Camparative Statement Hortifinal H 1 to H 4

Embed Size (px)

Citation preview

  • 8/13/2019 Camparative Statement Hortifinal H 1 to H 4

    1/8

    H-1

    Note : The rates are inclusive of all taxes etc and for

    estimation purpose only

    Increase Decrea

    se

    1 2 3 4 5 6 7 8

    1.1 Supply of dry manure including loading unloading

    transportation & stacking at site :

    1.1.1 Fram Yard Manure (Organic) Cum 300.00 300.00 0.00

    1.1.2 Compost Cum 350.00 350.00 0.00

    1.1.3 Goat Dungmanure Cum 500.00 500.00 0.00

    1.2 Supply of Chemical Fertilizers at store in bags

    weighing not less than 50 Kg each includingloading unloading & transportation etc.

    1.2.1 Urea Per 50

    Kg Bag220.00 220.00

    0.00

    1.2.2 D.A.P. Per 50

    Kg Bag550.00 550.00

    0.00

    1.2.3 Super Phosphate Per 50

    Kg Bag300.00 300.00

    0.00

    1.2.4 Murrate of Photash Per 50

    Kg Bag450.00 450.00

    0.00

    1.2.5 Straw Meal Per 50

    Kg Bag900.00 900.00

    0.00

    1.3 Supply & Stacking good earth at site complete

    including loading unloading & transportation etc. Cum 75.00 75.00 0.00

    1.4 Supply of Insecticides & Pesticides at store in dust

    / liquid form complete :

    1.4.1 Methyl Prathion 2 % Per 25

    Kg Bag400.00 400.00

    0.00

    1.4.2 Karathion (Liquid) Per 250

    ml300.00 300.00

    0.00

    1.4.3 Metacid (Liquid) Per Litre 370.00 370.00 0.00

    1.4.4 Roger (Liquid) Per Litre 280.00 280.00 0.00

    1.4.5 Cholorophyriphos 20 Ec Per Litre 325.00 325.00 0.00

    1.4.6 Bauiston 50 % Per 100

    Grms100.00 100.00

    0.00

    Proposed

    Rate (Rs.)2007

    % Variation

    CHAPTER H-1

    SUPPLY OF MANURE, INSECTICIDES, PLANTS, POTS, T & P ETC

    Chapte

    r Code

    No. Description Unit

    Rate (Rs)

    2005

    Reason

    for

    variation

  • 8/13/2019 Camparative Statement Hortifinal H 1 to H 4

    2/8

    H-2

    Increase Decrea

    se

    1 2 3 4 5 6 7 8

    Proposed

    Rate (Rs.)

    2007

    % VariationChapte

    r Code

    No.Description Unit

    Rate (Rs)

    2005

    Reason

    for

    variation

    1.5 Supply of Garden Tools & Implements at store

    complete :

    1.5.1 Spade weighing 1.5 Kg with handle Each 75.00 75.00 0.00

    1.5.2 Khurpa weighing 500 gm with handle Each 45.00 45.00 0.00

    1.5.3 Gurvana weighing 800 gm with handle Each 60.00 60.00 0.00

    1.5.4 Hedge Shear (Kamani Steel) Each 275.00 275.00 0.00

    1.5.5 Secaetur Each 150.00 150.00 0.00

    1.5.6 Garden Rack with handle Each 60.00 60.00 0.00

    1.5.7 Pick - Axe Each 90.00 90.00 0.00

    1.6 Supply of different sized pots at site store

    including loading Unloading & transportation etc.

    1.6.1 Cement pot 300 mm Size Each 46.00 46.00 0.00

    1.6.2 Cement Pot 350 mm size Each 65.00 65.00 0.00

    1.6.3 Asbestos Pot 350 mm size Each 46.00 46.00 0.00

    1.7 Supply of different sized earthen pots at site / store

    including loading unloading & transportation etc.

    complete :

    1.7.1 Earthen Pot 150 mm size Each 6.00 6.00 0.00

    1.7.2 Earthen Pot 225 mm size Each 10.00 10.00 0.00

    1.7.3 Earthen Pot 300 mm size Each 15.00 15.00 0.00

    1.8 Supply of different sized lawn mower including

    transportation etc. as store complete :

    1.8.1 300 mm size Hand Lawn Mower Each 2200.00 2200.00 0.00

    1.8.2 350 mm size Hand Lawn Mower Each 2500.00 2500.00 0.00

    1.8.3 450 mm size Hand Lawn Mower Each 3800.00 3800.00 0.00

    1.8.4 500 mm size Hand Lawn Mower Each 4800.00 4800.00 0.00

    1.8.5 600 mm size Hand Lawn Mower Each 5500.00 5500.00 0.00

    1.9 Supply of different size Tokaras / Tokaris etc. at

    store complete :

    1.9.1 Big Size (600 mm dia) Each 35.00 35.00 0.00

  • 8/13/2019 Camparative Statement Hortifinal H 1 to H 4

    3/8

    H-3

    Increase Decrea

    se

    1 2 3 4 5 6 7 8

    Proposed

    Rate (Rs.)

    2007

    % VariationChapte

    r Code

    No.Description Unit

    Rate (Rs)

    2005

    Reason

    for

    variation

    1.9.2 Small Size (450 mm dia) Each 25.00 25.00 0.00

    1.10 Supply of P.V.C. hose pipe of different sizes at

    Store including transportation etc. complete :

    1.10.1 50 mm dia R. Mtr 100.00 100.00 0.00

    1.10.2 38 mm dia R. Mtr 85.00 85.00 0.00

    1.10.3 25 mm dia R. Mtr 40.00 40.00 0.00

    1.11 Supply of different H.P. Motor pumps submersible

    pumps / Multistaged pumps at store including

    transportation etc. complete :

    1.11.1 Motor Pumps 5 H.P. ISI Marked Each 9230.00 9230.00 0.00

    1.11.2 Motor Pumps 7.5 H.P. ISI Marked Each 11830.00 11830.00 0.00

    1.11.3 Motor Pumps 10 H.P. ISI Marked Each 14130.00 14130.00 0.00

    1.11.4 Submersible Pumps 3 H.P. ISI Marked KSB Each 16000.00 16000.00 0.00

    1.11.5 Submersible Pumps 5 H.P. ISI Marked KSB Each 19000.00 19000.00 0.00

    1.11.6 Submersible Pumps 10 H.P. ISI Marked KSB Each 25000.00 25000.00 0.00

    1.12 Supply of different varities of tree/ shrubs/

    climbers according to height and age of the plant at

    site including loading/ unloading & transportation

    etc. complete :

    1.12.1 Different flowing plants 900 mm to 1500 mmEach

    15.00 to

    40.00

    15.00 to

    40.00

    1.12.2 Different varities of shrubs 600 mm to 900 mmEach

    12.00 to

    25.00

    12.00 to

    25.00

    1.12.3 Different varities of Climber 900 mm to 1500 mmEach

    25.00 to

    50.00

    25.00 to

    50.00

    1.13 Supply of different varieties of Bougainvillea in

    poly bags/ earthen pots according to height,

    growth and age of plant at site including loading/unloading & transportation etc. complete :

    1.13.1 Local Variety of Bougainvillea 600 mm to 900

    mmEach

    10.00 to

    25.00

    10.00 to

    25.00

    1.13.2 Different Varieties of Bougainvillea 600 mm to

    900 mmEach

    25.00 to

    40.00

    25.00 to

    40.00

    1.14 Supply of different varieties of Rose plants in

    Polyethylene bags/ earthen pots according to

    height , growth and age of the plant at site

    including loading/ unloading & transportation etc.

  • 8/13/2019 Camparative Statement Hortifinal H 1 to H 4

    4/8

    H-4

    Increase Decrea

    se

    1 2 3 4 5 6 7 8

    Proposed

    Rate (Rs.)

    2007

    % VariationChapte

    r Code

    No.Description Unit

    Rate (Rs)

    2005

    Reason

    for

    variation

    1.14.1 Desi Rose / Root Stock Plants/ GanganagriEach

    10.00 to

    15.00

    10.00 to

    15.00

    1.14.2 Different varieties of Grafted Rose PlantEach

    30.00 to

    50.00

    30.00 to

    50.00

    1.15 Supply of different varieties of Palms in

    polyethylene bags/ earthen pots according to

    height , growth and age of the plant at site

    including loading/ unloading & transportation etc.

    Each

    25.00 to

    50.00

    25.00 to

    50.00

    1.16 Supply of different varieties of Palms indoor plants

    in polythene bags/ earthen pots according to

    height , growth and age of the plant at site

    includin loadin / unloadin & trans ortation etc.

    1.16.1 Desi CrotonsEach

    30.00 to

    40.00

    30.00 to

    40.00

    1.16.2 Selective Varieties of CrotonsEach

    40.00 to

    60.00

    40.00 to

    60.00

    1.16.3 Rubber Plants etc.Each

    80.00 to

    100.00

    80.00 to

    100.00

    1.16.4 Daffen BachiaEach

    100.00 to

    200.00

    100.00 to

    200.00

    1.16.5 Arecca Palm

    Each

    200.00 to

    400.00

    200.00 to

    400.00

    1.16.6 Song of IndiaEach

    80.00 to

    150.00

    80.00 to

    150.00

    1.16.7 AglonmiaEach

    80.00 to

    100.00

    80.00 to

    100.00

    1.16.8 DrassinaEach

    80.00 to

    100.00

    80.00 to

    100.00

    1.16.9 Singonium with Moss StickEach

    125.00 to

    250.00

    125.00 to

    250.00

    1.16.10 MiscellaneousEach

    100.00 to

    250.00

    100.00 to

    250.00

  • 8/13/2019 Camparative Statement Hortifinal H 1 to H 4

    5/8

    H-13

    Note :- The Rates are inclusive of all taxes etc. and for

    estimation purpose only.

    Increa

    se

    Decreas

    e

    1 2 3 4 5 6 7 8

    2.1 Maintenance of Lawns :

    2.1.1 Spreading of manure and good earth in required

    thickness (Cost of manure and good earth to be paid

    separately). Cum 4.00 4.00 0.00

    2.1.2 Irrigation of Lawns

    Per HectPer Day -- --

    2.1.3 Uprooting weeds from the lawn plots and treched

    area after 10 to 15 days of its flooding with

    including disposal of uprooted vegetation.

    100

    Sqm 150.00 150.00 0.00

    2.1.4 Mowing manually / with power machines

    a) Manually

    Per Hect 1000.00 1000.00 0.00

    b) With power machines

    Per Hect 800.00 800.00 0.00

    2.1.5 Maintenance of Shrubbary or hedge cutting

    inlcuding disposal of rubbish with all leads & lifts.

    100

    Sqm 300.00 300.00 0.00

    2.1.6 Sweeping / Cleaning of Garden roads. Lawns &

    Paths & disposal of all rubbish.

    Per 100

    Sqm 1.50 1.50 0.00

    2.1.7 Security of the Garden per gate for 24 Hours in 3

    Shift with the exilitary persons.

    Per Day

    (24

    Hours) -- --

    2.1.8 Maintenance / Fittig of permanent ornamental pots/

    Seasonal plots

    Per 50

    Kg Bag 900.00 900.00 0.00

    (a) Mixing earth and manure inproporotion as specified

    or directed for pots Cum 30.00 30.00 0.00

    (b) Filling and planting of sapplings and watering of

    plots

    Per 100

    Pots Per

    day 50.00 50.00 0.00

    Proposed Rate

    (Rs.)

    2007

    % Variation

    CHAPTER - H-2

    MAINTENANCE OF GARDENS

    Chapt

    erCode

    No.Description Unit

    Rate

    (Rs)

    2005

    Reason for

    variation

  • 8/13/2019 Camparative Statement Hortifinal H 1 to H 4

    6/8

    H-14

    Increa

    se

    Decreas

    e

    1 2 3 4 5 6 7 8

    Propose

    d Rate

    (Rs.)

    2007

    % VariationChapt

    er

    Code

    No.Description Unit

    Rate

    (Rs)

    2005

    Reason for

    variation

    (c) Weding Hoeing, stacking & colouring of pots

    material will be supplied by the department

    Per 100

    Pots Perday 50.00 50.00 0.00

    2.1.9 Preparation of beds for bedging and shrubbary by

    excavating 60 cms deep and trenching the

    excavated base to a further depth of 30 cms

    refilling the excavated earth after breaking clods &

    mixing with manure in the ratio 8 : 1 ( 8 Parts of

    stacked volume of earth after reduction by 20 % one

    part of stacking volume of manure after reduction

    by 8% flooding with water filling with earth if

    necessary (Cost of manure of extra earth to be paid

    for separately) Each 10.00 10.00 0.00

    2.2 Digging pits in ordinary soil & refilling the same

    with the excavated earth mixed with manure in the

    ratio of 2 : 1 by volume (2 parts of stacked volume

    of earth after reduction by 20 % 1 parts of stacked

    volume of manure after reduction by 8 %) flooding

    with water and dressing including removal of

    surplus earth (Cost of manure or extra good earth if

    needed to be paid separately) pit dia 60 cm x 60 cm

    deep Each 10.00 10.00 0.00

    2.3 Planting of annual sapplings watering in the bed Sqm 0.50 0.50 0.00

    2.4 Watering of group plantation at the bed Sqm 0.10 0.10 0.00

    2.5 Preparation of eding cutting Lawn Sqm 0.25 0.25 0.00

    2.6 Group plantation in the bed specified place Sqm 1.00 1.00 0.00

  • 8/13/2019 Camparative Statement Hortifinal H 1 to H 4

    7/8

    81

    Note :- The Rates are inclusive of all taxes etc. and for

    estimation purpose only.

    Increase

    Decrease

    1 2 3 4 5 6 7 8

    3.1 Laying of lawns including ploughing levelling

    breaking of clods manuring & removal of stones etc.

    (Cost of manure or extra good earth to be paid

    separately) Maintenance of lawns for 30 days or

    more till the grass forms a thick lawns free from

    weeds & fit for moving in the duration of planting if

    lawn die some where the contractor will replant it at

    his own cost

    3.1.1 In rows 15 cms apart in either direction 100

    Sqm 1000.00 1000.00 0.00

    3.1.2 In rows 7.5 cms apart in either direction 100

    Sqm 1500.00 1500.00 0.00

    3.1.3 In rows 5 cms apart in either direction 100

    Sqm 2000.00 2000.00 0.00

    3.2 Renovating lawns including weeding cheeling the

    grass forking the ground top dressing with manure

    Mixing the same with forked soil watering

    maintaining the lawns for 30 days or more till grass

    forms a thick lawns free from weeds & fit for

    moving & disposal of rubbish as directed.

    100

    Sqm 3000.00 3000.00 0.00

    3.3 Planting of trees / Shrubs/ hedge & climbers plants

    at desired distance in a row & watering.

    100

    Plants 10.00 10.00 0.00

    3.4 Preparation of different sized beds as directed. 100

    Sqm 300.00 300.00 0.00

    Proposed

    Rate

    (Rs.)2007

    % Variation

    CHAPTER - H-3

    DEVELOPMENT OF GARDENS

    Chapt

    er

    CodeNo.

    Description Unit

    Rate

    (Rs)

    2005

    Reason

    for

    variation

  • 8/13/2019 Camparative Statement Hortifinal H 1 to H 4

    8/8

    H-88

    Increa

    se

    Decrea

    se

    1 2 3 4 5 6 7 8

    1

    a) Preparation of soil including cleaning & removing

    of unwanted shrubs removal of stones & garbage.

    Per 100

    Sqm 80.00 80.00 0.00

    b) Digging of pits size 60 x 60 x 60 cms including

    removal of stones. Manuring applicable of

    insecticides & watering atleast 15 litre per plant

    after planting. Per Pit 15.00 15.00 0.00

    c) Loading & unloading of plants from Deptt

    Nursery to site Per Km.

    Per 1000

    Plants 80.00 80.00 0.00

    d) Preparation of Thawala sizing 60 cms Diametre &

    10 cms Deep once in a month.

    Per

    Thawala 0.50 0.50 0.00

    e) Inter cultural operation hoeing & weeding etc, in

    90 cms Dia & 15 cms deep. Per Plants 0.60 0.60 0.00

    f) Watering of plants with the own tanker i.e.at least

    20 Litre water for plant at one time. Per Plants 0.50 0.50 0.00

    g) Transportation of tree guards from Depot to the

    plantation site including loading & unloading.

    Per Tree

    Guard 10.00 10.00 0.00

    h) Security of plants & fencing etc. Per PlantPer Month 0.50 0.50 0.00

    i) Prunning & trumming and cutting of old big trees

    on the road side. The contractor will deposit the

    cut wood in the Deptt. Per Tree 30.00 30.00 0.00

    2 Maintenance of plants by the contractor including

    of pits / bids watering preparation of Thawala

    Hoeing weeding etc. & application of insecticides

    etc. & security if the plant die during maintenance

    contractor has to replace same height plant at his

    own cost.

    Per Plant

    Per Month 10.00 10.00 0.00

    Propos

    ed

    Rate

    (Rs.)

    2007

    % Variation

    CHAPTER - H-4

    MAINTENANCE OF ROAD SIDE PLANTATION

    Chapt

    er

    Code

    No.Description Unit

    Rate

    (Rs)

    2005

    Reason for

    variation