Broker Note, Hochschild Mining, 23/01/2007 (Cannacord Adams)

Embed Size (px)

Citation preview

  • 8/15/2019 Broker Note, Hochschild Mining, 23/01/2007 (Cannacord Adams)

    1/60

    Canaccord Adams is the global capital markets group of Canaccord Cap ital Inc. (CCI : TSX|AIM)The recommendations and opinions expressed in this Investment Research accurately reflect the Investment Analysts personal,independent and objective views about any and all the Designated Investments and Relevant Issuers discussed herein. For importantinformation, please see the Important Disclosures section in the appendix of this document or visithttp://www.canaccordadams.com/research/Disclosure.htm.23 January 2007 2007-010

    Damien Hackett44.20.7050.6641

    [email protected]

    Nicholas Pickens44.20.7050.6646

    [email protected]

    BUY

    HOC : LSE : 3.95

    TARGET PRICE:4.50

    Inside

    Company Overview.....................................3

    Valuation .....................................................7

    Application of Funds ..........................13

    Investment Risks ................................13

    Company History and Structure ..............15Company Assets .......................................17

    Peru .....................................................17

    Mexico .................................................29

    Argentina.............................................34

    Market Position.........................................37

    Silver Market Overview ............................41

    Share price data COB 22 January 2007.

    Metals and Mining -- Precious Metals and Minerals

    Hochschild Mining PlcSpecialists from Latin America in narrow-vein, high-value mining

    Figure 1: Production and cash flow growth (2003-2012E)

    0

    10

    20

    30

    40

    50

    60

    2003 2004 2005 2006e 2007e 2008e 2009e 2010e 2011e 2012e

    TotalProduction(Moz)

    0

    50

    100

    150

    200

    250

    300

    EBITDAandCashFlow(

    US$M)

    Silver Production Gold and base metals (Ag equiv)EBITDA Cash from Operations

    Source: Canaccord Adams estimates, company data

    We initiate coverage on Hochschild Mining with a BUY recommendation. HOC is a

    silver and gold mining company with over 40 years of experience and was the fourth-

    largest producer of primary silver in the world in 2005 with production totaling 10.5

    million ounces of silver plus 232,000 ounces of gold. We expect silver production to

    increase by at least 95% thru 2009, Figure 1.

    We set our initiating target price for 2007 at 4.50 based on our analysis of comparable

    company financials, which suggests a current price of 3.67 rising to 4.82 in 2008; a

    10 times multiple of cash, which suggests a price of 3.68 for 2007 rising to 5.15 in

    2008; and our NAV estimate of 3.55/share based on our expectation of declining

    commodity prices. With current precious metal prices carried forward, our NAV

    estimate for the stock is 4.80/share.

  • 8/15/2019 Broker Note, Hochschild Mining, 23/01/2007 (Cannacord Adams)

    2/60

  • 8/15/2019 Broker Note, Hochschild Mining, 23/01/2007 (Cannacord Adams)

    3/60

    3

    23 January 2007 Hochschild Mining plc

    COMPANY OVERVIEW

    INTRODUCTION

    Hochschild Mining is a silver and gold mining company with over 40 years of experiencein mining precious metals. It has 3,100 employees, three operating mining assets in

    Peru, one advanced mining project in each of Peru, Argentina and Mexico, and one early

    stage project in Mexico, Figure 2. The Group was the fourth largest producer of primary

    silver in the world in 2005 with production totaling 10.5 million ounces of silver (plus

    232,000 ounces of gold) and has seen production expand by 80% over the previous three

    years. The company is focused on high-grade, mid-scale underground mining with

    production in 2005 recovered from narrow-vein ore grading on average, 373g/t of silver

    and 4.98g/t gold. The companys policy is to mine at life of mine grades in all operations

    and not to hedge product prices.

    Figure 2: Summary of company assets

    Asset Status Description Product Start Date OwnershipPERUArcata Mine UG mine. Ag, Au concentrate 1964 100%

    Ares Mine UG mine Au, Ag dor 1998 100%

    Selene Mine UG mine Ag, Au dor 2003 100%

    Pallancatta Advanced Project UG mine Ag, Au dor 2007 60%

    Sipn Closed Open pit Au, Ag dor Closed 100%

    ARGENTINASan Jos Advanced Project UG mine Au, Ag dor 2007 51%

    MEXICOMina Moris1 Advanced Project Mothballed open pit/heap leach Au, Ag dor, Pb-Zn concentrate 20071 70%

    San Felipe Medium-term Project UG mine Ag, Pb, Zn, Cu concentrates 2009 70%

    1) Mina Moris initially operated between 1996-99 by Minera Manhatten S.A. de C.VSource: Company data

    Management has plans to diversify and further increase production in the near term, in

    the case of silver by at least 95% through 2009 via a combination of expansions to

    existing operations and project development. In addition, the company plans to pursue

    value accretive acquisitions, initially with a target value in the range US$150-250

    million. This would see the company evolve from its current configuration of 100%

    dependence on three Peruvian operations to at least seven separate mines in three

    countries where less than 50% of production would be from Peru. With the seven mines

    in Figure 2 fully developed, we calculate that the companys share of precious metal

    production could double from 24.4 million ounces of silver equivalent in 2005 to more

    than 50 million ounces silver equivalent over the next five years.

    There also appear to be significant production growth opportunities beyond the seven

    mines in Figure 2. The companys development pipeline holds interests in at least 20

    other properties, ranging from prospects to defined targets across four countries in Latin

    America: Mexico, Peru, Argentina and Chile. Argentina ranks highly in the companys

    development plans because of the geological reality of the eastern slopes of the Andes

    despite limited past mining activity. Peru, Mexico and Chile on the other hand have

    significant and widely documented mining potential.

  • 8/15/2019 Broker Note, Hochschild Mining, 23/01/2007 (Cannacord Adams)

    4/60

    4

    Hochschild Mining plc 23 January 2007

    The company follows three important and differentiating pillars of management

    philosophy:

    RESPONSIBILITY for safety, the environment and social relationships in thecommunities in which it operates. Concerns such as these have kept the company

    out of high risk areas such as Bolivia, Colombia and parts of Venezuela and have

    focused management on qualitative measures of responsibility rather than

    quantitative measures of expenditure.

    EXCELLENCE in all technical aspects of operation from exploration to tailingsmanagement. The companys expertise and efficiency has come from decades of

    experience in small-scale, narrow vein mining.

    PROFITABILITY derived from its focus on high margin operations which targetcash costs of less than US$2.5/oz of silver equivalent and a capital cost of US$1/oz

    silver equivalent of developed reserve. It has posted cash operating margins in the

    range of 45-50% of revenue over the last three years, before administration,

    exploration and other expenses.

    The company listed on the main board of the London Stock Exchange in November 2006as Hochschild Mining plc (HOC), with a free float of 29% of the companys stock, 25% as

    new issue plus a further 4% of secondary shares as part of the greenshoe at listing.

    Money raised is intended for expansion, development and acquisition and we expect the

    companys solid reputation in the region to help add to the expansion opportunities

    already in the pipeline.

    The company came to market because it saw possible project development opportunities

    in the region exceeding its own cash flow. We expect the funds raised to bring forward

    planned project development, while in our view, the company is also likely to use its now

    publicly traded shares as acquisition currency to enhance organic growth via value

    accretive acquisitions consistent with the companys growth strategy.

    Reserves and resources

    Hochschild Mining estimates its precious metal resources at 221 million ounces of silver

    equivalent (3.7 million ounces of gold equivalent) from 3.849 million tonnes of ore with

    an average grade of 374gm/t silver and 5.0gm/t gold, Figure 3.

    Figure 3: Attributable reserves and resources as at November 2006

    Project Reserves Silver Gold Silver eq Gold eq Million ounces Silver equivalent O'ship000t gm/t gm/t gm/t gm/t P & P M & I Inferred R & R %

    Arcata 930 462 1.26 538 9 16 19 24 43 100Ares 835 327 12.24 1061 17.7 29 30 1 31 100Selene 799 377 2.56 530 8.8 14 14 5 18 100San Jose 642 418 7.9 892 14.9 19 19 7 26 51Pallancata 643 263 1.09 328 5.5 6 7 15 22 60Moris 10 10 70San Felipe 70 70 70Total 3,849 374 4.99 673 11.2 84 99 122 221

    Source: Company data

    The company also appears to have a different approach to exploration from many major

    mining companies. We believe its long-term and sustained commitment to exploration,

  • 8/15/2019 Broker Note, Hochschild Mining, 23/01/2007 (Cannacord Adams)

    5/60

    5

    23 January 2007 Hochschild Mining plc

    through various commodity price cycles, is an approach best suited to preserving

    intellectual capital and building an integrated project portfolio. It is similar to the

    commitment made by Rio Tinto, for example, and one that has yielded the company

    success across a range of minerals and metals.

    Hochschilds approach is to focus on precious metals, in particular deposits with high

    grade, and these typically occur as narrow vein deposits. The Andean fault zone alongthe South American plate boundary is a classic environment for such occurrences.

    Figure 4: Group production summary

    Production 2006e 2007e 2008e 2009e 2010e 2011e 2012eSilver 000 ozs 11,604 13,086 24,123 26,941 28,370 28,370 28,370

    Gold 000 ozs 196 206 280 224 207 207 207

    Zinc 000 t - - - 36 66 66 66

    Lead 000 t - - - 10 19 19 19

    Copper 000 t - - - 1 2 2 2

    RevenueSilver $000's 132,604 168,169 287,112 292,670 265,981 265,981 265,981Gold $000's 121,279 133,553 174,162 127,794 113,140 113,140 113,140

    Zinc $000's - - - 73,479 104,127 89,665 89,665

    Lead $000's - - - 10,589 19,000 19,000 19,000

    Copper $000's - - - 3,195 4,888 4,213 4,213

    Total revenue $000's 253,883 301,722 461,273 507,728 507,135 491,999 491,999

    Revenue splitSilver % 52.2 55.7 62.2 57.6 52.4 54.1 54.1

    Gold % 47.8 44.3 37.8 25.2 22.3 23.0 23.0

    Zinc % - - - 14.5 20.5 18.2 18.2

    Lead % - - - 2.1 3.7 3.9 3.9

    Copper % - - - 0.6 1.0 0.9 0.9

    Total 100.0 100.0 100.0 100.0 100.0 100.0 100.0

    EBITDA $000's 132,561 146,778 245,189 274,081 232,176 211,221 208,069Margin % 52% 49% 53% 54% 46% 43% 42%

    Source: Canaccord Adams estimates

    With this style of mineralisation, we believe there is little value for investors in life-of-

    mine reserve delineation the classic porphyry model for North America, for example.

    Hochschilds targeted mineralisation does not lend itself to such a practice while over 20

    years of proven reserve and resource replenishment suggests it is unnecessary. For each

    of the 15 years since 1990, the companys current practices of reserve delineation have,

    on average, more than replaced its expanding production over that period, see

    Company Assets section for more details.

    The company appears to us to understand an age-old practice in narrow vein mining

    drill for structure and drift for grade. By far the majority of the companys mineral

    resources have been discovered and delineated from underground operations rather

    than from pre-production surface drilling. Further, we consider that Hochschilds

    digitised geological database, right down to core storage and sample preparation, reflects

    its focus on excellence in all aspects of the operations. This rigorous approach to

    exploration supports a more efficient and less subjective approach to target generation,

  • 8/15/2019 Broker Note, Hochschild Mining, 23/01/2007 (Cannacord Adams)

    6/60

    6

    Hochschild Mining plc 23 January 2007

    which, in our view, increases management focus on reserves and resources and, in turn,

    enhances cash flow and profitability.

    Figure 5: Group financial summary

    FYE Dec 2006e 2007e 2008e 2009e 2010e 2011e 2012eSales $000's 253,883 301,722 461,273 507,728 507,135 491,999 491,999

    Other income $000's 0 0 0 0 0 0 0

    Operating costs $000's 121,322 154,943 216,084 233,647 274,960 280,778 283,930

    EBITDA $000's 132,561 146,778 245,189 274,081 232,176 211,221 208,069

    D, D & A $000's 19,311 34,007 37,205 57,328 52,141 46,345 43,194

    EBIT $000's 113,250 112,771 207,985 216,753 180,034 164,877 164,875

    Interest $000's 5,894 -15,861 -14,964 -14,536 -18,362 -23,410 -28,646

    Pre tax profit $000's 107,356 128,633 222,948 231,289 198,396 188,286 193,521

    Income tax $000's 34,354 41,162 71,343 74,013 63,487 60,252 61,927

    Profit from cont.. operations $000's 73,002 87,470 151,605 157,277 134,909 128,035 131,594

    Discontinued $000's 0 0 0 0 0 0 0

    Minority interest $000's 0 2,770 44,915 53,586 38,486 36,529 37,073

    Net profit to shareholders $000's 73,002 84,700 106,690 103,691 96,423 91,506 94,521Shares on issue x mill 307.4 307.4 307.4 3 07.4 307.4 307.4 307.4Earnings per share $/share 0.24 0.28 0.35 0.34 0.31 0.30 0.31

    Payout ratio % nmf 30% 30% 30% 30% 30% 30%Dividend per share $/share 0.08 0.10 0.10 0.09 0.09 0.09

    Source: Canaccord Adams estimates

  • 8/15/2019 Broker Note, Hochschild Mining, 23/01/2007 (Cannacord Adams)

    7/60

    7

    23 January 2007 Hochschild Mining plc

    VALUATION

    Net Asset Value

    We have derived a range of values for the net assets of Hochschild Mining plc using a

    sum-of-the-parts, net present value based calculation for each of the current and planned

    operations, Figure 6, based on a discount rate of 10%. In addition, we have ascribed a

    value to all defined targets and prospects not included in our cash flow analysis at a

    nominal 20% of the estimated value of producing assets. A total contribution of 20% is

    what we believe to be reasonable for up to 25 prospects with similar geological

    characteristics to producing assets but with, as yet, limited drill confirmation of

    mineralisation. We have not applied a completion risk to the present value of advanced

    projects given that they are in the later stages of development and given managements

    experience and record of bringing on new projects.

    Figure 6: Hochschild Mining net asset value estimate

    Net Asset Value SummaryNet Present Values (Attributable): US$M LOW MID HIGH

    Arcata (100%) 282 330 379

    Selene (100%) 116 128 140

    Ares (100%) 209 248 286

    Pallancatta (60%) 78 98 118

    San Jose (51%) 183 219 255

    Mina Moris (70%) 58 73 88

    San Filipe (70%) 123 169 215

    Defined production 1,048 1,265 1,481Defined targets and prospects @ 20 % 210 253 296Group level and other:

    Group G&A -325 -325 -325Current assets Jun '06 107 107 107

    Current liabilities Jun '06 -152 -152 -152

    Long-term liabilities Jun '06 -92 -92 -92

    Net Asset Value US$M 796 1,056 1,316Pre-IPO value with market premium 50 % 1,194 1,584 1,974Cash raised US$M 514 514 514Less IPO expenses 3% -15 -15 -15Post-IPO value with market premium US$M 1,692 2,082 2,472Shares on issue x mill 307.350 307.350 307.350

    /Share @ exchange rate of 1.91 2.88 3.55 4.21Source: Canaccord Adams analysis

    Our current base-case, net asset value for the company is 3.55/share based on our

    commodity price assumptions and a /US$ exchange rate of 1.91, Figure 6. The

    commodity price assumptions that underpin this valuation are shown in Figure 7 while

    our high and low case valuations in Figure 6 have been derived from a 10% variation

    in commodity prices. Our analysis shows our valuation varies by 19% for a 10% change

    in the profile of key commodity prices.

  • 8/15/2019 Broker Note, Hochschild Mining, 23/01/2007 (Cannacord Adams)

    8/60

    8

    Hochschild Mining plc 23 January 2007

    Figure 7: Canaccord price assumptions metal prices

    2006 2007e 2008e 2009e 2010e 2011e 2012eGold US$/oz 622.60 650.00 625.00 575.00 550.00 550.00 550.00

    Silver US$/oz 11.58 13.00 12.00 11.00 9.50 9.50 9.50

    Copper $/lb 3.06 2.50 2.18 1.75 1.45 1.25 1.25

    Lead $/lb 0.58 0.72 0.54 0.46 0.45 0.45 0.45

    Zinc $/lb 1.48 1.88 1.36 0.94 0.72 0.62 0.62

    Source: Canaccord Adams estimates, Bloomberg

    Some might argue for a lower discount rate than our 10% per annum given that more

    than 70% of the companys revenue is derived from gold and silver both a natural

    hedge against inflation and seen to be a store of value in more difficult economic times.

    An 8% discount rate against our estimated project cash flows would deliver a value for

    the company of 3.88/share compared to our mid-point 3.55/share at a 10%pa discount

    in Figure 6, while a 5% per annum discount rate would deliver a value of 4.48/share.

    Market pricing on sector-average comparables

    We believe a single-point, present day NAV calculation masks potential underlying

    growth in a stock. We consider that the process simply delivers a value at a point in time

    and an opportunity for short-term investors to close out any market mis-pricing. We

    suggest it is more helpful to show investors how we believe potential value accrues over

    time from expanding production, earnings, cash flows and the PV of residual cash flow

    after capital has been invested.

    Figure 8 presents such parameters for Hochschild Mining out to 2012 based on market

    average multiples, see Market Position in this report, but with production restricted to

    just the seven current and sanctioned operations in Figure 6. Clearly, we would expect

    upside potential from other new projects and potential acquisitions:

    We price production at US$65/oz for an estimate of EV, after consideration of othergold and silver producers, Figure 37;

    EBITDA is priced at 15 times also as an estimate of EV, with 15 being more or lesscomparable to other silver and gold producers, Figures 39 and 40;

    We price earnings at 25 times as an estimate of market capitalisation with 25 beingthe average of a suite of comparable silver and gold producers.

    We suggest it is appropriate to include multiples of EBITDA and earnings for gold

    companies as we are comparing income in US$ and not metal production, and for

    Hochschild in 2007, we expect gold revenue to account for more than 40% of revenue

  • 8/15/2019 Broker Note, Hochschild Mining, 23/01/2007 (Cannacord Adams)

    9/60

    9

    23 January 2007 Hochschild Mining plc

    Figure 8: Market valuation of Hochschild Mining

    US$ M 2006e 2007e 2008e 2009e 2010e 2011e 2012eSilver prod'n Koz 11,604 13,086 24,123 26,941 28,370 28,370 28,370

    Gold prod'n Koz 196 206 280 224 207 207 207

    EV/Prod'n 65 617 1,327 2,039 2,351 2,563 2,672 2,774EV/EBITDA 15 1,852 2,678 4,148 4,711 4,202 3,996 4,051PE Ratio 25 1,825 2,117 2,667 2,592 2,411 2,288 2,363NAV+premium US$M 1,531 2,504 2,471 2,659 2,701 2,786 2,870

    Average US$M 1,456 2,157 2,831 3,078 2,969 2,935 3,014Per share /share 2.48 3.67 4.82 5.24 5.06 5.00 5.13

    Source: Canaccord Adams estimates

    The average valuation for Hochschild Mining based on the four m ethods for 2007E is3.67/share, on our num bers, rising to 4.82/share for 2008.It is important to note that our analysis also shows that expected growth in this company

    from existing projects only, can offset our expected decline in gold and silver to

    US$550/oz and US$9.50/oz respectively by 2010, and support a value for the company at

    around 5.00/share over the next five years, Figures 8 and 9.

    Figure 9: Value growth in Hochschild Mining (2006E-2012E)

    0.00

    2.00

    4.00

    6.00

    8.00

    10.00

    2006e 2007e 2008e 2009e 2010e 2011e 2012e

    Market

    value(/share)

    Source: Canaccord Adams estimates

    In our opinion, this ability to offset the effect of declining commodity prices points to

    significant possible upside in value for the shares if precious metal prices maintaincurrent levels or even appreciate further as some forecasters suggest.

    If current precious metal prices were maintained then our 3.67/share valuation for

    2007 would become 3.99/share, rising to 6.98/share by 2010 based on this

    methodology.

  • 8/15/2019 Broker Note, Hochschild Mining, 23/01/2007 (Cannacord Adams)

    10/60

    10

    Hochschild Mining plc 23 January 2007

    Pricing for growth

    We expect Hochschild Mining to enjoy substantial production growth to 2009 from

    existing projects on our numbers almost a 100% lift in terms of silver output over the

    next three years assuming the new projects come on stream and existing projects are

    expanded to full potential, Figure 8. This production growth is not as spectacular as that

    which we see in say, Yamana Gold (AUY: BUY) or Peter Hambro Mining (POG: BUY),

    Figure 11, but on our estimates it is stronger than the average of other gold and silver

    producers. Based on a 28% per annum expansion in sliver output from 2006 to 2009

    we estimate a PEG ratio of 0.92 for Hochschild, which suggests to us that at a PE of 28

    times 2007E earnings, the stock does not look expensive, see Figure 10.

    Figure 10: Growth ratio analysis for silver producers

    Company Ag equiv (Koz ) Growth % pa P/E EV/EBITDA PEG Ratio2006E 2009E 2006E-09E 2007E 2007E

    Pan American Silver 24,000 30,000 8 15x 17x 1.93

    Coeur d'Alene Mines(1) 22,000 35,900 18 15x 9x 0.87

    Hecla Mining(1) 22,000 22,000 - 28x 9x na

    Hochschild 23,348 48,839 28 28x 13 0.92Source: Canaccord Adams estimates, 1. First Call, Datastream

    As an aside, neither Yamana Gold nor Peter Hambro Mining appear expensive on our

    numbers either compared to their peers given the production growth we estimate is on

    offer. PEG ratios of 0.31 and 0.63 respectively, based on our production growth

    estimates, would seem to support our claim, Figure 11. At a PEG ratio of 0.92,

    Hochschild Mining is second only to Yamana and Peter Hambro Mining in terms of

    attractively priced growth potential, on our estimates.

    Figure 11: Growth ratio analysis for gold producers

    Company Au equiv (Koz) Growth% pa P/E EV/EBITDA PEG Ratio2006E 2009E 2006E-09E 2007E 2007E

    Barrick Gold 8,777 8,725 (0.1) 17x 9x na

    Buenaventura(1) 8x 10x na

    Goldcorp 1,650 2,509 15 27x 18x 1.82

    Hochschild 389 814 28 28x 13x 0.92Kinross 1,450 1,876 9 22x 13x 2.49

    Meridian 296 361 7 27x 16x 3.95

    PeterHambro 256 1,069 61 38x 25x 0.63

    YamanaGold 313 800 37 11x 50x

    Source: Canaccord Adams estimates, 1. First Call, Datastream

  • 8/15/2019 Broker Note, Hochschild Mining, 23/01/2007 (Cannacord Adams)

    11/60

    11

    23 January 2007 Hochschild Mining plc

    Cash flow valuation

    Figure 12: Net cash flow and projected share price

    0

    100,000

    200,000

    300,000

    400,000

    500,000

    2006e 2007e 2008e 2009e 2010e 2011e 2012e

    0.0

    2.0

    4.0

    6.0

    8.0

    10.0

    Net cash flow US$000 (LHS) /share FD (RHS) 8x 12x

    Source: Canaccord Adams estimates

    We also price Hochschilds shares on a multiple of net cash flow from operations.

    Figures 12 and 13 show our estimates of Hochschilds cash flow from operations with a

    8% CAGR over the six years under review from US$149.7 million in 2006 to US$237.6

    million in 2012, in spite of our expectations of declining commodity prices.

    We have priced the stock each year to 2012 at 10 times cash flow for that year and

    added the previous years cash balance. We suggest a multiple of 10 is appropriate given

    Hochschild is primarily a silver producer, which as a precious/industrial metal places itbetween base metal producers that trade around 8 times and platinum producers that

    trade around 12 times net cash flow. Based on our estimate of US$164.4 million as cashflow from operations in 2007 and a cash balance of US$518 m illion at year end 2006,we estimate an appropriate market price for Hochschild Mining at 3.68/share, Figure13 . Subsequent to raising $514 million in November 2006, we estimate IPO expensesabsorbed $15 million while the company reduced debt by $40 million.

    Figure 13: Net cash flow and projected share price

    Unit 2006e 2007e 2008e 2009e 2010e 2011e 2012eCash flow from operations US$000's 149,667 164,426 232,904 261,666 251,006 241,593 237,557

    Priced at multiple of fwd cash flow US$000's 1,496,674 1,644,256 2,329,044 2,616,656 2,510,056 2,415,928 2,375,565Cash balance US$000's 518,001 696,321 829,140 1,019,553 1,241,563 1,463,065 1,671,636

    Exchange rate US$/ 1.91 1.91 1.91 1.91 1.91 1.91 1.91

    Value per share /share 2.55 3.68 5.15 5.87 6.01 6.23 6.54Source: Canaccord Adams estimates

  • 8/15/2019 Broker Note, Hochschild Mining, 23/01/2007 (Cannacord Adams)

    12/60

    12

    Hochschild Mining plc 23 January 2007

    Conclusion

    In summary, the three valuation methods have delivered indications of a current market

    price for the stock in the range 3.55 - 3.68 per share. At the low end of the range is our

    NAV for the company at 3.55/share based on declining commodity price projections but

    note that the methodology also indicates a value of 4.80/share if current precious metal

    prices are carried forward or 4.21/share with a commodity price profile just 10%

    higher than we are forecasting.

    Near the top end of the range is a current market value of 3.67/share based on

    comparable market parameters - the market value of production, EV/EBITDA and price/

    earnings multiples a method which also suggests a comparable market price in 2008 of

    4.82/share.

    Also at the top end of our valuation range we have a current market price of 3.68/share

    based on a multiple of 10 times 2007E cash flow from operations, rising to 5.15/share

    based on 2008E cash flow.

    Although the current price for Hochschild Mining stock at 3.95/share may have

    captured a little of the underlying future growth that we see in this company, we suggesta market price of 4.50/share during 2007 can be justified on the basis of value that we

    believe is yet to be extracted from existing operations and projects.

  • 8/15/2019 Broker Note, Hochschild Mining, 23/01/2007 (Cannacord Adams)

    13/60

    13

    23 January 2007 Hochschild Mining plc

    APPLICATION OF FUNDS

    Figure 14: Use of proceeds

    Maximising Existing Operations of next 5 years US$M 140Expenditure by Operation % Subtotal

    Arcata 40% 56

    Ares 30% 42

    Selene 30% 100% 42 140

    Expenditure by UtilisationMining Development 80% 112

    Plant, Property, Equipment 20% 100% 28 140

    Timing of expenditureFirst 2 years 35% 49

    Following 2 years 55% 77

    Remainder 10% 100% 14 140

    Growth of Project Pipeline US$M 250Expenditure by Project % Subtotal

    San Jos 40% 100San Felipe /Moris Mine 45% 113

    Pallancata 15% 100% 38 250

    Expenditure by UtilisationMining Development 40-50% 100-125

    Plant, Property, Equipment 50-60% 100% 125-150 250

    Timing of expenditureFirst 2 years 70% 175

    Remainder 30% 100% 75 250

    Repayment of Debt US$M 40Acquisitions & Additional Growth Remaind er

    UtilisationTwo Feasibility Studies

    Further exploration studies in South America

    Strategic acquisitions where opportunities arise

    Source: Figures in grey shading from Company presentation, Others Canaccord Adams estimates

    INVESTMENT RISKS

    The following comprise risks to our target price and rating.

    Mining riskWe note that Hochschild Mining is ISO 14001 certified on all its mines. However, there areinherent dangers associated withunderground, narrow vein mining. Extraction is difficultand the process is carried out in an environment that is not always predictable. Whilst themanagement team and mine operators may be effective in identifying risks and well able to

    take measures in order to mitigate them, it is impossible to remove the possibility of an

    unexpected event occurring that could impact on the operation of a mine. There are alsorisks associated with the use of mining contractors for operations, although the company

    employs a number of mining contracting companies and is not over reliant on one company.

  • 8/15/2019 Broker Note, Hochschild Mining, 23/01/2007 (Cannacord Adams)

    14/60

    14

    Hochschild Mining plc 23 January 2007

    Reserve and resource risk

    Hochschilds proven and probable reserves have been reviewed by an independent

    consultant and are compliant with the Joint Ore Reserves Committee (JORC). Based on

    the companys historical track record and taking into account the type of deposit, our

    analysis assumes production beyond the current reserve base. We recognise the

    companys reserve replacement program has more than replaced production of the past20 years; however this past success does not guarantee reserve replacement in the

    future. There are therefore risks associated with replacement of reserves.

    Development risk

    A proportion of the companys value lies in the development of new projects which carry

    a completion risk. Delays in the development schedule or increases in capital

    requirements for example, may negatively impact our suggested valuation range.

    Country risk

    There are risks associated with unforeseen political intervention, such as an increase in

    royalties, restriction on business practices, changes in permitting legislation or

    expropriation of mineral assets and operations. Following a year of elections, some

    investors may feel increasing uncertainty over the changing political face of LatinAmerica, particularly those whom perceive a movement towards the left and are wary of

    nationalisation. We note that Peru has a democratic government, recently voting in a

    moderate-left politician Alan Garcia as President over the more extreme Peruvian

    Nationalist Party. In Mexico, leader of the conservative National Action Party Felipe

    Calderon was declared winner of presidential elections in July 2006, with victory over

    his left-wing rival and in Argentina, the current government, led by left-leaning Nestor

    Kirchner, has been in power since 2003. Although much improved, all three countries

    have some history of social unrest and there are risks associated with the transition to a

    new government.

    Economic risk

    Our suggested valuation range is impacted by our long-term price assumptions for silver,

    gold, copper, lead and zinc. We have indicated the impact of price on our valuation

    using low, medium and high price scenarios (Valuationsection). Our net present value

    calculation assumes a discount rate of 10% per annum; however should the weighted

    average cost of capital differ our estimated value range would also change. Peru

    experienced high inflation rates, exchange rate instability in the 1980s and 1990s and

    Argentina fell into deep recession and economic collapse in 2001. A re-occurrence of

    these environments could impact our valuation range.

  • 8/15/2019 Broker Note, Hochschild Mining, 23/01/2007 (Cannacord Adams)

    15/60

    15

    23 January 2007 Hochschild Mining plc

    COMPANY HISTORY

    The Hochschildname is synonymous with mining in South America. The Group was

    founded in Chile nearly 100 years ago, with operations largely focused on the

    commercialisation of some of the worlds largest mines in Chile. The company expandedinto Bolivian tin mining following World War II and later acquired Mantos Blancos in Chile

    during the 1970s; this was subsequently sold to Anglo American in 1984 along with most

    of the Groups other South American operations.

    Luis Hochschild (father of the current CEO Eduardo Hochschild) in the same year that all

    South American operations were sold to Anglo American, bought back the Peruvian

    operations. The Arcata mine in Peru, which commenced production in 1964, is still

    operated by the company today. Eduardo Hochschild became head of Hochschild Mining

    in 1998 and under his guidance the company began extensive exploration on its prospects

    in Peru. Mining commenced at Sipn in 1997 followed by commissioning of the Ares

    sliver-gold mine in 1998 while the Selene operation commenced in 2003.

    In 2001, the Group began building its project portfolio and extending its asset base outsidePeru. It opened an exploration office in Mexico, followed by further offices in Argentina

    and Chile in 2003 and 2004 respectively.

    CORPORATE STRUCTURE

    Figure 15: Company structure Post-IPO

    Source: Company data

    CompaiaMinera

    Coriorco

    Arcata

    (Per)

    Ares

    (Per)

    Sipn

    (Per)

    MH Argentina(Argentina)

    Minera SantaCruz

    (Argentina)

    MineraHochschild

    (Mxico)

    MH Chile

    (Chile)

    Per

    Hold co

    MH Nevada

    (Delaware)

    Mxico

    Hold co

    Chile

    Hold co

    Argentina

    Hold co

    UK plc

    UK Hold co

    100%100% 100% 100% 100% 51% 100% 100%

    100% 100% 100%100%100%

    100%

    CompaiaMinera

    Suyamarcs

    60%

  • 8/15/2019 Broker Note, Hochschild Mining, 23/01/2007 (Cannacord Adams)

    16/60

    16

    Hochschild Mining plc 23 January 2007

    DIRECTORS AND MANAGEMENT

    Eduardo Hochschild - Executive Chairman

    Eduardo Hochschild joined the Hochschild Mining Group in 1987. He was head of the

    Hochschild Mining Group between 1998-2006 and has been Executive Chairman since

    2006. He holds directorships with Banco de Crdito del Peru, Compaa de Seguros ElPacfico, Asian Pacific Economic Council Business Advisory Committee, Sociedad Nacional

    de Minera y Petroleo, COMEX, Patronato Universidad Nacional de Ingeniera y de la

    Universidad de Ciencias Aplicadas, TECSUP & Conferencia Episcopal Peruana.

    Mr.Hochschild also holds a B.Sc. degree in Physics and Mechanical Engineering from Tufts

    University, USA.

    Alberto Beeck - Executive Director

    Alberto Beeck joined the Hochschild Mining Group in 1998. Previously he served as

    Managing Director and Head of Latin American Investment Banking for Barings, Inc. in

    New York and Baring Brothers in London (1992-97), Vice President of Dillon, Read Ltd

    (1988-92) and Vice President of Lehman Brothers, Inc. (1982-88). Mr. Beeck holds a B.Sc.

    degree in Mechanical Engineering from Purdue University, and an MBA in Finance and

    International Business from Columbia University.

    Roberto Daino - Executive Director

    Roberto Daino joined the Hochschild Mining Group in1995, where he remained until

    2001. Since 2001 he has held positions as Senior Vice President and General Counsel of

    the World Bank Group (2003-06), Prime Minister of Peru (2001-02) and Ambassador to the

    United States (2002-03). Previously he was a partner at Wilmer, Cutler & Pickering and

    Rogers & Wells and Chairman of the firms Latin American Practice Groups (1993-2001)

    and Founding General Counsel of the Inter-American Investment Corporation (1989-93).

    Mr. Daino holds an SJD (abd) and LLM from Harvard Law School and JD from the

    Pontificia Universidad Catlica del Peru.

    Miguel Aramburun - General Manager, Mining Division

    Miguel Aramburun joined the Hochschild Mining Group in 1995 as General Manager of

    Compaa Minera Pativilca. He has been General Manager of the Hochschild Mining

    Group since 2006. He was Chief Financial Officer of the Hochschild Mining Group (2002-

    05) and Mr. Aramburun holds an MBA from Stanford University and BA Industrial

    Engineering, from Pontificia Universidad Catlica del Peru.

    Jorge Benavides - General Manager, Exploration and Geology Division

    Jorge Benavides joined the Hochschild Mining Group in 2001 as Exploration and Geology

    Manager. He has nearly 30 years experience in the mining industry, including with Phelps

    Dodge Mining Company in South America. Mr. Benavides holds a MSc. from StanfordUniversity and a B.Sc. in Geological Engineering from the Colorado School of Mines.

    Ignacio Rosado - Chief Financial Officer

    Ignacio Rosado has been CFO of the Hochschild Mining Group since 2005. Previously he

    has held positions as a Senior Engagement Manager, McKinsey & Company (2000-05),

    Project Manager at Banco de Crdito del Peru (1995-96) and Corporate Banker at Banco

    Wiese (1993-94). Mr. Rosado holds an MBA from the University of Michigan Business

    School and a B.Sc. in Economics from the Universidad del Pacfico del Peru.

  • 8/15/2019 Broker Note, Hochschild Mining, 23/01/2007 (Cannacord Adams)

    17/60

    17

    23 January 2007 Hochschild Mining plc

    COMPANY ASSETS

    Hochschild Mining owns and operates three silver-gold underground mines in southern

    Peru, Arcata, Ares and Selene, which produced 10.5 million ounces of silver and 232.6

    thousand ounces of gold during 2005. The company also has a majority interest in two

    advanced development projects, San Jos in Argentina and Pallancata in Peru plus two

    early-stage development projects in Mexico, Moris and San Felipe. In addition the

    company has long-term prospects throughout Latin America (Figure 16).

    Figure 16: Company projects

    Producing assets

    Projects

    xResource delineation

    Development

    Legend

    Mine

    Target definition

    Prospect

    Producing assets

    Projects

    xResource delineation

    Development

    Legend

    Mine

    Target definition

    Prospect

    San Felipe

    Mina Moris

    El Pino

    La Enramada

    Las Tortugas

    Pocito

    Sierra Mojina

    San Luis del Cordero

    Caldern

    Pozos

    Julia

    Paracoya

    Cerro Blanco

    Quevar

    AmbargastaSierra de las Minas

    Puesto Chacn

    San Jos

    xFronteraParaiso

    Ares Mine

    San MartnMinaspataAzuca

    TincosSan Andrs

    PallancataCerro Blanco Arcata MineSelene Mine

    Tacna

    x

    Source: Company presentation

    PERU

    Peru is central to the companys current production capabilities. All three operating mines

    owned by the company are located in close proximity in Southern Peru while Pallancata,

    one of the advanced development projects, is adjacent to the Selene mine and thus offers

    synergy benefits. The properties lie between 4,600-5,000 metres above sea-level in the

    Puquio-Cayollma Belt and all the deposits display similar mineralisation characteristics.

    Arcata and Selene each produce a silver concentrate with contained gold, while Ares

    produces a refined silver-gold dor. The Selene mine has been producing dor since

    October 2006 and thus retaining more downstream value from its mined products.

    The company also owns the Sipn mine, which closed in 2004, and holds rights for eight

    other prospects in Peru, including San Martin, located between Arcata and Selene.

    Hochschild also previously owned the Caylloma silver mine, but sold the property to

    Fortune Silver Mines in June 2005.

  • 8/15/2019 Broker Note, Hochschild Mining, 23/01/2007 (Cannacord Adams)

    18/60

  • 8/15/2019 Broker Note, Hochschild Mining, 23/01/2007 (Cannacord Adams)

    19/60

    19

    23 January 2007 Hochschild Mining plc

    In Peru, the company has a strategy of exploring new ground within the concession area

    and adjacent to mines, often the best place to find additional resources. Preliminary work

    is typically undertaken with long surface drill holes to define an inferred resource the

    company currently has several contracted diamond drill rigs around the Peruvian

    operations.

    In our view, the ability of the company to more than replace production with reservesconsistently over the last 15 years goes some way towards mitigating any risk that might

    be attributed by some to a relatively short life-of-mine proven reserve. We note the

    company has more than replaced production year-on-year since production of the mines

    began, Figure 18. On average, over all of the companys operations since mining began,

    the company has replaced 37% of total reserves by new reserves each year. With a three

    year proven reserve, the company has produced 33% of its reserves each year while

    adding 37% of its proven reserve.

    Figure 18: Reserve replacement (LHS: Ore in Kt, RHS: Life of mine in years)

    Arcata Ares Selene

    -500

    0

    500

    1000

    1500

    2000

    1990 1992 1994 1996 1998 2000 2002 2004 2006

    Ore ( '000tonnes)

    -2.0

    0.0

    2.0

    4.0

    6.0

    8.0

    Life of Mine(Yrs)

    Resources Production Reserves LOM -400

    -200

    0

    200

    400

    600

    800

    1000

    1200

    1990 1992 1994 1996 1998 2000 2002 2004 2006

    Ore ( '000tonnes)

    -2.0

    -1.0

    0.0

    1.0

    2.0

    3.0

    4.0

    5.0

    6.0

    7.0

    Life of Mine(Yrs)

    Production Resources Reserv es LOM -400-200

    0

    200

    400

    600

    800

    1000

    1200

    1990 1992 1994 1996 1998 2000 2002 2004 2006

    Ore ( '000tonnes)

    -2.0

    -1.0

    0.0

    1.0

    2.0

    3.0

    4.0

    5.0

    6.0

    7.0

    L i fe of Mine(Yrs)

    Pr od uct ion Res ourc es R ese rv es LOM Source: Company data, Canaccord Adams

    Our valuation of these mining assets is based partly on the life-of-mine discounted cashflow. Given the companys long history of replacing reserve ounces, in most cases we haveassumed a longer life-of-mine in our analysis than the current reserve statements wouldsuggest.

    Figure 19: Peru Proven and probable reserves (as at June 2006)

    Reserves (Kt) Ag Au Ag Ag eq.Proved Probable Total (g/t) (g/t) mm oz Mm oz

    Selene Mine 763 37 799 377 3 10 4

    Aracata Mine 647 283 930 462 1 14 2

    Ares Mine 642 193 835 327 12 9 20

    Pallancata Project - 643 643 263 1 5 1

    Total 2,052 1,156 3,207 366 4 38 27We note that since 1999, the company has applied the JORC classification system to delineate its reserves.Prior to this, a Peruvian system was applied and this has resulted in some variation in the historical averageLOM of reserves.Source: Company reports

  • 8/15/2019 Broker Note, Hochschild Mining, 23/01/2007 (Cannacord Adams)

    20/60

    20

    Hochschild Mining plc 23 January 2007

    Arcata Mine

    Arcata is located in the Arequipa region of Peru, 800km from Lima, at an altitude of 4,400

    metres and is 100% owned by Hochschild. The mine commenced production in 1964 and

    production has averaged 4.3 million ounces of silver and 6.5 thousand ounces of gold per

    year since 2003.

    Three vein systems (The Mariana, Ramal 2 and Macarena) are currently being mined byconventional, trackless cut-and-fill breast or overhand stoping methods with timber

    supports. The veins have a minimum mining width of 0.8 metres and maximum of 3.0

    metres. Each orebody has been accessed via discrete inclines and ramps to a depth of 500

    metres. Ore is loaded from passes into 22t haulage trucks distances to the plant are

    between 4.5km and 5km depending on the system.

    The processing facilities at Arcata have a capacity of 350ktpa of ore following an expansion

    from 280ktpa in 1980. Two further expansions are planned, with throughput expected by

    the company to increase to 420ktpa in January 2007 for a minimum of capital, perhaps as

    little as US$200,000 and then expand by a further 25% to approximately 530ktpa in 2009

    for a cost of US$10 million. Processing consists of a conventional crushing, grinding and

    flotation circuit which produces a silver concentrate, containing approximately 400oz/t of

    silver and gold in concentrate. Processing recoveries are relatively low compared to the

    other two operations (~88.5% Ag and 83.5% Au) due to arsenic in the ore. We estimate

    ongoing sustaining development of approximately US$6.0 million per annum, but we

    expect full operating costs to fall from US$55/t at current throughput of 350ktpa to US$48/t

    when fully developed at 530ktpa. Further detail is shown in Figure 21.

    Figure 20: Arcata mine

    Source: Company presentation

  • 8/15/2019 Broker Note, Hochschild Mining, 23/01/2007 (Cannacord Adams)

    21/60

    21

    23January2007

    Ho

    chschildMiningplc

    Figure21:Arcataforecas

    tassumptionsandeconomicanalysis

    0246810

    12

    2003

    2004

    2005

    2006

    2007

    2008

    2009

    2010

    00.5

    11.5

    22.5

    33.5

    44.5

    5

    EquivSilverProduction(Moz)-LHS

    TotalCashCost($/ozAg-RHS

    GrossSalesRevenue

    Silver

    Gold

    Mining

    Sales

    OperatingCost

    s

    Valuation

    Mineclosure

    year

    2025

    Smeltingconc

    $/t

    conc

    112.5

    Admin

    $

    /t

    5

    Ds

    Re

    NUM)

    Recoverysilver

    %

    89%

    RefiningAg

    $/o

    z

    0.3

    0

    Genservices$

    /t

    11

    5%

    453

    $

    Recoverygold

    %

    84%

    RefiningAu

    $/o

    z

    6.0

    0

    Plant

    $

    /t

    4

    8%

    371

    $

    Saleproduct%conc

    %

    100%

    Freight&Ins

    $/k

    gdore

    0.0

    0

    Mine

    $

    /t

    26

    10%

    330

    $

    Concentrategrade

    oz/t

    400

    Payablesilver

    %

    97.0

    %

    Geology

    $

    /t

    2

    12%

    296

    $

    Payablegold

    %

    96.0

    %

    TotalOpCost$

    /t

    48

    2006

    2007

    2008

    2009

    2010

    2011

    2012

    2013

    2014

    2015

    2016

    2017

    2018

    Annualthroughput

    000

    'st

    314

    350

    420

    530

    530

    530

    530

    530

    530

    530

    530

    530

    530

    Silverproduction

    000'soz

    4,7

    54

    4,5

    81

    5,6

    40

    8,1

    43

    7,5

    40

    7,5

    40

    7,5

    40

    7,5

    40

    7,5

    40

    7,5

    40

    7,5

    40

    7,5

    40

    7,5

    40

    Goldproduction

    000'soz

    12

    12

    15

    24

    23

    23

    23

    23

    23

    23

    23

    23

    23

    Cashcosts

    $/oz

    Ag

    4.0

    7

    4.5

    9

    4.0

    1

    3.5

    4

    3.6

    9

    3.6

    9

    3.6

    9

    3.6

    9

    3.6

    9

    3.6

    9

    3.6

    9

    3.6

    9

    3.6

    9

    Cashcosts

    $/oz

    Au

    219

    230

    209

    185

    214

    214

    214

    214

    214

    214

    214

    214

    214

    Netsales

    $00

    0's

    56,4

    76

    61,5

    43

    69,7

    34

    93,4

    06

    75,2

    99

    75,2

    93

    75,2

    88

    75,2

    85

    75,2

    84

    75,2

    82

    75,2

    82

    75,2

    81

    75,2

    81

    Cashoperatingcosts

    $00

    0's

    17,2

    53

    19,2

    50

    20,1

    60

    25,4

    40

    25,4

    40

    25,4

    40

    25,4

    40

    25,4

    40

    25,4

    40

    25,4

    40

    25,4

    40

    25,4

    40

    25,4

    40

    EBITDA

    $00

    0's

    39,2

    23

    42,2

    93

    49,5

    74

    67,9

    66

    49,8

    59

    49,8

    53

    49,8

    48

    49,8

    45

    49,8

    44

    49,8

    42

    49,8

    42

    49,8

    41

    49,8

    41

    EBIT

    $00

    0's

    31,1

    38

    34,0

    27

    40,3

    52

    58,9

    96

    41,9

    29

    42,5

    98

    43,0

    33

    43,3

    15

    43,4

    99

    43,6

    18

    43,6

    96

    43,7

    46

    43,7

    79

    NetProfit

    $00

    0's

    20,5

    54

    22,4

    62

    26,6

    36

    38,9

    43

    27,6

    78

    28,1

    19

    28,4

    06

    28,5

    93

    28,7

    14

    28,7

    93

    28,8

    44

    28,8

    77

    28,8

    99

    Capex

    $00

    0's

    6,2

    00

    11,0

    00

    11,0

    00

    6,0

    00

    6,0

    00

    6,0

    00

    6,0

    00

    6,0

    00

    6,0

    00

    6,0

    00

    6,0

    00

    6,0

    00

    6,0

    00

    Projectcashflow

    $00

    0's

    22,4

    39

    30,7

    27

    35,8

    59

    47,9

    13

    35,6

    08

    35,3

    74

    35,2

    22

    35,1

    23

    35,0

    58

    35,0

    17

    34,9

    89

    34,9

    72

    34,9

    60

    Source:Companyreports,

    Cana

    ccordAdamsestimatesfor2006-2018

  • 8/15/2019 Broker Note, Hochschild Mining, 23/01/2007 (Cannacord Adams)

    22/60

    22

    Hochschild Mining plc 23 January 2007

    Ares Mine

    The 100% owned Ares concession was discovered in 1988 following interpretation of

    aerial photography and covers over 22,700 hectares. In the early 1990s, geological

    mapping, geochemical mapping, surface drilling and subsequent underground drilling

    were undertaken. By 1995, at least two vein systems had been defined, including the

    Victoria Vein, now being mined, and the Tanis Vein.

    Mineralogy of the Ares ore is significantly different from both Arcata and Selene in that it

    contains a much higher abundance of gold relative to silver. The operation was

    commissioned in 1998 and produced 3.1 million ounces of contained metal in dor

    during 2005 (2.9 million ounces of silver and 199 thousand ounces of gold).

    The Victoria Vein system has a minimum designed mining width of 0.8 metres, a

    maximum width of 15 metres and averages 2.13 metres in thickness. As with Arcata,

    each system is accessed via discrete inclines which are connected underground to a

    depth of 275 metres below surface. A conventional trackless cut-and-fill breast or

    overhand stoping mining method is utilised. The ore is loaded from ore passes in to 22t

    trucks and hauled 4km and 5km depending on the system. Dilution at Ares is

    comparatively low at 10% or less owing to the competent wall-rock.

    Ore is delivered to an on-site cyanide leaching plant which feeds pregnant solution to

    Merril Crowe plant to produce dor; recoveries being achieved are approximately 93%

    for silver and 96% for gold. The plant is currently operating at 280ktpa of ore, however

    the company plans to increase throughput to 325ktpa in 2007, little more than a de-

    bottlenecking exercise. We expect production to decrease slightly from current levels as

    silver grades fall from around 410g/t to below 250g/t over the long-term, Figure 21.

    We estimate sustaining development at this mine will be approximately US$3.5 million

    per annum while we expect operating costs to remain relatively constant around current

    levels of US$68/t of mill feed. Further detail is shown in Figure 23.

    Figure 22: Ares mine

    Source: Company presentation

  • 8/15/2019 Broker Note, Hochschild Mining, 23/01/2007 (Cannacord Adams)

    23/60

  • 8/15/2019 Broker Note, Hochschild Mining, 23/01/2007 (Cannacord Adams)

    24/60

    24

    Hochschild Mining plc 23 January 2007

    Selene Mine

    The Selene mine is 100% owned by the company and is located in Cotanuse District,

    650km from Lima and at an altitude of 4,600 metres above sea-level. Operations

    commenced in November 2003.

    The deposit is associated with a 5-6km geological structure interpreted as a collapsed

    caldera and the concession area itself covers an area of 19,540 hectares. The regional

    structure hosts the Explorador-Tumiri-Aycha vein system and these mineralised zones

    are currently the focus of mining and development. The mining method at Selene is

    similar to the other Peruvian underground operations, utilising standard cut-and-fill

    overhand stoping. Current workings are at a depth of 350km below surface and haulage

    distances from stope to plant are approximately 1.3km.

    Mineralised veins are relatively thin; in the Explorador system, thicknesses range from

    0.8-5.0 metres and average around 2.0 metres. However, the ore body benefits from a

    relatively competent host rock, reducing the risk of excessive dilution and based on

    historical mining, a dilution factor of 10% is a reasonable assumption.

    The processing plant is similar to that at Arcarta, following a standard crushing,

    screening, grinding and flotation route to produce a silver-gold bulk concentrate.

    However, since October 2006 concentrate from Selene has been treated at Ares to

    produce dor. As such, the company has been gaining access to more of the value chain

    from its metal production and benefiting from a reduction in working capital by virtue of

    the reduced metal in inventory.

    The Selene mine and concentrator currently have capacity of 350ktpa, however the

    company plans to expand the plant to 700ktpa in 2007 so as to be able to treat 350ktpa

    of ore from the nearby Pallancata project due for production from 2007. The plant will

    then be expanded a further 180ktpa to 880ktpa so as to accommodate an expansion of

    the Selene mining operation from 350ktpa to 530ktpa. We estimate the total cost of the

    plant expansion at US$10 million, half of which will be allocated to the development cost

    of Pallancata.

    We estimate sustaining development at the Selene mine will be approximately US$3.0

    million per annum while we expect operating costs will fall 13% from US$44/t of mill

    feed in the current configuration to US$38.6/t when fully developed in 2010. Further

    detail is shown in Figure 25.

    The Selene mine pays a 2% NSR royalty as a carried-interest royalty to its previous

    owners but will benefit from the economies of scale through the plant when Pallancata

    comes on stream from 2007.

    Figure 24: Selene Mine

    Source: Company presentation

  • 8/15/2019 Broker Note, Hochschild Mining, 23/01/2007 (Cannacord Adams)

    25/60

    25

    23January2007

    Ho

    chschildMiningplc

    Figure25:Seleneforecastassumptionsandeconomicanalysis

    01234567

    2003

    20

    04

    2005

    2006

    2007

    2008

    2009

    2010

    0123456

    EquivSilverProduction(Moz)-LHS

    TotalCashCost($/ozAg-RHS

    GrossSalesRevenue

    Silver

    Gold

    Mining

    Sales

    OperatingCost

    s

    Valuation

    Mineclosure

    year

    2025

    Smeltingdore

    $/k

    g

    6.1

    1

    Admin

    $

    /t

    5.6

    Ds

    Re

    NUM)

    Recoverysilver

    %

    91%

    RefiningAg

    $/o

    z

    0.7

    5

    Genservices$

    /t

    7

    5%

    170

    $

    Recoverygold

    %

    87%

    RefiningAu

    $/o

    z

    0

    Plant

    $

    /t

    7

    8%

    142

    $

    Saleproduct%conc

    %

    0

    Freight&Ins

    $/k

    gdore

    7

    Mine

    $

    /t

    16

    10%

    128

    $

    Concentrategrade

    oz/t

    1000

    Payablesilver

    %

    99.8

    5%

    Geology

    $

    /t

    3

    12%

    116

    $

    Payablegold

    %

    99.7

    5%

    TotalOpCost$

    /t

    38.6

    2006

    2007

    2008

    2009

    2010

    2011

    2012

    2013

    2014

    2015

    2016

    2017

    2018

    Annualthroughput

    000

    'st

    360

    180

    180

    180

    180

    180

    180

    180

    180

    180

    180

    180

    180

    Silverproduction

    000'soz

    4,1

    62

    1,9

    22

    1,9

    17

    1,6

    32

    1,6

    85

    1,6

    85

    1,6

    85

    1,6

    85

    1,6

    85

    1,6

    85

    1,6

    85

    1,6

    85

    1,6

    85

    Goldproduction

    000'soz

    28

    13

    13

    7

    3

    3

    3

    3

    3

    3

    3

    3

    3

    Cashcosts

    $/oz

    Ag

    2.8

    3

    3.0

    8

    2.7

    1

    3.4

    8

    3.8

    0

    3.8

    0

    3.8

    0

    3.8

    0

    3.8

    0

    3.8

    0

    3.8

    0

    3.8

    0

    3.8

    0

    Cashcosts

    $/oz

    Au

    152

    154

    141

    182

    220

    220

    220

    220

    220

    220

    220

    220

    220

    Netsales

    $00

    0's

    60,7

    71

    30,3

    77

    27,7

    86

    19,5

    20

    14,9

    86

    14,9

    82

    14,9

    79

    14,9

    77

    14,9

    76

    14,9

    75

    14,9

    75

    14,9

    75

    14,9

    74

    Cashoperatingcosts

    $00

    0's

    16,0

    42

    7,9

    20

    6,9

    48

    6,9

    48

    6,9

    48

    6,9

    48

    6,9

    48

    6,9

    48

    6,9

    48

    6,9

    48

    6,9

    48

    6,9

    48

    6,9

    48

    EBITDA

    $00

    0's

    44,7

    29

    22,4

    57

    20,8

    38

    12,5

    72

    8,0

    38

    8,0

    34

    8,0

    31

    8,0

    29

    8,0

    28

    8,0

    27

    8,0

    27

    8,0

    27

    8,0

    26

    EBIT

    $00

    0's

    39,8

    29

    16,4

    72

    15,0

    23

    7,7

    42

    3,8

    49

    4,2

    61

    4,5

    29

    4,7

    03

    4,8

    16

    4,8

    89

    4,9

    37

    4,9

    68

    4,9

    89

    NetProfit

    $00

    0's

    26,2

    91

    13,5

    73

    15,3

    06

    10,4

    99

    7,9

    29

    8,2

    02

    8,3

    78

    8,4

    93

    8,5

    68

    8,6

    17

    8,6

    48

    8,6

    69

    8,6

    82

    Capex

    $00

    0's

    8,0

    00

    8,0

    00

    3,0

    00

    3,0

    00

    3,0

    00

    3,0

    00

    3,0

    00

    3,0

    00

    3,0

    00

    3,0

    00

    3,0

    00

    3,0

    00

    3,0

    00

    Projectcashflow

    $00

    0's

    23,1

    91

    19,5

    58

    21,1

    21

    15,3

    29

    12,1

    19

    11,9

    75

    11,8

    81

    11,8

    20

    11,7

    80

    11,7

    55

    11,7

    38

    11,7

    27

    11,7

    20

    Source:CanaccordAdamsestim

    atesfor2006-2018

  • 8/15/2019 Broker Note, Hochschild Mining, 23/01/2007 (Cannacord Adams)

    26/60

    26

    Hochschild Mining plc 23 January 2007

    Pallancata Project

    In June 2006, Hochschild signed a joint venture agreement with International Minerals

    Corporation (a TSX listed company) for 60% ownership of the Pallancata project with

    Hochschild as the operator. The deposit is located approximately 17km from the Selene

    mine and is considered to be part of the same mineralised structure. Old colonial

    workings are found in the concession area and current reserves of 643,267 tonnes at263g/t silver and 1.09g/t gold are associated with a mineralised vein system stretching

    over 2km along strike. Beyond the current resource, hosted by the West Breccia

    structure, surface sampling programmes at more workings to the north have returned

    promising results and constitute future exploration targets. The company intends to use

    Pallancata ore to supplement feed to the Selene concentrator as the plant undergoes

    expansion. The current mine plan envisages mining methods similar to the other

    Peruvian operations; trackless cut-and-fill and overhand stoping. Mining widths will

    range between 0.8-25 metres, averaging five metres. Three stopes are scheduled to

    rotate in the production cycle and ore will be loaded on to 22t trucks and transported

    directly to the primary crusher at Selene mine.

    Initial construction permits were granted in August 2006 with first production scheduled to

    commence in 2007. The total capital expenditure requirement will be US$10.5 million

    being the JV share of the plant expansion at Selene plus approximately US$3.0 million per

    annum for ongoing development. Costs for transporting ore from the mine to the plant at

    Selene are estimated by us to be US$5/t of ore and this is included in the total estimated

    operating cost of US$52/t of ore milled, which includes a management fee for the JV

    operation of 10% of all generating costs to Hochschild Mining. The Selene operation should

    also benefit from a processing margin on ore treated at the expanded Selene mill, which we

    estimate will be US$11/t of ore above the cash cost of ore processing.

    Figure 26: Pallancata development project

    Source: Company presentation

    Other prospects

    The company also holds rights to eight other targets in Peru, including the San Martin

    prospect which lies between Arcata and Selene. Other prospects include La Colorada,

    Tincos, Minaspata Azuca, Cerro Blanco, San Andrs, Frontera and Paraso. There is also

    further exploration potential at the companies, with a number of new vein systems

    targeted for development.

  • 8/15/2019 Broker Note, Hochschild Mining, 23/01/2007 (Cannacord Adams)

    27/60

    27

    23January2007

    Ho

    chschildMiningplc

    Figure27:PallancataPro

    jectassumptionsandeconomicanalys

    is

    Mining

    Sales

    OperatingCost

    s

    Valuation

    Mineclosure

    year

    2025

    Smeltingdore

    $/k

    g

    6.1

    1

    Admin

    $

    /t

    4.7

    Ds

    Re

    NUM)

    Recoverysilver

    %

    0.9

    1

    RefiningAg

    $/o

    z

    0.7

    5

    Genservices$

    /t

    5

    5%

    141

    $

    Recoverygold

    %

    0.8

    7

    RefiningAu

    $/o

    z

    -

    Plant

    $

    /t

    18

    8%

    113

    $

    Saleproduct%conc

    %

    0

    Freight&Ins

    $/k

    gdore

    7

    Mine

    $

    /t

    20

    10%

    98

    $

    Concentrategrade

    oz/t

    400

    Payablesilver

    %

    99.8

    5%

    Geology

    $

    /t

    4

    12%

    87

    $

    Payablegold

    %

    99.7

    5%

    TotalOpCost$

    /t

    51.7

    2006

    2007

    2008

    2009

    2010

    2011

    2012

    2013

    2014

    2015

    2016

    2017

    2018

    Annualthroughput

    000

    'st

    0

    125

    520

    520

    520

    520

    520

    520

    520

    520

    520

    520

    520

    Silverproduction

    000'soz

    0

    784

    3,9

    55

    3,9

    55

    5,4

    77

    5,4

    77

    5,4

    77

    5,4

    77

    5,4

    77

    5,4

    77

    5,4

    77

    5,4

    77

    5,4

    77

    Goldproduction

    000'soz

    0

    3

    16

    16

    20

    20

    20

    20

    20

    20

    20

    20

    20

    Cashcosts

    $/oz

    Ag

    0.0

    0

    12.0

    7

    5.6

    2

    5.6

    2

    4.0

    5

    4.0

    5

    4.0

    5

    4.0

    5

    4.0

    5

    4.0

    5

    4.0

    5

    4.0

    5

    4.0

    5

    Cashcosts

    $/oz

    Au

    0

    604

    293

    294

    234

    234

    234

    234

    234

    234

    234

    234

    234

    Netsales

    $00

    0's

    0

    11,3

    13

    52,5

    65

    47,8

    62

    56,5

    13

    56,5

    12

    56,5

    11

    56,5

    10

    56,5

    10

    56,5

    10

    56,5

    10

    56,5

    10

    56,5

    10

    Cashoperatingcosts

    $00

    0's

    0

    11,3

    09

    26,8

    84

    26,8

    84

    26,8

    84

    26,8

    84

    26,8

    84

    26,8

    84

    26,8

    84

    26,8

    84

    26,8

    84

    26,8

    84

    26,8

    84

    EBITDA

    $00

    0's

    0

    4

    25,6

    81

    20,9

    78

    29,6

    29

    29,6

    28

    29,6

    27

    29,6

    26

    29,6

    26

    29,6

    26

    29,6

    26

    29,6

    26

    29,6

    26

    EBIT

    $00

    0's

    0

    -4,1

    96

    21,9

    01

    17,4

    71

    26,2

    99

    26,4

    14

    26,4

    88

    26,5

    36

    26,5

    67

    26,5

    88

    26,6

    01

    26,6

    10

    26,6

    15

    NetProfit

    $00

    0's

    0

    -2,7

    70

    14,4

    57

    11,5

    33

    17,3

    60

    17,4

    36

    17,4

    85

    17,5

    16

    17,5

    37

    17,5

    51

    17,5

    59

    17,5

    65

    17,5

    69

    Capex

    $00

    0's

    10,5

    00

    3,0

    00

    3,0

    00

    3,0

    00

    3,0

    00

    3,0

    00

    3,0

    00

    3,0

    00

    3,0

    00

    3,0

    00

    3,0

    00

    3,0

    00

    3,0

    00

    Projectcashflow

    $00

    0's

    -10,5

    00

    1,4

    30

    18,2

    37

    15,0

    40

    20,6

    90

    20,6

    50

    20,6

    24

    20,6

    07

    20,5

    96

    20,5

    89

    20,5

    84

    20,5

    81

    20,5

    79

    Source:CanaccordAdamsestim

    atesfor2006-2018

  • 8/15/2019 Broker Note, Hochschild Mining, 23/01/2007 (Cannacord Adams)

    28/60

    28

    Hochschild Mining plc 23 January 2007

    Infrastructure

    Establishing and maintaining infrastructure at the Peruvian operations is challenging

    owing to the sites remoteness, terrain and elevation (~5,000m). However, national grid

    power supply is available and sufficient. Selene and Ares run from the grid and both

    have standby generation. Arcata is also run from the grid but the operation can

    generate only 33% of its required power from its stand by generators the company is

    considering additional generation capacity. In most cases, goods are transported to and

    from mine site by a mixture of tarmac and good dirt roads from the nearest main city

    and provincial capital, Arequipa. Arequipa is approximately 300km from Arcata, 285km

    from Ares and 180km from Selene. The majority of goods (~80%) destined for Selene are

    actually sourced from Lima, a distance of 650km.

    The undeveloped Pallancatta Project has only basic infrastructure at this time. The

    company has budgeted for installation of a new 12.5km transition line to run from

    Selene at a cost of US$0.352 million. A new road is also planned at a cost of US$2 million

    and this should improve access to Selene. It is expected that the workforce will be based

    at Selene and transported to Pallancatta each day.

    Fiscal Regime

    Corporate tax is payable at a prima facie rate of 30% while royalties are charged on a

    sliding scale at the pre-tax level: 1% of profit from US$0-60 million, 2% of profits

    between US$60-120 million and 3% of profit thereafter.

    Permitting and Environmental Regulation

    In Peru, the environmental requirements for operating a mine are detailed in a

    government decree and applications are made to the Ministry of Energy and Mines

    (MEM). Mines operating prior to 1993 have to compile a Programa de Adecuacion y

    Manejo Ambiental (PAMA). Mines commissioned post-1993 require an Environmental

    Impact Statement (EIS). All the Peruvian mines are operating with the necessary

    environmental permits and an application for the Pallancata Project is currentlyundergoing the necessary authorisation process.

    The company has certain obligations regarding its closed operations in Peru, namely the

    Sipn open pit. The mine generates acid mine drainage and this is currently being

    treated at liming plants. The cost of water treatment for Sipn is approximately US$1.0

    million a year. Environmental liabilities for the Peruvian assets are included in a mine

    closure plan prepared by an independent party and approved by the local authority.

    All three mining operations have tailings dam facilities, but with varying degrees of

    remaining capacity. The mines are all located in high seismic risk areas and so

    engineering design and monitoring requirements are strict under guidelines issued by

    the Ministry of Energy and Mines and details of the tailings dam are included in the EIA.

    At Arcata, the mine is on its sixth tailings dam; Dam No.6 can be lifted a further five

    metres giving a remaining life of approximately eight years. The Ares mine tailings

    facilities are currently near maximum height and have a life of only three years

    remaining.

  • 8/15/2019 Broker Note, Hochschild Mining, 23/01/2007 (Cannacord Adams)

    29/60

    29

    23 January 2007 Hochschild Mining plc

    MEXICO

    The company has rights over two advanced projects in Mexico via joint venture

    partnerships. Hochschild has purchased the Moris silver-gold mine and related

    concessions from Exmin and other parties. The company also has an option to acquire a

    70% interest in San Felipe polymetallic project in northern Mexico in addition to rights

    over several exploration prospects and targets.

    Figure 28: Mexico - advanced projects location map

    Mina Moris

    San Felipe

    Source: Company presentation, Canaccord Adams

    Mina Moris Project

    The Moris mine is located in Chihuahua, along the Sierra Madre. The mine was

    operated between 1996-1999 by Minera Manhatten S.A. de C.V. and produced 50,000

    ounces of gold and 150,000 ounces of silver from 1.1 million tonnes of ore over this three

    year period. The asset is now subject to a joint venture, agreed in June 2006, through

    which Hochschild has exercised the option to purchase up to 70% in the project for

    US$4.2 million. Hochschild is in the process of developing a business plan for the mineand expects production to re-commence in July 2007, subject to mine plan approval.

    The company also has an option to acquire (at a cost of US$4.8 million plus an

    investment of US$0.85 million in Exmin) a 70% interest in 9,889 hectares of concessions

    around the Moris Mine.

    Moris is an epithermal deposit and mineralisation is predominately gold and silver with

    minor lead and zinc sulphides hosted by conglomerates and volcanic breccias. Several

    vein systems have been identified, but only the El Creston has been mined to date.

    Vein thicknesses are up to approximately 10 metres the average mining width for El

    Creston was 13 metres. Manhatten Minerals calculated a life of mine reserve of 4.0

    million tonnes at 1.9g/t gold and 8.75 g/t silver then following closure in 1999, the

    company stated resources of 3.1 million tonnes at 1.9g/t and 6.6 g/t silver. Latestattributable resource estimates updated by Hochschild are shown in Figure 29.

    Mining is by open pit methods; the El Creston ore body, previously mined by Manhattan

    was extracted through conventional blast, shovel and haulage techniques. The current

    mine plan involves continuation of open pit mining with 5.0 metre benches, strip ratio

    1:3.6 (O:W) and haulage utilising 33 tonne trucks. The mine currently has a capacity of

    just over one million tonnes per year of ore.

    Figure 29: Moris Resources

    Kt Ag Au(g/t) (g/t)

    Measured 2,951 4 1.32

    Indicated 404 3.7 1.24

    Total 3,354 4.0 1.3Source: Company data

  • 8/15/2019 Broker Note, Hochschild Mining, 23/01/2007 (Cannacord Adams)

    30/60

    30

    Hochschild Mining plc 23 January 2007

    The ore will be hauled approximately 2km to the current processing facilities, which

    currently has a capacity of 1,095ktpa. Previously ore was crushed, agglomerated and

    then heap leached using cyanide solution. From solution, the gold and silver was

    recovered through a carbon adsorption, electrowinning and smelting circuit to produce

    dor.

  • 8/15/2019 Broker Note, Hochschild Mining, 23/01/2007 (Cannacord Adams)

    31/60

    31

    23January2007

    Ho

    chschildMiningplc

    Figure30:MinaMorisProjectassumptionsandeconomicanalysis

    Mining

    Sales

    OperatingCost

    s

    Valuation

    Mineclosure

    year

    2025

    Smeltingdore

    $/k

    g

    6.1

    1

    Admin

    $

    /t

    0

    Ds

    Re

    NUM)

    Recoverysilver

    %

    70%

    RefiningAg

    $/o

    z

    0.7

    5

    Genservices$

    /t

    0

    5%

    100

    $

    Recoverygold

    %

    35%

    RefiningAu

    $/o

    z

    0

    Plant

    $

    /t

    0

    8%

    82

    $

    Saleproduct%conc

    %

    0%

    Freight&Ins

    $/kgdore

    7

    Mine

    $

    /t

    0

    10%

    73

    $

    Concentrategrade

    oz/t

    400

    Payablesilver

    %

    100%

    Geology

    $

    /t

    0

    12%

    66

    $

    Payablegold

    %

    100%

    TotalOpCost$

    /t

    7

    2006

    2007

    2008

    2009

    2010

    2011

    2012

    2013

    2014

    2015

    2016

    2017

    2018

    Annualthroughput

    000

    'st

    0

    400

    2,7

    00

    2,7

    00

    2,7

    00

    2,7

    00

    2,7

    00

    2,7

    00

    2,7

    00

    2,7

    00

    2,7

    00

    2,7

    00

    2,7

    00

    Silverproduction

    000'soz

    0

    255

    2,0

    05

    2,0

    05

    1,2

    15

    1,2

    15

    1,2

    15

    1,2

    15

    1,2

    15

    1,2

    15

    1,2

    15

    1,2

    15

    1,2

    15

    Goldproduction

    000'soz

    0

    6

    46

    46

    46

    46

    46

    46

    46

    46

    46

    46

    46

    Cashcosts

    $/oz

    Ag

    0.0

    0

    11.7

    9

    5.5

    6

    4.3

    2

    4.9

    2

    4.9

    2

    4.9

    2

    4.9

    2

    4.9

    2

    4.9

    2

    4.9

    2

    4.9

    2

    4.9

    2

    Cashcosts

    $/oz

    Au

    0.0

    0

    589

    290

    226

    285

    285

    285

    285

    285

    285

    285

    285

    285

    Netsales

    $00

    0's

    0

    6,7

    99

    49,8

    68

    45,5

    81

    34,9

    69

    34,9

    60

    34,9

    66

    34,9

    70

    34,9

    61

    34,9

    54

    34,9

    50

    34,9

    48

    34,9

    46

    Cashoperatingcosts

    $00

    0's

    0

    6,4

    00

    24,3

    00

    18,9

    00

    18,9

    00

    18,9

    00

    18,9

    00

    18,9

    00

    18,9

    00

    18,9

    00

    18,9

    00

    18,9

    00

    18,9

    00

    EBITDA

    $00

    0's

    0

    399

    25,5

    68

    26,6

    81

    16,0

    69

    16,0

    60

    16,0

    66

    16,0

    70

    16,0

    61

    16,0

    54

    16,0

    50

    16,0

    48

    16,0

    46

    EBIT

    $00

    0's

    0

    -3,8

    01

    22,8

    38

    24,0

    31

    13,4

    72

    14,3

    72

    13,7

    44

    13,3

    36

    14,2

    83

    14,8

    99

    15,2

    99

    15,5

    60

    15,7

    29

    NetProfit

    $00

    0's

    0

    -2,5

    09

    15,0

    75

    15,8

    63

    8,8

    93

    9,4

    87

    9,0

    72

    8,8

    03

    9,4

    28

    9,8

    35

    10,0

    99

    10,2

    71

    10,3

    83

    Capex

    $00

    0's

    12,0

    00

    0

    0

    5,0

    00

    0

    0

    7,0

    00

    0

    0

    0

    0

    0

    0

    Projectcashflow

    $00

    0's

    -12,0

    00

    1,6

    91

    17,8

    05

    18,5

    13

    11,4

    90

    11,1

    75

    11,3

    95

    11,5

    37

    11,2

    06

    10,9

    90

    10,8

    50

    10,7

    59

    10,7

    00

    Source:CanaccordAdamsestim

    atesfor2006-2018

  • 8/15/2019 Broker Note, Hochschild Mining, 23/01/2007 (Cannacord Adams)

    32/60

    32

    Hochschild Mining plc 23 January 2007

    San Felipe Project

    The San Felipe concession is a small project covering an area of 544 hectares located in

    northern Sonara, Mexico. The property is currently owned by the Mexican company

    Grupo Serrana S.A de C.V, but Hochschild has an option to acquire 70% of the full

    mining rights and ownership. The company has paid US$0.2 million with an obligation

    to invest US$6.5 million over three years. Additionally, the company plans to invest

    US$10 million in Grupo Serrana and US$33.3 million in a Newco for the 70% ownership.

    We expect the mine to be in production by 2009; the current capacity is 730ktpa but that

    is expected to increase to 1,250ktpa. Hochschild will invest approximately US$33 million

    for the development, with any excess being equally divided between parties.

    The property was previously exploited by Grupo Serrana and between 1974-1991 a

    100tpd mill processed around 210,000 tonnes of ore. The deposit is a polymetallic skarn

    and mineralisation is associated with the contact between volcanic and metamorphic

    rocks. Swedish mining group Boliden carried out exploration in the area in 1997,

    defining an attributable resource of 4.5Mt at 69.7 g/t silver a metal content of 6.5% zinc,

    12.7% lead and 0.4% copper. Hochschild is currently engaged in verification drilling on

    the property with a 10,000 metre program in operation to define an indicated andmeasured resource. The company hopes to start an engineering study by early in 2007,

    meanwhile exploration at other identified potential targets will continue.

    Infrastructure

    Having been an operating mine until relatively recently, Moris mine has adequate

    infrastructure in place. There is enough power generation capacity at the minesite to be

    self sufficient and there is a system in place for re-cycling industrial water supply. Raw

    materials are transported to the mine via road from Chihuahua, 260km away and dor is

    exported from the minesite to the airport in Chihuahua.

    Fiscal Regime

    Corporate tax is payable at a prima facie rate of 29% and there are no mineral royalties.We have assumed straight line depreciation over 10 years.

    Permitting and Environmental Regulation

    The environmental requirements in Mexico are relatively standard; an EIA has to be

    submitted for approval prior to commissioning. Although in operation until 1999, the

    permit for the Moris mine has now expired and an EIA will have to be re-applied prior to

    production. Permitting for the San Felipe currently only covers exploration and drilling;

    an EIA is yet to be submitted.

    Figure 31: San Felipe Resources

    Kt Ag Au(g/t) (g/t)

    Measured 5,160 182 3.60Indicated 1,938 310 3.55

    Total 7,098 217 3.59Source: Company presentation

  • 8/15/2019 Broker Note, Hochschild Mining, 23/01/2007 (Cannacord Adams)

    33/60

    33

    23January2007

    Ho

    chschildMiningplc

    Figure32:SanFelipePro

    jectassumptionsandeconomicanalys

    is

    Mining

    O

    peratingCosts

    Valuation

    Mineclosure

    Yr

    2025

    Pbconc

    Znconc

    Cuconc

    A

    dmin

    $/t

    0.0

    0

    Ds

    Re

    NUM)

    Grades

    Recov%

    Transport

    $/tconc

    70

    70

    70

    P

    lant

    $/t

    0.0

    0

    5%

    270

    $

    Zinc(%)

    8%

    88%

    Concgrade

    %

    0.7

    60%

    21%

    M

    ine

    $/t

    0.0

    0

    8%

    203

    $

    Lead(%)

    2%

    88%

    %Payable

    %

    0.9

    5

    85%

    99%

    G

    eology

    $/t

    0.0

    0

    10%

    169

    $

    Copper(%)

    0%

    65%

    Deduction

    %

    0.0

    4

    2%

    1%

    T

    otal

    $/t

    25.0

    0

    12%

    142

    $

    Silver(g/t,%)

    70

    88%

    AgPayable

    %

    0.9

    5

    0

    0%

    2006

    2007

    2008

    2009

    2010

    2011

    2012

    2013

    2014

    2015

    2016

    2017

    2018

    Annualthroughput

    000

    'st

    0

    0

    0

    650

    1,2

    00

    1,2

    00

    1,2

    00

    1,2

    00

    1,2

    00

    1,2

    00

    1,2

    00

    1,2

    00

    1,2

    00

    Silverproduction

    000'soz

    0

    255

    2,0

    05

    2,0

    05

    1,2

    15

    1,2

    15

    1,2

    15

    1,2

    15

    1,2

    15

    1,2

    15

    1,2

    15

    1,2

    15

    1,2

    15

    Goldequivproduction

    000'soz

    0

    0

    0

    163

    300

    300

    300

    300

    300

    300

    300

    300

    300

    Zincproduction

    000

    'st

    0

    0

    0

    35.5

    3

    65.6

    0

    65.6

    0

    65.6

    0

    65.6

    0

    65.6

    0

    65.6

    0

    65.6

    0

    65.6

    0

    65.6

    0

    Leadproduction

    000

    'st

    0

    0

    0

    10.3

    7

    19.1

    5

    19.1

    5

    19.1

    5

    19.1

    5

    19.1

    5

    19.1

    5

    19.1

    5

    19.1

    5

    19.1

    5

    Copperproduction

    000

    'st

    0

    0

    0

    0.8

    3

    1.5

    3

    1.5

    3

    1.5

    3

    1.5

    3

    1.5

    3

    1.5

    3

    1.5

    3

    1.5

    3

    1.5

    3

    Cashcosts

    $/oz

    Ag

    0

    0

    0

    4.0

    2

    4.3

    2

    4.8

    1

    4.8

    1

    4.8

    1

    4.8

    1

    4.8

    1

    4.8

    1

    4.8

    1

    4.8

    1

    Netsales

    $00

    0's

    0

    0

    0

    80,0

    71

    111,3

    68

    96,2

    32

    96,2

    32

    96,2

    32

    96,2

    32

    96,2

    32

    96,2

    32

    96,2

    32

    96,2

    32

    Cashoperatingcosts

    $00

    0's

    0

    0

    0

    16,2

    50

    30,0

    00

    30,0

    00

    30,0

    00

    30,0

    00

    30,0

    00

    30,0

    00

    30,0

    00

    30,0

    00

    30,0

    00

    EBITDA

    $00

    0's

    0

    0

    0

    63,8

    21

    81,3

    68

    66,2

    32

    66,2

    32

    66,2

    32

    66,2

    32

    66,2

    32

    66,2

    32

    66,2

    32

    66,2

    32

    EBIT

    $00

    0's

    0

    0

    0

    43,3

    21

    63,3

    68

    51,2

    32

    53,6

    32

    55,5

    52

    57,0

    88

    58,3

    17

    59,3

    00

    60,0

    86

    60,7

    15

    NetProfit

    $00

    0's

    0

    0

    0

    43,3

    21

    41,1

    89

    33,3

    01

    34,8

    61

    36,1

    09

    37,1

    07

    37,9

    06

    38,5

    45

    39,0

    56

    39,4

    65

    Capex

    $00

    0's

    0

    8,0

    00

    88,0

    00

    13,0

    00

    3,0

    00

    3,0

    00

    3,0

    00

    3,0

    00

    3,0

    00

    3,0

    00

    3,0

    00

    3,0

    00

    3,0

    00

    Projectcashflow

    $00

    0's

    0

    -8,0

    00

    -88,0

    00

    50,8

    21

    56,1

    89

    45,3

    01

    44,4

    61

    43,7

    89

    43,2

    51

    42,8

    21

    42,4

    77

    42,2

    02

    41,9

    81

    Source:CanaccordAdamsestim

    atesfor2006-2018

  • 8/15/2019 Broker Note, Hochschild Mining, 23/01/2007 (Cannacord Adams)

    34/60

    34

    Hochschild Mining plc 23 January 2007

    ARGENTINA

    Hochschild has a presence in Argentina through Compania Minera Santa Cruz S.A., a

    joint venture company in which the Group holds a 51% stake. The remaining 49% is

    owned by Minera Andes S.A. (MASA) which is controlled by Minera Andes Inc., a TSX

    listed company. The joint venture company holds a 40,499 hectare concession area inPatagonia, which includes the San Jos Project. The company also holds rights to four

    other exploration prospects in the country, including Sierra de las Minas, Ambargasta,

    Quevar and Puesto Chacon.

    Figure 33: Argentina - San Jos location map

    San Jos

    Source: Company presentation, Canaccord Adams

    San Jos Project

    The San Jos silver-gold project is located in the Deseado Massif of the Santa Cruz

    Province, Patagonia. Geologically, the deposit is very similar to the epithermal deposits

    in Peru, although the volcanic host rock is slightly older. The deposit currently consists

    of two defined vein systems, Huevos Verdes was discovered by MASA in 1997 and Freadiscovered in 2004 under Hochschild Minings management. Most recently, the

    company has developed shaft inclines into both vein systems to better delineate the

    resources. Current attributable reserves for the San Jos Project are estimated at 642kt

    containing 9.04 million ounces of silver and 168,000 ounces, Figure 34.

    The current mine plan involves initial development of a 265ktpa of ore operation,

    ramping up to 500ktpa after two years producing approximately 118,000 ounces of

    silver and 70,000 ounces of gold per year. Mining will be by underground cut and fill

    breast stoping methods using timber and steel bolt supports where necessary. Five

    stopes will rotate the production cycle and ore will be loaded on to 28t haulage trucks.

    Haulage distances form Huevos Verdes and Frea to the plant will be approximately

    18km. Metallurgical testwork on the ore has already been carried out; the plant will

    incorporate conventional crushing, grinding, flotation and concentration methods. Go