PROPOSED 18 MW BIOMASS BASED THERMAL POWER PLANT AT VILL. SEDHASINGH WALA, TEHSIL- JAITU, DISTRICT- FARIDKOT, PUNJAB BY M/S SUKHBIR AGRO ENERGY LIMITED EXECUTIVE SUMMARY EXECUTIVE SUMMARY Of DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT For PROPOSED 18 MW BIOMASS BASED THERMAL POWER PLANTAT VILLAGE SEDHA SINGH WALA, TEHSIL-JAITO, DISTRICT-FARIDKOT, PUNJAB BY M/S SUKHBIR AGRO ENERGY LIMITED SMS Envocare Ltd Page 1

BY M/S SUKHBIR AGRO ENERGY LIMITED

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

ExeSumSukhbir(EngPbi)PROPOSED 18 MW BIOMASS BASED THERMAL POWER PLANT AT VILL. SEDHASINGH WALA, TEHSIL- JAITU,
DISTRICT- FARIDKOT, PUNJAB BY M/S SUKHBIR AGRO ENERGY LIMITED
EXECUTIVE SUMMARY
EXECUTIVE SUMMARY
For
PROPOSED 18 MW BIOMASS BASED THERMAL POWER PLANTAT VILLAGE SEDHA SINGH WALA, TEHSIL-JAITO, DISTRICT-FARIDKOT,
PUNJAB
SMS Envocare Ltd Page 1
PROPOSED 18 MW BIOMASS BASED THERMAL POWER PLANT AT VILL. SEDHASINGH WALA, TEHSIL- JAITU,
DISTRICT- FARIDKOT, PUNJAB BY M/S SUKHBIR AGRO ENERGY LIMITED
EXECUTIVE SUMMARY
Sukhbir Agro Energy Limited
1(d ) Thermal Power Plants as per EIA notification 2006
3. Category ‘B’ Category (> 15 MW plants based on biomass fuel)
4. Location Khasara No. 206, 207, 214, 170, 171, 204, 205,571/172,
159,160, 161/1, 173, 174,572/172 at Village Sedha
Singh Wala, Tehsil-Jaito, District-Faridkot, Punjab
5. Toposheet No. 44J/14, 44 J/15, 44 N/2 & 44 N/3
6. Capacity 1 X18 MW Biomass Based Thermal Power Plant
7. Name of Project
8. Area Requirement Particulars Area in SQM
Built-up Land 16500
Road Development 12000
Green Belt 35200.73
Storage Biomass 37000
Open Areas 5853
Total Area 106553.73
Capacity of Cooling Towers. Evaporation Loss will
depend on season and will vary from 3-4%. Considering
3.5% loss, make-up water requirement will be 210
CuM/Hr. After adding requirement of Water for Green
Belt Development & Human consumption, total
requirement of Water has been estimated at 225
CuM/Hr.
11. Man Power 123(Skilled/Semi-Skilled/Unskilled)
12. Project Cost 141.25Crore
SMS Envocare Ltd Page 2
PROPOSED 18 MW BIOMASS BASED THERMAL POWER PLANT AT VILL. SEDHASINGH WALA, TEHSIL- JAITU,
DISTRICT- FARIDKOT, PUNJAB BY M/S SUKHBIR AGRO ENERGY LIMITED
EXECUTIVE SUMMARY
B. TYPE OF PROJECT
This is proposed Biomass based Thermal Power plant of 18 MW capacity which is located at
Village - at Village Sedha Singh Wala, Tehsil-Jaito, District-Faridkot, Punjab. Paddy Straw
will be used as raw material for the proposed project.As per the Schedule attached to the EIA
Notification 2006 the proposed project is covered under Project or Activity of 1(d), namely
“Thermal Power Plants” requiring prior Environmental Clearance (EC). This proposed project
categorized as Category B (>15 MW plants based on biomass fuel) requiring Environmental
Clearance from State Environmental Impact Assessment Authority (SEIAA), Government of
Punjab.
C. CHRONOLOGY OF PROJECT
Sr. No. Particulars Date 1 Online Submission of Application 23rd April, 2018
2 TOR Presentation to SEAC, Government of Punjab 21st June, 2018
3 Approval of ToR 16 th July, 2018
4 Base Line Environmental Monitoring 1st March 2018 to 31st May, 2018
5 Public Hearing To be conducted
D. BASELINE ENVIRONMENTAL STUDIES Baseline environmental studies were conducted during the pre-monsoon season (1stMarch
2018 to 31stMay, 2018) to cover the entire season as per the requirement and also to have
representative conditions during monitoring and sampling.Site area covers the 10 km radial
study area in Survey of India (SOI) Topo-Sheet No.44J/14, 44 J/15, 44 N/2 & 44 N/3.
Summary of analysis results are given below:
Parameter Location Results Standards
PM10: 34.93 to 40.42 µg/m3
SOx : 9.95 to 15.93
PM2.5 : 60 µg/m3
PM10 : 100 µg/m3
SOx : 80 µg/m3
NOx : 80 µg/m3
DISTRICT- FARIDKOT, PUNJAB BY M/S SUKHBIR AGRO ENERGY LIMITED
EXECUTIVE SUMMARY
6.5 to 8.5
Soil Quality 8 Location pH: 8.42 to 9.45
Organic Matter: 0.4 % to 5.42 %.
Total Nitrogen: 580.32 to
-
-
-
-
E. ENVIRONMENTAL MANAGEMENT PLAN
Various pollution controlling devises and measures are integral part of project and incorporated
with the project component like ESP, Bag Filters, Stacks, and Effluent Treatment Plant etc. Apart
from these; other pollution mitigation measures and management plans are mandatory to run the
plant ecofriendly manner. Brief of the same are given below.
Air Pollution Mitigation and Management
Transportation of construction material in closed containers/ trucks
Regular water sprinkling in entire construction site, along the road etc.
Thick greenbelt shall be developed in and around the project site.
Transportation of raw material in closed container is slurry format.
Maintenance of vehicles, ensuring PUC certificates.
Storage of excavated material in a war to avoid the direct contact with blowing air.
The construction activities shall be carried out during day time only
The equipment design shall be chosen for least suspension of the dust/ sand into
atmosphere.
Alltheinternalroadsshallbeconcreted /
asphaltedtoreducethefugitivedustduetovehicularmovement.
A dust control plan shall be implemented viz. regular spraying of water on daily basis
on the road and periphery of the project site and dust porn area in the project site
SMS Envocare Ltd Page 4
PROPOSED 18 MW BIOMASS BASED THERMAL POWER PLANT AT VILL. SEDHASINGH WALA, TEHSIL- JAITU,
DISTRICT- FARIDKOT, PUNJAB BY M/S SUKHBIR AGRO ENERGY LIMITED
EXECUTIVE SUMMARY
The sand and other such dispersible material shall be stored at site for minimum
working period
The emission are temporary and not expected to contribute significantly to the ambient
air and shall be within prescribed limits for industrial regions by National Ambient Air
Quality Standards (NAAQS)
Manufacturers and suppliers of machine/equipment shall be selected to ensure that
these machine /equipment meet the desired noise/vibration standards
The operators working in the high-noise areas shall be provided with ear-muffs/ear-
plugs
Acoustic laggings and silencers shall be provided in equipment wherever
required
Transportation of Raw material & Final Product shall be ensured in day time only
Proper green belt shall be develop which helps to reduce the noise level
Noise level can be reduced by stopping leakages from various steam lines, compressed
air lines and other high pressure equipment
Padding at various locations to avoid rattling due to vibration
The air compressor, process air blower, pneumatic valves shall be provided with
acoustic enclosure
Other than the regular maintenance of the various equipment, ear plugs/muffs are
recommended for the personnel working close to the noise generating units
All the openings like covers, partitions shall be designed properly
Inlet and outlet mufflers shall be provided which are easy to design and construct
All rotating items shall be well lubricated and provided with enclosures as far as
possible to reduce noise transmission
Extensive vibration monitoring system shall be provided to check and reduce
vibrations. Vibration isolators shall be provided to reduce vibration and noise
wherever possible
SMS Envocare Ltd Page 5
PROPOSED 18 MW BIOMASS BASED THERMAL POWER PLANT AT VILL. SEDHASINGH WALA, TEHSIL- JAITU,
DISTRICT- FARIDKOT, PUNJAB BY M/S SUKHBIR AGRO ENERGY LIMITED
EXECUTIVE SUMMARY
Raw water from adjacent canal shall be tapped & stored into raw water reservoir. Raw water
from underground reservoir shall be transferred to silting chamber, flash mixer & further
transferred to Clariflocculator. Pretreated water from Clariflocculator shall be transferred to
clarified water storage tank. Clarified water from tank shall be transferred to cooling tower
basin through cooling tower make up pump. Wall/tonner mounted chlorinator system having
adequate capacity for raw water & CW chlorination shall be provided for continuous dosing in
cooling tower Fore bay. Side stream filter shall be provided to reduce total suspended solid in a
tapping point from cooling water return pipe line.
Proper separate drainage system will be developed for Storm Water and Effluent
Water for plantation shall be supplied from waste water
No ground water will be abstracted as required water will be source from nearby canal
Drinking water facilities shall be provided
Water for other non-portable drinking purpose shall be ensures
Solid & Hazardous Waste Management
Construction waste shall be managed as per Construction and demolition waste
management rule, 2016
Municipal solid waste shall be stored separately. Organic waste shall be managed by
vermicomposting/ composting
Non organic waste shall be stored separately and sent to the authorized agency
Water for plantation shall be supplied from waste water
Construction material shall be stored separately
Handling of waste shall be done in a way so as to avoid loss of material during handling
Biomedical waste shall be managed as per New Biomedical Waste Management Rule,
2016
Electronic waste shall be managed as per E-Waste Management Rule, 2016
Other hazardous waste shall be managed as per Hazardous and Other Wastes
(Management & Trans-boundary Movement) Rule, 2016
Occupational Health & Safety Management
SMS Envocare Ltd Page 6
PROPOSED 18 MW BIOMASS BASED THERMAL POWER PLANT AT VILL. SEDHASINGH WALA, TEHSIL- JAITU,
DISTRICT- FARIDKOT, PUNJAB BY M/S SUKHBIR AGRO ENERGY LIMITED
EXECUTIVE SUMMARY
The Project design and development has been planned with utmost care and all provisions
have been made for the safety and security of the plant and personnel. For protection of the
facility against fire, explosion or gas leak, all the blocks and yards shall be equipped with
required firefighting arrangement including Fire hydrants, DCP and CO2 Fire extinguishers.
They shall be placed at various places after proper identification of risk from the area/s. At
the time of emergency, mobile fire station shall be sourced from nearby fire station.
Adequate parking space, widening of road and turning radius shall also be implemented.
Green Belt Development Plan
Green belt will be developed along plot boundary for width of 3 to 5 meters using varieties
of plant species suitable to local environment. Total 33% of Total plot area has been secured
for Green Belt Development. Species type will be selected based on soil characteristics, and
other related aspects to mitigate pollution effects due to noise, odor, dust etc. Major
advantage of green belt is development of buffer zone and visual barrier for surrounding
locality.
Cost of Environmental Management Plan
The approximate cost for the EMP will be 125.0 Lakhs towards capital investment and
about 60.0 Lakhs/year towards recurring cost per annum. Details of the same are given
below:
Capital Cost
2 Solid & Hazardous Waste Management 20.0
3 Water & Waste Water Management 20.0
4 Air Pollution Management including instrumentation 30.0
5 Occupational Health & Safety 25.0
6 RWH & Miscellaneous Cost 20.0
Total 125.0
Recurring Cost
LAKHS/year)
2 Environmental Monitoring 3.0
5 Air Pollution Management 15.0
SMS Envocare Ltd Page 7
PROPOSED 18 MW BIOMASS BASED THERMAL POWER PLANT AT VILL. SEDHASINGH WALA, TEHSIL- JAITU,
DISTRICT- FARIDKOT, PUNJAB BY M/S SUKHBIR AGRO ENERGY LIMITED
EXECUTIVE SUMMARY
Total 60
F. CONCLUSION
Project shall create direct & indirect employment opportunities to the people residing at
surrounding region. Different types of people will be recruited for proposed unit based on the
basic qualification as skilled, unskilled or semiskilled. As the project needs good amount of
workforce of non-technical and technical nature, they are being made available from the
nearby villages. Migration of highly education and skilled experience people will result in
increase of literacy in the surrounding villages. Project will also enhance the prospects of
employment to the nearby people. Additional government revenues are generated from taxes,
duties and other fees. Additional benefit of the project also includes considerable growth of the
industrial and commercial activities in the region and the state. With setting up of the
proposed 18 MW Biomass Power Plant with 100% Paddy Straw, there will be generation of
employment both direct to the Plant and in Biomass Collection Centers & indirect to the
Contractors for collection & delivery of Paddy straw to Collection Centers / Plant.
SMS Envocare Ltd Page 8
w?;L ;[ypho n?ro' n?Boih fbwfNv(SAEL) tZb' gq;skfts pkfJUwk; p/;v Eowb gkto gbKN
fgzv ;/Yk f;zx tkbk sfj;hb i?s' fiabQk cohde'N gzikp fty/,
nfXekfos ;zy/g
nfXekfos ;zy/g
vokcN tksktoB gqGkt w[bKeD fog'oN
d/ tk;s/ gq;skfts 18 w?rk tkN pkfJUwk; nkXkfos Eowb gkto gbKN
fgzv ;/Yk f;zx tkbk sfj;hb i?s' fiabQk cohde'N ^ gzikp, fty/
d[nkok w?;oia ;[ypho n?ro' n?Boih fbwfNv
w?;L ;[ypho n?ro' n?Boih fbwfNv(SAEL) tZb' gq;skfts pkfJUwk; p/;v Eowb gkto gbKN
fgzv ;/Yk f;zx tkbk sfj;hb i?s' fiabQk cohde'N gzikp fty/,
nfXekfos ;zy/g
1 gq'i?eN dk BK w?;oia ;[ypho n?ro' n?Boih fbwfNv dk 18 w?rk tkN pkfJUwk; nkXkfos Eowb gkto gbKN
2 1(d) Eowb gkto gbKN; EIA B'Nhfce/;aB 2006 d/ sfjs 3 e?Nkroh "B" e?Nkroh ( > 15 w?rktkN gbKN; pkfJUwk; JhAXB s/ nkXkfos) 4 tkfenk y;ok BzL 206, 207, 214, 170, 171, 204, 205, 571/172, 159, 160, 161/1,
173, 174, 572/172 tkfenk fgzv ;/Yk f;zx tkbk sfj;hb i?s' fiabQk cohde'N ^ gzikp, fty/
5 N'g';ahN BzL 44 J /14 & 44 J/15, 44 N/2 & 44 N/3
6 ;woZEk (eg?;Nh) 1 X 18 w?rktkN = 18 w?rktkN pkfJUwk; nkXkfos Eowb gkto gbKN 7 g'qi?eN cow dk BK w?;oia ;[ypho n?ro' n?Boih fbwfNv 8 b'VhAdk y/so t/ot/ y/so tor whNoK ftu
iawhB 16500.00
y[Zbk y/so 5853.00
e[Zb y/so 106553.73
9 b'VhAdk gkDh mzv/ gkDh dk ;oe{b/;aB j't/rkL 6000 CuM/Hr (e{fbzr NktoK dh eg?;Nh) T[vD;ahb xkNk ;hiaB s/ fBoGo eo/rk ns/ 3 - 4 % sZe pdb/rk, 3.5 % xkN/ B{z fXnkB ftu oZyd/ j'J/ b'VhAd/ gkDh dh fsnkoh j't/rh 210 CuM/Hr
joh gZNh d/ ftek; ns/ wB[Zyh ygs bJh b'VhAd/ gkDh B{z i'VB T[gozs, e[Zb b'VhAdk gkDh 225 CuM/Hr dk nB[wkB brkfJnk frnk j?.
10 b'VhAdh ;aesh eZ[b gkto T[sgkdB dk 10 s'A 11 %
11 nkdw ;aesh 123 (f;Zfyns, xZN^f;Zfyns ns/ nD^f;Zfyns) 12 g'qi?eN bkrs 141.25 eo'V
phL gq'i?eN dh fe;w fJj gq / ? Z z / z;skfts pkfJUwk; p;v Eowb gkto gbKN 18 wrktkN ;woEk tkbk, i' fe fgv ;Yk f;x tkbk sfj;hb i?s' fiabQk cohde' z / ? q q ? / M'B/$XkB dh gokbh B{z eZ / wkb tZ ' tofsnk N, gikp fty ;fEs j, g;skfts gkieN tk;s u iA ikt/ / aB 2006 Bkb BZEh ;a { / sfjs gq 'i?eN Bz g'i?eN iK rfsftXh 1(d) d nXhB rk. EIA B'fNfce; fvTb d ;skfts gq { q / oZ ? Z A "Eowb gkto gbKN;" fi; bJh nrkT{ ?; (EC) b'Vhdh j?fynk frnk j, Bkw ti' A gfonktoB ebhnoA A .
z
w?;L ;[ypho n?ro' n?Boih fbwfNv(SAEL) tZb' gq;skfts pkfJUwk; p/;v Eowb gkto gbKN
fgzv ;/Yk f;zx tkbk sfj;hb i?s' fiabQk cohde'N gzikp fty/,
nfXekfos ;zy/g
gq 'i?eN fi;B{z fe gd;a gfonktoB gGkt w[bKeD nEkoNh (SEIAA), gikp ;oeko tZb'A gfonktoB;skfts gq q / q z ebhnoA?; b'VhAdh j?, B{z (Pq/Dh "B" pk:'wk; JhXB nkXkfos 15 w?rktkN s'A tX)Z d/ s"o s/ Pq/DhpZX ehsk frnk j?.
;hH g'qi?eN dh eqwpZX xNBkeqwL bVh t/otk fwsh 1 nkBbkJhB noiah dkyb 23 ngq?b 2018 2 SEAC, gzikp ;oeko B{z TOR g/;a eoBh 21 i{B 2018 3 ToR dh wzia{oh 16 i[bkJh 2018 4 p/;bkJhB gfonktoB dh fBrokBh 1 wkou 2018 s'A 31 wJh 2018 5 iBse ;[DtkJh nk:'fis ehsk ikDk j?
vhL p/ ?;bkJhB gfonktoB nfXnB
p/ ? [ { / ;? aB B{z eto eoB s/ fBrokBh s/ z /;bkJhB gfonktoB nfXnB b'V wskpe go ; Bw{BkeoB (wkBhnfor ns ;A? gfbzr) d"okB B{z ;fEshnK B{z gqkgs eoB bJh wkB;{B ;?;aB (1 wkou 2018 s'A 31 wJh 2018) d"okB eotkJh rJh. ;ot/ nkc fz z ' ' ahN BzL 44J/14, 44 J/15, 44 N/2 & 44 N/3 sfjs ;kJhN yso/ ;otJfvnk (SOI) Ng; / nkc
Jfvnk (SOI) ftu 10 feLwhL o B yso ftu ;fz z vhnb/ nfXn? / akfwb jz[dk j?.
ft;ab;/ aD Bshi/ dk ;ko jmK/ fdskZ ik fojk jL? wkgdzv ;EkB Bshik wkBe ftnkge jtk r[DtZsk
8 ;EkB PM2.5 : 13.98 to 18.2 pg/m3 PM10: 34.93 to 40.42 pg/m3 SOx : 9.95 to 15.93 pg/m3 NOx : 14.95 to 20.72 pg/m3
PM2.5 : 60 pg/m3 PM10 : 100 pg/m3 SOx : 80 pg/m3 NOx : 80 pg/m3
X[Bh gZXo 8 ;EkB Day: 47.18- 60.28 dB(A) Night: 34.51-42.83 dB(A)
T[d:'fre fdBL 70 dB(A)
oks:
45 dB(A)
ib r[DtZsk iawhBh gkDh 8 ;EkB pH : 7.7 to 8.16
TDS : 1100 to 1840 mg/1 TH : 200 to 652 mg/1.
6.5 to 8.5 2000 mg/1
sb s/ gkDh 2 ;EkB (d' Bw{B/ 1000 whNo d/ ck;b/ s'A)
pH : 7.69 to 7.54 TDS : US: 180 to 274 mg/1,
TH: 138 to 142 mg/L
fwZNh r[DtZsk 8 ;EkB pH: 8.42 to 9.45 Organic Matter: 0.4 % to 5.42 %.
w?;L ;[ypho n?ro' n?Boih fbwfNv(SAEL) tZb' gq;skfts pkfJUwk; p/;v Eowb gkto gbKN
fgzv ;/Yk f;zx tkbk sfj;hb i?s' fiabQk cohde'N gzikp fty/,
nfXekfos ;zy/g
992.64kg/Ha Potassium: 20to 98 Kg/Ha. Phosphorus: 0.1 to 25.19 Kg/Ha
. ,
, .
. .

-- / .
-- ' .
-- .
-- - .
-- -, . -- , . -- .
-- - / . -- .
-- ' ' - .
dispersible -- ' .
.
(NAAQS) .
w?;L ;[ypho n?ro' n?Boih fbwfNv(SAEL) tZb' gq;skfts pkfJUwk; p/;v Eowb gkto gbKN
fgzv ;/Yk f;zx tkbk sfj;hb i?s' fiabQk cohde'N gzikp fty/,
nfXekfos ;zy/g

-- / - . / - / . - - / .
-- - . -- . -- .
-- , , , , .
-- ' .
-- , ,
-- - ,
/ .
-- , . --- .
-- . -- .
.
:
. , .
Clariflocculator .
.
/ , .
w?;L ;[ypho n?ro' n?Boih fbwfNv(SAEL) tZb' gq;skfts pkfJUwk; p/;v Eowb gkto gbKN
fgzv ;/Yk f;zx tkbk sfj;hb i?s' fiabQk cohde'N gzikp fty/,
nfXekfos ;zy/g
.
-- . -- , .
-- ' , . - . -- - .

--- - - , 2016
. -- . - /
. --- - ' . -- . -- . -- . -- 2016 , . -- - , 2016 . -- ( - ) , 2016
.

. ,
, ,
, .
w?;L ;[ypho n?ro' n?Boih fbwfNv(SAEL) tZb' gq;skfts pkfJUwk; p/;v Eowb gkto gbKN
fgzv ;/Yk f;zx tkbk sfj;hb i?s' fiabQk cohde'N gzikp fty/,
nfXekfos ;zy/g
/ ' . ,
. , - .

3 5 . 33% . , ,
. .

125.0 60.0 / . :
2.18:
( / ) 1 10.0
2 - 20.0
3 20.0
4 30.0
5 25.0
6 RWH 20.0
125.0

( / ) 1 2.0
2 3.0
3 25.0
4 5.0
w?;L ;[ypho n?ro' n?Boih fbwfNv(SAEL) tZb' gq;skfts pkfJUwk; p/;v Eowb gkto gbKN
fgzv ;/Yk f;zx tkbk sfj;hb i?s' fiabQk cohde'N gzikp fty/,
nfXekfos ;zy/g
5 15.0
6 5.0
7 5.0
60.0
f;ZNkL
fJj g'iq eN? ;pXsz fJbke/ d/ b'eK bJh f;X/Z ns/ nf;ZX/ o{g ftu oiarko' d/ w"e/ g?dk eo ;edk j.? gq;skfts :{ / w[Z Z / nkXko s/ f;Z Z Z / nD^f;Z zfBN bJh nbZr nbZr soK d Ybh f;fynk d fyns, xN^f;fyns ns fyns ekfwnK B{ u[ / / fe g'i?eN B{z fJe uz / r?o seBheh gZ zfDnk iktrk. fitA q rh wksok ftu seBheh ns yh ewK bJh ekwroK dh iao{ ? ' fe B/V/ d/ fgz ' TgbGX eotkJ/ ikDr/. TZ / fBg[B ftneshnK d gbkfJB d/ f;Nos j, i vK ftuA [ uh[ f;fynk ns z / Z / tZ / fgz Z Z 'ieN oiarko d/ BiaohJ/ B{z th B/V/ d/ b'eK tXkJ/i' Bkb brd vK ftu f;fynk dk ;so tX/rk. gq ? ' rk. nfsfoes ;oekoh wkbhnk th N?e;K fvTNhia ns/ j' / o{ z tZ ? ' / 'i?eN d/ nfsfoes bkGK { o ch;K d g B{ X gdk jtrk. gq ftu fJbke/ ns/ oki ftu ;Bnsh ns/ ewo;ahnb rshftXhnK dk jD' tkbk ftek; th ;akwb j.? gq;skfts 18 w?rk tkN pkfJUwk; gkto gbKN 100# M' ' Z / ftu jh ns/B/ dh gokbh Bkb, dBK soK, fJe sK f;X/ gbKN d pkfJUwk; e[ aB ;?NoK TZ / ns/ nf;X/ og Bkb m/ dkoK bJh i' M'B/ dh gokbh dh ebe;aB ns fvbhtoh, b?e; A s Z { e/ [ ? / e[ aB ;?NoK iK gbKN s/ iarko g? ' iktrk .b?e; A eoBr/, bJh o' dk j /
Executive Summary_FARIDLOT.pdf