Upload
others
View
2
Download
0
Embed Size (px)
Citation preview
Detached buildings from
65,000 - 250,000 SQ FT (6,040 - 23,225 SQ M) axisj9.co.uk
Freehold or Leasehold
BUILT TO INDIVIDUAL
OCCUPIER REQUIREMENTS
PHASE 3 DEVELOPED TO SUIT DISTRIBUTION AND PRODUCTION BUILDINGS
MIDDLETON STONEY ROAD BICESTER OX26 1RT
JUST 3 MILES FROM J9 M40
A SUPERB M40 DISTRIBUTION/PRODUCTION OPPORTUNITY –
OCCUPATION WITHIN 12 MONTHSAll site infrastructure complete and phases 1
and 2 under construction
UNIT 1
100,000 SQ FT
UNIT 2
150,000 SQ FT
50m
50m
96 parking spaces 135 parking spaces
Howes Lane (Ring road)
Mid
dleto
n S
ton
ey Ro
ad
Proposed Howes Lane Realignment
PHASE 1
PHASE 3
PHASE 3
N
Distribution and Production 12m clear height to haunch FM2 level classification floor slabs with 75kN/m2 UDL loading
Generous dock level and level access loading door provision
12% roof lights
Offices Grade A open plan upper floor offices Ground floor feature entrance with double height glazing and brise soleil
Carpeted raised floors with boxes for data wiring Suspended ceilings with recessed lighting to CIBSE LG7
Automatic passenger lifts Kitchen areas Comfort cooling
Buildings at Phase 3 will be developed in response to individual occupier requirements. As a guide the specification could include:
External Areas Concrete service yards graded for dock level use for 44 tonne HGVs
Wash down area Gatehouse Block paved and macadam car parks External lighting Security fencing Steel protection bollards to dock level doors Vehicle charging points Extensive landscaping
Other Features BREEAM rating very good Renewable technology for energy use associated with base build services
Carbon zero building specification High speed fibre broadband connections
OCCUPATIONAL COST SAVING
SPECIFICATION
Axis J9 will provide a total of 500,000 sq ft (46,450 sq m) of new commercial buildings set within a prime business park environment just 3 miles from J9 M40 and 1 mile from Bicester Village with close to 10,000+ planned new homes.
Developed to suit options are offered in Phase 3 to provide bespoke buildings of between 65,000 and 250,000 sq ft.
Phases 1 and 2 are being built on a speculative basis.
Planning permission is for B1, B2 and B8 uses without hours of use restrictions.
For more information on Phase 3 and other phases go to axisj9.co.uk
OVERVIEWUxbridge 40-45%
Park Royal 60-65%
Reading 25-30%Oxford 20-25%
High Wycombe 30-40%
Purchasing or leasing a Phase 3 unit at Axis J9 will have a significant occupational cost saving compared with similar buildings in other South East locations.
UNIT 1
100,000 SQ FT
UNIT 2
150,000 SQ FT
50m
50m
96 parking spaces 135 parking spaces
Howes Lane (Ring road)
Mid
dleto
n S
ton
ey Ro
ad
Proposed Howes Lane Realignment
PHASE 1
PHASE 3
PHASE 3
N
UNIT8
UNIT9
UNIT10
UNIT11
UNIT12
UNIT13
UNIT14
UNIT 2150,000 SQ FTUNIT 1
100,000 SQ FT
50m
50m
96 parking spaces 135 parking spaces
UNIT 1
250,000 SQ FT
50m
250 parkin
g sp
aces
Howes Lane (Ring road)
Mid
dleto
n S
ton
ey Ro
ad
Proposed Howes Lane Realignment
PHASE 1
FUTUREPHASE
PHASE 3
N
UNIT 1
250,000 SQ FT
50m
250 parkin
g sp
acesPHASE 3
N
INDICATIVE LAYOUTS
PHASES 1 & 2
www.albionland.co.uk
Building layouts, plans and specifications will be prepared
in response to individual occupier enquiries.
Outline planning permission for B1c, B2 and B8 use without
hours of use restrictions.
Plan Option 1
Plan Option 2
Axis J9 is at the heart of a dynamic regional economy which is being driven on by distribution/logistics, advanced manufacturing and the technology sectors. The expanding labour force, improving infrastructure and strategic planning initiatives will act as a further catalyst to economic growth.
BICESTER
A41
A34
VENDEE DRIVE
BICESTER VILLAGE
J9M40
M40
Phases 1 and 2 Under Construction
Phase 3
WHY BICESTER?The town is at the forefront of Oxfordshire’s growth plans with excellent infrastructure and available housing land supply, enabling rapid expansion.
LOCATION
TERMS
Axis J9 is prominently located on Bicester’s perimeter road just to the west of the town and only 3 miles from Junction 9 M40 via Vendee Drive and the A41 dual carriageway. Bicester Village is approximately 1 mile to the east.
In addition to the M40, the location provides fast and easy access to the A41, A43 and A34.
J9
J10
M40
M40
34
J11
J12J15A
J16
J15
J14
J13
J12J10
J9
J8A
J8
J7
M40
M40
M1
M1
HOW
ES LA
NE
VEN
DEE D
RIVE
A422
A4
3
A43
OXFORD
BICESTER
BICESTER
AYLESBURY
BANBURY
LONDON
NORTHAMPTON
ROYALLEAMINGTON SPA
MILTONKEYNES
A34
A34
A41
A41
A421 A421
BUCKNELL ROAD
B4100
BICESTER ROAD
A4421
A
A
41
A
41
A41
A41
A44
21
A4421
Bicester Village
M25
BIRMINGHAMM42
SOUTHAMPTONM3 & M4
MIDDLETON STONEY RD
A4095
A4421
J9
J10
M40
M40
34
J11
J12J15A
J16
J15
J14
J13
J12J10
J9
J8A
J8
J7
M40
M40
M1
M1
HOW
ES LA
NE
VEN
DEE D
RIVE
A422
A4
3
A43
OXFORD
BICESTER
BICESTER
AYLESBURY
BANBURY
LONDON
NORTHAMPTON
ROYALLEAMINGTON SPA
MILTONKEYNES
A34
A34
A41
A41
A421 A421
BUCKNELL ROAD
B4100
BICESTER ROAD
A4421
A
A
41
A
41
A41
A41
A44
21
A4421
Bicester Village
M25
BIRMINGHAMM42
SOUTHAMPTONM3 & M4
MIDDLETON STONEY RD
A4095
A4421
Chris [email protected]
James [email protected]
Georgia [email protected]
Misrepresentation ActThe accuracy of any description, dimensions, references to condition, necessary permissions for use and occupation and other details contained herein is not guaranteed and is for general guidance only and prospective purchasers or tenants must not rely on them as statement of fact or representations and must satisfy themselves as to their accuracy. Neither VSL & Partners, White Commercial or Colliers nor any of their employees or representatives has any authority to make or give any representation or warranty or enter into any contract whatever in relation to the Property. Rents quoted in these particulars may be subject to VAT in addition. The reference to any mechanical or electronic equipment or other facilities at the Property shall not constitute a representation (unless otherwise stated) as to its state or condition or that it is capable of fulfilling its intended function. Prospective tenants/purchasers should satisfy themselves as to the fitness of such equipment for their requirements. 04/20. Designed and produced by Barques Design. www.barques.co.uk
For viewing and further information please contact the joint agents.
Destination Miles Km Travel Time
J9 M40 3 4.8 4 mins
Birmingham 61 98 1 hour 6 mins
Park Royal 53 85 1 hour 4 mins
Banbury 15 24 16 mins
Oxford 16 26 30 mins
High Wycombe 35 56 40 mins
J1A M25 44 71 45 mins
Heathrow Airport 53 85 55 mins
Units at Phase 3 Axis J9 are now available on a Pre Letting or Pre Sale basis. For detailed terms please contact the marketing agents.
Source: Google Maps
axisj9.co.uk
SAT NAVOX26 1RT