CCTV REPORT
AT
LORD NELSON
TRAFALGAR TERRACE
Client ********* Contents: Existing drainage layout c/c. Mr. D. Collingwood Executive Summary Proposed Drainage CCTV Chainage Listing Client's Ref ABC123 Auger's Ref: 21447.2.RTN Visit Date: Report Date: Checked By:
24-Mar-09 28-Mar-09 JH
= Inspection Pot
Risk Address :
= Rainwater GullywgIP = Waste Gully
LEGEND
= Rainwater Pipe (No Gully)
Client :
= Manhole IC rwp
Drawn By :Date Drawn :
= Inspection Chambersvp rwg
Job No :
= Soil and Vent Pipe
EXISTING DRAINAGE LAYOUTDiagram 1 of 2
This drawing assumes the layout of the drainage system shown below. The conformation of the pipework location can only be determined by excavation and detailed technical survey.
= lines camera surveyed= lines not camera surveyed
store room
store room
store room
staff livingquarters
staff livingquarters
porch
LordNelsonHotel
FRO
NT
no accessburied
no access
no accessburied under
tarmac
no access
above groundpipework not
connected into gully grillcollapsed
no accessMH cover with
concrete underneath
above groundpipework not
connected into gully
disused
disused
expellingonto ground
Lord Nelson, Hamilton Terrace, Milford Haven,Pembrokeshire, SA73 3AW
Brains Brewery31/03/09
R.W21447.01
gate flags
gate
railings
steps downto basementfire escape
rwp
rwp
fwg
svp
fwg
svp
MH10aMH101.6m
pumpchamber
MH71.55m
grasstarmacpath
tarmac
flags
raisedgrass
stonesstones
rwp
MH90.36m
MH61.4m
retaining wall
stepsdown1.5m
raised grassoutdoor seating
flags
svp
rwg
MH130.3m
rwg
MH51.7m
MH140.3m
MH
MH
rwgMH150.4m
rwp
svp
rwp
fwgMH
MH30.48m
svp
fwg
svp
swg
fencefence
flags
svp
fwg
MH40.4m
MH10.3m
MH20.38m
fire escapesteps down
MH81.66m
concrete
steps downto basement
rwp
concrete
first floorwalkway
MH160.47m
MH17
tarmaccar park
fwg
svp
fwg
fwg
MH18
fwg
svp
svp
IP23:0.3m
acodrain
acodrainMH19
0.8m
MH200.97m
MH211.05m
MH221.2m
rwp
rwp
rwp
garages
int. IP
footpathfootpath
line13
line1
line2line5 line4
line6
line3
line7line11
line9
line8
line10
line12
line14
line15
line17
w/c
line19
line16 line18
line23
line20
line21
line22
outlet
line24
line25
MA
IN SEW
ER
line29
line30
line31line32
line32line34
line36
line35
line37
line38
line39
line40
line42
line41
line43
line52line51
line50
line46
line45
line44
line47to acodrain
line48
line46
rwp
line46
MA
IN SEW
ER
line49
rwp
Lord Nelson Hotel, Trafalgar Terrace Nottingham, NG1 1NG
Mr Collingwood
26.03.2010
RW
21447.2.RTNJob No:
Risk Address:
Client:
Date Drawn:
Drawn By:
Lord Nelson Hotel, Trafalgar Terrace Nottingham, NG1 1NG
Mr Collingwood
26.03.2010
RW
21447.2.RTNJob No:
Risk Address:
Client:
Date Drawn:
Drawn By:
Auger Site Investigations Ltd T/A Auger. Registered Office: 70 Rodney St, Liverpool L1 9AF Company No: 3088958, VAT No: 659 6999 43 Director: David Brewster BSc. C.Eng. M.I.Struct.E.
1.0 EXECUTIVE SUMMARY
BRIEF: Auger were commissioned to undertake a CCTV survey of
the underground drainage system at the above address and
report back any findings
SPECIFIC AREAS OF
INTEREST:
Condition of surface and foul drainage systems
SYSTEM ACCESS: - Via Manholes
VISUAL SURVEY: - Defective benching
EXPOSURE: - No Pipework was Exposed
WATER PRESSURE TEST: Not Carried Out
1.1 SUMMARY OF FINDINGS
Defects requiring repair Yes Is the damaged section
shared
No
No.of properties sharing N/A Age of property / system N/A
General Summary
The results of the CCTV / inspection survey to the underground foul and surface drainage
system at the above address revealed the following:
a. Pipework obstructions / defective pipework.
b. Undulation in pipework leading to water retention and debris build up.
c. Improper connections to main sewer and from gullies.
d. Defective benching within manholes.
e. Above ground pipework not connected to gullies.
f. Manholes covered and sealed, preventing access
Auger Site Investigations Ltd T/A Auger. Registered Office: 70 Rodney St, Liverpool L1 9AF Company No: 3088958, VAT No: 659 6999 43 Director: David Brewster BSc. C.Eng. M.I.Struct.E.
Conclusions
Our engineer attended the above address to carry out a CCTV / inspection survey to evaluate the
condition of the underground drainage. The following issues with the underground drainage
system were discovered during the survey:
a. Defective pipework within lines 1, 7, 9, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 24,
25, 30, 31, 32, 34, 35, 36, 37, 38, 39 & 46, potentially causing blockages,
preventing the normal flow of the pipework and allowing the escape of water into
the surrounding ground.
b. Undulation within lines 23 & 33 causing water retention, that could potentially lead
to debris build up and blockages in the future.
c. Improper connections from line 25 into the main sewer (see fig 1.1) and along line
34 from a rain water gully (see fig 1.2).
d. Defective benching in manholes 2, 4, 5 & 7, preventing the normal flow of the
pipework, and could potentially lead to debris build up and blockages in the future.
e. Rain water gully and down pipes expelling onto the ground, no gully to take water
away from building.
f. Access to manholes 17 & 18 unavailable as covered by tarmac car park.
Specific defects were encountered as follows:
Condition C Issues,
Lines 13, 15, 19, 25, 34,
The results of the CCTV / inspection survey to this part of the system revealed multiple severe
joint displacements within the pipework, there are also some medium joint displacement, slight
open joint displacements, circumferential cracking, debris and water retention within some of
these lines.
Condition B Issues,
Lines 1, 7, 9, 14, 16, 17, 18, 20, 21, 22, 24, 30, 31, 32, 37, 38, 39 & 46,
The results of the CCTV / inspection survey to this part of the system revealed multiple medium
joint displacements within the pipework, there are also some slight open joint displacements,
circumferential cracking, debris and water retention within some of these lines.
Lines 23 & 33,
The results of the CCTV / inspection survey to this part of the system revealed water retention
within the pipework, we believe this could be a result of dips / undulation to the pipework.
Auger Site Investigations Ltd T/A Auger. Registered Office: 70 Rodney St, Liverpool L1 9AF Company No: 3088958, VAT No: 659 6999 43 Director: David Brewster BSc. C.Eng. M.I.Struct.E.
Condition A Issues,
Lines 2, 3, 4, 5, 6, 8, 10, 11, 12, 26, 27, 28, 29, 35, 36, 40, 41, 42, 43, 44, 45, 47, 48, 49, 50, 51, 52,
The results of the CCTV / inspection survey to this part of the system revealed no significant
defects which would affect its operation during normal usage, however, it must be appreciated
that as with all drainage systems, regular maintenance and upkeep is essential. It should be
periodically inspected in the future for any deterioration and kept free flowing / free of
blockages. Any damage noted during future inspections should be repaired immediately in
accordance with current Building Regulations.
Recommendations
These lines appear to have minor defects / water retention / debris within the system, however these
defects are currently not affecting the flow of the system, we recommend it should be periodically
inspected in the future for any deterioration and kept free flowing / free of blockages. Any damage
noted during future inspections should be repaired immediately in accordance with current Building
Regulations:
Lines, 1, 9, 15, 16, 19, 20, 24, 30, 31, 32, 33, 34, 35 &46.
We would recommend the following lines/repairs be considered to ensure the system flows effectively:
a. Line 7 - Reline 1.0m downstream from manhole 2 (MH2) to manhole 4 (MH4), this
appears to have a medium joint displacement within the line.
b. Line 14 - Replace 1.0m upstream from manhole 6 (MH6), there appears to be a
medium joint displacement, debris and longitudinal fracture within the pipework.
c. Line 17 - Excavate and replace 1.0m downstream @ 3.3m downstream from
manhole 8 (MH8). There is a blockage preventing the normal flow of the line (see
fig 1.3).
d. Line 18 - Replace soil and vent pipe (SVP) rest bend and 1.0m, there appears to be
a blockage within the line preventing the normal flow of the pipework (see fig 1.4).
e. Line 21 - Reline 4.0m upstream from manhole 7 (MH7), there appears to be some
medium joint displacements and circumferential cracking within the line.
f. Line 23 - Replace soil and vent pipe (SVP) rest bend and 3.0m downstream, there is
water retention within the line, we believe this is due to dips within the pipework.
g. Line 25 - There is water retention within the line and there appears to be multiple
severe and medium joint displacements within the pipework. There does not appear
to be a proper connection to the main sewer (see fig 1.1). We recommend the
following: i. Reline 1.5m upstream from manhole 10a (MH10a).
Auger Site Investigations Ltd T/A Auger. Registered Office: 70 Rodney St, Liverpool L1 9AF Company No: 3088958, VAT No: 659 6999 43 Director: David Brewster BSc. C.Eng. M.I.Struct.E.
ii. Reline 3.0m downstream from manhole 10a (MH10a). iii. Replace 4.0m downstream @ 3.0m downstream from manhole 10a
(MH10a).
h. Line 38 - Reline 3.7m downstream from manhole 17 (MH17), there appears to be
multiple medium joint displacements and a circumferential crack within the line.
i. Manholes - There appears to be poor / defective benching and access issues, we
recommend that the following manholes are periodically inspected in the future for
any deterioration and kept free flowing / free of blockages. Any damage noted
during future inspections should be repaired immediately in accordance with current
Building Regulations:
i. Manholes 2 & 7 - Monitor and rebench if any further damage is noted to
them
ii. Manhole 4 - Rebench manhole base, there appears to be no proper
channel within the manhole (see fig 1.5). iii. Manholes 5, - appears to have cracked pipework at the base of the
manhole (see fig 1.6). Currently there is no issue with the flow through
this manhole, however, we advise rebenching is considered with this
manhole
iv. Manhole 18 - Expose manhole to facilitate works to line 38.
j. A regular maintenance programme of jetting / cleaning of the system.
Note:
The connection to the main from line 25 is situated within the road at the front of the property,
excavation and replacement of this section will therefore require authorisation from the local
council and a number of other licences to permit excavation within a highway. This will
obviously increase the timescale before repairs can be carried out.
Auger Site Investigations Ltd T/A Auger. Registered Office: 70 Rodney St, Liverpool L1 9AF Company No: 3088958, VAT No: 659 6999 43 Director: David Brewster BSc. C.Eng. M.I.Struct.E.
fig 1.1 - Connection from line 25 into the main sewer fig 1.2 - Rain water gully connection into line 34
fig 1.3 - Blockage within line 17 preventing normal flow fig 1.4 - Blockage within line 18 preventing normal flow
fig 1.5 - Poor benching in manhole 4 fig 1.6 - Cracked pipework & poor benching in manhole 5
Auger Site Investigations Ltd T/A Auger. Registered Office: 70 Rodney St, Liverpool L1 9AF Company No: 3088958, VAT No: 659 6999 43 Director: David Brewster BSc. C.Eng. M.I.Struct.E.
CCTV INSPECTION
0.0m Start Survey
0.2m Joint Displacement Slight
0.6m Joint Displacement Slight
1.3m Joint Displacement Slight
1.8m Joint Displacement Slight
2.5m Joint Displacement Slight Circumferential Crack
2.8m Line of sewer deviates Up
2.9m Soil and Vent Pipe Finished Survey Length
end of line
0.0m Start Survey
0.3m Joint Displacement Slight
0.6m Line of sewer deviates Down Foul Waste Gully Finish Survey Length
end of line
Line No - 1
From - MH1
Invert Depth - 0.30m
To - SVP
Pipe Size - 100mm Diameter
Pipe Material - Clay
Line No - 2
From - MH1
Invert Depth - 0.30m
To - FWG
Pipe Size - 100mm Diameter
Pipe Material - Clay
Auger Site Investigations Ltd T/A Auger. Registered Office: 70 Rodney St, Liverpool L1 9AF Company No: 3088958, VAT No: 659 6999 43 Director: David Brewster BSc. C.Eng. M.I.Struct.E.
0.0m Start Survey
0.8m No Significant joint Displacement
0.9m Line of sewer deviates Down Finished Survey Length – Internal gully trap / interceptor
end of line
0.0m Start Survey
0.5m Joint Displacement Slight
1.2m Manhole 2 Finished Survey Length
end of line
Line No - 3
From - MH1
Invert Depth - 0.30m
To - Upstream
Pipe Size - 100mm Diameter
Pipe Material - Plastic Pipe
Line No - 4
From - MH1
Invert Depth - 0.30m
To - MH2
Pipe Size - 100mm Diameter
Pipe Material - Clay
Line No - 5
From - MH2
Invert Depth - 0.38m
To - SVP
Pipe Size - 100mm Diameter
Pipe Material - Clay
Auger Site Investigations Ltd T/A Auger. Registered Office: 70 Rodney St, Liverpool L1 9AF Company No: 3088958, VAT No: 659 6999 43 Director: David Brewster BSc. C.Eng. M.I.Struct.E.
0.0m Start Survey
0.2m Joint Displacement Slight Line of sewer deviates Left
0.3m No Significant joint Displacement
0.6m Line of sewer deviates Up
0.7m Soil and Vent Pipe Finished Survey Length
end of line
0.0m Start Survey
1.9m Surface Water Gully Finished Survey Length
end of line
0.0m Start Survey
0.1m Joint Displacement Medium
0.4m No Significant joint Displacement
1.0m No Significant joint Displacement
1.4m No Significant joint Displacement
2.0m Joint Displacement Slight
2.2m Manhole 4 Finished Survey Length
end of line
Line No - 6
From - MH2
Invert Depth - 0.38m
To - SWG
Pipe Size - 100mm Diameter
Pipe Material - Plastic Pipe
Line No - 7
From - MH2
Invert Depth - 0.38m
To - MH4
Pipe Size - 100mm Diameter
Pipe Material - Clay
Auger Site Investigations Ltd T/A Auger. Registered Office: 70 Rodney St, Liverpool L1 9AF Company No: 3088958, VAT No: 659 6999 43 Director: David Brewster BSc. C.Eng. M.I.Struct.E.
0.0m Start Survey
0.2m No Significant joint Displacement
0.3m No Significant joint Displacement
0.6m Line of sewer deviates Up
0.7m Soil and Vent Pipe Finished Survey Length
end of line
0.0m Start Survey
0.1m Joint Displacement Slight
0.3m Connection Position 10 O’clock
0.5m Joint Displacement Medium
0.7m Joint Displacement Medium
1.1m Connection Position 9 O’clock
1.3m Joint Displacement Slight
2.3m Manhole Internal
2.9m Circumferential Crack Line of sewer deviates Left
3.2m Joint Displacement Medium
3.4m Joint Displacement Medium
Line No - 8
From - MH3
Invert Depth - 0.48m
To - SVP
Pipe Size - 100mm Diameter
Pipe Material - Plastic Pipe
Line No - 9
From - MH3
Invert Depth - 0.48m
To - FWG
Pipe Size - 100mm Diameter
Pipe Material - Clay
Auger Site Investigations Ltd T/A Auger. Registered Office: 70 Rodney St, Liverpool L1 9AF Company No: 3088958, VAT No: 659 6999 43 Director: David Brewster BSc. C.Eng. M.I.Struct.E.
3.5m Foul Waste Gully Finished Survey Length
end of line
0.0m Start Survey
0.2m No Significant joint Displacement
1.6m Manhole 4 Finished Survey Length
end of line
0.0m Start Survey
0.7m No Significant joint Displacement
0.9m No Significant joint Displacement Line of sewer deviates Right
1.2m No Significant joint Displacement Line of sewer deviates Up
1.3m Finished Survey Length
end of line
Line No - 10
From - MH3
Invert Depth - 0.48m
To - MH4
Pipe Size - 100mm Diameter
Pipe Material - Plastic Pipe
Line No - 11
From - MH4
Invert Depth - 0.4m
To - W/C
Pipe Size - 100mm Diameter
Pipe Material - Plastic Pipe
Auger Site Investigations Ltd T/A Auger. Registered Office: 70 Rodney St, Liverpool L1 9AF Company No: 3088958, VAT No: 659 6999 43 Director: David Brewster BSc. C.Eng. M.I.Struct.E.
0.0m Start Survey
4.7m No Significant joint Displacement
4.9m Line of sewer deviates Right
5.0m No Significant joint Displacement
6.6m No Significant joint Displacement
7.0m Manhole 5 Finished Survey Length
end of line
0.0m Start Survey
0.3m Joint Displacement Medium
0.5m Joint Displacement Medium
0.6m Joint Displacement Large
0.8m Line of sewer deviates Up
1.0m Finished Survey Length – Line blocked off (assumed disused)
end of line
Line No - 12
From - MH4
Invert Depth - 0.40m
To - MH5
Pipe Size - 100mm Diameter
Pipe Material - Plastic Pipe
Line No - 13
From - MH1
Invert Depth - 0.30m
To - Upstream
Pipe Size - 100mm Diameter
Pipe Material - Clay
Auger Site Investigations Ltd T/A Auger. Registered Office: 70 Rodney St, Liverpool L1 9AF Company No: 3088958, VAT No: 659 6999 43 Director: David Brewster BSc. C.Eng. M.I.Struct.E.
0.0m Start Survey Water Level 5 %
1.4m No Significant joint Displacement Water Level 10 %
6.8m Water Level 15 %
7.2m Joint Displacement Medium Debris 15 % Loss – Hard Obstruction
7.5m Longitudinal Crack
7.6m Manhole 6 Finished Survey Length
end of line
0.0m Start Survey
0.3m Joint Displacement Large
1.0m Joint Displacement Medium Water Level 5 %
1.7m Joint Displacement Medium Water Level 5 %
2.2m Joint Displacement Medium
2.8m Joint Displacement Medium
3.5m Joint Displacement Medium Circumferential Crack
4.1m Joint Displacement Slight Water Level 5 %
4.7m Joint Displacement Medium Water Level 5 %
5.3m Joint Displacement Medium
5.9m Joint Displacement Medium
6.6m Joint Displacement Medium
Line No - 14
From - MH5
Invert Depth - 1.7m
To - MH6
Pipe Size - 150mm Diameter
Pipe Material - Clay
Line No - 15
From - MH6
Invert Depth - 1.4m
To - MH7
Pipe Size - 150mm Diameter
Pipe Material - Clay
Auger Site Investigations Ltd T/A Auger. Registered Office: 70 Rodney St, Liverpool L1 9AF Company No: 3088958, VAT No: 659 6999 43 Director: David Brewster BSc. C.Eng. M.I.Struct.E.
7.1m Joint Displacement Medium
7.8m Joint Displacement Slight
8.4m Joint Displacement Medium
9.0m Joint Displacement Slight
9.7m No Significant joint Displacement
10.3m Joint Displacement Medium
10.9m Joint Displacement Slight
11.5m Joint Displacement Medium
12.2m Joint Displacement Slight
12.8m Joint Displacement Slight
13.4m No Significant joint Displacement
14.1m Joint Displacement Slight
15.1m Manhole 7 Finished Survey Length
end of line
0.0m Start Survey
0.3m Joint Displacement Medium Open Joint Slight
Pipework Material Change – 100mm Clay
0.6m Line of sewer deviates Up
1.1m Soil and Vent Pipe Finish Survey Length
end of line
Line No - 16
From - MH8
Invert Depth - 0.66m
To - SVP
Pipe Size - 150mm Diameter
Pipe Material - Clay
Auger Site Investigations Ltd T/A Auger. Registered Office: 70 Rodney St, Liverpool L1 9AF Company No: 3088958, VAT No: 659 6999 43 Director: David Brewster BSc. C.Eng. M.I.Struct.E.
0.0m Start Survey
0.2m Joint Displacement Slight Line of sewer deviates Right
0.7m Joint Displacement Slight
1.0m Joint Displacement Medium Open Joint Slight
1.4m Joint Displacement Slight
2.1m Joint Displacement Slight
2.6m Joint Displacement Medium
3.2m Joint Displacement Slight Debris 20 % Loss – Hard Obstruction Scale/Grout
3.9m Joint Displacement Medium
4.5m Joint Displacement Slight
5.1m Joint Displacement Medium
5.7m Joint Displacement Medium
6.3m Joint Displacement Medium
7.0m Joint Displacement Medium
7.3m Manhole 5 Finish Survey Length
end of line
0.0m Start Survey
0.1m Joint Displacement Medium
0.5m Debris 20 % Loss – Hard Scale
0.6m Joint Displacement Slight
0.7m Line of sewer deviates Down Foul Waste Gully Finished Survey Length
end of line
Line No - 17
From - MH8
Invert Depth - 0.66m
To - MH5
Pipe Size - 150mm Diameter
Pipe Material - Clay
Line No - 18
From - MH8
Invert Depth - 0.66m
To - FWG
Pipe Size - 100mm Diameter
Pipe Material - Clay
Auger Site Investigations Ltd T/A Auger. Registered Office: 70 Rodney St, Liverpool L1 9AF Company No: 3088958, VAT No: 659 6999 43 Director: David Brewster BSc. C.Eng. M.I.Struct.E.
0.0m Start Survey
0.1m Joint Displacement Medium
0.7m Joint Displacement Medium
1.4m Joint Displacement Medium
1.7m Line of sewer deviates Up
1.8m W/C Finished Survey Length
end of line
0.0m Start Survey
0.2m Joint Displacement Slight
0.9m Joint Displacement Medium
1.2m Line of sewer deviates Down Foul Waste Gully Finished Survey Length
end of line
Line No - 19
From - MH8
Invert Depth - 0.66m
To - W/C
Pipe Size - 100mm Diameter
Pipe Material - Clay
Line No - 20
From - MH9
Invert Depth - 0.36m
To - FWG
Pipe Size - 100mm Diameter
Pipe Material - Clay
Auger Site Investigations Ltd T/A Auger. Registered Office: 70 Rodney St, Liverpool L1 9AF Company No: 3088958, VAT No: 659 6999 43 Director: David Brewster BSc. C.Eng. M.I.Struct.E.
0.0m Start Survey
0.3m Joint Displacement Slight
0.8m Joint Displacement Slight
1.4m Joint Displacement Slight
2.1m Joint Displacement Medium Circumferential Crack
2.7m Joint Displacement Slight
2.8m Circumferential Crack
3.3m Joint Displacement Slight
3.5m Joint Displacement Medium Circumferential Crack
3.9m Joint Displacement Slight
4.2m Manhole 7 Finished Survey Length
end of line
0.0m Start Survey Debris 10 % Loss
1.2m Circumferential Crack Debris 20 % Loss
1.4m Joint Displacement Slight
2.1m Joint Displacement Medium
2.7m Joint Displacement Slight Debris 10 % Loss
Line No - 21
From - MH9
Invert Depth - 0.36m
To - MH7
Pipe Size - 100mm Diameter
Pipe Material - Clay
Line No - 22
From - MH7
Invert Depth - 1.55m
To - Upstream
Pipe Size - 100mm Diameter
Pipe Material - Clay
Auger Site Investigations Ltd T/A Auger. Registered Office: 70 Rodney St, Liverpool L1 9AF Company No: 3088958, VAT No: 659 6999 43 Director: David Brewster BSc. C.Eng. M.I.Struct.E.
3.3m Finish Survey Length – Blocked with soil (assumed disused)
end of line
0.0m Start Survey
2.7m No Significant joint Displacement
4.7m Water Level 5 %
5.0m Camera Underwater
7.0m Water Level 0 % Line of sewer deviates Up Soil and Vent Pipe
7.1m Finish Survey Length
end of line
0.0m Start Survey
0.1m Joint Displacement Medium
1.0m No Significant joint Displacement
3.0m Manhole 10 Finish Survey Length
Line No - 23
From - MH7
Invert Depth - 1.55m
To - SVP
Pipe Size - 100mm Diameter
Pipe Material - Plastic Pipe
Line No - 24
From - MH7
Invert Depth - 1.55m
To - MH10
Pipe Size - 150mm Diameter
Pipe Material - Clay
Auger Site Investigations Ltd T/A Auger. Registered Office: 70 Rodney St, Liverpool L1 9AF Company No: 3088958, VAT No: 659 6999 43 Director: David Brewster BSc. C.Eng. M.I.Struct.E.
end of line
0.0m Start Survey
1.0m No Significant joint Displacement
4.0m No Significant joint Displacement
7.1m Joint Displacement Medium
7.5m Joint Displacement Slight
8.8m Manhole 10a Water Level 10 %
9.1m Joint Displacement Medium Line of sewer deviates Right
9.7m Joint Displacement Slight
10.4m Joint Displacement Medium Circumferential Crack
10.9m Joint Displacement Medium
11.7m Camera Underwater
12.5m Water Level 0 %
12.9m Joint Displacement Large
13.3m Joint Displacement Medium
13.9m Joint Displacement Large
15.0m Joint Displacement Large Open Joint Displacement – Improper Connection to Main
15.4m Main Sewer Finish Survey Length
end of line
0.0m Start Survey
2.1m No Significant joint Displacement
Line No - 25
From - MH10
Invert Depth - 1.60m
To - MAIN
Pipe Size - 150mm Diameter
Pipe Material - Clay
Line No - 26
From - MH11
Invert Depth - 0.20m
To - SWG
Pipe Size - 100mm Diameter
Pipe Material - Plastic Pipe
Auger Site Investigations Ltd T/A Auger. Registered Office: 70 Rodney St, Liverpool L1 9AF Company No: 3088958, VAT No: 659 6999 43 Director: David Brewster BSc. C.Eng. M.I.Struct.E.
2.3m Surface Water Gully Finished Survey Length
end of line
0.0m Start Survey
2.6m No Significant joint Displacement
2.7m Connection Position 12 O’clock
2.9m No Significant joint Displacement Line of sewer deviates Up
3.4m No Significant joint Displacement
3.5m Connection Position 9 O’clock
3.7m No Significant joint Displacement
4.2m No Significant joint Displacement
4.3m Connection Position 3 O’clock
4.5m No Significant joint Displacement
4.8m No Significant joint Displacement
4.9m Connection Position 12 O’clock
5.0m No Significant joint Displacement
5.1m No Significant joint Displacement Connection Position 9 O’clock
5.2m No Significant joint Displacement
5.6m No Significant joint Displacement
6.0m Line of sewer deviates Left
7.8m No Significant joint Displacement
10.6m No Significant joint Displacement
10.8m Line of sewer deviates Up
11.1m Connection Position 9 O’clock W/C Finished Survey Length
end of line
Line No - 27
From - MH11
Invert Depth - 0.20m
To - W/C
Pipe Size - 100mm Diameter
Pipe Material - Plastic Pipe
Line No - 28
From - MH11
Invert Depth - 0.20m
To - Pump Chamber
Pipe Size - 100mm Diameter
Pipe Material - Plastic Pipe
Auger Site Investigations Ltd T/A Auger. Registered Office: 70 Rodney St, Liverpool L1 9AF Company No: 3088958, VAT No: 659 6999 43 Director: David Brewster BSc. C.Eng. M.I.Struct.E.
0.0m Start Survey
5.7m No Significant joint Displacement
11.7m No Significant joint Displacement
14.4m No Significant joint Displacement
14.5m Manhole 12
14.7m No Significant joint Displacement
18.3m No Significant joint Displacement
20.7m No Significant joint Displacement
22.6m No Significant joint Displacement
22.8m No Significant joint Displacement Line of sewer deviates Right
24.1m Pump Chamber Finished Survey Length
end of line
0.0m Start Survey
0.1m Joint Displacement Slight Line of sewer deviates Left
0.2m Line of sewer deviates Right
0.6m Joint Displacement Slight
0.8m Line of sewer deviates Up Soil and Vent Pipe
1.0m Finished Survey Length
end of line
Line No - 29
From - MH13
Invert Depth - 0.3m
To - SVP
Pipe Size - 100mm Diameter
Pipe Material - Clay
Line No - 30
From - MH13
Invert Depth - 0.3m
To - Upstream
Pipe Size - 100mm Diameter
Pipe Material - Clay
Auger Site Investigations Ltd T/A Auger. Registered Office: 70 Rodney St, Liverpool L1 9AF Company No: 3088958, VAT No: 659 6999 43 Director: David Brewster BSc. C.Eng. M.I.Struct.E.
0.0m Start Survey
0.1m Joint Displacement Slight
0.7m Joint Displacement Medium
1.2m Joint Displacement Slight
1.9m Joint Displacement Slight
3.2m Joint Displacement Slight Debris 10 % Loss
3.3m No Significant joint Displacement
3.8m Connection Position 9 O’clock
3.9m Joint Displacement Medium
4.3m Joint Displacement Medium
4.6m Line of sewer deviates Up
4.8m Finished Survey Length
end of line
0.0m Start Survey
0.1m Joint Displacement Medium
0.2m Connection Position 3 O’clock
0.5m Joint Displacement Medium
1.0m Joint Displacement Medium
1.6m No Significant joint Displacement
2.1m No Significant joint Displacement Circumferential Crack
2.8m Joint Displacement Slight
3.4m Joint Displacement Slight
4.0m Joint Displacement Slight Circumferential Crack
4.9m Manhole 14 Finished Survey Length
end of line
Line No - 31
From - MH13
Invert Depth - 0.3m
To - MH14
Pipe Size - 100mm Diameter
Pipe Material - Clay
Line No - 32
From - MH14
Invert Depth - 0.4m
To - Upstream
Pipe Size - 100mm Diameter
Pipe Material - Clay
Auger Site Investigations Ltd T/A Auger. Registered Office: 70 Rodney St, Liverpool L1 9AF Company No: 3088958, VAT No: 659 6999 43 Director: David Brewster BSc. C.Eng. M.I.Struct.E.
0.0m Start Survey
0.1m Joint Displacement Slight
0.5m Joint Displacement Slight
1.1m No Significant joint Displacement
1.6m No Significant joint Displacement
2.3m Joint Displacement Medium
3.0m Joint Displacement Slight
3.6m Joint Displacement Medium
3.9m Manhole – Internal in store room (no access, under furniture)
4.3m Joint Displacement Slight
4.6m Line of sewer deviates Left
4.8m Joint Displacement Slight
5.0m Finished Survey Length
end of line
0.0m Start Survey
0.2m Water Level 10 %
0.6m No Significant joint Displacement Water Level 10 %
0.7m Connection Position 3 O’clock Water Level 10 %
1.2m Joint Displacement Slight Water Level 10 %
1.6m Joint Displacement Slight Water Level 10 %
2.2m Joint Displacement Slight Water Level 5 %
2.8m Joint Displacement Slight Water Level 5 %
3.4m Joint Displacement Slight Water Level 5 %
4.2m Manhole 15 Water Level 0 % Finished Survey Length
end of line
Line No - 33
From - MH14
Invert Depth - 0.4m
To - MH15
Pipe Size - 100mm Diameter
Pipe Material - Clay
Line No - 34
From - MH15
Invert Depth - 0.5m
To - Upstream
Pipe Size - 100mm Diameter
Pipe Material - Clay
Auger Site Investigations Ltd T/A Auger. Registered Office: 70 Rodney St, Liverpool L1 9AF Company No: 3088958, VAT No: 659 6999 43 Director: David Brewster BSc. C.Eng. M.I.Struct.E.
0.0m Start Survey
0.1m Joint Displacement Medium
0.5m Joint Displacement Slight
1.0m Connection Position 3 O’clock Pipe intrusion - Rain Water Gully
1.2m Joint Displacement Slight Open Joint Slight
1.8m Joint Displacement Slight
2.5m Joint Displacement Slight
3.2m Joint Displacement Medium
3.9m Joint Displacement Slight
4.5m Joint Displacement Slight
5.2m Joint Displacement Slight
5.5m Line of sewer deviates Left
5.9m Manhole – Internal (no access, in living quarters)
6.6m Joint Displacement Medium
7.0m Joint Displacement Medium
7.5m Connection Position 3 O’clock
7.6m Joint Displacement Slight
8.1m Joint Displacement Slight
8.4m Line of sewer deviates Up
8.5m Finished Survey Length
end of line
0.0m Start Survey
0.5m Joint Displacement Slight
1.1m Joint Displacement Slight Circumferential Crack
1.7m Joint Displacement Slight
2.3m Joint Displacement Slight
3.0m Joint Displacement Slight
3.6m Joint Displacement Slight
4.3m Joint Displacement Slight
Line No - 35
From - MH15
Invert Depth - 0.5m
To - MH16
Pipe Size - 100mm Diameter
Pipe Material - Clay
Auger Site Investigations Ltd T/A Auger. Registered Office: 70 Rodney St, Liverpool L1 9AF Company No: 3088958, VAT No: 659 6999 43 Director: David Brewster BSc. C.Eng. M.I.Struct.E.
4.8m Manhole 16 Finish Survey Length
end of line
0.0m Start Survey
0.6m Joint Displacement Slight
1.5m Joint Displacement Slight
2.4m Joint Displacement Slight
2.8m Joint Displacement Slight
3.2m Connection Position 12 O’clock
3.4m Joint Displacement Slight
3.7m Line of sewer deviates Up
3.9m Finished Survey Length
end of line
0.0m Start Survey
0.1m Joint Displacement Medium
0.8m Joint Displacement Slight
1.4m Joint Displacement Slight
2.0m Joint Displacement Slight
2.7m No Significant joint Displacement
3.3m Joint Displacement Slight
3.9m No Significant joint Displacement
4.5m No Significant joint Displacement
5.1m Joint Displacement Slight
Line No - 36
From - MH16
Invert Depth - 0.47m
To - Upstream
Pipe Size - 100mm Diameter
Pipe Material - Clay
Line No - 37
From - MH16
Invert Depth - 0.47m
To - MH17
Pipe Size - 100mm Diameter
Pipe Material - Clay
Auger Site Investigations Ltd T/A Auger. Registered Office: 70 Rodney St, Liverpool L1 9AF Company No: 3088958, VAT No: 659 6999 43 Director: David Brewster BSc. C.Eng. M.I.Struct.E.
5.7m No Significant joint Displacement
6.7m Manhole 17 – Buried under tarmac Finished Survey Length
end of line
0.0m Start Survey
0.1m Line of sewer deviates Left
0.3m Joint Displacement Medium Water Level 5 %
0.6m Joint Displacement Medium
1.2m Joint Displacement Medium Water Level 5 %
1.8m Joint Displacement Medium
2.4m Joint Displacement Slight
3.0m Joint Displacement Medium
3.2m Circumferential Crack
3.7m Manhole 18 – Buried under tarmac Finished Survey Length
end of line
0.0m Start Survey
0.5m Joint Displacement Medium
0.7m Joint Displacement Slight
0.8m Connection Position 9 O’clock
0.9m Joint Displacement Slight
2.6m Joint Displacement Slight
2.7m Connection Position 9 O’clock
2.8m Joint Displacement Slight
3.7m Manhole 19 Finished Survey Length
Line No - 38
From - MH17
Invert Depth - Unknown
To - MH18
Pipe Size - 100mm Diameter
Pipe Material - Clay
Line No - 39
From - MH18
Invert Depth - Unknown
To - MH19
Pipe Size - 100mm Diameter
Pipe Material - Clay
Auger Site Investigations Ltd T/A Auger. Registered Office: 70 Rodney St, Liverpool L1 9AF Company No: 3088958, VAT No: 659 6999 43 Director: David Brewster BSc. C.Eng. M.I.Struct.E.
end of line
0.0m Start Survey
1.0m No Significant joint Displacement
1.2m No Significant joint Displacement Line of sewer deviates Left
1.3m No Significant joint Displacement
4.6m Joint Displacement Slight
4.8m Line of sewer deviates Up Finished Survey Length
end of line
0.0m Start Survey
3.2m Manhole 20 Finished Survey Length
end of line
Line No - 40
From - MH19
Invert Depth - 0.8m
To - Upstream
Pipe Size - 100mm Diameter
Pipe Material - Plastic Pipe
Line No - 41
From - MH19
Invert Depth - 0.8m
To - MH20
Pipe Size - 100mm Diameter
Pipe Material - Plastic Pipe
Line No - 42
From - MH19
Invert Depth - 0.8m
To - FWG
Pipe Size - 100mm Diameter
Pipe Material - Plastic Pipe
Auger Site Investigations Ltd T/A Auger. Registered Office: 70 Rodney St, Liverpool L1 9AF Company No: 3088958, VAT No: 659 6999 43 Director: David Brewster BSc. C.Eng. M.I.Struct.E.
0.0m Start Survey
0.1m Line of sewer deviates Right
0.4m No Significant joint Displacement
0.6m Line of sewer deviates Up Line of sewer deviates Right
0.9m Foul Waste Gully Finished Survey Length
end of line
0.0m Start Survey
0.1m No Significant joint Displacement Line of sewer deviates Right
Pipework Material Change – 100mm Plastic Pipe
3.8m No Significant joint Displacement
4.1m Inspection Pot 23 Finished Survey Length
end of line
0.0m Start Survey
0.7m No Significant joint Displacement Line of sewer deviates Right
6.8m No Significant joint Displacement
8.3m No Significant joint Displacement
8.6m Inspection Pot – Internal (no access) Finished Survey Length
end of line
Line No - 43
From - MH20
Invert Depth - 0.97m
To - IP23
Pipe Size - 150mm Diameter
Pipe Material - Plastic Pipe
Line No - 44
From - MH20
Invert Depth - 0.97m
To - IP
Pipe Size - 100mm Diameter
Pipe Material - Plastic Pipe
Auger Site Investigations Ltd T/A Auger. Registered Office: 70 Rodney St, Liverpool L1 9AF Company No: 3088958, VAT No: 659 6999 43 Director: David Brewster BSc. C.Eng. M.I.Struct.E.
0.0m Start Survey
0.1m No Significant joint Displacement Line of sewer deviates Left
1.2m No Significant joint Displacement
1.6m Line of sewer deviates Up Finished Survey Length
end of line
0.0m Start Survey
0.5m No Significant joint Displacement
3.9m Manhole 21
5.3m No Significant joint Displacement
8.3m No Significant joint Displacement
11.6m Manhole 22
12.1m No Significant joint Displacement Line of sewer deviates Left
13.2m No Significant joint Displacement
15.9m No Significant joint Displacement
19.0m No Significant joint Displacement
22.2m No Significant joint Displacement Line of sewer deviates Right
22.7m Pipework Material Change – 150mm Clay
23.0m Joint Displacement Medium
23.8m Joint Displacement Medium
24.1m Joint Displacement Slight
Line No - 45
From - MH20
Invert Depth - 0.97m
To - Upstream
Pipe Size - 100mm Diameter
Pipe Material - Plastic Pipe
Line No - 46
From - MH20
Invert Depth - 0.97m
To - MAIN
Pipe Size - 150mm Diameter
Pipe Material - Plastic Pipe
Auger Site Investigations Ltd T/A Auger. Registered Office: 70 Rodney St, Liverpool L1 9AF Company No: 3088958, VAT No: 659 6999 43 Director: David Brewster BSc. C.Eng. M.I.Struct.E.
24.8m Joint Displacement Slight
25.4m Joint Displacement Slight
26.0m Joint Displacement Medium
26.7m Joint Displacement Slight
27.2m Joint Displacement Slight
27.8m Joint Displacement Medium
28.5m Joint Displacement Medium
29.0m Joint Displacement Medium
29.5m Joint Displacement Medium Line of sewer deviates Left Line of sewer deviates Down
30.3m Main – Joins main on blind connection Finished Survey Length
end of line
0.0m Start Survey
0.1m No Significant joint Displacement Line of sewer deviates Up
1.0m Aco Drain Finish Survey Length
end of line
0.0m Start Survey
0.1m Line of sewer deviates Up
0.6m No Significant joint Displacement
1.8m No Significant joint Displacement
1.9m No Significant joint Displacement
Line No - 47
From - MH21
Invert Depth - 1.05m
To - Aco Drain
Pipe Size - 100mm Diameter
Pipe Material - Plastic Pipe
Line No - 48
From - MH21
Invert Depth - 1.05m
To - Upstream
Pipe Size - 100mm Diameter
Pipe Material - Plastic Pipe
Auger Site Investigations Ltd T/A Auger. Registered Office: 70 Rodney St, Liverpool L1 9AF Company No: 3088958, VAT No: 659 6999 43 Director: David Brewster BSc. C.Eng. M.I.Struct.E.
2.6m No Significant joint Displacement
2.7m Connection Position 12 O’clock
2.8m No Significant joint Displacement
3.6m No Significant joint Displacement
3.7m Connection Position 12 O’clock
3.8m No Significant joint Displacement
4.0m No Significant joint Displacement
4.2m Line of sewer deviates Left
4.4m No Significant joint Displacement
4.6m Line of sewer deviates Up Finished Survey Length
end of line
0.0m Start Survey
0.1m No Significant joint Displacement
0.2m No Significant joint Displacement Line of sewer deviates Left Line of sewer deviates Up
0.3m No Significant joint Displacement Pipework Material Change – 100mm Plastic Pipe
0.6m No Significant joint Displacement
1.1m No Significant joint Displacement Line of sewer deviates Right
1.6m No Significant joint Displacement
1.7m Connection Position 2 O’clock
1.8m No Significant joint Displacement
3.0m No Significant joint Displacement
3.1m Connection Position 9 O’clock
3.2m No Significant joint Displacement
3.9m No Significant joint Displacement
4.0m Connection Position 12 O’clock
4.1m No Significant joint Displacement
4.3m No Significant joint Displacement
4.5m Line of sewer deviates Up Finished Survey Length
end of line
Line No - 49
From - MH22
Invert Depth - 1.20m
To - Upstream
Pipe Size - 150mm Diameter
Pipe Material - Plastic Pipe
Auger Site Investigations Ltd T/A Auger. Registered Office: 70 Rodney St, Liverpool L1 9AF Company No: 3088958, VAT No: 659 6999 43 Director: David Brewster BSc. C.Eng. M.I.Struct.E.
0.0m Start Survey
0.1m No Significant joint Displacement Line of sewer deviates Left
0.3m No Significant joint Displacement
0.6m Line of sewer deviates Up
0.7m Soil and Vent Pipe Finished Survey Length
end of line
0.0m Start Survey
0.1m No Significant joint Displacement
0.2m Foul Waste Gully Finished Survey Length
end of line
Line No - 50
From - IP23
Invert Depth - 0.3m
To - SVP
Pipe Size - 100mm Diameter
Pipe Material - Plastic Pipe
Line No - 51
From - IP23
Invert Depth - 0.3m
To - FWG
Pipe Size - 100mm Diameter
Pipe Material - Plastic Pipe
Line No - 52
From - IP23
Invert Depth - 0.3m
To - SVP
Pipe Size - 100mm Diameter
Pipe Material - Plastic Pipe
Auger Site Investigations Ltd T/A Auger. Registered Office: 70 Rodney St, Liverpool L1 9AF Company No: 3088958, VAT No: 659 6999 43 Director: David Brewster BSc. C.Eng. M.I.Struct.E.
0.0m Start Survey
0.1m No Significant joint Displacement
0.2m Line of sewer deviates Up
0.3m Soil and Vent Pipe Finish Survey Length
end of line
Auger Site Investigations Ltd T/A Auger. Registered Office: 70 Rodney St, Liverpool L1 9AF Company No: 3088958, VAT No: 659 6999 43 Director: David Brewster BSc. C.Eng. M.I.Struct.E.
LIMITATIONS OF REPORT
We were commissioned to carry out an inspection of the accessible areas of the drainage to the
property, identifying any major defects and recommending any repair works that may be
necessary. It should be appreciated that the exact layout of the system cannot be confirmed
without the exposure of inaccessible branches and connections etc.
The lack of any significant defects within the main drainage line should not be regarded as a
guarantee of watertightness. Defects may be encountered upon exposure of inaccessible branches
and gullies etc.
The contents of this report are strictly confined to comments concerning those terms outlined
above. It is not a structural survey and must not be construed as such.
The views expressed in this report are based entirely upon a visual examination of the drainage,
supported by information obtained from a drainage CCTV inspection / water pressure test.
RIGHTS OF ORIGINATOR
This report was for the sole use of the client. It must not be reproduced or transferred to any
other third party without the express written consent of the author.
We will consider the re-issue of the report in its original form to a third party within 6 months of
the original report date for an administrative fee. (currently £100.00 excl VAT).
Upon the lapse of a 6-month period the report can only be re-issued following a full re-
inspection, which will attract a full survey fee.
We reserve the right to refuse copies of the report to any third party (other than those named
above). We also reserve the right to amend our opinions in the event of additional information
being made available at some future date.
Jane Hibbert Account Manager
Auger