Camberwell regeneration Supplementary Planning Document (SPD) Public consultation report May 2013 www.southwark.gov.uk 5 Camberwell library and public space Camberwell Green Streets (highway improvements) Pocket spaces (proposed areas) Supplementary Planning Document (covers Camberwell Community Council area)

Camberwell regeneration Supplementary Planning Document (SPD) · 4 Introduction On 21 January Southwark Council launched the consultation of five projects as part of the £11m Camberwell

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Camberwell regeneration Supplementary Planning Document (SPD) · 4 Introduction On 21 January Southwark Council launched the consultation of five projects as part of the £11m Camberwell

Camberwell regenerationSupplementary Planning Document (SPD)

Public consultation report May 2013 www.southwark.gov.uk

5

Camberwell library and public space

Camberwell Green

Streets (highway improvements)

Pocket spaces (proposed areas)

Supplementary Planning Document (covers Camberwell Community Council area)

Page 2: Camberwell regeneration Supplementary Planning Document (SPD) · 4 Introduction On 21 January Southwark Council launched the consultation of five projects as part of the £11m Camberwell

2

Page 3: Camberwell regeneration Supplementary Planning Document (SPD) · 4 Introduction On 21 January Southwark Council launched the consultation of five projects as part of the £11m Camberwell

Camberwell regenerationSupplementary Planning Document

3

Contents

Introduction 4

Camberwell SPD 4

• Projectsummary

• Relocation

• Intendedoutcome

• Consultationstatus

• Projecttimeline

• Summaryof12weekstakeholderengagement

• Exhibitioncontent

Stakeholder groups specific engagement 5

Consultation analysis 7

VISION(1)-ResponsestoaskingshouldweupdatetheSPDvisiontocoverthewholeofCamberwellCommunityCouncilareaorfocusontheareawheremostchangewilltakeplace?

VISION(2)–Responsestohowcanweimprovethisvision?

BOUNDARY-ResponsestoproposingthattheSPDboundarycoverstheCamberwellCommunityCouncilarea,doyouagree?

DESIGNANDHERITAGE-ResponsestoaskingarewecoveringthemaindesignandheritageissuesforCamberwell,orarethereotherthingsweshouldlookat?

PUBLICREALM-Responsestoaskingwhichpublicspacesneedimprovingandhowshouldtheybeimproved?

TRANSPORT(1)-ResponsestoaskinghowdoyouprefertotravelaroundCamberwell?

TRANSPORT(2)–ResponsestoaskingwhatsortofimprovementswouldencourageyoutowalkorcyclemoreinandaroundCamberwell?

SHOPPING(1)-ResponsestoaskingwhatsortofimprovementsinthetowncentrewouldencourageyoutoshopinCamberwellmoreoften?

SHOPPING(2)–Responsestoaskingshouldwetrytorestrictthenumberofnewhotfoodtakeawaysinthetowncentre?

BUSINESSANDEMPLOYMENT(1)-Responsetoaskingwhatsortofemploymentdoweneedtoencourage?

BUSINESSANDEMPLOYMENT(2)-ResponsetoaskingwhatsortofimprovementsdoyouthinkwouldhelpattractbusinesstoCamberwell?

ENVIRONMENT-ResponsetoaskingisthereadditionalguidancethattheSPDshouldincludethatisspecifictoCamberwell?

HOUSING-ResponsetoaskingaretherehousingissuesspecifictoCamberwellthatweshouldlookatintheSPD?

COMMUNITYFACILITIES-ResponsetoaskingisthereparticularinformationoncommunityfacilitiesthattheSPDshouldprovideguidanceon?

SPDCONSULTATIONFIRSTPHASE-Responsetoaskingarethereanyparticularissuesthatyouthinkwehavemissed

andthatshouldbeconsideredintheCamberwellSPD?

Respondents by email 36

Register to be kept informed 38

What happens next? 38

Appendices 38

Page 4: Camberwell regeneration Supplementary Planning Document (SPD) · 4 Introduction On 21 January Southwark Council launched the consultation of five projects as part of the £11m Camberwell

4

IntroductionOn21JanuarySouthwarkCouncillaunchedtheconsultationoffiveprojectsaspartofthe£11mCamberwellRegenerationprogramme,thisincludedthelibraryandpublicspace,theGreen,theStreets,PocketspacesandtheSupplementaryPlanningDocument(SPD).Thisconsultation,whichwasheldinconjunctionwithTransportforLondonandLambethCouncil,ranforsixweeks,andclosedon8MarchforallprojectsexcepttheCamberwellSPDwhichranfor12weeksandclosedon12April.

Asummaryofthefiveprojectsandfurtherinformationcanbefoundforeachprojectonthewebsite–www.southwark.gov.uk/camberwellregen

ThisconsultationreportisdedicatedtotheresponsesfortheCamberwell SPDproject.PleaserefertothedocumentCamberwellregenerationprogrammesummarytoreadaboutthestakeholderengagementacrossallfiveprojectsduringtheconsultationdurationwhichcanbefoundonthewebsite.

AfulldetailedconsultationreportwillbepreparedaspartofthepreparationofthedraftSPDforconsultation.ThiswillsetoutamoredetailedsummaryofalltheresponsesreceivedontheSPDvisionandissuespaper,thefullresponsesreceived,andofficercommentsonhowthecouncilhavetakenthecommentsintoconsiderationinpreparingthedraftSPD

Camberwell SPD• Projectsummary: TheCamberwellsupplementaryplanningdocument(SPD)willprovidedetailed

planningguidanceandinformationfortheareacoveredbytheCamberwellCommunityCouncil.ThisincludestheCamberwellactionareawhichisfocusedaroundthetowncentreandtheareatothewestofthetowncentre.TheSPDwillsetoutdetailedguidanceonhowthepolicieswithinSouthwark’sdevelopmentplan(theCoreStrategy,thesavedSouthwarkPlanandtheLondonPlan)shouldbeimplementedinCamberwell.

• Intendedoutcomes: AtthemomentthecouncilisconsideringthattheSPDwillincludeguidanceonarangeofpoliciesincluding:theCamberwellvision,designguidanceforkeydevelopmentsites,howmuchhousing,retailandemploymentusemaycomeforward,designandpublicrealmimprovements.Itwillalsobringtogetherworkbeingcarriedoutbyotherpartsofthecouncil,providingacoherentandcomprehensiveframeworkforfuturedevelopment.

• Consultationstatus:IntheprocessofpreparingtheearlystagesoftheSPD,withavision/issuespaperplannedforinformalconsultationfromJanuarytoApril2013toengagethelocalcommunityandtoidentifythekeyissuesthattheSPDneedstoprovideguidanceon.

Page 5: Camberwell regeneration Supplementary Planning Document (SPD) · 4 Introduction On 21 January Southwark Council launched the consultation of five projects as part of the £11m Camberwell

Camberwell regenerationSupplementary Planning Document

5

• Projecttimeline:FollowinginitialconsultationinJanuary2013,therewillbeafurtherstageofconsultationonasustainabilityappraisalscopingreportinearlysummer2013.ThisisaformaldocumentthatlooksattheissuesintheareaandsetsoutabaselineofinformationonCamberwelltoday,suchastheamountofhousing,levelsofdeprivation,andtypeofemployment.

• TheactualSPDwillbeconsultedonfromSeptember2013foraminimumof12weeks.ThepreparationoftheSPDwilltakeintoaccountthecommentsraisedthroughearlierstagesofconsultation.ThecompletedSPDisexpectedtobeadoptedbythecouncilinearly2014.

• Stakeholderengagement:ToexhibittheSPDvisionpaper;andtorequestresponsestothepaper.

• Thetimingofthisconsultationwasfor12weeksstartingon21Januaryuntil12April.

• Anewconsultationwillbegininsummerforthesustainabilityscopingreport,andafinalconsultationinSeptemberfortheactualSPD.

• SPDandtheGreenaretoworkcloselytogethertoensuretheSPDoutcomedoesnotcontradictwiththatoftheGreenandlibraryandopenspaces.

• Exhibitioncontentforthelibraryandpublicspace:–oneboardshowingtheproposedboundaryandphotos

• ThedesignexplainedtheprojectandtheprocessofhowtheSPDiscreatedthroughtoapproval.Nineissueswerehighlighted;designandheritage,publicrealm,transport,housing,communityfacilities,shopping,businessandemploymentandimplementation.ThedetailsmapenabledvisitorstoseeexactlytheareasaffectedbytheSPD.

• Handouts–A15pagecolourdocumentwasavailabletoexplaintheprojectinmoredetail.

Stakeholder groups specific engagement to Camberwell SPDThe1000+databaseofindividualsandstakeholdergroupswerecategorisedasfollows:

• SouthwarkandLambethCouncils–cabinetmembers,wardcouncillors,relevantprojectpersonnelanddepartments

• Residentsandbusinesses

• Forumsandnetworks

• Tenantsresidentsassociations

• Nurseries,primaryandsecondaryschoolswithinonemileradius

• Churchesofallfaithswithinonemileradius

Page 6: Camberwell regeneration Supplementary Planning Document (SPD) · 4 Introduction On 21 January Southwark Council launched the consultation of five projects as part of the £11m Camberwell

6

• InterestedPartiesdatabasefromtheredevelopmentofCamberwellLeisureCentreproject

• Consultationrespondentsandthosepeoplethatregisteredtobekeptinformedonly.

Inadditiontotheabove,specificstakeholdergroupswithaninterestinthisprojectwerekeptinformedbyemailandmetwithatexhibitionsandatone-to-onemeetingswhereSPDvisionandissuespaper(andtherestoftheCamberwellprojects)wereavailable.

• SE5Forum–meetingheldonTuesday22January

• FriendsofCamberwellGreen–meetingheldonWednesday20February

• CamberwellSociety –subgroupplanningmeetingheldonThursday28February

Specificinvitationstomeetatnearestexhibition

• SouthwarkPensionersCentre

• ParksideMedicalCentre

• MagistratesCourt

• SouthwarkDisabilityAssociation

PowerPointpresentationwrittenaboutCamberwellregenerationspecificallyaimedateightto16yearolds,anddeliveredbythegroupleadersoftheseorganisations

• YouthCommunityCouncil

• ScoutAssociation–Southwarkdistrict(SE5)

• SouthsideYouthLeadersAcademy

InadditiontotheconsultationcarriedoutaspartoftheCamberwellRegenerationprojectonallfiveprojects,theplanningpolicyteamcarriedoutthefollowingadditionalconsultationandengagement,inaccordancewiththeStatementofCommunityInvolvement:

• Sentamailouttoeveryoneontheplanningpolicymailingliston15March2013toprovidedetailsontheCamberwellSPDworkshopconsultationevent,andtoprovidedetailsonhowtomakecommentsontheSPD.

• RanaCamberwellSPDworkshopattheSouthLondonGalleryon25March2013.

• PresentedanddiscussedtheSPDattheLivingStreetsmeetingon21February2013.

• PresentedanddiscussedtheSPDtoPlanningCommitteeon5March2013.

Page 7: Camberwell regeneration Supplementary Planning Document (SPD) · 4 Introduction On 21 January Southwark Council launched the consultation of five projects as part of the £11m Camberwell

Camberwell regenerationSupplementary Planning Document

7

Consultation analysis51

77 responses in total.

1. VisionWhen we start work on the New Southwark Plan late in 2013, should we update this version to cover the whole of Camberwell Community Council area or should we continue to focus on the area where most change will take place?

How can we improve this vision? Comments received

Focus on CamberwellAction Area31 (40%)

Refer to widercommunitycouncil area17 (22%)

Other1 (2%)

Blank28 (36%)

26 emails

Page 8: Camberwell regeneration Supplementary Planning Document (SPD) · 4 Introduction On 21 January Southwark Council launched the consultation of five projects as part of the £11m Camberwell

8

ascentralasweare.2)Antisocialbehaviour-thereisadisgustingamountoflitter,andi’msickofseeingpeoplespittinginthestreet,orcompletelyofftheirheads.3)Aesthetics-therearesometrulyuglybuildings,forexampletheflatsonBroomeWay,thatreallyshouldbedemolished.4)Businesses-wemustsupportstronglocalbusinessesandhigherendretailers;everyunitthathasopenedrecentlyhasbeenatakeaway,apaydayloansshoporachurch.

• WhileIsupportindependentbusinessinCamberwell,Ithinkthisvisionneedstobemorepro-growthandpro-jobs.Atthemomentitreadsasbeingsmall‘c’conservative-protectingwhatisthere.Whataboutmoreflexiblesmallbusinessspaceinthearea?Thiswouldcomplementa‘cafeculture’andthecreativecommunity.Businessgrowthdoesn’thavetomeanbigchains,butatthemomentitreadsthatwedon’twantgrowthatall.

• Fastinternetisanessentialfeatureoflifethesedays,soensureinternetinfrastructure(cabinetsetc.)isallowedfor.Make20mphdefaultand30mphtheexception,andenforce!

• ThePocketSpacesrequiregoodqualitysurfacetreatmentandshouldaccommodatedeliveryvehiclesonly–trytoremovecar/pedestrianboundaries.

• WefullysupporttheneedforanSPDprovidedthattherecanbeanassurancethatitwillnotbeover-riddenwhenactualplanningapplicationscomein.WebelievethatitwillonlybeworthwhileifitcentresonthewholeoftheCamberwellCommunityCouncilareawhiletakingintoaccounttheinterfaceswithotherareas.Forexample,cyclingroutes,trafficreduction,publictransport,parkingandpedestrianroutesmusttakeaccountofadjacentareas.

^SLS-1:Whileweunderstandthattheprincipalaimistoimprovecurrentshops,wefeelthatnewretailprovisionmaybeappropriatetoencouragewalkableneighbourhoods.WefeelthatsomeretailisneededfortheregeneratedElmingtonEstateinparticular.Anauditisneededofthewalking/cyclingaccesstolocalretailthroughouttheSPDareaandidentificationoflocationsofunderprovisionforcommunities.IfmorehousingisgeneratedintheSPDareathaniscurrentlyenvisaged,assessmentisneededofretailprovision.Wewouldliketoseementionof20mphspeedlimitsaspartofthevisionforasafer,morewalkableandeconomicallyvibrantarea.

+ Sustranswelcomestheproposaltoreducetrafficcongestion,andimproveparking,safetyandaccessibilitytoandwithinCamberwellactionareabybike,footandpublictransport.Evidenceshowsthatactivetravelisstronglylinkedtoretailvitality.Forexample,researchfromtheNewYorkCityDepartmentofTransportshowedthatafternewcycleinfrastructurewasinstalled,localshopsexperienceda46%increaseinfootfall.Bycomparison,duringthesamethreeyeartimeperiod,therewasonlya3%increaseinouterboroughsofthecity.SustranswelcomestheproposaltoincorporatealloftheCamberwellcommunitycouncilareaintotheproposedboundaryfortheSPD.

^CllrsMW,NG,IW-Protectionofourgoodpubsascommunityassets;Clampdownonsourcesofanti-socialbehaviourandnoisenuisance;

Page 9: Camberwell regeneration Supplementary Planning Document (SPD) · 4 Introduction On 21 January Southwark Council launched the consultation of five projects as part of the £11m Camberwell

Camberwell regenerationSupplementary Planning Document

9

2. BoundaryWe propose that the SPD covers the Camberwell Community Council area. Do you agree with the SPD boundary?

Any further comments on the proposed SPD boundary? Comments received

• VicarageGrove,ElmingtonandSansomStreetshouldbecovered.

• SPDboundaryshouldbebroadaspossible

• Keepitfocusedandcentral.

• CamberwellsouthofPeckhamRoadhasaverydifferentfeeltotheareaaroundtheGreenandupCamberwellRoadandIworrythatthiswiderareacouldconfuseordilutethatregenerationthatissoneededintheactionarea.Allworkshould,however,ofcourserefertowideractivity.

• AslongasimprovementstoCamberwellGreen/DenmarkHillareaarenotdiluted.

• FocusontheCamberwellarea.

PRN-ThecommentconcernsthesharedboundariesofSouthCamberwell,EastDulwichandTheLanewards.ThecommentislinkedalsowithmyobjectiontotheboundaryproposedforthePNAAPalongthesharedboundaryofTheLaneandSouthCamberwellwards.Thislocalityismylocalneighbourhood.Itsuffersfrombeingdividedthreewaysbytheseadministrativeboundarieswhicharederivedsimplyfromelectoralwardboundariescreatedforadministrativereasons.Theseboundariesarenotcoherentinplanningterms,astheneighbourhoodsarenotatalldividedinreality.Iappreciatethattherehastobeaboundaryfortheplanningdocument.Butiftheneighbourhoodsaregoingtobecutarbitrarilybythoseboundaries,thereneedstobe,ineachoftheplanningdocumentsforthesethreeCommunityCouncilswheretheycometogetherinthislocality,asectionacknowledginginplanningtermstheunityonthegroundof,theGroveValeshoppingarea,theGooseGreenneighbourhood,bothofwhichareintegrallylinkedtoandoverlapping,theBellendenneighbourhood.PleasetakethesecommentsintoaccountforboththeDulwichandCamberwellSPDs.

Yes36 (47%)

No5 (6%)

Don’t know9 (12%)

Blank27 (35%)

Page 10: Camberwell regeneration Supplementary Planning Document (SPD) · 4 Introduction On 21 January Southwark Council launched the consultation of five projects as part of the £11m Camberwell

10

^SLS-1:Yes.ItisvitalthatCamberwellisconsideredasawholeandthequalityofitslinkswiththerestoftheboroughareassessed.ItisvitaltoothatfullconsiderationsisgiventolocationssuchastheshoppingcentresonCamberwellNewRoadastheyarevitalifsustainableneighbourhoodsaretobecreatedandshopsandservicescanbeaccessedonfootandbycycle.

3. Design and HeritageWhat aspects of the local character are important to you? This could be buildings, spaces, views or something else.

Comments received

• Victorianbuildings,thegreen,theleisurecentreandthediversityofpeopleandinterestsreflectedintheenvironment.

• Buildings.

• Builtdensity,qualityanddetailofbuildingsonChurchSt.-pleaseremoveclutterinc.lightingandcleanup.ContinuationofthisintotheGreen/Datchelor/ArtichokeandGroveLane.

• Openspacesfortemporaryeventsie.Farmersmarkets.Also-smallareascurrentlyunderusedlikeoldcarparksonwrenroadshouldbecomecommunityfoodgrowingventures.

• Protectandenhancethehighqualityoldandnewbuildings,connectopenspaces.transportintegrationandmuchgreaterfoot,cyclingandroadpermeabilitythroughestatesandprivateareas.Managethetrafficbetter.

• Reductionofdilapidatedbuildings,increasespaceforpedestrians,integratecommunities.

• Thebuildings,StGilesChurchandthetreelinedroadsinthearea.

• Heritagelook.

• Heritageisimportant,butcanbeintegratedwithnewerdesigns.

• KeeptheGeorgianandVictorianbuildings.

• Newbuildsandregenerationtocompliment/reflecttherichhistoryofCamberwell.

• Ithinkmoreshouldbedonetopromotebetterdesignandbettermaintenanceofbuildings,whilstprotectingtheheritage.

• Victorianbuildings,thegreen,PeabodyEstate.

• Artculture,artgalleriesandartshops.

• Ensuringthatsomeoftheolderbuildingsarepreservedwhilstnewbuildingsareconstructedinatastefulandgreenway.

• Buildingsandviews.Camberwellisblessedwithmanyfineterracesandindividualbuildings,chieflyfromthe19thcentury.Theirappearanceisgreatlymarred,particularlywithintheconservationarea,

Page 11: Camberwell regeneration Supplementary Planning Document (SPD) · 4 Introduction On 21 January Southwark Council launched the consultation of five projects as part of the £11m Camberwell

Camberwell regenerationSupplementary Planning Document

11

byintrusiveandinappropriatecommercialfascias.Muchmorecontrolneedstobeexercisedoverthese./Adepressingnumberofbuildingsinthecentrearepoorlymaintained.Theyaredirtyandwithvegetation.CantheCouncilexercisesomecontrolheretoo?Asregardsviews,variouslargenewdevelopmentsarecurrentlyproposed.Ithinkthatinsufficientregardisbeingpaidtotheirimpactonexistingviewsofthecentre.

• Buildings,retainingtheuniquefeaturesoftheareaandkeepingitsidentity.

• Beautifuloldbuildings.

• Theartandmurals,theGeorgianbuildings,theGreen,thefresh-lookingvibrantindependentshops.

• TheVictorianbuildingsandinterestingskyline.TheGreen.SmallindependentretailersandexcellentrestaurantssuchasFMMangalandCaravaggio.

• Periodbuildings,suchastheCamberwellGreenSurgery,aswellasupdating/modernisingCamberwellGreenparkspacetomakeitfeelmoreliketheheartofthecommunity.

• ArchitectureonCamberwellChurchStreetandaroundtheGreen.

• Thelovelybrickbuildingssuchasthosenearthegreen,thebathsandthePeabodyflatsmustbepreserved,andsomeofthearchitecturaltravestiesthatsurroundthemdemolishedandrebuiltinamoresympatheticstyle.Weshouldalsomakemoreofthewonderfulopenspacesandparks.

• Thearchitectureoftheexistingbuildingsneedstobeprotectedandenhanced/restored.ButIamnotopposedtohighqualitynewmoderndevelopments,asIthinkourcityhasalwaysseennewandoldco-exist.

• Therearesomeattractiveolderbuildings,butitssometimesdifficulttoseethese.

• Conservationareas.Architecture.

• Mixedcommunity,supportinglotsofdifferentsectionsofcommunity.Welcomingnotexclusive.

• TheGreen,theGeorgianarchitecture,theHermitsCave,Sophoclies,andCruzon-allimportantlocalhistory.

• Buildings.

• AformerpresidentandformereditorofCamberwellQuarterly(TonyWilson)oncesuggestedlightingthesurgery(formerbank),Haskols(formerbank)andturretonSouth/westcornerofDenmarkHill/CamberwellNewRoadbyfloodlightstocreateafocusonthearea.Ithinkthisisagoodidea.

• Facadesofoldbuildings,greenspacesandpublicamenitiese.g.libraryandtransport.

• TheCamberwellBeauty(Butterfly)TheClockTower.

• ViewofStPaulsfromCamberwellRoad,VictorianheritageofCamberwellGreenandsurroundingbuildings,GeorgianheritageofCamberwellGroveandGroveLane.

Page 12: Camberwell regeneration Supplementary Planning Document (SPD) · 4 Introduction On 21 January Southwark Council launched the consultation of five projects as part of the £11m Camberwell

12

• Buildings,spaces-communalareasforseating,exhibitingart,childrentoplayinadditiontotheplaygroundonthegreen.Ibelievecommunalareascanhaveabenefittohowpeopleinteractandrespecteachotherwithoutthisitisverydifficulttomoveforwardasacommunitytogether.Thearchitectureofsomeofthebuildingsisverygoodbutneedscleaninguptofullyappreciate.

• Buildingsandgreenspaces.

• Victorianandearlierbuildings.PubssuchastheHermit’sCaveandtheTiger.Buildingsofhistoricintereste.g.thesnookerhallandNollywood’snightclub(formermusichall).CamberwellCollegeofArtandartists’studios/galleries.

• Keepingoutlargeretailerswhopushuptheprices.Itisatown,whichinwhichthecommunitythrives.Bringinlargechains,andthatwillbelost.

• Maintainingthehistoricbuildingsandstrengtheningenforcementactionwithinaconservationarea.

• Theolderbuildings,especiallyonCamberwellChurchStreet,manyofwhicharerun-downorhavehorribleshopfrontswhichruinthem.Ownersshouldbemaderesponsibleforupkeep.

• Ivaluetheinternationalandindividualfeelaboutit.IwassadwhentheshopsinSouthamptonWaychangedalltheirshopfrontstolookmoreorlessthesame.Itwasnicewheneachhaddonethemselvesintheirownway,somehand-paintedandreflectingtheculturebehindit,e.g.LittleOchie.Nowitlookssmarterbuthaslostsomecharacteranditfeelslikesomeoneonsomecommitteesaidthatitwasn’tgoodenoughbefore(probablyfortheirhouseprices).It’sabitlikewhentheturnedtheGlanvilleArcadein‘BrixtonVillage’anditnowservestrendytouriststotheareawiththingslocalpeoplecan’tafford.Pleasedon’tdothesametoCamberwell.

• What’simportanttomeareareasofopenspace,includingminimisingtallbuildingsandkeepingopengreenspacesopen.TheolderpartsofCamberwellarecriticalinperceptionsofthearea-moreemphasisneededonthese.

• ThemainfrontagesonCamberwellChurchStreetandDenmarkHilltobeupgradeswithgrantstoretailers(seeLeytonHighRoadandMaryleboneHighStreet).

• TheVisionsandIssuesDocumentshasthesentence,“Someofthetypesofthingswewilllookatprovidingguidanceforarehowtoimproveshopfronts,...”.Iheartilyapplaudthis.IhavetakenaparticularinterestintheshopfrontswithintheCamberwellGreenConservationarea.Theareaisblightedbyshopfasciasquiteoutofkeepingwiththecharacterofaconservationareas.ThefeaturesIhaveinmind,whicharesometimescombined,include:protrudinginternallyilluminatedboxes,garishcolours,greatsize,partialcoveringofpilastersandotherarchitecturalfeatures.Iattach,forexample,aphotoofMorley’sat58ChurchStreetwhichexhibitsseveralofthesefeatures,marringabuildingwhichisoneofthemostattractiveindividualbuildingsintheconservationarea.Itismyimpressionthatmanyofthecurrentfasciasought,underthelaw,tohavebeenthesubjectofplanningapplicationsbuthavenotbeen.IbelievethattheSPDshouldputmuchmoreemphasisonimprovingthesituationthroughstricterenforcementoftheplanninglegislation.

Page 13: Camberwell regeneration Supplementary Planning Document (SPD) · 4 Introduction On 21 January Southwark Council launched the consultation of five projects as part of the £11m Camberwell

Camberwell regenerationSupplementary Planning Document

13

• Inotethatthereisnomentionofthe‘churches’thatareaplagueintheareaandcausesomanyoftheretailshopfrontdesignissues–i.e.signage,lackofinvestmentandgapsinactivefrontages.NodoubtfewofthesehaveplanningpermissionfromtheirconversionfromB1orA1toD1space.Manyofthechurchescausenoisedisturbanceandothernuisance(suchasall-night‘vigils’)whichaplanningpermissionwouldhaverestricted,forexampleinconditioningloud-speakerequipmentandmusiclevelstoanappropriatelevel,havingregardtotheambientnoiselevel.Youshouldidentifyinthedocumentationthattheenforcementteamwilltakeactivestepstoapproachthisproblem(andothersignageandshopfrontdegradationinthetowncentre–manysignsareovertenyearsoldandneedinvestment),aswellastheabovecomplaints,includingworkingwithLambethcouncilwhichhasallowedasimilarproliferation.Thetowncentrewillthenbenefitfromarefreshmentthatwillbeinstantlynoticeable.

^CllrsMW,NG,IW-Wealsoneedpowerstogetprivateownersofhistoricbuildingstocleanthemupandmaintaininagoodcondition

Are we covering the main design and heritage issues for Camberwell? Are there other things we should look at?

Any further comments about design and heritage? Comments received

• Openingupsparespacesforcommunityfoodgrowing-lotsandlotsofpeoplewouldliketobeinvolved.

• TheshopsonCamberwellChurchStreetarebecomingdisgustingwithmeatshopsandstrangefruitandvegetableshops.Toomanymobileshopsandpaydayloanpremises.ItisbeginningtolooklikePeckhamHighStreetwhichistrulyawful.

• IthinkthatthereshouldbedisplayedphotosaroundCamberwellthatgivepeopleaninsightintothearea’shistory.Photo’sandfunfactsshouldbeondisplayaroundthecitycentre.ItwouldmakeusproudtobeCamberwellian.

• Youneedtostopbettingandpawnshopsopeninginanareawithhighamountoflowincomes.

Yes27 (35%)

No5 (6%)Don’t

know14 (19%)

Blank31 (40%)

Page 14: Camberwell regeneration Supplementary Planning Document (SPD) · 4 Introduction On 21 January Southwark Council launched the consultation of five projects as part of the £11m Camberwell

14

• MorecouldbemadeofexploringCamberwellasanartscentre-itneedsacentralplaceforengagementinarts.

• Thereshouldbestrictercontrolsontheappearanceofshopsetc.,somearetrulyshabby

• Wouldliketolimitthenumberofcheap/hotfoodstyleoutlets.Couldwedomoreforpopupshops?

• Communityelementswouldbeincludedmore,e.g.howcanthenewlibraryencourageuseoftheGreen?

• TheSnookerHallinCamberwellNewRoadisadisgraceandmustberenovated.IwouldlikeacrossingpointfromLoveWalktotheothersideofDenmarkHill.

• TheCamberwellBeauty(Butterfly)TheClockTower.

• Councilflatsintheareashouldbelookedafter.

• Conservationareasareneeded.

• Thequalityofmaterials/streetfurnituretobehigh.BellendenRoadisamoveintherightdirectionandshouldbecopiedatCamberwell.

4. Public RealmWhich public spaces need improving and how should they be improved? Comments received

• TheGreen,theunderusedstreets.Morepedestrianisation,treesandseatingareas.Morespaceforcommunityactivitysuchasmarketstalls,children’s’eventsetc

• Thecyclelanesarenotgoodenough.Mandatorycyclelanesarerequired.

• Camberwellisnotsimplyatrafficcross.ThepedestrianaxisfromNewRoad(andhopefullyare-openedstation)throughthePassageandtheGreentoElmingtonshouldbea‘raised’sharedspace.Thelibraryshouldrespondtothis.CamberwellChurchStreethasintegrityandneedsdeclutteringandpedestrianenhancementwithphysicalspurstoArtichokeandDatchelor.

• Maincrossroads-pedestriansneedtocomefirst-theroadisfartoowide.AreaoutsidetheTigerpubcouldbereallygreatopenurbanspace.WrenRoadcouldalsobeveryinterestingifnocarsdownthere-possibleextensionofmarketsetc.

• Uniformity.Pleasechooseastrikingnewpavingdesignandblanketthestreetsinit.Givetheareaastrong,uniqueandinterestingidentity.Itcandoamazingthispaving-justlookathowwellknowntheCopacabanaswirlshavebecome.

• Betterfootpathsandlesstraffic.Pedestrianscannotcrossroadswithoutbeingatriskfromcars,busesandroguecyclistswhodonottakeanynoticeofthetrafficlights.

• asperpocketspaces.

• TheGreenitselfneedsimproving,maybewithsomemoresmallflowerbeds.

Page 15: Camberwell regeneration Supplementary Planning Document (SPD) · 4 Introduction On 21 January Southwark Council launched the consultation of five projects as part of the £11m Camberwell

Camberwell regenerationSupplementary Planning Document

15

• ArtichokePlace,CamberwellGreenandDatchelorPlace.

• CamberwellGreen-itsforbiddingandunsafe.

• ButterflyWalkcouldbeimprovedandtheareaaroundhere.Movethebusstoptoallowfreepassageofpedestrians.

• I’dliketheGreentobemorevisible(fewertrees).

• CamberwellGreeninparticular.

• Allofthemareawful.Butterflywalkandthebusstopoutsideareunsightly.

• TheGreen,theroads(thereistoomuchclutteronthem),theshopfronts(nomoreneonsignsetc)

• Theareainfrontandtothesideofthepostoffice.IfthepostofficeistostaythenI’dliketoseeseating,treesandattractivepaving.

• Themainretailareas-ButterflyWalk,CamberwellChurchStreetandsouthernDenmarkHill-shouldbegivenamakeover!CamberwellGreenpark,LucasGardensshouldbemadetofeelsaferandmoreaccessible.

• Green.

• IsupporttheCamberwellGreen/Streets/PocketSpacesproposals.

• CamberwellGreenisn’tbigenoughtobeadestinationpark,itneedstoservethepublicbuildings/shoppingfacilitiesasasupportingfunction:withattractiveplacestosit.

• Lightinginpublicspacese.g.BrunswickParktoenablelongerhoursofuse.

• Thegreen,theareaatthebackofButterflywalk.

• CamberwellChurchStreetisveryclutteredandcongestedawiderpavementwouldhelpthis.

• TheGreen,pavements,maintenanceofstreetfurniture.

• DenmarkHillshoppingareaisextremelyunwelcoming.

• CamberwellChurchStreet.Publicbuildingsneedafacelift.

• ArtichokePlace,GroveLaneontoCamberwellChurchStreet

• CamberwellGreen-hopewecanhavehangingbaskets,maybeacafe.

• Mostpublicspaces.Aswellasthetowncentre,theareaaroundtheElmingtonestateswouldbenefitfromnewpavingandpavementwidening/roadnarrowingandplantingofmoretrees.

• LucasGardens-badlyneedsitsplaygroundupdatedandneedstolookatthebestwaythatpeoplecanenjoythegreenareasaswellasdogownerslettingdogsofflead.Whyare‘older’childrenusingthekid’splaygroundforfootball?Stifferpenalties(andpromotionofsuch)forlitteringandnotcleaningupdogmess.ThereisaspaceonthecornerofVestryRoadandPeckhamRoad(oppositesidetoLucasGardens)canthisberevitalised?It’semptyatthemomentandovergrownbutitdoeshaveashelterbeneathitwithanentranceonthegroundmakingitabitdangerousasitis.

Page 16: Camberwell regeneration Supplementary Planning Document (SPD) · 4 Introduction On 21 January Southwark Council launched the consultation of five projects as part of the £11m Camberwell

16

• ColdharbourLane,CamberwellGreenespecially.

• Mainshoppingstreetsneedabetterrangeofindependentshops,withfarfewerfast-foodoutlets,bettingshopsandpaydayloanshops.Butthecouncilhaslittleornocontroloverthis.

• CamberwellGreen,Areainfrontoftheleisurecentre./Needmorelights,Idon’ttrusttheGreenatnight.

• CamberwellGreencouldbeimproved.

• IwouldliketheretobeamoreefficientwayofcrossingthebigjunctionatCamberwellGreenbecauseittakesmorethanfiveminstocrosstheroadsometimesandtherearealotoftrafficfumes.IwouldalsolikethepavementtobewideronCamberwellChurchStreetonthebitpastLloydsBankbecauseitgetstoocrowdedanddirtyonthatonebit.

• CamberwellGreen.Moreevents,continuingitsimprovementthroughattentiontolitter,improvingplantsandgrasses.Greendaleneedspreservingandnotbuildingon.Seemyblog–keepinggreendalegreem.tumblr.com.Morefocusongreenspaces.Iwanttoseemoreinformedmanagementofgrassverges(seehttp://www.plantlife.org.uk/roadvergecampaign/)andothergreenareaswhichgetoverlooked.

• PocketSpaces/emptysites.

^SLS-1:TheplansforthestreetsofCamberwellareverygoodasaretheproposalsforthepocketspaces.Onthebasisthatnotallwillbedevelopedinthecurrentregenerationschemebutthatallofthepocketspacesintheareaareworthyofimprovement,wewouldliketoseetheSDPconsiderhowthefullprogrammecanbeundertaken.

WealsofeelthatDanevilleRdshouldbeincluded.Itseemsappropriatetoincludeitwhenitcouldbethewalking/cyclingspinethatconnectsGroveLane,WrenRdandOrpheusStandhasbeenthefocusofsomuchconfusioninthepast.

+SUSTRANS:Inrelationtothepublicrealm,Sustranssupportsdesignwhichencouragesappealingpublicspace,togetherwithimprovedpedestrianpermeabilityandconnectivity.Weadvocatethatanypocketofunusedorunderusedpublicspaceshouldbereclaimedtohelpre-knitthesocialandphysicalfabricofCamberwell.Sustrans’DIYStreetsteamisdeliveringasimilarprojectonPeckhamRye,byfocusingonanurbancorridorand‘reclaiming’aseriesofpocketplaces’forpeople.

Page 17: Camberwell regeneration Supplementary Planning Document (SPD) · 4 Introduction On 21 January Southwark Council launched the consultation of five projects as part of the £11m Camberwell

Camberwell regenerationSupplementary Planning Document

17

How could the experience and identity of Camberwell be improved through changes to its public realm?

Comments received

• Lesstraffic,morepedestrianactivity,moregreenery.

• Improveairqualityandreducecongestionbyencouragingcyclelanesthroughtheprovisionofsegregatedcyclelanesandcycleparking.

• Camberwellhasintactpocketsoforganicgrowthandhadadoptedmoderndemandsofmassuseimposedwithoutmuchurbanconsiderationofwiderconsequences.Generallythepublicrealmshowsalackofcare/maintenanceanddestroyedphysicalconnectionsthroughpoorplanningdecisions.Thisimportantregenerationproposalneedstodomoreandaimhighertorespondtothelatentqualityandnotimposesurfacefashionsorcontinuetherecentimpositionwithoutduequalityofthoughtanddesign.

• Bringbettershopsintotheareawhichnowhastoomanybettingshopandpornbrokers-foranareaofhighunemploymentthereshouldbemoreshopsthatcouldprovidejobstolocalsforexampleanArgos.

• Behindthemainroadstherearequitegoodpedestrianconnections-onthewayareseveralsmallspacesthatcouldbeopportunitiesforsmallcommunitygroupstocoloniseandsetupfoodgrowingspaces.ForinstancethefootpathbetweenCamberwellGroveandgrovelanefromLettsomestatetowardsDenmarkHillstation,directlyinfrontofGrove&HullCourt.

• Greentrafficfreeareas.

• Someofthesideroadsarenotpedestrianfriendly.

• Itwouldn’tlooksorun-downanddingy.Usebrightcolouring!Itwouldgivemesomeneighbourhoodpride!

• EstablishmoreapparentidentityandwhichdistinguishesfromPeckhamandBrixton.

• Improveaccesstotheareabyremovingbusstopstoareaswheretherearelesscrowded.Trytoincentivisenewbusinessesandrestrictbettingshopsinthearea.

• Itisseenasaplacefullofbuses.

• ItcouldbecomeadestinationforartytypesinSouthLondon.

• Retailerscouldbeencouragedtopaintuptheirshopsandtidyupthefrontages-notspilloutoverthepavement.

• MaketheGreennicerandnotjustabusyjunction.

• Improvetheappearanceofbuildingsandimproveairquality.

Page 18: Camberwell regeneration Supplementary Planning Document (SPD) · 4 Introduction On 21 January Southwark Council launched the consultation of five projects as part of the £11m Camberwell

18

• Camberwellshouldbesomewherethatpeoplespendtimeratherthantrytopassthroughasquicklyaspossible.

• Itseemslikeastagingpostattheminuteandbyopeningoutthevariousonewayroutesandlinkingsomeofthedeadendstreetsyoumighthaveamorecoherentcentrethatpeoplewanttostaylongerin.

• Encouragemoreshopsandlesstakeawaychickenshops!Acommunitycentreorartgallery/culturalheritagecentre.

• Improvedrighttimeframe.

• TheCamberwellBeauty(Butterfly)AClockTower.

• ThesurvivingVictorianheritageisCamberwell’sbiggestasset;thepublicrealmimprovementsshouldbesympathetictothisandtieittogether,forexamplethroughtheuseofYorkstonepavingandtraditional,elegantstylesofstreetfurniture.RecentimprovementstoHerneHilltowncentregiveagoodexample.Also,declutteringasmuchaspossible.

• Morepleasantthroughtreesandpedestrianareas.Easeofaccessonfootpathswhichareverycongested-makesitabitdangerousifyouarewalkingwithsmallchildren.Cleanershopfronts.ThepeopleofCamberwellneedtobepulledtogether,thereareanumberofdifferent‘types’ofpeoplefromartstudentstoworkingpeopletopeopleexperiencingpoverty-weneedtofindsomecommongroundoratleastremindpeoplethatit’simportant.

• Shoppingandbusinesswithinthearea,especiallyrestrictingbettingplacesandweirpeopleinthearea.

• BykeepingthelibraryintheheartofCamberwellratherthansitingitinanobscurecornernexttoamagistrates’court.

• Betterparkingfacilitieswouldencourageshoppers,andtherebyencouragebettershops.

• Idon’treallyunderstandthisquestion.IthinkpeoplewholivehereknowCamberwell’sidentity-it’sameltingpotwithastrongsenseofcommunitywherepeoplefromcompletelydifferentcountriesandwalkoflifemixwitheachotherprettywell.Peoplewhodon’tliveherethinkit’sabitgrittyandgrimybuttheydon’tliveheresoIdon’tcarewhattheythink.Ilikeit.

Page 19: Camberwell regeneration Supplementary Planning Document (SPD) · 4 Introduction On 21 January Southwark Council launched the consultation of five projects as part of the £11m Camberwell

Camberwell regenerationSupplementary Planning Document

19

0 5 10 15 20 25 30 35

Walk (32)

Bus (25)

Cycle (20)

Car (2)

5. TransportHow do you prefer to travel around Camberwell?

What sort of improvements would encourage you to walk or cycle more in and around Camberwell?

Comments received

• Lesstraffic,widerpavements.

• Provisionofsegregatedcyclelanesandcycleparking.

• IcycleandwalkoutofCamberwell,thisregenerationproposalmayaddressthis.

• Removalofgroupsofpeopleoutsidebettingshopsaskingformoney.

• Iamencouragedenoughbutalessdangerousmainjunctionwouldcertainlyhelpothers-especiallythepeopleinwheelchairsanddifficultieswithmobility.

• Morepermeabilitythroughestatesandprivateareas.Linkthegreenspacesandencourageopenaccess.Camberwellseemstobedominatedbyhospitals,campuses,SalvationArmyandpublicandprivateestates.Weneedclearwaysthroughtheseareas.Teardownthewallsandfencesopenitupandencourage,orevenpressurethroughplanning,acoherentthemesothatprivateareasusethesametreatmentsaspublicareasgivinganareaidentitythatwecanbeproudof.

• Widerpavements,cyclelanes,somebikesparking.

• Widerfootpathsandnomorecyclistsinthearea,theyaredangerous.

• Morefrequentcrossingtimesatthelightcontrolledcrossingsoftenbadonatrunkroad.

• Makesomeofthesideroadspedestrianonlye.g.WrenRoad.

• Lesstraffic.

Page 20: Camberwell regeneration Supplementary Planning Document (SPD) · 4 Introduction On 21 January Southwark Council launched the consultation of five projects as part of the £11m Camberwell

20

• Morepedestrianisedareas.Speedlimits.Residentialareahasbeentakenoverbyamotorwayfeel.

• Morecyclelanes.

• Bikelanes,morepicturesquescenery.

• Widencyclelanes/footpathsintheareaaroundCamberwellGreen/DenmarkHill.

• MoreguidanceforcyclistsattheGreenjunction.

• Lessclutteredpavements,bettercrossings.

• Movethebusstopsoutsidebutterflywalk.

• ArighthandturnfromCamberwellNewRoadtoWarnerRoadthatcanbedonesafely.Fewerspeedbumps.

• WideningthefootpathbetweenStGilesChurchandCamberwellGreen.

• Wider,cleanerpavements,well-litpassages.

• Walking-Iworryabouttheairquality.Quickersafercrossingswouldbevaluable.Bus-takestoolongduetotraffic,andit’sridiculousthatwehavetopayasecondbusfaretochangebuses,thereshouldbeatransferticketsystem.WeneedtheTube.

• None-Ialreadywalk.

• Moredesignatedcyclepaths.

• WiderpavementsaroundthebeginningofCamberwellChurchStreetespeciallythesouthsidewhichisalwaysblockedbythebusstoppassengersandwinosusingthesmallalcoholshopsthere.

• WiderpavementsaroundthebeginningofCamberwellChurchStreetespeciallythesouthsidewhichisalwaysblockedbythebusstoppassengersandwinosusingthesmallalcoholshopsthere.

• SortoutthecrushattheBusStopatWrenRoad.

• PavementswideningandbusstopsneartheGreen.EasiercrossingofDenmarkHill.

• Cyclelanes.

• Widerfootways,moreseatingandbettercycleracks.

• CycleHireScheme,improvedpedestriancrossings.

• Iusuallycycleorwalk.

• Widerstreetsforwalkingwithmoregreenerspaces.

• Lesscrowdingaroundbusstops.

• Morecyclelockingspaces.

• Betterpedestriancrossing(e.g.lesscarpriority).20mphlimit.

Page 21: Camberwell regeneration Supplementary Planning Document (SPD) · 4 Introduction On 21 January Southwark Council launched the consultation of five projects as part of the £11m Camberwell

Camberwell regenerationSupplementary Planning Document

21

• Cycling-Iftheroadswereresurfaced,theyarecurrentlyawful.Iftheywerewiderassomedriversaredangerous.Priorityshouldbegiventocyclists.ItwouldbegreatiftherewasaseparateCycleSuperhighwayforbikes,especiallygoingdownWalworthroadtoPeckham.

• Betterpavements,fewerdrunks.

• ImplementCycleSuperhighway;havestagedtrafficlightsforcyclists.Re-openCamberwellstationtoreducetrafficcongestion.ReducedtrainconnectionstocentralLondonneedtobeaddressed

• AquickerwaytogetacrossCamberwellGreencrossroads.ThiswouldencouragemetouseMyatt’sFieldparkmorewithmydaughterbutIhatecrossingthecrossroadswithher-ittakesagesandtherearetoomanyfumes.IwouldlovetheBarclaysBikeschemetobeextendedtohere,andthecongestionchargezone,becauseairpollutionisanissue.

• Morepedestrianwalkways.

• Betterpaving–getridofTarmac!

• FollowingyourrequestsforinputIwouldliketosuggestimmediatepracticalconsultationontheconstructionofanundergroundtubestationintheunsightlyspacebesidetherailwaybridgenearCamberwellbusstation.UseoftheOvergroundrailsasatransitionalorevenfinalsolutiontothesagaofthemuchsoughtaftertubeconnectioncouldberealizedveryfastwithanadjustmenttothedevelopmentplansforElephantandCastlewithanaccesstotheBakerloolinetrainscomingfromCamberwell.Itshouldnotbedifficult,emulatingtheDistrictline,toconstructanextensiontotheBakerloolinethatdoesnottake7yearstobuildbutcouldbedoneveryfastwhilesimultaneouslysmarteningupthebusgarageareaanddeliveringthemuchneedednewtubelinkBUTOVERGROUNDANDUSINGEXISTINGRAILSANDCUTTINGS.THISWOULDWINYOUTHENEXTELECTION!AnalternativewouldbetoconnectthenewDenmark-hillstationtotheBakerlooline-evenlessexpensive,becauseitwouldmeanONLYcreatingtheaccessfortubetrainsatElephantandCastle,andusingnewDenmarkHillstationandtheexistingrails.TheonlyproblemIseeisthefactthatMAYBEtherailwaygaugeofthetubeisdifferentfromtheOvergroundtailsystem...isit?

^SLS-1:TheborderroadswithLambethremainveryintimidatingowingtohighvehiclespeeds.ThewholeofWestCamberwellandespeciallyDenmarkRdfeelsunsafeforcycling.A20mphzoneneedstobecreatedinthisareaandespeciallyalongDenmarkRdwhichisbothaborderroadandacycleroute.

SouthwarkLivingStreetsstronglysharestheCouncil’svisionforaCamberwellthatiswellconnectedforthoseonfootandthosewhocycle.Theselowcostactiveformsoftravelofferbenefitstosocialinclusion,personalcostsoftravel,physicalandmentalhealthandclimatechange.Muchofourcomments,therefore,arefocusedoncreatinglinksbetweenthedifferentpartsofCamberwell,encouraginganenvironmentwherepeopleshoplocallyonfootandbybicyclewithenormousbenefitstokeepingwealthwithintheareaandpromotinglocalandtypicallyindependentsbusinesses.

Wewould,thereforeliketosuggestthefollowingissuesandlocationswheretheSPDmightfocustopromotewalkableandcycleableandeconomicallysuccessfulneighbourhoods.

Page 22: Camberwell regeneration Supplementary Planning Document (SPD) · 4 Introduction On 21 January Southwark Council launched the consultation of five projects as part of the £11m Camberwell

22

1.TheRegenerationoftheElmingtonEstate.WefeelthatplanningpolicyguidanceisneededtoensurethatactivetravelandawalkableneighbourhoodisembeddedintotheElmingtonRegeneration.WeweredisappointedthatinthefirstphaseoftheredevelopmentopportunitieswerenottakentorethinkthepurposeoftheexistingroadsandespeciallyEdmundSt.Guidanceisneededtoa)ensurethatthroughvehiculartrafficisdiscouragedandb)localshopsandservicesarecreatedtoensurethatpeoplemakejourneysonfootandcycleforessentialsandthatc)easy,safe,directandquietroutesexisttoshopsinthetowncentreofCamberwellandthelocalcentreofSouthamptonWay.

Westillbelievethatthereisstrongpotentialtore-routeLCN+Route23awayfromtheextremelyintimidatingWellsWayandcreateaquietroutealongEdmundStandacrossBurgessParkaidedbyfilteredpermeabilityonEdmundStwhichwouldbeofadvantagetocyclists,pedestriansandthenewresidentsalike.Thoughtisalsoneededastohowtocreatealargecrossingarea/spacefromtheregeneratedElmingtonEstateintoBurgessPark(potentiallysimilartothatproposedbetweenCamberwellGreenandthepedestrianisedareaoftheMagistratesCourt).

2.CamberwellNewRoadShoppingParade.WebelievestronglythatencouragementshouldbegiventotheCamberwellNewRdasalocalshoppingcentre.EnormousnumbersofpeopleliveoneithersideoftheNewRoadandencouragingshoppingonfootandbycyclecanhelptocreateamorewalkableandliveableneighbourhood.Aswellasencouragingtheretention,developmentandexpansionofretailinthearea,weproposethatwalkingandcyclingroutesarecreatedinandaroundthisareaasfollows:

• betweenMyattsFieldsandBurgessPark.

• CamberwellTownCentreandKenningtonParkviaBethwinRdandacrossJohnRuskinSt.

3.Links.Wearekeentoseethefollowingadditionalwalking/cyclinglinksenvisagedintheSPD:

• DenmarkHillStntoPeckhamRyeStn.

• SceauxGds/CamberwellCollegeofArts/LucasGardenstoBurgessPark(seecommentsaboutEdmundStabove).

• RuskinParkandthenewlyimprovedGreendale.

>WWRTA–Wecallfortheretentionoftheexistingdesignatedcycle-routesintheareathatwereinthepreviousUDPandcallforanexpansionofthisnetwork.

Page 23: Camberwell regeneration Supplementary Planning Document (SPD) · 4 Introduction On 21 January Southwark Council launched the consultation of five projects as part of the £11m Camberwell

Camberwell regenerationSupplementary Planning Document

23

6. ShoppingWhat sort of improvements in the town centre would encourage you to shop in Camberwell more often?

Comments received

• Widerpavements,morepedestrianisation,widerrangeofshopsandservices.

• Provisionofsegregatedcyclelanesandcycleparking.

• Market/Independent/international/deli/choiceofsupermarket/coffee/breakfast/gastropub...

• Bettershops,visiblesecuritysoIfeelsafer.

• Theencouragementofindependentretailandfoodoutlets-themixatpresentisnottoobadbutwithurbanimprovementspleasedon’tletthebigbrandsmovein-itwillloseitscharm.

• Morehighqualityshops.Adeliforexample.Auniversityartshopmaybewherestudentscansellwhattheyproduceattheartschool(furniture,ceramicsandillustrations).

• Widerangeofshops-cheapfoodshopsaregreatbuttoomanyexpensivecornershopsandtakeaways.Morecafe’sorplacetotakeabreak.

• MoreshopslikeSophoclesbakeryandthefruitshopnextdoor.NOMOREbutchers,phoneandcheaptakeawaysshops.

• Widervarietyofshops.

• DoawaywithsomeoftheBettingshopsandMoney/Pawnbrokershopsandencouragemoreshopssellingtheessentialsinlife,thereisnownowheretobuyshoes.

• Ashoppingcentre,withshopslike:NewLook,DorothyPerkins,Marks&Spencer,Evans,whilststillkeepingitsrangeofethnicretailersliketheGreek,Africanandafghanshops.

• Iamallforfreedomofchoice,butdonotsupporthavingmorethanone:Bettingshop/PaydayLoanshop.MoremarketsandeventsontheGreen.ButterflyWalkdoesnotwork.ThiswilleventuallybeknockeddownandredesignedtosupportacommunitydestinationbutIdon’timaginethiswillhappeninmylifetime.

• Less/bettercontroltostopchainshops,bettingshopsandpawnshops.

• Lessbettingshops.Morelocalcraftsandopeningforlocalmakers.

• Moreshops,morelocalshops,lesschains.Anemphasisonsustainabilityandethicalproducts.

• Lessbettingshopsandmorerestaurantsandqualityshopsincludingdeli’s,children’sclothingshopsetc.

• Cleanstreets,leafystreets.

• getridofcardcorner!!!!.Lessbuses,lesschickenshops.

Page 24: Camberwell regeneration Supplementary Planning Document (SPD) · 4 Introduction On 21 January Southwark Council launched the consultation of five projects as part of the £11m Camberwell

24

• Morefunkyindependentshops.Morrisonshavingshorterqueues!ACamberwellshopsloyaltycard.Afewposherchainshops(ieM&S,Monsoon,etc).Betterhairdressers.

• IwouldliketoseeasmallbranchofBHSorMarks&Spencer.

• Betterqualityshops,perhapsacoupleofhighstreetnamesbutnottoomanyasindependentboutiquesandretailersadduniquecharacter.Wouldliketoseemoreupmarketclothes,homeware,foodandgiftshops.

• Bettershops.

• Weneedtostopturningunitsintochurchesastheyeliminateopportunitiesforothervaluableusessuchascinemas.Weneedtoattracthigherendshops.Weneedtoreducethenumberofchickenshopsandtakeaways.ThenumberofPayDayLoanshopsisjustdisgusting,theyshouldbebanned,orattheveryleastrestrictedinCamberwell.

• Idon’tthinkIwillevershopalotinCamberwell,butafewmorequalityindependentshopsmightdoitbutmainlymyinterestisinleisure/convenience.

• Moreindependentshops.

• Cleanerstreets.Nothavingtonegotiateroundlargerubbishbins.

• Stopgivingplanningpermissiontobettingshopsandcornershops,Camberwelldoesnotneedanymore,itneedsmoreattractivestreetscapeandacleanerenvironmentthatpeoplemightrespectmore.

• Varietyofshops,supportlocalbusinesses.

• Abookshop!LoanmethemoneyandI’llopenone?;-)

• BetterSaturdaymarket.

• WecannotsustainalltheshopunitsinCamberwelletc.,Changingsomeshopsintoresidentialwouldhelp.

• Moreinterestingsmallshops,lesstakeaways.WaitroseorMarks&Spencer!

• Freecarparkforthebigshop.

• Iliketheindependentshopsandrestaurants.Camberwelliswellservedforrestaurantsandcafes,butshopsarestilldominatedbybettingshops,pawnbrokersandnailsalons.Iwouldliketoseeawidervarietyofshops,Camberwellcouldevenbecomeashoppingdestinationknownforsmallindependentshops.Thefarmersmarketisgreat,andshouldbeexpanded.

• BetterrangeofshopsthatareNOTpoundshopsorhairdressers/nailsalons-thefoodisfantasticasitis.Irealisethisisafinancialconcern,butCamberwell,Ibelieve,hasthepotentialtoattractawiderrangeofsmallshopping-thereweresomeonDenmarkHillbuttheyhavecloseddown.WhatcanbedonetosustainthesekindsofshopsinCamberwell?

Page 25: Camberwell regeneration Supplementary Planning Document (SPD) · 4 Introduction On 21 January Southwark Council launched the consultation of five projects as part of the £11m Camberwell

Camberwell regenerationSupplementary Planning Document

25

• Cleanershops,somedesignanddecorationshopsaswellandbook/musicshops.Moreculturalplease!!

• IshopinCamberwellasfaraspossiblebutrangeonofferisverylimited-e.g.,nobookshop,petshoporwinemerchant’s.Morrisonssupermarketisthoroughlydepressing.Toomanygoodshops(ePaul’sOliveShop,WingTaisupermarket)haveclosed.

• Bettermanagementofbusqueuestoenablewalking.Signssayingwhatshopsarewhere.Moreindependentshops.Increasedvarietyofshops.

• Fasterchangingtrafficlightsforpedestrians.Amarket.Lesschickenshops.Morerecyclingfacilities.AndaplasticbagbaninCamberwell.

• NA-alreadydomostshoppingthere.

• Betterparkinganddecentshops.

• Lesstakeaways,betterqualityshops,tidyingtheplaceup,betterpavements.

• Same-thebitaboutthecrossroads.I’msurprisedthereisnogoodafrohairandcosmeticsshopinCamberwell-IoftengotoPeckhamorEastStreetinsteadforthisreason.

• Imposedesignconstraintsonshopfronts,iereducecheapandgarishsignage.Moresupportforindependentretailers.Camberwellneedsabigstatementofsomekindabuildingoramajorvenue.Camberwellneedstobeadestinationandnotjustacrossroads,forpeoplefromotherareas.

• Goodqualitystreetscape–nobodywantstovisitanareathatlooksrundown.

• Camberwellhasenoughdown-markethotfoodjoints-itneedsmoreupmarketeateriesandthatwouldhoisttherestoftheneighbourhoodtoo.So,nomoreplanningpermissionsforhamburgersandchickenwings,nomoreplanningpermissionforplacedthatwillrequirerubbishfacilitiesonthepavement.Thatwouldmakeanamazingdifferenceifflankedbyapolicyofensuringtheenvironmentalhealthofficialsclampdownonrubbishmanagement-youshouldbanstreetrubbishstockage.ItissoobviousI’malmostembarrassedtowriteit.Thefilthonthepavementsisunacceptable,butyouhaveallowedittopersistbynotdiscipliningthefoodoutlets-justlookatthenewrestaurantonthecornerofCamberwellGroveandimaginehowitwillsmellinsummer.Atthesametime,maybefixthedrainageofsurfacewaterwhenitrainsandthefactthatthereareguttersoffloadingwaterofallkindsdirectlyontopavements!!

Page 26: Camberwell regeneration Supplementary Planning Document (SPD) · 4 Introduction On 21 January Southwark Council launched the consultation of five projects as part of the £11m Camberwell

26

Should we try to restrict the hot food takeaways in the town centre?

Any further comments about shopping?

Comments received

• Buyexistingretail/convertlibrarytolowrentwithrestricteduse.Independent/international/deli/choiceofsupermarket/coffee/breakfast/gastropub.

• Youalsoneedtorestrictthebettingshopsandpornbrokers.

• Nomorebettingshopsplease.

• Andrestrictbettingshops.

• Camberwellisgoodforessentialsbutnotmuchelse.

• Thereisnotreallyanydecentcafe’swithoutsideseatinginthemainshoppingarea.

• Theshopsshouldbeencouraged/forcedtocreatebettersignage,suchasthecornerofCamberwellGreen(e.g.NoodleCity).

• Dependsonthequality-wouldpreferifyoulimitedgamblingshopsthatincreasesocialexclusion.LinkuptoCamberwellCollegeofArtsandallowstudentstosellinpopupshops.

• Restrictbettingshops.

• Onhotfoodtakeaways,andindeedcoldfoodtakeawaysandcigarettes,whatisneededisstrictercontroloflittering.

• Maybeamaximumquotafortypesoftake-awaywouldencouragemorediversity.

• Yes,wecantostopjunkfoodoutlets.ButCamberwellisabitofafoodiedestination,andwedon’twanttodoanythingthatwillstopthat!

Yes40 (52%)

No5 (6%)

Don’t know3(4%)

Blank29 (38%)

Page 27: Camberwell regeneration Supplementary Planning Document (SPD) · 4 Introduction On 21 January Southwark Council launched the consultation of five projects as part of the £11m Camberwell

Camberwell regenerationSupplementary Planning Document

27

• Iwouldliketoseesuchoutletsfinedforlitterleftoutsidetheirpremisesevenifitisdroppedbycustomers.

• Restrictfriedchickenshopsandbettingshops.

• Themainproblemwiththetakeawaysisthelittertheyproduce;I’msickofwalkingtoworkthroughchickenbonesanddiscardedpackaging.

• Pleasealsofindawaytodrivepaydaylendersoutofourtowncentre!

• Restrictpawnbrokersandbettingshops.

• Makesureyourestrictthenumberofbettingshopstheyareabiggermenacethatthetakeaways.

• Norestrictionsencouragegoodthingsratherthandiscouragebadthings.

• Restrictingbettingshopsandloanshopswouldbebetter.

• Ratherrestrictpoundshopsandhairdressing.

• Thisisincrediblyimportant,notonlyfortheimageofcamberwellbutforpublichealth,especiallychildren.Thereisalreadyahugeamount.Camberwellneedsorganicandhealthyfoodmovingin.

• Needfewerbettingshops,therearetoomanyandtherearealwaysslipslitteringtown.

• ABSOLUTELY.Badforlitter,badforregenerationandinvestment,badforpopulations’health.

• Actuallyyes,becausei’msuresomepeoplejustusethembecausetheyarethere,andtheyareterribleforpeople’shealth,especiallychildren.

^CllrsMW,NG,IW-Limitsonthenumberoffastfoodshops;Restrictingthenumberofoff-licences,unhealthytakeaways,bettingshopsandpaydayloanshopsinCamberwell,andencouragingamorediverseshoppingexperience.

7. Business and employmentWhat sort of employment do you think we need to encourage?

Comments received

• Smallscalelive/workactivitiese.g.tradespeople,craftspeople.

• Communitypubs.

• Creative/Design/Retail/Art/Start-up...

• Meaningfulemploymentforlongtermunemployed.

• Localskillsinfoodgrowing,adultandyoutheducationfacilitiesandpracticalskillsworkshops.

• Freelancers,Technologyandcreativeprofessionalssoontobepricedoutthecentre.Setuphubworkingandcreatesomelargeinnovativecheapspacesthatsmallstartupcompaniescanuse.LookatwhatLambethhasdonewithAtlanticmarketforexample.EncourageintheinnovatorsfromtheeastandOldStreet.

Page 28: Camberwell regeneration Supplementary Planning Document (SPD) · 4 Introduction On 21 January Southwark Council launched the consultation of five projects as part of the £11m Camberwell

28

• Permanent,skilledandwellpaid.

• Workshopswithapprenticetraining.

• HowaboutR&D,TechnologicalPlants.

• Moreretailjobs.Mostyouthswouldhavingone,helpsthemtogainresponsibilityandindependence.

• Theyouth/school/college/unileaversarestrugglingmorethanever.Weneedtoputstructuresinplacetosupportemploymentintheseareas.

• Morejobsforeveryone,butalsosmallaffordableworkshopsforsmallartistrybusinessesandmoreopportunitiesforyoungpeople.

• Sustainable,livingwage.

• Design,art

• Privateenterprise.

• Arangeofemploymentthatisgoingtobenefitthoseresidentsofallagesandparticularlythoselackinginqualifications.

• Arts,creativity,youth.

• I’mnotsure,butpreferablythosewhichwillofferemploymenttoyoungadults.

• Arts,culture,education,youthandcommunity.

• ManycharitiesseekacentrallocationonabudgetandIthinkthatcamberwellcouldofferthis,particularlyiftransportlinkstoWaterlooandtoWestminstercouldbeimproved.TherearemanyunitsalongCamberwellRoadthatcouldbeconvertedintosuchoffices.

• Iwouldfocusonusingsmallorunderutilisedpremisesforcreativeindustries/start-upspace,notnecessarilyrightinthetowncentrebutnearby.

• Retail/hospitalityisalsoobviouslyimportantintermsofbars,cafesandshops.

• Knowledge-based/smallscalecrafts.

• Localentrepreneurial.Linkstoroadartsandculturesector.

• Notenoughinformationtoknow.

• Moreprofessional.

• Morevariety,butwhatcanyoudo?

• Publicservices,charities.

• AnyandAll.

• Smallbusiness,communitywork,socialenterprise.

• Healthyshopswithorganicfood.Moretrendybusinessforyourpeople/professional.

Page 29: Camberwell regeneration Supplementary Planning Document (SPD) · 4 Introduction On 21 January Southwark Council launched the consultation of five projects as part of the £11m Camberwell

Camberwell regenerationSupplementary Planning Document

29

• Thirdsectorprojects.Gettingtheyouthoffthestreetsandintoactivities,whetherthisberadio,theatre,gardeningorpainting.

• YouthWorkandmentoring.Andhelpforsmallindependentbusinessestosurvivetherecessionheresothateverynicecafe,restaurantetcdoesn’tcloseandbecomeaMorleysChickenorNoodleCity,whichiswhatseemstobehappening.

• Mixedeconomy,focusonsocialenterprises,whichincludelocalpeopleanddisadvantagedgroups.

• Smallindependentbusiness–highend–IT,creative,design–linkstoartcollege.

What sort of improvements do you think would help to attract business to Camberwell?

Comments received

• Lesstraffic,morepedestrianisation,moregreenerysothatcamberwelllookslessrundownandlessofathroughtrafficjunction.Moreregularcollectionofcommercialwastewhichnowoverflowsfrombins.

• Provisionofsegregatedcyclelanesandcycleparking.

• Tram/Underground/PrivatetunnelunderWalworthfortraffic.

• Goodsecuritysonewbusinessesfeelsafetooperate.

• Astateruncoffeegrindhouse-bestinLondonandexcitingcheapworkspace.

• Allowbusinessestouseemptyplacesforlowrent;ratesdiscounts,makemoreofButterflyWalkshoppingcentre.Encourageabitofnightlifee.g.underrailwayarches.

• ReducingthetypeofshopsthatareprevalentinPeckhamHighStreet.Ensuringlandlordskeeptheirpropertiesinagoodstateofrepair.Widerfootpathsandcleanerstreets.

• Cheaperbusinessrates

• Parkingisatapremium,soturntheparkingareabehindButterflyWalkintoamultistoreycarpark.

• MakepeopleactuallywanttocometoCamberwellinsteadofpassingthrough.Givetheplaceanattractionthatcan’tbefoundinmanyplacesnearbyandpeoplewillcometoseeitanduseit.Forexample,ashoppingcentre,inner-citythemepark,BotanicalGardensaScience-Basedmuseum(freeofcourse!).ImprovethewholeideaofbeingaUniversity-town,exploitthefacttheKing’sCollegeisinCamberwell.

• Getridofgreedylandlordratesandcharges.

• BetterpromotionofthegreatthingsCamberwellhastooffer.

• Quickaccesstopopupshopsanduseemptyshops.

• Moreinvestmentintheareasuchasabusinesscentre.Nomoregovernment/councilfundedjobs,moreprivateenterprise.

Page 30: Camberwell regeneration Supplementary Planning Document (SPD) · 4 Introduction On 21 January Southwark Council launched the consultation of five projects as part of the £11m Camberwell

30

• Lowerrents.

• Moreencouragementforindependentretailers.

• Bettershopfronts,moretrees,lesstake-awaysandbettingshops.

• MarketitasthearthubofSouthLondon,acheaperandmorealternativedestinationforartists.

• Offstreetparking.

• Transportandretail.

• ATube,amorepleasantenvironment(lesslitteretc.),andsomepurposebuiltofficespaces.

• Transportwouldbeakeyfactor,butIworkwithsmallbusinessesandlargelytheyarelookingforcheap/flexiblespace.

• Reliablehigh-speedinternet.

• ATubestation.

• Supportforcleaningupshopfronts.• Supportforsmallsocialenterprise.• AtramorTubeorreopenCamberwellrailstation.

• Cleanerenvironment,betterlookingbuildings(snookerhallonCamberwellGreenbeinganexample).Theemploymentacademyshouldhelpherebecauseitisagoodcommitmenttogettingpeopleclosertothejobmarketandhenceincreasingthepossibilityofmoneyinpeople’spockettospend.Alsobusinessesshouldbeencouragedmoretotradeonline-anonlinepresencecanbringpeopletoyourshopregardlessofwhereyouarebasedandsobringsmorepeopleinCamberwellfromoutsideareas.

• Closebettingshops.

• Camberwellisalongwayoffbeingabusinesshub,Idon’tthinkthecouncilshouldbeaimingforthisyetorfocusingonattractingbusinesses.LookatthedisasterofthebuildingatElephantandCastle(theonewiththefansontop).WhointheirrightmindwouldpayapremiumpricetobelocatedinElephantandCastle?ThesamegoesforCamberwell.

• Ifwe’dgotthattramlinethatKenLivingstoneplannedandBorisscrapped.Thatwould’vebeenbrilliantforthisarea.

• SignalsthatCamberwellisfriendlytoartistsandsmallbusinesses.

• Goodqualitymaterials/finishes.TrainstationatCamberwellNewRoad.TubelinefromElephanttoCamberwellandPeckham.

Page 31: Camberwell regeneration Supplementary Planning Document (SPD) · 4 Introduction On 21 January Southwark Council launched the consultation of five projects as part of the £11m Camberwell

Camberwell regenerationSupplementary Planning Document

31

8. EnvironmentIs there additional guidance that SPD should include that is specific to Camberwell?

Any further comments about the environment? Comments received

• Aclearstatementthatyouwillmakesustainabletransportapriority.

• Yespleaselinkmoregreenspaces.ForexampleinthesouthofthearealargeareasofGreendaleplayingfieldsarewasteland,cut-offbytheSainsbury’sonDogKennelHill.PleasevisitthisplaceandlinkitbackuptoDogKennelhillwithpathsandwalks.ThatSainsbury’sshouldhaveneverbeenallowedonthegreenspace.TheareawouldhavemadeoneofLondon’sbestparks-butnowwehavetolookafterwhat’sleft.PersonallyIthinkSainsbury’sshouldbemadetoputacanopyovertheircarparkwithagreenroof.AllowingthatexpanseofTarmacinzone2isunforgivable.

• Lotsofrubbishonthestreets.

• Ifullysupporttheworkonlinkinggreenspaces,andwouldalsoliketoseeafocusonlitterandairquality.

• Recyclinginpublicareas.

• Thecouncilcannotclaimtohave“highenvironmentalstandardsforenvironmentalperformance”whenitiscuttingdownsomanytreesintheboroughaspartof“regeneration”projects.

^CllrsMW,NG,IW-Strongerenforcementpowersoverderelictlandinprivatehands(e.g.VestryRoadoppositetheoldTownHallandthecornerofHavilStreet/SouthamptonWay).

>D’EnysfordTRA-WearewritingtoyouasCo-ChairsoftheD’EynsfordEstateTenants&ResidentsAssociationandaslocalresidents.WewouldliketoformallystateourfullsupportfortheproposalputforwardtopedestrianiseDatchelorPlace.Wehaveheardfromseverallocalresidentsinourtworecentgeneral/committeemeetingsabouthowDatchelorPlacehasbeenabusedbydrugdealers/users,drunk

Yes8 (11%)

No4 (5%)

Don’t know24(31%)

Blank41 (53%)

Page 32: Camberwell regeneration Supplementary Planning Document (SPD) · 4 Introduction On 21 January Southwark Council launched the consultation of five projects as part of the £11m Camberwell

32

people,peopledumpingrubbishanddriversparkingillegallyformanyyearsnow.ThisisarealconcerntousasChairsoftheT&RAthatconnectsdirectlywiththisstreet.Asitistheentrancetoourestate,manyofourresidentshavetowalkthroughDatchelorPlacetogettotheirhomesandwefeelitwouldbemuchsafer,usefulandmorewelcomingifitwaspavedoverasproposed.Itwouldalsobegreatifwecouldturnthisintoagreenarea.

9. HousingAre there housing issues specific to Camberwell that we should look at in the SPD?

Any further comments about community facilities?

Comments received

• Housingispoorlymaintainedandstreet/estatelightingisasifaprisonstate.

• Alotofpropertiesareinneedofupgradeandlocalestatesshouldhavebettersecuritytocutcrime.

• Ican’tbuyaflatonLettsomestatebecausethemortgagecompanysaystoolittleoftheestateisnotprivatelyowned.Perhapssellsomemoreandpeoplecanstartcaringfortheirspacethemselves-Iwouldliketo!

• TheestatebetweenDonPhelanCloseandMaryDatchelorCloseislowrisebutitisoppressive.Itisworsethatmostoftheestatesthecounciliscurrentlyreplacinginthatitisimpermeable,carorientatedandusingtotallythewrongmaterialsforthearea.Itneedstobeurgentlyimprovedwithmoreopenthroughroutes.

• Thereisaneedforgoodqualityhousing-somebuildingsarerundown.

• morerefurbishmentofrundownrentedproperties.

• Weneedless‘affordablehousing’andmorerealcouncilhomes.

• Consultleaseholdersproperly.

• Provisionofmoreaffordablehousing,perhapsusinglongtermunoccupiedprivatehousing.

Yes21 (27%)

No4 (5%)

Don’t know19 (25%)

Blank33 (43%)

Page 33: Camberwell regeneration Supplementary Planning Document (SPD) · 4 Introduction On 21 January Southwark Council launched the consultation of five projects as part of the £11m Camberwell

Camberwell regenerationSupplementary Planning Document

33

• WhileIsupportthemovetobuildhighqualityhousing,itmustbenotedthatitwillputanadditionalstrainontheinfrastructureandinparticularonbusesandthealreadycongestedroads.Therearealotofuglyblocksofflatsthatarenotefficientlyusingtheirgroundareaandbeforebuildingonopenspaces,renovatingtheseshouldbeconsidered.Thiswouldalsoimprovethelookofthestreets.

• Potentialforshopresidents’actioninoverallpockets.

• SomeveryBADhousingonDalwoodStreet,SedgmoorPlace,HavilStreetareas.

• Affordablehousingistooexpensiveformanylocalpeople,weneedsocialhousing.

• Whataboutanti-socialbehaviour?Wecanseeattitudesrubbingoffontoyoungchildrenfromadults.

• Councilflatsinthearealookdodgy.

• I’mhorrifiedbythenumberoflocal-authorityownedslumdwellingsinCamberwell(e.g.inmyownstreet,BenhillRoad).Providingdecenthousingshouldbethecouncil’sfirstpriorityratherthan“regenerating”publicareas.

• Lackofcontactwithtenants.

• Encouragingresidentialuseovershops.Therearetoomanystudentswhopreferthiskindofspace.

>WWRTA–WeopposedisproportionalnewhousingbeingplacedinCamberwellandaskthatallareasoftheboroughshouldtaketheirshare.Wealsoopposeareturntothefailedhigh-risepoliciesofthe1960/70sandsocallforhousinginourareatobeamaximumof8storeysandtheyshouldfollowatraditionalstreet-scapehuman-scaleformat.HighdensityhousingofthissorthassuccessfullybeendevelopedincentralLondonareassuchasKensingtonandChelseawhichhelpedcommunitycohesion.

^CllrsMW,NG,IW-Highlevelsofsocialandaffordablehousing;

10. Community facilitiesIs there particular information on community facilities that the SPD should provide guidance on?

Yes12 (16%) No

4 (5%)

Don’t know15 (19%)

Blank46 (60%)

Page 34: Camberwell regeneration Supplementary Planning Document (SPD) · 4 Introduction On 21 January Southwark Council launched the consultation of five projects as part of the £11m Camberwell

34

Any further comments about community facilities?

Comments received

• Provisionofsegregatedcyclelanesandcycleparking.

• Thereisaneedforacinema.

• Multipurposelocationsencouraginglocalprojects/businessesofferingcheapfacilitiesshouldbeencouraged.

• Moreattractionsforthecommunity.Areligiousyouthclubmaybe(mostCamberwellian’sarereligious).Haveeventsandtownparties!

• Camberwellcouldbenefitfromawellfundedanddesignedcommunityspace.

• Thereneedstobeanartscentre/events/space/communityspaceavailablenotjusttounder20s.Churchesseemtobeabletohavethespacesbutthecommunitydoesn’ti.e.theBingohall.

• Movingthelibraryawayfromthecentreis,Iknow,alostcause.Iassumetheeffectonusewillbemonitored.

• Theleisurecentreishidden.

• Providegrantsorsupportforgroupslookingtosetupinthearea,andgivethemspaceonthewebsitetoadvertisethis,sopeopleknowabout.Thereshouldbeabadmintonclubattheleisurecentre.

• Thenewlibrarywillbeverywelcome.Leisurecentresshouldalsobemoreaffordable-currentlypay£15formembershipattheFitness4LessgyminSouthwark-councilgymsmustbefarmorecompetitive.

• Moreseating.

• Themorecommunityfacilitiesthebetter.

• Cinema,concerts,communityactivitiescentre.

• SouthLondonGalleryrunabrilliantkidsclubonmyestate,butSouthwarkCouncilchargesthemcommercialrentforthespace.Ithinkitshouldbeeasierforthingslikethistobesetupbecausetheymakethecommunitysomuchsaferandimproveprospectsforthechildren.

Page 35: Camberwell regeneration Supplementary Planning Document (SPD) · 4 Introduction On 21 January Southwark Council launched the consultation of five projects as part of the £11m Camberwell

Camberwell regenerationSupplementary Planning Document

35

11. Consultation first stageThis is the first stage of consultation on the Camberwell SPD, so our main aim is to capture local ideas about the key issues in Camberwell.

If there are any particular issues that you think we have missed and that should be considered in the Camberwell SPD, please let us know.

Any further comments about particular issues?

Comments received

• Theareaisbeginningtolookverypoorandrundown,sotheseimprovementswillbegreatlywelcomedinthearea.

• OneparticulareyesoreformeistheEuroBinsthatfrequentthebusstopareaonDenmarkHillnearLoveWalk.Theyarealwaysinthewaywhenyouaretryingtogeton/offaBus.

• Camberwellhasmanygreatthingstooffer,butsuffersfromaco-ordinatedplan.

• Needmorepoliceonthebeat.Intwoyears,IcancountononehandthenumberofpoliceofficersIhaveseenwalkingthestreets.

• TheButterflyWalkShoppingCentrecouldbeputtobetteruse.

• Camberwelltowncentreneedstofeelmorelikeatowncentre-adestination,ratherthansomewherethatyoujustpassthrough.theGreenprojectisagreatstepforward,butsomepublicartwouldbeagreataddition,aswouldsomedestinationshopsandservices,suchasacinema.

• Transport,transport,transport.Let’susetheCIL(acrossSouthwark)tocontributetotheBakerlooLineextension.

• ThenorthsideofCamberwellChurchStreet/PeckhamRoadhassomehadhousing(privatelandlords??)needsattention/replanning.

• PensionersCentreisanexcellentresource,butcoulddowithbetterpremises.

• TheCamberwellBeauty(Butterfly)AClockTower.

• Needmorecommunityofficers-outsidemyflatonCamberwellGreenpeoplestandanddrinkallday-theyleavecansinbushesandlitterthearea,whichisnotgreat.

• WouldliketoseeenforcementactiononpeoplewhohaveputsatellitedishesupontheVictoriantownhousesintheGrosvenorestate.Alsoissuewithmetalrailingstobuildingswithinconservationarea.

• Ifindthatthereisalackofplaceswhereyoucangoandshareanactivitywithyourchildren.Apartfromswimming,there’snotalotwecandotogether.Everythingiseitherforchildren,orforadultsbutrarelyboth.TherearelotsofthingsI’dliketodowithmychild,e.g.yoga,dance,learningnewskillsetc.Shewantsthistoo.Afamilylearningcentrewouldbeuniqueandbrilliant.

Page 36: Camberwell regeneration Supplementary Planning Document (SPD) · 4 Introduction On 21 January Southwark Council launched the consultation of five projects as part of the £11m Camberwell

36

• *PRS–Backin2010,anumberofuswastedsomesixmonthsofourlivesandofourfreetimereadingthroughtheCoreStrategy,makingcommentsontheCoreStrategy,emailingandtalkingtothecouncilabouttheCoreStrategy,attendingtheExaminationinPublicoftheCoreStrategy,inthevainhopethecouncilwouldlisten.Itdidn’t.

Overthelastcoupleofyears,anumberofpeoplewastedaninordinateamountoftimereadingthroughtheElephantandCastleSupplementaryPlanningDocument(SPD),makingcommentsonit,emailingandtalkingtothecouncilaboutit,inthevainhopethecouncilwouldlisten.Itdidn’t.What’smore,thecouncildisregardedtheirownplanningpoliciesandtheirownSPDwhentheyapprovedthetwoplanningapplicationsfortheHeygateearlierthisyear.IsCamberwellanydifferent?I’myettoseeanyproofofit.

NOTE:Responsestoquestionshavebeenincludedinthestatisticsofthereportandcommentsapplicabletoissuesraisedhavebeenextractedandincluded.

References to abbreviated stakeholder group responsesNOTE:Responsestoquestionshavebeenincludedinthestatisticsofthereport,commentsapplicabletoissuesraisedhavebeenextractedandadded,andadditionalcommentsprovidedareavailabletoreadintheappendicessection.

*PRS–People’sRepublicofSouthwark–LilianaDmitrovic^SLS-1–SouthwarkLivingStreets–JeremyLeach+Sus–Sustrans–FrancescaLeadlay>WWRTA–WellsWayResidentsandTenantsAssociation–DonnachadhMcCarthy<FoBP–FriendsofBurgessPark–SusanCrisp,Chair*PRN–PeckhamResidentsNetwork–EileenConn^CllrsMW,NG,IW-CllrMarkWilliams,CllrNormaGibbesandCllrIanWingfield>D’EnysfordTRA–KateTraynorandConnieGray,Co-ChairsofD’EynsfordEstateT&RA

Respondents by emailTherewere26respondentsthatprovidedemailcontributionstotheconsultationfromlocalresidentsand

stakeholdergroups;thesearenamedbelowinorderofdatereceived.

Whereemailsreceiveddidnotactuallyrespondtothequestionstheyhavenotbeenincludedinthisreport.

AstheyaddressedwiderissuesontheCamberwellSPDprojecttheyhavebeencapturedintheappendices

andareavailabletodownloadfromthewebsite.

Page 37: Camberwell regeneration Supplementary Planning Document (SPD) · 4 Introduction On 21 January Southwark Council launched the consultation of five projects as part of the £11m Camberwell

37

Camberwell regenerationSupplementary Planning Document

Visit Camberwell, initiative by a local businessman

Page 38: Camberwell regeneration Supplementary Planning Document (SPD) · 4 Introduction On 21 January Southwark Council launched the consultation of five projects as part of the £11m Camberwell

38

Register to be kept informedIfyouwerenotabletotakepartinthetwelveweekconsultationandwanttobekeptinformedoftheCamberwellSPDprojectyoucanstillregisteronline.Byregisteringyourcontactdetailsyouwillbesentaregularenewsletterandnotifiedofthestagesforthedurationofthisproject.Pleasevisitwww.southwark.gov.uk/camberwellregen

What happens next?

ThesearetheestimatedstagesoftheCamberwellSPDproject.

2013

JanuarytoApril 12weekstakeholderengagementandconsultation

Spring Reviewconsultationresponses,collatefurtherevidence,preparesustainabilityscopingreport

Earlysummer Consultationonthesustainabilityscopingreport

Latesummer Considerresponsesreceived,preparethedraftSPD

SeptembertoDecember ConsultationonthedraftSPD,sustainabilityappriasal,equalitiesanalysisandconsultationplan

2014

JanuarytoMarch ConsiderresponsesontheSPD,preparethefinalSPD,sustainabilityappraisal,equalitiesanalysisandconsultationreport

April AdoptionoftheSPD

Appendices PleasevisitthewebsitetodownloadthesePDFdocuments

• SPDexplanatoryboardfortheproject

• CamberwellSPDVisionandIssuesdocument–15pages

• SusanCrisponbehalfofFriendsofBurgessPark(onepage)

• JonathanGregsondocument(13pages)

• AnthonyKyrke-Smith(onepage)

• LisaRussellBSc(Hons)MRTPIonbehalfofHighcross,landowneroftheCamberwellBusinessCentre

Page 39: Camberwell regeneration Supplementary Planning Document (SPD) · 4 Introduction On 21 January Southwark Council launched the consultation of five projects as part of the £11m Camberwell

Camberwell regenerationSupplementary Planning Document

39

Visit Camberwell, initiative by a local businessman

OnOn

On