MandatesPrevention and Suppression of all destructive fires on buildings, houses and other similar structures; Forests; Airports; Land Transportation Vehicles and Equipment; Ships docked at wharves; Petroleum industry installations; and other similar incidents;Enforcement of the Fire CodeInvestigate all causes of fireAssist AFP in times of National EmergenciesEstablish at least one fire station in each local government unit nationwide with adequate personnel and equipage.
I. GENERAL OVERVIEWA. Regional Profile
AREA PROFILE
PROVINCE NO. OF CITIES
NO. OF MUNICIPALITIES
NO. OF BARANGAYS POPULATION LAND
AREANO. OF
HOUSEHOLDSNO. OF
ESTABLISMENTS
CAGAYAN 1 28 820 1,199.320 9,295.75 190,604 25,967
ISABELA 3 34 1,055 1,593,566 12,414.93 254,928 28,524
N. VIZCAYA 0 15 275 452,287 3,975.67 74,402 11,334QUIRINO 0 6 132 188,991 2,323.47 30,581 2,808BATANES 0 6 29 17,246 219.01 12,670 1,318
TOTAL 4 89 2,311 3,451,410 28,228.83 563,185 69,951
B. JURISDICTIONAL MAP
CAGAYAN ISABELA NUEVA VIZCAYA QUIRINO BATANES
1 Abulug 1 Alicia 1 Alfonso Castañeda 1 Aglipay 1 Basco2 Alcala 2 Angadanan 2 Aritao 2 Diffun 2 Mahatao3 Allacapan 3 Aurora 3 Bagabag 3 Cabarroguis 3 Sabtang4 Amulung 4 Benito Soliven 4 Bambang 4 Maddela5 Aparri 5 Burgos 5 Bayombong 5 Nagtipunan6 Baggao 6 Cabagan 6 Diadi 6 Saguday
7 Ballesteros 7 Cabatuan 7 Dupax Del Sur
8 Buguey 8 Cauayan City 8 Kasibu9 Camalaniugan 9 Cordon 9 Kayapa10 Claveria 10 Delfin Albano 10 Quezon11 Enrile 11 Echague 11 Santa Fe 12 Gattaran 12 Ilagan City 12 Solano
13 Gonzaga 13 Jones 13 Villaverde14 Iguig 14 Luna 15 Lal-lo 15 Mallig16 Lasam 16 Naguilian
17 Pamplona 17 Quezon
18 Peñablanca 18 Quirino
19 Piat 19 Ramon 20 Rizal 20 Reina Mercedes
21 Sanchez-Mira 21 Roxas
22 Santa Ana 22 San Agustin
23 Santa Praxedes 23 San Guillermo
24 Solana 24 San Mariano
25 Sto Niño 25 San Mateo
26 Tuao 26 San Pablo
27 Tuguegarao City 27 Santa Maria
28 Santiago City29 Sto Tomas30 T i i
II. ADMINISTRATIVE UPDATES
PERSONNEL STRENGTH / RANK PROFILE2ND Quarter CY 2018
SSUPT SUPT CINSP SINSP INSP SFO4 SFO3 SFO2 SFO1 FO3 FO2 FO1 NUP
1 6 8 15 11 26 51 108 158 147 171 611 11
PROVINCEOFFICER NON OFFICER
NUP TOTALSSUPT SUPT CINSP SINSP INSP SFO4 SFO3 SFO2 SFO1 FO3 FO2 FO1
REGIONAL OFFICE 1 3 3 4 3 3 4 15 6 10 19 113 3 187
CAGAYAN 0 1 1 1 3 12 18 41 76 50 64 158 7 432
ISABELA 0 1 3 6 3 7 14 25 49 49 36 243 0 436
N. VIZCAYA 0 0 1 1 2 3 9 16 15 21 25 58 1 153
QUIRINO 0 1 0 1 0 1 6 7 11 10 27 25 0 89
BATANES 0 0 0 1 0 4 1 7 14 0 27
TOTAL 1 6 8 15 11 26 51 108 158 147 171 611 11 1,324
Promotion of NCOs
• 202 from FO2-SFO4
PROMOTION
4th Quarter CY 2018
90 FIRE OFFICER ONE
RECRUITMENT
III. LOGISTICAL UPDATES
III. LOGISTICAL UPDATE
A. STATUS OF FIRE STATION/SUBSTATIONSTATUS OF CONSTRUCTION/REPAIR/IMPROVEMENT
OF FIRE STATIONS AND BUILDINGS
4th QUARTER CY 2018
REGION IIDATE OF
SARO
DATE STARTED/
NTPBUDGET
AMOUNT OF CONSTRUCTION
PROGRESS OF CONSTRUCTION
DATE OF COMPLETION
REMARKS
CAGAYAN
1.REGIONAL OFFICE(PHASE 1)
3 JAN 2017 8 JUL 2018 PhP 1,624,931.37 PhP 1,622,065.07 100% 9 NOV 2018
PROJECT COMPLETED AS OF 07 NOV 2018
2. STA. TERESITA FIRE STATION
2 MAY 2018 18 SEP 2018 PhP 7,320,968.20 PhP 7,318,000.00 7.82% 15 FEB 2018PROJECT IS ON-
GOING
3. REGIONAL OFFICE (PHASE 1)
18 SEPT 2018 - PhP 1,629,931.37 PhP 1,627,849.89 AWARDED AS
OF NOV 28 ,2018
STATUS OF FIRE STATION/SUBSTATIONSTATUS OF CONSTRUCTION/REPAIR/IMPROVEMENT
OF FIRE STATION AND BUILDINGS3rd QUARTER CY 2018
ISABELADATE OF
SARO
DATE STARTED/N
TPBUDGET
AMOUNT OF CONSTRUCTION
PROGRESS OF CONSTRUCTION
DATE OF COMPLETION
REMARKS
1. BENITO SOLIVEN FIRE STATION
20NOV2017
29DEC2017 PhP 1,603,780.75 PhP 1,592,622.36 100% 15 AUG2018
PROJECT COMPLETED AS OF NOV 12,2018(with Liquidated damages)
1. JONES FIRE STATION
20NOV2017
29DEC2017 PhP 1,603,780.75 PhP 1,588,204.08 75.01% 15 AUG2018
PROJECT IS ON-GOING (with Liquidated damages)
STATUS OF FIRE STATION/SUBSTATIONSTATUS OF CONSTRUCTION/REPAIR/IMPROVEMENT
OF FIRE STATION AND BUILDINGS4th QUARTER CY 2018
STATUS OF REPAIR OF FIRETRUCKas of 4th Quarter CY 2018
REGION II DATE AWARDED BUDGETAMOUNT OF CONTRACT
PROGRESS OF CONSTRUCTION (% of
Accomplishment)
DATE OF COMPLETION
REMARKS
NAGTIPUNAN ISUZU MORITA FIRE TRUCK
24 AUG 2018 PhP 122,000.00 Php 118,310.72 100 % 14 NOV 2018 COMPLETED
BAMBANG HINO FIRE TRUCK 19 NOV 2018 PhP 299,280.37 - - - FOR PULL OUT FROM STATION
SOLANO FORD ROUGHNECK FIRE TRUCK
19 NOV 2018
PhP 297,139.47 - - -
FOR PULL OUT FROM STATION
PIAT FORD ROUGHNECK
FIRE TRUCK
19 NOV 2018PhP 98,637.00 - - -
FOR PULL OUT FROM STATION
STATUS OF REPAIR OF RESCUE TRANSPORT VEHICLEas of 4th Quarter CY 2018
REGION IIDATE
AWARDEDBUDGET
AMOUNT OF CONTRACT
PROGRESS OF CONSTRUCTION (%
of Accomplishment)
DATE OF COMPLETION
REMARKS
OPFM QUIRINO RESCUE AMBULANCE(MITSUBISHI L300)
11 JUN 2018 PhP 87,000.00 PhP 84,438.00 85% - ON-GOING REPAIR
SOLANO FIRE STATION (KIA BESTA AMBULANCE) 19 NOV 2018 PhP 138,719.49 - - -
FOR PULL OUT FROM STATION
AMULUNG (KIA BESTA RTV) 19 NOV 2018 PhP 128,000.00 - - - FOR PULL OUT FROM STATION
STATUS OF REPAIR OF SERVICE VEHICLEas of 4th Quarter CY 2018
REGION IIDATE
AWARDEDBUDGET
AMOUNT OF CONTRACT
PROGRESS OF CONSTRUCTION (% of
Accomplishment)
DATE OF COMPLETION
REMARKS
NUEVA VIZCAYA NISSAN TERRANO SERVICE VEHICLE
11 JUN 2018 Php146,034.00 Php140,621.93 100% 28 SEP 2018 COMPLETED
STATUS OF PERSONAL PROTECTIVE EQUIPMENTas of 4th Quarter CY 2018
REGION II DATE AWARDED BUDGETAMOUNT OF CONTRACT
PROGRESS OF CONSTRUCTION (% of
Accomplishment)
DATE OF COMPLETION
REMARKS
Fire Hose 1 1/2 06 OCT 2017 PhP 2,549,300.00 PhP 1,998,100.00
Returned to supplier, due to failurein the test conduct (burst
test)
Fire Boots 06 OCT 2017 PhP 1,756,000.00 PhP 1,706,832.00Returned to
supplier, waiting for the delivery of replacement
IV. OPERATIONAL UPDATES
Fire Prevention Activities(4th Quarter CY 2018)
• No. of Establishment Inspected: 4,506
• No. of FSIC Issued : 4,626
• Fire Code Fees Collected : PhP 4,067,143.42
A. FIRE PREVENTION COMPARATIVE REPORTNUMBER OF ESTABLISHMENT INSPECTED AND COMPLIANCE STATUS
FIRE PREVENTION COMPARATIVE REPORT
NO. OF ESTABLISHMENT INSPECTED4th Quarter
CY 20174th Quarter
CY 2018VARIANCE
Assembly 76 80 5.26Educational 85 137 61.18Health Care 18 27 50Detention and Correctional 0 5Residential 225 124 -44.89Mercantile 4631 2911 -37.14Business 1272 860 -32.39Industrial 268 230 -14.18Storage 88 75 -14.77Miscellaneous 163 57 -58.09
TOTAL 6,799 4,506 -33.73
No. Of Building Plan Reviewed/Processed and issued FSEC1195 1052 -22.68
No. of FSIC for Occupancy Permit Issued 1893 3574 -44.43
No. of FSIC for Business/ Permit to Operate Issued5523 4626 -35.29
TOTAL FSIC ISSUED 7,416 4,626 -37.62Notice to Comply Issued 144 108 -25.00Notice to Correct Violations IssuedAbatement Order
AMOUNT OF FIRE CODE FEES ASSESSED3,994 4,067,143.42 1.81
Fire Incident Report
• No. of Fire Incident: 38
• Amount of Damages based on Affidavit of Loss Submitted: PhP 9,280,024.53
KINDS OCCUPANCY4th Quarter CY
20174th Quarter
CY 2018VARIANCE
STRU
CTU
RAL
FIRE
Residential 24 24 0Industrial/Factory 1 2 100Commercial/Mercantile 0 3 300Storage 5 0 -500
Mixed 1 0 -100
Business/ Government Offices 3 0 -300
Educational 2 2 0
Institutional 0 0 0Place of Assembly 0 0 0Miscellaneous 3 3 0
TOTAL 39 34 -12.82
NO
N S
TRU
CTU
RAL
FIRE
Grass, rubbish and forest fire 0 0 0
Motor Vehicle 7 4 -42.86Ship/Water Vessel 0 0 0Aircraft 0 0 0Locomotive 0 4 400
TOTAL 7 4 -42.86
GRAND TOTAL 46 38 -17.39
AMOUNT OF DAMAGE BASED ON SUBMITTED AFFIDAVIT OF LOSS 13,569,900.00 9,280,024.53 -31.61
FIRE SUPPRESSIONFIRE INCIDENT COMPARATIVE REPORT
CAU
SES
OF
FIRE
DESCRIPTION3rd Quarter
CY 20173rd Quarter CY
2018Variance
Electrical connection 10 20 100Electrical appliances 9 4 -55.56Electrical machinery 1 1 0Spontaneous combustion 1 0 -100Unattended cooking/stove 5 3 -40
Open flame due to torch/gasera 1 1 0
LPG Explosion 0 0 0Lighted cigarette butt 5 2 -60Chemicals 0 0 0Pyro techniques 0 0 0Lighted match stick/lighter 2 1 -100
Incendiary devices/flammable liquid 4 0 -400
Lighting 0 0 0Bomb Explosion 0 0 0Undetermined 0 0 0Others* 8 6 -25
TOTAL 46 38 -17.39
CLA
SSIF
ICA
TIO
N
OF
FIRE
Intentional 4 0 -400Accidental 38 38 0Undetermined 4 0 -400
Fire cases under investigation 0 0 0
TOTAL 46 38 100
TIES
Fatalities in fire fighter 0 0 0Fatalities in civilian 1 1 0
FIRE INVESTIGATION
FIRE INVESTIGATION COMPARATIVE REPORT
D. EMERGENCY MEDICAL SERVICES AND RESCUE SERVICESEMS/RESCUE COMPARATIVE REPORT
.
EMEGENCY RESPONSE
ACTIVITIES 3rd Quarter CY 2017
3rd Quarter CY 2018
VARIANCE
FIRE INCIDENTS 3 1 -66.66%RESCUE OPERATIONAL/DISASTERS
0 0 0
VEHICULAR ACCIDENTS 66 107 62.12%MEDICAL CASES 50 49 -2%
TOTAL 119 157 31.93%
NONEMERGENCYRESPONSE
FREE MEDICAL AND DENTAL SERVICES0 1 0
TT VACCINATION 0 0 0BLOOD LETTING 3 0 -100%CONSULTATION 13 201 1446.15%BP MONITORING 1,069 1,464 36.95%DRILLS CONDUCTED 27 8 -70.37%LECTURES/DEMOS 19 7 -63.15%TRAININGS 2 1 -50%OTHERS 13 31 138.46%-Stand-by Medical Team 8 23-Medical Profiling, etc 4 7Tree Planting 1 1
TOTAL 1147 1713 49.34%GRAND TOTAL 1 266 1 870 47 70%
V. BUDGETARY UPDATES4th Quarter CY 2018
CY 2018
ALLOTMENT OBLIGATION BALANCE
60,238,897.79 52,153,353.26 8,085,544.53
VI. PLANS AND PROGRAMS
KEY RESULT AREA (KRA) ACTION TAKEN BY REGIONAL OFFICE
ACTION TO BE REQUESTED FROM
NHQ
EXPECTED OUPUT TARGET DATE
ADMINISTRATIVE AND PERSONNEL MATTERS
1. Decentralization of BFP ID Application of Active Personnel, Retirees and Survivors
* requires personnel and pensioners who do not have biometric records to proceed to PRMD, BFP-NHQs
* request for authority from Chief, BFP to authorize Regional Offices to conduct renewal and issuance of BFP IDs
* request for ID printers and other materials needed
* to avoid additional personal travel expenses of active personnel and retirees from travelling to BFP-NHQs
* ensures all BFP ID of active personnel are updated
* ease in the process of ID renewal especially for pensioners with physical difficulties in travelling to BFP-NHQs
* within CY 2019
2. Database for digital personnel records and official BFP communications
* records personnel staff must attend various pertinent trainings at BFP-NHQs
* to request for fund for maintenance and updating of personnel records of BFP-RO2
* centralized digital records of all BFP-RO2 personnel which is protected from corruptions by common viruses, calamities and physical deterioration of desktop computers
* within CY 2019
Action Plan
Action Plan
KEY RESULT AREA (KRA) ACTION TAKEN BY REGIONAL OFFICE
ACTION TO BE REQUESTED FROM
NHQ
EXPECTED OUPUT TARGET DATE
3. BFP RO2 is experiencing manpower shortage in the majority of fire stations regionwide
* to reassign few personnel from stations with unserviceable trucks to augment to stations with insufficient/depleted personnel
* to designate inappropriate Ranks (SFO1-SFO4) as /to be Officer-In-Charge/Marshals in the lower units
* to adopt dual/multi designation/function of personnel to underman/ outnumbered stations
* to request for additional vacancies/quota in this region
* be able to conduct recruitment/ promotion in order to fill-up the stations experiencing scarcity/shortage in manpower
* at least twice a year Recruitment/Promotion CY 2019
4. BFP RO2 needs to ensure uniformity and continuity in filing of records and timely submission of reports and
* funding is needed for seminar/ workshop on updates regarding Admin functions: HRMO
* request training fund from NHQ * to conduct Admin
Seminar /Workshop twice a year
*twice a year
Action Plan
KEY RESULT AREA (KRA) ACTION TAKEN BY REGIONAL OFFICE
ACTION TO BE REQUESTED FROM
NHQ
EXPECTED OUPUT
TARGET DATE
LOGISTICAL MANAGEMENT
I. Construction of Fire Stations
1.Penablanca,Cagayan
Submitted pertinent documents for the request of Construction of Typical Fire Station amounting to PhP 7.3 Million / PhP 4.2 Million / PhP 2.6 Million
Release of FundFull
Implementation of Projects
For CY 2018
2. San Pablo, Isabela
3. Echague, Isabela
4. Santa Maria, Isabela
5. San Guillermo, Isabela
6. Bambang, Nueva Vizcaya
7. Calayan, Cagayan
8. Gamu, Isabela
9. Maconacon, Isabela
10. San Manuel, Isabela
Action Plan
KEY RESULT AREA (KRA) ACTION TAKEN BY REGIONAL OFFICE
ACTION TO BE REQUESTED FROM
NHQ
EXPECTED OUPUT TARGET DATE
II. Repair/Improvement of Regional Office/Fire Stations
1. Repair of Regional Office On-Going Construction of Phase 1 (PhP1,624,931.37)
For Posting of Phase 2(PhP 1,624,931.37)
Release of payment upon
completion of the project Phase 1
PhP 1,624,931.37Phase 2 PhP1,624,931.37
Full implementation of Projects
Phase 1For CY 2018
Phase 2CY 2019
2.Lasam Fire Station Submitted pertinent documents for the request of Repair/
Improvement of Typical Fire Station amounting
to PhP1,603,780.75
Release of Fund Full Implementation of Projects
For CY 2019
Action PlanKEY RESULT AREA (KRA) ACTION TAKEN BY REGIONAL OFFICE
ACTION TO BE REQUESTED FROM
NHQ
EXPECTED OUPUT TARGET DATE
3. Abulug Fire Station
4. Sto. Tomas Fire Station
5. Diffun Fire Station
6.Saguday Fire Station
7.San Isidro Fire Station
8. Mallig Fire Station
For request of Fund for the Repair/ Improvement of Fire Stations amounting to PhP1,737,092.50/ Fire Station
Release of Fund Full Implementation of Projects
For CY 2019
9.Dinapigue Fire Station Request Construction of Typical Fire Station amounting
to PhP 3,112,930.85
10. Divilacan Fire Station Request Construction of Typical Fire Station amounting
to PhP 3,475,665.80
11. Kasibu Fire Station Request Construction of Typical Fire Station amounting
to PhP 2,500,424.11
12.Ambaguio Fire Station Request Construction of Typical Fire Station amounting
to PhP 2,614,282.80 Release of Fund Full Implementation of Projects
For CY 2019
Action PlanKEY RESULT AREA (KRA) ACTION TAKEN BY
REGIONAL OFFICEACTION TO BE REQUESTED
FROM NHQEXPECTED OUPUT TARGET DATE
III. Repair of Fire trucks/Service Vehicle/Rescue Transport Vehicle
1. Solano Fire Station (KIA BestaAmbulance)
For Posting of Repair amounting to PhP 138,719.49
2. Bambang Fire Station (Hino Fire Truck)
For Posting of Repair amounting to PhP 299,280.37
3. Solano Fire Station (Ford Roughneck Fire Truck)
For Posting of Repair amounting to PhP 297,139.47
4. Piat Fire Station ( Ford Roughneck Fire Truck)
For Posting of Repair amounting to PhP 98,637.00
Release of payment upon completion of the project.
Full Implementation of Project
For 1st Quarter CY 2019
5. Amulung Fire Station ( KIA Besta RTV) For Posting of Repair
amounting to PhP 128,000.00
Release of payment upon completion of the project.
Full Implementation of Project
For 1st Quarter CY 2019
Action PlanKEY RESULT AREA (KRA) ACTION TAKEN BY REGIONAL
OFFICEACTION TO BE
REQUESTED FROM NHQ
EXPECTED OUPUT TARGET DATE
IV. Personnel Property Equipment
1. Fire Hose 1 ½
Returned to supplier due to failure in the test conduct (burst test) (PhP
1,998,100.00)
Request release of payment upon
acceptance
Full Implementation 4th QUARTER CY 2018
2. Fire Hose 2 1/2
Accepted (PhP 566,988.00)
Request release of payment
Full Implementation 4th QUARTER CY 2018
2. Fire Boots
returned to supplier, waiting for the replacement of
delivery (PhP 1,706,832.00)
Request release of payment upon
acceptance
Full Implementation 4th QUARTER CY 2018
Action Plan
KEY RESULT AREA (KRA) ACTION TAKEN BY REGIONAL OFFICE
ACTION TO BE REQUESTED FROM
NHQ
EXPECTED OUPUT TARGET DATE
INVESTIGATION AND INTELLIGENCE ACTIVITIES
* conduct 40 hours Seminar/Workshop on Investigation
* request/approval and allocation of funds for the conduct of seminar/training/workshop for Investigation
* enhance their skills in the field of investigations
* request for allocation of funds to support the activity
3rdand4th Quarter CY 2018
* conduct 40 hours Seminar/workshop on Intelligence gathering
* request/approval and allocation of funds for the conduct of seminar/training/workshop for Intelligence gathering
* enhance their skills in the field of intelligence operations
* request for allocation of funds to support the activity
3rdand4th Quarter CY 2018
Action PlanKEY RESULT AREA (KRA) ACTION TAKEN BY REGIONAL
OFFICEACTION TO BE
REQUESTED FROM NHQ
EXPECTED OUPUT TARGET DATE
FINANCIAL MANAGEMENT / PLANS AND PROGRAMS
Financial Management * progressive PPMP preparation and massive idea gathering from stations level, re: financial needs and prioritization of projects/ budgets
* request additional Funds for PPMP Preparation
* additional Trainings for Financial Management enhancement
* progressive PPMP & seminar and funds for procurement of accountable forms
* systematic and attainable financial management
* competitive financial management plan
* every year
Seminar on Financial Management System
*conduct seminar on Financial Management System quarterly
* request allocation of fund for the activity
*atleast all personnel of FMD will undergo the seminar
*every year
Continous Enhancement / Upgrade “know how” on the latest Financial Management System
*seminar, information dissemination to Provincial , City/ Municipal level
* request allocation of fund for the activity
*all personnel of region, province and station will be aware
*every year
Action PlanKEY RESULT AREA
(KRA)ACTION TAKEN BY REGIONAL
OFFICE
ACTION TO BE REQUESTED FROM
NHQ
EXPECTED OUPUT TARGET DATE
FIRE PREVENTION AND FIRE CODE ENFORCEMENT
40 hours Training of Fire Safety
Inspectors
* conduct of 40 hours training for Fire Safety Inspectors
* request for allocation of funds to support the activity
* at least 40 FO1 or FO2 had undergone training to augment the scarcity of FSIs
October to December 2018
Seminar/Workshop on the Assessment of Fire Code Fees
and Fines
* conduct seminar on fire code assessment in all fire stations
* request for allocation of funds to support the activity
* all designated Fire Code Assessors regionwidewill be able to assess fees and fines based on RA 9514 in order to have uniformity in the fire code fees collection
October to December 2018
SIGNIFICANT ACCOMPLISHMENT PER PREXC STRUCTURE
3rd Quarter CY 2018
P/P/As ACCOMPLISHMENT DECREASE/INCREASEVIS – A –VIS
ACCOMPLISHMENT
REMARKS
A. General Administration Services
1. Percentage (%) of compliance of BFP, ROs and field delivery/operating units with Presidential, Department and oversight agencies’ policies, directives and issuance
2. Percentage (%) of fund allocation obligated and disbursed funds against financial obligations
79% 85% For 4th Quarter CY 2017, 85% was only obligated
while 4th Quarter CY 2018 was79% based on cash
basis
3.Percentage (%) of BFP personnel with appropriate training against manpower complement.
88.23% of uniformed personnel with appropriate training against1,206 of uniformed
personnel strength.
80.19% of uniformed personnel with appropriate training against 1,237 of
uniformed personnel strength.
Increase in number of personnel who had
undergone their mandatory trainings with the opening of off-campus
SIGNIFICANT ACCOMPLISHMENT PER PREXC STRUCTURE
3rd Quarter CY 2018P/P/As ACCOMPLISHMENT DECREASE/INCREASE
VIS – A –VISACCOMPLISHMENT
REMARKS
B. Fire Prevention Management Program
1. Number of buildings and establishment inspected against total no. of BPLO registered establishment region wide
72.81% or 7210 buildings and establishments inspected against 9902 BPLO registered establishment regionwide.
100% or 9565 buildings and establishment inspected against 9565 BPLO registered establishment regionwide. decrease
2. Number of Fire Safety Inspection Certificate (FSIC) Issued to registered business establishment against number of FSIC issued to registered establishment that has not been cause of fire
99.97% or 6750 Fire Safety Inspection Certificate (FSIC) issued to registered business establishment 6752 FSIC issued to registered business that has not been cause of fire.
99.51% or 7989 Fire Safety Inspection Certificate (FSIC) issued to registered business establishments against 8028 FSIC issued to registered business establishments that has not been cause of fire.
increase
3.Percentage (%) of buildings and establishments inspected within the prescribed time (i.e2 days from the receipt of the Inspection Order) nof the Fire Safety Inspector
93.1% or 6714 buildings and establishments inspected within the prescribed time frame (i.e 2 days) from the receipt of the Inspection Order (IO) of the Fire Safety Inspector out of 7210.
79.57% or 6388 buildings and establishments isnpected within the prescribed time frame (e.i 2 days from the receipt of the Inspection Order of the Fire Safety Inspector out of 8028.
increase
SIGNIFICANT ACCOMPLISHMENT PER PREXC STRUCTURE
3rd Quarter CY 2018P/P/As ACCOMPLISHMENT DECREASE/INCREASE
VIS – A –VISACCOMPLISHMENT
REMARKS
C. Fire and Emergency Management Program – Fire Operations Activities
1. Number of fire and Emergency and rescue calls responded regionwide
41 4395.35% or 41 total fire
incident/ems/rescue calls responded out of 43
2. Percentage (%) of fire calls with low level of alarm (up to 3rd alarm) out of the total number of fire calls responded regionwide
29 3876.32 or 29 fire calls not
exceeding 300,000 estimated property damage out of 38 fire calls
3. Percentage (%) of fire calls and related emergencies responded within 7minutes
30 39
76.92% or 30 of fire calls and related emergencies responded within 7mins out of 39 fire incidents and related emergencies responded.
SIGNIFICANT ACCOMPLISHMENT PER PREXC STRUCTURE
3rd Quarter CY 2018
P/P/As ACCOMPLISHMENT DECREASE/INCREASEVIS – A –VIS
ACCOMPLISHMENT
REMARKS
D. Fire and Emergency Management Program – Fire Investigation Activities
1. Percentage (%) of arson/intentional fire cases filed in court against total no. of
arson/intentional fires
0% 0%No Cases filed in court
against the total no. of arson
2. Percentage (%) of intentional fires against total no. of fire incidents investigated
100% 0%No cases of intentional
fires occurred during the quarter.
3. Percentage (%) of resolved cases 100% (38) 100% (38) All cases were resolved within the period
PHYSICAL REPORT OF OPERATIONS
FIRE PREVENTION MANAGEMENT PROGRAMas of Third Quarter CY 2018
Particulars UACS CODE
Physical TargetPhysical
Accomplishments
Physical Accomplishments Varianc
e as of2018
Remarks
1st
Quarter2nd
Quarter3rd
Quarter4th
QuarterTotal 1st Quarter 2nd
Quarter3rd
Quarter
3
1 2 3 4 5 6 7=(3+4+5+6)
8 9 10 12=(8+9+10+11)
13 14
1. Percentage of buildings and
establishments inspected
covered by Fire Code: BPLO registered,
government-owned
buildings/structures, and all other privately owned
buildings/structures not requiring FSIC against
total number of buildings and
establishments regionwide.
88% or 36,770 buildings/establishments
inspected out
of 42,498 buildings/establishments
registered
88% or 11,528 buildings/establishments inspected out of 13,100 buildings/establishments register
ed
88% or 8,523
buildings/establishment
s inspected out
of 9,686 buildings/establishment
s register
ed
88% or 4,735
buildings/establishment
s inspected out
of 5,381 buildings/establishment
s register
ed
88% or
61,556 out
of 69,95
1
103.19% or 43,115 buildings/establish
ments inspected
out of 42,498
buildings/establish
ments registere
d
91.16% or
12,217 buildings/establishments
inspected out
of 13,401 buildings/establishments
registered
72.81% or 7,210
buildings/establishments inspected
out of 9,902 buildings/establishments registered
97.03% or 63,846
buildings/establishments inspected
out of 65,801
buildings/establishments registered
Particulars UACS CODE
Physical Target
PhysicalAccomplishment
s
Physical Accomplishments Varianc
e as of2018
Remarks
1st
Quarter2nd
Quarter3rd
Quarter4th
QuarterTotal 1st
Quarter2nd
Quarter3rd
Quarter
Total
1 2 3 4 5 6 7=(3+4+5+6)
8 9 10 12=(8+9+10+11)
13 14
2. Percentage of Fire Safety Inspection Certificate
(FSIC) rated buildings and structure that
has not been the cause of fire
incident (origin of fire) against total number of
FSIC rated buildings/establi
shments regionwide
88% or 36,770 FSIC rated
buildings /
establishments
that has not been the
cause of fire
incident out of 42,498
88% or 11,528 FSIC rated
buildings /
establishments that has
not been the
cause of fire
incident out of 13,100
88% or 8,523 FSIC rated
buildings /
establishments that has
not been the
cause of fire
incident out of 9,686
88% or 4,735 FSIC rated
buildings /
establishments that has
not been the
cause of fire
incident out of 5,381
88% or 61,556 out of 69,951
100% or 42,124 FSIC rated
buildings / establish
ments that has not
been the cause of
fire incident
out of 42, 126
99.99% or 11,331
FSIC rated
buildings /
establishments
that has not been the cause
of fire incident out of 11,333
99.97% or 6,750 FSIC
rated buildings / establishments
that has not been the cause of fire incident out of 6,752
99.99% or 60,205 FSIC
rated buildings /
establishments that has not been the cause of fire incident out of 60,211
Particulars UACS CODE
Physical Target
PhysicalAccomplishment
s
Physical Accomplishments Varianc
e as of2018
Remarks
1st
Quarter2nd
Quarter3rd
Quarter4th
QuarterTotal 1st
Quarter2nd
Quarter3rd
Quarter
Total
1 2 3 4 5 6 7=(3+4+5+6)
8 9 10 12=(8+9+10+11)
13 14
3. Percentage (%) of buildings and establishments inspected within the prescribed time frame (i.e. 3½ days from the receipt of Inspection Order (IO) of the Fire Safety Inspector) against total number of buildings/establishments regionwide.
85% or 35,516
buildings/establishme
nts inspected
within prescribed time frame
out of 42,498
85% or 11,135,
buildings/establishme
nts tinspected
within prescribed time frame
out of 13,100
85% or 8,233
buildings/establishme
nts inspected
within prescribed time frame
out of 9,686
85% or 4,573
buildings/establishme
nts inspected
within prescribed time frame
out of 5,381
85% or 59,458 out of 69,951
101.20% or 42,286 buildings/establish
ments inspected
within prescribe
d time frame out of 42,498
87.29% or 11,698
buildings/establishments
inspected within prescribed time
frame out of 13,401
95.07% or 60,698
buildings/establishments
inspected within prescribed time
frame out of 65,801
4. No. of IEC and related activities conducted
760 580 810 770 *actual 1085 650 709
FIRE AND EMERGENCY MANAGEMENT PROGRAM
Fire Operations Activitiesas of Third Quarter CY 2018
Particulars UACS CODE
Physical Target
PhysicalAccomplishment
s
Physical Accomplishments Varianc
e as of2018
Remarks
1st
Quarter2nd
Quarter3rd
Quarter4th
QuarterTotal 1st
Quarter2nd
Quarter3rd
Quarter
Total
1 2 3 4 5 6 7=(3+4+5+6)
8 9 10 12=(8+9+10+11)
13 14
1. Percentage of fire, emergency and rescue calls responded regionwide (fire related) against total number of fire, EMS and rescue calls
100% 100% 100% 100% 100%
98.33% or 59 total
fire incidents/EMS/Rescue calls responded out of
60
94.80% or 73 total
fire incidents/EMS/Rescue calls responded out of
77
95.35% or 41 total fire
incidents/EMS/Rescue calls
responded out of 43
93.33% or 168 total fire
incidents/EMS/Rescue calls
responded out of 180
2. Percentage (%) of fire calls not exceeding 300,000 estimated property damage out of the total number of fire calls regionwide
88% or 31 out of 36
88% or 44 out of 50
88% or 40 out of 46
88% or 41 out of 47 88%
74.57% or 44 fire
calls not exceeding 300,000
estimated property damage out of 59 fire calls
68.49% or 50 fire calls not exceeding 300,000 estimated property damage out of 73 fire calls
76.32% or 29 fire calls not exceeding 300,000
estimated property
damage out of 38 fire calls
72.35% or 123 fire calls not exceeding 300,000
estimated property
damage out of 170 fire calls
Particulars UACS CODE
Physical TargetPhysical
Accomplishments
Physical Accomplishments Varia
nce as of2018
Remarks
1st
Quarter2nd Quarter 3rd
Quarter4th
QuarterTotal 1st Quarter 2nd
Quarter3rd
Quarter
Total
1 2 3 4 5 6 7=(3+4+5+6)
8 9 10 12=(8+9+10+11)
13 14
3. Percentage (%) of fire calls and related emergencies responded within seven (7) minutes (from receipt of call until arrival on the fire scene)
90% or 32 out of 36
90% or 45 out of 50
90% or 41 out of 46
90% or 42 out of 47 90%
68.33% or 41 of fire calls and related emergencies responded within 7 minutes out of 60 fire incidents and related emergencies responded
64.70% or 43 of fire calls and related emergencies responded within 7 minutes out of 67 fire incidents and related emergencies responded
76.92% or 30 of fire calls and related emergencies responded within 7 minutes out of 39 fire incidents and related emergencies responded
68.85% or 114 of fire calls and related emergencies responded within 7 minutes out of 168 fire incidents and related emergencies responded
2. Percentage (%) of fire calls not exceeding 300,000 estimated property damage out of the total number of fire calls regionwide
88% or 31 out of 36
88% or 44 out of 50
88% or 40 out of 46
88% or 41 out of 47 88%
74.57% or 44 fire calls
not exceeding 300,000
estimated property
damage out of 59 fire
calls
68.49% or 50 fire calls
not exceeding 300,000
estimated property
damage out of 73 fire
calls
76.32% or 29 fire calls not exceeding 300,000
estimated property
damage out of 38 fire calls
72.35% or 123 fire calls not exceeding 300,000
estimated property
damage out of 170 fire calls
FIRE AND EMERGENCY MANAGEMENT PROGRAM
Non-Fire Response Activitiesas of Third Quarter CY 2018
Particulars UACS CODE
Physical Target
PhysicalAccomplishment
s
Physical Accomplishments Varianc
e as of2018
Remarks
1st
Quarter2nd
Quarter3rd
Quarter4th
QuarterTotal 1st
Quarter2nd
Quarter3rd
Quarter
Total
1 2 3 4 5 6 7=(3+4+5+6)
8 9 10 12=(8+9+10+11)
13 14
1. Percentage (%) of households in disaster/calamity-affected barangays rendered with assistance
10% 10% 10% 10% 10% 0 0 10.26% 10.26%
2. Number of individuals rendered with technical rescue assistance/intervention
*actual 207 460 1920 2,587
3. Number of Non-emergency cases rendered with assistance by BFP
*actual 83 77 37 197
4. Number of Local, National and International events deployed with BFP contingents
*actual 25 105 18 148
5. Number of LGUs extended with technical trainings by BFP
*actual 3 2 9 14
FIRE AND EMERGENCY MANAGEMENT PROGRAM Fire Investigation Activities
as of Third Quarter CY 2018
Particulars UACS CODE
Physical Target
PhysicalAccomplishment
s
Physical Accomplishments
Variance as of2018
Remarks
1st
Quarter2nd
Quarter3rd
Quarter4th
QuarterTotal 1st
Quarter2nd
Quarter3rd
Quarter
Total
1 2 3 4 5 6 7=(3+4+5+6)
8 9 10 12=(8+9+10+11)
13 14
1. Percentage (%) fire incidents investigated against total no. of fire incidents responded.
70% or 25 out of
36
70% or 35 out of 50
70% or 32 out of 46
70% or 32 out of 46 70%
100% or 59 out of
59
115.87% or 73 out
of 63
105.56% or 36 out of 38
115.87% or 132 out of 122
2. Percentage (%) of arson fire cases filed in court against total no. of arson fires.
22% or 0 out of 1
22% or 0 out of 0
22% or 0 out of 2
22% or 0 out of 1 22% 0 0 out of 0 0 out of 0 0 out of 0
3. Percentage (%) of fire incidents investigated with SIR submitted. Against total number of fire incident regionwide.
90% or 32 out of
36
90% or 45 out of 50
90% or 41 out of 46
90% or 42 out of 47 90%
100% or 59 out of
59
100% or 73 out of
73
100% or 38 out of 38
100% or 170 out of 170
ACCOMPLISHMENTS 2018
The BFP-RO2 under the leadership of F/SSUPT JORGE B FARIÑAS, MBA, DSC conducted
Dental Profiling.
The BFP-RO2 under the leadership of F/SSUPT JORGE B FARIÑAS, MBA, DSC thru CINSP
APOLONIO G DIAZ, Regional Chief of Staff/Chief, Admin
spearheaded the clean-up drive of the Regional Office ground.
The Office of the Fire Safetyand Enforcement Division,BFP-RO2 under the supervisionof CINSP NOEL DC DE LEONdistributed Fire SafetyTarpaulins to the differentstations in the Region.
F/SSUPT JORGE B FARIÑAS,MBA, DSC, Regional Director,Bureau of Fire Protection,Regional Office 2, presided theWeekly Staff Meeting at theOffice of the Regional Director,Carig Sur, Tuguegarao City,Cagayan.
The BFP Regional Office 2 underthe leadership of F/SSUPTJORGE B FARIÑAS, MBA, DSC,Regional Director conductedpanel interview to Fire Officer 1applicants at the BFP RegionalHeadquarters, Carig Sur,Tuguegarao City, Cagayan.
F/SSUPT JORGE B FARIÑAS,MBA, DSC, Regional Director,BFP RO2, attendedpreparedness meeting withCAGAYAN VALLEY DISASTERRISK REDUCTIONMANAGEMENT COUNCIL(CVDRRMC) members.
Maraming Salamat Po!!