BUILDING DEPARTMENT

GUIDE TO RESIDENTIAL BUILDING PERMITS

www.amherstburg.ca

April 18, 2018

Welcome to The Town of Amherstburg

The Town of Amherstburg is a growing historical community. It is one of the oldest most picturesque towns in Southwestern Ontario, Amherstburg is nestled on the shores of Lake Erie and the Detroit River. The Town of Amherstburg is committed to delivering cost-effective and efficient services for the residents with a view to improve and enhance their quality of life.

The Building Division is responsible for the enforcement of the Ontario Building Code, By-Laws and the Municipal Act.

What construction projects need building permits? The following is a partial list of projects that require building permits.

• New residence • Additions or renovations to an existing building • Detached garage and carports • Pole Barns • Sunrooms and porches • Sheds and Pool houses • Covered deck • All swimming pools • Demolition of a building • Alterations of building structures • Alterations to the plumbing system in a building • New septic system or alterations to a septic system • Retaining walls greater than 3’-4” in height • Solar Panels

What construction projects do not require a building permit?

• Building less than 107 s.f. (without plumbing) • Property fence (must comply with the fence by-law) • Retaining walls less 3’-4” in height • Sidewalks and Landscaping • Replacing roof shingles • Finishing a basement (installation of drywall) • Minor repairs to masonry • Damp proofing basements • Hot tubs • Other approvals may be required for electrical, gas, ERCA, etc.

2

Why are building permits needed? Permits are required to ensure that construction meets the minimum standards set out in the Ontario Building Code. They are also required to ensure that other applicable laws such as zoning by-laws, site plan control etc. are complied with. Who should apply for a permit? It is the property owner’s responsibility to ensure that a building permit is obtained. You may authorize your contractor to apply for the permit, however as the owner, ensure that a permit is in place prior to commencement of work. Owner should also verify that all work, inspections and all permits are complete prior to finalizing any contracts. What does the Building Department provide? The building department reviews all applications for building permits to ensure compliance with all applicable zoning by-laws, applicable laws and building code requirements. In addition, we perform the inspections as mandated by the Building Code Act based on the project that is being constructed. The Building Department are available to answer any questions you may have. For additional information call 519-736-5408. What is required for a building permit? Documents for permit applications will vary by the type of construction project. Every project will require an application to construct or demolish. This can be found on our web site at www.amherstburg.ca. The following is a list of required documents for new residential applications:

• Application to Construct or Demolish • Designer form • Energy efficiency form • Right of Way Permit. (To be obtained from Public Works) • Lot grading plan if not part of a subdivision • Two set of scaled drawings • Other approvals (as required)ERCA, Septic System Design • $1000.00 deposit cheque

Please note that incomplete applications or plans will not be accepted.

3

What drawings will I need to submit? Along with your completed application form you will be required to submit two full sets of construction drawings completed by a certified designer. All drawings shall be a minimum scale as indicated or scale that is ledgable. The following drawings are required.

• Site plan (1/16” = 1’-0”) • Foundation plan (1/4” = 1’-0”) • Floor plans (1/4” = 1’-0”) • Elevations (1/4” = 1’-0”) • Sections and details (1/2” = 1’-0”) • Lot grading plan • Engineering drawings (where required)

Along with the drawings listed above, other approvals may be required for your particular project. The following are some approvals that may be required upon submitting your application prior to issuance of a building permit.

• ERCA (Essex Regional Conservation Authority) • Septic Sewage System Approval • Ministry of Transportation • Committee of Adjustment • Minor Variance • Site plan agreement • County road approval • County road construction / Entrance Permit

4

What is the cost of a building permit?

Some fees may vary. For our complete fee schedule go to our web site at www.amherstburg.ca.

5

Permit Calculation Work Sheet

Some things to consider when choosing a contractor

• Check for contractor’s experience in the type of construction proposed • Interview the contractor and check on previous projects the contractor has completed • If building a new home, verify that the building contractor is registered with the Tarion

warranty program • Before signing the contract, check the drawings to ensure they comply with what you

want and check specifications and materials proposed. • Confirm whether the contractor is obtaining the building permit or if you are expected to

handle the building permit. When the contractor is applying for the permit, make sure you see the permit card before allowing work to start.

• Please note that the building department

has no jurisdiction to rectify any contract disputes

6

How long does it take to get my permit and when can I start? Residential building permits are usually issued within 10 business day of a complete application being submitted. Applications that are incomplete because of missing or incorrect information will be delayed. No work can commence until the permit has been issued and all fees have been paid. What inspections are required and how are they scheduled? Requesting inspections is the responsibility of the homeowner or the contractor of the project. Inspections must be booked at least 24 hours in advance. Each major phase of construction must be inspected to make certain the work conforms to the Ontario Building Code. Listed below are the mandatory inspections that are required.

7

INSPECTION SCHEDULE

The following schedule outlines the required inspections for building projects. It is the builder’s responsibility to request inspections and confirm that all work has been approved. Permit drawings must be on site at time of inspection. Any work covered before inspections are made, must be uncovered by the applicant for proper inspection. Inspections will be available between the hours of 10:00 am to 12:00 pm and 1:00 pm to 3:30 pm. Inspection request must be made 24 hours in advance at 519-736-5408.

1. Storm and sanitary sewer connection inspection. (water test required)

2. Water Service Line inspection contact Water Department at 519-736-3664

3. Footing inspection (before concrete is poured). Top of footing certificate required for new homes.

4. Grade entry inspection (rigid insulation installed prior to inspection).

5. Underground storm completion (before backfilling)

6. Parge & tar inspection (before backfilling).

7. Underground plumbing inspection (water test or air test)

8. In-floor heating inspection

9. Rough plumbing inspection (water test or air test)

10. Water Line inspection (air test required)

11. Rough framing inspection (Provide roof truss drawings and engineered floor truss

drawing layouts)

12. House Wrap Inspection (May be part of framing inspection)

13. Concrete porch rebar inspection

14. Fireplace inspection: before damper installation

15. Insulation & air/vapour barrier inspection. (Post attic insulation certificate at the hydro panel location).

16. Rear yard drainage inspection (before backfilling)

17. Final building and plumbing / Occupancy Permits , Final Grade Certificate

8

INSPECTION GUIDELINES

All construction sites must be clearly identified with municipal address. Approved permit drawings must be available on site for review. Contractor must ensure proper and safe access onto the job site as per Ministry of Labour guidelines. Inspection may be denied if proper access is not provided. Contractor / Applicant must ensure that all work is complete and ready for inspection. If any booked inspections are not ready they must be cancelled prior to the inspection otherwise it may be subject to a $50.00 fee. Contractor / Applicant must ensure that deficiencies are complete and re-inspected.

Storm and Sanitary

o Both storm and sanitary connections must be ready and water tested for inspection

o Water connection inspection is to be booked with Public Works at 519-736-3664 Footing

o All form work placed and secured o Soil must be undisturbed with no loose or organic material o A soils report may be required if soil conditions are questionable o Top of footing certificate is required at time of inspection

Backfill

o Weeping tiles must be covered with building paper or geo sock to prevent ingress of sand

o Storm sewer must be on compacted fill, clear stone or secured to the foundation o Pipe penetrations through foundation wall must be properly sealed with non-

shrinkable grout and tar o All downspouts must be splashed on to grade level. Downspouts are

permitted to be connected where there is a walk way or front entry. Anywhere where it is susceptible to frost..

o ‘Y’ and 45o fittings are to be used for vertical to horizontal downspout connections

o ‘TY’ fittings are permitted for test tees and cleanouts only. o Two 45o elbows or one 90o ‘long sweep’ elbow fitting may be used for

horizontal installations o Storm pipe suspended by foundation must be secured with straps and saddles

at maximum 16” o/c o All storm piping must have a water test o Directing ground water into the sanitary sewer is not permitted.

9

Framing

o Provide proper access to all floor levels o Ensure that all framing is complete including installation of windows, doors and

house wrap o Approved drawings must be available on site which include approved pre-

engineered roof trusses, floor joist layout and beam drawings o All steel beams and columns must be bolted or secured o Exterior columns must be anchored at top and bottom o All truss bracing must be complete for inspection o Attic hatch must be installed

Fire Separations

o Where applicable, all fire separations must be inspected o ABS piping not permitted within party walls

Plumbing

o All residential dwelling must be equipped with a back water valve (open type) or a sewage ejector where required

o All plumbing must be tested by either water or air and exposed for inspection o Rough plumbing to have water test or air test of 5 psi o Water line inspections are required to have a 100 psi air test o Provide smash plates on all drain lines and waterline where required o Maximum hot water temperature supplied to fixtures shall not exceed 49

degrees Celsius for all dwelling units Heating (Not a required inspection)

o A rough heating inspection is currently not required however minimum requirements are required prior to insulation inspection

o Grade entrances must have a supply air register at floor level within 5 feet of the door

o Heat ducts in attic spaces, exterior walls and garage areas must be sealed and insulated (min. R-12)

o All ductwork to be sealed o All return air inlets must be at floor level in basements o All heating and cooling units must be at least 36” from any side yard. o Insulation of ductwork must be completed for insulation inspection

Insulation

o Building must be weather protected to prevent rain ingress o All coffered ceilings must have minimum of R-60 insulation o Insulation stops minimum 16” must be installed at all change of ceiling heights. o Blown-in insulation cannot be installed on sloped ceilings greater than 2.5/12 o Provide blown insulation certificate at the electrical panel

10

Structural Slabs over Cellar

o Slab re-enforcing must be installed as per code, including ties to foundation walls

o Provide moisture protect for all wood in contact with concrete o Inspection required prior to placement on concrete

Final Inspection

o A final inspection must be performed before occupancy of all buildings. o All interior finish work completed o Water meter must be installed and connected o Gas meter to be installed and connected o All exterior finishes to be completed o All smoke and carbon monoxide detector to be connected and operational o All stairway to be completed with guard rails and handrails o All self-closing devices required between garage and house o All plumbing and heating to be complete and operational o Grading must be completed as per grading design o Final grading certificate required o All cleanout exposed complete with screw on caps o A final occupancy certificate will be issued on site only if all items are complete.

A certificate will not be issued if any deficiencies are safety related. o A deficiency letter will be issued for permits that remain outstanding

Grade Certificate

o A top of footing elevation certificate* must be presented to the Building Inspector. Once all forms are in place or immediately after concrete is poured.

o A final grade certificate* must be submitted to the Building Department. A grade certificate should indicate the following elevations:

• Brick ledge • Finished grades at front and rear of building • Catch basin or swale • Rear lot line

*Note: Top of footing certificates and grade certificates must be prepared by an Ontario Land Surveyor, Professional Engineer or a Certified Engineering Technician.

11

Record of Requested Building Inspections

Type of Inspection

Date Requested

Date Approved

Storm and Sanitary

Footings

Grade Entry Insulation

Backfill and Storm Completion

Framing

House Wrap

Fire Separation (if required)

Underground Plumbing

Rough Plumbing

Waterlines

Main Floor Insulation

Basement Insulation

Final Building, Plumbing

12

GENERAL BY-LAW INFORMATION

The following is for general information only. The information below is for residential zone with in the Town of Amherstburg. It is the applicant’s responsibility to verify all property lines, setbacks, roadways and easements.

Setback requirements Pool Minimum side and rear yard 1.5m (5’-0”) Minimum exterior side yard not permitted Pump, Filter and Heater

Minimum from side and rear lot lines 1.0m (3’-4”) Fences The minimum height for pool fences 1.2m (4’-0”) The maximum height for all fencing 1.98m (6’-6”) Fences must be constructed within property lines and are not permitted on easements and alleys Decks building permit required if deck is above 24” from grade

Minimum side yard (deck attached to house) 1.5m (5’-0”) Minimum side yard (deck not attached to house) 1.0m (3’-4”) Minimum rear yard 1.5m (5’-0”) Maximum height 1.5m (5 feet) Sheds (Accessory structures) Structures over 10m2 (107s.f.) – building permit is required Maximum lot coverage applies. Refer to bylaw.

Proper building drawings and a site plan are required.

o Minimum side and rear yard 1.0m (3’-4”) o Exterior side yard not permitted o Maximum building height (to the top peak of roof) 5.5m (18’-0”)

Structures under 10m2 (107s.f.) – building permit not required

o Minimum side and rear yard 1.0m (3’-4”) o Exterior side yard not permitted o Maximum building height (to the top peak of roof) 3.0m (10’-0”)

Air Conditioners

Air conditioner units must be a minimum of 0.9m (3’-0”) from any property line. 13

Frequently Used Phone Numbers

1. Building Department……………………………………………. 519-736-5408

2. Committee of Adjustment………………………………… …… 519-736-5408

3. Public Works …………………………………………………… 519-736-3664

4. Water Department………………………………………… …… 519-736-3664

5. Clerks Department……………………………………………… 519-736-0012

6. Finance Department……………………………………………. 519-736-0012

7. MPAC……………………………………………………………. 519-739-9920

8. Essex Power …………………………………………………… 519-737-6640

9. Union Gas……………………………………………….............. 1-888-774-3111

10. Ontario One Call (Call before your dig) ………………………. 1-800-400-2255

11. Electrical Safety Authority………………………………………. 1-877-372-7233

12. Essex Region Conservation Authority (ERCA)……….… ……. 519-776-5209

13. County of Essex………………………………………………… 519-776-6441

14. Windsor Essex County Health Unit ……………………………. 519-258-2146

15. Ministry of Transportation…………………………….………… 519-354-1400

16. Ministry of Environment………………………………................ 519-254-2546

17. Ministry of Natural Resources………………………….............. 519-354-7340

18. Ministry of Municipal Affairs ……………………………………. 416-265-4736

19. Ontario New Home Warranty (Tarion)……………………..….. 1-800-250-3589

20. Town of Amherstburg Police Service………………………….. 519-736-8559

21. Town of Amherstburg Fire Service……………………… ……. 519-736-6500

14

Application for a Permit to Construct or Demolish – Effective January 1, 2014 Page 1 of 4

Application for a Permit to Construct or Demolish This form is authorized under subsection 8(1.1) of the Building Code Act,1992

For use by Principal Authority

Application number: Permit number (if different):

Date received: Roll number:

Application submitted to: (Name of municipality, upper-tier municipality, board of health or conservation authority)

A. Project information

Building number, street name Unit number Lot/con.

Municipality Postal code Plan number/other description

Project value est. $ Area of work (m2)

B. Purpose of application

New construction Addition to an

existing building Alteration/repair Demolition

Conditional Permit

Proposed use of building Current use of building

Description of proposed work

C. Applicant Applicant is: Owner or Authorized agent of owner

Last name First name Corporation or partnership

Street address Unit number Lot/con.

Municipality Postal code Province E-mail

Telephone number

Fax

Cell number

D. Owner (if different from applicant)

Last name First name Corporation or partnership

Street address Unit number Lot/con.

Municipality Postal code Province E-mail

Telephone number

Fax

Cell number

Application for a Permit to Construct or Demolish – Effective January 1, 2014 Page 2 of 4

E. Builder (optional)

Last name First name Corporation or partnership (if applicable)

Street address Unit number Lot/con.

Municipality Postal code Province E-mail

Telephone number

Fax

Cell number

F. Tarion Warranty Corporation (Ontario New Home Warranty Program)

i. Is proposed construction for a new home as defined in the Ontario New Home Warranties Plan Act? If no, go to section G.

Yes No

ii. Is registration required under the Ontario New Home Warranties Plan Act? Yes No

iii. If yes to (ii) provide registration number(s):

G. Required Schedules

i) Attach Schedule 1 for each individual who reviews and takes responsibility for design activities.

ii) Attach Schedule 2 where application is to construct on-site, install or repair a sewage system.

H. Completeness and compliance with applicable law

i) This application meets all the requirements of clauses 1.3.1.3 (5) (a) to (d) of Division C of the Building Code (the application is made in the correct form and by the owner or authorized agent, all applicable fields have been completed on the application and required schedules, and all required schedules are submitted).

Payment has been made of all fees that are required, under the applicable by-law, resolution or regulation made under clause 7(1)(c) of the Building Code Act, 1992, to be paid when the application is made.

Yes

Yes

No

No

ii) This application is accompanied by the plans and specifications prescribed by the applicable by-law, resolution or regulation made under clause 7(1)(b) of the Building Code Act, 1992.

Yes No

iii) This application is accompanied by the information and documents prescribed by the applicable by- law, resolution or regulation made under clause 7(1)(b) of the Building Code Act, 1992 which enable the chief building official to determine whether the proposed building, construction or demolition will contravene any applicable law.

Yes No

iv) The proposed building, construction or demolition will not contravene any applicable law. Yes No

I. Declaration of applicant

I declare that: (print name)

1. The information contained in this application, attached schedules, attached plans and specifications, and other attached

documentation is true to the best of my knowledge. 2. If the owner is a corporation or partnership, I have the authority to bind the corporation or partnership.

Date Signature of applicant

Personal information contained in this form and schedules is collected under the authority of subsection 8(1.1) of the Building Code Act, 1992, and will be used in the administration and enforcement of the Building Code Act, 1992. Questions about the collection of personal information may be addressed to: a) the Chief Building Official of the municipality or upper-tier municipality to which this application is being made, or, b) the inspector having the powers and duties of a chief building official in relation to sewage systems or plumbing for an upper-tier municipality, board of health or conservation authority to whom this application is made, or, c) Director, Building and Development Branch, Ministry of Municipal Affairs and Housing 777 Bay St., 2nd Floor. Toronto, M5G 2E5 (416) 585-6666.

Application for a Permit to Construct or Demolish – Effective January 1, 2014 Page 3 of 4

Schedule 1: Designer Information Use one form for each individual who reviews and takes responsibility for design activities with respect to the project.

A. Project Information

Building number, street name Unit no. Lot/con.

Municipality Postal code Plan number/ other description

B. Individual who reviews and takes responsibility for design activities

Name Firm

Street address Unit no. Lot/con.

Municipality Postal code Province E-mail

Telephone number

Fax number

Cell number

C. Design activities undertaken by individual identified in Section B. [Building Code Table 3.5.2.1. of Division C]

House

Small Buildings

Large Buildings

Complex Buildings

HVAC – House

Building Services

Detection, Lighting and Power

Fire Protection

Building Structural

Plumbing – House

Plumbing – All Buildings

On-site Sewage Systems

Description of designer’s work

D. Declaration of Designer

I declare that (choose one as appropriate):

(print name)

I review and take responsibility for the design work on behalf of a firm registered under subsection 3.2.4.of Division C, of the Building Code. I am qualified, and the firm is registered, in the appropriate classes/categories.

Individual BCIN: __________________________________________

Firm BCIN: __________________________________________

I review and take responsibility for the design and am qualified in the appropriate category as an “other designer”

under subsection 3.2.5.of Division C, of the Building Code.

Individual BCIN: __________________________________________ Basis for exemption from registration: ________________________________________________________

The design work is exempt from the registration and qualification requirements of the Building Code.

Basis for exemption from registration and qualification: ___________________________________________

I certify that:

1. The information contained in this schedule is true to the best of my knowledge.

2. I have submitted this application with the knowledge and consent of the firm.

Date Signature of Designer

NOTE:

1. For the purposes of this form, “individual” means the “person” referred to in Clause 3.2.4.7(1) (c).of Division C, Article 3.2.5.1. of Division C, and all other persons who are exempt from qualification under Subsections 3.2.4. and 3.2.5. of Division C.

2. Schedule 1 is not required to be completed by a holder of a license, temporary license, or a certificate of practice, issued by the Ontario Association of Architects. Schedule 1 is also not required to be completed by a holder of a license to practise, a limited license to practise, or a certificate of authorization, issued by the Association of Professional Engineers of Ontario.

Application for a Permit to Construct or Demolish – Effective January 1, 2014 Page 4 of 4

Schedule 2: Sewage System Installer Information

A. Project Information

Building number, street name Unit number Lot/con.

Municipality Postal code Plan number/ other description

B. Sewage system installer

Is the installer of the sewage system engaged in the business of constructing on-site, installing, repairing, servicing, cleaning or emptying sewage systems, in accordance with Building Code Article 3.3.1.1, Division C?

Yes (Continue to Section C) No (Continue to Section E) Installer unknown at time of application (Continue to Section E)

C. Registered installer information (where answer to B is “Yes”)

Name BCIN

Street address Unit number Lot/con.

Municipality Postal code Province E-mail

Telephone number

Fax

Cell number

D. Qualified supervisor information (where answer to section B is “Yes”)

Name of qualified supervisor(s) Building Code Identification Number (BCIN)

E. Declaration of Applicant:

I declare that:

(print name)

I am the applicant for the permit to construct the sewage system. If the installer is unknown at time of application, I shall submit a new Schedule 2 prior to construction when the installer is known;

OR

I am the holder of the permit to construct the sewage system, and am submitting a new Schedule 2, now that the installer is known.

I certify that:

1. The information contained in this schedule is true to the best of my knowledge.

2. If the owner is a corporation or partnership, I have the authority to bind the corporation or partnership.

Date Signature of applicant

Energy Efficiency Design Summary

(Part 9 Residential)

This form to be completed & signed by the person who reviews and takes responsibility for the energy efficiency design of the project Information on completing this form is contained on the reverse

For use by Principal Authority Application No:

Model/Certification Number

A. Project Information

Building number, street name

Unit number Lot/Con

Municipality

Postal code Reg. Plan number / other description

B. Compliance Option

SB-12 Prescriptive [SB-12 - 2.1.1.] Table: Package:

SB-12 Performance* [SB-12 - 2.1.2.] * Attach energy performance calculations using an approved software

Energy Star®* [SB-12 - 2.1.3.] * Attach BOP form. House must be labeled on completion by Energy Star

EnerGuide 80® * * House must be evaluated by NRCan advisor and meet a rating of 80

C. Project Design Conditions

Climatic Zone (SB-1): Heating Equipment Efficiency Space Heating Fuel Source □ Zone 1 (< 5000 degree days) □ ≥ 90% AFUE

□ ≥ 78% < 90% AFUE □ Gas □ Propane □ Solid Fuel

□ Zone 2 (≥ 5000 degree days) □ Oil □ Electric □ Earth Energy

Windows+Skylights+Glass Doors Other Building ConditionsGross Wall Area = m2

% Windows+ _____ % □ ICF Basement □ Walkout Basement □ Log/Post&Beam Gross Window+ Area = m2 □ ICF Above Grade □ Slab-on-ground

D. Building Specifications

Building Component RSI / R values Building Component Efficiency RatingsThermal Insulation Windows & Doors1

Ceiling with Attic Space Windows/Sliding Glass Doors Ceiling without Attic Space Skylights Exposed Floor Mechanicals

Walls Above Grade Space Heating Equip.2 Basement Walls HRV Efficiency (%) Slab (all >600mm below grade) DHW Heater (EF) Slab (edge only ≤600mm below grade)

NOTES 1. Provide U-Value in W/m2.K, or ER rating 2. Provide AFUE or indicate if condensing type combined system used Slab (all ≤600mm below grade, or heated)

E. Performance Design Verification [complete applicable sections if SB-12 Performance, Energy Star or EnerGuide80 options used]

SB-12 Performance: The annual energy consumption using Subsection 2.1.1. SB-12 Package__________ is__________Gj (1 Gj =1000Mj) The annual energy consumption of this house as designed is__________Gj The software used to simulate the annual energy use of the building is:______________________________________ The building is being designed using an air leakage of ______ air changes per hour @50Pa.

Energy Star: BOP form attached. The house will be labeled on completion by:

Energy Star and EnerGuide80: Evaluator/Advisor/Rater Name:

Evaluator/Advisor/Rater Licence #:

F. Declaration [by the person who reviews and takes responsibility for the energy efficiency design]

I certify that I have reviewed the design documents submitted with the permit application, that the information contained on this form is consistent with the design documents, and that information used in any annual energy use calculations, if applicable, is a true representation of the design documents. Name Signature

Date:

Guide to the Energy Efficiency Design Summary Form The Energy Efficiency Design Summary form summarizes the compliance path used by a house designer to comply with energy efficiency requirements of the Ontario Building Code. This form is completed by the person responsible for the energy efficiency design of the project, and must be submitted with the building permit application. The information on this form MUST reflect the drawings and specifications being submitted, or the building permit will be refused. Refer to Supplementary Standard SB-12 for details about building code compliance requirements. Further information about energy efficiency requirements for new buildings is available from the provincial building code website at www.mah.gov.on.ca, or the municipal building department.

Beginning January 1, 2012, a house designer must use one of four energy efficiency compliance options in the building code:

1. Comply with the SB-12 Prescriptive design tables, 2. Use the SB-12 Performance compliance method, and model the design against the prescriptive standards, 3. Design to Energy Star standards, or 4. Evaluate the design according to EnerGuide technical procedures and achieve a rating of 80 or more.

COMPLETING THE FORM

B. Compliance Options

Indicate the compliance option being used.

SB-12 Prescriptive requires that the building conforms to a package of thermal insulation, window and mechanical system efficiency requirements set out in Subsection 2.1.1. of SB-12. Energy efficiency design modeling and testing of the building is not required under this option.

SB-12 Performance refers to the alternative method of compliance set out in Subsection 2.1.2. of SB-12. Using this approach the designer must use recognized energy simulation software (HOT2000 V9.34c1.2 or newer), and submit documents which show that the annual energy use of the building is equal to a prescriptive package.

Energy Star houses must be designed to Energy Star requirements and be labelled on completion by Enerquality or other agency. The Energy Star BOP form must be submitted with the permit documents.

EnerGuide80 houses are validated by NRCan authorized energy advisors and must achieve a rating of 80 or more when evaluated in accordance with EnerGuide administrative and technical procedures.

C. Project Design Conditions Climatic Zone: The number of degree days for Ontario cities is contained in Supplementary Standard SB-1 Windows, Skylights and Glass Doors: If the ratio of the total gross area of windows, sidelights, skylights and glass doors to the total gross area of walls is more than 17%, higher efficiency glazing is required. If the ratio is more than 22% the SB-12 Prescriptive option may not be used. The total area is the sum of all the structural rough openings. Some exceptions apply. Refer to 2.1.1.1. of SB-12 for further details. Fuel Source and Heating Equipment Efficiency: The fuel source and efficiency of the proposed heating equipment must be specified in order to determine which SB-12 Prescriptive compliance package table applies. Other Building Conditions: These construction conditions affect SB-12 Prescriptive compliance requirements. D. Building Specifications Thermal Insulation: Indicate the RSI or R-value being proposed where they apply to the house design. Under the SB-12 Prescriptive option, RSI 3.52 wall insulation is permitted in certain conditions where other design elements meet higher standards. Refer to SB-12 for further details. E. Performance Design Summary This section is not required to be completed if the SB-12 Prescriptive option is being used. AIRTIGHTNESS REQUIREMENTS FOR NEW HOUSES All houses must comply with increased air barrier requirements in the building code. Notice of air barrier completion must be provided and an inspection conducted prior to it being covered. A blower door test to verify the air tightness of the house must be conducted during construction if the NRCan EnerGuide80 option is used, or if the SB-12 Performance or Energy Star options are used and an air tightness of less than 2.5 ACH @ 50 Pa in the case of detached houses, or 3.0 ACH @ 50 Pa in the case of attached houses is necessary to meet the required energy efficiency standard.

ENERGY EFFICIENCY LABELING FOR NEW HOUSES Energy Star and EnerGuide issue labels for new homes constructed under their energy efficiency programs. The building code does not regulate new home labelling.

PWD-WM-2012-005 Revision Date: April 25, 2017

THE CORPORATION OF THE TOWN OF AMHERSTBURG Application For Water Connection and Water Meter

A) WATER SERVICE CONNECTION

Address of Water Service Connection:

B) APPLICANT

The Applicant is the Owner or The Applicant is an Authorized Agent of the Owner

Name: Telephone Number:

Mailing Address: Cell Phone Number:

Fax Number:

Email Address:

C) WATER METER FEE

¾” Water Meter Fee $ 470.00

1” Water Meter Fee $ 560.00

1 ½” Water Meter Fee $1020.00

2” Water Meter Fee $1135.00

TOTAL PAYMENT RECEIVED $

D) FRONTAGE AND CONNECTION FEES (for unserviced properties)

¾” Water Service Fee $2750.00

1” Water Service Fee $2950.00

1 ½” Water Service Fee At cost (Deposit) $3000.00

2” Water Service Fee – At Cost At cost (Deposit) $3000.00

TOTAL PAYMENT RECEIVED $

ADDITIONAL INFORMATION:

All waterlines are to be a continuous length of type “k” copper (no couplers) unless installed after a meter pit at

the lot line and approved by the Town.

All waterlines must be 1.5 metres five (5’) deep and 2.4 metres (8’) from the sewer or other utilities.

E) CONDITIONS

i) The Applicant must contact the Public Works Department (PWD) at 519-736-3664 at least ten (10) days before the

installation of the water service is required to allow for locates to be scheduled.

ii) Once a waterline inspection has been completed, a water billing account will be activated with Essex Power Services.

iii) The Applicant must ensure that the water meter is picked up from the Public Works Department located at 512

Sandwich Street South.

iv) Prior to the Building Department’s plumbing inspection, the following must be completed:

a) Water meter installation with a minimum 22 gauge, four (4) conductor wire run for the touch pad from the water

meter continuously to the electrical stack located outside of the house.

b) Water meter installation is inspected by the PWD and the touch pad has been connected by the PWD.

v) The Applicant shall abide by the “Conditions” as outlined in the by-laws or policies as adopted by the Town of Amherstburg and to hold this application as a contract when signed by the Applicant and by the Town of Amherstburg.

PLEASE NOTE: Failure to complete the above may result in the disconnection of the water service.

F) DECLARATION OF APPLICANT

I declare that the information contained in this application is

true to the best of my knowledge. If the owner is a corporation or partnership, I have the authority to bind the

corporation or partnership.

Signature of Applicant Date of Application

Personal Information on this form is collected pursuant to Municipal Act 2001, SO 2001, c.25 and will be used for the purposes of

processing your application. Questions about this collection should be directed to the Clerk, Town of Amherstburg at 271 Sandwich

Street, Amherstburg, ON N9V 2A5, 519-736-0012