

T.D

.C.

% p

rogre

ss-

Phy

% p

rogre

ss-

Fin Remarks/Status RE

4 52 L633

AD

A

Sr.

DE

E/G Adra Divn.-

Rehabilitation of street

lighting arrangement of

Bokaro steel city, Anara,

Purulia, Bhojudih,

Bankura, Mohuda,

Bhaga, Damodar

09-1

0

DR

F

7840

1044

2000

4796

456

1500

Yes

Yes

Yes

31.1

2.1

2

30

19.1

3 Stores- 550 nos. have been supplied. 1450 nos. will be supplied

within D.P. - 25.01.12. . Contractual- Works tender awarded on

13.8.10. Materials received. CFL fittings 85Watt fitted at BQA -

50Nos, ANR- 80Nos, DMA- 20Nos, BJE- 140Nos, VAA, MHQ &

PRR- 50Nos.

1500

5 52 L635

AD

A

Sr.

DE

E/G Adra division-

Augmentation of water

supply at various pump

houses.

08-0

9

DF

(2)

6955 0

200

6755

399

399

Yes

Yes

Due

31.3

.13

35

5.7

4 Detail estimate revised and sanctioned on on 14.02.11. Stores - 4

nos. sub-pump received on 21.04.11 & 6 nos. received and bill

psssed on 12.09.11. Balance 7 nos. case No. S/65/11/5017. P.O.

issued. D.P - 31.08.12. XLPE cable 3X6X2500 mtrs. Tender case

No. S/40/11/5088 under process.

2500

6 52 L653

CK

P

Sr.

DE

E/G Chakradharpur Railway

complex - Improvement

of street lights and

proposed park for RE

colony.

08-0

9

DF

(2)

3227

871

2356

2377

2377

Yes

Yes

Yes

31.0

3.1

3

95

73.6

6 Stores: All materials received at divisional level. Contractual:

Work awarded to M/s.Santosh Dodrajka, Chaibasa on 22.1.10.

Cable laying completed. 110Nos poles erected. 550Nos fittings

erected.

600

7 52 L654

CK

P

Sr.

DE

E/G Tatanagar: Model

Colony- Improvement of

Power supply & street

light illumination of

BAGBERA colony.

08-0

9

DF

-2

3504

1412

300

1792

457

1869

Yes

Yes

Yes

31.3

,12

55

53.3

4 Stores: All cables received.. Contractual: Work awarded to

M/s.Santosh Dodrajka, Chaibasa on 22.1.10.2492

25 H:\CEE-DEC'11-Progress of all works.xls 25 of 34

Sl

No

Pla

n H

ead

PB

/ LB

NO

11-1

2

Div

n

Agency Name of Work

Yr.

of

sanction

Allo

cation

Estim

ate

d C

ost

Expend.

Upto

Marc

h '1

1

Outlay 1

1-1

2

Bala

nce

Expend.

during t

he y

ear

Cum

m.

Expend.

Till

date

Pla

n

Estim

ate

Tender

T.D

.C.

% p

rogre

ss-

Phy

% p

rogre

ss-

Fin Remarks/Status RE

8 52 L656

CK

P

Sr.

DE

E/G Tatanagar &

Chakradharpur -

Rewiring of staff qrs.

(Qrs considered - Type-I

650 nos, Type-II 300

nos, Type-III 100 nos

and Type-IV 50 nos =

Total 1100 nos)

09-1

0

DR

F

9747

4328

2000

3419

4088

8416

Yes

Yes

Yes

31.1

2.1

1

90%

86.3

4 Contractual- LOA issued to M/s.Ganapati Colour Lab/

Jamshedpur on 8.9.10. Work done for quarters at TATA-370 &

CKP-250.No Stores.

5419

9 52 L657

CK

P

Sr.

DE

E/G Bondamunda, Rourkela

& Jharsuguda -Rewiring

of staff qrs.(Qrs

considered - Type-I 400

nos, Type-II 185 nos,

Type-III 100 nos and

Type-IV 30 nos = Total

715 nos)

09-1

0

DR

F

9062

800

500

7762

441

1241

Yes

Yes

Yes

31.0

3.1

2 5

13.6

9 Contractual- LOA issued to M/s.Ganapati Colour Lab/

Jamshedpur on 08.9.10. JSG and ROU 50 NOS completed. No

Stores.

8262

10 52 L

663 KG

P

Sr.

DE

E/G Kharagpur division- Re-

wiring of staff qrs. at

North Settlement

08-0

9

DR

F

17092

7846

2000

7246

4569

12415

Yes

Yes

Yes

31.3

.12

99

72.6

4 Contractual- Tender floated in three parts. Part 'A' - LOA issued

on 24.07 09, Part 'B'- LOA issued on 16.09. 09 .Part "C'- LOA

issued on 29.7.09. 1093 (o/o 1100) Qtrs.has been completed.

8569

11 52 L

664 KG

P

Sr.

DE

E/G Tikiapara, Santragachi

& Shalimar - Re-wiring

of staff QR.(750).

08-0

9

DR

F

10280

7240

1500

1540 0

7240

Yes

Yes

Yes

31.0

3.1

2

75

70.4

3 Contractual- LOA issued on 1.4.09 to M/s Bharat Electric Works.

Work started on 30.4.09. Rewiring completed on480quarters (o/o

750)

3000

26 H:\CEE-DEC'11-Progress of all works.xls 26 of 34

Sl

No

Pla

n H

ead

PB

/ LB

NO

11-1

2

Div

n

Agency Name of Work

Yr.

of

sanction

Allo

cation

Estim

ate

d C

ost

Expend.

Upto

Marc

h '1

1

Outlay 1

1-1

2

Bala

nce

Expend.

during t

he y

ear

Cum

m.

Expend.

Till

date

Pla

n

Estim

ate

Tender

T.D

.C.

% p

rogre

ss-

Phy

% p

rogre

ss-

Fin Remarks/Status RE

12 52 L

665 KG

P

Sr.

DE

E/G Kharagpur division - Re-

wiring of staff quarters

at wayside station(20

stations). 904 Qtrs

08-0

9

DR

F

12681

7140

2000

3541

869

8009

Yes

Yes

Yes

31.3

.12

65

63.1

6 Contractual- LOA issued on 14.9.09 to M/s Young Unemployed.

(Rs 113.91 Lacs). Material supplied. Re-wiring completed on 808

Qrs (out of 904).

2869

13 52 L666

KG

P

Sr.

DE

E/G Kharagpur - Provision of

bed lift at SERLy.

Hospital.

08-0

9

DF

-2

3684

1750

600

1334

100

1850

Yes

Yes

Yes

31.3

.12

50

50.2

2 Contractual- LOA issued- 02.6.09. Material supplied. Site

finalised.2000

14 52 L670

KG

P

Sr.

DE

E/G Kharagpur-Rewiring of

staff quarters under

SSE(N)- Quarters

considered (Ty-I 400

nos Ty-II- 100 nos, Ty-

III-25 nos & Ty-IV-15

nos. Total 540 Nos.

09-1

0

DR

F

9001

188

1000

7813 0

188

Yes

Yes

Yes

31.3

.12 0

2.0

9 Contractual- Re-tender opened. LOA issued. 4000

15 52 L671

KG

P

Sr.

DE

E/G Kharagpur-

Improvement of street

light at North settlement

by providing energy

efficient fittings.

09-1

0

DR

F

8884

18

1000

7866 0

18

Yes

Yes

Yes

31.3

.12 0

0.2

0 Contractual- T/opened- 4.2.11. Under TC. 1000

27 H:\CEE-DEC'11-Progress of all works.xls 27 of 34

Sl

No

Pla

n H

ead

PB

/ LB

NO

11-1

2

Div

n

Agency Name of Work

Yr.

of

sanction

Allo

cation

Estim

ate

d C

ost

Expend.

Upto

Marc

h '1

1

Outlay 1

1-1

2

Bala

nce

Expend.

during t

he y

ear

Cum

m.

Expend.

Till

date

Pla

n

Estim

ate

Tender

T.D

.C.

% p

rogre

ss-

Phy

% p

rogre

ss-

Fin Remarks/Status RE

16 52 L672

KG

P

Sr.

DE

E/G Kharagpur-Rewiring of

staff quarters under

SSE(S). Quarters

cosnidered Type-I-150

nos. Type-II-150 nos.,

Type-III-100 nos. &

Type-IV-100 nos. Total

500 nos.

09-1

0

DR

F

9824

70

1000

8754

3219

3289

Yes

Yes

Yes

31.3

.12

25

33.4

8 Contractual- LOA issued on 27.10.10 on M/S R.S.System.124

Qrs completed.5219

17 52 L673

KG

P

Sr.

DE

E/G Rewiring of staff

quarters at Tikiapara,

Santragachi & Shalimar.

Quarters considered

Type-I-400 nos., Type-II-

100 nos., Type-III-25

nos. & Type-IV-15 nos.

Total = 540 Nos.

09-1

0

DR

F

9001 6

1000

7995 0 6

Yes

Yes

Due

31.3

.12 0

0.0

7 Contractual- T/opened- 12.5.10, but discharged. Retender

opened on 08.06.11. under T.C.1000

28 H:\CEE-DEC'11-Progress of all works.xls 28 of 34

Sl

No

Pla

n H

ead

PB

/ LB

NO

11-1

2

Div

n

Agency Name of Work

Yr.

of

sanction

Allo

cation

Estim

ate

d C

ost

Expend.

Upto

Marc

h '1

1

Outlay 1

1-1

2

Bala

nce

Expend.

during t

he y

ear

Cum

m.

Expend.

Till

date

Pla

n

Estim

ate

Tender

T.D

.C.

% p

rogre

ss-

Phy

% p

rogre

ss-

Fin Remarks/Status RE

18 52 L674

KG

P

Sr.

DE

E/G Kharagpur divn -

Rewiring of staff

quarters at Wayside

stations (Excluding

TPKR, SRC, SHM,

ADL, BVA, BZN, KPE,

HLZ, TMZ, HAUR, BCK,

MDN, BLS, GII, CNT,

MCA, DTE & BOP)

(Qrs. considered- Ty-I-

400 no, Ty-II-100 no, Ty-

III-25 no. & Ty-IV-15 no.

Total-540 Nos.

09-1

0

DR

F

9001 0

1000

8001 0 0

Yes

Due

Due

31.3

.13 0

0.0

0 Tender discharged. Retender opened on 08.06.11.Under TC. 1000

19 52 L679

KG

P(W

)

DY

.CE

E(W

) KGP(W) - Augmentation

of power suppl in

connection with

augmentation of

pumping arrangement

at A,B & C reservoir.

09-1

0

DF

(2)

9229 0

300

8929 0 0

Yes

Due

Due

31.3

.13 0

0.0

0 Detailed estimate under preparation. 1

20 52 L690

RN

C

Sr.

DE

E/G RNC- Re-wiring of of

500 Nos. Qtrs. (Type I,

II & III)

09-1

0

DR

F

8242

2004

1400

4838

1279

3283

Yes

Yes

Yes

31.3

.12

10

39.8

3 LOA issued to M/s Associated Engineers/RNC on 2.8.10.

Materials supplied partially. 350 Qrs completed. 4961

29 H:\CEE-DEC'11-Progress of all works.xls 29 of 34

Sl

No

Pla

n H

ead

PB

/ LB

NO

11-1

2

Div

n

Agency Name of Work

Yr.

of

sanction

Allo

cation

Estim

ate

d C

ost

Expend.

Upto

Marc

h '1

1

Outlay 1

1-1

2

Bala

nce

Expend.

during t

he y

ear

Cum

m.

Expend.

Till

date

Pla

n

Estim

ate

Tender

T.D

.C.

% p

rogre

ss-

Phy

% p

rogre

ss-

Fin Remarks/Status RE

21 52 L691

GR

C

AD

EE

/G Garden Reach -

Replacement of the

existing Elecric Traction

Passenger Lifts intalled

at various

service/Residential

buildings of S.E.Railway

(old Hospital lift, GFM 1

& 2, Block 19-1

09-1

0

DR

F

8262

5156

3106 0 0

5156

Yes

Yes

Yes

30.6

.12 0

62.4

1 Contractual- Materials received on 11.11.2010 (Execution PDC-

31.01.11) LOA issued to M/s Schindler India Pvt Ltd.). ( Work

required for lift well at GFM 1 & 2 and Hospital. DEN/GRC yet to

submit his estimate.Work completed at Block No-19 & hospital.

3106

22 52 L692

GR

C

AD

EE

/G Garden Reach -

Rewiring of Type-I -

237 unit, Type-IV-75

units, Type-V-57 units of

staff quarters and

replacement of high

power consuming street

light fittings by energy

efficient T-5 fittings.

09-1

0

DR

F

8795 0

1000

7795 0 0

Yes

Yes

Due

31.3

.13 0

0.0

0 Tender opened on 16.02.11. Tender discharged. Re-tender

schedule under vetting.1

23 52 L693

GR

C

AD

EE

/G Garden Reach -

Replacement of over

aged equipments

(HT/LT power supply

arrangement) at railway

complex.

09-1

0

DR

F

9032 0

1000

8032 0 0

Yes

Yes

Yes

31.3

.12 0

0.0

0 LOA issued on 15.02.11 amounting to Rs 7379876/- to M/s J.K.

Enterprise. Drg. Approved on 28.11.11.563

30 H:\CEE-DEC'11-Progress of all works.xls 30 of 34

Sl

No

Pla

n H

ead

PB

/ LB

NO

11-1

2

Div

n

Agency Name of Work

Yr.

of

sanction

Allo

cation

Estim

ate

d C

ost

Expend.

Upto

Marc

h '1

1

Outlay 1

1-1

2

Bala

nce

Expend.

during t

he y

ear

Cum

m.

Expend.

Till

date

Pla

n

Estim

ate

Tender

T.D

.C.

% p

rogre

ss-

Phy

% p

rogre

ss-

Fin Remarks/Status RE

24 52 L700

GR

C

AD

EE

/G GRC- Execution of

electrical renovation

work & provision of

furniture for all units in

Transit Block North

Colony.09-1

0

DR

F

4591

889

1000

2702 0

889

Yes

Yes

Yes

31.3

.12

50

19.3

6 Electrical work completed. 1

25 52 L709

GR

C

AD

EE

/G GRC- Repl. of Central

AC Plant alongwith

accessories by 1 X 110

TR capacity Central AC

Plant including

replacement and

relocation of the existing

Cooling towers at

Central Hospital.

11-1

2

DR

F

5135 0

100

5035 0 0

Yes

Due

Due

31.3

.13

0.0

0 Detail estimate under preparation. 1211565

41239

30877

139449

18700

59939 63564

1 53 P

435

RN

C,

KG

P

Sr.

DE

E/G South Eastern Railway-

Escalators at major

stations (4 nos.) (2

station)

08-0

9

DF

-1

28000 0

8000

20000 0

Yes

Yes

No

31.0

3.1

3 0 0 RNC- Estimate sanctioned. Vetted indents (6509.5084) (2 Nos)

sent to COS. KGP- estimate sanctioned. Requisition No.

1661509088 dtd.30.10.09, 2 Nos. Tender Case for procurement

of 100 Escalators under finalisation at Rly. Bd.Tender is under TC

Constraints: Being procured by Board.(K-40,00, R-16145)

4000

31 H:\CEE-DEC'11-Progress of all works.xls 31 of 34

Sl

No

Pla

n H

ead

PB

/ LB

NO

11-1

2

Div

n

Agency Name of Work

Yr.

of

sanction

Allo

cation

Estim

ate

d C

ost

Expend.

Upto

Marc

h '1

1

Outlay 1

1-1

2

Bala

nce

Expend.

during t

he y

ear

Cum

m.

Expend.

Till

date

Pla

n

Estim

ate

Tender

T.D

.C.

% p

rogre

ss-

Phy

% p

rogre

ss-

Fin Remarks/Status RE

1 64 P448

CK

P

CO

N Tatanagar - 200

bedded hostel building

at Electric Loco Training

Centre.

06-0

7

DF

-3

38021

38486

100

-565 0

38486

Yes

Yes

Yes

Com

ple

ted

100

101.2

2 Work completed & handed over to Principal for

accomodation of trainees.00,00

2 64 P449

CK

P,A

DA

Sr.

DE

N(C

o) Banspani, Anara,

Chakradharpur &

Rourkela: Upgradation

of running room.

06-0

7

CA

P

36516

21515

8000

7001 0

21515

Yes

Yes

Yes

31.7

.11

90

58.9

2 Banspani: Work completed. Anara: Work completed.

Chakradharpur: Work completed. Rourkela: Drawing approved.

LOA issued to M/s Singh & Sons/ Bondamunda on 27.1.10;

Progress - 60% Constraints:

Engg. Work at Rourkela.

3 64 P451

CK

P

CO

N Tatanagar(Electrical

Loco Training Centre) -

200 bedded new hostel

building(2nd wing)

09-1

0

DF

-3

68404

2133

5000

61271 0

2133

Yes

Yes

No

31.0

3.1

3

20

3.1

2 Composite re-tender under process. Tender for power supply and

street lighting awarded 28.11.11. Indent placed for training aid

items through COS/Spot purchase committee.

3500

4 64 L738

CK

P

Sr.

DE

E/G CKP Divn. - Rewiring of

service building at CKP

& TATA section.

09-1

0

DR

F

7949 0

500

7449 0 0

Yes

Yes

Due

31.3

.12 10

0.0

0 No Stores.LOA issued to ESEM/Dhanbad for SNY & Tata on

12.5.11.Work in progress. 7949

5 64 L739

CK

P

Sr.

DE

E/G CKP Divn. - Rewiring of

service building at

Bondamunda &

Rourkela section.

09-1

0

DR

F

6957 0

400

6557 0 0

Yes

Yes

Due

31.3

.12 0

0.0

0 No Stores.LOA issued to M/S Sunaina cons. On 19.7.11.One part

tender opened on 20.10.11. 6957

6 64 L762

KG

P

Sr.

DE

E/G KGP- Re-wiring and

supply rehabilitation of

DRM building.

09-1

0

DR

F

7016

161

500

6355 0

2161

Yes

Yes

Yes

31.3

.12 0

30.8

0 LOA issued on 20.5.11.Work in progress. 2000

32 H:\CEE-DEC'11-Progress of all works.xls 32 of 34

Sl

No

Pla

n H

ead

PB

/ LB

NO

11-1

2

Div

n

Agency Name of Work

Yr.

of

sanction

Allo

cation

Estim

ate

d C

ost

Expend.

Upto

Marc

h '1

1

Outlay 1

1-1

2

Bala

nce

Expend.

during t

he y

ear

Cum

m.

Expend.

Till

date

Pla

n

Estim

ate

Tender

T.D

.C.

% p

rogre

ss-

Phy

% p

rogre

ss-

Fin Remarks/Status RE

7 64 L770

GR

C

AD

EE

/G Garden Reach-

Rewiring of service

building NAB 3rd & 4th

floor and replacement of

40 watt FL fitting by

energy efficient tube

light fitting of NAB & GM

building and

Upgradation of street

light with energy

efficient fitting at GRC

Rly.Complex.

08-0

9

DR

F

4431

1472

1000

1959 0

1472

Yes

Yes

Due

31.3

.12 75

33.2

2 Stores- Requns for 1) 25 sqmm x 3.5 core Al XLPE cable of

750m (1661508047, dt 18.4.08), of 800m (1664008051, dt

25.10.08), of 900m (1667208035, dt 21.8.08); 2) 70 sqmm x 3.5

core Al XLPE cable of 500m (1661508045, dt 18.4.08) & 3)

Ceiling Fan for 400 nos (166400004, dt 15.5.08) at COS.

Contractual- LOA issued to M/s Sreeguru Electrics on 25.1.09.

Rewiring of 4th floor completed, Street Light with energy efficient

fittings completed. Contractor abandoned the work after May'09.

Revised estimate prepared (5142 thousand). Final variation

statement under vetting.

100

8 64 L786

GR

C

AD

EE

/G Repl. of the existing 2

nos old Electric Traction

Passenger lift installed

at GM's office building

(Lift No 481838 &

267536) of S.E. Railway

Complex, Garden

Reach.

10-1

1

DR

F

3672 0

200

3472 0 0

Yes

Yes

Yes

31.3

.12 0

0.0

0 Detailed estimate sanctioned. Requisitions under preparation. 1

9 64 L64/

788 GR

C

AD

EE

/G Garden Reach: (a)

Renovation of Traffic

Accounts Office

Building. (b) Rewiring of

1st & 2nd floor of

Traffice Accounts

Building.

DF

-3

2510

2000

510 0 0

2000

Yes

Yes

Yes

31.3

.12

79.6

8 Works in progress.

33 H:\CEE-DEC'11-Progress of all works.xls 33 of 34

Sl

No

Pla

n H

ead

PB

/ LB

NO

11-1

2

Div

n

Agency Name of Work

Yr.

of

sanction

Allo

cation

Estim

ate

d C

ost

Expend.

Upto

Marc

h '1

1

Outlay 1

1-1

2

Bala

nce

Expend.

during t

he y

ear

Cum

m.

Expend.

Till

date

Pla

n

Estim

ate

Tender

T.D

.C.

% p

rogre

ss-

Phy

% p

rogre

ss-

Fin Remarks/Status RE

DR

F

836

532

304

0 0 532 6

4

176312

66299

16514

93499 0

68299 20507

G TOTAL

4314423

1188053

402419

2697798

201488

1392118 801961