DISASTER RECOVERY
1) Site Plan w/Legend(Make sure street names appear on the Site Plan)
2) Renderings(Arrange as necessary)
3) Renderings(Arrange as necessary)
DEVELOPMENT NAMEBorough, NY
CAMPOS PLAZA 2Manhattan, NY
SITE PLAN ELEVATION (PARTIAL)
LEGENDExisting Buildings
Annex Buildings
Back-up generators
Boiler Plants
Community Centers/ Childcare Centers
Conceptual
CAMPOS PLAZA II Development Information
Development Statistics
Elected Representative:
Tenant Association:
Buildings benefiting from FEMA funding:
Building heights:9 and 17 stories
TotalBuildings: 2
2
Property Size:
Congressional (D-12):
Tenant Association President:
NYS Assembly (D-74):
NYS Senate (D-27):
NYC Council (D-2):
• Carolyn Maloney
• Patricia Troche
• Harvey Epstein
• Brad Hoylman
• Carlina Rivera
12 acres
Existing Funded Buildings Annex Buildings Back-up Generators Community Centers/ Childcare Centers
Capital Projects Division Recovery and Resilience
tinyurl.com/SANDYRECOVERY(212) 306-8532 — [email protected]
NYCHA’s Recovery & Resilience Department Questions/Problems, 疑 问/家 里 的 问 题,
Вопросы / проблемы, Preguntas/Problemas (212) 306-8532 — [email protected]
Project Scope
Resiliency• Install automatic and manual dry flood proofing in areas below the FEMA flood level
Safety• Install new security cameras, per funding availability• Install upgraded door security access systems per funding availability• Replace exterior site lighting fixtures sitewide and bulbs
Development Improvements• Restore 1 playground• Resurface site pavement impacted by the construction
Building Improvements• Remove hazardous materials and clean building crawl space• Construct new electric rooms elevated to FEMA flood level• Construct new annex above the FEMA flood level on the roof of Building 3 to house automatic
transfer switches and distribution panels• Replace all building roofs• Replace first-floor doors, door frames, and hardware damaged by water• Replace and/or repair mechanical, electrical and plumbing equipment damaged by water• Install new back water valves on sewer/storm plumbing lines• Replace sump pumps
Energy• Install full backup power generators at all buildings• Implement sitewide energy and sustainability measures