CEC/ICMC 2015, Tucson Anatoly Zhirnov, DESY presented by Anatoly Zhirnov, DESY, MKS With a huge appreciation to colleagues from INP-PAS (Poland), WUT (Poland), BINP (Russia) and other DESY groups for joint fruitful work during AMTF test activity Experience with cryogenic operation of Accelerator Module Test Facility during testing of one third of XFEL cryomodules V. Anashin 3 , L. Belova 3 , Y. Bozhko 1 , K. Escherich 1 , B. Petersen 1 , S. Putselyk 1 , E. Pyata 3 , T. Schnautz 1 , J. Swierblewski 2 , A. Zhirnov 1 1 Deutsches Elektronen-Synchrotron (DESY), Notkestrasse 85, 22607 Hamburg, Germany 2 Institute of Nuclear Physics (INP), Polish Academy of Sciences (PAS), 31- 342 Krakow, Poland 3 Budker Institute of Nuclear Physics (BINP), Russian Academy of Science, Novosibirsk, 630090, Russia CEC/ICMC 2015

CEC/ICMC 2015, Tucson Anatoly Zhirnov, DESY presented by Anatoly Zhirnov, DESY, MKS With a huge appreciation to colleagues from INP-PAS (Poland), WUT (Poland),

Embed Size (px)

Citation preview

Page 1: CEC/ICMC 2015, Tucson Anatoly Zhirnov, DESY presented by Anatoly Zhirnov, DESY, MKS With a huge appreciation to colleagues from INP-PAS (Poland), WUT (Poland),

CEC/ICMC 2015, TucsonAnatoly Zhirnov, DESY

presented by Anatoly Zhirnov, DESY, MKS

With a huge appreciation to colleagues from INP-PAS (Poland), WUT (Poland), BINP (Russia) and other DESY groups for joint fruitful work during AMTF test activity

Experience with cryogenic operation of Accelerator Module Test Facility during testing of one third of XFEL cryomodules

V. Anashin3, L. Belova3, Y. Bozhko1, K. Escherich1, B. Petersen1, S. Putselyk1, E. Pyata3, T. Schnautz1, J. Swierblewski2, A. Zhirnov1

1Deutsches Elektronen-Synchrotron (DESY), Notkestrasse 85, 22607 Hamburg, Germany2Institute of Nuclear Physics (INP), Polish Academy of Sciences (PAS), 31-342 Krakow, Poland3Budker Institute of Nuclear Physics (BINP), Russian Academy of Science, Novosibirsk, 630090, Russia

CEC/ICMC 2015

Page 2: CEC/ICMC 2015, Tucson Anatoly Zhirnov, DESY presented by Anatoly Zhirnov, DESY, MKS With a huge appreciation to colleagues from INP-PAS (Poland), WUT (Poland),

- Complete cold performance tests of all XFEL cryomodules before tunnel installation (RF measurements, vacuum check, cryo-losses)

103 cryomodules, rate: 1cryomodule/week

- Cold RF tests of all XFEL superconducting cavities before cryomodule assembly 824 cavities, rate: 6 cavities/week

- Cold tests of all superconducting magnet packages before cryomodule assembly 103 magnets, rate: 1magnet/week

AMTF: purpose & objectives (TDR)

CEC/ICMC 2015, TucsonAnatoly Zhirnov, DESY

2

Page 3: CEC/ICMC 2015, Tucson Anatoly Zhirnov, DESY presented by Anatoly Zhirnov, DESY, MKS With a huge appreciation to colleagues from INP-PAS (Poland), WUT (Poland),

AMTF Hall – Cavities and Cryomodules

CEC/ICMC 2015, TucsonAnatoly Zhirnov, DESY

3

Vertical Cryostat Radiation protection shielding Cavity preparation area

Unloading of the cryomodule after transport

Cryomodule preparation area XATB – module inside radiation protection shielding

Page 4: CEC/ICMC 2015, Tucson Anatoly Zhirnov, DESY presented by Anatoly Zhirnov, DESY, MKS With a huge appreciation to colleagues from INP-PAS (Poland), WUT (Poland),

AMTF – cryogenics contributions

CEC/ICMC 2015, TucsonAnatoly Zhirnov, DESY

4

Red = Wroclaw University of Technology+Kriosystem, Poland (in-kind)

Blue = DESY MKS acting for XFEL company (no in-kind!)

-> DeMaCo, Netherlands

Green= Budker Institute of Nuclear Physics, Russia (in-kind)

AMTF – cryogenics contributions

Page 5: CEC/ICMC 2015, Tucson Anatoly Zhirnov, DESY presented by Anatoly Zhirnov, DESY, MKS With a huge appreciation to colleagues from INP-PAS (Poland), WUT (Poland),

Helium compressors (DESY in-kind)

CEC/ICMC 2015, TucsonAnatoly Zhirnov, DESY

5

2 sets of compressors for 2K operation at AMTF ( 2 x 20 g/s helium at 20 mbar)

1 set = 12 x parallel pump stations (WS 2001 RUVAC roots vacuum pump + SOGEVAC SV750B rotary vane vacuum pump)

– simple, modular, redundant

In average: about 8000 h operation (status June 2015)

Manufacturer: Oerlikon Leybold

SOGEVAC

RUVAC

Page 6: CEC/ICMC 2015, Tucson Anatoly Zhirnov, DESY presented by Anatoly Zhirnov, DESY, MKS With a huge appreciation to colleagues from INP-PAS (Poland), WUT (Poland),

AMTF Vertical Cryostats

CEC/ICMC 2015, TucsonAnatoly Zhirnov, DESY

Concrete cylinder 140mm thick

Vacuum vessel

Thermal shield

LHe vessel

Stainless steel ring 30mm thickConcrete floor

Soil

Warm magneticshields

PVC pipe DN200

Support

Concrete

~

A-A

The lowestradiation shield

Cold magneticshield (MHF-sl)

Cold magneticshield (MKS1)

Space for heaters

Vacuum lid Vacuum flange

max.Ø

3xM20

Ø

Ø

Ø

min

.

Water drain pipe DN100(PVC or stainless steel)

~

6

SPEC DESY

April 2009

Design & Construction

WUT&Kriosystem

Delivery & installation:

July 2012 – April 2013

Cavity Frame Design:

DESY FLA

6 inserts for AMTF

Page 7: CEC/ICMC 2015, Tucson Anatoly Zhirnov, DESY presented by Anatoly Zhirnov, DESY, MKS With a huge appreciation to colleagues from INP-PAS (Poland), WUT (Poland),

CEC/ICMC 2015, TucsonAnatoly Zhirnov, DESY

7

Spec DESY (February 2010) Design, Construction, Installation: BINP

First test stand delivered & installed May 2013 (cold commissioning July 2013)

Cold commissioning of 3rd test stand December 2013

2 cryostat adapters for the test of single dressed cavities at AMTF

AMTF:3 cryomodule test stands & cryostat adapters

Page 8: CEC/ICMC 2015, Tucson Anatoly Zhirnov, DESY presented by Anatoly Zhirnov, DESY, MKS With a huge appreciation to colleagues from INP-PAS (Poland), WUT (Poland),

CEC/ICMC 2015, TucsonAnatoly Zhirnov, DESY

8

L Helium Dewar XASTValve Box XAVBSub-Cooler Box XASB

DESY is acting for XFEL company

Manufacturer: DeMaCO

Wessington Cryogenics Ltd, UK

XASB, XAVB, XAST

Page 9: CEC/ICMC 2015, Tucson Anatoly Zhirnov, DESY presented by Anatoly Zhirnov, DESY, MKS With a huge appreciation to colleagues from INP-PAS (Poland), WUT (Poland),

Cryogenic operation of AMTF

CEC/ICMC 2015, TucsonAnatoly Zhirnov, DESY

9

Supplied by HERA helium refrigerator.

33 g/s of LHe and cooling capacities of about 3 kW at 40/80K, 0.5 kW at 4.5K.

Modular structure - independent operation of test stands from each other.

Buffering of extra liquefaction in 10000 ltr liquid helium storage dewar (XAST).

Missing of air condensation on cryogenic valves during exchange of modules or cavities.

Capacity limits – return gas peak, screw compressor capacity during cool down/warm-up, 2 dynamic procedures in parallel.

XATC1, XATC2Manual pump and purgeCool-down to 4K, liquid helium transfer and warm-up in automatic mode Manual pump-down to 2K

XATB1, XATB2, XATB3Manual pump and purge

Mainly automatically warm-up,

Cool-down partially in automatic mode

Cool down and Warm up

Page 10: CEC/ICMC 2015, Tucson Anatoly Zhirnov, DESY presented by Anatoly Zhirnov, DESY, MKS With a huge appreciation to colleagues from INP-PAS (Poland), WUT (Poland),

Main Cryo Operation Problems in AMTF

CEC/ICMC 2015, TucsonAnatoly Zhirnov, DESY

10

Serial tests with installation work and commissioning at the same time

Mixing of warm&cold gas for controlled cool-down/warm up

LHe level measurements affected by electrical heaters

2K supply JT-valve in module test stand 3 (XATB3) out of shape

Misalignment of process tube flanges (feed-caps) -> install adapters

“Digital ” operation of valve positioners -> change type of positioners

Some cold and warm valves have leakages over the seats as well as jerk movement of valve stems

Bad thermal contacts of some electrical heaters -> use of other heater type

Liquid level measurements -> increase current

Mix-up of thermometers (calibration) -> try to sort, some re-calibration

Page 11: CEC/ICMC 2015, Tucson Anatoly Zhirnov, DESY presented by Anatoly Zhirnov, DESY, MKS With a huge appreciation to colleagues from INP-PAS (Poland), WUT (Poland),

CEC/ICMC 2015, TucsonAnatoly Zhirnov, DESY

11

All superconducting magnets are tested!

In total, 720 Cavity Tests were performed on vertical cryostats.

Specified test rate of accelerator module is reached !

Total heat load (static+dynamic) in line with budget.

Near all results above XFEL specification: accelerating gradient 23.6 MV/m cavity quality factor Q0 =1010 at 23.6 MV/m

Commissioning of two other test benches

Leakage of some modules

Summary of preliminary results (status May 2015)

Page 12: CEC/ICMC 2015, Tucson Anatoly Zhirnov, DESY presented by Anatoly Zhirnov, DESY, MKS With a huge appreciation to colleagues from INP-PAS (Poland), WUT (Poland),

Deliveries & installation of XATCs,XASB,XAVB,XATL were “just-in-time“ for start-up of cavity production

Deliveries & installation of XATBs were “just-in-time“ for start-up of cryomodule production

No dedicated debugging of cryo-supply and other systems

XATCs design capacities demonstrated

Complexity of XATBs commissioning underestimated

General effort for installation & commissioning underestimated

1 cryomodule test/week is reached (further ramping-up rate is under investigation)

So far: in budget and almost “in time“ (not “on schedule“)

Some preliminary conclusions

CEC/ICMC 2015, TucsonAnatoly Zhirnov, DESY

12

Page 13: CEC/ICMC 2015, Tucson Anatoly Zhirnov, DESY presented by Anatoly Zhirnov, DESY, MKS With a huge appreciation to colleagues from INP-PAS (Poland), WUT (Poland),

CEC/ICMC 2015, TucsonAnatoly Zhirnov, DESY

13

Thank you for your attention !