S C S E N E R G Y
CAPSTONE 30 kW AND 60 kW MICROTURBINECAPSTONE 30 kW AND 60 kW MICROTURBINEINSTALLATIONS AT LANDFILLSINSTALLATIONS AT LANDFILLS
Intermountain CHP Application Center WorkshopIntermountain CHP Application Center WorkshopCHP and CHP and BioenergyBioenergy for Landfills andfor Landfills and
Wastewater Treatment PlantsWastewater Treatment Plants
August 11, 2005August 11, 2005Salt Lake City, UtahSalt Lake City, Utah
Jeffrey L. Pierce, P.E.Jeffrey L. Pierce, P.E.Vice President Vice President SCS EnergySCS Energy
Long Beach, CaliforniaLong Beach, California
S C S E N E R G Y
Capstone 30 kW MicroturbineCapstone 30 kW Microturbine
Available for biogas service for over five yearsAvailable for biogas service for over five years
Have been installed in arrays of one to fifty unitsHave been installed in arrays of one to fifty units
Heat rate = 13,100 Btu/kWh (LHV)Heat rate = 13,100 Btu/kWh (LHV)
Heat recovery optionalHeat recovery optionalOne heat exchanger per microturbine or multiple units to single One heat exchanger per microturbine or multiple units to single heat exchangerheat exchanger
About 190,000 Btu/hr of hot waterAbout 190,000 Btu/hr of hot water
Radiator or exhaust bypass for regulation of heat recoveryRadiator or exhaust bypass for regulation of heat recovery
S C S E N E R G Y
New Jersey: 1New Jersey: 1stst LFG CHPLFG CHPRutgers University EcoComplexRutgers University EcoComplex
S C S E N E R G Y
S C S E N E R G Y
S C S E N E R G Y
Capstone 60 kW MicroturbineCapstone 60 kW Microturbine
Will be available for biogas in early 2006Will be available for biogas in early 2006
Expected heat rate = 12,200 Btu/kWh (LHV)Expected heat rate = 12,200 Btu/kWh (LHV)
Expected heat recoveryExpected heat recoveryAbout 375,000 Btu/hrAbout 375,000 Btu/hr
Same options for heat recovery as for C30Same options for heat recovery as for C30
Likely cost (without heat recovery) of about $56,000 Likely cost (without heat recovery) of about $56,000 ($930/kW) versus $34,000 ($1,130/kW) for 30 kW ($930/kW) versus $34,000 ($1,130/kW) for 30 kW machinemachine
S C S E N E R G Y
Hot Water CHP: Biogas C60Hot Water CHP: Biogas C60--ICHPICHP
Optional integrated stainless steel heat exchanger Optional integrated stainless steel heat exchanger designed & designed & manufactured by manufactured by Capstone TurbineCapstone Turbine
S C S E N E R G Y
Calabasas LandfillCalabasas Landfill
Ten Capstone 30 kW microturbinesTen Capstone 30 kW microturbines
300 kW 300 kW ((grossgross)) / 250 kW / 250 kW ((netnet))
Microturbine inlet pressure = 80 psigMicroturbine inlet pressure = 80 psig
30% to 45% methane content30% to 45% methane content
HH22S = 75 / siloxanes = 705 S = 75 / siloxanes = 705 ppbvppbv
80 psig sliding vane compressor / chilling of gas to 40º F / 80 psig sliding vane compressor / chilling of gas to 40º F / reheat of gas by 20º F / activated carbon and silica gelreheat of gas by 20º F / activated carbon and silica gel
S C S E N E R G Y
Calabasas LandfillCalabasas Landfill
Capital cost = $770,000 Capital cost = $770,000 (($2,570/kW$2,570/kW))
O&M cost = 2.5¢/kWhO&M cost = 2.5¢/kWh
Onsite retail deferral at 15¢/kWhOnsite retail deferral at 15¢/kWh
Interconnection cost = $5,000 Interconnection cost = $5,000 (($16/kW$16/kW))
Design/construction duration = 5 monthsDesign/construction duration = 5 months
Simple payback Simple payback ((after grantsafter grants)) = 1.6 years= 1.6 years
S C S E N E R G Y
S C S E N E R G Y
S C S E N E R G Y
S C S E N E R G Y
S C S E N E R G Y
S C S E N E R G Y
S C S E N E R G Y
S C S E N E R G Y
S C S E N E R G Y
Capstone C30 Air Emissions at Calabasas LandfillCapstone C30 Air Emissions at Calabasas Landfill
NONOxx
COCO
VOCsVOCs
NMOC DestructionNMOC Destruction
S C S E N E R G Y
ConclusionsConclusions
Capstone microturbines are a relatively proven Capstone microturbines are a relatively proven technology for biogas fuels (35% or less methane)technology for biogas fuels (35% or less methane)
They are primarily applicable to distributed generation They are primarily applicable to distributed generation projects, but have been used for large sale to grid projects, but have been used for large sale to grid projectsprojects
High retail power costs and financial incentives can High retail power costs and financial incentives can result in economically feasible projectsresult in economically feasible projects