Upload
others
View
4
Download
0
Embed Size (px)
Citation preview
I I I I I II I I I I I
I I I I I II I I I I I
I I I I I II I I I I I
I I I I I II I I I I I
I I I I I II I I I I I
I I I I I II I I I I I
I I I I I II I I I I I
I I I I I II I I I I I
I I I I I II I I I I I
I I I I I II I I I I I
I I I I I I
I I I II I I I I I
VERMONT
N
N
E
W
H
A
M
P
S
H
IR
E
MASSACHUSETTS
N
E
W
Y
O
R
K
CANADA
Mears Road
Milton, Vermont
SOURCE DATA LEGEND
KL&
Krebs & Lansing Consulting Engineers, Inc.
164 Main Street, Suite 201
Colchester, VT 05446
T: (802) 878-0375
F: (802) 878-9618
KrebsandLansing.com
MILTON
GMP
MICROGRID
MILTON
PROJECT
LOCATION MAP
SCALE: 1" =
1
2
Mile
LOCATION MAP
SCALE: 1" =
1
2
Mile
ISSUED FOR PERMIT REVIEW
NOT FOR CONSTRUCTION
Proposed Solar
Array and Battery
Powerpack System
SITE
LAT: N44° 39' 27.7"
LONG: W73° 10' 45.3"
“ ”
SOIL DISTURBED BY EXCAVATION
NECESSARY TO INSTALL ACCESS DRIVE,
PAS STORAGE ADJACENT TO ACCESS
DRIVE, PULL BOXES, PAD MOUNTED
EQUIPMENT, BATTERY EQUIPMENT,
SECONDARY OIL CONTAINMENT,
UNDERGROUND ELECTRIC LINES, AND
TEMPORARY STAGING AREA
COMBINATION SILT FENCE AND
CONSTRUCTION LIMIT BARRIER FENCE,
SEE 'GENERAL EPSC' NOTE.
EROSION CONTROL MIX BERM MAYBE
SUBSTITUTED FOR SILT FENCE OR
USED IN ADDITION TO SILT FENCE.
EROSION CONTROL MIX BERM SHALL
NOT BE USED IN AREAS OF
CONCENTRATED FLOW.
PRIME AGRICULTURAL SOILS (PAS)
STORAGE AREAS, PAS SOILS STRIPPED
FROM THE PROJECT WILL BE STORED IN
THESE AREAS FOR FUTURE RESTORATION
USE DURING DECOMMISSIONING OF THE
PROJECT. GRADE AND PROVIDE
TEMPORARY AND PERMANENT
STABILIZATION, SEE NOTE REGARDING
STORAGE OF DISTURBED PRIMARY
AGRICULTURAL SOILS (PAS).
EPSC-0
OVERALL EROSION
PREVENTION AND
SEDIMENT CONTROL PLAN
LEGEND
APPROXIMATE PROPERTY LINES
EXISTING GRADE CONTOUR LINES
(10 FOOT INTERVALS)
EXISTING TREELINE
EXISTING OVERHEAD POWER LINES
PROPOSED PERIMETER FENCE
EXISTING GRADE CONTOUR LINES
(2 FOOT INTERVALS)
PROPOSED ACCESS DRIVES
EXISTING BARBED WIRE FENCE
PROJECT SETBACKS
PROPOSED UNDERGROUND POWER LINES
EXISTING POWER POLE /
PROPOSED POLE
IRON PIPE FOUND
PROPOSED OVERHEAD POWER LINES
PROPOSED SOLAR ARRAY
VHB ENVIRONMENTAL
RESOURCE STUDY AREA
SOIL BOUNDARIES FROM VCGI
PROPOSED PROJECT LEASE LIMITS
I I I I I IPROPOSED STING INVERTERS