23
By Isela Canava Lead Civil Engineer, Construction Office

By Isela Canava - ibwc.gov · Isela F. Canava Lead Civil Engineer Phone: 915-832-4748 Email: [email protected]. Title: Microsoft PowerPoint - Citizens Forum July 14 2016 final

  • Upload
    others

  • View
    11

  • Download
    0

Embed Size (px)

Citation preview

Page 1: By Isela Canava - ibwc.gov · Isela F. Canava Lead Civil Engineer Phone: 915-832-4748 Email: isela.canava@ibwc.gov. Title: Microsoft PowerPoint - Citizens Forum July 14 2016 final

By Isela CanavaLead Civil Engineer, Construction Office

Page 2: By Isela Canava - ibwc.gov · Isela F. Canava Lead Civil Engineer Phone: 915-832-4748 Email: isela.canava@ibwc.gov. Title: Microsoft PowerPoint - Citizens Forum July 14 2016 final

Rehabilitation of Vado East Levee Awarded September 2015 - $10.7 Million Meridian Contracting, Inc. Notice to Proceed Issued on October 27, 2015 ~ 95% Complete Expect Substantial

Completion July 2016

Page 3: By Isela Canava - ibwc.gov · Isela F. Canava Lead Civil Engineer Phone: 915-832-4748 Email: isela.canava@ibwc.gov. Title: Microsoft PowerPoint - Citizens Forum July 14 2016 final

American Canal Lower Reach Replacement Awarded in September 2014 ($17.8 Million) Terminated for Convenience in March 15, 2016 Design to be revised taking into account record

drawings and re-solicited for construction. Overchute at College Arroyo was built.

Page 4: By Isela Canava - ibwc.gov · Isela F. Canava Lead Civil Engineer Phone: 915-832-4748 Email: isela.canava@ibwc.gov. Title: Microsoft PowerPoint - Citizens Forum July 14 2016 final

Projects to be Awarded in FY 2016 American Canal Upper Segment Replacement Wasteways #1 & #2 Flood Control Improvements Sunland Park Levee Silt Fence Removal

FY 2017/FY 2018 – Tentatively (Assumed Funding) Courchesne Phase 1A Flood Control Improvements Courchesne Phase 1B Flood Control Improvements American Canal Lower Reach Replacement Operational Improvements of American Dam and Canal

Gates

FY 2018/FY 2019 – Tentatively (Assumed Funding) American Canal Middle Reach Replacement

Page 5: By Isela Canava - ibwc.gov · Isela F. Canava Lead Civil Engineer Phone: 915-832-4748 Email: isela.canava@ibwc.gov. Title: Microsoft PowerPoint - Citizens Forum July 14 2016 final

Project: Replacement of the upper segment of American Canal with open channel sections. The project extends nearly 0.5 mile and will involve remediation of contaminated soil and/or groundwater.

Magnitude: Above $10,000,000 Location: El Paso, TX Planned: FY 2016 Status: Preparing

Solicitation Package

Upper segment view from American Dam

Page 6: By Isela Canava - ibwc.gov · Isela F. Canava Lead Civil Engineer Phone: 915-832-4748 Email: isela.canava@ibwc.gov. Title: Microsoft PowerPoint - Citizens Forum July 14 2016 final

Project: Reconstruction of existing wasteway structures crossing the Rio Grande levee with new gated structures.

Magnitude: Between $1,000,000 and $5,000,000. Locations: Socorro, TX and San Elizario, TX Planned: FY 2016 Status: Preparing Solicitation Package

Wasteway #1 Wasteway #2

Page 7: By Isela Canava - ibwc.gov · Isela F. Canava Lead Civil Engineer Phone: 915-832-4748 Email: isela.canava@ibwc.gov. Title: Microsoft PowerPoint - Citizens Forum July 14 2016 final

Project: Removal of the silt fence that remained after the construction of the Sunland Park Levee project.

Magnitude: Between $50,000 and $250,000. Location: El Paso County, Texas and Dona Ana County,

New Mexico Status: Proposals

have been received and under review

Silt Fence along Sunland Park levee

Page 8: By Isela Canava - ibwc.gov · Isela F. Canava Lead Civil Engineer Phone: 915-832-4748 Email: isela.canava@ibwc.gov. Title: Microsoft PowerPoint - Citizens Forum July 14 2016 final

Project: Construction of levee embankment and foundation improvements on west bank of river totaling 1.2 miles.

Magnitude: Between $5,000,000 and $10,000,000 Locations: Sunland Park City, NM and El Paso, TX Planned: FY 2017 Status: Finalizing

Design

Page 9: By Isela Canava - ibwc.gov · Isela F. Canava Lead Civil Engineer Phone: 915-832-4748 Email: isela.canava@ibwc.gov. Title: Microsoft PowerPoint - Citizens Forum July 14 2016 final

Project: Construction of levee embankment and foundation improvements on east bank of river totaling 0.8 mile.

Magnitude: Between $5,000,000 and $10,000,000 Location: El Paso, TX Planned: FY 2017/FY 2018 Status: Finalizing Design & Preparing Permitting Documents

Page 10: By Isela Canava - ibwc.gov · Isela F. Canava Lead Civil Engineer Phone: 915-832-4748 Email: isela.canava@ibwc.gov. Title: Microsoft PowerPoint - Citizens Forum July 14 2016 final

Project: Improvements to the gates at American Dam and Canal

Magnitude: Between $250,000 and $500,000. Location: El Paso, TX Planned: FY 2017 Status: Preparing Design Procurement Documents

American Dam Gates American Canal Gates

Page 11: By Isela Canava - ibwc.gov · Isela F. Canava Lead Civil Engineer Phone: 915-832-4748 Email: isela.canava@ibwc.gov. Title: Microsoft PowerPoint - Citizens Forum July 14 2016 final

Project: Replacement of the middle segment of American Canal with a closed conduit section. Project extends approximately 0.6 mile and will likely involve remediation of contaminated soil and/or groundwater.

Magnitude: Above $10,000,000

Middle segment view from Paisano Drive (US Highway 85)

Location: El Paso, TX Planned: FY

2018/2019 Status: In Design

Page 12: By Isela Canava - ibwc.gov · Isela F. Canava Lead Civil Engineer Phone: 915-832-4748 Email: isela.canava@ibwc.gov. Title: Microsoft PowerPoint - Citizens Forum July 14 2016 final
Page 13: By Isela Canava - ibwc.gov · Isela F. Canava Lead Civil Engineer Phone: 915-832-4748 Email: isela.canava@ibwc.gov. Title: Microsoft PowerPoint - Citizens Forum July 14 2016 final

Rio Grande Canalization Project (RGCP) From Percha Dam to American Dam◦ Reach of 105.4 miles

Rectification Reach From American Dam to Little Box Canyon◦ Reach of 93.6 miles

Page 14: By Isela Canava - ibwc.gov · Isela F. Canava Lead Civil Engineer Phone: 915-832-4748 Email: isela.canava@ibwc.gov. Title: Microsoft PowerPoint - Citizens Forum July 14 2016 final

The USIBWC has rehabilitated several sections of the Rio Grande Canalization Project and Rectification Project levees. Initial funding was from the American Recovery and Reinvestment Act (2009).

USIBWC continues to fund levee projects with annual funding allotted for construction of such projects.

The USIBWC has completed the submittals of several packages representing rehabilitated levee segments to FEMA for levee accreditation.

Page 15: By Isela Canava - ibwc.gov · Isela F. Canava Lead Civil Engineer Phone: 915-832-4748 Email: isela.canava@ibwc.gov. Title: Microsoft PowerPoint - Citizens Forum July 14 2016 final

A FEMA accredited levee system is a levee system that meets the requirements of Title 44, Chapter 1, Section 65.10 of the Code of Federal Regulations (44 CFR 65.10) ‘Mapping of Areas Protected by Levee Systems’

Such a levee system is shown on the Federal Insurance Rate Map (FIRM) as providing protection from the 1-percent-annual chance flood (100-year flood).

Page 16: By Isela Canava - ibwc.gov · Isela F. Canava Lead Civil Engineer Phone: 915-832-4748 Email: isela.canava@ibwc.gov. Title: Microsoft PowerPoint - Citizens Forum July 14 2016 final

Must Meet 44 CFR 65.10 Standards. These include:

Hydraulic Models to Determine Water Surface Elevations (WSEL) and Establish Minimum Top of Levee Elevations (TOLE) – with Freeboard

Geotechnical Analysis Embankment Stability Interior Drainage Analysis Operations & Maintenance (O&M) Plans

Page 17: By Isela Canava - ibwc.gov · Isela F. Canava Lead Civil Engineer Phone: 915-832-4748 Email: isela.canava@ibwc.gov. Title: Microsoft PowerPoint - Citizens Forum July 14 2016 final

Canalization Project Canutillo Phase I, Doña Ana County Hatch West Levee, Doña Ana County Mesilla Phase I, Doña Ana County Mesilla Phase II, Doña Ana County

Rectification Project International Dam to Riverside Weir, El Paso County

Draft FEMA review comments were received for above levee segments and addressed in December 2015 on all reaches except Mesilla Phase II. Comments for Mesilla Phase II are under review.

Page 18: By Isela Canava - ibwc.gov · Isela F. Canava Lead Civil Engineer Phone: 915-832-4748 Email: isela.canava@ibwc.gov. Title: Microsoft PowerPoint - Citizens Forum July 14 2016 final

Nature of comments - Freeboard- Geotechnical Analysis- Embankment Stability- Tie-Ins- Hydraulic Independence- Interior Drainage Analysis- Site Specific O&M Plans- Structure Closures

Page 19: By Isela Canava - ibwc.gov · Isela F. Canava Lead Civil Engineer Phone: 915-832-4748 Email: isela.canava@ibwc.gov. Title: Microsoft PowerPoint - Citizens Forum July 14 2016 final

Sept 9-10, 2015: Meeting with FEMA and communities in El Paso and Las Cruces where FEMA explained Seclusion being adopted for this area

FEMA may seclude levee area to prevent ongoing projects from being stopped.

Levee area will reflect current effective floodplain.

The areas will be revisited when new levee procedures are final based on data and consultation with stakeholders.

Short Term Solution

USIBWC continues to provide response to FEMA comments on levee submittals

Page 20: By Isela Canava - ibwc.gov · Isela F. Canava Lead Civil Engineer Phone: 915-832-4748 Email: isela.canava@ibwc.gov. Title: Microsoft PowerPoint - Citizens Forum July 14 2016 final

LAMP = Levee Analysis and Mapping Procedure for Non-Accredited Levees

Takes into account that non-accredited levees may still provide a measure of flood protection.

Mapping Techniques (Natural Valley being considered by FEMA for Canalization and Rectification Projects)

Interim flood maps with Zone D

Will be replaced with floodplains that fully account for levee protection after levee accreditation

Page 21: By Isela Canava - ibwc.gov · Isela F. Canava Lead Civil Engineer Phone: 915-832-4748 Email: isela.canava@ibwc.gov. Title: Microsoft PowerPoint - Citizens Forum July 14 2016 final

*Hydraulic modeling without levee impeding flow

Page 22: By Isela Canava - ibwc.gov · Isela F. Canava Lead Civil Engineer Phone: 915-832-4748 Email: isela.canava@ibwc.gov. Title: Microsoft PowerPoint - Citizens Forum July 14 2016 final

FEMA will eventually shift their focus and begin focusing on levees in this area.

If levees are not accredited at that point, FEMA will be using LAMP to analyze the levees in the Upper Rio Grande Flood Control Project

In prior meetings, FEMA has suggested the importance of starting a levee district to aid in the levee accreditation process

One entity is required to submit all items for accreditation to FEMA to include the interior drainage.