19

BUILDING DEMOLITION - Iowa Publications Onlinepublications.iowa.gov/25338/1/Building demolition 1969.pdf · 2017. 10. 11. · demolition work. This requires the inspector and a repre

  • Upload
    others

  • View
    16

  • Download
    2

Embed Size (px)

Citation preview

Page 1: BUILDING DEMOLITION - Iowa Publications Onlinepublications.iowa.gov/25338/1/Building demolition 1969.pdf · 2017. 10. 11. · demolition work. This requires the inspector and a repre
Page 2: BUILDING DEMOLITION - Iowa Publications Onlinepublications.iowa.gov/25338/1/Building demolition 1969.pdf · 2017. 10. 11. · demolition work. This requires the inspector and a repre

BUILDING DEMOLITION

Dan Wagner Lyle Baughman

Page 3: BUILDING DEMOLITION - Iowa Publications Onlinepublications.iowa.gov/25338/1/Building demolition 1969.pdf · 2017. 10. 11. · demolition work. This requires the inspector and a repre

/

INTRODUCTION

This handbook is an inspector's aid. It was written by two inspectors to bring together all of the most­often-needed information involved in their work.

Much care has been taken to detail each phase of construction, with particular attention to the require­ments and limitations of specifications. All applicable specification interpretations in Instructions to Resident Engineers have been included.

The beginning inspector should look to the hand­book as a reference for standards of good practice. The Standard Specifications and Special Provisions should not, however, be overlooked as the basic sources of information on requirements and restrictions concerning workmanship and materials.

Page 4: BUILDING DEMOLITION - Iowa Publications Onlinepublications.iowa.gov/25338/1/Building demolition 1969.pdf · 2017. 10. 11. · demolition work. This requires the inspector and a repre

Demolition

contract and Proposal

Record Book and Diary

Plans

Rodent Extermination

Wrecking Permits

Utilities

water Lines

Sanitary Lines

Storm Sewers

Gas Lines

Telephone Lines

Records

Jobs ite Procedure

Salvage

Appendix

CONTENTS

Page

1

1

1

3

3

5

5

6

7

7

7

8

8

8

9

11

Page 5: BUILDING DEMOLITION - Iowa Publications Onlinepublications.iowa.gov/25338/1/Building demolition 1969.pdf · 2017. 10. 11. · demolition work. This requires the inspector and a repre

Demolition Demolition is the removal of manmade structures,

such as houses, garages, outbuildings, foundations, side­walks, w~ lls, cisterns, and septic tanks from areas to be used for highway construction. Sometimes removal of trees is also included. Street sidewalks are normally not removed unti I road work begins.

In most cases , the area scheduled for demolition appears the same as the surrounding neighborhood. Occa­sionally building s of value are removed and all that remains for the demolition contractor is removal of foundations and sidewalks.

Whether or not a building can legally be moved is usually decided by the city or county building inspector. Highway Commission personnel involved in demolition work should become familiar with local codes and requirements.

contract and Proposal Th ese documents give the inspector information

pertaining to both the area of demolition and the require­ments of the Iowa State Highway Commission. Contracts are awarded on the basis of the sum of the total bid on each item in the proposal. Each item or parcel i s listed separately on the contract, showing item number, parcel number, location of parcel, and the amount for removal of each item. Other information useful for the inspector's records and diary also appears in the contract.

Record Book and Diary A field record book and diary must be prepared

before work begins in the field. These books are used to record all daily activities performed by the project con­tractor.

The diary should be started on the first day the contractor works or the first day of the contract period, whichever comes first. Explain why the contractor did not start on the contract starting date, if the reason is known. This comes in handy later if a construction per­iod report is required. The diary may be started before

Page 6: BUILDING DEMOLITION - Iowa Publications Onlinepublications.iowa.gov/25338/1/Building demolition 1969.pdf · 2017. 10. 11. · demolition work. This requires the inspector and a repre

2

-- CONTRACT jl01902

1 2 3 4 5 6 7 8 9

10 11 12 1 ~ ~4

15 16 17 lB 19 20

rn- .. w.k Salvage & Removal of Bldgs. ...... ... __ UN_-_sl_B_-_5('-9~)_--_4_1_-5_7 ___ _ = .. c.--• ...;. ,.r~.-·n ., l . .. ~/) c:...r Linn ·-. ..., ~dar valley Expressway Route . in Cedar Rapids , from point on l s t Ave. : ~ a r 4th S t. NW. northeaster :. . r, l s t St. N'"t'l at E Ave. NW .

1XII A:an..DrT ........ _. " ... - ...,. w.. ._ H.q•••, c---..._.,'-""-. .. 11ooo .......... -....,.,

Harry J. Bradley , Jr . , D·~ rb•: D. T"lompson, Robert C. Barry, John R. Hansen . r.·.:·-! -t Voo rhees ,...,..,._.,.,...._.

J. C , WtU~E Exc:·.-ating Co .

Parcel 915 , 320 1st Ave . "'"" $ 600.00 Parcel 924, 120 JrC. St. l>"W 650.00 Parcel 933, 309 A Ave. NW 45D.OO Parcel 934, 305 A Ave. NW 400,00 Parcel 941, 306 A Ave . t!W 350.00 Parcel 942, 308 A Ave. NW 400.00 Parcel 942, 308 A Ave. NW 150.00 Parcel 942, 308 A Ave. NW 125.00 Parcel 942, 312 A Ave. NW 15'0 . 00 Parcel 943, 314 A Ave. NW 425.00 Pared 941, 314 A Ave. NW U5.00 Parcel 944, 320 A Ave. NW 750 . 00 Parcel 944, 320 A Ave. NW 200 . 00 Parcel 944, 32 0 A Av e . NW 150.00 Parcel 963 . 220 A Ave. NW 625.00 Parcel 963, 2 2 0 A Ave . NW 300.00 Parcel 969, 223 B Ave . NW 450.00 Parcel 969, 219 B Ave . NW 450 .00 Parcel 969, 22 1 B Ave. ''" 325 . 00 Parcel 970, 217 B Ave . t;W 700.00

3

the contract period begins in order to document preparatory steps, such as rodent inspection.

The record book helps maintain a weekly progress report on' work being done. Because demo I ition is a rela­tively new operation in the construction department, inspectors may observe possible means of improving record book set-ups. Diaries should therefore be kept on an indiv­idual basis.

Each individual item and parcel should be listed on separate sheets along with all information pertaining to the respective item or parcel. This forms a record of the project's progress from the beginning of the job to the com­pletion. This system fulfills all demolition project record requirements .

Documenting all work in the diary as well as noting it in the record book is essential. Such things as locations of utilities, plugging sewers , and exterminat ion (if required) must be included in both volumes.

Plans Plans must be on the job at all times . Becoming

familiar with the plans helps determine the locations of all involved parcels. General notes pertaining to the pro­jects are also helpful. Plans can be obtained from the resident engineer. Parcels to be demolished should be shaded in. Mark on the plans (in color) the locations of water cutoffs, sanitary sewer cutoffs, and any other per­tinent information prior to the beginning of work. This helps prepare as-built plans upon completion of the projec t.

Plans usually state the estimated date of posses­sion of the structures. These dates should be checked through the resident engineer to verify that the dates are final. If structures are not available for demolition, the contractor should be informed; such matters influence his work schedule.

Rodent Extermination This is required by the Special Provisions. To

facilitate progress of the work, an inspection should be

Page 7: BUILDING DEMOLITION - Iowa Publications Onlinepublications.iowa.gov/25338/1/Building demolition 1969.pdf · 2017. 10. 11. · demolition work. This requires the inspector and a repre

4

APPLICATION FOR WRECKING PERMIT

TO: OUILOI:-;G SAFETY OF.PART~I ENT

CITY O r I':EDAR 11-\PIPS. 10 WA

PERMIT No·---------------

Date ___ - __ - _----- - -------- -----

_ _ • _ . ___________ ___ ___ _ __ __ _ _ _ _ pc-rm1t to wreck the _ -------- ---- - - -

____ _ ____ __ __ ---- __ --- - - _ --------- -- aL ___ _ - -- - - - -- - - -- --- - - - --- - ----- ---- -

Stories - - - - - -- -------- - Fire Zone - - -- _- - - -- ---- __ - --- -- -- -- ----------

O"'·ncr _ _ ___ ___ --- _ -- ----- - - ------- ------ _ __ -- - - - ------ - - -- - - ---- --- -

\V/r' k'b Contr . - -------- · __ - - ------- - - -- - - ---- Addr. - - -- - - -- - ------ --- -- - --- --

f EE ______ ___ _ -- - - Stgn:a turc/ A ppilcanL _-- - - __ --- - - ------ -- --- - --- - --- - - -----TI1i1 :.a r pl ic J.II on ~nJ an y pc:rmit dut may bt granted in rt 51X'Imc thrrcto 1rc subjtcc to all laws o f chc St.uc- o i IO•.l. and all ord inances o ( the Ci cy of ~ar Ra pods, Jo.,.a, that may have bearing on

Date ___ -- -- __ - -- - ---- --- Appr'vd . _ -- - -- --- ------- -- - - -- - - - - -- - - ----- - -- -- -

CC: ~~~~:;~~n~:c~~ r:J·~;p. so0..:~~ See back o f sheet for CONDITIONS OF PERMIT

CONDIT;Q0,'S fo r issuance of PERMIT: (Bond , St reet Occupancy Permit, Fences,

B.uricades, P rotect iVe Canopies, Walkways, etc):-- -- --- - - - - -- - --- - ----- ---------- --

The O wner or h is H.cpr~cntati ve Sha ll :

l. :-.=or i:·\ .;. ;; ut d1ty com...,an ics and as.:;u mc the responsib ility for proper d iKonnec­l•ons, an clu..:.n b •cmo va l of efcctcon l hazards, capping of ~wers, and termtnation of gas, deccrical an,: v.·.o. te r lines .

2. Fill in t: x..:• var•ons, cisterns, pits and other depressions to grade.

3. Clt:an 1...:> "-'eelcly; accomplish prompt and thorough final dean-up.

5

made approximately one week prior to the beginning of demolition work. This requires the inspector and a repre­sentative of the contractor to contact the city or county health department, depending upon the job location. An off icial health department representative should accompany the inspector and the contractor to examine each individ-ual parcel on the contract. The health department represen t­ative then decides whether or not a parcel needs placement of poi son for rodents, or a house needs fumigation for roaches.

wrecking Permits The contractor may be obliga ted to obta i n wreckin g

permits for each separate structure. These perm its can be obtained from the city or county buildin g department, de­pending upon the job location . Cities have di f fere nt requi re­ment s. The cos t of ob tain ing a wreckin g permit normall y fall s to th e contractor. The wreck.ing permit number and the date of i ssuance must be recorded in the in spector's record book. Wreckin g permits must be posted by the contract or prior to beginning work. They should be visibl e to the pub­lic, and they must not become lost or destroyed be fore the parcel is completel y demolished and all debri s haul ed away.

Each building department, dependin g on th e c i ty or to wn , has codes stat i ng how a building should be dem ol­ished and what barricades are necessary for th e protec tion of pedestrian and automobile traffic. In general, thes e codes are established for the protection of everyone in­volved in the area of the demolition work. The contractor and the inspector should both be familiar with these codes and follow them.

Utilities Utilities are such things as sanitary sewers,

storm sewers, water lines, telephone lines, gas lines, and power I ines. Uti I ily company officials should be in vi ted to a preconstruction conference with the resident engineer and the contractor to discuss the contractor's schedule and resolve potential problems.

Page 8: BUILDING DEMOLITION - Iowa Publications Onlinepublications.iowa.gov/25338/1/Building demolition 1969.pdf · 2017. 10. 11. · demolition work. This requires the inspector and a repre

6

The utility companies should be notified in advance of the time the contractor starts work. They require ample time to locate and disconnect their services. All utility cutoffs should be coordinated with the contractor so his work can progress steadily. By the same token, the con­tractor should arrange his work to cooperate with the utility companies.

water Lines water cutoff locations are usually determined by

an official of the city water works department. Most cutof fs are made at the curb cock shut-off valve either on the lead side ( side toward the street) or just behind the shut-off valve (side toward the residence). The lead pipe side is bent and clamp ed to prevent leaks . The excavation should be l ef t open for a short period of time to determine if leaks appear. The pipe may be threaded and tapped off with a plug when service is cut off behind the shut-off valve (side toward the residence).

In some instances, the water department may re­qui re that the water be cut off at the main; usually this will require excavation in the traveled way . If the main is aba ndoned at the time of road construction, cutoff at the main may not be required at the time of demolition. This should be discussed with the city water department.

The Highway commission pays for these water cutoffs on some projects. The inspector should be aware of who pays for the cutoffs. Requirements differ from town to town.

The contractor should mark all water shut-off valves, keeping them from being disturbed by the contractor's equipment. water cutoffs should be completely disconnected and plugged before the structure is demolished. Otherwise, the water line may be pulled completely out of the main, causing extensive damage and water loss. All cutoffs should be located, referenced, and recorded for future use. The ties should be recorded on as-built plans. This infor­mation becomes helpful when the proposed roadway is con­structed.

7

Sanitary lines The contractor must cut off and seal all sanitary

lines leading from structures to be removed. These lines are lot ated near the structure and cut off. The broken open end still leading to the main line is then cleaned out and sealed with a mortar mix. An 8-inch mortar plug is usually the minimum size required. The inspector should concurrently locate and reference the cut and plugged end with distances from the main line. The main line is usually found in an alley. After referencing is completed , the ex­cavation may be backfi lied.

Storm Sewers Storm sewers are normally not disturbed. Most are

located in the traveled way, and can be removed at a later date if no longer i'n service. If they are in the way, how­ever, storm sewers should be handled in the same manner as sanitary sewers.

Water lines must be properly capped to prevent contam­ination of the water supply. Lines to sewers must be plug­ged to prevent foreign objects and rodents from entering the sewer system.

Gas Lines Gas line cutoffs are usually handled by the gas

company. The contractor should contact the gas company and inform them of the demolition work.

The electrical company should be informed by the contractor of the location and type of work to be done and requested to remove their lines from the structures, For

safety reasons, H is important that power I i nes be removed from structures :

Electrical utility companies usually remove all meter b0xes when doing a cut off. The inspector should make a second check with a representative of the electrical utility to ensure that all electrical power has been taken out. The company usually keeps a check list of each struc­ture.

Page 9: BUILDING DEMOLITION - Iowa Publications Onlinepublications.iowa.gov/25338/1/Building demolition 1969.pdf · 2017. 10. 11. · demolition work. This requires the inspector and a repre

8

Telephone Lines The telephone company should also be informed of

the location and type of work taking place in the demolition area. The inspector can request that they remove lines attached to structures involved in the contract. Check if any telephones have been left behind. The telephone company may want to retrieve them.

Payment responsibility for disconnection of the various utilities is outlined in the specifications, special provisions, and / or plans for a particular project. If any questions arise concerning this or other matters pertaining to the project, contact the resident engineer.

Records All information on utilities must be recorded in

the field record book. The sample set-up serves as both a complete record of demolition and as a check list.

Jobs ite Procedure When the contractor is prepared to start demolition

of structures the inspector should be assured that 1) All utilities have been cut off. 2) The wrecking permits are placed in a

manner complying with local require­ments.

3) The contractor has all fences or barri­cades required by city building codes in place.

There is no set pattern for the contractor to follow in demolishing a structure. The inspector should be pri­mari I y concerned

1) With getting the structure torn down and all debris removed in a safe manner.

2) That the contractor does not damage adjoining property not in the demoli­tion contract. (Liability insurance is covered in the specifications.)

9

All debris should be removed to leave the site in a clean condition prior to backfilling excavation areas. Someone may return in the future to excavate for a new structu re; any rubble left behind by demolition may then cause construction problems.

Trees must also be removed. Normally, only trees interfering with demolition work should be removed. Remain­ing trees are removed under subsequent grading contracts. The resident engineer (or the plans) may specify removal of dead or diseased trees in special cases.

It is the contractor's responsibility to acquire an area satisfactory to the city and to the Highway Commission for disposal of debris and rubbish from the demolition site. He must backfill excavations within two weeks, or fence open excavations with snow fence. Suitable material must be obtained for backfilling. Some backfill areas require compaction with a sheepsfoot roller. These areas are des­ignated on the plans under "general notes". Back fill must be placed in lifts and compacted as shown on applicabl e plans and specifications for the particular proj ect.

The area backfilled should be bladed relatively smooth and blended with the adjacent terrain and elevation. Water Pondage should be eliminated. Extra compa ct ion is needed because structures may be located in these areas at a later date. All installation, maintenance, and removal costs of fences and barricades erected to keep the site from becoming a public hazard are incidental to other items on the contract.

The contractor must take care to control air pollu ­tion, such as dust. He should wet down masonry thoroughly, providing water and the necessary equipment.

Salvage The demolition (prime) contractor may sublet a

portion of the job to a salvage subcontractor prior to demolition. Certain items are then removed for resale to the public. The subcontractor is required to operate under conditions established in the original contract. An author­ized representative of the prime contractor should be on the job at all times.

Page 10: BUILDING DEMOLITION - Iowa Publications Onlinepublications.iowa.gov/25338/1/Building demolition 1969.pdf · 2017. 10. 11. · demolition work. This requires the inspector and a repre

10

This allows the Highway commision to retain control of the various salvage operations through the prime contrac­tor. (See Spec. 593)

The prime contractor may sell the house or struc­ture if it is torn down on the existing site. Under no circumstances should a house or structure be moved from its existing site unless provided for in the contract. The prime contractor must keep all houses and str:.Jctures se­cure to avoid creating a public hazard. NJ items should be stored on the premises, the right of way, or the street pending sale or other disposal.

Sometimes salvage work removes enough of the struc­ture to constitute demolition, and a wrecking permit is needed for salvagjng. A rule uf thumb is: if the salvage work causes any portion of the structure to collapse or en­dangers persons entering the structure after salvage is completed, the work is considered demolition. To remove all doubt, permits should be obtained and posted before work begins. Posting permits too early invites vandalism.

11

APPENDIX

SAMPLE RECORD PAGES

Page 11: BUILDING DEMOLITION - Iowa Publications Onlinepublications.iowa.gov/25338/1/Building demolition 1969.pdf · 2017. 10. 11. · demolition work. This requires the inspector and a repre

//~M

11\10/!X P/IG£

OE.:JCIZIPT/ON

CoNrel9croes P.e.<tso-"1"-'EC...

J.c. W#//E Exc,..v~T/NG

i?lt!O #191ZINI</6 /ZP.

Dlf.s I'?OtA/E~, ./o..-19.

.5oP7' R4t.P't WIWT4

7.f!VG'< O~tv~,£- O<w Ro&N.SO...I

Teuct<. OetvJ!K- f<.c. W#/TE

/ow"! S~v~G£

Dee. /10IN,e"', IowA .

.511' V-'l<>£ rc.eE/"?,l/11

Wt>,V!II! ~el!l.I~TE.Ie.

PIIG£ .!:!.fL._

I

/,YSP.eCT/OA/ PE,/i!.50NN£L ~

Ro8e'eT c . .C-9¥

11£N Bvckt.tlll

OoN 1-<I'-'Ja.N<!IZ

C4PGK40 BY

R/!'3/P&'NT $.-./Gii!.

OFFICE 3<Go5 S7e>e

,1/0MI£ !

. A&eor. ~$/P~If/T .e'..vG~ ·

, OrF'tCE- 3'-!SS7St!

:#on£-

/!l.sPEcroe ;S.W·

_. N

_. VJ

Page 12: BUILDING DEMOLITION - Iowa Publications Onlinepublications.iowa.gov/25338/1/Building demolition 1969.pdf · 2017. 10. 11. · demolition work. This requires the inspector and a repre

OVIIIITI T/&.S

!7L!!M PAR Et No. 1-0CAr/oN >JO .

I PARC '" 9!5 :3ZO ;o>.f AVe NW

2 PARe E.L!'e4- IZO 3"!1g. N-W

.3 PA/i.C :£L 83.3 3o1P ;fAll£ N-W

4 At\ll.C Q.'!>3~ 30s ~· Av£ /J.w

A· ITE.M N0.1 PAet:E(. N0 -1

liS- Pee.c "1'/7 01" O:wreAc r

. 3oo•< /'10 - /£> PES16NA

IP- PAc.E f.'o. I~ S.etl" ~x~

f · PlAU ,'If>. 04'~t.IIAT~S

CONT£h::T INFOii!MAT/ON

Pf?.o.u:cr ND · f.JN · SI8·S(J!Jl· - 4h57

,(.INN Coo"' TY

S,q( VAG£ AIVO RI!'MOW>L OF' BVIGD/Nud

ON 'T#.I! P.elo.RilY 1 SIC77o!V or T/1'.1!'

C£Dlll! VAa£'1 e'Kp~I!'SSWAY IN C£o-'!.e

R'APIPS -

C o,yr.eAc7 6TA/i!TING 1/,IJT.e'

CoiYTif!AC.T CoMPC£'Ti o"' PA71!" .

CoAJTJi!ACT CA<-t!IYOA/l. DAY6

1/CTt/AG 6TAJ!:T/NG- {1/ITE

I/C70AC. CoMPCE77011 J:)ATt:

ACTOAL CA,EII()AR. ()11%

/..1 0111 DATED PAI'IA.G~OAY

AU6-IZ ' Jf?J<S.d

1\)ov. ~o . f!}~

1/1

5EPT. 10, 19'-J!,

Oc.T 1!4-, ~6

4F>

j

l),G'-5Cii!! !PTIOA/ AMO{/NT 9'- of' I'N~" I ":AGI! p,.o::

lco.vrll- 110·

2 6roey Fe!lf'IIE /.lousE 4 -31 .S7

G. (!'!> .ooo. oo .501

Z 5TO!i!'l FeAM~ /{Ot/6£ <OSO · oo 4 -C.? .57

7 Zf!J ..SO/

t'((J(/$.1! ,3 .Z3 ..67 a zg I sro.ey /"IBAI'It:' 450 · 00 SO/

I .S7'02Y /"teAM£ ltlo~ 400· 00 Z-87 .?7 g Z!!' .SOl

.LOCI\ T/011, 0E6GIZIP7'701'1/ AJ>JO IU10IIA/T GJVd.V ON COHTIBACT

o5'TIY~<~I!D B'( PNIDIN<i Ar-'X>U!<I'T oF PA~c.. ~V ror;~c.. :5UM ol" C•Nr~;~cr:

ie'o ~r )I'O(I.e, ""'"' a.I"JC£ Fo~a H'-'"'c;, Mo f?E,<:'&ee'fcl!'. PtJt<Po&I!S .

t&AN!TO!eV

~RCI\ Wlfll/11 A Ctry P£OJECT.

~ - ·

.,.

..... ~

..... Vl

Page 13: BUILDING DEMOLITION - Iowa Publications Onlinepublications.iowa.gov/25338/1/Building demolition 1969.pdf · 2017. 10. 11. · demolition work. This requires the inspector and a repre

W6,tt.K'V PROC;.fi!65.5 $

CONT.II .... f:J17<>TAL IT/!11\0>NTR TO &141<!

"· /?"l"itl W•lfillfTIO "tb,,., I '~'· l f"ll"' CD,.,.,._ 9'- To OATM COM,.. "'6~1ir:!'~~~ c:;.,.. li14"/6JITifD170TAI.. l"'lf5M i/'(LIIMIT

,.. \70 P~T/! Cl>MP I ,.

This book setup will follow the general f rm o Report, Fo rm 239A. The project inspector is e

up to date and to report the total per ce

the per cent of ma jor items completed (as t

Eng ineer) , along with a br ief s tatement o wor don

week and a brief statement of the contrac ure

KeepiDg in mind that 4 wee~s can be shown

co~secutive pag e s open t o cover the contr p riod, plus i-

mately 20 p e r cent pverrun,

r<>ri!L

WElK lfNPt#l!.-

APIUL £0U!P TMEN T i.OG A t:.tl U. f..Q. iLt.e.lM.ti.IY. [ I. Q e

I ::J 13 ~ 4 l) f, 7 R 9 vo TDt8A fiOZ. X X X X X ;.< X >< 0

Tfi-11-A N..rN X X X X X X ~ )< X X

END J./),1? . X X X X X X ~ - - -TIIUCK(ST) X X X X X X - - -

II\ ·c·· PUi.L X X X X X 0 of X

'c " ;:>uJ..L I; X X X X X X X

·f~/:>$jH,. X -1" X X X X X

II I!~ /3

0 ' )(

X X · X

- -- - -X X 0

X X X

X X X 5 51'f£&~1,oor lx )( X X X X X X X X X

fOM£ btsc AD.fMS OiOH&.fAll#~

IIIJ-f.JIJJ. t kM ,,., ,o,_,,;¥

11

lvl

I' 5 ~ . ,,.,.

lx lx

J:. X X X lt' ~ X

" )( - - - -

X X X X .~ X X X X X X

X X X X 1/i " .. "'" /

VoR II X Jl

/l>"TAI­

;.t£1!1< /:NOIN6

II I!.? ln. /7 IJR !/9 20 .21

X .. >< X . )( '- X )( ; ~ X

~ ~ ' )( X ~ ;: X

~

~ X X ~ ~ ~ V X t )( X

)<. c. X X

X ' X X

X ' X X

,x t: )( !( ~

~X ~ t: X X ~

"' ~ I); ~ ,; X X ~ II 1);

X )( Is.

"TOT/\ I.. 7l>T~(..

I'IEEK~Nt*N, WEklt. E.Nt>t~6

12. 23 121' i2, 2. 12 ;;!Jl 129 :l/1 l:l. -~

- •a, ~

~£NOVI.D 0/Y -'1",<11<. 19.> '~

X- WO.'rlrEfi NO_.,M,..L D.tr

~-NUMB/!_., OF Ht>t/lfS WOIUrE.O (LESS T#A,<t A

0- £/)UI I"AIE/IIT ~,<lOirE po IV N ( /VOT ,/ V.-4 /tA8 .£E)

-- AVAI.LA8t..E BUT NOT WO/ftrE.O

fi- RENTED

/VO.'rMAL iJAY- 01'? MORe "THAN)

,d 6

.... 0'

-' .......

Page 14: BUILDING DEMOLITION - Iowa Publications Onlinepublications.iowa.gov/25338/1/Building demolition 1969.pdf · 2017. 10. 11. · demolition work. This requires the inspector and a repre

I D.E.S.c.B. < e.rLQ~ a~ ~tzU.l~r. M.I!.ta. l

I '

I

I I I I I

i I I I I I I I i

! I ! '

I

\ I I

i

i \

! I

I I I I ' I

!

I

; ; I I

'

6,Q<:. VAG.~ #/ RENOW/1... or SVI£.0/Nci.S

I

1\ Ill I T J.~TION OI.SC~/PTION E M

£xrd.ei'?INA7"10N Ot~PostrroN

R£1"11/f. KS: '

OI~Po.stTYoAI ~h't:XI<-0 4..YoW /.,&' But,O·

l tv'GI W45 ff'AIIGEP I/W4}1 'f O.C!1 f3ullJIED. /t<' .SO,

13 '1 W,VCM ~ W'fH!EJf . 1 I

li£X TLI IZ MIIV'A7"10tv' \.SAlOl/' a .s-YO.IV t),9T£ ~

av """"'"'"'· . . I : I I

I

I I

!

i '

D.O.TE

1

8

/NSP BY sr"u /~P.

tf~II.SC/~~o 195 Pl~ l "~TicGI! -----

..... OJ

.....

..0

Page 15: BUILDING DEMOLITION - Iowa Publications Onlinepublications.iowa.gov/25338/1/Building demolition 1969.pdf · 2017. 10. 11. · demolition work. This requires the inspector and a repre

NOTES

Page 16: BUILDING DEMOLITION - Iowa Publications Onlinepublications.iowa.gov/25338/1/Building demolition 1969.pdf · 2017. 10. 11. · demolition work. This requires the inspector and a repre
Page 17: BUILDING DEMOLITION - Iowa Publications Onlinepublications.iowa.gov/25338/1/Building demolition 1969.pdf · 2017. 10. 11. · demolition work. This requires the inspector and a repre
Page 18: BUILDING DEMOLITION - Iowa Publications Onlinepublications.iowa.gov/25338/1/Building demolition 1969.pdf · 2017. 10. 11. · demolition work. This requires the inspector and a repre
Page 19: BUILDING DEMOLITION - Iowa Publications Onlinepublications.iowa.gov/25338/1/Building demolition 1969.pdf · 2017. 10. 11. · demolition work. This requires the inspector and a repre