  • CADANGAN KERJA-KERJA NAIKTARAF & BAIKPULIH BANGUNAN PARLIMEN MALAYSIA (FASA 3B)- 2 November 2018

    2-11-2018 Mukasurat 1

    1. EMAJUAN BLOK AHLI PARLIMEN

    Blok MP - Pandangan Keseluruhan

    Blok MP - Pandangan Sudut A

    Blok MP - Pandangan Sudut B

    A B

    C D

  • CADANGAN KERJA-KERJA NAIKTARAF & BAIKPULIH BANGUNAN PARLIMEN MALAYSIA (FASA 3B)- 2 November 2018

    2-11-2018 Mukasurat 2

    Blok MP - Pandangan Sudut C

    Blok MP - Pandangan Sudut D

    Blok MP - Pandangan Belakang

  • CADANGAN KERJA-KERJA NAIKTARAF & BAIKPULIH BANGUNAN PARLIMEN MALAYSIA (FASA 3B)- 2 November 2018

    2-11-2018 Mukasurat 3

    Aras Tanah - Perpustakaan Aras Tanah - Perpustakaan

    Aras Tanah - Pemasangan Longkang Perimeter Aras Tanah - Pemasangan Longkang Perimeter

    Aras 1 Blok MP – Mock up toilet Aras 1 Blok MP – MP Lounge

  • CADANGAN KERJA-KERJA NAIKTARAF & BAIKPULIH BANGUNAN PARLIMEN MALAYSIA (FASA 3B)- 2 November 2018

    2-11-2018 Mukasurat 4

    Aras 2 - MP LOUNGE Aras 2 – KORIDOR (Pemasangan Tiles)

    Aras 3 – Koridor Bilik Kementerian Aras 3 – Bilik Kementerian

    Aras 4 – Bahagian Senggara dan Fasiliti Lanskap Aras 4 – Bahagian Pentadbiran

  • CADANGAN KERJA-KERJA NAIKTARAF & BAIKPULIH BANGUNAN PARLIMEN MALAYSIA (FASA 3B)- 2 November 2018

    2-11-2018 Mukasurat 5

    Aras Bumbung – Pemasangan Solar Panel Aras Lift Motor – Pemasangan Solar Panel

    Aras Bumbung – Pemasangan Panel Strip Siling Aras Lift Motor _ Pemasangan Copper tape

    Link Bridge

  • CADANGAN KERJA-KERJA NAIKTARAF & BAIKPULIH BANGUNAN PARLIMEN MALAYSIA (FASA 3B)- 2 November 2018

    2-11-2018 Mukasurat 6

    2. KEMAJUAN DEWAN SERBAGUNA

    Pandangan Keseluruhan

    Pandangan Hadapan

    A

    B

  • CADANGAN KERJA-KERJA NAIKTARAF & BAIKPULIH BANGUNAN PARLIMEN MALAYSIA (FASA 3B)- 2 November 2018

    2-11-2018 Mukasurat 7

    Pandangan Belakang

    Dewan - Pandangan Sudut A Dewan - Pandangan Sudut B

  • CADANGAN KERJA-KERJA NAIKTARAF & BAIKPULIH BANGUNAN PARLIMEN MALAYSIA (FASA 3B)- 2 November 2018

    2-11-2018 Mukasurat 8

    3. KEMAJUAN KERJA-KERJA LUAR/ SEKITAR BANGUNAN

    OSD 1- Kerja Penuangan Konkrit untuk papak CDS inlet

    OSD 1 – Pemasangan rebar dan formwork untuk dinding CDS inlet

    Tempat Letak Bas Berbumbung Key Stone Wall

    Pagar Dekoratif Pagar Dekoratif

  • CADANGAN KERJA-KERJA NAIKTARAF & BAIKPULIH BANGUNAN PARLIMEN MALAYSIA (FASA 3B)- 2 November 2018

    2-11-2018 Mukasurat 9

    Nursery – Papak Tempat Letak Kereta Terbuka