Auger Site Investigations Ltd T/A Auger. Registered Office: 70 Rodney St, Liverpool L1 9AF Company No: 3088958, VAT No: 659 6999 43 Director: David Brewster BSc. C.Eng. M.I.Struct.E. CCTV REPORT AT LORD NELSON TRAFALGAR TERRACE Client ********* Contents: Existing drainage layout c/c. Mr. D. Collingwood Executive Summary Proposed Drainage CCTV Chainage Listing Client's Ref ABC123 Auger's Ref: 21447.2.RTN Visit Date: Report Date: Checked By: 24-Mar-09 28-Mar-09 JH

CCTV REPORT AT LORD NELSON TRAFALGAR TERRACE · Lord Nelson Hotel, Trafalgar TerraceRisk Address: Nottingham, NG1 1NG Mr Collingwood 26.03.2010 RW Job No: 21447.2.RTN Client: Date

Embed Size (px)

Citation preview

Auger Site Investigations Ltd T/A Auger. Registered Office: 70 Rodney St, Liverpool L1 9AF Company No: 3088958, VAT No: 659 6999 43 Director: David Brewster BSc. C.Eng. M.I.Struct.E.

CCTV REPORT

AT

LORD NELSON

TRAFALGAR TERRACE

Client ********* Contents: Existing drainage layout c/c. Mr. D. Collingwood Executive Summary Proposed Drainage CCTV Chainage Listing Client's Ref ABC123 Auger's Ref: 21447.2.RTN Visit Date: Report Date: Checked By:

24-Mar-09 28-Mar-09 JH

= Inspection Pot

Risk Address :

= Rainwater GullywgIP = Waste Gully

LEGEND

= Rainwater Pipe (No Gully)

Client :

= Manhole IC rwp

Drawn By :Date Drawn :

= Inspection Chambersvp rwg

Job No :

= Soil and Vent Pipe

EXISTING DRAINAGE LAYOUTDiagram 1 of 2

This drawing assumes the layout of the drainage system shown below. The conformation of the pipework location can only be determined by excavation and detailed technical survey.

= lines camera surveyed= lines not camera surveyed

store room

store room

store room

staff livingquarters

staff livingquarters

porch

LordNelsonHotel

FRO

NT

no accessburied

no access

no accessburied under

tarmac

no access

above groundpipework not

connected into gully grillcollapsed

no accessMH cover with

concrete underneath

above groundpipework not

connected into gully

disused

disused

expellingonto ground

Lord Nelson, Hamilton Terrace, Milford Haven,Pembrokeshire, SA73 3AW

Brains Brewery31/03/09

R.W21447.01

gate flags

gate

railings

steps downto basementfire escape

rwp

rwp

fwg

svp

fwg

svp

MH10aMH101.6m

pumpchamber

MH71.55m

grasstarmacpath

tarmac

flags

raisedgrass

stonesstones

rwp

MH90.36m

MH61.4m

retaining wall

stepsdown1.5m

raised grassoutdoor seating

flags

svp

rwg

MH130.3m

rwg

MH51.7m

MH140.3m

MH

MH

rwgMH150.4m

rwp

svp

rwp

fwgMH

MH30.48m

svp

fwg

svp

swg

fencefence

flags

svp

fwg

MH40.4m

MH10.3m

MH20.38m

fire escapesteps down

MH81.66m

concrete

steps downto basement

rwp

concrete

first floorwalkway

MH160.47m

MH17

tarmaccar park

fwg

svp

fwg

fwg

MH18

fwg

svp

svp

IP23:0.3m

acodrain

acodrainMH19

0.8m

MH200.97m

MH211.05m

MH221.2m

rwp

rwp

rwp

garages

int. IP

footpathfootpath

line13

line1

line2line5 line4

line6

line3

line7line11

line9

line8

line10

line12

line14

line15

line17

w/c

line19

line16 line18

line23

line20

line21

line22

outlet

line24

line25

MA

IN SEW

ER

line29

line30

line31line32

line32line34

line36

line35

line37

line38

line39

line40

line42

line41

line43

line52line51

line50

line46

line45

line44

line47to acodrain

line48

line46

rwp

line46

MA

IN SEW

ER

line49

rwp

Lord Nelson Hotel, Trafalgar Terrace Nottingham, NG1 1NG

Mr Collingwood

26.03.2010

RW

21447.2.RTNJob No:

Risk Address:

Client:

Date Drawn:

Drawn By:

Lord Nelson Hotel, Trafalgar Terrace Nottingham, NG1 1NG

Mr Collingwood

26.03.2010

RW

21447.2.RTNJob No:

Risk Address:

Client:

Date Drawn:

Drawn By:

Auger Site Investigations Ltd T/A Auger. Registered Office: 70 Rodney St, Liverpool L1 9AF Company No: 3088958, VAT No: 659 6999 43 Director: David Brewster BSc. C.Eng. M.I.Struct.E.

1.0 EXECUTIVE SUMMARY

BRIEF: Auger were commissioned to undertake a CCTV survey of

the underground drainage system at the above address and

report back any findings

SPECIFIC AREAS OF

INTEREST:

Condition of surface and foul drainage systems

SYSTEM ACCESS: - Via Manholes

VISUAL SURVEY: - Defective benching

EXPOSURE: - No Pipework was Exposed

WATER PRESSURE TEST: Not Carried Out

1.1 SUMMARY OF FINDINGS

Defects requiring repair Yes Is the damaged section

shared

No

No.of properties sharing N/A Age of property / system N/A

General Summary

The results of the CCTV / inspection survey to the underground foul and surface drainage

system at the above address revealed the following:

a. Pipework obstructions / defective pipework.

b. Undulation in pipework leading to water retention and debris build up.

c. Improper connections to main sewer and from gullies.

d. Defective benching within manholes.

e. Above ground pipework not connected to gullies.

f. Manholes covered and sealed, preventing access

Auger Site Investigations Ltd T/A Auger. Registered Office: 70 Rodney St, Liverpool L1 9AF Company No: 3088958, VAT No: 659 6999 43 Director: David Brewster BSc. C.Eng. M.I.Struct.E.

Conclusions

Our engineer attended the above address to carry out a CCTV / inspection survey to evaluate the

condition of the underground drainage. The following issues with the underground drainage

system were discovered during the survey:

a. Defective pipework within lines 1, 7, 9, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 24,

25, 30, 31, 32, 34, 35, 36, 37, 38, 39 & 46, potentially causing blockages,

preventing the normal flow of the pipework and allowing the escape of water into

the surrounding ground.

b. Undulation within lines 23 & 33 causing water retention, that could potentially lead

to debris build up and blockages in the future.

c. Improper connections from line 25 into the main sewer (see fig 1.1) and along line

34 from a rain water gully (see fig 1.2).

d. Defective benching in manholes 2, 4, 5 & 7, preventing the normal flow of the

pipework, and could potentially lead to debris build up and blockages in the future.

e. Rain water gully and down pipes expelling onto the ground, no gully to take water

away from building.

f. Access to manholes 17 & 18 unavailable as covered by tarmac car park.

Specific defects were encountered as follows:

Condition C Issues,

Lines 13, 15, 19, 25, 34,

The results of the CCTV / inspection survey to this part of the system revealed multiple severe

joint displacements within the pipework, there are also some medium joint displacement, slight

open joint displacements, circumferential cracking, debris and water retention within some of

these lines.

Condition B Issues,

Lines 1, 7, 9, 14, 16, 17, 18, 20, 21, 22, 24, 30, 31, 32, 37, 38, 39 & 46,

The results of the CCTV / inspection survey to this part of the system revealed multiple medium

joint displacements within the pipework, there are also some slight open joint displacements,

circumferential cracking, debris and water retention within some of these lines.

Lines 23 & 33,

The results of the CCTV / inspection survey to this part of the system revealed water retention

within the pipework, we believe this could be a result of dips / undulation to the pipework.

Auger Site Investigations Ltd T/A Auger. Registered Office: 70 Rodney St, Liverpool L1 9AF Company No: 3088958, VAT No: 659 6999 43 Director: David Brewster BSc. C.Eng. M.I.Struct.E.

Condition A Issues,

Lines 2, 3, 4, 5, 6, 8, 10, 11, 12, 26, 27, 28, 29, 35, 36, 40, 41, 42, 43, 44, 45, 47, 48, 49, 50, 51, 52,

The results of the CCTV / inspection survey to this part of the system revealed no significant

defects which would affect its operation during normal usage, however, it must be appreciated

that as with all drainage systems, regular maintenance and upkeep is essential. It should be

periodically inspected in the future for any deterioration and kept free flowing / free of

blockages. Any damage noted during future inspections should be repaired immediately in

accordance with current Building Regulations.

Recommendations

These lines appear to have minor defects / water retention / debris within the system, however these

defects are currently not affecting the flow of the system, we recommend it should be periodically

inspected in the future for any deterioration and kept free flowing / free of blockages. Any damage

noted during future inspections should be repaired immediately in accordance with current Building

Regulations:

Lines, 1, 9, 15, 16, 19, 20, 24, 30, 31, 32, 33, 34, 35 &46.

We would recommend the following lines/repairs be considered to ensure the system flows effectively:

a. Line 7 - Reline 1.0m downstream from manhole 2 (MH2) to manhole 4 (MH4), this

appears to have a medium joint displacement within the line.

b. Line 14 - Replace 1.0m upstream from manhole 6 (MH6), there appears to be a

medium joint displacement, debris and longitudinal fracture within the pipework.

c. Line 17 - Excavate and replace 1.0m downstream @ 3.3m downstream from

manhole 8 (MH8). There is a blockage preventing the normal flow of the line (see

fig 1.3).

d. Line 18 - Replace soil and vent pipe (SVP) rest bend and 1.0m, there appears to be

a blockage within the line preventing the normal flow of the pipework (see fig 1.4).

e. Line 21 - Reline 4.0m upstream from manhole 7 (MH7), there appears to be some

medium joint displacements and circumferential cracking within the line.

f. Line 23 - Replace soil and vent pipe (SVP) rest bend and 3.0m downstream, there is

water retention within the line, we believe this is due to dips within the pipework.

g. Line 25 - There is water retention within the line and there appears to be multiple

severe and medium joint displacements within the pipework. There does not appear

to be a proper connection to the main sewer (see fig 1.1). We recommend the

following: i. Reline 1.5m upstream from manhole 10a (MH10a).

Auger Site Investigations Ltd T/A Auger. Registered Office: 70 Rodney St, Liverpool L1 9AF Company No: 3088958, VAT No: 659 6999 43 Director: David Brewster BSc. C.Eng. M.I.Struct.E.

ii. Reline 3.0m downstream from manhole 10a (MH10a). iii. Replace 4.0m downstream @ 3.0m downstream from manhole 10a

(MH10a).

h. Line 38 - Reline 3.7m downstream from manhole 17 (MH17), there appears to be

multiple medium joint displacements and a circumferential crack within the line.

i. Manholes - There appears to be poor / defective benching and access issues, we

recommend that the following manholes are periodically inspected in the future for

any deterioration and kept free flowing / free of blockages. Any damage noted

during future inspections should be repaired immediately in accordance with current

Building Regulations:

i. Manholes 2 & 7 - Monitor and rebench if any further damage is noted to

them

ii. Manhole 4 - Rebench manhole base, there appears to be no proper

channel within the manhole (see fig 1.5). iii. Manholes 5, - appears to have cracked pipework at the base of the

manhole (see fig 1.6). Currently there is no issue with the flow through

this manhole, however, we advise rebenching is considered with this

manhole

iv. Manhole 18 - Expose manhole to facilitate works to line 38.

j. A regular maintenance programme of jetting / cleaning of the system.

Note:

The connection to the main from line 25 is situated within the road at the front of the property,

excavation and replacement of this section will therefore require authorisation from the local

council and a number of other licences to permit excavation within a highway. This will

obviously increase the timescale before repairs can be carried out.

Auger Site Investigations Ltd T/A Auger. Registered Office: 70 Rodney St, Liverpool L1 9AF Company No: 3088958, VAT No: 659 6999 43 Director: David Brewster BSc. C.Eng. M.I.Struct.E.

fig 1.1 - Connection from line 25 into the main sewer fig 1.2 - Rain water gully connection into line 34

fig 1.3 - Blockage within line 17 preventing normal flow fig 1.4 - Blockage within line 18 preventing normal flow

fig 1.5 - Poor benching in manhole 4 fig 1.6 - Cracked pipework & poor benching in manhole 5

Auger Site Investigations Ltd T/A Auger. Registered Office: 70 Rodney St, Liverpool L1 9AF Company No: 3088958, VAT No: 659 6999 43 Director: David Brewster BSc. C.Eng. M.I.Struct.E.

CCTV INSPECTION

0.0m Start Survey

0.2m Joint Displacement Slight

0.6m Joint Displacement Slight

1.3m Joint Displacement Slight

1.8m Joint Displacement Slight

2.5m Joint Displacement Slight Circumferential Crack

2.8m Line of sewer deviates Up

2.9m Soil and Vent Pipe Finished Survey Length

end of line

0.0m Start Survey

0.3m Joint Displacement Slight

0.6m Line of sewer deviates Down Foul Waste Gully Finish Survey Length

end of line

Line No - 1

From - MH1

Invert Depth - 0.30m

To - SVP

Pipe Size - 100mm Diameter

Pipe Material - Clay

Line No - 2

From - MH1

Invert Depth - 0.30m

To - FWG

Pipe Size - 100mm Diameter

Pipe Material - Clay

Auger Site Investigations Ltd T/A Auger. Registered Office: 70 Rodney St, Liverpool L1 9AF Company No: 3088958, VAT No: 659 6999 43 Director: David Brewster BSc. C.Eng. M.I.Struct.E.

0.0m Start Survey

0.8m No Significant joint Displacement

0.9m Line of sewer deviates Down Finished Survey Length – Internal gully trap / interceptor

end of line

0.0m Start Survey

0.5m Joint Displacement Slight

1.2m Manhole 2 Finished Survey Length

end of line

Line No - 3

From - MH1

Invert Depth - 0.30m

To - Upstream

Pipe Size - 100mm Diameter

Pipe Material - Plastic Pipe

Line No - 4

From - MH1

Invert Depth - 0.30m

To - MH2

Pipe Size - 100mm Diameter

Pipe Material - Clay

Line No - 5

From - MH2

Invert Depth - 0.38m

To - SVP

Pipe Size - 100mm Diameter

Pipe Material - Clay

Auger Site Investigations Ltd T/A Auger. Registered Office: 70 Rodney St, Liverpool L1 9AF Company No: 3088958, VAT No: 659 6999 43 Director: David Brewster BSc. C.Eng. M.I.Struct.E.

0.0m Start Survey

0.2m Joint Displacement Slight Line of sewer deviates Left

0.3m No Significant joint Displacement

0.6m Line of sewer deviates Up

0.7m Soil and Vent Pipe Finished Survey Length

end of line

0.0m Start Survey

1.9m Surface Water Gully Finished Survey Length

end of line

0.0m Start Survey

0.1m Joint Displacement Medium

0.4m No Significant joint Displacement

1.0m No Significant joint Displacement

1.4m No Significant joint Displacement

2.0m Joint Displacement Slight

2.2m Manhole 4 Finished Survey Length

end of line

Line No - 6

From - MH2

Invert Depth - 0.38m

To - SWG

Pipe Size - 100mm Diameter

Pipe Material - Plastic Pipe

Line No - 7

From - MH2

Invert Depth - 0.38m

To - MH4

Pipe Size - 100mm Diameter

Pipe Material - Clay

Auger Site Investigations Ltd T/A Auger. Registered Office: 70 Rodney St, Liverpool L1 9AF Company No: 3088958, VAT No: 659 6999 43 Director: David Brewster BSc. C.Eng. M.I.Struct.E.

0.0m Start Survey

0.2m No Significant joint Displacement

0.3m No Significant joint Displacement

0.6m Line of sewer deviates Up

0.7m Soil and Vent Pipe Finished Survey Length

end of line

0.0m Start Survey

0.1m Joint Displacement Slight

0.3m Connection Position 10 O’clock

0.5m Joint Displacement Medium

0.7m Joint Displacement Medium

1.1m Connection Position 9 O’clock

1.3m Joint Displacement Slight

2.3m Manhole Internal

2.9m Circumferential Crack Line of sewer deviates Left

3.2m Joint Displacement Medium

3.4m Joint Displacement Medium

Line No - 8

From - MH3

Invert Depth - 0.48m

To - SVP

Pipe Size - 100mm Diameter

Pipe Material - Plastic Pipe

Line No - 9

From - MH3

Invert Depth - 0.48m

To - FWG

Pipe Size - 100mm Diameter

Pipe Material - Clay

Auger Site Investigations Ltd T/A Auger. Registered Office: 70 Rodney St, Liverpool L1 9AF Company No: 3088958, VAT No: 659 6999 43 Director: David Brewster BSc. C.Eng. M.I.Struct.E.

3.5m Foul Waste Gully Finished Survey Length

end of line

0.0m Start Survey

0.2m No Significant joint Displacement

1.6m Manhole 4 Finished Survey Length

end of line

0.0m Start Survey

0.7m No Significant joint Displacement

0.9m No Significant joint Displacement Line of sewer deviates Right

1.2m No Significant joint Displacement Line of sewer deviates Up

1.3m Finished Survey Length

end of line

Line No - 10

From - MH3

Invert Depth - 0.48m

To - MH4

Pipe Size - 100mm Diameter

Pipe Material - Plastic Pipe

Line No - 11

From - MH4

Invert Depth - 0.4m

To - W/C

Pipe Size - 100mm Diameter

Pipe Material - Plastic Pipe

Auger Site Investigations Ltd T/A Auger. Registered Office: 70 Rodney St, Liverpool L1 9AF Company No: 3088958, VAT No: 659 6999 43 Director: David Brewster BSc. C.Eng. M.I.Struct.E.

0.0m Start Survey

4.7m No Significant joint Displacement

4.9m Line of sewer deviates Right

5.0m No Significant joint Displacement

6.6m No Significant joint Displacement

7.0m Manhole 5 Finished Survey Length

end of line

0.0m Start Survey

0.3m Joint Displacement Medium

0.5m Joint Displacement Medium

0.6m Joint Displacement Large

0.8m Line of sewer deviates Up

1.0m Finished Survey Length – Line blocked off (assumed disused)

end of line

Line No - 12

From - MH4

Invert Depth - 0.40m

To - MH5

Pipe Size - 100mm Diameter

Pipe Material - Plastic Pipe

Line No - 13

From - MH1

Invert Depth - 0.30m

To - Upstream

Pipe Size - 100mm Diameter

Pipe Material - Clay

Auger Site Investigations Ltd T/A Auger. Registered Office: 70 Rodney St, Liverpool L1 9AF Company No: 3088958, VAT No: 659 6999 43 Director: David Brewster BSc. C.Eng. M.I.Struct.E.

0.0m Start Survey Water Level 5 %

1.4m No Significant joint Displacement Water Level 10 %

6.8m Water Level 15 %

7.2m Joint Displacement Medium Debris 15 % Loss – Hard Obstruction

7.5m Longitudinal Crack

7.6m Manhole 6 Finished Survey Length

end of line

0.0m Start Survey

0.3m Joint Displacement Large

1.0m Joint Displacement Medium Water Level 5 %

1.7m Joint Displacement Medium Water Level 5 %

2.2m Joint Displacement Medium

2.8m Joint Displacement Medium

3.5m Joint Displacement Medium Circumferential Crack

4.1m Joint Displacement Slight Water Level 5 %

4.7m Joint Displacement Medium Water Level 5 %

5.3m Joint Displacement Medium

5.9m Joint Displacement Medium

6.6m Joint Displacement Medium

Line No - 14

From - MH5

Invert Depth - 1.7m

To - MH6

Pipe Size - 150mm Diameter

Pipe Material - Clay

Line No - 15

From - MH6

Invert Depth - 1.4m

To - MH7

Pipe Size - 150mm Diameter

Pipe Material - Clay

Auger Site Investigations Ltd T/A Auger. Registered Office: 70 Rodney St, Liverpool L1 9AF Company No: 3088958, VAT No: 659 6999 43 Director: David Brewster BSc. C.Eng. M.I.Struct.E.

7.1m Joint Displacement Medium

7.8m Joint Displacement Slight

8.4m Joint Displacement Medium

9.0m Joint Displacement Slight

9.7m No Significant joint Displacement

10.3m Joint Displacement Medium

10.9m Joint Displacement Slight

11.5m Joint Displacement Medium

12.2m Joint Displacement Slight

12.8m Joint Displacement Slight

13.4m No Significant joint Displacement

14.1m Joint Displacement Slight

15.1m Manhole 7 Finished Survey Length

end of line

0.0m Start Survey

0.3m Joint Displacement Medium Open Joint Slight

Pipework Material Change – 100mm Clay

0.6m Line of sewer deviates Up

1.1m Soil and Vent Pipe Finish Survey Length

end of line

Line No - 16

From - MH8

Invert Depth - 0.66m

To - SVP

Pipe Size - 150mm Diameter

Pipe Material - Clay

Auger Site Investigations Ltd T/A Auger. Registered Office: 70 Rodney St, Liverpool L1 9AF Company No: 3088958, VAT No: 659 6999 43 Director: David Brewster BSc. C.Eng. M.I.Struct.E.

0.0m Start Survey

0.2m Joint Displacement Slight Line of sewer deviates Right

0.7m Joint Displacement Slight

1.0m Joint Displacement Medium Open Joint Slight

1.4m Joint Displacement Slight

2.1m Joint Displacement Slight

2.6m Joint Displacement Medium

3.2m Joint Displacement Slight Debris 20 % Loss – Hard Obstruction Scale/Grout

3.9m Joint Displacement Medium

4.5m Joint Displacement Slight

5.1m Joint Displacement Medium

5.7m Joint Displacement Medium

6.3m Joint Displacement Medium

7.0m Joint Displacement Medium

7.3m Manhole 5 Finish Survey Length

end of line

0.0m Start Survey

0.1m Joint Displacement Medium

0.5m Debris 20 % Loss – Hard Scale

0.6m Joint Displacement Slight

0.7m Line of sewer deviates Down Foul Waste Gully Finished Survey Length

end of line

Line No - 17

From - MH8

Invert Depth - 0.66m

To - MH5

Pipe Size - 150mm Diameter

Pipe Material - Clay

Line No - 18

From - MH8

Invert Depth - 0.66m

To - FWG

Pipe Size - 100mm Diameter

Pipe Material - Clay

Auger Site Investigations Ltd T/A Auger. Registered Office: 70 Rodney St, Liverpool L1 9AF Company No: 3088958, VAT No: 659 6999 43 Director: David Brewster BSc. C.Eng. M.I.Struct.E.

0.0m Start Survey

0.1m Joint Displacement Medium

0.7m Joint Displacement Medium

1.4m Joint Displacement Medium

1.7m Line of sewer deviates Up

1.8m W/C Finished Survey Length

end of line

0.0m Start Survey

0.2m Joint Displacement Slight

0.9m Joint Displacement Medium

1.2m Line of sewer deviates Down Foul Waste Gully Finished Survey Length

end of line

Line No - 19

From - MH8

Invert Depth - 0.66m

To - W/C

Pipe Size - 100mm Diameter

Pipe Material - Clay

Line No - 20

From - MH9

Invert Depth - 0.36m

To - FWG

Pipe Size - 100mm Diameter

Pipe Material - Clay

Auger Site Investigations Ltd T/A Auger. Registered Office: 70 Rodney St, Liverpool L1 9AF Company No: 3088958, VAT No: 659 6999 43 Director: David Brewster BSc. C.Eng. M.I.Struct.E.

0.0m Start Survey

0.3m Joint Displacement Slight

0.8m Joint Displacement Slight

1.4m Joint Displacement Slight

2.1m Joint Displacement Medium Circumferential Crack

2.7m Joint Displacement Slight

2.8m Circumferential Crack

3.3m Joint Displacement Slight

3.5m Joint Displacement Medium Circumferential Crack

3.9m Joint Displacement Slight

4.2m Manhole 7 Finished Survey Length

end of line

0.0m Start Survey Debris 10 % Loss

1.2m Circumferential Crack Debris 20 % Loss

1.4m Joint Displacement Slight

2.1m Joint Displacement Medium

2.7m Joint Displacement Slight Debris 10 % Loss

Line No - 21

From - MH9

Invert Depth - 0.36m

To - MH7

Pipe Size - 100mm Diameter

Pipe Material - Clay

Line No - 22

From - MH7

Invert Depth - 1.55m

To - Upstream

Pipe Size - 100mm Diameter

Pipe Material - Clay

Auger Site Investigations Ltd T/A Auger. Registered Office: 70 Rodney St, Liverpool L1 9AF Company No: 3088958, VAT No: 659 6999 43 Director: David Brewster BSc. C.Eng. M.I.Struct.E.

3.3m Finish Survey Length – Blocked with soil (assumed disused)

end of line

0.0m Start Survey

2.7m No Significant joint Displacement

4.7m Water Level 5 %

5.0m Camera Underwater

7.0m Water Level 0 % Line of sewer deviates Up Soil and Vent Pipe

7.1m Finish Survey Length

end of line

0.0m Start Survey

0.1m Joint Displacement Medium

1.0m No Significant joint Displacement

3.0m Manhole 10 Finish Survey Length

Line No - 23

From - MH7

Invert Depth - 1.55m

To - SVP

Pipe Size - 100mm Diameter

Pipe Material - Plastic Pipe

Line No - 24

From - MH7

Invert Depth - 1.55m

To - MH10

Pipe Size - 150mm Diameter

Pipe Material - Clay

Auger Site Investigations Ltd T/A Auger. Registered Office: 70 Rodney St, Liverpool L1 9AF Company No: 3088958, VAT No: 659 6999 43 Director: David Brewster BSc. C.Eng. M.I.Struct.E.

end of line

0.0m Start Survey

1.0m No Significant joint Displacement

4.0m No Significant joint Displacement

7.1m Joint Displacement Medium

7.5m Joint Displacement Slight

8.8m Manhole 10a Water Level 10 %

9.1m Joint Displacement Medium Line of sewer deviates Right

9.7m Joint Displacement Slight

10.4m Joint Displacement Medium Circumferential Crack

10.9m Joint Displacement Medium

11.7m Camera Underwater

12.5m Water Level 0 %

12.9m Joint Displacement Large

13.3m Joint Displacement Medium

13.9m Joint Displacement Large

15.0m Joint Displacement Large Open Joint Displacement – Improper Connection to Main

15.4m Main Sewer Finish Survey Length

end of line

0.0m Start Survey

2.1m No Significant joint Displacement

Line No - 25

From - MH10

Invert Depth - 1.60m

To - MAIN

Pipe Size - 150mm Diameter

Pipe Material - Clay

Line No - 26

From - MH11

Invert Depth - 0.20m

To - SWG

Pipe Size - 100mm Diameter

Pipe Material - Plastic Pipe

Auger Site Investigations Ltd T/A Auger. Registered Office: 70 Rodney St, Liverpool L1 9AF Company No: 3088958, VAT No: 659 6999 43 Director: David Brewster BSc. C.Eng. M.I.Struct.E.

2.3m Surface Water Gully Finished Survey Length

end of line

0.0m Start Survey

2.6m No Significant joint Displacement

2.7m Connection Position 12 O’clock

2.9m No Significant joint Displacement Line of sewer deviates Up

3.4m No Significant joint Displacement

3.5m Connection Position 9 O’clock

3.7m No Significant joint Displacement

4.2m No Significant joint Displacement

4.3m Connection Position 3 O’clock

4.5m No Significant joint Displacement

4.8m No Significant joint Displacement

4.9m Connection Position 12 O’clock

5.0m No Significant joint Displacement

5.1m No Significant joint Displacement Connection Position 9 O’clock

5.2m No Significant joint Displacement

5.6m No Significant joint Displacement

6.0m Line of sewer deviates Left

7.8m No Significant joint Displacement

10.6m No Significant joint Displacement

10.8m Line of sewer deviates Up

11.1m Connection Position 9 O’clock W/C Finished Survey Length

end of line

Line No - 27

From - MH11

Invert Depth - 0.20m

To - W/C

Pipe Size - 100mm Diameter

Pipe Material - Plastic Pipe

Line No - 28

From - MH11

Invert Depth - 0.20m

To - Pump Chamber

Pipe Size - 100mm Diameter

Pipe Material - Plastic Pipe

Auger Site Investigations Ltd T/A Auger. Registered Office: 70 Rodney St, Liverpool L1 9AF Company No: 3088958, VAT No: 659 6999 43 Director: David Brewster BSc. C.Eng. M.I.Struct.E.

0.0m Start Survey

5.7m No Significant joint Displacement

11.7m No Significant joint Displacement

14.4m No Significant joint Displacement

14.5m Manhole 12

14.7m No Significant joint Displacement

18.3m No Significant joint Displacement

20.7m No Significant joint Displacement

22.6m No Significant joint Displacement

22.8m No Significant joint Displacement Line of sewer deviates Right

24.1m Pump Chamber Finished Survey Length

end of line

0.0m Start Survey

0.1m Joint Displacement Slight Line of sewer deviates Left

0.2m Line of sewer deviates Right

0.6m Joint Displacement Slight

0.8m Line of sewer deviates Up Soil and Vent Pipe

1.0m Finished Survey Length

end of line

Line No - 29

From - MH13

Invert Depth - 0.3m

To - SVP

Pipe Size - 100mm Diameter

Pipe Material - Clay

Line No - 30

From - MH13

Invert Depth - 0.3m

To - Upstream

Pipe Size - 100mm Diameter

Pipe Material - Clay

Auger Site Investigations Ltd T/A Auger. Registered Office: 70 Rodney St, Liverpool L1 9AF Company No: 3088958, VAT No: 659 6999 43 Director: David Brewster BSc. C.Eng. M.I.Struct.E.

0.0m Start Survey

0.1m Joint Displacement Slight

0.7m Joint Displacement Medium

1.2m Joint Displacement Slight

1.9m Joint Displacement Slight

3.2m Joint Displacement Slight Debris 10 % Loss

3.3m No Significant joint Displacement

3.8m Connection Position 9 O’clock

3.9m Joint Displacement Medium

4.3m Joint Displacement Medium

4.6m Line of sewer deviates Up

4.8m Finished Survey Length

end of line

0.0m Start Survey

0.1m Joint Displacement Medium

0.2m Connection Position 3 O’clock

0.5m Joint Displacement Medium

1.0m Joint Displacement Medium

1.6m No Significant joint Displacement

2.1m No Significant joint Displacement Circumferential Crack

2.8m Joint Displacement Slight

3.4m Joint Displacement Slight

4.0m Joint Displacement Slight Circumferential Crack

4.9m Manhole 14 Finished Survey Length

end of line

Line No - 31

From - MH13

Invert Depth - 0.3m

To - MH14

Pipe Size - 100mm Diameter

Pipe Material - Clay

Line No - 32

From - MH14

Invert Depth - 0.4m

To - Upstream

Pipe Size - 100mm Diameter

Pipe Material - Clay

Auger Site Investigations Ltd T/A Auger. Registered Office: 70 Rodney St, Liverpool L1 9AF Company No: 3088958, VAT No: 659 6999 43 Director: David Brewster BSc. C.Eng. M.I.Struct.E.

0.0m Start Survey

0.1m Joint Displacement Slight

0.5m Joint Displacement Slight

1.1m No Significant joint Displacement

1.6m No Significant joint Displacement

2.3m Joint Displacement Medium

3.0m Joint Displacement Slight

3.6m Joint Displacement Medium

3.9m Manhole – Internal in store room (no access, under furniture)

4.3m Joint Displacement Slight

4.6m Line of sewer deviates Left

4.8m Joint Displacement Slight

5.0m Finished Survey Length

end of line

0.0m Start Survey

0.2m Water Level 10 %

0.6m No Significant joint Displacement Water Level 10 %

0.7m Connection Position 3 O’clock Water Level 10 %

1.2m Joint Displacement Slight Water Level 10 %

1.6m Joint Displacement Slight Water Level 10 %

2.2m Joint Displacement Slight Water Level 5 %

2.8m Joint Displacement Slight Water Level 5 %

3.4m Joint Displacement Slight Water Level 5 %

4.2m Manhole 15 Water Level 0 % Finished Survey Length

end of line

Line No - 33

From - MH14

Invert Depth - 0.4m

To - MH15

Pipe Size - 100mm Diameter

Pipe Material - Clay

Line No - 34

From - MH15

Invert Depth - 0.5m

To - Upstream

Pipe Size - 100mm Diameter

Pipe Material - Clay

Auger Site Investigations Ltd T/A Auger. Registered Office: 70 Rodney St, Liverpool L1 9AF Company No: 3088958, VAT No: 659 6999 43 Director: David Brewster BSc. C.Eng. M.I.Struct.E.

0.0m Start Survey

0.1m Joint Displacement Medium

0.5m Joint Displacement Slight

1.0m Connection Position 3 O’clock Pipe intrusion - Rain Water Gully

1.2m Joint Displacement Slight Open Joint Slight

1.8m Joint Displacement Slight

2.5m Joint Displacement Slight

3.2m Joint Displacement Medium

3.9m Joint Displacement Slight

4.5m Joint Displacement Slight

5.2m Joint Displacement Slight

5.5m Line of sewer deviates Left

5.9m Manhole – Internal (no access, in living quarters)

6.6m Joint Displacement Medium

7.0m Joint Displacement Medium

7.5m Connection Position 3 O’clock

7.6m Joint Displacement Slight

8.1m Joint Displacement Slight

8.4m Line of sewer deviates Up

8.5m Finished Survey Length

end of line

0.0m Start Survey

0.5m Joint Displacement Slight

1.1m Joint Displacement Slight Circumferential Crack

1.7m Joint Displacement Slight

2.3m Joint Displacement Slight

3.0m Joint Displacement Slight

3.6m Joint Displacement Slight

4.3m Joint Displacement Slight

Line No - 35

From - MH15

Invert Depth - 0.5m

To - MH16

Pipe Size - 100mm Diameter

Pipe Material - Clay

Auger Site Investigations Ltd T/A Auger. Registered Office: 70 Rodney St, Liverpool L1 9AF Company No: 3088958, VAT No: 659 6999 43 Director: David Brewster BSc. C.Eng. M.I.Struct.E.

4.8m Manhole 16 Finish Survey Length

end of line

0.0m Start Survey

0.6m Joint Displacement Slight

1.5m Joint Displacement Slight

2.4m Joint Displacement Slight

2.8m Joint Displacement Slight

3.2m Connection Position 12 O’clock

3.4m Joint Displacement Slight

3.7m Line of sewer deviates Up

3.9m Finished Survey Length

end of line

0.0m Start Survey

0.1m Joint Displacement Medium

0.8m Joint Displacement Slight

1.4m Joint Displacement Slight

2.0m Joint Displacement Slight

2.7m No Significant joint Displacement

3.3m Joint Displacement Slight

3.9m No Significant joint Displacement

4.5m No Significant joint Displacement

5.1m Joint Displacement Slight

Line No - 36

From - MH16

Invert Depth - 0.47m

To - Upstream

Pipe Size - 100mm Diameter

Pipe Material - Clay

Line No - 37

From - MH16

Invert Depth - 0.47m

To - MH17

Pipe Size - 100mm Diameter

Pipe Material - Clay

Auger Site Investigations Ltd T/A Auger. Registered Office: 70 Rodney St, Liverpool L1 9AF Company No: 3088958, VAT No: 659 6999 43 Director: David Brewster BSc. C.Eng. M.I.Struct.E.

5.7m No Significant joint Displacement

6.7m Manhole 17 – Buried under tarmac Finished Survey Length

end of line

0.0m Start Survey

0.1m Line of sewer deviates Left

0.3m Joint Displacement Medium Water Level 5 %

0.6m Joint Displacement Medium

1.2m Joint Displacement Medium Water Level 5 %

1.8m Joint Displacement Medium

2.4m Joint Displacement Slight

3.0m Joint Displacement Medium

3.2m Circumferential Crack

3.7m Manhole 18 – Buried under tarmac Finished Survey Length

end of line

0.0m Start Survey

0.5m Joint Displacement Medium

0.7m Joint Displacement Slight

0.8m Connection Position 9 O’clock

0.9m Joint Displacement Slight

2.6m Joint Displacement Slight

2.7m Connection Position 9 O’clock

2.8m Joint Displacement Slight

3.7m Manhole 19 Finished Survey Length

Line No - 38

From - MH17

Invert Depth - Unknown

To - MH18

Pipe Size - 100mm Diameter

Pipe Material - Clay

Line No - 39

From - MH18

Invert Depth - Unknown

To - MH19

Pipe Size - 100mm Diameter

Pipe Material - Clay

Auger Site Investigations Ltd T/A Auger. Registered Office: 70 Rodney St, Liverpool L1 9AF Company No: 3088958, VAT No: 659 6999 43 Director: David Brewster BSc. C.Eng. M.I.Struct.E.

end of line

0.0m Start Survey

1.0m No Significant joint Displacement

1.2m No Significant joint Displacement Line of sewer deviates Left

1.3m No Significant joint Displacement

4.6m Joint Displacement Slight

4.8m Line of sewer deviates Up Finished Survey Length

end of line

0.0m Start Survey

3.2m Manhole 20 Finished Survey Length

end of line

Line No - 40

From - MH19

Invert Depth - 0.8m

To - Upstream

Pipe Size - 100mm Diameter

Pipe Material - Plastic Pipe

Line No - 41

From - MH19

Invert Depth - 0.8m

To - MH20

Pipe Size - 100mm Diameter

Pipe Material - Plastic Pipe

Line No - 42

From - MH19

Invert Depth - 0.8m

To - FWG

Pipe Size - 100mm Diameter

Pipe Material - Plastic Pipe

Auger Site Investigations Ltd T/A Auger. Registered Office: 70 Rodney St, Liverpool L1 9AF Company No: 3088958, VAT No: 659 6999 43 Director: David Brewster BSc. C.Eng. M.I.Struct.E.

0.0m Start Survey

0.1m Line of sewer deviates Right

0.4m No Significant joint Displacement

0.6m Line of sewer deviates Up Line of sewer deviates Right

0.9m Foul Waste Gully Finished Survey Length

end of line

0.0m Start Survey

0.1m No Significant joint Displacement Line of sewer deviates Right

Pipework Material Change – 100mm Plastic Pipe

3.8m No Significant joint Displacement

4.1m Inspection Pot 23 Finished Survey Length

end of line

0.0m Start Survey

0.7m No Significant joint Displacement Line of sewer deviates Right

6.8m No Significant joint Displacement

8.3m No Significant joint Displacement

8.6m Inspection Pot – Internal (no access) Finished Survey Length

end of line

Line No - 43

From - MH20

Invert Depth - 0.97m

To - IP23

Pipe Size - 150mm Diameter

Pipe Material - Plastic Pipe

Line No - 44

From - MH20

Invert Depth - 0.97m

To - IP

Pipe Size - 100mm Diameter

Pipe Material - Plastic Pipe

Auger Site Investigations Ltd T/A Auger. Registered Office: 70 Rodney St, Liverpool L1 9AF Company No: 3088958, VAT No: 659 6999 43 Director: David Brewster BSc. C.Eng. M.I.Struct.E.

0.0m Start Survey

0.1m No Significant joint Displacement Line of sewer deviates Left

1.2m No Significant joint Displacement

1.6m Line of sewer deviates Up Finished Survey Length

end of line

0.0m Start Survey

0.5m No Significant joint Displacement

3.9m Manhole 21

5.3m No Significant joint Displacement

8.3m No Significant joint Displacement

11.6m Manhole 22

12.1m No Significant joint Displacement Line of sewer deviates Left

13.2m No Significant joint Displacement

15.9m No Significant joint Displacement

19.0m No Significant joint Displacement

22.2m No Significant joint Displacement Line of sewer deviates Right

22.7m Pipework Material Change – 150mm Clay

23.0m Joint Displacement Medium

23.8m Joint Displacement Medium

24.1m Joint Displacement Slight

Line No - 45

From - MH20

Invert Depth - 0.97m

To - Upstream

Pipe Size - 100mm Diameter

Pipe Material - Plastic Pipe

Line No - 46

From - MH20

Invert Depth - 0.97m

To - MAIN

Pipe Size - 150mm Diameter

Pipe Material - Plastic Pipe

Auger Site Investigations Ltd T/A Auger. Registered Office: 70 Rodney St, Liverpool L1 9AF Company No: 3088958, VAT No: 659 6999 43 Director: David Brewster BSc. C.Eng. M.I.Struct.E.

24.8m Joint Displacement Slight

25.4m Joint Displacement Slight

26.0m Joint Displacement Medium

26.7m Joint Displacement Slight

27.2m Joint Displacement Slight

27.8m Joint Displacement Medium

28.5m Joint Displacement Medium

29.0m Joint Displacement Medium

29.5m Joint Displacement Medium Line of sewer deviates Left Line of sewer deviates Down

30.3m Main – Joins main on blind connection Finished Survey Length

end of line

0.0m Start Survey

0.1m No Significant joint Displacement Line of sewer deviates Up

1.0m Aco Drain Finish Survey Length

end of line

0.0m Start Survey

0.1m Line of sewer deviates Up

0.6m No Significant joint Displacement

1.8m No Significant joint Displacement

1.9m No Significant joint Displacement

Line No - 47

From - MH21

Invert Depth - 1.05m

To - Aco Drain

Pipe Size - 100mm Diameter

Pipe Material - Plastic Pipe

Line No - 48

From - MH21

Invert Depth - 1.05m

To - Upstream

Pipe Size - 100mm Diameter

Pipe Material - Plastic Pipe

Auger Site Investigations Ltd T/A Auger. Registered Office: 70 Rodney St, Liverpool L1 9AF Company No: 3088958, VAT No: 659 6999 43 Director: David Brewster BSc. C.Eng. M.I.Struct.E.

2.6m No Significant joint Displacement

2.7m Connection Position 12 O’clock

2.8m No Significant joint Displacement

3.6m No Significant joint Displacement

3.7m Connection Position 12 O’clock

3.8m No Significant joint Displacement

4.0m No Significant joint Displacement

4.2m Line of sewer deviates Left

4.4m No Significant joint Displacement

4.6m Line of sewer deviates Up Finished Survey Length

end of line

0.0m Start Survey

0.1m No Significant joint Displacement

0.2m No Significant joint Displacement Line of sewer deviates Left Line of sewer deviates Up

0.3m No Significant joint Displacement Pipework Material Change – 100mm Plastic Pipe

0.6m No Significant joint Displacement

1.1m No Significant joint Displacement Line of sewer deviates Right

1.6m No Significant joint Displacement

1.7m Connection Position 2 O’clock

1.8m No Significant joint Displacement

3.0m No Significant joint Displacement

3.1m Connection Position 9 O’clock

3.2m No Significant joint Displacement

3.9m No Significant joint Displacement

4.0m Connection Position 12 O’clock

4.1m No Significant joint Displacement

4.3m No Significant joint Displacement

4.5m Line of sewer deviates Up Finished Survey Length

end of line

Line No - 49

From - MH22

Invert Depth - 1.20m

To - Upstream

Pipe Size - 150mm Diameter

Pipe Material - Plastic Pipe

Auger Site Investigations Ltd T/A Auger. Registered Office: 70 Rodney St, Liverpool L1 9AF Company No: 3088958, VAT No: 659 6999 43 Director: David Brewster BSc. C.Eng. M.I.Struct.E.

0.0m Start Survey

0.1m No Significant joint Displacement Line of sewer deviates Left

0.3m No Significant joint Displacement

0.6m Line of sewer deviates Up

0.7m Soil and Vent Pipe Finished Survey Length

end of line

0.0m Start Survey

0.1m No Significant joint Displacement

0.2m Foul Waste Gully Finished Survey Length

end of line

Line No - 50

From - IP23

Invert Depth - 0.3m

To - SVP

Pipe Size - 100mm Diameter

Pipe Material - Plastic Pipe

Line No - 51

From - IP23

Invert Depth - 0.3m

To - FWG

Pipe Size - 100mm Diameter

Pipe Material - Plastic Pipe

Line No - 52

From - IP23

Invert Depth - 0.3m

To - SVP

Pipe Size - 100mm Diameter

Pipe Material - Plastic Pipe

Auger Site Investigations Ltd T/A Auger. Registered Office: 70 Rodney St, Liverpool L1 9AF Company No: 3088958, VAT No: 659 6999 43 Director: David Brewster BSc. C.Eng. M.I.Struct.E.

0.0m Start Survey

0.1m No Significant joint Displacement

0.2m Line of sewer deviates Up

0.3m Soil and Vent Pipe Finish Survey Length

end of line

Auger Site Investigations Ltd T/A Auger. Registered Office: 70 Rodney St, Liverpool L1 9AF Company No: 3088958, VAT No: 659 6999 43 Director: David Brewster BSc. C.Eng. M.I.Struct.E.

LIMITATIONS OF REPORT

We were commissioned to carry out an inspection of the accessible areas of the drainage to the

property, identifying any major defects and recommending any repair works that may be

necessary. It should be appreciated that the exact layout of the system cannot be confirmed

without the exposure of inaccessible branches and connections etc.

The lack of any significant defects within the main drainage line should not be regarded as a

guarantee of watertightness. Defects may be encountered upon exposure of inaccessible branches

and gullies etc.

The contents of this report are strictly confined to comments concerning those terms outlined

above. It is not a structural survey and must not be construed as such.

The views expressed in this report are based entirely upon a visual examination of the drainage,

supported by information obtained from a drainage CCTV inspection / water pressure test.

RIGHTS OF ORIGINATOR

This report was for the sole use of the client. It must not be reproduced or transferred to any

other third party without the express written consent of the author.

We will consider the re-issue of the report in its original form to a third party within 6 months of

the original report date for an administrative fee. (currently £100.00 excl VAT).

Upon the lapse of a 6-month period the report can only be re-issued following a full re-

inspection, which will attract a full survey fee.

We reserve the right to refuse copies of the report to any third party (other than those named

above). We also reserve the right to amend our opinions in the event of additional information

being made available at some future date.

Jane Hibbert Account Manager

Auger