  • Message from Jorge Glas, Coordinating Minister for the Strategic Sectors

    Introduction Strategic Sectors

    Ecuador Investing in EcuadorGuidelines to present a bidContracting Modes

    Electricity Projects Hydroelectric Wind Power Geothermic Thermal Transmission Oil & Gas

    Water ProjectsMining Projects Oil and Gas Projects Telecommunications Projects

    Investment Catalogue for Strategic Projects

  • Dear friends,

    Due to its privileged geographical position, the safety offered, a solid legal framework, a favourable perfor-mance of the economy which according to figures of the Economic Commission for Latin America and the Caribbean (ECLAC), is within the best in Latin America and its modern physical infrastructure and road network, as well as the openness and responsibility of the government of Economist Rafael Correa that promotes investment under clear rules, Ecuador is now ready to welcome foreign investment and to direct it to areas that are considered of strategic importance for the countrys economy.

    A total of USD 4.546 million have been invested in the Strategic Sectors between 2007 and 2009: USD 3.077 million for Oil and Gas; USD 554,60 million for water resources; USD 474 million for Electricity and USD 441 million for Telecommunications.

    Firm and sovereign steps guide us forward. A sample of this is the signing of the contract to finance the hydroelectric Project Coca-Codo Sinclair with Chinas EXIMBANK for a total of USD 1.682.745.000. This will allow us to transform into a reality, the largest infrastructure project in the country, that will generate 1.500 MW and energy of 8.600 GW- hour per year to cover a 35% of our energy demand. This is a true demons-tration of the confidence that foreign investors have in Ecuador.

    Undoubtedly, the Strategic Sectors constitute the dynamic power of the Ecuadorian economy, and are the ones to generate direct and indirect employment, promoting important investments and opening new opportunities, and these represent the main source to recovering the wealth of the country and that leads to public works and services that benefit all the Ecuadorians.

    There are four ethical principles set by the present Government, which must be met: Respect for workers rights, fair prices regarding the offer of goods and services, compliance with tax obligations and respect to the rights of nature, Ecuador opens its doors to receive foreign investment, in a relation of mutual benefit that will contribute to development and growth.

    JORGE GLAS ESPINELMINISTER OF THE STRATEGIC SECTORS

  • Introduction

    The main objective of the Government of Economist Rafael Correa is to build infrastructure works to attend the demands of 14 million Ecuadorians, to exploit strategic areas in the country to generate resources that will benefit the entire population, as well as the acquisition of resources that will allow developing these and other works. With this background, the Coordinating Ministry for Strategic Sectors presents the first edition of the Investment Catalogue for Strategic Projects, which will serve as a guide for Governments and com-panies in the world to find areas where they can invest, as well as the legal an economic conditions that Ecuador offers to its investors.

    The present document is a joint effort of the States Portfolios that have governing power over the areas of telecommunications, oil and gas and mining, water resources and electricity, renewable energies, to strengthen relations with countries in the international community and to generate new alliances with strategic partners, to build important infrastructure works and use of natural resources. Welcome

  • Strategic Sectors

    The Coordinating Ministry for Strategic Sectors proposes, coordinates, executes, articula-tes, controls and evaluates policies, projects, inter-sectorial plans and actions that the Mi-nistries of Non Renewable Natural Resources, Electricity and Renewable Energies, Telecom-munications and the National Secretariat for Water Resources undertake and administrate to fulfil the National Development Plan and improve citizens quality of life; additionally it executes specific programs in the short and medium run that enhance the new sustainable development model of the country.

    The Ecuadorian Constitution considers that energy in all its forms, telecommunications, non renewable natural resources and refinement of oil and gas, biodiversity and genetic heritage, radio electricitys spectrum, water resources, among others, constitute the strate-gic resources of the nation.

    Vision

    Ensure the adequate, sustainable and efficient use of mining resources, oil and gas, water resources and the efficient provision of public services in telecommunications and electrici-ty, generating the maximum economic impacts and social benefit under the least environ-mental impact, directed at guaranteeing the rights of the population.

    Our Strategic Objectives:

    1. TO BE SOVEREING, with self-sufficiency in the generation of electricity, oil and gas (by-products) refinement, access to ICTs and management of water resources.

    2. TO BE PRODUCTIVE, with quality in the electricity and telecommunications services; oil and gas, mineral exploitation; and efficient use of water resources.

    3. TO BE INCLUSIVE in the provision of public services accessible to all the population, and to have access to exploit resources and benefit from their income.

  • Ecuador

    Ecuador limits at the north with Colombia, to the south and east with Peru, and to the west with the Pacific Ocean. There are four distinct geographical zones. The first one is the Sierra or Andes highlands, which begins at the northern border with Colombia and ends at the southern border with Peru. The second region is the Coast, a coastal plain between the Andes and the Pacific Ocean. The third one is the Amazon made up by the upper basin of the Amazon River. The fourth one is the Galapagos Islands Archipelago, located at 1.000 KM. from the continent, in the Pacific Ocean.

    The Ecuadorian territory has 24 provinces which are divided into cantons and subdivided into rural or urban parishes. The official language and the intercultural relation are in Spanish.

    It has a rich fauna and flora, reason why it is among the list of mega diverse countries.

  • Investing in Ecuador

    Ecuador offers a stable regulatory framework where investment incentives are promoted in Strate-gic Sectors, with opportunities to create mutual benefits and achieve the countrys development.

    The Government of the Economist Rafael Correa has as priority to provide the public and private, national and foreign sectors, with tools that will allow consolidating the needed conditions to at-tract investors.

    Transparency in public contracting Public contracting processes will be carried out through the National Institute of Public Procure-ment (INCOP) that articulates, harmonizes and controls the execution of works made with public resources, through speedy procedures, transparent, efficient and technologically updated that ease control works both at the contracting entities as well as with the suppliers and citizens in general.

    For further information visit: www.compraspublicas.gov.ec

  • Guidelines to present a bid

    What is relevant when assessing an offer:

    Companies with recognized international performance Competitive economic offer Quality of the materials, equipment and service Percentage of national aggregated value

    If the offer includes financing:

    Firm financing offer with a lending organization internationally known. Financing percentage over the Investment value Credit terms Grace period to pay the capital (at least equal to the execution time of the project) Interest rate (all in cost)

  • Direct financing Government to Government

    International Bidding with Financing

    Strategic Alliances

    Service Contracts

    Auction Bidding

    CO N T R AC T I N G M O D E S

  • Punto Focal: Loly Montesinos, Directora de Gestin Internacional Ministerio de Coordinacin de los Sectores Estratgicos [email protected] Telf.: (593-2) 2260670

    ENTIDAD RECTORA Ministerio de Electricidad y Energa RenovableCOBERTURA Y LOCALIZACIN Provincias de Pichincha e Imbabura

    NIVEL DE ESTUDIOS En fase de factibilidad y de diseos denitivos.POTENCIA 187 MW

    POBLACIN BENEFICIADA Toda la poblacin del EcuadorIMPACTO AMBIENTAL Impacto ambiental menor, con aplicacin a Mecanismos de Desarrollo Limpio

    MONTO TOTAL INVERSIN USD 355500.000 FINANCIAMIENTO REQUERIDO USD 302175.000

    Nombre Proyecto | CHONTAL

    Datos Tcnicos

    Indicadores Financieros

    DESCRIPCIN:Considera dos centrales hidroelctricas a pie de presa que aprovechan el caudal del ro Guayllabamba a travs de una presa de 91m. de altura ubicada en el sector de San Jos; y en cascada, la presa del Chontal ubicada aguas abajo de San Roque, de 63m. de altura.

    P R O J E C T SELECTRICITY

    > > H I D R O E L E C T R I C

    Modalidades de Contratacin

    To increase electricity coverage, ensure reliance and quality of the supply, self-suciency by 2012; to promote the ecient and reasonable use of energy and encourage regional electricity integration. These are some of the objectives that Ecuador is aiming at, through the development and implementation of an eective policy in the electricity sector and project management.

  • Punto Focal: Loly Montesinos, Directora de Gestin InternacionalMinisterio de Coordinacin de los Sectores Estratgicos [email protected] Telf.: (593-2) 2260670

    EXECUTING AGENCY Ministry of Electricity and Renewable EnergiesCOVERAGE AND LOCATION Pichincha and Imbabura Provinces.

    STUDY LEVEL In feasibility stage and denite design (I Trimester 2011)POWER 187 MW

    BENEFICIARY POPULATION All the Ecuadorian population. ENVIRONMENTAL IMPACT Low environmental impact, applying Clean Development Mechanisms.

    TOTAL INVESTMENT AMOUNT USD 355500.000 REQUIRED FINANCING USD 302175.000

    Name of the project | CHONTAL

    Technical Data

    Financial Indicators

    DESCRIPTION:It considers two hydroelectric power stations at the lowest level of the dam, using the ow of Guayllabamba River through a dam of 91 metres of height located at San Jose area; and using the energy of a waterfall at Chontal dam, located down river of San Roque, of 63 mt. of height.

    Contracting Modes

    Focal Point: Loly Montesinos, International Management DirectorStrategic Sectors Coordination Ministry [email protected] Phone: (593-2) 2260670

    ENTIDAD RECTORA Ministerio de Electricidad y Energa RenovableCOBERTURA Y LOCALIZACIN Provincia de El Oro.

    NIVEL DE ESTUDIOS Estudios de factibilidad realizados, en proceso diseos denitivos.POTENCIA 87 MW

    POBLACIN BENEFICIADA Toda la poblacin ecuatoriana IMPACTO AMBIENTAL Impacto ambiental menor, con aplicacin a Mecanismos de Desarrollo Limpio.

    MONTO TOTAL INVERSIN USD 224652.458 FINANCIAMIENTO REQUERIDO USD 190954.589

    Nombre Proyecto | LA UNIN

    Datos Tcnicos

    Indicadores Financieros

    DESCRIPCIN:Proyecto Hidroelctrico que utiliza un paso elevado y cmara de interconexin antes del ingreso al tnel de conduccin del aprovechamiento del caudal del ro La Unin. La cota de la seccin nal del canal de descarga se ubica a 99,90 m.s.n.m.

    Modalidades de Contratacin

  • Focal Point: Loly Montesinos, International Management DirectorStrategic Sectors Coordination Ministry [email protected] Phone: (593-2) 2260670

    EXECUTING AGENCY Ministry of Electricity and Renewable Energies COVERAGE AND LOCATION El Oro Province.

    STUDY LEVEL Denitive studies in progressPOWER 87 MW

    BENEFICIARY POPULATION All the Ecuadorian population.ENVIRONMENTAL IMPACT Low environmental impact, applying Clean Development Mechanisms.

    TOTAL INVESTMENT AMOUNT USD 224652.458 REQUIRED FINANCING USD 190954.589

    Name of the Project | LA UNIN

    Technical Data

    Financial Indicators

    DESCRIPTION:The Hydroelectric Project uses an overpass and interconnection chamber prior to the entry to the conduction tunnel to benet from the ow of the Union river. The altitude of the nal section of the download channel is at 99,90 m.a.s.l.

    Contracting Modes

    Punto Focal: Loly Montesinos, Directora de Gestin InternacionalMinisterio de Coordinacin de los Sectores Estratgicos [email protected] Telf.: (593-2) 2260670

    ENTIDAD RECTORA Ministerio de Electricidad y Energa RenovableCOBERTURA Y LOCALIZACIN Provincia del Azuay.

    NIVEL DE ESTUDIOS Estudios denitivos en ejecucin.POTENCIA 270 MW

    POBLACIN BENEFICIADA Toda la poblacin ecuatoriana.IMPACTO AMBIENTAL Impacto ambiental menor, con aplicacin a Mecanismos de Desarrollo Limpio

    MONTO TOTAL INVERSIN USD 495989.324 FINANCIAMIENTO REQUERIDO USD 421590.925

    Nombre Proyecto | MINAS - SAN FRANCISCO

    Datos Tcnicos

    Indicadores Financieros

    DESCRIPCIN:El trazado de las obras propuestas inicia aguas abajo de la conuencia de los ros San Francisco y Jubones; con un trazado de su conduccin por el margen derecho del Jubones, hasta llegar al sector de Gramalote donde se ubicar la Chimenea de Equilibrio y la Casa de Mquinas.

    Modalidades de Contratacin

  • Punto Focal: Loly Montesinos, Directora de Gestin InternacionalMinisterio de Coordinacin de los Sectores Estratgicos [email protected] Telf.: (593-2) 2260670

    ENTIDAD RECTORA Ministerio de Electricidad y Energa RenovableCOBERTURA Y LOCALIZACIN Provincias de Pichincha, Santo Domingo de los Tschilas y Cotopaxi.

    NIVEL DE ESTUDIOS Estudios denitivos de construccin, e impacto ambiental culminados.POTENCIA 246 MW

    POBLACIN BENEFICIADA Toda la poblacin ecuatoriana IMPACTO AMBIENTAL Impacto ambiental menor, con aplicacin a Mecanismos de Desarrollo Limpio.

    MONTO TOTAL INVERSIN USD 470596.000 FINANCIAMIENTO REQUERIDO USD 400006.600

    Nombre Proyecto | TOACHI - PILATN

    Datos Tcnicos

    Indicadores Financieros

    DESCRIPCIN:El proyecto hidroelctrico Toachi-Pilatn es una obra que se desarrolla entre 1.107 y 737 m.s.n.m., y comprende dos centrales que aprovechan en cascada el caudal de Pilatn-Sarapullo y el Toachi- Alluriqun.

    Modalidades de ContratacinContracting Modes

    Focal Point: Loly Montesinos, International Management DirectorStrategic Sectors Coordination Ministry [email protected] Phone: (593-2) 2260670

    EXECUTING AGENCY Ministry of Electricity and Renewable Energies COVERAGE AND LOCATION Azuay Province.

    STUDY LEVEL Denitive studies in progress.POWER 270 MW

    BENEFICIARY POPULATION All the ecuadorian population.ENVIRONMENTAL IMPACT Low environmental impact, applying Clean Development Mechanisms.

    TOTAL INVESTMENT AMOUNT USD 495989.324 REQUIRED FINANCING USD 421590.925

    Name of the Project | MINAS - SAN FRANCISCO

    Technical Data

    Financial Indicators

    DESCRIPTION:The proposal is to begin downstream at the junction of San Francisco and Jubones rivers, the layout for water conduction will be at the right margin of Jubones river up to the area of Gramalote, where the Equilibrium Funnel and Engine House are located

  • Punto Focal: Loly Montesinos, Directora De Gestin InternacionalMinisterio de Coordinacin de los Sectores Estratgicos [email protected] Telf.: (593-2) 2260670

    ENTIDAD RECTORA Ministerio de Electricidad y Energa RenovableCOBERTURA Y LOCALIZACIN Provincia de Pichincha.

    NIVEL DE ESTUDIOS El proyecto se encuentra en fase de factibilidad.POTENCIA 440 MW

    POBLACIN BENEFICIADA Toda la poblacin ecuatoriana.IMPACTO AMBIENTAL Impacto ambiental menor, con aplicacin a Mecanismos de Desarrollo Limpio .

    MONTO TOTAL INVERSIN USD 727000.000 FINANCIAMIENTO REQUERIDO USD 617950.000

    Nombre Proyecto | CHESP - PALMA REAL

    Datos Tcnicos

    Indicadores Financieros

    DESCRIPCIN:El Proyecto Hidroelctrico contempla una presa, tnel de conduccin, pozo de carga y casa de mquinas. A construirse en la sub cuenca hidrogrca del Guayallabamba, ubicado en el tramo medio del ro a unos 30 Km. al norte de Quito.

    Modalidades de Contratacin

    Focal Point: Loly Montesinos, International Management DirectorStrategic Sectors Coordination Ministry [email protected] Phone: (593-2) 2260670

    EXECUTING AGENCY Ministry of Electricity and Renewable Energies COVERAGE AND LOCATION Pichincha, Santo Domingo de los Tschilas and Cotopaxi Provinces

    STUDY LEVEL Construction and environmental studies completed, bidding. POWER 246 MW

    BENEFICIARY POPULATION All the ecuadorian populationENVIRONMENTAL IMPACT Low environmental impact, applying Clean Development Mechanisms

    TOTAL INVESTMENT AMOUNT USD 470596.000 REQUIRED FINANCING USD 400006.600

    Name of the Project | TOACHI - PILATN

    Technical Data

    Financial Indicators

    DESCRIPTION:The hydroelectric project Toachi-Pilatn is a project that develops between 1.107 y 737 m.a.s.l. and includes two power stations that use the ow of Pilatn-Sarapullo and Toachi- Alluriqun.

    Contracting Modes

  • Focal Point: Loly Montesinos, International Management DirectorStrategic Sectors Coordination Ministry [email protected] Phone: (593-2) 2260670

    EXECUTING AGENCY Ministry of Electricity and Renewable EnergiesCOVERAGE AND LOCATION Pichincha Province.

    STUDY LEVEL The Project is at feasibility stage. POWER 270 MW

    BENEFICIARY POPULATION All the ecuadorian population.ENVIRONMENTAL IMPACT Low environmental impact, applying Clean Development Mechanisms

    TOTAL INVESTMENT AMOUNT USD 727000.000 REQUIRED FINANCING USD 617950.000

    Nombre Proyecto | CHESP - PALMA REAL

    Technical Data

    Financial Indicators

    DESCRIPTION:The Hydroelectric Project considers a dam, a conduction tunnel, loading well, Engine House. Regarding the equipments and taking into account that the slope will be considerably higher, it is suggested to use Pelton Units (Vertical Axis). Considering a Nominal Flow of 80 M3/s with 3 Pelton Units, a power of 146 MW (Total 440 MW) can be obtained for each unit with an external diameter for the roll of 3.350 mm.

    Contracting Modes

    Punto Focal: Loly Montesinos, Directora de Gestin InternacionalMinisterio de Coordinacin de los Sectores Estratgicos [email protected] Telf.: (593-2) 2260670

    ENTIDAD RECTORA Ministerio de Electricidad y Energa Renovable COBERTURA Y LOCALIZACIN Provincia Del Napo.

    NIVEL DE ESTUDIOS Factibilidad y diseo se encuentran terminados.POTENCIA 100 MW

    POBLACIN BENEFICIADA Toda la poblacin ecuatoriana.IMPACTO AMBIENTAL Impacto ambiental menor, con aplicacin a Mecanismos de Desarrollo Limpio.

    MONTO TOTAL INVERSIN USD 190524.730 FINANCIAMIENTO REQUERIDO USD 161946.020

    Nombre Proyecto | QUIJOS-BAEZA

    Datos Tcnicos

    Indicadores Financieros

    DESCRIPCIN:El proyecto conformado por los proyectos hidroelctricos Quijos y Baeza est ubicado en las estribaciones de la Cordillera Oriental, entre las cotas 2.323 y 1.806 m.s.n.m., la cuenca que se aprovecha en el Proyecto Hidroelctrico Quijos-Baeza alcanza una supercie de 694 Km2.

    Modalidades De Contratacin

  • Punto Focal: Loly Montesinos, Directora de Gestin InternacionalMinisterio de Coordinacin de los Sectores Estratgicos [email protected] Telf.: (593-2) 2260670

    ENTIDAD RECTORA Ministerio de Electricidad y Energa RenovableCOBERTURA Y LOCALIZACIN Provincia de Pichincha.

    NIVEL DE ESTUDIOS El proyecto est en fase de pre-factibilidad.POTENCIA 90 MW

    POBLACIN BENEFICIADA Toda la poblacin ecuatoriana.IMPACTO AMBIENTAL Impacto ambiental menor, con aplicacin a Mecanismos de Desarrollo Limpio.

    MONTO TOTAL INVERSIN USD 156633.799 FINANCIAMIENTO REQUERIDO USD 133138.729

    Nombre Proyecto | CHIRAPI

    Datos Tcnicos

    Indicadores Financieros

    DESCRIPCIN:El Proyecto Hidroelctrico Chirapi est constituido por una presa de hormign a gravedad para derivar los caudales del ro Guayllabamba. Est ubicada en la cota 645 m.s.n.m. en el cauce del ro Guayllabamba, tiene 30m de altura mxima sobre la cuenca y una longitud de coronacin de 150m. aproximadamente.

    Modalidades De Contratacin

    Focal Point: Loly Montesinos, International Management DirectorStrategic Sectors Coordination Ministry [email protected] Phone: (593-2) 2260670

    EXECUTING AGENCY Ministry of Electricity and Renewable EnergiesCOVERAGE AND LOCATION Napo Province.

    STUDY LEVEL Feasibility and design studies are completed POWER 100 MW

    BENEFICIARY POPULATION All the ecuadorian population.ENVIRONMENTAL IMPACT Low environmental impact, applying Clean Development

    TOTAL INVESTMENT AMOUNT USD 190524.730 REQUIRED FINANCING USD 161946.020

    Name of the Project | QUIJOS-BAEZA

    Technical Data

    Financial Indicators

    DESCRIPTION:The Hydroelectric Project is made up of two projects: Quijos and Baeza. It is located at the foothills of the Eastern Range, between the altitudes 2.323 and 1.806 m.a.s.l. The amount of watershed used at the Hydroelectric Project Quijos-Baeza has a surface of 694 Km2.

    Contracting Modes

  • Punto Focal: Loly Montesinos, Directora de Gestin InternacionalMinisterio de Coordinacin de los Sectores Estratgicos [email protected] Telf.: (593-2) 2260670

    ENTIDAD RECTORA Ministerio de Electricidad y Energa RenovableCOBERTURA Y LOCALIZACIN Provincia de Morona Santiago.

    NIVEL DE ESTUDIOS Diseo denitivo en realizacin.POTENCIA 400 MW

    POBLACIN BENEFICIADA Toda la poblacin ecuatoriana.IMPACTO AMBIENTAL Impacto ambiental menor, con aplicacin a Mecanismos de Desarrollo Limpio.

    MONTO TOTAL INVERSIN USD 507000.000 FINANCIAMIENTO REQUERIDO USD 430950.000

    Nombre Proyecto | CARDENILLO

    Datos Tcnicos

    Indicadores Financieros

    DESCRIPCIN:La Central Paute Cardenillo, corresponde a la cuarta etapa del complejo Paute Integral, utiliza las aguas turbinadas de la Central Paute Sopladora y est localizado en el margen derecho del ro Paute, entre las cotas 925 y 525 m.s.n.m., aproximadamente.

    Modalidades De Contratacin

    Focal Point: Loly Montesinos, International Management DirectorStrategic Sectors Coordination Ministry [email protected] Phone: (593-2) 2260670

    EXECUTING AGENCY Ministry of Electricity and Renewable EnergiesCOVERAGE AND LOCATION Pichincha Province.

    STUDY LEVEL The Project Is In Pre-feasibility Phase.POWER 90 MW

    BENEFICIARY POPULATION All the ecuadorian population.ENVIRONMENTAL IMPACT Low environmental impact, applying Clean Development Mechanisms.

    TOTAL INVESTMENT AMOUNT USD 156633.799 REQUIRED FINANCING USD 133138.729

    Name of the Project | CHIRAP

    Technical Data

    Financial Indicators

    DESCRIPTION:The Hydroelectric Project Chirapi is made of a concrete dam activated by gravity to receive the water ow of Guayllabamba River. The dam is located at the altitude of 645 meters above sea level (masl) in the river bed of Guayllabamba RIver, it has a maximum altitude of 30 mt. over the river bed and a crowning length of 150 mt. approximately.

    Contracting Modes

  • Punto Focal: Loly Montesinos, Directora de Gestin InternacionalMinisterio de Coordinacin de los Sectores Estratgicos [email protected] Telf.: (593-2) 2260670

    ENTIDAD RECTORA Ministerio de Electricidad y Energa RenovableCOBERTURA Y LOCALIZACIN Provincias de Pichincha y Esmeraldas.

    NIVEL DE ESTUDIOS Pre factibilidadPOTENCIA 150 MW

    POBLACIN BENEFICIADA Toda la poblacin ecuatoriana.IMPACTO AMBIENTAL Impacto ambiental menor, con aplicacin a Mecanismos de Desarrollo Limpio.

    MONTO TOTAL INVERSIN USD 244000.000 FINANCIAMIENTO REQUERIDO USD 207400.000

    Nombre Proyecto | LLURIMAGUAS

    Datos Tcnicos

    Indicadores Financieros

    DESCRIPCIN:Aprovechamiento de los recursos hidro-energticos del ro Guayllabamba que prev la construccin, en los tramos medio y bajo, de una cascada a pie de presa en tres centrales del Sistema Interconectado del Guayllabamba. Las investigaciones consideraron la construccin de proyectos con embalses de poca capacidad, preferiblemente con el esquema de presas de derivacin.

    Modalidades De Contratacin

    Focal Point: Loly Montesinos, International Management DirectorStrategic Sectors Coordination Ministry [email protected] Phone: (593-2) 2260670

    EXECUTING AGENCY Ministry of Electricity and Renewable EnergiesCOVERAGE AND LOCATION Morona Santiago Province.

    STUDY LEVEL Denite design in progress.POWER 400 MW

    BENEFICIARY POPULATION All the ecuadorian population.ENVIRONMENTAL IMPACT Low environmental impact, applying Clean Development Mechanisms.

    TOTAL INVESTMENT AMOUNT USD 507000.000 REQUIRED FINANCING USD 430950.000

    Name of the Project | CARDENILLO

    Technical Data

    Financial Indicators

    DESCRIPTION:The Paute Cardenillo Central, belongs to the fourth stage of the Paute Integral Complex. It uses the water from the turbines at Paute Sopladora Power Station and is located at the right margin of Paute RIver, at an altitude of 925 and 525 m.a.s.l approximately.

    Contracting Modes

  • Punto Focal: Loly Montesinos, Directora de Gestin InternacionalMinisterio de Coordinacin de los Sectores Estratgicos [email protected] Telf.: (593-2) 2260670

    ENTIDAD RECTORA Ministerio de Electricidad y Energa Renovable COBERTURA Y LOCALIZACIN Provincia de Pichincha.

    NIVEL DE ESTUDIOS Pre-factibilidadPOTENCIA 176 MW

    POBLACIN BENEFICIADA Toda la poblacin ecuatoriana.IMPACTO AMBIENTAL Impacto ambiental menor, con aplicacin a Mecanismos de Desarrollo Limpio.

    MONTO TOTAL INVERSIN USD 253000.000 FINANCIAMIENTO REQUERIDO USD 215050.000

    Nombre Proyecto | MANDURIACU

    Datos Tcnicos

    Indicadores Financieros

    DESCRIPCIN:EL Proyecto Hidroelctrico Manduriacu Grande est situado en la cuenca baja del ro Guayllabamba, entre las cotas 520 y 428m., desde un sitio a 1,50Km., aguas arriba de la conuencia del ro Manduriacu Grande hasta 1,10Km. aguas arriba de la conuencia del ro Guayllabamba con el Pachijal. El proyecto est constituido por una presa de hormign, un tnel de presin, y casas de mquinas superciales.

    Modalidades De Contratacin

    Focal Point: Loly Montesinos, International Management DirectorStrategic Sectors Coordination Ministry [email protected] Phone: (593-2) 2260670

    EXECUTING AGENCY Ministry of Electricity and Renewable EnergiesCOVERAGE AND LOCATION Pichincha and Esmeraldas Provinces.

    STUDY LEVELS Pre-feasibility stage.POWER 150 MW

    BENEFICIARY POPULATION All the ecuadorian population.ENVIRONMENTAL IMPACT Low environmental impact, applying Clean Development Mechanisms.

    TOTAL INVESTMENT AMOUNT USD 244000.000REQUIRED FINANCING USD 207400.000

    Name of the Project | LLURIMAGUAS

    Technical Data

    Financial Indicators

    DESCRIPTION:To use the water resources of Guayllabamba River, for such purpose, a waterfall at the foot of the dam will be built with three power plants of the interconnected system of Guayllabamba. The studies considered building projects of small capacity dams, preferably with a scheme of derivation dams.

    Contracting Modes

  • Punto Focal: Loly Montesinos, Directora de Gestin InternacionalMinisterio de Coordinacin de los Sectores Estratgicos [email protected] Telf.: (593-2) 2260670

    ENTIDAD RECTORA Ministerio de Electricidad y Energa RenovableCOBERTURA Y LOCALIZACIN Provincia de Morona Santiago.

    NIVEL DE ESTUDIOS Pre factibilidad en proceso de contratacin.POTENCIA 2300 MW

    POBLACIN BENEFICIADA Toda la poblacin ecuatoriana.IMPACTO AMBIENTAL Impacto ambiental menor con aplicacin a Mecanismos de Desarrollo Limpio.

    MONTO TOTAL INVERSIN USD 2760.000.000 FINANCIAMIENTO REQUERIDO USD 2346.000.000

    Nombre Proyecto | COMPLEJO HIDROELCTRICO RO ZAMORA

    Datos Tcnicos

    Indicadores Financieros

    DESCRIPCIN:Cuenta con el diseo de aprovechamiento del ro Zamora con una presa de gravedad sobre la cual se ubica el vertedero de excesos con capacidad para evacuar la crecida milenaria, un canal de desvo ubicado en el margen izquierdo, obra de toma, tnel de carga, chimenea de equilibrio, tubera de presin y casa de mquinas en caverna, tneles de descarga; estructuras ubicadas en el margen derecho del ro.

    Modalidades De Contratacin

    Focal Point: Loly Montesinos, International Management DirectorStrategic Sectors Coordination Ministry [email protected] Phone: (593-2) 2260670

    EXECUTING AGENCY Ministry of Electricity and Renewable EnergiesCOVERAGE AND LOCATION Pichincha Province.

    STUDY LEVEL Pre-feasibility stagePOWER 176 MW

    BENEFICIARY POPULATION All the ecuadorian population.ENVIRONMENTAL IMPACT Low environmental impact, applying Clean Development Mechanisms.

    TOTAL INVESTMENT AMOUNT USD 253000.000 REQUIRED FINANCING USD 215050.000

    Name of the Project | MANDURIACU

    Technical Data

    Financial Indicators

    DESCRIPTION:The hydroelectric Project Manduriacu Grande is located at the lower basin of Guayllabamba River, between the altitudes 520 and 428 mts, starting at a place 1,50 Km. upstream of the conuence of Manduriacu Grande River up to 1,10 Km. upstream of the conuence of the rivers Guayllabamba and Pachijal. The Project is made up of a concrete dam, a pressure tunnel and installations for machinery at the surface.

    Contracting Modes

  • Punto Focal: Loly Montesinos, Directora de Gestin InternacionalMinisterio de Coordinacin de los Sectores Estratgicos [email protected] Telf.: (593-2) 2260670

    ENTIDAD RECTORA Ministerio de Electricidad y Energa RenovableCOBERTURA Y LOCALIZACIN Provincias de Pichincha e Imbabura.

    NIVEL DE ESTUDIOS Factibilidad (I Trimestre 2011)POTENCIA 200 MW

    POBLACIN BENEFICIADA Toda la poblacin ecuatoriana.IMPACTO AMBIENTAL Impacto ambiental menor, con aplicacin a Mecanismos de Desarrollo Limpio.

    MONTO TOTAL INVERSIN USD 296000.000FINANCIAMIENTO REQUERIDO USD 251600.000

    Nombre Proyecto | TORTUGO

    Datos Tcnicos

    Indicadores Financieros

    DESCRIPCIN:Aprovechamiento de los recursos hidro-energticos del ro Guayllabamba que prev la construccin, en el tramo medio y bajo del ro, de una cascada a pie de presa en tres centrales del Sistema Interconectado del Guayllabamba. Las investigaciones consideraron la construccin de proyectos con embalses de poca capacidad, preferiblemente con el esquema de presas de derivacin.

    Modalidades De Contratacin

    Focal Point: Loly Montesinos, International Management DirectorStrategic Sectors Coordination Ministry [email protected] Phone: (593-2) 2260670

    EXECUTING AGENCY Ministry of Electricity and Renewable EnergiesCOVERAGE AND LOCATION Morona Santiago Province.

    STUDY LEVEL Pre-feasibility studies in bidding process.POWER 2300 MW

    BENEFICIARY POPULATION All the ecuadorian population.ENVIRONMENTAL IMPACT Low environmental impact, applying Clean Development Mechanisms .

    TOTAL INVESTMENT AMOUNT 2760.000.000 USDREQUIRED FINANCING 2346.000.000 USD

    Name of the Project | HYDROELECTRIC COMPLEX ZAMORA RIVER

    Technical Data

    Financial Indicators

    DESCRIPTION:The design to use the ow of Zamora River is ready, there will be a dam that operates with gravity where an overow outlet is located with capacity to evacuate important oods, a detour cannel located at the right margin, capturing works, loading tunnel, balance funnel, pressure pipeline and cavern engine house, discharge tunnel; and structures placed at the right margin of the river.

    Contracting Modes

  • Punto Focal: Loly Montesinos, Directora de Gestin InternacionalMinisterio de Coordinacin de los Sectores Estratgicos [email protected] Telf.: (593-2) 2260670

    ENTIDAD RECTORA Ministerio de Electricidad y Energa RenovableCOBERTURA Y LOCALIZACIN Provincias de Pichincha e Imbabura.

    NIVEL DE ESTUDIOS Pre factibilidad POTENCIA 200 MW

    POBLACIN BENEFICIADA Toda la poblacin ecuatoriana.IMPACTO AMBIENTAL Impacto ambiental menor, con aplicacin a Mecanismos de Desarrollo Limpio.

    MONTO TOTAL INVERSIN USD 300000.000 FINANCIAMIENTO REQUERIDO USD 255000.000

    Nombre Proyecto | TIGRE

    Datos Tcnicos

    Indicadores Financieros

    DESCRIPCIN:Aprovechamiento de los recursos hidro-energticos del ro Guayllabamba que prev la construccin, en el tramo medio y bajo del ro, de una cascada a pie de presa en tres centrales del Sistema Interconectado del Guayllabamba. Las investigaciones consideraron la construccin de proyectos con embalses de poca capacidad, preferiblemente con el esquema de presas de derivacin.

    Modalidades De Contratacin

    Focal Point: Loly Montesinos, International Management DirectorStrategic Sectors Coordination Ministry [email protected] Phone: (593-2) 2260670

    EXECUTING AGENCY Ministry of Electricity and Renewable EnergiesCOVERAGE AND LOCATION Pichincha and Imbabura Provinces.

    STUDY LEVEL The project is at feasibility stage.POWER 200 MW

    BENEFICIARY POPULATION All the ecuadorian population.ENVIRONMENTAL IMPACT Category 3. negative environmental impacts are easily solvable.

    TOTAL INVESTMENT AMOUNT USD 296000.000 REQUIRED FINANCING USD 251600.000

    Name of the Project | TORTUGO

    Technical Data

    Financial Indicators

    DESCRIPTION:To use the water resources of Guayllabamba River, for such purpose, a waterfall at the foot of the dam will be built with three power plants of the interconnected system of Guayllabamba. The studies considered building projects of small capacity dams, preferably with a scheme of derivation dams.

    Contracting Modes

  • Focal Point: Loly Montesinos, International Management DirectorStrategic Sectors Coordination Ministry [email protected] Phone: (593-2) 2260670

    EXECUTING AGENCY Ministry of Electricity and Renewable Energies.COVERAGE AND LOCATION Pichincha and Imbabura Provinces

    STUDY LEVEL Pre-feasibility stage.POWER 200 MW

    BENEFICIARY POPULATION All the ecuadorian population.ENVIRONMENTAL IMPACT Low environmental impact, applying Clean Development Mechanisms.

    TOTAL INVESTMENT AMOUNT USD 300000.000 REQUIRED FINANCING USD 255000.000

    Name of the Project | TIGRE

    Technical Data

    Financial Indicators

    DESCRIPTION:To use the water resources of Guayllabamba River, for such purpose, a waterfall at the foot of the dam will be built with three power plants of the interconnected system of Guayllabamba. The studies considered building projects of small capacity dams, preferably with a scheme of derivation dams.

    Contracting Modes

    NOMBRE

  • Punto Focal: Loly Montesinos, Directora de Gestin InternacionalMinisterio de Coordinacin de los Sectores Estratgicos [email protected] Telf.: (593-2) 2260670

    P R O J E C T SELECTRICITY

    > > W I N D P O W E R

    ENTIDAD RECTORA Ministerio de Electricidad y Energa RenovableCOBERTURA Y LOCALIZACIN Provincias de Loja, Azuay e Imbabura

    NIVEL DE ESTUDIOS Estudios de factibilidad concluidos y en ejecucin diseo denitivoPOTENCIA 200 MW

    POBLACIN BENEFICIADA Toda la poblacin ecuatorianaIMPACTO AMBIENTAL Impacto ambiental menor, con aplicacin a mecanismos de desarrollo limpio.

    MONTO TOTAL INVERSIN USD 428500.000FINANCIAMIENTO REQUERIDO USD 364225.000

    Nombre proyecto | VILLONACO, MEMBRILLO, CHICHAS, DUCAL I, HUASCACHACA I, SALINAS

    Datos Tcnicos

    Indicadores Financieros

    DESCRIPCIN:El proyecto se llevar a cabo en tres sectores a nivel nacional. El primero se ubica en Salinas (Imbabura), el segundo en Huascachaca (Azuay),y el tercero en los cerros Villonaco, Ducal, Membrillo y Chinchas (Loja). Los proyectos cuentan con datos de viento medidos, que indican la existencia de recurso aprovechable, bajo un modelo mecnico para 121 aerogeneradores para todos los desarrollos.

    Modalidades de Contratacin

  • P R O Y E C T O S

    ELCTRICOS> > G E O T R M I C O

    EXECUTING AGENCY Ministry of Electricity and Renewable EnergiesCOVERAGE AND LOCATION Loja, Azuay and Imbabura Provinces.

    STUDY LEVEL Complete feasibility studies and the denite design is in the execution phase.POWER 200 MW

    BENEFICIARY POPULATION All the Ecuadorian population.ENVIRONMENTAL IMPACT Low environmental impact, applying Clean Development Mechanisms

    TOTAL INVESTMENT AMOUNT USD 428500.000REQUIRED FINANCING USD 364225.000

    Name of the project | VILLONACO, MEMBRILLO, CHICHAS, DUCAL I, HUASCACHACA I, SALINAS

    Technical Data

    Financial Indicators

    DESCRIPTION:The Project will be executed in three sectors at national level, the rst one is located in Salinas, Imbabura Province, the second one is in Huascachaca ,Azuay Province; and nally at the hills of Villonaco, Ducal, Membrillo and Chinchas, Loja Province; the projects already have measured wind information that indicates the presence of a resource than can be used under a mechanical model for 121 wind turbines at all the developments.

    Contracting Modes

    Focal Point: Loly Montesinos, International Management DirectorStrategic Sectors Coordination Ministry [email protected] Phone: (593-2) 2260670

  • > > G E O T H E R M A L

    P R O J E C T SELECTRICITY

    ENTIDAD RECTORA Ministerio de Electricidad y Energa RenovableCOBERTURA Y LOCALIZACIN Provincia del Napo.

    NIVEL DE ESTUDIOS Geologa supercial y anlisis preliminarPOTENCIA 50 MW

    POBLACIN BENEFICIADA Toda la poblacin del EcuadorIMPACTO AMBIENTAL Impacto ambiental menor, con aplicacin a Mecanismos de Desarrollo Limpio

    MONTO TOTAL INVERSIN USD 185000.000FINANCIAMIENTO REQUERIDO USD 157250.000

    Nombre proyecto | CHACANA

    Datos Tcnicos

    Indicadores Financieros

    DESCRIPCIN:Constituye la parte central y somital del complejo volcnico Plio-Cuaternario Chacana, cuyas dimensiones son: 65Km. (Norte-Sur) x 25Km. (Este-Oeste). Las cotas uctan entre 3.200 y 4.500 m.s.n.m. Su borde topogrco presenta una forma irregular alargada de 35Km. (Norte-Sur) x 10-15Km. (Este-Oeste).

    Modalidades de Contratacin

    Punto Focal: Loly Montesinos, Directora de Gestin InternacionalMinisterio de Coordinacin de los Sectores Estratgicos [email protected] Telf.: (593-2) 2260670

  • ENTIDAD RECTORA Ministerio de Electricidad y Energa RenovableCOBERTURA Y LOCALIZACIN Provincia de Imbabura.

    NIVEL DE ESTUDIOS Pre-factibilidad bsicaPOTENCIA 50 MW

    POBLACIN BENEFICIADA Todos los ecuatorianos IMPACTO AMBIENTAL Impacto ambiental menor, con aplicacin a Mecanismos de Desarrollo Limpio

    MONTO TOTAL INVERSIN USD 162500.000FINANCIAMIENTO REQUERIDO USD 138125.000

    Nombre proyecto | CHACHIMBIRO

    Datos Tcnicos

    Indicadores Financieros

    DESCRIPCIN:La fuente de calor lo constituye el Complejo Volcnico Chachimbiro, de edad cuaternaria superior. Entre los ms recientes estn los domos de Pitzantzi.

    Modalidades de Contratacin

    EXECUTING AGENCY Ministry of Electricity and Renewable EnergiesCOVERAGE AND LOCATION Napo Province

    STUDY LEVEL Supercial Geology and preliminary analysisPOWER 50 MW

    BENEFICIARY POPULATION All the Ecuadorian population.ENVIRONMENTAL IMPACT Low environmental impact, applying Clean Development Mechanisms

    TOTAL INVESTMENT AMOUNT USD 185000.000REQUIRED FINANCING USD 157250.000

    Name of the project | CHACANA

    Technical Data

    Financial Indicators

    DESCRIPTION:Its location takes the central and summit part of the volcanic complex Plio-Quaternary Chacana, its area is: 65 km (NS) x 25 km (EW). The altitudes vary between 3200 and 4500 masl. Its topographic border presents an irregular elongated form of 35km (NS) x 10-15 km (EW).

    Contracting Modes

    Focal Point: Loly Montesinos, International Management DirectorStrategic Sectors Coordination Ministry [email protected] Phone: (593-2) 2260670

    Punto Focal: Loly Montesinos, Directora de Gestin InternacionalMinisterio de Coordinacin de los Sectores Estratgicos [email protected] Telf.: (593-2) 2260670

  • ENTIDAD RECTORA Ministerio de Electricidad y Energa RenovableCOBERTURA Y LOCALIZACIN Provincia del Carchi

    NIVEL DE ESTUDIOS Reconocimiento de prospectoPOTENCIA 50 MW

    POBLACIN BENEFICIADA Toda la poblacin ecuatorianaIMPACTO AMBIENTAL Impacto ambiental menor, con aplicacin a Mecanismos de Desarrollo Limpio

    MONTO TOTAL INVERSIN USD 175000.000FINANCIAMIENTO REQUERIDO USD 148750.000

    Nombre proyecto | CHALPATN

    Datos Tcnicos

    Indicadores Financieros

    DESCRIPCIN:Chalpatn es una caldera de colapso de 5Km. de dimetro, ubicada a unos 20Km. al suroeste de Tulcn, en el mbito estructural del Valle Interandino. La composicin de sus productos vara desde andesitas a trminos ms diferenciados, como dacitas y riolitas. La edad del colapso se estima en el pleistoceno temprano. Datos geofsicos indican bajos gravimtricos y magnticos centrados en la caldera y en concordancia con un horizonte conductivo de resistividades muy bajas.

    Modalidades de Contratacin

    EXECUTING AGENCY Ministry of Electricity and Renewable EnergiesCOVERAGE AND LOCATION Imbabura Province.

    STUDY LEVEL Basic pre-feasibility.POWER 50 MW

    BENEFICIARY POPULATION All the Ecuadorian populationENVIRONMENTAL IMPACT Low environmental impact, applying Clean Development Mechanisms

    TOTAL INVESTMENT AMOUNT USD 162500.000REQUIRED FINANCING USD 138125.000

    Name of the project | CHACHIMBIRO

    Technical Data

    Financial Indicators

    DESCRIPTION:: The heat source comes from the Volcanic Complex Chachimbiro, of Higher Quaternary Age. The Pitzantzi domes are among the most recent ones.

    Contracting Modes

    Focal Point: Loly Montesinos, International Management DirectorStrategic Sectors Coordination Ministry [email protected] Phone: (593-2) 2260670

    Punto Focal: Loly Montesinos, Directora de Gestin InternacionalMinisterio de Coordinacin de los Sectores Estratgicos [email protected] Telf.: (593-2) 2260670

  • P R O Y E C T O S

    ELCTRICOS> > T R M I C O

    EXECUTING AGENCY Ministry of Electricity and Renewable EnergiesCOVERAGE AND LOCATION Carchi Province

    STUDY LEVEL Prospect reconnaissancePOWER 50 MW

    EXECUTING AGENCY All the Ecuadorian populationENVIRONMENTAL IMPACT Low environmental impact, applying Clean Development Mechanisms

    TOTAL INVESTMENT AMOUNT USD 175000.000REQUIRED FINANCING USD 148750.000

    Name of the project | CHALPATN

    Technical Data

    Financial Indicators

    DESCRIPTION:Chalpatn is a collapsed cauldron of about 5 km diameter, located at 20 km south-east of Tulcn in the structural scope of the inter-Andean valley. The composition of its products varies from andesites in dierent compositions as dacites and riolites. It is estimated that the collapse time was during Early Pleistocene. Geophysical data indicates low gravimetric and magnetic measurements centred at the cauldron and in agreement with a conductive horizon of very low resistivity.

    Contracting Modes

    Focal Point: Loly Montesinos, International Management DirectorStrategic Sectors Coordination Ministry [email protected] Phone: (593-2) 2260670

  • > > T H E R M A L

    ENTIDAD RECTORA Ministerio de Electricidad y Energa RenovableCOBERTURA Y LOCALIZACIN Provincia de Sucumbos.

    NIVEL DE ESTUDIOS Estudios denitivos ao 2010POTENCIA 135 MW

    POBLACIN BENEFICIADA Toda la poblacin ecuatorianaIMPACTO AMBIENTAL Mitigable

    MONTO TOTAL INVERSIN USD 169400.000FINANCIAMIENTO REQUERIDO USD144000.000

    Nombre proyecto | SHUSHUFINDI

    Datos Tcnicos

    Indicadores Financieros

    DESCRIPCIN:Central de generacin termoelctrica con motores de combustin interna de potencia 135MW, combustible, crudo reducido proveniente de Renera Shushundi enfriamiento por radiadores, generar 800 GWh/ao.

    Modalidades de Contratacin

    Punto Focal: Loly Montesinos, Directora de Gestin InternacionalMinisterio de Coordinacin de los Sectores Estratgicos [email protected] Telf.: (593-2) 2260670

    P R O J E C T SELECTRICITY

  • P R O Y E C T O S

    ELCTRICOS> > T R A N S M I S I N

    EXECUTING AGENCY Ministry of Electricity and Renewable EnergiesCOVERAGE AND LOCATION Sucumbos Province.

    STUDY LEVEL Denite studies year 2010.POWER 135 MW.

    BENEFICIARY POPULATION All the Ecuadorian populationENVIRONMENTAL IMPACT May be mitigated

    TOTAL INVESTMENT AMOUNT USD 169400.000REQUIRED FINANCING USD144000.000

    Nombre proyecto | SHUSHUFINDI

    Technical Data

    Financial Indicators

    DESCRIPTION:Thermoelectric generation plant with internal combustion engines, power 135 MW, fuel reduced crude, source Shushundi Renery, cooling by radiators, it will generate 800 GWH/year.

    Contracting Modes

    Focal Point: Loly Montesinos, International Management DirectorStrategic Sectors Coordination Ministry [email protected] Phone: (593-2) 2260670

  • > > T R A N S M I S I O N

    ENTIDAD RECTORA Ministerio de Electricidad y Energa RenovableCOBERTURA Y LOCALIZACIN Provincias de Sucumbios, Pichincha, Los Rios, Guayas y Azuay

    NIVEL DE ESTUDIOS Estudios de conguracin, 2010; de Diseo denitivo del Sistema, 2012

    POBLACIN BENEFICIADA Toda la poblacin ecuatoriana.IMPACTO AMBIENTAL Impacto ambiental mitigable

    MONTO TOTAL INVERSIN USD 450000.000FINANCIAMIENTO REQUERIDO USD 382500.000

    Nombre proyecto | SISTEMA DE TRANSMISIN LNEA DE 500kV.

    Datos Tcnicos

    Indicadores Financieros

    DESCRIPCIN:Sistema con 4 subestaciones de 500kV 230kV en Coca - Pifo - Yaguachi - Sopladora, su extensin es de 750Km. de lnea de 500kV.

    Modalidades de Contratacin

    Punto Focal: Loly Montesinos, Directora de Gestin InternacionalMinisterio de Coordinacin de los Sectores Estratgicos [email protected] Telf.: (593-2) 2260670

    P R O J E C T SELECTRICITY

  • P R O Y E C T O S

    ELCTRICOS> > H I D R O C A R B U R O S

    EXECUTING AGENCY Ministry of Electricity and Renewable EnergiesCOVERAGE AND LOCATION Sucumbios, Pichincha, Los Rios, Guayas and Azuay Provinces.

    STUDY LEVEL Conguration studies, 2010; Denite design of the system, year 2012.

    BENEFICIARY POPULATION All the Ecuadorian population.ENVIRONMENTAL IMPACT May be mitigated.

    TOTAL INVESTMENT AMOUNT USD 450000.000REQUIRED FINANCING USD 382500.000

    Name of the project | TRANSMISION SYSTEM OF 500KV. LINE

    Technical Data

    Financial Indicators

    DESCRIPTION:System with 4 sub-stations of 500kV - 230kV en Coca - Pifo - Yaguachi - Sopladora, its length is 750 kilometres of 500kW line.

    Contracting Modes

    Focal Point: Loly Montesinos, International Management DirectorStrategic Sectors Coordination Ministry [email protected] Phone: (593-2) 2260670

  • > > O I L A N D G A S

    ENTIDAD RECTORA Ministerio de Recursos Naturales No RenovablesCOBERTURA Y LOCALIZACIN Provincia de Sucumbos.

    NIVEL DE ESTUDIOS Estudio de Pre-factibilidad.POTENCIA 30 MW

    POBLACIN BENEFICIADA Toda la poblacin ecuatorianaIMPACTO AMBIENTAL Disminucin de gases que provocan el efecto invernadero

    MONTO TOTAL INVERSIN USD 95560.000FINANCIAMIENTO REQUERIDO USD 67593.049

    Nombre proyecto | UTILIZACIN Y APROVECHAMIENTO DEL GAS ASOCIADO PARA GENERACIN ELCTRICA

    Datos Tcnicos

    Indicadores Financieros

    DESCRIPCIN:Mejoramiento de la captacin del gas asociado en el rea de inuencia del Sistema Interconectado de Petroproduccin (SEIP) para generar 30 MW e incrementar el volumen de entrega de gas a la planta de gas de Shushundi.

    Modalidades de Contratacin

    Punto Focal: Loly Montesinos, Directora de Gestin InternacionalMinisterio de Coordinacin de los Sectores Estratgicos [email protected] Telf.: (593-2) 2260670

    P R O J E C T SELECTRICITY

  • EXECUTING AGENCY Ministry of Electricity and Renewable EnergiesCOVERAGE AND LOCATION Sucumbos Province.

    STUDY LEVEL Pre-feasibility studyPOWER 30 MW

    BENEFICIARY POPULATION All the Ecuadorian population ENVIRONMENTAL IMPACT Diminish the production of gases that cause greenhouse eect

    TOTAL INVESTMENT AMOUNT USD 95560.000REQUIRED FINANCING USD 67593.049

    Name of the project | USAGE OF ASSOCIATED GAS FOR ELECTRICITY GENERATION

    Technical Data

    Financial Indicators

    DESCRIPTION:Improvement of associated gas collection in the inuence area of Petroproduccins (SEIP) interconnected system to generate 30 M.W. and increase the volume of delivered gas to the plant at Shushundi.

    Contracting Modes

    Focal Point: Loly Montesinos, International Management DirectorStrategic Sectors Coordination Ministry [email protected] Phone: (593-2) 2260670

    Resumen de Proyectos

    Chontal

    La Unin

    Minas - San Francisco

    Toachi - Pilatn

    Chesp - Palma Real

    Quijos-Baeza

    Chirap

    Cardenillo

    Llurimaguas

    Manduriacu

    Complejo Hidroelctrico Ro Zamora

    Tortugo

    Tigre

    Villonaco, Membrillo, Chichas, Ducal I,Huascachaca I, Salinas

    Chacana

    Chachimbiro

    Chalpatn

    Shushundi

    Sistema de Transmisin 500 Kv

    Proyecto de Aprovechamiento del GasAsociado para Generacin Elctrica

    Pichincha, Imbabura

    El Oro

    Azuay

    Pichincha, Tschila, Cotopaxi

    Pichincha

    Napo

    Pichincha

    Morona Santiago

    Pichincha, Esmeraldas

    Pichincha

    Morona Santiago

    Pichincha, Imbabura

    Pichincha, Imbabura

    Loja, Azuay, Imbabura

    Napo

    Imbabura

    Carchi

    Sucumbos

    Nacional

    Sucumbos

    Hidroelctrico

    Hidroelctrico

    Hidroelctrico

    Hidroelctrico

    Hidroelctrico

    Hidroelctrico

    Hidroelctrico

    Hidroelctrico

    Hidroelctrico

    Hidroelctrico

    Hidroelctrico

    Hidroelctrico

    Hidroelctrico

    Elico

    Geotrmico

    Geotrmico

    Geotrmico

    Trmico

    Transmisin

    Generacin hidrocarburfera

    USD 355500.000

    USD 224652.458

    USD 495989.324

    USD 470596.000

    USD 727000.000

    USD 190524.730

    USD 156633.799

    USD 507000.000

    USD 244000.000

    USD 253000.000

    USD 2.346000.000

    USD 296000.000

    USD 300000.000

    USD 428500.000

    USD 185000.000

    USD 162500.000

    USD 175000.000

    USD 169400.000

    USD 450.000.000

    USD 95560.000

    187

    87

    270

    246

    440

    100

    90

    400

    150

    176

    2.300

    200

    200

    200

    50

    50

    50

    135

    30

    NOMBRE LOCALIZACIN - PROVINCIA TIPO DE PROYECTO MONTO TOTALDE INVERSIN

    POTENCIAEFECTIVA [MW]

  • Project Summary

    Chontal

    La Unin

    Minas - San Francisco

    Toachi - Pilatn

    Chesp - Palma Real

    Quijos-Baeza

    Chirap

    Cardenillo

    Llurimaguas

    Manduriacu

    Hydroelectric complex Zamora River

    Tortugo

    Tigre

    Villonaco, Membrillo, Chichas, Ducal I,Huascachaca I, Salinas

    Chacana

    Chachimbiro

    Chalpatn

    Shushundi

    Transmision system of 500Kv. line

    Usage of associated gas for electricity generation

    Pichincha, Imbabura

    El Oro

    Azuay

    Pichincha, Tschila, Cotopaxi

    Pichincha

    Napo

    Pichincha

    Morona Santiago

    Pichincha, Esmeraldas

    Pichincha

    Morona Santiago

    Pichincha, Imbabura

    Pichincha, Imbabura

    Loja, Azuay, Imbabura

    Napo

    Imbabura

    Carchi

    Sucumbos

    National

    Sucumbos

    Hydroelectric

    Hydroelectric

    Hydroelectric

    Hydroelectric

    Hydroelectric

    Hydroelectric

    Hydroelectric

    Hydroelectric

    Hydroelectric

    Hydroelectric

    Hydroelectric

    Hydroelectric

    Hydroelectric

    Wind Power

    Geothermal

    Geothermal

    Geothermal

    Thermal

    Transmission

    Oil and Gas Production

    USD 355500.000

    USD 224652.458

    USD 495989.324

    USD 470596.000

    USD 727000.000

    USD 190524.730

    USD 156633.799

    USD 507000.000

    USD 244000.000

    USD 253000.000

    USD 2.346000.000

    USD 296000.000

    USD 300000.000

    USD 428500.000

    USD 185000.000

    USD 162500.000

    USD 175000.000

    USD 169400.000

    USD 450.000.000

    USD 95560.000

    187

    87

    270

    246

    440

    100

    90

    400

    150

    176

    2.300

    200

    200

    200

    50

    50

    50

    135

    30

    NAME LOCATION - PROVINCE PROJECT TYPETOTAL INVESTMENTAMOUNT

    REAL POWER(MW)

  • ENTIDAD RECTORA Secretara Nacional del Agua COBERTURA Y LOCALIZACIN Provincia de Santa Elena

    NIVEL DE ESTUDIOS Diseo denitivo para la construccin del proyecto. HECTREAS HABILITADAS 19.000 Has.

    POBLACIN BENEFICIADA 30.000 habitantes

    MONTO TOTAL INVERSIN USD 39170,000 FINANCIAMIENTO REQUERIDO USD 33290,000

    Nombre Proyecto | TRASVASE CHONGN - SAN VICENTE

    Datos Tcnicos

    Indicadores Financieros

    DESCRIPCIN:

    Contempla el abastecimiento seguro de 4.6 m3/seg. de agua al embalse San Vicente (ya en operacin), facilitando el riego en el valle del ro Javita y su ruta.

    Modalidades de Contratacin

    Punto Focal: Loly Montesinos, Directora de Gestin InternacionalMinisterio de Coordinacin de los Sectores Estratgicos [email protected] Telf.: (593-2) 2260670

    P R O J E C T SWATER RESOURCES PROJECTS

    The impetus given to water projects seeks to recover the States control over water resources. Through policies, norms and control in a decentralized management processes to preserve and protect the resource, based in the planning of watersheds.

  • ENTIDAD RECTORA Secretara Nacional del Agua COBERTURA Y LOCALIZACIN Provincia del Guayas

    NIVEL DE ESTUDIOS Pre factibilidad y trazado preliminar. TIEMPO DE CONSTRUCCIN 39 meses

    POBLACIN BENEFICIADA 324.000 habitantes

    MONTO TOTAL INVERSIN USD 154270.000 FINANCIAMIENTO REQUERIDO USD 131770.000

    Nombre Proyecto | CONTROL DE INUNDACIONES Y DRENAJE MILAGRO

    Datos Tcnicos

    Indicadores Financieros

    EXECUTING AGENCY National Secretariat of Water ResourcesCOVERAGE AND LOCATION Santa Elena Province

    STUDY LEVEL Final design to build the Project. USEFUL HECTARES 19.000 Hec.

    BENEFICIARY POPULATION 30.000 inhabitants

    TOTAL INVESTMENT AMOUNT USD 39170,000 REQUIRED FINANCING USD 33290,000

    Name of the project | CHONGON - SAN VICENTE TRANSFER

    Technical Data

    Financial Indicators

    DESCRIPTION:

    It takes into account the reliable supply of water to the San Vicente dam (already operating), supplying irrigation along the Javita river valley and its course.

    Contracting Modes Modalidades de Contratacin

    DESCRIPCIN:

    Control de inundaciones de la ciudad de Milagro, drenando las aguas lluvias a gravedad hacia el ro de la localidad y construccin de un sistema hidrulico para controlar los niveles de agua en los ros Milagro, Naranjito, Los Monos y Chimbo.

    Punto Focal: Loly Montesinos, Directora de Gestin InternacionalMinisterio de Coordinacin de los Sectores Estratgicos [email protected] Telf.: (593-2) 2260670

    Focal Point: Loly Montesinos, International Management DirectorStrategic Sectors Coordination Ministry [email protected] Phone: (593-2) 2260670

  • ENTIDAD RECTORA Secretara Nacional del Agua COBERTURA Y LOCALIZACIN Provincias: Caar y Guayas

    NIVEL DE ESTUDIOS Trazado preliminar realizado. Estudios denitivos II trimestre de 2011.HECTREAS HABILITADAS 100.000 Has.

    POBLACIN BENEFICIADA 600.000 habitantes

    MONTO TOTAL INVERSIN USD 149170.000 FINANCIAMIENTO REQUERIDO USD 128000.000

    Nombre Proyecto | CONTROL DE INUNDACIONES RO BULUBULU RO CAAR

    Datos Tcnicos

    Indicadores Financieros

    DESCRIPCIN:

    Implementacin de un sistema integral de medidas de ingeniera para el control de inundaciones y estabili-zacin de cauces de los ros Bulubulu, Caar, Naranjal, pertenecientes a la cuenca del ro Guayas.

    Modalidades de Contratacin

    EXECUTING AGENCY National Secretariat of Water ResourcesCOVERAGE AND LOCATION Guayas Province

    STUDY LEVEL Pre-feasibility and preliminary design ready CONSTRUCTION TIME 39 months

    BENEFICIARY POPULATION 324.000 inhabitants

    TOTAL INVESTMENT AMOUNT USD 154270.000 REQUIRED FINANCING USD 131770.000

    Name of the project | MILAGRO FLOOD CONTROL AND DRAINAGE

    Technical Data

    Financial Indicators

    Contracting Modes

    DESCRIPTION:

    Flood control in the city of Milagro, draining rainfall waters by gravity towards the river and an hydraulic system is under construction to control water levels at the rivers Milagro, Naranjito, Los Monos and Chimbo.

    Punto Focal: Loly Montesinos, Directora de Gestin InternacionalMinisterio de Coordinacin de los Sectores Estratgicos [email protected] Telf.: (593-2) 2260670

    Focal Point: Loly Montesinos, International Management DirectorStrategic Sectors Coordination Ministry [email protected] Phone: (593-2) 2260670

  • ENTIDAD RECTORA Secretara Nacional del Agua COBERTURA Y LOCALIZACIN Provincias de Guayas y Los Ros

    NIVEL DE ESTUDIOS Trazado preliminar realizado. Estudios denitivos II trimestre de 2011.HECTREAS HABILITADAS 179.000 Has.

    POBLACIN BENEFICIADA 182.000 habitantes

    MONTO TOTAL INVERSIN USD 145360.000 FINANCIAMIENTO REQUERIDO USD 124360.000

    Nombre Proyecto | TRASVASE DAULE - VINCES

    Datos Tcnicos

    Indicadores Financieros

    DESCRIPCIN:

    El proyecto tiene como objetivo el aprovechamiento del agua disponible en el ro Daule, durante los meses de verano, para proveer de riego a una extensa rea baja comprendida entre los ros Daule, Vinces y Pueblo Viejo.

    Modalidades de Contratacin

    EXECUTING AGENCY National Secretariat of Water Resources COVERAGE AND LOCATION Guayas and Caar Provinces

    STUDY LEVEL Preliminary design ready. Denite studies II quarter 2011. USEFUL HECTARES 100.000 Hec.

    BENEFICIARY POPULATION 600.000 inhabitants

    TOTAL INVESTMENT AMOUNT USD 149170.000 REQUIRED FINANCING USD 128000.000

    Name of the Project | FLOOD CONTROL AT BULUBULU RIVER CAAR RIVER

    Technical Data

    Financial Indicators

    DESCRIPTION:

    Implementation of an integral engineering measuring system to control oods and the river bed stabiliza-tion at the rivers Bulubulu-Caar-Naranjal, those rivers make part of Guayas river watershed.

    Contracting Modes

    Punto Focal: Loly Montesinos, Directora de Gestin InternacionalMinisterio de Coordinacin de los Sectores Estratgicos [email protected] Telf.: (593-2) 2260670

    Focal Point: Loly Montesinos, International Management DirectorStrategic Sectors Coordination Ministry [email protected] Phone: (593-2) 2260670

  • ENTIDAD RECTORA Secretara Nacional del Agua COBERTURA Y LOCALIZACIN Provincia de Los Ros

    POBLACIN BENEFICIADA 300.000 habitantes

    MONTO TOTAL INVERSIN USD 257810.000 FINANCIAMIENTO REQUERIDO USD 220310.000

    NOMBRE PROYECTO | PLAN DE APROVECHAMIENTO Y CONTROL DE AGUA DE LA PROVINCIA DE LOS ROS

    NIVEL DE ESTUDIOS Perl de proyecto.HECTREAS HABILITADAS 171.000 Has.TIEMPO DE CONSTRUCCIN 46 meses

    Datos Tcnicos

    Indicadores Financieros

    DESCRIPCIN:Dotacin de agua a los cultivos ubicados en las regiones sur occidental, central y sur de la provincia de Los Ros.

    Modalidades de Contratacin

    EXECUTING AGENCY National Secretariat of Water ResourcesCOVERAGE AND LOCATION Guayas and Los Ros Provinces

    STUDY LEVEL Preliminary design complete. Final studies II quarter 2011.USEFUL HECTARES 179.000 Hec.

    BENEFICIARY POPULATION 182.000 inhabitants

    TOTAL INVESTMENT AMOUNT USD 145360.000 REQUIRED FINANCING USD 124360.000

    Name of the Project | DAULE VINCES TRANSFER

    Technical Data

    Financial Indicators

    DESCRIPTION:

    The purpose of the project is to use the water available at Daule River during the summer months, to irrigate an extensive low land between Daule, Vinces, and Pueblo Viejo rivers.

    Contracting Modes

    Punto Focal: Loly Montesinos, Directora de Gestin InternacionalMinisterio de Coordinacin de los Sectores Estratgicos [email protected] Telf.: (593-2) 2260670

    Focal Point: Loly Montesinos, International Management DirectorStrategic Sectors Coordination Ministry [email protected] Phone: (593-2) 2260670

  • ENTIDAD RECTORA Secretara Nacional del Agua COBERTURA Y LOCALIZACIN Provincias: Guayas y Los Ros

    NIVEL DE ESTUDIOS Perl de proyecto. HECTREAS HABILITADAS 300.000 Has.

    POBLACIN BENEFICIADA 1759.000 habitantes

    MONTO TOTAL INVERSIN USD 322000.000 FINANCIAMIENTO REQUERIDO USD 277000.000

    Nombre Proyecto | CONTROL DE INUNDACIONES DE LA ZONA VINCES - BABAHOYO GUAYAQUIL

    Datos Tcnicos

    Indicadores Financieros

    DESCRIPCIN:Control de inundaciones de 300.000 Has. ubicadas entre las ciudades de Vinces, Babahoyo y Guayaquil. Adems, proteccin contra inundaciones de 30 poblados urbanos y rurales.

    Modalidades de Contratacin

    EXECUTING AGENCY National Secretariat of Water ResourcesCOVERAGE AND LOCATION Guayas and Los Ros Provinces

    STUDY LEVEL Project Prole.USEFUL HECTARES 171.000 Hec.CONSTRUCTION TIME 46 months.

    BENEFICIARY POPULATION 300.000 inhabitants

    TOTAL INVESTMENT AMOUNT USD 257810.000 REQUIRED FINANCING USD 220310.000

    Name of the Project | PLAN TO USE AND CONTROL WATER RESOURCES PROJECTS IN LOS RIOS PROVINCE

    Technical Data

    Financial Indicators

    DESCRIPTION:

    Water for crops located in the south-western, central and southern regions of Los Ros Province.

    Contracting Modes

    Punto Focal: Loly Montesinos, Directora de Gestin InternacionalMinisterio de Coordinacin de los Sectores Estratgicos [email protected] Telf.: (593-2) 2260670

    Focal Point: Loly Montesinos, International Management DirectorStrategic Sectors Coordination Ministry [email protected] Phone: (593-2) 2260670

  • ENTIDAD RECTORA Secretara Nacional del Agua COBERTURA Y LOCALIZACIN Provincia del Guayas y Los Ros

    NIVEL DE ESTUDIOS Perl de proyecto.HECTREAS HABILITADAS 33.000 Has.

    POBLACIN BENEFICIADA 200.000 habitantes

    MONTO TOTAL INVERSIN USD 153800.000 FINANCIAMIENTO REQUERIDO USD 131300.000

    Nombre Proyecto | NUEVO PROYECTO PEDRO CARBO

    Datos Tcnicos

    Indicadores Financieros

    DESCRIPCIN:Habilitacin de riego, en el nivel intermedio de las cuencas de los ros Pedro Carbo y Colimes.

    Modalidades de Contratacin

    EXECUTING AGENCY National Secretariat of Water ResourcesCOVERAGE AND LOCATION Guayas and Los Ros Province

    BENEFICIARY POPULATION 1759.000 inhabitants

    TOTAL INVESTMENT AMOUNT USD 322000.000 REQUIRED FINANCING USD 277000.000

    Name of the project | FLOOD CONTROL IN THE AREA VINCES - BABAHOYO GUAYAQUIL

    STUDY LEVEL Project prole.USEFUL HECTARES 300.000 Hec.

    Technical Data

    Financial Indicators

    DESCRIPTION:

    Flood control for 300.000 hectares located in the cities Vinces, Babahoyo and Guayaquil, and to protect 30 urban and rural centres against oods.

    Contracting Modes

    Punto Focal: Loly Montesinos, Directora de Gestin InternacionalMinisterio de Coordinacin de los Sectores Estratgicos [email protected] Telf.: (593-2) 2260670Focal Point: Loly Montesinos, International Management Director

    Strategic Sectors Coordination Ministry [email protected] Phone: (593-2) 2260670

  • NIVEL DE ESTUDIOS Diseos denitivos.HECTREAS HABILITADAS 2.220 Has.

    POBLACIN BENEFICIADA 500.000 habitantes

    MONTO TOTAL INVERSIN USD 54000,000.00 FINANCIAMIENTO REQUERIDO USD 45900,000.00

    Nombre Proyecto | PROPSITO MLTIPLE CHONE

    Datos Tcnicos

    Indicadores Financieros

    Modalidades de Contratacin

    EXECUTING AGENCY National Secretariat of Water ResourcesCOVERAGE AND LOCATION Guayas and Los Ros Province

    STUDY LEVEL Project prole.USEFUL HECTARES 33.000 Hec.

    BENEFICIARY POPULATION 200.000 inhabitants

    TOTAL INVESTMENT AMOUNT USD 153800.000 REQUIRED FINANCING USD 131300.000

    Name of the Project | NEW PROJECT PEDRO CARBO

    Technical Data

    Financial Indicators

    DESCRIPTION:Enabling land for irrigation purposes at the intermediate level in the watersheds of the rivers Pedro Carbo and Colimes.

    Contracting Modes

    ENTIDAD RECTORA Secretara Nacional del Agua COBERTURA Y LOCALIZACIN Provincia de Manab

    DESCRIPCIN:El proyecto busca regular los caudales del ro Grande, asegurar el abastecimiento de agua para consumo humano de la localidad de Chone y poblaciones aledaas, satisfacer las demandas de riego y contribuir a disminuir los riesgos de inundaciones en esa ciudad.

    Punto Focal: Loly Montesinos, Directora de Gestin InternacionalMinisterio de Coordinacin de los Sectores Estratgicos [email protected] Telf.: (593-2) 2260670

    Focal Point: Loly Montesinos, International Management DirectorStrategic Sectors Coordination Ministry [email protected] Phone: (593-2) 2260670

  • ENTIDAD RECTORA Secretara Nacional del Agua COBERTURA Y LOCALIZACIN Provincia de Manab

    NIVEL DE ESTUDIOS Diseo denitivo. HECTREAS HABILITADAS 7.518 Has.

    POBLACIN BENEFICIADA 400.000 habitantes

    MONTO TOTAL INVERSIN USD 42000,000.00 FINANCIAMIENTO REQUERIDO USD 20000,000.00

    Nombre Proyecto | DE RIEGO CARRIZAL- CHONE ETAPA II

    Datos Tcnicos

    Indicadores Financieros

    DESCRIPCIN:El proyecto consiste en la dotacin de agua para riego a 6.018 Has. de los cantones Bolvar, Tosagua, Junn y Chone; a travs de un sistema presurizado de tuberas, con la posibilidad de ampliar el riego a 1.500 Has., adicionales.

    Modalidades de Contratacin

    STUDY LEVEL Final designs.USEFUL HECTARES 2.220 Hec.

    BENEFICIARY POPULATION 500.000 inhabitants

    TOTAL INVESTMENT AMOUNT USD 54000,000.00 REQUIRED FINANCING USD 45900,000.00

    Name of the project | CHONE MULTI-PURPOSE

    Technical Data

    Financial Indicators

    Contracting Modes

    EXECUTING AGENCY National Secretariat of Water ResourcesCOVERAGE AND LOCATION Manab Province

    DESCRIPTION:The project seeks to regulate the water ows of the main river, to guarantee water supply for human consumption in the city of Chone and surrounding populations, to satisfy irrigation demands in an area of 2.220 hectares and to contribute to diminish risks of oods in the city of Chone.

    Punto Focal: Loly Montesinos, Directora de Gestin InternacionalMinisterio de Coordinacin de los Sectores Estratgicos [email protected] Telf.: (593-2) 2260670

    Focal Point: Loly Montesinos, International Management DirectorStrategic Sectors Coordination Ministry [email protected] Phone: (593-2) 2260670

  • ENTIDAD RECTORA Secretara Nacional del Agua COBERTURA Y LOCALIZACIN Provincia de Manab

    NIVEL DE ESTUDIOS Diseo denitivo.

    POBLACIN BENEFICIADA 500.000 habitantes

    MONTO TOTAL INVERSIN USD 12000,000.00 FINANCIAMIENTO REQUERIDO USD 6000,000.00

    Nombre Proyecto | CONSTRUCCIN DE LA PRESA LAS GILSES

    Datos Tcnicos

    Indicadores Financieros

    DESCRIPCIN:

    Construccin de una presa de control y de regulacin de mareas, que contribuir a las labores de riego de las zonas bajas del valle del ro Portoviejo.

    Modalidades de Contratacin

    EXECUTING AGENCY National Secretariat of Water ResourcesCOVERAGE AND LOCATION Manab Province

    STUDY LEVEL Final designUSEFUL HECTARES 7.518 Hec.

    BENEFICIARY POPULATION 400.000 inhabitants

    TOTAL INVESTMENT AMOUNT USD 42000,000.00 REQUIRED FINANCING USD 20000,000.00

    Name of the project | CARRIZAL - CHONE IRRIGATION, II STAGE

    Technical Data

    Financial Indicators

    DESCRIPTION:

    The project wants to provide irrigation water to 6.018 hectares at the cantons Bolvar. Tosagua, Junn and Chone, through a system that uses pressurized pipes, and there is the possibility of increasing the irrigation area to an additional 1500 hectares.

    Contracting Modes

    Punto Focal: Loly Montesinos, Directora de Gestin InternacionalMinisterio de Coordinacin de los Sectores Estratgicos [email protected] Telf.: (593-2) 2260670Focal Point: Loly Montesinos, International Management Director

    Strategic Sectors Coordination Ministry [email protected] Phone: (593-2) 2260670

  • EXECUTING AGENCY National Secretariat of Water Resources COVERAGE AND LOCATION Manab Province

    STUDY LEVEL Final design

    BENEFICIARY POPULATION 500.000 inhabitants

    TOTAL INVESTMENT AMOUNT USD 12000,000.00 REQUIRED FINANCING USD 6000,000.00

    Name of the project | CONSTRUCTION OF THE DAM LAS GILSES

    Technical Data

    Financial Indicators

    DESCRIPTION:

    Construction of a central and tide regulation dam, which will contribute to irrigation works at the agricultural areas in the Portoviejos River Valley.

    Contracting Modes

    Focal Point: Loly Montesinos, International Management DirectorStrategic Sectors Coordination Ministry [email protected] Phone: (593-2) 2260670

    Trasvase Chongn - San Vicente

    Control de Inundaciones y Drenaje Milagro

    Control de Inundaciones Ro Bulubulu Ro Caar

    Trasvase Daule - Vinces

    Aprovechamiento y Control de Agua de la Provincia de Los Ros

    Control de Inundaciones de la Zona Vinces - Babahoyo Guayaquil

    Nuevo Proyecto Pedro Carbo

    Propsito Mltiple Chone

    Riego Carrizal Chone Etapa II

    Presas Las Gilses

    Santa Elena

    Guayas

    Caar y Guayas

    Guayas - Los Ros

    Guayas - Los Ros

    Guayas - Los Ros

    Guayas - Los Ros

    Manab

    Manab

    Manab

    Cuenca del Ro Guayas

    Cuenca del Ro Guayas

    Cuenca del Ro Guayas

    Cuenca del Ro Guayas

    Cuenca del Ro Guayas

    Cuenca del Ro Guayas

    Cuencas de los Ros Pedro Carbo y Colimes

    Valle del Ro Portoviejo

    Valle del Ro Portoviejo

    Valle del Ro Portoviejo

    USD 39170.000

    USD 154270.000

    USD 149170.000

    USD 145360.000

    USD 257810.000

    USD 322000.000

    USD 153800.000

    USD 54000.000

    USD 42000.000

    USD 12000.000

    NOMBRE LOCALIZACIN - PROVINCIA

    Resumen de Proyectos

    MONTO TOTALDE INVERSIN TIPO DE PROYECTO

  • Chongon - San Vicente Transfer

    Milagro ood control and drainage

    Flood control at Bulubulu River Caar River

    Daule Vinces Transfer

    Plan to use and control water resources projects in Los Rios Province

    Flood control in the area Vinces - Babahoyo Guayaquil

    New project Pedro Carbo

    Chone multi-purpose

    Carrizal - Chone Irrigation, II Stage

    Construction of the dam Las Gilses

    Santa Elena

    Guayas

    Caar y Guayas

    Guayas - Los Ros

    Guayas - Los Ros

    Guayas - Los Ros

    Guayas - Los Ros

    Manab

    Manab

    Manab

    Guayas River Basin

    Guayas River Basin

    Guayas River Basin

    Guayas River Basin

    Guayas River Basin

    Guayas River Basin

    Pedro Carbo y Colimes river Basin

    Portoviejo River Valley

    Portoviejo River Valley

    Portoviejo River Valley

    USD 39170.000

    USD 154270.000

    USD 149170.000

    USD 145360.000

    USD 257810.000

    USD 322000.000

    USD 153800.000

    USD 42000.000

    USD 54000.000

    USD 12000.000

    NAME LOCATION - PROVINCE PROJECT TYPE TOTAL INVESTMENT AMOUNT

    Project Summary

  • ENTIDAD RECTORA Ministerio de Recursos Naturales No RenovablesCOBERTURA Y LOCALIZACIN Provincia de Loja

    NIVEL DE ESTUDIOS Pre factibilidad bsica.

    POBLACIN BENEFICIADA Toda la poblacin ecuatoriana.IMPACTO AMBIENTAL Impacto que no genera mayores consecuencias y permite una recuperacin a corto plazo.

    MONTO TOTAL INVERSIN USD 4274.000FINANCIAMIENTO REQUERIDO USD 3632.900

    Nombre proyecto | FIERRO URCO

    Datos Tcnicos

    Indicadores Financieros

    DESCRIPCIN:Realizar la prospeccin del yacimiento minero mencionado, con miras a determinar las reservas, principalmente de oro, plata y cobre, para luego, dependiendo de las reservas probables y probadas que determinen pasar a una etapa de aprovechamiento.

    Modalidades de Contratacin

    Punto Focal: Loly Montesinos, Directora de Gestin InternacionalMinisterio de Coordinacin de los Sectores Estratgicos [email protected] Telf.: (593-2) 2260670

    P R O J E C T S

    MINNINGEcuador is a country with important growth potential in exploration and exploitation of mineral deposits. The objective of this sector is to generate a sustainable development with public policies that expedite, regulate and promote investment in exploitation activities. For Ecuador, the mining sector represents an important source of resources for the development of the nation, a lever to generate employment, key for a balanced local and regional development.

  • ENTIDAD RECTORA Ministerio de Recursos Naturales No RenovablesCOBERTURA Y LOCALIZACIN Provincia de Imbabura

    NIVEL DE ESTUDIOS Pre factibilidad bsica

    POBLACIN BENEFICIADA Toda la poblacin ecuatorianaIMPACTO AMBIENTAL Impacto que no genera mayores consecuencias y permite una recuperacin a corto plazo.

    MONTO TOTAL INVERSIN USD 7075.827 FINANCIAMIENTO REQUERIDO USD 6.014.452

    Nombre proyecto | JUNN

    Datos Tcnicos

    Indicadores Financieros

    DESCRIPCIN:Realizar la exploracin del proyecto minero mencionado, con miras a determinar las reservas de, cobre y molibdeno principalmente.

    Modalidades de Contratacin

    EXECUTING AGENCY Ministry of Non Renewable Resources.COVERAGE AND LOCATION Loja Province

    STUDY LEVEL Basic Pre-feasibility

    BENEFICIARY POPULATION All the Ecuadorian populationENVIRONMENTAL IMPACT The impact does not generate important consequences and allows a recovery in the short run.

    TOTAL INVESTMENT AMOUNT USD 4274.000REQUIRED FINANCING USD 3632.900

    Name of the project | FIERRO URCO

    Technical Data

    Financial Indicators

    DESCRIPTION:To carry out the prospection of the mining deposit, to be able to determine its reserves, mainly in gold, silver and copper, and then, depending on the probable and tested reserves, determine moving on to an exploitation stage.

    Contracting Modes

    Loly Montesinos, International Management DirectorStrategic Sectors Coordination Ministry [email protected] Phone: (593-2) 2260670

    Punto Focal: Loly Montesinos, Directora de Gestin InternacionalMinisterio de Coordinacin de los Sectores Estratgicos [email protected] Telf.: (593-2) 2260670

  • ENTIDAD RECTORA Ministerio de Recursos Naturales No RenovablesCOBERTURA Y LOCALIZACIN Provincia de Zamora Chinchipe

    NIVEL DE ESTUDIOS El proyecto se encuentra en la fase de pre factibilidad bsica para la exploracin.

    POBLACIN BENEFICIADA Toda la poblacin ecuatorianaIMPACTO AMBIENTAL Impacto que no genera mayores consecuencias y permite una recuperacin a corto plazo.

    MONTO TOTAL INVERSIN USD 2899.977FINANCIAMIENTO REQUERIDO USD 2464.980

    Nombre proyecto | MINA REAL

    Datos Tcnicos

    Indicadores Financieros

    DESCRIPCIN:Realizar la prospeccin del yacimiento minero, con miras a determinar las reservas, principalmente en oro, cobre y molibdeno.

    Modalidades de Contratacin

    Loly Montesinos, International Management DirectorStrategic Sectors Coordination Ministry [email protected] Phone: (593-2) 2260670

    Punto Focal: Loly Montesinos, Directora de Gestin InternacionalMinisterio de Coordinacin de los Sectores Estratgicos [email protected] Telf.: (593-2) 2260670

    EXECUTING AGENCY Ministry of Non Renewable Natural ResourcesCOVERAGE AND LOCATION Imbabura Province

    STUDY LEVEL Basic pre-feasibility

    BENEFICIARY POPULATION All the Ecuadorian population ENVIRONMENTAL IMPACT The impact does not generate important consequences and allows a recovery in the short run

    TOTAL INVESTMENT AMOUNT USD 7075.827REQUIRED FINANCING USD 6.014.452

    Name of the project | JUNN

    Technical Data

    Financial Indicators

    DESCRIPTION:To carry out the exploration of the mining deposit, in order to determine its reserves, mainly in copper and molybdenum.

    Contracting Modes

  • ENTIDAD RECTORA Ministerio de Recursos Naturales No RenovablesCOBERTURA Y LOCALIZACIN Provincia de Cotopaxi.

    NIVEL DE ESTUDIOS Perl bsico

    POBLACIN BENEFICIADA Toda la poblacin del EcuadorIMPACTO AMBIENTAL Impacto que no genera mayores consecuencias y permite una recuperacin a corto plazo

    MONTO TOTAL INVERSIN USD 2836.495FINANCIAMIENTO REQUERIDO USD 2411.020

    Nombre proyecto | LA PLATA

    Datos Tcnicos

    Indicadores Financieros

    DESCRIPCIN:Realizar la prospeccin y exploracin del proyecto, para determinar las reservas de plata, cobre, plomo y zinc.

    Modalidades de Contratacin

    Punto Focal: Loly Montesinos, Directora de Gestin InternacionalMinisterio de Coordinacin de los Sectores Estratgicos [email protected] Telf.: (593-2) 2260670

    EXECUTING AGENCY Ministry of Non Renewable Natural Resources COVERAGE AND LOCATION Zamora Chinchipe Province

    STUDY LEVEL The project is at the basic pre-feasibility phase for exploration.

    BENEFICIARY POPULATION All the Ecuadorian populationENVIRONMENTAL IMPACT The impact does not generate important consequences and allows a recovery in the short run

    TOTAL INVESTMENT AMOUNT USD 2899.977REQUIRED FINANCING USD 2464.980

    Name of the project | MINA REAL

    Technical Data

    Financial Indicators

    DESCRIPTION:To carry out the prospection of the mining deposit, in order to determine its reserves, mainly in gold, copper and molybdenum.

    Contracting Modes

    Loly Montesinos, International Management DirectorStrategic Sectors Coordination Ministry [email protected] Phone: (593-2) 2260670

  • EXECUTING AGENCY Ministry of Non Renewable Natural Resources COVERAGE AND LOCATION Cotopaxi Province

    STUDY LEVEL Basic Prole

    BENEFICIARY POPULATION All the Ecuadorian populationENVIRONMENTAL IMPACT The impact does not generate important consequences and allows a recovery in the short run

    TOTAL INVESTMENT AMOUNT USD 2836.495REQUIRED FINANCING USD 2411.020

    Name of the project | LA PLATA

    Technical Data

    Financial Indicators

    DESCRIPTION:To carry out the prospection and exploration of the project, to determine silver, copper, lead and zinc reserves.

    Contracting Modes

    Loly Montesinos, International Management DirectorStrategic Sectors Coordination Ministry [email protected] Phone: (593-2) 2260670

    FIERRO URCO

    JUNN

    MINA REAL

    LA PLATA

    Loja

    Imbabura

    Zamora Chinchipe

    Cotopaxi

    Oro, plata y cobre

    Cobre y molibdeno

    Oro, cobre y molibdeno

    Plata, cobre, plomo y zinc

    USD 4274,917.90

    USD 7075,827.97

    USD 2899,977.86

    USD 2836,495,00

    NOMBRE LOCALIZACIN - PROVINCIA MONTO TOTALDE INVERSINYACIMIENTO

    Resumen de Proyectos

  • FIERRO URCO

    JUNN

    MINA REAL

    LA PLATA

    Loja

    Imbabura

    Zamora Chinchipe

    Cotopaxi

    Gold, silver and copper

    Copper and molybdenum

    Gold, copper and molybdenum

    Silver, copper, lead and zinc

    USD 4274,917.90

    USD 7075,827.97

    USD 2899,977.86

    USD 2836,495,00

    NAME LOCATION - PROVINCE TOTAL AMOUNT OF THE INVESTMENTMETAL IN THE DEPOSIT

    Project Summary

  • P R O J E C T SOIL

    ENTIDAD RECTORA Ministerio de Recursos Naturales No RenovablesCOBERTURA Y LOCALIZACIN Provincia de Orellana

    NIVEL DE ESTUDIOS Pre factibilidad y factibilidad realizados.

    POBLACIN BENEFICIADA Toda la poblacin ecuatoriana.IMPACTO AMBIENTAL Permisos ambientales, en trmite.

    MONTO TOTAL INVERSIN USD 41200.000 FINANCIAMIENTO REQUERIDO USD 35000.000 TIR 68%VAN USD 91400.000

    Nombre Proyecto | TUMALI

    Datos Tcnicos

    Indicadores Financieros

    Modalidades de Contratacin

    DESCRIPCIN:Explotacin de crudo del campo Tumali, a travs de Paacocha. En 2010 se espera perforar tres pozos.

    Punto Focal: Loly Montesinos, Directora de Gestin InternacionalMinisterio de Coordinacin de los Sectores Estratgicos [email protected] Telf.: (593-2) 2260670

    Ecuador is seeking to exploit eciently energy resources, promoting the exploration in new oil and gas elds, as well as investment in oil reneries to guarantee the autonomy in the consumption of oil by-products.

  • Modalidades de Contratacin

    ENTIDAD RECTORA Ministerio de Recursos Naturales No RenovablesCOBERTURA Y LOCALIZACIN Provincia de Orellana

    NIVEL DE ESTUDIOS Pre factibilidad y factibilidad realizados.

    POBLACIN BENEFICIADA Toda la poblacin ecuatoriana. IMPACTO AMBIENTAL Impacto ambiental mnimo, segn estndares de desarrollo de proyectos del Plan de Manejo Ambiental (PAM).

    MONTO TOTAL INVERSIN USD 122100.000 FINANCIAMIENTO REQUERIDO USD 103780.000TIR 62%VAN USD 216500.000

    Nombre Proyecto | QUINDE - CEDROS

    Datos tcnicos

    Indicadores Financieros

    DESCRIPCIN:Explotacin de crudo del campo Quinde - Cedros

    EXECUTING AGENCY Ministry of Non Renewable Natural ResourcesCOVERAGE AND LOCATION Orellana Province

    STUDY LEVEL Pre-feasibility and feasibility done.

    BENEFICIARY POPULATION All the Ecuadorian population.ENVIRONMENTAL IMPACT Environmental permits in process.

    TOTAL INVESTMENT AMOUNT USD 41200.000 REQUIRED FINANCING USD 35000.000INTERNAL RATE OF RETURN 68%NET PRESENT VALUE USD 91400.000

    Name of the project | TUMALI

    Technical Data

    Financial Indicators

    Contracting Modes

    DESCRIPTION:Oil exploitation at the eld Tumali, through Paacocha. In 2010 three wells will be drilled.

    Punto Focal: Loly Montesinos, Directora de Gestin InternacionalMinisterio de Coordinacin de los Sectores Estratgicos [email protected] Telf.: (593-2) 2260670

    Focal Point: Loly Montesinos, International Management DirectorStrategic Sectors Coordination Ministry [email protected] Phone: (593-2) 2260670

  • Modalidades de Contratacin

    ENTIDAD RECTORA Ministerio de Recursos Naturales No Renovables COBERTURA Y LOCALIZACIN Provincia de Orellana

    NIVEL DE ESTUDIOS Pre factibilidad realizado, ingeniera conceptual, bsica y de detalle en contratacin.

    POBLACIN BENEFICIADA Toda la poblacin ecuatoriana. IMPACTO AMBIENTAL Impacto ambiental mnimo, segn estndares del Plan de Manejo Ambiental (PAM).

    MONTO TOTAL INVERSIN USD 560500.000 FINANCIAMIENTO REQUERIDO USD 476400.000TIR 74%VAN USD 1.220000.000

    Nombre Proyecto | BLOQUE 31

    Datos Tcnicos

    Indicadores Financieros

    DESCRIPCIN:Explotacin de crudo del Bloque 31

    Contracting Modes

    EXECUTING AGENCY Ministry of Non Renewable Natural ResourcesCOVERAGE AND LOCATION Orellana Province

    STUDY LEVEL Pre-feasibility and feasibility done.

    BENEFICIARY POPULATION All the Ecuadorian population. ENVIRONMENTAL IMPACT Minimum environmental impact, according to development standards for the projects of the Environmental Management Plan (PAM).

    TOTAL INVESTMENT AMOUNT USD 122100.000 REQUIRED FINANCING USD 103780.000INTERNAL RATE OF RETURN 62%NET PRESENT VALUE USD 216500.000

    Name of the project | QUINDE - CEDROS

    Technical Data

    Financial Indicators

    DESCRIPTION:Oil exploitation at the eld Quinde - Cedros

    Punto Focal: Loly Montesinos, Directora de Gestin InternacionalMinisterio de Coordinacin de los Sectores Estratgicos [email protected] Telf.: (593-2) 2260670

    Focal Point: Loly Montesinos, International Management DirectorStrategic Sectors Coordination Ministry [email protected] Phone: (593-2) 2260670

  • Contracting Modes

    EXECUTING AGENCY Ministry of Non Renewable Natural Resources COVERAGE AND LOCATION Orellana Province

    STUDY LEVEL Pre-feasibility done, conceptual engineering, basic and detail in contracting process.

    BENEFICIARY POPULATION All the Ecuadorian population. ENVIRONMENTAL IMPACT Minimum environmental impact, according to the standards of the Environmental Management Plan (PAM).

    TOTAL INVESTMENT AMOUNT USD 560500.000 REQUIRED FINANCING USD 476400.000 INTERNAL RATE OF RETURN 74%NET PRESENT VALUE USD1.220000.000

    Name of the project | BLOCK 31

    Technical Data

    Financial Indicators

    DESCRIPTION:Oil exploitation at Block 31.

    Focal Point: Loly Montesinos, International Management DirectorStrategic Sectors Coordination Ministry [email protected] Phone: (593-2) 2260670

    P R O Y E C T O S

    PETROLEROS> > R E F I N A C I N

  • Modalidades de Contratacin

    ENTIDAD RECTORA Ministerio de Recursos Naturales No RenovablesCOBERTURA Y LOCALIZACIN Provincia de Sucumbos, Napo y Orellana.

    NIVEL DE ESTUDIOS Perl del proyecto.

    POBLACIN BENEFICIADA Toda la poblacin ecuatoriana.IMPACTO AMBIENTAL Se reducirn emisiones lquidas y gaseosas.

    MONTO TOTAL INVERSIN USD 799500.000 +/-30%FINANCIAMIENTO REQUERIDO USD 680000.000 +/- 30%TIR 23.61%VAN USD 532000.000

    Nombre Proyecto | AMPLIACIN Y MODERNIZACIN DE LA REFINERA AMAZONAS

    Datos Tcnicos

    Indicadores Financieros

    DESCRIPCIN:Diseo, construccin y puesta en marcha de unidades de procesos de destilacin atmosfrica, craqueo cataltico uido de residuos, hidrodesulfurizadora de disel, tratamiento jet, hidrotratamiento de naftas liviana y pesada, tratamiento de gas licuado de petrleo, planta de aminas, de azufre y produccin de hidrgeno.

    Punto Focal: Loly Montesinos, Directora de Gestin InternacionalMinisterio de Coordinacin de los Sectores Estratgicos [email protected] Telf.: (593-2) 2260670

    P R O J E C T S

    OIL> > R E F I N I N G

  • Modalidades de Contratacin

    ENTIDAD RECTORA Ministerio de Recursos Naturales No RenovablesCOBERTURA Y LOCALIZACIN Provincias de Santa Elena, Manab, Guayas, El Oro, Los Ros, Caar, Azuay, Loja, Zamora Chinchipe y Morona Santiago.

    NIVEL DE ESTUDIOS Perl del proyecto.

    POBLACIN BENEFICIADA Toda la poblacin del Ecuador. IMPACTO AMBIENTAL Se reducirn emisiones lquidas y gaseosas.

    MONTO TOTAL INVERSIN USD 816000.000 +/-30%FINANCIAMIENTO REQUERIDO USD 693600.000 +/-30%TIR 26.77%VAN USD 312000.000

    Nombre Proyecto | PROCESAMIENTO DE RESIDUOS DE LA REFINERA LA LIBERTAD

    Datos Tcnicos

    Indicadores Financieros

    DESCRIPCIN:Diseo, construccin y puesta en marcha de unidades de procesos de alta conversin para el procesamiento de los residuos provenientes de las plantas existentes.

    Contracting Modes

    EXECUTING AGENCY Ministry of Non Renewable Natural Resources COVERAGE AND LOCATION Sucumbos, Napo and Orellana Provinces.

    STUDY LEVEL Project prole.

    BENEFICIARY POPULATION All the Ecuadorian population. ENVIRONMENTAL IMPACT Liquid and gas emissions will be reduced.

    Name of the project | ENLARGEMENT AND MODERNIZATION OF AMAZONAS REFINERY

    Technical Data

    TOTAL INVESTMENT AMOUNT USD 799500.000 +/-30%REQUIRED FINANCING USD 680000.000 +/- 30% INTERNAL RATE OF RETURN 23.61%NET PRESENT VALUE USD 532000.000

    Financial Indicators

    DESCRIPTION:Design, construction and start up of atmospheric distillation process units, uid catalytic cracking of residues, diesel hydro desulfurizer, jet