CARROLL STREETProject Development & Environment StudyFrom John Young Pa rkway t o M i ch i gan AvenuePD E&
Issue #2, August 2015
Carrol l Street Project Developmentand Environment (PD&E) Study Cont inues
Meet ing Purpose
The purpose of the Alternatives Public Information Meeting is to obtain input from the public for the development of the alternatives for Carroll Street. The alternatives include the “no-build” alternative, Alternative 1 and Alternative 2. Alternative 1 includes adding two through lanes and installing a median. Alternative 2 includes adding two through lanes and keeping (or installing) a center turn lane. Both Alternatives 1 and 2 will require additional right-of-way. The impacts of widening each alterna-tive to the north or to the south are being evaluated.
The PD&E Study began in December 2014. A Public Kickoff Meeting was held on February 26, 2015. A Public Hearing is currently scheduled for the spring of 2016.
Osceola County is conducting a Project Development and Environment (PD&E) Study for Carroll Street from John Young Parkway to Michigan Avenue in Osceola County. The PD&E Study involves developing and evaluating alternatives to widen the existing roadway and possibly adding a median. A no-build alternative is also being considered.
Upcoming Publ ic Meet ing
The Alternatives Public Information Meeting, scheduled for September 24, 2015, will have an open house format starting at 5:30 p.m. with a formal presentation at 6:00 pm. Team members will be available to answer questions one-on-one at any time during the informal open house from 5:30 p.m. to 7:00 p.m. Members of the public may submit written comments at the meeting or by contacting Ms. Joedel Zaballero (contact information on reverse side). She may also be contacted by persons with disabilities who require special accommodations under the Americans with Disabilities Act or persons who require translation services (free of charge) at least seven (7) days prior to the Alternatives Public information Meeting.
Thursday, September 24, 2015,5:30 pm to 7:00 pmFormal Presentation at 6:00 pm
Osceola County Administrative BuildingCommission Chambers (4th Floor)1 Courthouse SquareKissimmee, Florida 34741
To receive your input for the development of alternatives for improving Carroll Street.
Your input is encouraged both at the public meeting as well as through the project website at
www.ImproveCarrollStreet.com.
WE NEED YOUR INPUT!At a Public Alternatives Meeting for Carroll Street
When:
Where:
Why:
Emmet St
Mai
n St
Broa
dway
Ave
John
You
ng P
kwy
192
441
MeetingLocation
Up-to-date information on the status of the project including information on upcoming public meetingsis available at www.ImproveCarrollStreet.com
Begin Study
Kickoff Meeting
Evaluation of Public Input
Develop Alternatives
Alternatives Public Meeting
Preferred Alternative
Public Hearing
Recommended Alternative
Study Complete
2014 2015 2016ACTIVITY
E Alternat ive 1 - 4 Lanes with Grass Median
Alternat ive 2 - 4 Lanes with Paved Center Turn Lane
Contact Informat ion
If you have any questions, need more information or would like for us to speak at your next community group or homeowner’s association meeting, please contact:
E Carroll St
Mic
higa
n Av
e
Wel
ls A
ve
Bay
Ave
Flor
ida
Ave
Carlton St
Raleigh St
Beckley St
E Fletcher St
Oran
ge B
loss
om T
rail
E Martin St
Whitney St
E Duncan Ave
W Jackson St
N Horseshoe Bay Dr
Home St
Joelson RdWoodland Creek Blvd
Sawdust Trail
Bam St
W Carroll St
W Tropicana Ct
Country Blvd
Reag
an L
n
Sam
ple
St
Lehi
gh A
veLe
high
Ave
John
You
ng P
kwy
Libe
rty
Blvd
Milt
on A
ve
N Ce
ntra
l Ave
Trop
ical
Lak
e Dr
Mar
tina
Ave
Cora
l Ave
Ranc
ho D
r
Beau
mon
t Ave
Hig
hlan
d Av
e
Mia
mi T
erra
ce
Gree
n M
eado
wCi
rcle
Texa
s Av
e
New
com
be L
n
Ceda
r AV
e
441
Begin Study
End Study
Ms. Joedel Zaballero, P.E., PTOEOsceola County Project ManagerOsceola County Public Works Department1 Courthouse Square, Suite 3100Kissimmee, FL 34741Phone: 407-742-0623Email: [email protected]
Mr. Clif Tate, P.E.Consultant Project ManagerKimley-Horn and Associates Inc.3660 Maguire Boulevard, Suite 200Orlando, FL 32803Phone: 407-898-1511Email: [email protected]
Up-to-date information on the status of the project including information on upcoming public meetingsis available at www.ImproveCarrollStreet.com
5’11’10’
ConcreteSidewalk
Conc.Sdwk.
TravelLane
11’
TravelLane
11’
TravelLane
11’
TravelLane
19.5’
Median
CL
92.5’ Right-of-Way
5’11’10’
ConcreteSidewalk
TravelLane
11’ 11’
TravelLane
11’
TravelLane
11’
TravelLane
Conc.Sdwk.
CL
Center TurnLane
84’ Right-of-Way
(Existing Right of Way Varies from 50 to 75 feet)
(Existing Right of Way Varies from 50 to 75 feet)