Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
1
KHGO (KHR)-series HZ1755-E Assembling manualCantaport made in Japan certified to AU standards
Precautions during installation□The Cantaport is a simple structure. Do not change or remodel it without gaining
certification from Cantaport to avoid warranty or danger to public.□The snow accumulation strength is 600N/m2 (61.2kg/m2) which corresponds to
20cm of fresh snowfall (specific weight 0.3). Do not install in heavy snow area.□Do not install it in the place where snow slides down from the building roof directly.
There is a possibility that products are damaged by snow falling.□When installing it besides wall, etc., keep enough clearance between the product
and the wall due to avoid damage during strong winds. 100mm-200mm clearance.□Do not install in locations subject to strong wind directly/constantly underneath the roof.
□When installing, it is recommended to install the front frame facing towards the building to reduce the wind effect.□When installing with side panel please be sure to install the support post.□Positioning the posts so that they do not affect underground services (water supply, drain pipes, etc.).□When moving the posts, please follow the manufactures specifications detailed in this manual.□Install so that the exhaust of hot-water steam, heating fumes and/or car exhaust do not directly hit the surface of the
supports and around the entire frame. This may cause discolouration of the surface structure.
Name of parts
Thank you very much for choosing our company's Cantaport products.Please be sure to thoroughly read these instructions for assembling the Cantaport product in conjunction with the engineering details. DIY or Authorisied Cantaport installations must follow the manufactures assembling manual to avoid warranty cover. Please retain the manual for future reference and maintenance inspection.
Gutter
BeamMain frame
Post Front frame
Roof panel
Side frameRoof retainer
Roof rafter
enough space
enough space
concrete wall etc
2
seasand
cementenhancer
water-reducing
cryoprotectant
Precautions during construction□Follow the instructions and be sure that all the specified screws and bolts for assembly are tightened securely□Tighten the M8 bolts about 13Nm (130kgfcm) tightening torque.□Do not use anything other than the specified parts or accessory parts.□The foundation should comply with the certified engineering specifications page 4 .□Allow sufficient curing time for the concrete and do not place heavy objects on it or subject it to vibrations during the curing
period.□Caution note below to prevent aluminum materials corrode.
(1) Do not use sea sand for the foundation since it containssalt and may cause corrosion. Do not use a cementenhancer, water-reducing agent or cryoprotectant. Theymay cause the posts to corrode.
(2) Immediately wipe off any mortar or stains from the surfaceof the aluminum parts as they may cause corrosion.
Necessary tools and materials for installation
□Electric drill, Drill bits□Ratchet wrench, Adjustable wrench□Screwdriver□Measure, Level, Plumb bob
□Foundation materials, concrete as per engineers specifications□Sealant, silicon gun□Drop saw for reducing or customising the structure□Please prepare tools and materials as required
□ Check all components are not damaged when receiving delivery. Exchanges can only apply 48 hours after delivery. Conditions apply and only refer to manufactures fault. Delivery damage is part of the receivers insurance. Report all damage
to sender.□After installation, check all bolts, screws, nuts, etc. are tightened and not loose and for any dangers that may exist.After installation, be sure to check if the product has no scratches or dents.□ Retain this manual for future reference on product operation procedures, maintenance and inspection methods.
Dimension, position of posts and base dimension
Spacing of posts 2900mm centered from each post. Height to be determined from the bottom cutout on the posts (where the beam is inserted see page 7) to Finished ground level. H1800mm below beam is 2422.60mm top of roof. H2250mm below beam is 2872.60mm top of roof. H2750mm below beam is 3372.60mm top of roof. NOTE: Posts higher then 2750 require a metal sleeve insert sold separately. Standard height is H2250mm supplied.
CAUTION DO NOT CLIMB, HANG OR WALK ON THE ROOF. THE OWNER TO PROVIDE CAUTION LABLES IF SITUATED IN PUBLIC OPEN SPACES OR EASY EXCESS TO THE INSTALLED STRUCTURE.
5
No U shape gutter
No U shape gutter
U shape gutter 2 parts U shape gutter 1 parts
Post type ①
KHRH-18C-2KHRH-23C-2
Section
Parts ID
Main frame type ①
KHRY-W50B-3
Section
Parts ID
Beam type ①
KHRM-5024
②
KHRM-5027
Section
Parts ID
Type Component partsPost
Beam Main frameStandard post
①②
①
Depth2427
50 ①
Length W Long postBody size
ShapeDescriptionContent
Parts IDQuantity
Post set(standard)KHRH-18C-2
Post set(long post)KHRH-23C-2
2
1
1
2
1
1
Post
Post
Round gutterGA4923
Instruction manualHZ0472
Round gutterGA4923
Instruction manualHZ0472
ShapeDescriptionContent
Parts IDQuantity
1
1
3
6
2
1
21
Main frame
Length setKHRY-W50B-3
Front frame
Gutter
Panel holder (middle)L=645
Panel holder (end)L=300
Round gutterGA4923
Roof panel cushionGB8274
Post・beam・main frame list
Parts instruction guide
Parts contents
□Please open the captioned carton and check all contents in advance.□Please check the parts for any damage.□After opening the carton boxes, please store the products so that
they are not damaged.□Extra screws in the parts box.(x)n umber is necessary Q'ty for
installation.
When △mark is P, it’s the polycarbonate panel.When △mark is CP, it’s the polycarbonate mat panel.When △mark is MCP, it’s the heat protection polycarbonate panel.
6
2
2
6
6
2
Beam
Side frame
ShapeDescriptionContent
Parts IDQuantity
59(56)
2
Roof rafter
Beam・depth setKHRM-5024KHRM-5027
Parts boxKHRB-2
95(90)
105(100)
KHRM-5024
KHRM-5027
3
4
KHRY-△○○-3
KHRY-△○○-4
Roof retainer (middle)
Roof retainer (end)
Small truss screw5×10×10
Drilling screw4×10×8
Corner partssetKHR-CBB-2
Corner bracketGB8063
Roof panel setKHRY-△24-3KHRY-△27-3KHRY-△24-4KHRY-△27-4
Roof panelGB4107(Polycarbonate)GB4575(Heat protection
polycarbonate)GB6365(Heat absorb
polycarbonate)
ShapeDescriptionContent
Parts IDQuantity
Right Left each 1pc
Right Left each 1pc
1
1
2
1
3
6(5)
1
1
Parts boxKHRB-2
2
2
2
24
16
Anchor rodGA0073
Post capGB8072
Hole sealφ14GA0150
Beam capGB8073
Hexagon bolt(with spring washer, washer)M8×25ES0249
Front frame capGB8074
ElbowGA4932
Drain elbowGA6461
SaddleGB8077
Caution labelGLZ20C
Gutter capGB8075
Gutter attachmentGA4929
GasketGA4930
Drilling screw4×10×8
GlueGA4934
1
1
Snow labelHY0177
Assembling manualHZ1755
M8×25Hexagon bolt
Small truss screw5×10×10
Drilling screw4×10×8
GEN
ERIC
DET
AILS
CAN
TAPO
RT A
USTR
ALIA
- PJ
R/PJ
F SE
RIES
SH
ADE
STRU
CTUR
E
001
APPR
OVED
BY
TITL
E
PROJ
ECT
PROJ
ECT
No.
REV
BYIS
SUE
/ RE
VISI
ON D
ESCR
IPTI
ONDA
TE
A3
0N
OT F
OR C
ONST
RUCT
ION
RWXX
.XX.
20
RUSS
ELL
WH
ITE
CLIE
NT
MIE
Aus
t CPE
ng N
ER R
PEQ
RBP
BPB
CAN
TAPO
RT A
USTR
ALIA
INFO
RMED
EN
GIN
EERI
NG
PTY
LTD
AB
N 7
2641
0936
56PO
BOX
405
5, B
ALW
YN E
AST,
VIC
310
3
GENERIC
EN
GIN
EE
RIN
G
E.GE
NER
AL D
ESIG
N C
RITE
RIA:
1.TH
E DE
SIGN
SPE
CIFI
CATI
ON IS
ONL
Y SU
ITAB
LE F
OR T
HE
ADDR
ESS
SHOW
N IN
TH
E TI
TLEB
LOCK
.TH
IS D
ESIG
N SP
ECIF
ICAT
ION
IS S
UITA
BLE
FOR
ONE
BUIL
DIN
G ON
LY U
NO.
PLE
ASE
CON
FIRM
WIT
H IN
FORM
ED E
NGI
NEE
RIN
G TH
AT T
HES
E DR
AWIN
GS H
AVE
BEEN
APP
ROVE
D. T
HE
NOT
ES M
AY B
E LI
MIT
ED IN
NAT
URE
AND
THE
STRU
CTUR
ESSU
ITAB
ILIT
Y M
UST
BE C
ONFI
RMED
AS
THE
LIM
ITAT
IONS
CAN
BE
EXCE
EDED
.TH
IS D
ESIG
N SP
ECIF
ICAT
ION
IS A
DDRE
SS S
PECI
FIC A
ND
IS N
OT A
UTH
ORIS
ED T
O BE
USE
D AT
AN
Y TI
ME
FOR
ANY
LOCA
TION
OTH
ER T
HAN
TH
E ST
RUCT
URE
SPEC
IFIE
D ON
TH
E CE
RTIF
ICAT
E OF
COM
PLIA
NCE
. IF
THE
STRU
CTUR
E IS
MOV
ED O
R TH
E GE
OMET
RICA
L CO
NFI
GURA
TION
IS C
HAN
GED
THEN
A N
EW C
ERTI
FICA
TION
IS T
O BE
ISSU
ED.
IF A
NY
OF T
HE
SPEC
IFIE
D LI
MIT
S AR
E EX
CEED
ED T
HE
ENGI
NEE
R IS
TO
BE C
ONTA
CTED
BEF
ORE
PROC
EEDI
NG.
2.DE
SIGN
LOA
D AC
TION
S (P
ERM
ANEN
T, L
IVE,
WIN
D) IN
CLUD
ED IN
TH
E DE
SIGN
OF
THE
STRU
CTUR
E AR
E DE
FIN
EDIN
ACC
ORDA
NCE
WIT
H T
HE
FOLL
OWIN
G:AS
1170
PAR
T 0
& 1
DEA
D AN
D LI
VE L
OADS
AS11
70 P
ART
2W
IND
LOAD
SAS
1170
PAR
T 4
EART
HQU
AKE
LOAD
S
3.50
YEA
R ST
RUCT
URE
DESI
GN W
ORKI
NG
LIFE
IM
PORT
ANCE
LEV
EL 2
WIN
D RE
GION
A T
ERRA
IN C
ATEG
ORY
2, 2
.5, 3
OR
4UL
T. L
IMIT
STA
TE W
IND
SPEE
D OF
43m
/sSE
RVIC
EABI
LITY
LIM
IT S
TATE
WIN
D SP
EED
OF 3
7m/s
F.SP
ECIF
ICAT
ION
NOT
ES
1.CO
NCR
ETE
TO B
E M
IN 2
0/20
/80
POUR
ED D
IREC
TLY
INTO
FOO
TIN
G EX
CAVA
TION
AN
D AL
L AR
OUN
D PO
ST. H
AND
TAM
P TO
REM
OVE
ANY
AIR
VOID
S OR
NON
-UN
IFOR
MIT
IES.
WH
ERE
POST
S AR
E BA
SEPL
ATED
TO
TOP
OF F
OOTI
NGS
, CON
CRET
E TO
BE
MIN
25/
20/8
0 TY
P PO
URED
IN S
ITU
IN A
CCOR
DAN
CE W
ITH
AS
3600
.
2.AL
L FA
BRIC
ATIO
N A
ND
EREC
TION
OF
STEE
LWOR
K TO
BE
IN A
CCOR
DAN
CE W
ITH
AS4
100
AND
AS16
64 F
OR A
LUM
INIU
M. R
EPAI
RAL
L W
ELDS
WIT
H C
OLD
GAL
VAN
IZIN
G PA
INT.
ALL
COA
TIN
GS A
ND
HAR
DWAR
E, B
OLTS
, SCR
EWS
TO S
UIT
EXPO
SURE
CLAS
SIFI
CATI
ON.
ALL
TIM
BER
WOR
KS A
ND
MAT
ERIA
LS A
RE T
O CO
MPL
Y W
ITH
TH
E PR
OVIS
ION
S OF
AS1
684
AND
AS17
20. I
T IS
TH
E RE
SPON
SIBI
LITY
OF T
HE
CLIE
NT
TO IN
FORM
TH
E OW
NER
OF
THE
IMPO
RTAN
CE O
F M
AIN
TAIN
ING
EXTE
RNAL
STR
UCTU
RAL
TIM
BERS
BY
WAY
OF
PAIN
TIN
G OR
SIM
ILAR
PRO
TECT
ION
..
3.SE
AL A
LL O
PEN
EN
DS O
F H
OLLO
W S
ECTI
ONS
WIT
H 3
PL S
EAL
CAP
PLAT
ES O
R TO
BUI
LDER
S DE
TAIL
S. P
ROVI
DE Ø
5 DR
AIN
HOL
EIN
SEA
L PL
ATES
AS
REQU
IRED
. REM
OVE
ALL
SHAR
P ED
GES
AND
BURR
S.
4.AL
L DI
SSIM
ILAR
MET
ALS
TO B
E IS
OLAT
ED W
ITH
LOA
D-BE
ARIN
G PL
ASTI
C W
ASH
ERS,
SPA
CERS
AN
D SL
EEVE
S TO
BUI
LDER
'SDE
TAIL
S.
5.IN
FORM
ED E
NGI
NEE
RIN
G PT
Y LT
D AC
CEPT
S N
O RE
SPON
SIBI
LITY
FOR
TH
E IN
SER
VICE
STR
UCTU
RAL
PERF
ORM
ANCE
OF
THE
DESI
GN O
F TH
E ST
RUCT
URE
UNTI
L W
E AR
E IN
VITE
D TO
CAR
RY O
UT A
COM
PLIA
NCE
INSP
ECTI
ON O
F TH
E AS
-CON
STRU
CTED
PROJ
ECT.
UPO
N IN
SPEC
TION
AN
D SU
BSEQ
UEN
T CE
RTIF
ICAT
ION,
A C
ERTI
FICA
TE O
F CO
MPL
IAN
CE W
ILL
BE IS
SUED
BY
THIS
OFF
ICE
DEM
ONST
RATI
NG
THE
CON
FORM
ANCE
WIT
H T
HIS
SPE
CIFI
CATI
ON.
6.AL
L SH
S/RH
S/CH
S H
OLLO
W S
ECTI
ONS
TO B
E G3
50 M
IN U
NO.
7.M
AX R
OOF
PITC
H - 7
.5°
8.PO
ST A
RE D
ESIG
NED
WTH
DEF
LECT
ION
S LI
MIT
ED T
O H
EIGH
T/10
0 UN
DER
EREC
TION
PRE
-TEN
SION
LOA
DIN
G. P
OSTS
ARE
OTH
ERW
ISE
DESI
GNED
FOR
STR
ENGT
H U
LTIM
ATE
DESI
GN L
OADI
NG
AND
MAY
BE
EXPE
CTED
TO
DEFL
ECT
UNDE
R SE
RVIC
EABI
LITY
WIN
D LO
ADS.
9.VE
HIC
ULAR
IMPA
CT L
OADS
HAV
E N
OT B
EEN
CON
SIDE
RED
IN T
HE
DESI
GN.
10.
ROOF
CLA
DDIN
G TO
BE
FIXE
D TO
MAN
UFAC
TURE
R'S
SPEC
IFIC
ATIO
NS.
FLAS
HIN
GS A
ND
GUTT
ERS
TO B
E FI
XED
TO B
UILD
ER'S
DET
AILS
.IT
IS T
HE
BUIL
DER'
S RE
SPON
SIBI
LITY
TO
NOT
IFY
THE
OWN
ER T
HAT
TH
E CA
NOP
Y PU
RLIN
S (P
1) A
RE N
OT A
BLE
TO C
ARRY
AN
Y LI
VE P
OIN
T LO
ADS.
11.
CAN
OPY
MU
ST N
OT B
E BL
OCKE
D M
ORE
THAN
2/3
OF
THE
CAN
OPY
HEI
GHT
IN T
HE
EVEN
T OF
PEA
K W
IND
LOAD
ING.
CAN
OPY
CAN
BE
BLOC
KED
(BY
WAL
LSOR
HOU
SE) O
N O
NE
SIDE
MAX
IMUM
.
12.
THE
MEM
BER
SIZE
S SH
OWN
ON
THIS
DES
IGN
ARE
THE
MIN
IMUM
SIZ
ES D
EEM
ED N
ECES
SARY
TO
FULF
ILL
THE
INTE
NT
OF T
HE
STRU
CTUR
AL D
ESIG
N. R
EFER
BAC
K TO
TH
IS O
FFIC
E SH
OULD
AN
Y IT
EMS
BE D
EVIA
TED
FROM
DUR
ING
THE
COUR
SE O
F FA
BRIC
ATIO
N,
EREC
TION
AN
D IN
STAL
LATI
ON.
13.
THIS
DES
IGN
SPEC
IFIC
ATIO
N IS
ONL
Y RE
LEVA
NT
FOR
PROJ
ECTS
WH
ICH
MAT
CH T
HE
ARRA
NGE
MEN
TS S
HOW
N. IT
IS T
HE
BUIL
DER'
SRE
SPON
SIBI
LITY
TO
ENSU
RE T
HAT
AN
Y M
ANUF
ACTU
RER
SPE
CIFI
C REQ
UIRE
MEN
TS A
RE M
ET.
14.
THE
DESI
GN IS
TO
BE E
RECT
ED S
TRIC
TLY
IN A
CCOR
DAN
CE W
ITH
TH
E CE
RTIF
IED
SITE
PLA
N A
ND
STAN
DARD
DRA
WIN
GS S
UPPL
IED
BY T
HIS
OFF
ICE.
CON
FORM
ITY
WIT
H A
LL S
TATU
TORY
OR
LOCA
L BU
ILDI
NG
AUTH
ORIT
Y RE
GULA
TION
S IS
TH
E BU
ILDE
R'S
RESP
ONSI
BILI
TY.
. 15.
CON
TACT
TH
E ST
RUCT
URAL
EN
GIN
EER
FOR
PROP
ER A
DVIC
E W
HEN
SUR
CHAR
GIN
G OR
UN
DERM
ININ
G OF
EXI
STIN
GST
RUCT
URES
/SER
VICE
S OC
CURS
ON
THIS
SIT
E (O
R AD
JACE
NT
SITE
S).
16.
ANY
EXIS
TIN
G ST
RUCT
URE
IS T
O BE
BY
OTH
ERS.
ALL
EXI
STIN
G EL
EMEN
TS A
RE T
O BE
DET
ERM
INED
AS
STRU
CTUR
ALLY
ADE
QUAT
EIN
ORD
ER T
O CA
RRY
THE
IMPO
SED
LOAD
ING
OF T
HE
PROP
OSED
STR
UCTU
RES,
BY
A CE
RTIF
ED P
RACT
ICIN
G EN
GIN
EER.
TH
IS D
ESIG
NCE
RTIF
ICAT
ION
DOE
S N
OT E
XTEN
D TO
CER
TIFI
CATI
ON O
F EX
ISTI
NG
STRU
CTUR
ES.
17.
ADDI
TION
AL S
HAD
E ST
RUCT
URE
CON
FIGU
RATI
ONS
MAY
BE
PLAC
ED D
IREC
TLY
ALON
G SI
DE A
LL S
INGU
LAR
PROP
OSED
STR
UCTU
RES.
ACC
EPTA
BLE
CON
FIGU
RATI
ONS
INCL
UDE
APEX
CON
NEC
TION
(M C
ONN
ECT)
, BAC
K TO
BACK
COL
UMN
CON
NEC
TION
(Y C
ONN
ECT)
, AN
D EN
D TO
EN
D CO
NN
ECTI
ONS
(INLI
NE
CON
NEC
T).
18.
C1 C
OLUM
NS
, B1
BEAM
S A
ND
P1 P
URLI
NS
TO B
E 60
63 T
6 AL
UMIN
IUM
WIT
H M
INIM
UM 1
80M
Pa C
OMPR
ESIO
NYI
ELD
STR
ESS
CAPA
CITY
. COR
NER
BRA
CKET
TO
BE S
TEEL
WIT
H M
INIM
UM G
RADE
OF
350M
Pa.
19.
IT IS
ASS
UMED
TH
AT T
HE
MIN
IMUM
ALL
OWAB
LE S
OIL
BEAR
ING
CAPA
CITY
IS 1
00kP
a OR
GRE
ATER
.
20.
IF S
ANDY
SOI
LS A
RE E
NCO
UNTE
RED,
FOU
NDA
TION
MAT
ERIA
L W
ITH
IN 1
m O
F AL
L FO
OTIN
GS T
O BE
SUF
FICI
ENTL
Y CO
MPA
CTED
TO A
CHIE
VE M
INIM
UM T
EST
RESU
LTS
OF 6
BLO
WS
/ 30
0mm
(FOR
TH
E FU
LL F
OOTI
NG
DEPT
H) W
HEN
TES
TED
WIT
H A
DYN
AMIC
CON
E PE
NOT
ROM
ETER
. COM
PACT
ION
LEVE
L TO
BE
ACH
IEVE
D PR
IOR
TO E
XCAV
ATIO
N.
21.
CERT
IFIC
ATIO
N IS
ONL
Y VA
LID
FOR
1x S
INGL
E PJ
R ST
RUCT
URE
SUPP
LIED
BY
CAN
TAPO
RT, C
ORRE
SPON
DIN
GW
ITH
IN T
HE
GEOM
ETRI
C LI
MIT
ATIO
NS
SHOW
N D
IAGR
AMM
ETIC
ALLY
ON
THIS
EN
GIN
EERI
NG
SPEC
IFIC
ATIO
N.
A.GE
NER
AL N
OTES
:
1.TH
E DE
TAIL
ING,
BUI
LDAB
ILIT
Y AN
D PU
RPOS
E OF
TH
ESE
DRAW
INGS
SH
ALL
BE C
HEC
KED
BY T
HE
CLIE
NT
AND
THEI
R BU
ILDE
R IN
ORD
ER T
O VE
RIFY
AN
D DE
TERM
INE
THE
PRAC
TICA
LITY
OF
THE
DESI
GN H
EREI
N.AN
Y IT
EMS
NOT
CON
FORM
ING
WIT
H T
HE
PROJ
ECT
ARCH
ITEC
TURA
L PL
AN S
HAL
L BE
REF
ERRE
D BA
CK T
OTH
IS O
FFIC
E PR
IOR
TO C
ONST
RUCT
ION
2.US
E OF
TH
ESE
DRAW
INGS
CON
FIRM
S TH
AT T
HE
CLIE
NT
UNDE
RSTA
NDS
TH
E DE
TAIL
S AN
D H
AS T
HE
RESP
ONSI
BILI
TY T
O PE
RFOR
M T
HE
EXEC
UTIO
N O
F TH
E W
ORKS
INVO
LVED
.
3.TH
ESE
DRAW
INGS
SH
ALL
BE R
EAD
IN C
ONJU
NCT
ION
WIT
H A
LL A
RCH
ITEC
TURA
L PL
ANS
AND
OTH
ER
CON
SULT
ANTS
WOR
KS A
ND/
OR S
PECI
FICA
TION
S. A
NY
SUCH
OTH
ER W
RITT
EN IN
STRU
CTIO
NS
THAT
MAY
BE
ISSU
ED D
URIN
G TH
E DE
VELO
PMEN
T OF
TH
E PR
OJEC
T, S
HAL
L RE
FER
ALL
DISC
REPA
NCI
ES T
O TH
E RE
LEVA
NT
CON
SULT
ANT
FOR
DECI
SION
PRI
OR T
O PR
OCEE
DIN
G W
ITH
TH
E W
ORK.
4.DO
NOT
SCA
LE D
IMES
ION
S FR
OM T
HE
STRU
CTUR
AL D
RAW
INGS
. DIM
ENSI
ONS
SHOW
N O
N A
LL D
RAW
INGS
SHAL
L BE
CH
ECKE
D AN
D VE
RIFI
ED O
N SI
TE B
Y TH
E CL
IEN
T.
5.AL
L RE
FERE
NCE
D ST
ANDA
RDS
TO B
E TH
E CU
RREN
T VE
RSIO
N A
T TI
ME
OF C
ONST
RUCT
ION
.
6.AL
L W
ORKS
AN
D M
ATER
IALS
TO
CON
FORM
WIT
H T
HE
PROV
ISIO
NS
OF T
HE
NAT
ION
AL C
ONST
RUCT
ION
CODE
AND
IN A
CCOR
DAN
CE W
ITH
REL
EVAN
T BU
ILDI
NG
STAT
E AU
THOR
ITIE
S..
7.DU
RIN
G CO
NST
RUCT
ION
, TH
E ST
RUCT
URE
SHAL
L BE
MAI
NTA
INED
IN A
SAF
E AN
D ST
ABLE
CON
DITI
ON A
ND
NO
PART
SHAL
L BE
OVE
RSTR
ESSE
D. T
EMPO
RARY
BRA
CIN
G AN
D W
ORKS
ARE
TO
BE A
S PE
R BU
ILDE
RS D
ETAI
L.
8.TH
E EN
GIN
EER
MUS
T BE
NOT
IFIE
D IN
WRI
TIN
G OF
AN
Y CH
ANGE
S TO
TH
E PR
OPOS
ED C
ONST
RUCT
ION
OR S
ITE
PREP
ARAT
ION
IN O
RDER
TO
MAK
E N
ECES
SARY
CH
ANGE
S AS
WAR
RAN
TED
IN T
HE
DESI
GN. S
UFFI
CIEN
T TI
ME
SHAL
L BE
AW
ARDE
D TO
PRO
CESS
AN
Y CL
IEN
T SU
PPLI
ED IN
FORM
ATIO
N FO
R VA
RIAT
ION
TO T
HE
CON
TRAC
T.
B. F
OOTI
NGS
:
1.AL
L W
ORKS
& M
ATER
IALS
SH
ALL
BE IN
ACC
ORDA
NCE
WIT
H A
S 28
70 A
ND
CON
FORM
WIT
H T
HE
NAT
ION
ALCO
NST
RUCT
ION
COD
E.
2.SH
OULD
SOI
L CO
NDI
TION
S EN
COUN
TERE
D ON
SIT
E DI
FFER
SIG
NIF
ICAN
TLY
FROM
TH
AT IN
DICA
TED
IN T
HE
SOIL
TES
T, T
HE
ENGI
NEE
R M
UST
BE N
OTIF
IED
BEFO
RE P
ROCE
EDIN
G AS
MOD
IFIC
ATIO
NS
TO T
HE
DESI
GNM
AY B
E RE
QUIR
ED.
3.AN
Y EX
CAVA
TION
S N
OT T
O UN
DERM
INE
FOOT
INGS
. IF
UNDE
RMIN
ING
IS L
IKEL
Y TO
OCC
UR, C
ONTA
CT T
HE
ENGI
NEE
R.
4.FO
OTIN
GS S
HAL
L BE
PLA
CED
CEN
TRAL
LY U
NDE
R CO
LUM
NS
UNLE
SS O
THER
WIS
E N
OTED
.
5.DR
AIN
AGE
SHAL
L BE
CON
STRU
CTED
TO
AVOI
D W
ATER
PON
DIN
G AG
AIN
ST O
R N
EAR
TH
E FO
OTIN
G, R
OOF
AND
SURF
ACE
WAT
ER T
O BE
TAK
EN A
WAY
FRO
M F
OUN
DATI
ON A
REA.
6.IF
AN
Y FO
OTIN
G IS
LOC
ATED
SUC
H TH
AT A
45
DEGR
EE L
INE
(FOR
CLA
Y AN
D 30
DEG
REES
FOR
SAN
D)FR
OM IT
S BA
SE IN
TERS
ECTS
AN
Y UN
DERG
ROUN
D SE
RVIC
E, T
HEN
PIE
RS A
RE R
EQUI
RED
TO B
E EX
TEN
DED
.
C. C
ONCR
ETE:
1.AL
L W
ORKS
AN
D M
ATER
IALS
SH
ALL
BE IN
ACC
ORDA
NCE
WIT
H A
S 36
00 &
AS
2870
.
2.RE
FER
TO C
ONCR
ETE
TABL
E BE
LOW
FOR
TYP
ICAL
VAL
UES.
3.SA
MPL
E AN
D TE
ST IN
ACC
ORDA
NCE
WIT
H A
S 36
00.
4.CO
NSO
LIDA
TE B
Y VI
BRAT
ION.
5.TH
OROU
GHLY
SCA
BBLE
CON
CRET
E ON
WH
ICH
NEW
CON
CRET
E IS
TO
BE P
OURE
D.
6.AL
L CO
NCR
ETE
SHAL
L BE
PLA
CED
AND
CURE
D IN
ACC
ORDA
NCE
WIT
H A
S360
0. A
LL C
ONCR
ETE
SHAL
L BE
CUR
EDCO
NTI
NUO
USLY
BY
APPR
OVED
MET
HOD
S AF
TER
PLAC
ING,
7.CO
NST
RUCT
ION
JOIN
TS IN
CON
CRET
E SH
ALL
ONLY
BE
MAD
E W
ITH
TH
E AP
PROV
AL O
F TH
E EN
GIN
EER.
8U.
N.O
NO
ALLO
WAN
CE H
AS B
EEN
MAD
E FO
R ST
ACKE
D M
ATER
IALS
OR
MAC
HIN
ERY
ON T
HE
CON
CRET
E ST
RUCT
URE.
ALL
FORM
WOR
K SH
ALL
BE D
ESIG
NED
TO
WIT
HST
AND
ALL
POS
SIBL
E LO
AD C
OMBI
NAT
ION
S DU
RIN
G CO
NST
RUCT
ION
.
9.AL
L GA
LVAN
IZED
ITEM
S W
HIC
H AR
E CA
ST IN
TO C
ONCR
ETE
SHAL
L BE
PAS
SIVA
TED
IN A
CCOR
DAN
CE W
ITH
NCC
.
10.
ALTE
RNAT
IVE
SPLI
CES
IN R
EIN
FORC
EMEN
T OT
HER
TH
AN T
HOS
E SH
OWN
SH
ALL
BE T
O TH
E AP
PROV
AL O
F TH
E EN
GIN
EER.
W
HER
E TH
E LA
P LE
NGT
H IS
NOT
SH
OWN
IT S
HAL
L BE
SUF
FICI
ENT
TO D
EVEL
OP T
HE
FULL
STR
ENGT
H O
F TH
E RE
INFO
RCEM
ENT.
11.
WEL
DIN
G OF
REI
NFO
RCEM
ENT
SHAL
L N
OT B
E PE
RMIT
TED
UN
LESS
SH
OWN
ON
TH
E ST
RUCT
URAL
DRA
WIN
GS.
12.
REIN
FORC
EMEN
T SY
MBO
LS:
N- D
ENOT
ES G
RADE
D50
0 HI
GH S
TREN
GTH
DEF
ORM
ED B
ARS
TO A
S 46
71.
R- D
ENOT
ES G
RADE
R25
0 H
OT R
OLLE
D PL
AIN
BARS
TO
AS 4
671.
SL
- D
ENOT
ES H
ARD-
DRAW
N W
IRE
SQUA
RE R
EIN
FORC
ING
FABR
IC T
O AS
467
1.
RL- D
ENOT
ES H
ARD-
DRAW
N W
IRE
RECT
ANGU
LAR
REIN
FORC
ING
FABR
IC T
O AS
467
1.
L- D
ENOT
ES H
ARD-
DRAW
N W
IRE
TREN
CH M
ESH
TO
AS 4
671.
TM
- DEN
OTES
HAR
D-DR
AWN
WIR
E TR
ENCH
MES
H T
O AS
467
1.
THE
NUM
BER
IMM
EDIA
TELY
FOL
LOW
ING
THES
E SY
MBO
LS IS
TH
E BA
R DI
AMET
ER IN
MIL
LIM
ETRE
S.
13.
FABR
IC/M
ESH
REIN
FORC
EMEN
T TO
BE
LAPP
ED O
NE
MES
H P
LUS
30m
m. L
APS
IN P
OSIT
ION
S OF
MAX
IMUM
MOM
ENT
ARE
NOT
PE
RMIT
TED.
REI
NFO
RCEM
ENT
SHAL
L BE
PLA
CED
WIT
H A
CCUR
ATE
COVE
R AS
NOT
ED.
14.
ALL
REIN
FORC
EMEN
T SH
ALL
BE F
IRM
LY S
UPPO
RTED
ON
PLA
STIC
CH
AIRS
GEN
ERAL
LY A
T N
OT G
REAT
ER T
HAN
800
CEN
TRES
.RO
DS S
HAL
L BE
TIE
D AT
ALT
ERN
ATE
INTE
RSEC
TION
S.
D.ST
RUCT
URAL
STE
ELW
ORK:
1.AL
L W
ORKS
AN
D M
ATER
IALS
TO
CON
FORM
WIT
H A
S 41
00 -
STEE
L ST
RUCT
URES
.AS/
NZS
460
0 - C
OLD-
FORM
ED
STEE
L ST
RUCT
URES
. ALL
ALU
MIN
IUM
WOR
K TO
AS1
664.
ALL
WOR
K GE
NER
ALLY
IN A
CCOR
DAN
CE W
ITH
TH
E N
ATIO
NAL
CON
STRU
CTIO
N C
ODE
AND
ALL
RELE
VAN
T BU
ILDI
NG
STAN
DARD
S AN
D CO
DES.
ALL
WOR
K ON
TH
IS P
ROJE
CT S
HAL
L BE
UN
DERT
AKEN
BY
COM
PETE
NT
PERS
ONN
ELST
EELW
ORK
SHAL
L BE
FAB
RICA
TED
BY F
ABRI
CATO
RS C
ERTI
FIED
UN
DER
THE
ASI '
NAT
ION
AL S
TRUC
TURA
L ST
EELW
ORK
COM
PLIA
NCE
SCH
EME'
(NSS
CS) (
see
http
://w
ww.s
caco
mpl
ianc
e.co
m.a
u/).
2.AL
L ST
EELW
ORK
SHAL
L BE
TEM
PORA
RILY
BUT
SEC
UREL
Y BR
ACED
, TO
MAI
NTA
IN T
HE
STRU
CTUR
E IN
A S
AFE
AND
STAB
LE C
ONDI
TION
DUR
ING
CON
STRU
CTIO
N.
3.BA
SE P
LATE
S SH
ALL
BE G
ROUT
ED B
EFOR
E BE
ING
SUBS
TAN
TIAL
LY L
OADE
D. M
INIM
UM G
ROUT
STR
ENGT
H (f
'c)SH
ALL
BE 2
5 M
Pa A
ND
SHAL
L BE
DRY
PAC
K M
ORTA
R RA
MM
ED IN
, OR
AN A
PPRO
VED
NON
-SH
RIN
K GR
OUT.
4.AL
L ST
RUCT
URAL
STE
EL M
ATER
IAL
SHAL
L CO
NFO
RM T
O TH
E FO
LLOW
ING
TABL
E UN
O:
5.W
ELDI
NG
SHAL
L BE
IN A
CCOR
DAN
CE W
ITH
TH
E PR
OVIS
ION
S OF
AS/
NZS
155
4.1.
WEL
DIN
G CO
NSU
MAB
LES
SHAL
L BE
GR
ADE
E48X
X OR
W50
X U.
N.O
. ALL
WEL
DS S
HAL
L BE
6m
m C
FW S
P CA
TEGO
RY U
.N.O
. IN
SPEC
TION
IS R
EQUI
RED
IN A
CCOR
DAN
CE W
ITH
AS/
NZS
155
4.1.
ALL
WEL
DS S
HAL
L BE
100
% V
ISUA
LLY
SCAN
NED
. SP
FILL
ET W
ELDS
SH
ALL
HAV
E 10
% V
ISUA
L EX
AMIN
ATIO
N U
.N.O
SP B
UTT
WEL
DS S
HAL
L H
AVE
50%
VIS
UAL
EXAM
INAT
ION
U.N
.O.A
LL G
P W
ELDS
SH
ALL
HAV
E 10
% V
ISUA
L EX
AMIN
ATIO
N.
6.M
IN B
OLTS
SIZ
E SH
ALL
BE M
20 D
IAM
ETER
U.N
.O. B
OLT
CATE
GORY
IS T
O BE
8.8
/S C
OMPL
YIN
G W
ITH
AS
4100
, AS/
NZS
125
2 &
AS/N
ZS 4
291.
1. U.
N.O
. EVI
DEN
CE O
F CO
MPL
IAN
CE W
ITH
TH
ESE
CODE
S SH
ALL
BE N
OTED
.AL
L BO
LTS,
NUT
S AN
D W
ASH
ERS
SHAL
L BE
HOT
DIP
GAL
VAN
ISED
TO
AS/N
ZS 1
214.
ALL
BOL
TS, N
UTS
AN
D W
ASH
ERS,
INCL
UDIN
GH
OLD
DOW
N B
OLTS
, CAS
T-IN
FER
RULE
S AN
D M
ASON
RY A
NCH
ORS
ARE
TO B
E H
OT-D
IP G
ALVA
NIZ
ED U
NLE
SS N
OTED
OTH
ERW
ISE.
ALL
GALV
ANIS
ED C
OMPO
NEN
TS T
O BE
CAS
T IN
TO C
ONCR
ETE
MUS
T BE
PAS
SIVA
TED.
A M
INIM
UM O
F TW
O TH
READ
S SH
ALL
EXTE
ND
PAS
T TH
E N
UT
7.AL
L DE
TAIL
ING
WH
ERE
NOT
SPE
CIFI
CALL
Y SH
OWN
SH
ALL
BE IN
ACC
ORDA
NCE
WIT
H T
HE
AUST
RALI
AN S
TEEL
INST
ITUT
ECU
RREN
T ED
ITIO
NS
OF T
HE
'DES
IGN
CAPA
CITY
TAB
LES
FOR
STRU
CTUR
AL S
TEEL
' AN
D TH
E AS
I STA
NDA
RDIS
ED S
TRUC
TURA
LCO
NN
ECTI
ON D
ETAI
LS C
ONTA
INED
TH
EREI
N.
PLAT
ES A
RE T
O BE
12m
m T
HIC
K, C
UT F
ROM
STA
NDA
RD F
LAT
BARS
U.N
.O.
THE
ENDS
OF
HOL
LOW
SEC
TION
MEM
BERS
SH
ALL
BE S
EALE
D W
ITH
NOM
INAL
TH
ICKN
ESS
PLAT
ES A
ND
CON
TIN
UOUS
SEA
LW
ELDE
D UN
LESS
NOT
ED O
THER
WIS
E. IF
HOL
LOW
SEC
TION
S AR
E TO
BE
HOT
-DIP
GAL
VAN
IZED
, VEN
T AN
D DR
AIN
AGE
HOL
ES S
HAL
LBE
PRO
VIDE
D CO
NFO
RMIN
G TO
TH
E RE
QUIR
EMEN
TS.
8.TH
E ST
EEL
FABR
ICAT
OR S
HAL
L PR
OVID
E TH
E EN
GIN
EER
WIT
H A
COP
Y OF
WOR
KSH
OP D
RAW
INGS
FOR
CER
TIFI
CATI
ON A
TLE
AST
7 DA
YS B
EFOR
E FA
BRIC
ATIO
N IS
STA
RTED
. STE
ELW
ORK
IS N
OT T
O BE
FAB
RICA
TED
UNTI
L W
ORKS
HOP
DRA
WIN
GS
ARE
APPR
OVED
.
9.AL
L DI
MEN
SION
S AR
E M
ILLI
MET
RES
U.N
.O.
10.
UNLE
SS N
OTED
OTH
ERW
ISE,
PRO
TECT
IVE
COAT
INGS
FOR
STE
ELW
ORK
SHAL
L BE
TRE
ATED
IN
ACCO
RDAN
CE W
ITH
NCC
VOL
. 2 T
ABLE
3.4
.4.2
'PRO
TECT
IVE
COAT
INGS
FOR
STE
ELW
ORK'
.
11.
ALL
STRU
CTUR
AL S
TEEL
WOR
K M
EMBE
RS S
HAL
L BE
SUP
PLIE
D IN
A S
INGL
E LE
NGT
H, E
XCEP
T W
HER
E OT
HER
WIS
EIN
DICA
TED
WIT
H S
PLIC
E LO
CATI
ONS
SHOW
N O
N TH
E ST
RUCT
URAL
DRA
WIN
G. S
PLIC
ES A
T OT
HER
LOC
ATIO
NS
SHAL
L BE
APPR
OVED
BY
THE
ENGI
NEE
R PR
IOR
TO F
ABRI
CATI
ON C
OMM
ENCI
NG.
12.
ALL
MEM
BERS
HAV
ING
A N
ATUR
AL C
AMBE
R W
ITH
IN T
HE
STRA
IGH
TNES
S TO
LERA
NCE
SH
ALL
BE E
RECT
ED W
ITH
TH
EN
ATUR
AL C
AMBE
R UP
.
13.
ALL
SITE
TES
TIN
G OF
POS
T-IN
STAL
LED
ANCH
ORS
SHAL
L BE
UN
DERT
AKEN
ACC
ORDI
NG
TO T
HE
REQU
IREM
ENTS
OF
AEFA
CTE
CHN
ICAL
NOT
E - S
ITE
TEST
ING
GUID
ELIN
ES V
OLUM
ES 1
TO
4 (a
vaila
ble
at w
w.ae
fac.o
rg.a
u/re
sour
ces)
.
14.
PROP
RIET
ARY
ITEM
S (E
.G. P
URLI
NS,
ROO
F/W
ALL
SHEE
TIN
G, F
ERRU
LES)
SH
ALL
BE IN
STAL
LED
IN A
CCOR
DAN
CE W
ITH
TH
EM
ANUF
ACTU
RER'
S SP
ECIF
ICAT
ION
S.
15.
ALL
CUTT
ING,
HOL
ING
AND
SHAP
ING
OF S
TRUC
TURA
L ST
EEL
SHAL
L CO
NFO
RM T
O TH
E RE
QUIR
EMEN
TS O
F AS
/NZS
513
1.PE
NET
RATI
ONS
OR C
UT-O
UTS
OTH
ER T
HAN
TH
OSE
SHOW
N O
N T
HE
DRAW
INGS
SH
ALL
NOT
BE
MAD
E W
ITH
OUT
PRIO
R AP
PROV
AL.
16.
ALL
STRU
CTUR
AL S
TEEL
SH
ALL
BE S
OURC
ED F
ROM
MIL
LS W
ITH
A R
ELEV
ANT
JAS
ANZ
ACCR
EDIT
ED T
HIRD
PAR
TY C
ERTI
FICA
TION
SCH
EME
SUCH
AS
THE
ACRS
SCH
EME
(see
htt
p://
stee
lcer
tifica
tion.
com
/). A
LTER
NAT
IVE
SOUR
CIN
G OF
TH
IRD
PART
Y CE
RTIF
IED
STRU
CTUR
AL S
TEEL
SH
ALL
BE S
UBM
ITTE
D FO
R RE
VIEW
AN
D M
UST
BE A
PPRO
VED
PRIO
R TO
TH
E CO
MM
ENCE
MEN
T OF
PRO
CURE
MEN
T.
17.
SITE
TES
TIN
G SH
ALL
BE P
ERFO
RMED
ON
MEC
HAN
ICAL
AN
D CH
EMIC
AL A
NCH
ORS
TO V
ALID
ATE
CORR
ECT
INST
ALLA
TION
(PRO
OF T
ESTI
NG)
. A M
INIM
UM T
EST
SAM
PLE
POPU
LATI
ON S
HAL
L BE
TH
REE
SPEC
IMEN
S OR
2.5
% O
F TH
E TO
TAL
RELE
VAN
T AN
CHOR
POPU
LATI
ON, W
HIC
HEV
ER IS
GRE
ATER
. IF
A SI
NGL
E FA
ILUR
E IS
REC
ORDE
D, T
HE
MIN
IMUM
TES
T SA
MPL
E PO
PULA
TION
SH
ALL
BEIN
CREA
SED
TO
SIX
TEST
SPE
CIM
ENS
OR 5
% O
F TH
E TO
TAL
RELE
VAN
T AN
CHOR
POP
ULAT
ION
, WH
ICH
EVER
IS G
REAT
ER. I
FTW
O OR
MOR
E TE
ST S
AMPL
ES F
AIL,
ALL
AN
CHOR
S IN
TH
E RE
LEVA
NT
ANCH
OR P
OPUL
ATIO
N S
HAL
L BE
TES
TED
.
SPEC
IFIC
ATIO
N
101
NTS
LOCA
TION
CON
CRET
EM
IN C
OVER
U.N
.O (m
m)
GROU
ND
SLAB
30 T
YPIC
AL
40 T
OP (E
XT.)
FOOT
INGS
50 T
YPIC
AL
SUSP
ENDE
D SL
AB30
TYP
ICAL
20 B
TM.
N25
/20/
100
N25
/20/
100
N32
/20/
80
COM
PON
ENT
TO C
ONFO
RM T
OAU
ST. S
TAN
DARD
SM
IN G
RADE
HOT
ROL
LED
STEE
L SE
CTIO
NS
PLAT
E
FLAT
S
HOL
LOW
SEC
TION
S
CIRC
ULAR
CH
S
SQUA
RE S
HS
RECT
ANGU
LAR
RHS
WEL
DED
BEAM
S &
COLU
MN
S
SHEA
R ST
UDS
QUEN
CHED
/TEM
PERE
D PL
ATE
PURL
INS
& GI
RTS
AS/N
ZS 3
679.1
TS1
02
AS/N
ZS 3
678
TS10
2
AS/N
ZS 1
594
TS10
2
AS/N
ZS 1
163
TS10
2
AS/N
ZS 3
679.
2 TS
102
AS/N
ZS 1
554.
2
AS/N
ZS 3
597
AS/N
ZS 1
397
300
250
300
C350
LO
C350
LO
C350
LO
300
380
690
450
APPR
OVED
BY
TITL
E
PROJ
ECT
PROJ
ECT
No.
REV
BYIS
SUE
/ RE
VISI
ON D
ESCR
IPTI
ONDA
TE
A3
0N
OT F
OR C
ONST
RUCT
ION
RWXX
.XX.
20
RUSS
ELL
WH
ITE
CLIE
NT
MIE
Aus
t CPE
ng N
ER R
PEQ
RBP
BPB
CAN
TAPO
RT A
USTR
ALIA
INFO
RMED
EN
GIN
EERI
NG
PTY
LTD
AB
N 7
2641
0936
56PO
BOX
405
5, B
ALW
YN E
AST,
VIC
310
3
STEE
L CO
LUM
N S
PIGO
T EM
BEDD
ED IN
TO
FOOT
ING
(min
2/6
5x3
SHS
WIT
H Ø
16m
m
WEL
DED
ROD
SPAC
ERS
OR 1
25PF
C).
BOLT
TO
C1 V
IA 2
xM16
BOL
TS, M
AX
100m
m F
ROM
EN
DS.
WEL
D 4x
N12
LUG
S TO
BAS
E OF
SPI
GOT,
25
0mm
LON
G, 1
00m
m CO
G.
FOOT
ING
PAD
OPT
ION
WIT
H E
MBE
DDED
SPI
GOT
SLEE
VE
900 MIN 1000
mm
SQ.
(x 1
000m
m)
100mm
GROU
ND
SURF
ACE
LEVE
L
1000mm
DETA
ILS
201
NTS
CORN
ER B
RACK
ET D
ETAI
L
FIX
WIT
H 2
x M8
8.8/
S BO
LTS,
MAX
100
mm
FRO
M E
NDS
(TYP
)
MIN
200
MIN
200
MIT
RE C
UT A
ND
FULL
Y W
ELD
STEE
L CO
RNER
BR
ACKE
T.12
5x75
x3 R
HS
min
.
SURE
FOOT
OPT
ION
SURE
FOOT
S40
0.AL
L PI
NS
(INCL
CEN
TRE
PILE
) MUS
T H
IT
REFU
SAL,
ROC
K OR
EX
TEN
D M
IN 1
200m
m IN
TO S
TIFF
N
ATUR
AL F
OUN
DIN
G M
ATER
IAL.
MIN
210
0mm
PIN
LEN
GTH
.
SPIG
OT C
OLUM
N
MIN
900
mm
HIG
H
FULL
Y W
ELD
SLEE
VE S
PIGO
T CO
LUM
N T
O 16
mm
BAS
EPLA
TE. P
ROVI
DE 4
xM20
8.8
/S
BOLT
S TO
SUR
EFOO
T.
NOT
ES:
a) H
OLES
MAY
NEE
D TO
BE
PRED
RILL
ED
WH
EN E
NCO
UNTE
RIN
G RO
CK, R
EFER
TO
SURE
FOOT
REC
OMM
ENDA
TION
S.b)
IF F
ILL
ENCO
UNTE
RED,
REF
ER B
ACK
TO T
HIS
OFF
ICE.
STEE
L CO
LUM
N S
PIGO
T FU
LLY
WEL
DED
TO 4
50SQ
x 16
PL B
ASEP
LATE
. FIX
TO
CON
CRET
E FO
OTIN
G VI
A 4x
M12
RAM
SET
CHEM
SET
101
PLUS
TYP
. 8.8
GR
ADE
THRE
ADED
ROD
AN
CHOR
S, M
IN 3
00m
m
EMBE
DMEN
T.AL
T. C
AST
N12
J-BA
R RO
DS M
IN 3
50m
m IN
TO
CON
CRET
E FO
OTIN
G, 1
00m
m C
OG, T
HRE
AD A
T TO
P AN
D PR
OVID
E N
UT T
O BA
SEPL
ATE
OVER
.ST
EEL
SPIG
OT T
O BE
125
PFC
OR 2
/65x
3.0m
m S
HS
C350
LO. B
OLT
TO C
1 VI
A 2x
M16
BOL
TS, M
AX 1
00m
m
FROM
EN
DS.
HOT
DIP
GAL
V AS
SEM
BLY.
FOOT
ING
PAD
OPT
ION
WIT
H S
PIGO
T SL
EEVE
900 MIN 1000
mm
SQ.
(x 1
000m
m)
GROU
ND
SURF
ACE
LEVE
L
1000mm
FOOT
ING
PAD
WIT
H O
FFSE
T CO
LUM
N O
PTIO
N
SPIG
OTOR
C1
EXTR
A SP
IGOT
SEC
TION
TO
BE
CON
NEC
TED
TO C
1 CO
LUM
N V
IA
2/50
x1.2
G30
0 ST
RAPS
WRA
PPED
AR
OUN
D B
OTH
MEM
BERS
WIT
HIN
10
0mm
OF
TOP/
BOTT
OM.
CON
NEC
T ST
RAP
TO E
ACH
MEM
BER
VIA
3N12
TEK
S EA
CH F
ACE.
FOOT
ING
AS D
ETAI
LED
65m
mM
IN
95m
m M
IN
150mm MIN
C1 S
ECTI
ON D
ETAI
L
MIN
IMUM
FLA
NGE
TH
ICKN
ESS
5.6m
mM
INIM
UM W
EB T
HIC
KNES
S 1.
6mm
67m
m M
IN
124mm MIN
B1 S
ECTI
ON D
ETAI
L
MIN
IMUM
FLA
NGE
TH
ICKN
ESS
4.9m
mM
INIM
UM W
EB T
HIC
KNES
S 2.
0mm
25m
m M
IN46mm MIN
P1 S
ECTI
ON D
ETAI
L
12m
m
MIN
IMUM
FLA
NGE
TH
ICKN
ESS
1.6m
mM
INIM
UM W
EB T
HIC
KNES
S 1.
1mm
APPR
OVED
BY
TITL
E
PROJ
ECT
PROJ
ECT
No.
REV
BYIS
SUE
/ RE
VISI
ON D
ESCR
IPTI
ONDA
TE
A3
0N
OT F
OR C
ONST
RUCT
ION
RWXX
.XX.
20
RUSS
ELL
WH
ITE
CLIE
NT
MIE
Aus
t CPE
ng N
ER R
PEQ
RBP
BPB
CAN
TAPO
RT A
USTR
ALIA
INFO
RMED
EN
GIN
EERI
NG
PTY
LTD
AB
N 7
2641
0936
56PO
BOX
405
5, B
ALW
YN E
AST,
VIC
310
3
GENERIC
EN
GIN
EE
RIN
G
DETA
ILS
202
NTS
BORE
D P
IER
FOOT
ING
DETA
IL
REFE
R TO
SLE
EVE
COLU
MN
FOR
FI
XIN
G DE
TAIL
.
100mm
Ø600
DIA
M
BP1 = 1800 MIN
GROU
ND
SURF
ACE
LEVE
L
MAX
. 300
0mm
DIS
TAN
CE T
OEX
ISTI
NG
POOL
BORE
D P
IER
FOOT
ING
ADJA
CEN
T PO
OLREFE
R TO
SLE
EVE
COLU
MN
FOR
FI
XIN
G DE
TAIL
.
100mm
2000mm MAX DEPTH MIN 1000mm
Ø900
mm
DIA
M
FP1 = 2100mm MIN - 3000mm MAX
GROU
ND
SURF
ACE
LEVE
L
SWIM
MIN
G PO
OLBY
OTH
ERS
WAL
L FI
XIN
G CL
EAT
DETA
ILN
OTE:
1. L
OCAT
E AT
LEA
ST 5
00m
m F
ROM
ALL
OPE
NIN
GS.
2. M
IN B
RICK
WAL
L H
EIGH
T RE
QUIR
ED A
BOVE
MID
HEI
GHT
FIXI
NG
IS 1
.2m
.3.
FIX
AT
MID
HEI
GHT
OF C
OLUM
N A
ND
ALSO
WIT
HIN
300
mm
OF
KNEE
JOIN
T.4.
BRI
CK V
ENEE
R CO
NST
RUCT
ION
TO
BE IN
ACC
ORDA
NCE
WIT
H N
CC A
ND
AS37
00.
FIXI
NG
150
x 20
0 x
8PL
CLEA
T W
ELDE
D ON
EAC
HSI
DE O
F CO
LUM
N A
T M
ID H
EIGH
T AN
DTO
P OF
COL
UMN
.FI
X W
ITH
4 N
o. H
ILTI
HAS
- R/
M12
AN
CHOR
S (1
30 C
RS H
ORIZ
ONTA
LLY)
,M
IN 9
0mm
EM
BEDM
ENT,
OR
EQUI
VALE
NT.
EXIS
TIN
G SL
AB C
ONN
ECTI
ON D
ETAI
L
EXIS
TIN
G RE
INFO
RCED
CO
NCR
ETE
BY O
THER
S.
COLU
MN
. FIX
ED T
O M
ASON
RY W
ALL
AT M
ID
HEI
GHT
AND
KN
EE JO
INT.
REFE
R TO
CON
NEC
TION
DETA
IL T
HIS
PAG
E.
PROV
IDE
400x
200x
10PL
BA
SEPL
ATE
WIT
H 8
x M16
RAM
SET
CHEM
SET
101
PLUS
WIT
H T
YP 8
.8
GRAD
E TH
READ
ED R
OD, M
IN
110m
m EM
BEDM
ENT.
APPR
OVED
BY
TITL
E
PROJ
ECT
PROJ
ECT
No.
REV
BYIS
SUE
/ RE
VISI
ON D
ESCR
IPTI
ONDA
TE
A3
0N
OT F
OR C
ONST
RUCT
ION
RWXX
.XX.
20
RUSS
ELL
WH
ITE
CLIE
NT
MIE
Aus
t CPE
ng N
ER R
PEQ
RBP
BPB
CAN
TAPO
RT A
USTR
ALIA
INFO
RMED
EN
GIN
EERI
NG
PTY
LTD
AB
N 7
2641
0936
56PO
BOX
405
5, B
ALW
YN E
AST,
VIC
310
3 GENERIC
EN
GIN
EE
RIN
G
301
NTS
PLAN
AN
D EL
EVAT
ION
CAN
TAPO
RT S
HAD
ING
SYST
EMS
PJR
SERI
ES33
00m
m M
AX. C
ANOP
Y W
IDTH
WIT
H S
UPPO
RT O
PTIO
NS
SHOW
N IN
SID
E EL
EVAT
ION
3300
mm
MAX
(TYP
)
B1B1C1
C1
PLAN
VIE
W
P1 C
ONTI
NUO
US A
T 60
0mm
CR
S M
AX T
YPIC
AL -
CON
NEC
T TO
EACH
B1
WIT
H 2
No8
TEK
S M
IN
5800
mm
MAX
1221
mm
MAX
B1C1
3300
mm
MAX
(TYP
)12
21m
m M
AX
3300mm MAX
C1
B1
SIDE
ELE
VATI
ON
REFE
R TO
COR
NER
BR
ACKE
T DE
TAIL
B1
P1 C
ONTI
NUO
US A
T60
0mm
CRS
MAX
TYP
ICAL
1800 mm MIN - 2850mm MAX
REFE
R DE
TAIL
S FO
R SU
REFO
OTCO
NN
ECTI
ON R
EQUI
REM
ENTS
.
2500 mm MIN - 3550mm MAX
2000
mm
MIN
- 33
00m
m M
AX
C1
B1
SIDE
ELE
VATI
ON
REFE
R TO
COR
NER
BR
ACKE
T DE
TAIL
B1
P1 C
ONTI
NUO
US S
PAN
AT 6
00m
m C
RSM
AX T
YPIC
AL
1800 mm MIN - 2850mm MAX
EXIS
TIN
G RE
INFO
RCED
CON
CRET
E SL
AB B
Y OT
HER
EXIS
TIN
G BU
ILDI
NGBY
OTH
ER
REFE
R DE
TAIL
S FO
R CO
NN
ECTI
ONRE
QUIR
EMEN
TS.
2500mm MIN -3550mm MAX
REFE
R DE
TAIL
S FO
RCO
NN
ECTI
ON R
EQUI
REM
ENTS
TO M
ASON
RY/C
ONCR
ETE
2000
mm
MIN
- 33
00m
m M
AX
1800 mm MIN - 2850mm MAX
2500mm MIN - 3550mm MAX
C1
B1
SIDE
ELE
VATI
ON
REFE
R TO
COR
NER
BR
ACKE
T DE
TAIL
B1
P1 C
ONTI
NUO
US S
PAN
AT 6
00m
m C
RSM
AX T
YPIC
AL
REFE
R DE
TAIL
S FO
RCO
NCR
ETE
FOOT
ING
REQU
IREM
ENTS
.
2000
mm
MIN
- 33
00m
m M
AX
APPR
OVED
BY
TITL
E
PROJ
ECT
PROJ
ECT
No.
REV
BYIS
SUE
/ RE
VISI
ON D
ESCR
IPTI
ONDA
TE
A3
0N
OT F
OR C
ONST
RUCT
ION
RWXX
.XX.
20
RUSS
ELL
WH
ITE
CLIE
NT
MIE
Aus
t CPE
ng N
ER R
PEQ
RBP
BPB
CAN
TAPO
RT A
USTR
ALIA
INFO
RMED
EN
GIN
EERI
NG
PTY
LTD
AB
N 7
2641
0936
56PO
BOX
405
5, B
ALW
YN E
AST,
VIC
310
3 GENERIC
EN
GIN
EE
RIN
G
302
NTS
PLAN
AN
D EL
EVAT
ION
CAN
TAPO
RT S
HAD
ING
SYST
EMS
PJF
SERI
ES -
3300
mm
MAX
. CAN
OPY
WID
THW
ITH
SUP
PORT
OPT
ION
S SH
OWN
IN S
IDE
ELEV
ATIO
N
3300
mm
MAX
(TYP
)
B1B1C1
C1
PLAN
VIE
W
P1 C
ONTI
NUO
US A
T 60
0mm
CR
S M
AX T
YPIC
AL -
CON
NEC
T TO
EACH
B1
WIT
H 2
No8
TEK
S M
IN
5800
mm
MAX
1221
mm
MAX
B1C1
3300
mm
MAX
(TYP
)12
21m
m M
AX
3300mm MAX
C1
SIDE
ELE
VATI
ON
REFE
R TO
COR
NER
BR
ACKE
T DE
TAIL
P1 C
ONTI
NUO
US A
T60
0mm
CRS
MAX
TYP
ICAL
1800 mm MIN - 2850mm MAX
REFE
R DE
TAIL
S FO
R SU
REFO
OTCO
NN
ECTI
ON R
EQUI
REM
ENTS
.
2500 mm MIN - 3550mm MAX
B1
2000
mm
MIN
- 33
00m
m M
AX
C1
SIDE
ELE
VATI
ON
REFE
R TO
COR
NER
BR
ACKE
T DE
TAIL
P1 C
ONTI
NUO
US S
PAN
AT 6
00m
m C
RSM
AX T
YPIC
AL
1800 mm MIN - 2850mm MAX
EXIS
TIN
G RE
INFO
RCED
CON
CRET
E SL
AB B
Y OT
HER
EXIS
TIN
G BU
ILDI
NGBY
OTH
ER
REFE
R DE
TAIL
S FO
R CO
NN
ECTI
ONRE
QUIR
EMEN
TS.
2500mm MIN -3550mm MAX
B1
2000
mm
MIN
- 33
00m
m M
AX
REFE
R DE
TAIL
S FO
RCO
NN
ECTI
ON R
EQUI
REM
ENTS
TO M
ASON
RY/C
ONCR
ETE
1800 mm MIN - 2850mm MAX
2500mm MIN - 3550mm MAX
C1
SIDE
ELE
VATI
ON
REFE
R TO
COR
NER
BR
ACKE
T DE
TAIL
P1 C
ONTI
NUO
US S
PAN
AT 6
00m
m C
RSM
AX T
YPIC
AL
REFE
R DE
TAIL
S FO
RCO
NCR
ETE
FOOT
ING
REQU
IREM
ENTS
.
B1
2000
mm
MIN
- 33
00m
m M
AX
APPR
OVED
BY
TITL
E
PROJ
ECT
PROJ
ECT
No.
REV
BYIS
SUE
/ RE
VISI
ON D
ESCR
IPTI
ONDA
TE
A3
0N
OT F
OR C
ONST
RUCT
ION
RWXX
.XX.
20
RUSS
ELL
WH
ITE
CLIE
NT
MIE
Aus
t CPE
ng N
ER R
PEQ
RBP
BPB
CAN
TAPO
RT A
USTR
ALIA
INFO
RMED
EN
GIN
EERI
NG
PTY
LTD
AB
N 7
2641
0936
56PO
BOX
405
5, B
ALW
YN E
AST,
VIC
310
3 GENERIC
EN
GIN
EE
RIN
G
PLAN
AN
D EL
EVAT
ION
305
NTS
CAN
TAPO
RT S
HAD
ING
SYST
EMS
PJR/
PJF
SERI
ES
M-C
ONN
ECT/
Y-CO
NN
ECT/
INLI
NE
CON
NEC
T TY
PICA
LCO
NFI
GURA
TION
S ON
LY, F
OR M
ULTI
PLE
STRU
CTUR
ES.
COM
PLEX
ING
DETA
ILS
AS P
ER M
ANUF
ACTU
RERS
SPECIFICATIONS.
NOT
E: E
ACH
INDI
VIDU
AL S
TRUC
TURE
TO
BE
CERT
IFIE
D, R
EFER
TO
CERT
IFIC
ATE
OF C
OMPL
IAN
CE
FOR
TOTA
L N
UMBE
R OF
CER
TIFI
ED S
TRUC
TURE
S.
C1
B1
TYP.
Y-C
ONN
ECT
B1
C1
B1B1
STRU
CTUR
E 1
STRU
CTUR
E 2
C1
B1
TYP.
M-C
ONN
ECT
B1
C1
B1B1
STRU
CTUR
E 1
STRU
CTUR
E 2
TYP.
INLI
NE-
CON
NEC
T
B1B1C1
C1
B1
C1
B1B1C1
C1
B1
C1
STRU
CTUR
E 1
STRU
CTUR
E 2
APPR
OVED
BY
TITL
E
PROJ
ECT
PROJ
ECT
No.
REV
BYIS
SUE
/ RE
VISI
ON D
ESCR
IPTI
ONDA
TE
A3
0N
OT F
OR C
ONST
RUCT
ION
RWXX
.XX.
20
RUSS
ELL
WH
ITE
CLIE
NT
MIE
Aus
t CPE
ng N
ER R
PEQ
RBP
BPB
CAN
TAPO
RT A
USTR
ALIA
INFO
RMED
EN
GIN
EERI
NG
PTY
LTD
AB
N 7
2641
0936
56PO
BOX
405
5, B
ALW
YN E
AST,
VIC
310
3
GENERIC
EN
GIN
EE
RIN
G
Beam
Support stand
Anchor rod
Beam cap(insert)(Parts box)
Corner bracket(Corner parts set)
Post
Hexagon bolt M8×25(Parts box)
7
Install post with beam cut out facing towards the beam (cantilever).
Connect between post and beam with corner bracket and fix with hexagon bolts M8x25
1 Installation of posts and beams
Standard type installation procedure
2 Installation to base hole
Step1
Insert the post into the base hole, and fix with support stand.
METAL SLEEVESMetal sleeves assist with the installation and also act as a further stiffenerand support to the structure. The metal sleeves are inserted into the conrete footing of 650mm. The balance of the metal sleeve is above ground level. The cantaport post then slides over the metal sleeve. The height of the cantaport posts can be adjusted by cutting from the base of the post. The metal sleeve eliminates error in height. Baseplate metal sleeves can also be ordered for plate and bolt fixing. See engineering details on page 4 to determine if the application is suitable for your application. Alternative option is the SUREFOOT system. More details on page 4. Metal sleeves are available as a seperate accessory.
FOUNDATIONS 1. All soil testing to be carried out by the enginner soil typeand conditions. 2. Remove all topsoil containing vegetation& deletrious fill materail from the building site.Concrete Notes :1. All concrete shall be in accordance with the concretestructure code AS 3600.2. Blended cement (type GB) shallconform with AS 3972 3. Water mustnot be added to the mix to increase theslump at any time.3. Concrete shall be supplied by an approved pre-mixedcompany and conform to the following unless notedotherwise :GRADE SLUMP MAX. AGG. FOOTINGS N20 80mm 30mm
OPTIONS ON BRACING METAL SLEEVES.
8
■Detailed figure
Install the gutter to the corner bracket with small truss screw 5x10x10.
3 Attaching the post cap
4 Installation of gutter
Small truss screw5×10×10
Attach the post cap onto the post
Be sure to check all fixings are tight.
30
Post cap(Parts box)
Beam
Post
Post cap
Gutter
Small truss screw5×10×10(Beam・depth set)
Take care when fixing small truss screws to not shear the screw head. Impact drill recommended
9
A view
5 Installation of front frame
■Detailed figure
Attach the roof panel cushions on the marked etched lines on top of main frame.
■A view drawing
※Push the roof panel cushionfirmly onto the top of the mainframe section .
Install the front frame to the beam with small truss screw 5x10x10.
6 Attaching the roof panel cushions715
30
Main frame
Roof panel cushion
Small truss screw5×10×10
Roof panel cushion
Front frame
Main frame
Mark-off lines
352.5 (end)
715(middle)
Small truss screw5×10×10(Beam・depth set)
10
Fin
Main frame
Beam
Small truss screw5×10×10(Beam・depth set)
7 Installation of main frame
Gutter side
Front frame side
※NOTE: fin of main framepurlin to face towards thegutter end.
Install the main frame to the beam adjusting the guide hole with small truss screw 5x10x10.
Cantaport made in Japan certified to AU standards
11
InsertInsert
Siliconesealantnot supplied
Front frame
Front frame cap(Parts box)
Gutter
Gutter cap(Parts box)
Drilling screw4×10×8(Beam・depth set)
Front frame
Gutter
Side frame
Main frame
Gutter cap Side frame
8 Installation of side frame
After installing step 2 apply sealant to the gutter ends.
Step3
Attach the front frame cap into the front frame.
Step1
Install the side frame to the gutter, main frame and front frame using guide holes with screws 4x10x8.
Step2
Attach the gutter cap into the gutter.
Step1
■Detailed figure for sealant application
sealant location.
NOTE: Common mistake of installing the wrong side frame. The two side frames provided, one is made for the right side and one for the left side. Match the curve to the beam.
Front frame side
12
Front frame
B part
C part
C part
A part
U-shape
Roof rafter
Gutter
Main frame
Roof rafter
guide fin
Drilling screw 4×10×8(Beam・depth set)
9 Installation of roof rafter
Drilling screw is fixed in the the U-shape part of the front gutter (step2) B part. Drilling screw is fixed in the the U-shape part of the main frame (step3) C part .
Drilling screw is fixed in the the U-shape part of the front frame (step 1) A part detail.
■ A part detail
■B part detailed drawingU-shape
■C part detailed drawingU-shape
■Roof rafter drawing of thefront frame and gutter part
※Fix the roof rafter firmly.
Screw to the gutter.Step2
Screw it to the main frame.
Step3
Screw the roof rafter first to the front frame. The rafter is placed in front of the guide fin. See A part
Step1
13
A A
3.5mm(guide)
Gutter
Front frame
Roof panel①
②
post interval, vertical, flat
post post
Side frame
Roof rafter
U-shape
panel
Roof rafter
In case of heat absorb polycarbonate (SI), attach the uneven side down. In case of polycarbonate (AO) and heat protection polycarbonate (AO), there are no two sides because both sides are weatherproof.
10 Installation of roof panels
Before installing the roof panels
Insert the roof panel into the front frame and then set on the gutter side.
※Check post interval, flat and the diagonal dimension of the roofis equal.
※In case diagonal dimension of the roof is not equal, loosen thescrews of the front frame, gutter, main frame and beam andadjust them.
■A-A’ section drawing ■B part detailed drawing
※When installing roof panels, please note below.
※Adjust the roof panel end to theU-shape .
※Sort the panel equally right and left. Otherwisethe expansion of panels resulting fromtemperature changes may causes crackingsounds.
Note
A A’
B part
Polycarbonate sheet has impact resistance approx. 250 times higher than glass. It can even withstand being hit with a hammer. The polycarbonate roof can protect you from harsh weather conditions such as hail. In addition, since it does not harden, it is suitable for use in cold climates.The Heat Protection Bluesmoke Polycarbonatesheeting reduces the heat by 83%.
Roof Panel
14
Processing part
For end part For middle part
18 70
Side frameGutter
Panel holder (end)(Length set)
Panel holder (middle)(Length set)
Gutter
Panel holder (middle)
Panel holder (end)
Roof rafter
Drilling screw4×10×8(Beam・depth set)
11 Installation of panel holder
Install the panel holders adjusting on the U-shape of the gutter frame as a guide, and fix with drilling screw 4x10x8.※Insert the cutout part of panel holder over the roof rafter (middle section) and install it.
■Position of the panel holder
REMINDER DO NOT FORGET THE INSTALLATION OF THE PANEL HOLDERS. THEY SUPPORT THE END OF THE ROOF PANEL.
Cantaport made in Japan certified to AU standards
15
Sealing
A part
Sealing
Roof retainer (end)(Beam・depth set)
Gutter cap
Roof retainer (middle)(Beam・depth set)
Gutter
Roof retainer (end) Roof retainer
(middle)
Small truss screw5×10×10
Front frame
Small truss screw5×10×10(Beam・depth set)
Small truss screw5×10×10(Beam・depth set)
Insert the end of roof retainer into the front frame, and fix from the front frame side with small truss screw 5x10x10.
Step1
Notice
※When screwing the roof retainer (end), insert the endpart of roof retainer into the gutter cap beforescrewing the second screw from the post side.
12 Installation of roof retainer
■A part detailed figure
Apply sealant to the insert part of roof retainer (end) into front frame.
Step2
If the screw installing into the roof retainer is tighten too much, the screw will run idle. Tightening torque is about less than 1.5Nm (15kgfcm).If the screw head leans when installing the roof retainer, it will cause water leakage (water will enter from the screw head clearance), so install the screw straight.
16
G.L
Rd`k`ms
Sealing
Rd`k`msRd`k`ms
Saddle(Parts box)
Round gutter(Post set)
Drain elbow(Parts box)
Elbow(Parts box)
Round gutter(Length set)
Drilling screw 4×10×8(Parts box)
Gutter attachment(Parts box)
Gasket(Parts box)
Drilling screw4×10×8(Parts box)
Gutter side
Xli pirkxl sj vsyrh kyxxiv hmjjivw hitirhmrk sr xli tswx tswmxmsr erh limklx2 Gyx xli kyxxiv pirkxl sr1wmxi xs wymx2
13 Attaching the round gutter parts
Capped side
① Tst syx xli get xs xli glswir wmhi sj xli hs{r tmti mr xli kyxxiv2 Ettp}kewoix xs i|tswih syxpix2
※In case that it could not crush, useelectric drill and hit the part again
②Screw the gutter attachment and dosealing work at the screw part.
※Be sure to seal around screws inorder to prevent danger whencleaning as well as for water proof.
③Use glue in the partsbox for rain gutter parts.
Capped
side
Gut
ter s
ide
Wiep evsyrh gettih irh sj kyxxiv2
Using drain elbow which can remove dust accumulated in the rain makes its maintenance easier.
17
XA14
XA9
30
XDepth dimension(D)
2-φ4.6(on U-shape )
φ4.5(on U-shape)
Roof cutting dimension 100mmDepth2427
Cutting length(mm)XA=101 ※2XA=100 ※1
Roof cutting dimension 100mmDepth2427
Cutting length(mm)
XA=101 ※2
The cutting length of each materials are※1 XA=X※2 XA= ×101X
100
14 Cutting procedure of depth direction
Front frame side
Front frame side
In case of cutting depth, be sure to cut from the front frame side.Subject to the cutting length of the roof, cut and process each part and roof panels. Please be careful of the direction of each part.
1. Cutting the beams2. Cutting the side frame3. Cutting the roof rafters4. Cutting the roof retainers (middle)5. Cutting the roof retainers (end)6. Cutting the roof panels
1. Beam processingWhen the roof cutting dimension is 100mm, the cutting length of material XA is
※The roof dimensions determines the length of the beam
2. Side frame processing
※The roof dimensions determines the length of the frame
When the roof cutting dimension is 100mm, the cutting length of material XA is
Cut rangeX=less than 300mm
18
XA9
XA70 ※4
XA
XA40 ※4
φ4.5(on U-shape gutter)
φ5.5(on U-shape gutter)
φ5.5(on U-shape gutter)
※3 The roof dimensions determines the length of the retainer middle※4 In case the dimension of pre-hole from end is more than 80mm, drill a new hole.
In case the dimension of pre-hole from end is less than 80mm, a new hole is not required.
※3 The roof dimensions determines the length of the retainer end.※4 In case the dimension of pre-hole from end is more than 50mm, drill a new hole.※In case the dimension of pre-hole from end is less than 50mm, a new hole is not required.※
Roof cutting dimension 100mmDepth2427
Cutting length(mm)
XA=101 ※2
Roof cutting dimension 100mmDepth2427
Cutting length(mm)
XA=101 ※2
Roof cutting dimension 100mmDepth2427
Cutting length(mm)
XA=101 ※2
Roof cutting dimension 100mmDepth2427
Cutting length(mm)
XA=101 ※2
4. Roof retainer (middle) processing
5. Roof retainer (end) processing
3. Roof rafter processing
※ The roof dimensions determines the length of the rafter
6. Roof panel cutting
※ The roof dimensions determines the length of the roof panel
After processing, install the frame of the roof referring to the procedure of this manual .■13■1
Front frame side
Front frame side
Front frame side
When the roof cutting dimension is 100mm, the cutting length of material XA is
When the roof cutting dimension is 100mm, the cutting length of material XA is
When the roof cutting dimension is 100mm, the cutting length of material XA is
When the roof cutting dimension is 100mm, the cutting length of material XA is
~
19
Y
5
5
Y
Y
φ3(on U-shape gutter)
φ3(on U-shape gutter)
21.8(cutting)
21.8(cutting)
1. Cutting the front frame2. Cutting the gutter3. Cutting the main frame4. Cutting the panel holder5. Cutting roof panel
Y
Y
15 Cutting procedures of length direction
The panel span is 715mm. In the case of cutting the length direction, the cutting dimension of the roof Y is recommended to be in the multiples of 715mm wide. Cut the materials from opposite side of round gutter installation.
Cut rangeY=less than 1430mm (less than 2 panel pitch)※It can’t be cut from 465mm to 535mm
for installing drain hole.From 651 to 714mm and from 1366 to1429mm are not available because theside frame overlaps to the roof rafter.
※Move the post the same length as the cutting dimension of theroof.
1. Front frame processingCut the materials the same length as the cutting dimension of the roof (Y).
Cut the materials the same length as the cutting dimension of the roof (Y).2. Gutter processing
SG
3. Main frame processing
4. Panel holder processingCut the panel holder(end) and panel holder (middle) at the cutting length Y referring to the table. In case the hole overlaps the pre-hole, a new hole is not required .
5. Roof panel cutting
Cutting lengthY
0<Y≦200200<Y≦400400<Y≦650715<Y≦915915<Y≦11151115<Y≦1365
Panel holder (end) cutting length
YY/2
No installationYY/2
No installation
Panel holder (middle) cutting lengthNo processingY/2Y−370
No processingY/2Y−370
Cut the materials the same length as the cutting dimension of the roof (Y).
Cut the materials the same length as the cutting dimension of the roof (Y).
After cutting, install the frame as per the instruction to this manual .■13■1 ~
10 10
Y
5
Y
70
Panel holder (middle)cutting length
Panel holder (end)cutting length
φ3(on U-shape gutter)
19(cutting)
φ5(on U-shape gutter)φ5(on U-shape gutter)
Panel holder
Cantaport made in Japan certified to AU standards
METAL SLEEVES DETAILS
FOO
TIN
G D
ETA
ILS
PIT
FOO
TIN
G 9
00 x
900
x 9
00PI
LE F
OO
TIN
G 4
50 x
150
0
BMS
450
CON
CRET
E D
RIVE
WAY
BASE
PLAT
E M
ETA
L SL
EEVE
SMS6
5ST
AN
DA
RD M
ETA
L SL
EEVE
STA
ND
ARD
PIT
FO
OTI
NG
900x
900x
900
PILE
FO
OTI
NG
ALT
ERN
ATIV
E 45
0x15
00O
STEE
L SL
EEVE
(MIN
G35
0)
AS
SHO
WN
.FI
X TO
MET
AL
SLEE
VE W
ITH
2x
M16
8.8
/S B
OLT
S M
AX
100m
m F
ROM
EN
DS
STEE
L SL
EEVE
(MIN
G35
0)
A
S SH
OW
N.
FIX
TO M
ETA
L SL
EEVE
WIT
H
2xM
16 8
.8/S
BO
LTS
MAX
10
0mm
FRO
M E
ND
S
FOO
TIN
G D
ETA
ILS
PIT
FOO
TIN
G 9
00 x
900
x 9
00
PILE
FO
OTI
NG
450
x 1
500
BMS4
50
SMS6
5
MET
AL
SLEE
VE A
DVA
NTA
GE:
1. E
limin
ates
err
or in
hei
ght.
The
met
al s
leev
es a
re in
sert
ed in
to th
e co
ncre
te fo
otin
g an
d ex
tend
abo
ve g
roun
d le
vel.
The
cant
apor
t pos
ts th
en
slid
e ov
er th
e m
etal
sle
eves
. The
hei
ght o
f the
pos
ts c
an th
en b
e ad
just
ed b
y cu
ttin
g fr
om th
e ba
se o
f the
pos
t. O
nce
the
heig
ht is
det
erm
ined
, the
pos
t is
fixed
usi
ng t
wo
bolts
on
the
fron
t and
or r
ear o
f the
pos
t. 2.
Ass
ists
with
unl
evel
site
s, e
xtra
hei
ght e
xten
sion
, 3. P
rovi
des
furt
her s
uppo
rt to
the
stru
ctur
e an
d 4.
The
can
tapo
rt c
an b
e re
loca
ted,
re
mov
ed if
requ
ired.
A n
on p
erm
anen
t str
uctu
re.
STA
ND
ARD
MET
AL
SLEE
VE S
HO
P D
RAW
ING
SM
ETA
L SL
EEVE
65X
65X3
HO
T D
IP G
ALV
AN
ISIE
D
BASE
RO
D
6565
5
50
4 x
N12
Lug
s x
250
long
600
600
600
1800 Continous
Wel
d 5m
mbr
ace
betw
enco
lum
ns
65 x 65 x 3 SHS
65 x 65 x 3 SHS
Keep
bra
ce ro
d cl
ear o
f edg
e of
SH
S
65
Keep
bra
ce ro
d cl
ear o
f edg
e of
SH
S13
0
Keep
bra
ce ro
d cl
ear o
f edg
e of
SH
S
Foot
ing
900x
900x
900
Pile
Foo
ting
Alte
rnat
ive
450
dia
x 15
00
65 x 65 x 3 SHS
Exis
ting
Gro
und
leve
l
FRO
NT
ELEV
ATIO
N
FRO
NT
ELEV
ATIO
N
65 x 65 x 3 SHS
Pile
Foo
ting
Alte
rnat
ive
450
dia
x 15
00
SID
E EL
EVAT
ION
Exis
ting
Gro
und
leve
lSI
DE
ELEV
ATIO
N
CAN
TAPO
RT S
HA
DIN
G S
YSTE
MS
PJR
SERI
ES(W
ind
Regi
on A
, Ter
rain
Cat
egor
y 2,
3 &
4)
FRO
NT
OF
POST
BACK
OF
POST
SM
S 6
5 M
ET
AL
SLE
EV
E D
ET
AIL
S
BASE
PLA
TE40
0 x
400
x 10
30
30BA
SE R
OD
400
400
6565
5
1100
10
700
50
4 x
N12
Lug
s x
250
long
4 x
18m
m H
oles
600
600
400
1600 Continous
Wel
d 5m
mbr
ace
betw
enco
lum
ns
65 x 65 x 3 SHS
65 x 65 x 3 SHS
Cut b
ase
Plat
e to
sui
t65
x 6
5 SH
S, s
lide
SHS
thro
ugh
and
wel
d ne
at
Expo
sed
wel
dne
at
Keep
bra
ce ro
d cl
ear o
f edg
e of
SH
S
65
Keep
bra
ce ro
d cl
ear o
f edg
e of
SH
S
130
Base
plat
e to
cov
er
conc
rete
acc
ess
hole
Pile
Foo
ting
Alte
rnat
ive4
50 d
ia x
150
0
65 x 65 x 3 SHS
Exis
ting
conc
rete
driv
eway
Base
plat
e to
cov
er
conc
rete
acc
ess
hole
Ram
set C
hem
set 1
01 P
lus
with
N16
Gra
de 5
00 T
hrea
ded
Rod.
Hol
e de
pth
Min
. 200
mm
Foot
ing
900x
900x
900
Exis
ting
conc
rete
driv
eway
65 x 65 x 3 SHS
Pile
Foo
ting
Alte
rnat
ive
450
dia
x 15
00
SID
E EL
EVAT
ION
FRO
NT
ELEV
ATIO
NCA
NTA
PORT
SH
AD
ING
SYS
TEM
S PJ
R SE
RIES
(Win
d Re
gion
A, T
erra
in C
ateg
ory
2,3
& 4
)
CON
CRET
E D
RIVE
WAY
BA
SEPL
ATE
SHO
P D
RAW
ING
SM
ETA
L SL
EEVE
65X
65X3
HO
T D
IP G
ALV
AN
ISIE
D
Keep
bra
ce ro
d cl
ear o
f edg
e of
SH
S
Keep
bra
ce ro
d cl
ear o
f edg
e of
SH
S
FRO
NT
OF
POST
FRO
NT
OF
POST
BACK
OF
POST
BM
S 4
50 M
ET
AL
SLE
EV
E D
ET
AIL
S