Water Management Improvement Project 75362Project ID: P040712
Implementing Agency: BWDB
Original Revised
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Central Zone, BWDB, Dhaka
1 BWDB: WMIP/SIMT/
MYM/W -1
Re-excavation of Sutia khal from km .000- 6.120,
Goraikuthi khal from km 0.000- km.7.680, Lakri
beelar khal from km. 0.000- km.3.520, Dublakurir
khal from km 0.000 -1.193 (U/S of Dublakuri
WCS) Km.0.000- km.3.378( D/S of Dublakuri
WCS) kachua khal from km.0.000- km.0.800 total
= km 22.691 in Dublakuri Katakhali sub- project in
Upazilla Mymensingh Sadar and Muktagacha,
district mymensingh in connection with Water
Management Improvement Project (WMIP)during
2011- 2012
km.
No.
Drainage
channel =
22.70 km. (P)
Water Control
structure = 2
Nos. (P)
140.00 NCB/OTM PPA /BG No *Jan '12
Feb '12
Feb '12 Feb '12
May'12
Jun '12 M/S Mamun
Enterprise
2 BWDB: WMIP/ OMPI/
MYM/W -2
Re-excavation of 7.095 Bannyarl khal, including
repair of Bannyar khal regulator in Bannyar khal
Sub project in Upazilla Muktagacha, District
Mymensingh under Water Management
Improvement Project (WMIP) during 2011- 2012.
km.
No.
Drainage
channel = 7.00
km. (P)
Water Control
structure = 1
No. (P)
80.00 NCB/OTM PPA /BG No Jan '12
Feb '12
Feb '12 Feb '12
May'12
Jun '12 AKM Abdul
Kuddus
Shaikh
3 BWDB: WMIP/OMPI/
MYM /W-3
Re-excavation of Bokabeel khal, Kuiser khal and
Godar khal, total 5.720 km. including repair of
Bokabeel Regulator under Bokabeel Sub project in
Upazilla Trishal, District Mymensingh under Water
Management Improvement Project (WMIP) during
2011- 2012.
km.
No.
Drainage
channel = 6.00
km. (P)
Water Control
structure = 1
No. (P)
60.00 NCB/OTM BG No Jan '12
Feb '12
Feb '12 Feb '12
May'12
Jun '12 Md.Eunus &
Brothers
Quantity Estimated
Price in Tk.
(Lac)
(Actual
Contract
price in
Contract
Currency)
Mymenshingh O&M Division
BWDB: Procurement Plan for Works: WMIP (S-1) 2011-2012IDA Credit # 4359 BD and the Netherlands Trust Fund Number TF 094800
Unit Planned
Date of
invitation
of Tender
(Date of
receipt)
Planned
Date of
Contract
signing
(Actual
date of
Contract
signing)
Planned
Date of
completion
(Actual date
of
completion)
Name of
Contractor
Contract Package
Number
Sl.
No.
Prog. of
Proc.as of
Feb, 2011
(Physical %/
Fin. Lac Tk.)
Name of Work Procedure
/Method
PPA/BG Prior
Review
(Yes / No)
Planned
Date of Bid
Evaluation
(Actual
Evaluation
completion
date)
Page 1
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Original Revised
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Quantity Estimated
Price in Tk.
(Lac)
(Actual
Contract
price in
Contract
Currency)
Unit Planned
Date of
invitation
of Tender
(Date of
receipt)
Planned
Date of
Contract
signing
(Actual
date of
Contract
signing)
Planned
Date of
completion
(Actual date
of
completion)
Name of
Contractor
Contract Package
Number
Sl.
No.
Prog. of
Proc.as of
Feb, 2011
(Physical %/
Fin. Lac Tk.)
Name of Work Procedure
/Method
PPA/BG Prior
Review
(Yes / No)
Planned
Date of Bid
Evaluation
(Actual
Evaluation
completion
date)
4 BWDB: WMIP/ OMPI/
MYM/W-4
Re- excavation of i) Andijuri khal ii) jamaipara khal
total 2.930 km. including repair of 1) Bahatra
regulator 2)Chullar khal regulator, 3) Suktajuri
regulator 4) Andijuri regulator and 5) Jamaipara
regulator under Suktajuri Pilot scheme Upazilla
Bhalukal, District Myensingh in connection with
Water Management Improvement Project WMIP
during the FY 2011-2012.
km.
No.
Drainage
channel = 3.00
km. (P)
Water Control
structure = 5
No. (P)
60.00 NCB/OTM PPA /BG No Jan '12
Feb '12
Feb '12 Feb '12
May'12
Jun '12 M/S Fair
Constructio
n
Sub-Total 340.00
Page 2
Original Revised
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Quantity Estimated
Price in Tk.
(Lac)
(Actual
Contract
price in
Contract
Currency)
Unit Planned
Date of
invitation
of Tender
(Date of
receipt)
Planned
Date of
Contract
signing
(Actual
date of
Contract
signing)
Planned
Date of
completion
(Actual date
of
completion)
Name of
Contractor
Contract Package
Number
Sl.
No.
Prog. of
Proc.as of
Feb, 2011
(Physical %/
Fin. Lac Tk.)
Name of Work Procedure
/Method
PPA/BG Prior
Review
(Yes / No)
Planned
Date of Bid
Evaluation
(Actual
Evaluation
completion
date)
5 BWDB: WMIP/ OMPI/
KISHORE/W-1
Re-excavation of 4.100 km Adampur khal,
including repair of Adampur regulator in Adampur
Sub-project in Upazilla Katiadi, District Kishoregonj
under Water Management Improvement Project
(WMIP) during 2011- 2012.
km.
No.
Drainage
channel =
4.100 km. (P)
Water Control
structure = 1
No. (P)
80.00 NCB/OTM PPA /BG No Jan '12
Feb '12
Feb '12
Mar'12
Feb '12 Jun '12 M/S Mamun
Enterprise
6 BWDB: WMIP/ OMPI/
KISHORE/W-2
Re-excavation of khal total 8.785 km including
repair of Gazaria khal regulator of Gazaria Beel
Scheme.
80.00 NCB/OTM PPA /BG No Jan '12
Feb '12
Feb '12
Mar'12
Feb '12 Jun '12 Shahil
Enterprise
7 BWDB: WMIP/ SIMT/
KISHORE/W-3
Re-sectioning of embankment in between km
0.000 to km 12.000 total 8.80 Km repair of 2 no.
WCS in Charfaradi Jungalis sub project in
connection with Water Management Improvement
Project WMIP during the FY 2011-2012.
km.
No.
Embankment =
10.500 km. (P)
300.00 NCB/OTM PPA /BG No Jan '12
Feb '12
Feb '12
Mar'12
Feb '12 Dec'12 Md.Eunus &
Brothers
Sub-Total 460.00
Netrakona O&M Division
BWDB: WMIP/ SIMTI/
NETRA/W-1
8 Lot No. BWDB:
WMIP/ SIMTI/
NETRA/W-1A
Re-sectioning of Embankment from km 0.000 to
km 13.300 Total 13.000 km in Thakurakuna Flood
Control and Drainage Improvement Project under
Upazilla Netrakona Sadar, District Netrakona in
connection with Water Management Improvement
Project (WMIP) during 2011- 2012.
km.
No.
Embankment =
13.300 km. (P)
Water Control
structure = 3
No. (P)
210.00 NCB/OTM PPA /BG No Jan '12
Feb '12
Feb '12 Feb '12
May'12
Dec'12 Md.Eunus &
Brothers
Kishoreganj WD Division
Page 3
Original Revised
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Quantity Estimated
Price in Tk.
(Lac)
(Actual
Contract
price in
Contract
Currency)
Unit Planned
Date of
invitation
of Tender
(Date of
receipt)
Planned
Date of
Contract
signing
(Actual
date of
Contract
signing)
Planned
Date of
completion
(Actual date
of
completion)
Name of
Contractor
Contract Package
Number
Sl.
No.
Prog. of
Proc.as of
Feb, 2011
(Physical %/
Fin. Lac Tk.)
Name of Work Procedure
/Method
PPA/BG Prior
Review
(Yes / No)
Planned
Date of Bid
Evaluation
(Actual
Evaluation
completion
date)
Lot No. BWDB:
WMIP/ SIMTI/
NETRA/W-1B
Re-excavation of drainage channel (MD-1, MD-2 &
MD-3) total 6.25 km of & repair of 3 no. regulator in
Thakurakuna Flood Control and drainage
Improvement Project in connection with Water
Management Improvement Project (WMIP) during
2011- 2012
Drainage
channel =
6.250 km. (P)
104.00 NCB/OTM PPA /BG No Jan '12
Feb '12
Feb '12 Feb '12
May'12
May '12 M/S Belabo
Traders
Sub-Total 314.00
Page 4
Original Revised
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Quantity Estimated
Price in Tk.
(Lac)
(Actual
Contract
price in
Contract
Currency)
Unit Planned
Date of
invitation
of Tender
(Date of
receipt)
Planned
Date of
Contract
signing
(Actual
date of
Contract
signing)
Planned
Date of
completion
(Actual date
of
completion)
Name of
Contractor
Contract Package
Number
Sl.
No.
Prog. of
Proc.as of
Feb, 2011
(Physical %/
Fin. Lac Tk.)
Name of Work Procedure
/Method
PPA/BG Prior
Review
(Yes / No)
Planned
Date of Bid
Evaluation
(Actual
Evaluation
completion
date)
BWDB: WMIP/SIMT/
NAR/ W-1
9 Lot No. BWDB:
WMIP/SIMT/ NAR/ W-
1A
Re-excavation of intake channel from km 0.000 to
0.110, Removal of slushy earth from reservoir, re-
excavation of No. 1, No 2 Drainage channel and,
No. 2 lateral channel of No. 1 main channel total
Km. 6.500 km. ; repairing and maintenance of
northern irrigation canal in between km 0 to 4.500,
No1 main canal from km 0.000 to 2.170 and No1
sub lateral canal from km 0.000 to 0.670 total
7.000 km; Ferro cement lining works of Northern
Irrigation Canal in between km. 0.000 to 2.500
total 0.414 km, of North Rupgonj Water
Conservancy Project under Water Management
Project (WMIP) during 2011-2012.
km.
Intake channel
and drainage
channel = 6.50
km (P).
Canal dyke
including canal
= 7.00 km (P).
Ferro cement
linning = 0.414
km (F).
220.00 NCB/OTM PPA /BG No Jan '11
Feb '12
Feb '12
Mar'12
Feb '12
May'12
Dec'12 Kh.Mainul
Islam
Lot No. BWDB:
WMIP/SIMT/ NAR/ W-
1B
Repairing and maintenance of General Irrigation
Canal from km. 0.000 to 1.200, Southern Irrigation
Canal in between km 0.000 to km. 4.500, No. 2
main canal from km 0.000 to km. 2.850 total =
10.952 km. Ferro cement lining of Southern
Irrigation Canal in between km.1.200 to km.1.800
total = 0.448 km. and construction of 5 nos Foot
bridges in different chainages of North Rupgonj
Water Conservancy Project under Water
Management Improvement (WMIP) during 2011-
2012.
km.
No.
Irrigation canal
= 11.00 km.
Ferro cement
linning = 0.448
Km.
Foot bridge =
5 Nos.
204.00 NCB/OTM PPA /BG No Jan '11
Feb '12
Feb '12
Mar'12
Feb '12
May'12
Dec'12 M/S
Associated
Builders
10 BWDB: WMIP/SIMT/
NAR/ W-2
Re-excavation of Dhaor khal from km 0.000 to
6.500 total 6.500 km in Dhaor Bridge sub-project in
connection with Water Management Improvement
project during 2011-2012.
km. Drainage
channel 6.500
(P)
80.00 NCB/OTM PPA /BG No Jan '11
Feb '12
Feb '12
Mar'12
Feb '12
May'12
Jun '12 M/S Rafique
Constructio
n
Sub-Total 504.00
1618.00Total of Central Zone
Narsingdi O&M Division
Page 5
Original Revised
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Quantity Estimated
Price in Tk.
(Lac)
(Actual
Contract
price in
Contract
Currency)
Unit Planned
Date of
invitation
of Tender
(Date of
receipt)
Planned
Date of
Contract
signing
(Actual
date of
Contract
signing)
Planned
Date of
completion
(Actual date
of
completion)
Name of
Contractor
Contract Package
Number
Sl.
No.
Prog. of
Proc.as of
Feb, 2011
(Physical %/
Fin. Lac Tk.)
Name of Work Procedure
/Method
PPA/BG Prior
Review
(Yes / No)
Planned
Date of Bid
Evaluation
(Actual
Evaluation
completion
date)
Southern Zone, BWDB Barisal
11 BWDB: WMIP/ SIMT/
PAT /W-1
Reconstruction and Rehabilitation of Embankment
from km 0.000 to km 20.000 Total 20.000 km &
Construction of 10 Nos. inlet at km. 0.90, km. 2.45,
km. 4.30, km. 12.10, km. 14.50, Km. 16.40 km.
18.30, km. 26.20 km. 32.55 & km. 35.90 including
Repair of 5 Nos. WCS (P) at different location in
Muradia-Kalagachia Sub-Project under WMIP
during the year 2011-2012.
km. Embkt 20.000
(P)
Pipe inlets (F)
= 10
WCS (P) = 5
450.00 NCB/OTM PPA /BG No Jan '11
Feb '12
Feb '12 Feb '12
April'12
Dec'12 Mohiuddin
Ahmed
12 BWDB: WMIP/ SIMT/
PAT /W-2
Re-sectioning of Embankment in between km
2.000 to km 38.000 total 8.500 km including
Construction of 10 nos. Flushing inlet in km 3.56,
km 4.92, km 8.92, km 12.42, km 17.25, km 22.50,
km 30.12, km 33.40, km 35.50 & km 36.70 & Re-
excavation of Madhobkhali, Dakhin Amragachia,
Gazi Bari, Kasinath & Sailatala Khal total 16.00 km
in Subidkhali Madhobkhali Sub-project under
Water Management Improvement Project (WMIP)
during 2011-12 & 2012-13.
km. Embkt 8.500
(P)
Pipe inlets (F)
= 10
Drainage
Channel =
16.00 km (P).
200.00
303.00
NCB/OTM PPA /BG No Jan '11
Feb '12
Feb '12 Feb '12
April'12
Dec'12 RU-LT(JV)
Sub-Total 753.00
13 BWDB: WMIP/SIMT/
PAT WD/W-1
Repair and re-sectioning of 10.000 km.
embankment (P) between km. 0.000 to 78.000
including construction of 3 nos inlet flushing inlet in
Polder 43/1B under upazila- Kalapara in District-
Patuakhali in connection with Component 1:
Rahabilitation and Improvement under WMIP
during the FY 2011-2012 and FY 2012-2013.
km. Embkt 10.000
(P)
Inlet = 3 nos.
(F)
300.00 NCB/OTM PPA /BG No Jan '11
Feb '12
Feb '12
March'12
Feb '12
May'12
Dec'12 Gangamoti
Enterprise
14 BWDB: WMIP/ SIMT/
PAT WD/W-2
Re-sectioning of Embankment from km 0.000 to
km 8.550 and from km 16.230 to km 17.400 Total
9.720 km in Polder 47/2 under upazila- Kalapara in
District- Patuakhali in connection with Component
1: Rahabilitation and Improvement under WMIP
during the FY 2011-2012 and FY 2012-2013.
km. Embkt 9.720
(P)
230.00 NCB/OTM PPA /BG No Jan '11
Feb '12
Feb '12
March'12
Feb '12
April'12
Dec'12 Gangamoti
Enterprise
Sub-Total 530.00
Patuakhali W.D. Division
Patuakhali O&M Division
Page 6
Original Revised
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Quantity Estimated
Price in Tk.
(Lac)
(Actual
Contract
price in
Contract
Currency)
Unit Planned
Date of
invitation
of Tender
(Date of
receipt)
Planned
Date of
Contract
signing
(Actual
date of
Contract
signing)
Planned
Date of
completion
(Actual date
of
completion)
Name of
Contractor
Contract Package
Number
Sl.
No.
Prog. of
Proc.as of
Feb, 2011
(Physical %/
Fin. Lac Tk.)
Name of Work Procedure
/Method
PPA/BG Prior
Review
(Yes / No)
Planned
Date of Bid
Evaluation
(Actual
Evaluation
completion
date)
1283.00Total of Southern Zone
Page 7
Original Revised
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Quantity Estimated
Price in Tk.
(Lac)
(Actual
Contract
price in
Contract
Currency)
Unit Planned
Date of
invitation
of Tender
(Date of
receipt)
Planned
Date of
Contract
signing
(Actual
date of
Contract
signing)
Planned
Date of
completion
(Actual date
of
completion)
Name of
Contractor
Contract Package
Number
Sl.
No.
Prog. of
Proc.as of
Feb, 2011
(Physical %/
Fin. Lac Tk.)
Name of Work Procedure
/Method
PPA/BG Prior
Review
(Yes / No)
Planned
Date of Bid
Evaluation
(Actual
Evaluation
completion
date)
North-Eastern Zone, BWDB, Comilla
15 BWDB: WMIP/SIMT/
COM/W-1
Lot: BWDB:
WMIP/SIMT/ COM/W-
1A
Re-excavation of Sonaichari khal from km 0.000 to
km 17.350 Total 17.350 km and repair of 2 Nos
Water Control Structures in Sonaichari irrigation
and Flood Control scheme in connection with
Water Management Improvement Project (WMIP)
during 2011- 2012 and 2012-2013.
km. Drainage
Channel =
17.350 (P)
WCS (P) = 2
nos.
135.00
370.00
NCB/OTM PPA /BG No Jan '11
Feb '12
March'12
Feb '12
May'12
Feb '12 Jun '12 M/S Niaz
Traders
BWDB: WMIP/SIMT/
COM/W-1
Lot: BWDB:
WMIP/SIMT/ COM/W-
1B
Re-excavation of New Dakatia from km 0.000 to
km 11.000 Total 11.000 km in Sonaichari irrigation
and Flood Control scheme in connection with
Water Management Improvement Project (WMIP)
during 2011- 2012 and 2012-2013.
km. Drainage
Channel =
11.000 (P)
WCS (P) = 2
nos.
410.00 March'12 May'12 ARC-KC(JV)
Sub-Total 780.00
Habigonj O&M Division
16 BWDB: WMIP/SIMT/
HABI/W-1
Re-Construction of sub-mersible embankment in
between km. 11.000 to 23.000 and re-sectioning of
embankment in between km 0.000 to 11.000 total
12.900 km in Sutki River FCD Project in
connection with Water Management and
Improvement Project during the FY 2011-2012
km. Embkt 12.590
(P)
135.00 NCB/OTM PPA /BG No Jan '11
Feb '12
Feb '12 Feb '12
May'12
Jun '12 Sharif Ullah
Sub-Total 135.00
17 BWDB: WMIP/SIMT/
MOULVI/W-1
Re-sectioning of Embankment from km 0.000 to
5.100 and from km 8.250 to 9.000, total 5.850 km;
Re-excavation of drainage channel U/S and D/S of
Sluice No. S-1A/C1, U/S of Sluice No. S-2/C3, U/S
and D/S of Sluice No. S-1A/C2 total 2.400 km and
Construction of Telibeel regulator (1V-1.800m x
1.520m) of Sharifpur FCD Sub-project under
Water Management Improvement Project (WMIP)
during 2011- 2012 & 2012-2013.
km. Embkt =
5.850 (P)
Drainage
channel =
2.400 (P)
WCS 1 No. (F)
380.00 NCB/OTM PPA /BG No Jan '11
Feb '12
March'12
Feb '12
April'12
Feb '12 Dec '12
Sub-Total 380.00
1295.00
Moulvibazar O&M Division
Total of North-Eastern Zone
Comilla O&M Division
Page 8
Original Revised
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Quantity Estimated
Price in Tk.
(Lac)
(Actual
Contract
price in
Contract
Currency)
Unit Planned
Date of
invitation
of Tender
(Date of
receipt)
Planned
Date of
Contract
signing
(Actual
date of
Contract
signing)
Planned
Date of
completion
(Actual date
of
completion)
Name of
Contractor
Contract Package
Number
Sl.
No.
Prog. of
Proc.as of
Feb, 2011
(Physical %/
Fin. Lac Tk.)
Name of Work Procedure
/Method
PPA/BG Prior
Review
(Yes / No)
Planned
Date of Bid
Evaluation
(Actual
Evaluation
completion
date)
North-Western Zone, BWDB, Rajshahi
18 BWDB: WMIP/SIMT/
NAWAB/W-1
Lot: BWDB:
WMIP/SIMT/
NAWAB/W-1A
Bank Revetment work in the right bank of
Mohananda River from km 40.800 to km 40.590
total 0.210 km of Marichar Danra scheme in
connection with Water Management Improvement
Project (WMIP) during 2011- 2012 & 2012-2013.
km. Bank
revetment =
0.210 (F)
135.00
310.00
NCB/OTM PPA /BG No Jan '11
Feb '12
April'12
Feb '12
May'12
Feb '12 Jun '12 M/S Kamrul
Enterprise
BWDB: WMIP/SIMT/
NAWAB/W-1
Lot: BWDB:
WMIP/SIMT/
NAWAB/W-1B
Re-sectioning of 8.390 km embankment in
between km 39.500 to km 61.500 of Marichar
Danra scheme in connection with Water
Management Improvement Project (WMIP) during
2011- 2012 & 2012-2013.
km. Embankment =
8.390 (P)
245.00 April'12 May'12 Kh.Mainul
Islam
BWDB: WMIP/SIMT/
NAWAB/W-1
Lot: BWDB:
WMIP/SIMT/
NAWAB/W-1C
Re-excavation of Trimohini khal, Boro Danra khal,
Laholamari khal, Chalkkirti Motora Danra khal total
27.550 km including repair of Trimohini regulator of
Marichar Danra scheme in connection with Water
Management Improvement Project (WMIP) during
2011- 2012 & 2012-2013.
km. Drainage
Channel =
27.550 (P)
WCS (P) = 1
no.
330.00 April'12 May'12 Kh.Mainul
Islam
Sub-Total 885.00
885.00
Mid-Western Zone, BWDB, Faridpur
19 BWDB: WMIP/SIMT/
FAR/W-1
Re-sectioning of Embankment from km 10.260 to
km 12.130; km 14.550 to km 15.094; km 16.110
to km 19.360 total 5.664 km & re-excavation of
Choto Lakhundia Khal, Jalalpur Khal, Sanidanga
Khal, Similar Khal and Zomaddar Dangi Khal total
3.290 km. including repair of 13 Nos. Water
Control Structures in Shakpaldia FCDI Scheme
under Water Management Improvement Project
(WMIP) during 2011-12 & 2012-13.
km. Embankment =
5.664 (P)
Drainage
Channel =
3.290 (P)
WCS = 13 nos
(P)
135.00 NCB/OTM PPA /BG No Jan '11
Feb '12
May'12
Feb '12
Aug'12
Feb '12 Jun '12 M/S Noor
Constructio
n
Total of North-Western Zone
Faridpur O&M Division, BWDB, Faridpur
Nawabganj O&M Division, BWDB, Chapai Nawabganj
Page 9
Original Revised
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Quantity Estimated
Price in Tk.
(Lac)
(Actual
Contract
price in
Contract
Currency)
Unit Planned
Date of
invitation
of Tender
(Date of
receipt)
Planned
Date of
Contract
signing
(Actual
date of
Contract
signing)
Planned
Date of
completion
(Actual date
of
completion)
Name of
Contractor
Contract Package
Number
Sl.
No.
Prog. of
Proc.as of
Feb, 2011
(Physical %/
Fin. Lac Tk.)
Name of Work Procedure
/Method
PPA/BG Prior
Review
(Yes / No)
Planned
Date of Bid
Evaluation
(Actual
Evaluation
completion
date)
20 BWDB:
WMIP/SIMT/FAR/W-2
Lot : BWDB:
WMIP/SIMT/FAR /W-
2A
Re-sectioning/ Breach Closing of Embankment
from km 17.500 to km 17.560; km 20.000 to km
20.089 & from km 21.100 to km 21.363 total 0.412
km. including repair of 11 Nos. Water Control
Structures in Boro Manikdi FCDI Scheme under
Water Management Improvement Project (WMIP)
during 2011-12 & 2012-13.
km. Embankment
=0.410 (P)
WCS = 11
nos. (P)
60.00 May'12 Aug'12 M/S
Rahman
Enterprise
BWDB:
WMIP/SIMT/FAR/W-2
Lot : BWDB:
WMIP/SIMT/FAR /W-
2B
Re-excavation of Maniknagor khal from km 3.650
to km 9.550; Nurkhali khal from km 5.700 to km
11.725; Aliabad khal from km 0.000 to km 0.680;
Bakhunda khal from km 0.000 to km 0.650;
Fulbaria khal from km 0.000 to km 0.508 &
Gopalpur Dakatia khal from km 1.400 to km 2.515
total 14.950 km in Boro Manikdi FCDI Scheme
under Water Management Improvement Project
(WMIP) during 2011-12 & 2012-13.
km. Drainage
Channel =
14.950 (P)
265.00 May'12 Aug'12 Starlite
Services
Ltd.
Sub-Total 460.00
21 BWDB: WMIP/SIMT/
MAD/W-1
Lot : Lot : BWDB:
WMIP/SIMT/MAD/W-
1A
Re-sectioning of Embankment from km 0.000 to
km 7.765, km 10.165 to km 12.805, km 16.400 to
km 19.400, km 25.300 to km 31.000 & km 31.220
to km 31.770 Total 19.655 km in North Kalkini
FCDI Schemes in connection with Water
Management Improvement Project (WMIP) during
2011- 2012 & 2012-2013.
km. Embankment =
19.655 (P)
135.00
265.00
NCB/OTM PPA /BG No Jan '11
Feb '12
April'12
Feb '12
July'12
Feb '12 Jun '12 SE-MRC(JV)
BWDB: WMIP/SIMT/
MAD/W-1
Lot : Lot : BWDB:
WMIP/SIMT/MAD/W-
1B
Re-excavation of Swasthal Khal from km 0.000 to
km 5.050 & Purba Alipur Khal from km 0.000 to km
3.800 Total 8.850 km in North Kalkini FCDI
Schemes in connection with Water Management
Improvement Project (WMIP) during 2011- 2012 &
2012-2013.
km. Drainage
Channel =
8.850 (P)
135.00 NCB/OTM PPA /BG No Jan '11
Feb '12
April'12
Feb '12
July'12
Feb '12 Jun '12 M/S Shara
Enterprise
Sub-Total 400.00
860.00
Legend:
P = Partial *=Proposed/Actual
F = Full
NCB = National Competitive Bidding
OTM = Open Tendering Method
Total of Mid-Western Zone
Madaripur O&M Division, BWDB, Madaripur
Page 10
Original Revised
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Quantity Estimated
Price in Tk.
(Lac)
(Actual
Contract
price in
Contract
Currency)
Unit Planned
Date of
invitation
of Tender
(Date of
receipt)
Planned
Date of
Contract
signing
(Actual
date of
Contract
signing)
Planned
Date of
completion
(Actual date
of
completion)
Name of
Contractor
Contract Package
Number
Sl.
No.
Prog. of
Proc.as of
Feb, 2011
(Physical %/
Fin. Lac Tk.)
Name of Work Procedure
/Method
PPA/BG Prior
Review
(Yes / No)
Planned
Date of Bid
Evaluation
(Actual
Evaluation
completion
date)
PPA = Public Procurement Act
BG = Bank Guideline
LCS = Landless Contracting Society
Page 11
Starting year: 2011-12
16
BWDB: Procurement Plan for Works: WMIP (S-1) 2011-2012IDA Credit # 4359 BD and the Netherlands Trust Fund Number TF 094800
Remarks
Page 12
16
Remarks
Page 13
16
Remarks
Page 14
16
Remarks
Page 15
16
Remarks
Page 16
16
Remarks
Page 17
16
Remarks
Page 18
16
Remarks
Page 19
16
Remarks
Page 20
16
Remarks
Page 21
16
Remarks
Page 22