CDM 2015
Principal Duties
A Practical Approach
About me…
Before I start the legal bit…
CDM 2015 – A Brief Overview
The Principal Designer
Who is the Principal Designer
The Principal Designer
is appointed by the Client in writing
must have control over the pre-construction phase
can be an individual or organizational
must have the relevant skills, knowledge and experience as an individual
or organization
is a designer
Policy and Procedure
Good Practice
Scope of services
Good Practice
Key Principal Designer
Duties
1. Plan, manage and monitor
the pre-construction phase
2. Assist the Client with
preparing the pre-construction
information document
3. Provide the PCI to every
Designer and Contractor
4. Eliminate foreseeable risks
5. Ensure other designer
comply with Reg 9 – Designer
Duties
Assist the Client with preparing
the pre-construction
information document
Provide the PCI to every
Designer and Contractor
Eliminate foreseeable risks to
health or safety of any person
During the
construction
Building
Maintenance
Building
used as a
workplace
Key Word
Safety
Key Word
Health
Ensure other designer comply
with Reg 9 – Designer Duties
Some examples:
Should the designer
have specified a
construction method or
is the Principal
Contractor not working
safely?
Poor design practice: an
AC condenser placed
over a fire exit
Who is responsible for
design? PD or M&E
designer? What of PD
missed the design fault?
Parapet wall 300mm
Mansafe system
Door opening outwards onto wall
Roof Access
Not installed
correctly onsite?
Parapet wall 300mm
Mansafe system
Door opening outwards onto wall
Roof Access
Client to manage?
Good design practice:
an inward inclined
washing sink with
incorporated hand dryer
etc.
Good design practice:
a safe walkway provided
to access the gas meter
reading boxes.
5. Liaise with Principal
Contractor
5. Prepare the H&S File
Project Review
(Lessons Learnt)
Policy and Procedure
Scope of services
Preconstruction Information
Design Risk Management
Plan, Manage & Monitoring
tools
(PD tools)
H&S File
Project Review
(Lesson Learnt)
The Principal Designer – Top tips
Have a clean and clear scope of works.
Keep a copy of the appointment letter from the Client.
Prepare a project specific and bespoke PCI document + visit the site
Keep good records on design review and management
Visit the site during the construction phase [you make see design issues] + issue reports
Keep good meeting minutes
Have a good plan on how to prepare the Health and Safety File [starting listing out what
you want to see]