CONSTRUCTION COST (PLINTH ARAE BASIS ) FOR BUILDING WORKS Item Specifications Units Plinth Area Rate (Rs./Sft) Plinth Area Rate (Rs./Sqm) Breakup Biology Block Structure RCC Rs./Sft BUA 450.00 4844 20% Finishes Rs./Sft BUA 675.00 7266 30% Electrical wiring & fixtures Rs./Sft BUA 150.00 1615 7% Plumbing / Sanitation Rs./Sft BUA 75.00 807 3% A/C Central A/C Rs./Tonne 300.00 3229 13% D.G./Backup 100% incl. A/C Rs./KVA 90.00 969 4% UPS 70% of Lighting load Rs./KVA 0.00 0 0% Stuctured Cabling LAN/ Datacom Rs./Sft. of BUA 90.00 969 4% Intercom/EPABX 37.50 404 2% Automation / Security 135.00 1453 6% Lifts 45.00 484 2% Sub-Station 60.00 646 3% Fire Alarm 75.00 807 3% Fire Fighting 45.00 484 2% Total Cost per Sft. 2227.50 23976.61 100% IT Block Structure RCC Rs./Sft BUA 425.00 4575 22% Finishes Rs./Sft BUA 500.00 5382 26% Electrical wiring & fixtures Rs./Sft BUA 150.00 1615 8% Plumbing / Sanitation Rs./Sft BUA 75.00 807 4% A/C Central A/C Rs./Tonne 300.00 3229 15% D.G./Backup 100% incl. A/C Rs./KVA 100.00 1076 5% UPS 70% of Lighting load Rs./KVA 0.00 0 0% Stuctured Cabling LAN/ Datacom Rs./Sft. of BUA 125.00 1345 6% Intercom/EPABX 50.00 538 3% Automation / Security 50.00 538 3% Lifts 45.00 484 2% Sub-Station 60.00 646 3% Fire Alarm 25.00 269 1% Fire Fighting 45.00 484 2% Total Cost per Sft. 1950.00 20989.63 100% Service Corridor Computational Biology Centre Structure RCC Rs./Sft BUA 350.00 3767 21% Finishes Rs./Sft BUA 300.00 3229 18% Electrical wiring & fixtures Rs./Sft BUA 125.00 1345 8% Plumbing / Sanitation Rs./Sft BUA 75.00 807 5% A/C Central A/C Rs./Tonne 300.00 3229 18% D.G./Backup 100% incl. A/C Rs./KVA 100.00 1076 6% UPS 70% of Lighting load Rs./KVA 0.00 0 0% Stuctured Cabling LAN/ Datacom Rs./Sft. of BUA 125.00 1345 8% Intercom/EPABX 50.00 538 3% Automation / Security 50.00 538 3% Lifts 50.00 538 3% Sub-Station 60.00 646 4% Fire Alarm 25.00 269 2% Fire Fighting 50.00 538 3% Total Cost per Sft. 1660.00 17868.09 100%

Building Rates-break Up

Embed Size (px)

DESCRIPTION

general rates

Citation preview

Page 1: Building Rates-break Up

CONSTRUCTION COST (PLINTH ARAE BASIS )

FOR BUILDING WORKS

Item Specifications UnitsPlinth Area

Rate (Rs./Sft)

Plinth Area Rate

(Rs./Sqm)Breakup

Biology Block

Structure RCC Rs./Sft BUA 450.00 4844 20%

Finishes Rs./Sft BUA 675.00 7266 30%

Electrical wiring & fixtures Rs./Sft BUA 150.00 1615 7%

Plumbing / Sanitation Rs./Sft BUA 75.00 807 3%

A/C Central A/C Rs./Tonne 300.00 3229 13%

D.G./Backup 100% incl. A/C Rs./KVA 90.00 969 4%

UPS 70% of Lighting load Rs./KVA 0.00 0 0%

Stuctured Cabling LAN/ Datacom Rs./Sft. of BUA 90.00 969 4%

Intercom/EPABX 37.50 404 2%

Automation / Security 135.00 1453 6%

Lifts 45.00 484 2%

Sub-Station 60.00 646 3%

Fire Alarm 75.00 807 3%

Fire Fighting 45.00 484 2%

Total Cost per Sft. 2227.50 23976.61 100%

IT Block

Structure RCC Rs./Sft BUA 425.00 4575 22%

Finishes Rs./Sft BUA 500.00 5382 26%

Electrical wiring & fixtures Rs./Sft BUA 150.00 1615 8%

Plumbing / Sanitation Rs./Sft BUA 75.00 807 4%

A/C Central A/C Rs./Tonne 300.00 3229 15%

D.G./Backup 100% incl. A/C Rs./KVA 100.00 1076 5%

UPS 70% of Lighting load Rs./KVA 0.00 0 0%

Stuctured Cabling LAN/ Datacom Rs./Sft. of BUA 125.00 1345 6%

Intercom/EPABX 50.00 538 3%

Automation / Security 50.00 538 3%

Lifts 45.00 484 2%

Sub-Station 60.00 646 3%

Fire Alarm 25.00 269 1%

Fire Fighting 45.00 484 2%

Total Cost per Sft. 1950.00 20989.63 100%

Service Corridor

Computational Biology Centre

Structure RCC Rs./Sft BUA 350.00 3767 21%

Finishes Rs./Sft BUA 300.00 3229 18%

Electrical wiring & fixtures Rs./Sft BUA 125.00 1345 8%

Plumbing / Sanitation Rs./Sft BUA 75.00 807 5%

A/C Central A/C Rs./Tonne 300.00 3229 18%

D.G./Backup 100% incl. A/C Rs./KVA 100.00 1076 6%

UPS 70% of Lighting load Rs./KVA 0.00 0 0%

Stuctured Cabling LAN/ Datacom Rs./Sft. of BUA 125.00 1345 8%

Intercom/EPABX 50.00 538 3%

Automation / Security 50.00 538 3%

Lifts 50.00 538 3%

Sub-Station 60.00 646 4%

Fire Alarm 25.00 269 2%

Fire Fighting 50.00 538 3%

Total Cost per Sft. 1660.00 17868.09 100%

Page 2: Building Rates-break Up

CONSTRUCTION COST (PLINTH ARAE BASIS )

FOR BUILDING WORKS

Item Specifications UnitsPlinth Area

Rate (Rs./Sft)

Plinth Area Rate

(Rs./Sqm)Breakup

Centre for specialised services

Structure RCC Rs./Sft BUA 425.00 4575 23%

Finishes Rs./Sft BUA 450.00 4844 24%

Electrical wiring & fixtures Rs./Sft BUA 150.00 1615 8%

Plumbing / Sanitation Rs./Sft BUA 75.00 807 4%

A/C Central A/C Rs./Tonne 300.00 3229 16%

D.G./Backup 100% incl. A/C Rs./KVA 90.00 969 5%

UPS 70% of Lighting load Rs./KVA 0.00 0 0%

Stuctured Cabling LAN/ Datacom Rs./Sft. of BUA 113.00 1216 6%

Intercom/EPABX 38.00 409 2%

Automation / Security 38.00 409 2%

Lifts 45.00 484 2%

Sub-Station 60.00 646 3%

Fire Alarm 23.00 248 1%

Fire Fighting 45.00 484 2%

Total Cost per Sft. 1852.00 19934.76 100%

Admin and Mgmt Block

Structure RCC Rs./Sft BUA 188.00 2024 26%

Finishes Rs./Sft BUA 150.00 1615 21%

Electrical wiring & fixtures Rs./Sft BUA 75.00 807 11%

Plumbing / Sanitation Rs./Sft BUA 45.00 484 6%

A/C Central A/C Rs./Tonne 75.00 807 11%

D.G./Backup 100% incl. A/C Rs./KVA 30.00 323 4%

UPS 70% of Lighting load Rs./KVA 0.00 0 0%

Stuctured Cabling LAN/ Datacom Rs./Sft. of BUA 0.00 0 0%

Intercom/EPABX 38.00 409 5%

Automation / Security 0.00 0 0%

Lifts 45.00 484 6%

Sub-Station 0.00 0 0%

Fire Alarm 23.00 248 3%

Fire Fighting 45.00 484 6%

Total Cost per Sft. 714.00 7685.43 100%

Amenity Centre

Structure RCC Rs./Sft BUA 350.00 3767 20%

Finishes Rs./Sft BUA 600.00 6458 35%

Electrical wiring & fixtures Rs./Sft BUA 150.00 1615 9%

Plumbing / Sanitation Rs./Sft BUA 75.00 807 4%

A/C Central A/C Rs./Tonne 150.00 1615 9%

D.G./Backup 100% incl. A/C Rs./KVA 100.00 1076 6%

UPS 70% of Lighting load Rs./KVA 0.00 0 0%

Stuctured Cabling LAN/ Datacom Rs./Sft. of BUA 75.00 807 4%

Intercom/EPABX 45.00 484 3%

Automation / Security 30.00 323 2%

Lifts 45.00 484 3%

Sub-Station 25.00 269 1%

Fire Alarm 25.00 269 1%

Fire Fighting 50.00 538 3%

Total Cost per Sft. 1720.00 18513.93 100%

Other Utility Services

Structure RCC Rs./Sft BUA 150.00 1615 27%

Page 3: Building Rates-break Up

CONSTRUCTION COST (PLINTH ARAE BASIS )

FOR BUILDING WORKS

Item Specifications UnitsPlinth Area

Rate (Rs./Sft)

Plinth Area Rate

(Rs./Sqm)Breakup

Finishes Rs./Sft BUA 125.00 1345 23%

Electrical wiring & fixtures Rs./Sft BUA 75.00 807 14%

Plumbing / Sanitation Rs./Sft BUA 50.00 538 9%

A/C Central A/C Rs./Tonne 50.00 538 9%

D.G./Backup 100% incl. A/C Rs./KVA 50.00 538 9%

UPS 70% of Lighting load Rs./KVA 0.00 0 0%

Stuctured Cabling LAN/ Datacom Rs./Sft. of BUA 0.00 0 0%

Intercom/EPABX 0.00 0 0%

Automation / Security 0.00 0 0%

Lifts 0.00 0 0%

Sub-Station 0.00 0 0%

Fire Alarm 25.00 269 5%

Fire Fighting 25.00 269 5%

Total Cost per Sft. 550.00 5920.15 100%

Services Apartments

Structure RCC Rs./Sft BUA 350.00 3767 20%

Finishes Rs./Sft BUA 500.00 5382 29%

Electrical wiring & fixtures Rs./Sft BUA 125.00 1345 7%

Plumbing / Sanitation Rs./Sft BUA 125.00 1345 7%

A/C Central A/C Rs./Tonne 350.00 3767 20%

D.G./Backup 100% incl. A/C Rs./KVA 30.00 323 2%

UPS 70% of Lighting load Rs./KVA 25.00 269 1%

Stuctured Cabling LAN/ Datacom Rs./Sft. of BUA 50.00 538 3%

Intercom/EPABX 25.00 269 1%

Automation / Security 25.00 269 1%

Lifts 30.00 323 2%

Sub-Station 40.00 431 2%

Fire Alarm 25.00 269 1%

Fire Fighting 25.00 269 1%

Total Cost per Sft. 1725.00 18567.75 100%

Apartments

Structure RCC Rs./Sft BUA 350.00 3767 34%

Finishes Rs./Sft BUA 400.00 4306 39%

Electrical wiring & fixtures Rs./Sft BUA 110.00 1184 11%

Plumbing / Sanitation Rs./Sft BUA 75.00 807 7%

A/C Central A/C Rs./Tonne 0.00 0 0%

D.G./Backup 100% incl. A/C Rs./KVA 30.00 323 3%

UPS 70% of Lighting load Rs./KVA 0.00 0 0%

Stuctured Cabling LAN/ Datacom Rs./Sft. of BUA 0.00 0 0%

Intercom/EPABX 0.00 0 0%

Automation / Security 0.00 0 0%

Lifts 25.00 269 2%

Sub-Station 30.00 323 3%

Fire Alarm 0.00 0 0%

Fire Fighting 0.00 0 0%

Total Cost per Sft. 1020.00 10979.19 100%

Commercial

Structure RCC Rs./Sft BUA 450.00 4844 20%

Finishes Rs./Sft BUA 700.00 7535 31%

Electrical wiring & fixtures Rs./Sft BUA 175.00 1884 8%

Page 4: Building Rates-break Up

CONSTRUCTION COST (PLINTH ARAE BASIS )

FOR BUILDING WORKS

Item Specifications UnitsPlinth Area

Rate (Rs./Sft)

Plinth Area Rate

(Rs./Sqm)Breakup

Plumbing / Sanitation Rs./Sft BUA 100.00 1076 4%

A/C Central A/C Rs./Tonne 400.00 4306 18%

D.G./Backup 100% incl. A/C Rs./KVA 50.00 538 2%

UPS 70% of Lighting load Rs./KVA 50.00 538 2%

Stuctured Cabling LAN/ Datacom Rs./Sft. of BUA 50.00 538 2%

Intercom/EPABX 50.00 538 2%

Automation / Security 50.00 538 2%

Lifts 50.00 538 2%

Sub-Station 50.00 538 2%

Fire Alarm 50.00 538 2%

Fire Fighting 50.00 538 2%

Total Cost per Sft. 2275.00 24487.90 100%