Bridges Southeast Asia
3-4 August 2010
Sustainable Bridge Construction Practices
Case Study: Second Penang Bridge, Malaysia
Dato’ Prof. Ir. Dr. Ismail Mohamed Taib
Managing Director
Jambatan Kedua Ptd. Ltd.
JAMBATAN KEDUA PTD. LTD. (824573-U)
Wholly owned by Minister of Finance, Incorporated
GOVERNMENT OF MALAYSIA
MALAYSIAN HIGHWAY AUTHORITY
Bridges Southeast Asia – 3 to 4 August 2010
Sustainable Bridge Construction Practices – Case Study: Second Penang Bridge, Malaysia
JAMBATAN KEDUA PTD. LTD. (824573-U)
Wholly owned by Minister of Finance, Incorporated
PROJECT INTRODUCTION
UNDERSTANDING FAST-TRACK CONSTRUCTION
PROCESSES OF LONG BRIDGE
APPRECIATING INCREASING ENVIRONMENTAL
CONCERNS IN BRIDGE CONSTRUCTION
IDENTIFYING ALTERNATIVE MATERIALS AND
COMPOSITES FOR BRIDGES
IMPLEMENTING 4Rs OF SUSTAINABILITY IN BRIDGE
CONSTRUCTION
2
Sustainable Bridge Construction Practices
Case Study: Second Penang Bridge, Malaysia
Bridges Southeast Asia – 3 to 4 August 2010
Sustainable Bridge Construction Practices – Case Study: Second Penang Bridge, Malaysia
JAMBATAN KEDUA PTD. LTD. (824573-U)
Wholly owned by Minister of Finance, Incorporated
3
Location of Second
Penang Bridge
Location Map
We are
Here
Bridges Southeast Asia – 3 to 4 August 2010
Sustainable Bridge Construction Practices – Case Study: Second Penang Bridge, Malaysia
JAMBATAN KEDUA PTD. LTD. (824573-U)
Wholly owned by Minister of Finance, Incorporated
Project Alignment
9+
000.
10+000.
11+000.
12+000. 13+000. 14+000.
15+
000.
16+
000.
0.
1+000. 2+000.
3+000. 4+000. 5+000. 6+000.
7+
000.
8+
000.
17+
000.
18+
000.
19+
000.
20+
000.
21+000.
22+000.
23+000.
PULAU
JEREJAK
PULAU
AMAN
PENANG
ISLAND
(Batu Maung)
NAVIGATIONAL
SPAN
PENANG SECOND
CROSSING BRIDGE
TOLL PLAZA
PLUS TOLL
PLAZA
BATU MAUNG
DIRECTIONAL RAMPS
BATU KAWAN
CLOVERLEAF
INTERCHANGE
BATU KAWAN
TRUMPET
INTERCHANGE
MAIN LAND
(Batu Kawan)
4
Bridges Southeast Asia – 3 to 4 August 2010
Sustainable Bridge Construction Practices – Case Study: Second Penang Bridge, Malaysia
JAMBATAN KEDUA PTD. LTD. (824573-U)
Wholly owned by Minister of Finance, Incorporated
General
Jambatan Kedua Ptd. Ltd. (“JKSB”), a wholly-owned
company of the Minister of Finance, Incorporated (“MoF
Inc.”) is the concessionaire for the Malaysian Second
Penang Bridge Project.
The 23.9km Second Penang Bridge project, when
completed will provide an alternative route between the
mainland in Batu Kawan and the island of Penang of
Malaysia in Batu Maung. The bridge will improve trade efficiency and enhance
logistics system by providing better connectivity and
accessibility to the Penang International Airport, boosting
economic growth in Penang.
5
Bridges Southeast Asia – 3 to 4 August 2010
Sustainable Bridge Construction Practices – Case Study: Second Penang Bridge, Malaysia
JAMBATAN KEDUA PTD. LTD. (824573-U)
Wholly owned by Minister of Finance, Incorporated
Work Packages Diagram
6
Package 3B,3C,3D,3E, 3F & 3G :
Conventional Works
Package 3A:
Conventional
Works
Package 1 : Main Navigation Span &
Substructure & Foundation Works
for Approach Spans.
Package 2: Super Structure Works of
Approach Spans.
Integrated Toll System
Design & Build
Bridges Southeast Asia – 3 to 4 August 2010
Sustainable Bridge Construction Practices – Case Study: Second Penang Bridge, Malaysia
JAMBATAN KEDUA PTD. LTD. (824573-U)
Wholly owned by Minister of Finance, Incorporated
Key Parameters
Length of Bridge 16.9km
Length of Expressway 7km
Lane Configuration Dual 2 traffic lanes and 1 motorcycle lane each direction.
Construction method:
Approach Spans
Main Span
Pre-cast Prestressed Segmental Box Girder
P0 to P24 = 24 span x 55m
= 1,320m.
P27 to P292 = 265 span x 55m
= 14,575m.
Cast in-situ Cable-Stayed Bridge
P24 to P27 = 117.5m + 240m + 117.5m
= 475m.
Navigational Channel
Other Spans
Width Clearance :150m
Height Clearance : 30m
Height Clearance : 6m
7
Bridges Southeast Asia – 3 to 4 August 2010
Sustainable Bridge Construction Practices – Case Study: Second Penang Bridge, Malaysia
JAMBATAN KEDUA PTD. LTD. (824573-U)
Wholly owned by Minister of Finance, Incorporated
Overall works is divided into 3 packages as follows :
Package 1 – Main Navigation Span and Substructure and
Foundation Works of Approach Span.
Package 2 – Superstructure Works of Approach Span.
Package 3 :
Work Packages
Package 3A Batu Maung Interchange
Package 3B Batu Kawan Expressway
Package 3C Batu Kawan Trumpet Interchange
Package 3D Toll Plaza & Administration Building
Package 3E Toll Collection System
Package 3F Traffic Control & Surveillance System
Package 3G Mechanical & Electrical Works
8
Bridges Southeast Asia – 3 to 4 August 2010
Sustainable Bridge Construction Practices – Case Study: Second Penang Bridge, Malaysia
JAMBATAN KEDUA PTD. LTD. (824573-U)
Wholly owned by Minister of Finance, Incorporated
UNDERSTANDING FAST-TRACK
CONSTRUCTION PROCESSES
OF LONG BRIDGE
Bridges Southeast Asia – 3 to 4 August 2010
Sustainable Bridge Construction Practices – Case Study: Second Penang Bridge, Malaysia
JAMBATAN KEDUA PTD. LTD. (824573-U)
Wholly owned by Minister of Finance, Incorporated
Work Packages for Design & Build Contract
Package 1 – Main Navigation Span and
Substructure and Foundation Works of Approach
Span.
o Date of Site Possession : 8 Nov 2008
o Date of Completion : 8 Mar 2013
o Completion Period : 52 Months
Package 2 – Superstructure Works of Approach
Span.
o Date of Site Possession : 8 Jun 2009
o Date of Completion : 8 Sept 2013
o Completion Period : 51 Months
10
Understanding Fast-Track Construction
Processes of Long Bridge
Bridges Southeast Asia – 3 to 4 August 2010
Sustainable Bridge Construction Practices – Case Study: Second Penang Bridge, Malaysia
JAMBATAN KEDUA PTD. LTD. (824573-U)
Wholly owned by Minister of Finance, Incorporated
Understanding Fast-Track Construction
Processes of Long Bridge
Design & Build Contract
Design & Build contract for the project delivery system
was adopted for Package 1 and 2 to reduce the delivery
schedule by overlapping the design phase and the
construction phase. For the Approach Spans, the works have been divided
into horizontal division between Package 1
(substructure) and Package 2 (superstructure).
The interfacing works between the two packages have
been identified in the Interfacing Agreement.
Bridges Southeast Asia – 3 to 4 August 2010
Sustainable Bridge Construction Practices – Case Study: Second Penang Bridge, Malaysia
JAMBATAN KEDUA PTD. LTD. (824573-U)
Wholly owned by Minister of Finance, Incorporated
Understanding Fast-Track Construction
Processes of Long Bridge
Design & Build Contract – (cont.)
Employer Requirement (ER) was introduced to
outline the scope of Design & Build (D&B) Contract. The D&B contract implemented in the Second Penang
Bridge Project, provides the following advantages:
i) Singular Responsibility concept
ii) Better Quality of product
iii) Time Saving for the project
iv) Improved Risk Management
Bridges Southeast Asia – 3 to 4 August 2010
Sustainable Bridge Construction Practices – Case Study: Second Penang Bridge, Malaysia
JAMBATAN KEDUA PTD. LTD. (824573-U)
Wholly owned by Minister of Finance, Incorporated
13
P024
P025P026
P027
Main Navigation Span
(Front Elevation)
m NGVD m NGVD
m NGVD m NGVDm NGVDm NGVD NGVD
m NGVD
m NGVD m NGVD
m NGVD
240m 117.5m 117.5m
Understanding Fast-Track Construction
Processes of Long Bridge
Bridges Southeast Asia – 3 to 4 August 2010
Sustainable Bridge Construction Practices – Case Study: Second Penang Bridge, Malaysia
JAMBATAN KEDUA PTD. LTD. (824573-U)
Wholly owned by Minister of Finance, Incorporated
14
Employer’s Requirement (ER)/Need Statement
Need Statement in the form of Employer‟s Requirement (ER) is
introduced to the Design & Build contract as follows: The ER sets out the detail scope of works for General,
Contractual and Technical requirements
The contractor shall comply with all the requirements in
carrying out the detailed design, construction and
completion of the project within the stipulated time up to and
including the Defect Liability Period.
Understanding Fast-Track Construction
Processes of Long Bridge
Bridges Southeast Asia – 3 to 4 August 2010
Sustainable Bridge Construction Practices – Case Study: Second Penang Bridge, Malaysia
JAMBATAN KEDUA PTD. LTD. (824573-U)
Wholly owned by Minister of Finance, Incorporated
15
All design shall comply with the requirement of all relevant
authorities. Contractor/Consultant shall liaise with the
relevant authorities during the design and construction
period
All designs, drawings, technical specifications, method
statements, etc shall be checked by Independent Checking
Engineers (ICE)
Understanding Fast-Track Construction
Processes of Long Bridge
Bridges Southeast Asia – 3 to 4 August 2010
Sustainable Bridge Construction Practices – Case Study: Second Penang Bridge, Malaysia
JAMBATAN KEDUA PTD. LTD. (824573-U)
Wholly owned by Minister of Finance, Incorporated
Understanding Fast-Track Construction
Processes of Long Bridge
16
The Second Penang Bridge Project - Overall Organization
Chart
i. Singular
Responsibility
Concept
CONSULTANT
(DESIGNER)
CONSESSIONAIRE
INDEPENDENT CHECK ENGINEER
GOVERNMENT OF
JAMBATAN KEDUA Ptd. Ltd.
ARUP JURURUNDING
Ptd. Ltd.
PACKAGE 1
CONTRACTORS
PROJECT OWNER
AUTHORITIES
CONSESSIONAIRE
INDEPENDENT CHECKING
ENGINEER
GOVERNMENT OF
MALAYSIA
MINISTRY OF
WORKS
MALAYSIA HIGHWAY
AUTHORITY
JAMBATAN KEDUA
UEM BUILDERS
Ltd.
PACKAGE 2
CHEC
Construction (M)
Ptd. Ltd.
ERE CONSULTING
GROUP Ptd. Ltd.
INDEPENDENT EIA CONSULTANT
FISHERIES IMPACT ASSESSMENT
CONSULTANT
FANLI MARINE AND
CONSULTING Ptd. Ltd.
Package 1 & 2 Package 1, 2 & 3
Package 1, 2 & 3
CONSULTANT
(Designer)
HPDI Consultants
Co. Ltd
CONSULTANT
(DESIGN REVIEW & SUPERVISION)
MMSB Consult Ptd. Ltd RB Perunding Ptd. Ltd.
EIA CONSULTANT EIA CONSULTANT
R-SYNC Tech.
Resources Ptd. Ltd. YES Enviro Services
Ptd. Ltd.
EIA CONSULTANT
DR. Nik & Associates
Ptd. Ltd.
Bridges Southeast Asia – 3 to 4 August 2010
Sustainable Bridge Construction Practices – Case Study: Second Penang Bridge, Malaysia
JAMBATAN KEDUA PTD. LTD. (824573-U)
Wholly owned by Minister of Finance, Incorporated
ii) Quality
The Contractor‟s responsibility to deliver a product
according to Client‟s requirements and expectations as
documented in the Employer‟s Requirement (ER).
Independent Checking Engineer (ICE)
ICE is appointed for the following scope of works to ensure
the specific client‟s requirement and high quality of works are
delivered: Review design input parameters adopted to confirm on
fundamental design issue.
Understanding Fast-Track Construction
Processes of Long Bridge
17
Bridges Southeast Asia – 3 to 4 August 2010
Sustainable Bridge Construction Practices – Case Study: Second Penang Bridge, Malaysia
JAMBATAN KEDUA PTD. LTD. (824573-U)
Wholly owned by Minister of Finance, Incorporated
P226L Water Curing
Understanding Fast-Track Construction
Processes of Long Bridge
Bridges Southeast Asia – 3 to 4 August 2010
Sustainable Bridge Construction Practices – Case Study: Second Penang Bridge, Malaysia
JAMBATAN KEDUA PTD. LTD. (824573-U)
Wholly owned by Minister of Finance, Incorporated
Check for conformance with employer‟s and government
authorities requirements
Review and comment design brief and final design report
Prepare design check report and certification
Review and comment on specification
Verify and endorse progress payment
Audit construction works
Review and comment on work procedures, method
statements and quality records
Design and construction coordination between Package 1,
Package 2 and Package 3 contractors
Understanding Fast-Track Construction
Processes of Long Bridge
19
Bridges Southeast Asia – 3 to 4 August 2010
Sustainable Bridge Construction Practices – Case Study: Second Penang Bridge, Malaysia
JAMBATAN KEDUA PTD. LTD. (824573-U)
Wholly owned by Minister of Finance, Incorporated
20
iii)Time Saving
Materials, equipment procurement and construction
works can begin before construction documents are
fully completed.
Understanding Fast-Track Construction
Processes of Long Bridge
Temporary Jetty
at P0
Load Out Jetty for the
Delivery of SBG
Bridges Southeast Asia – 3 to 4 August 2010
Sustainable Bridge Construction Practices – Case Study: Second Penang Bridge, Malaysia
JAMBATAN KEDUA PTD. LTD. (824573-U)
Wholly owned by Minister of Finance, Incorporated
21
Pier 25 & Pier 26 Platform
Precast Segmental Box
Girder (SBG) Factory
Dredging Works
Bridges Southeast Asia – 3 to 4 August 2010
Sustainable Bridge Construction Practices – Case Study: Second Penang Bridge, Malaysia
JAMBATAN KEDUA PTD. LTD. (824573-U)
Wholly owned by Minister of Finance, Incorporated
Understanding Fast-Track Construction
Processes of Long Bridge
iv) Improved Risk Management
Method of construction can be suited to the contractor‟s
advantage.
Change orders due to errors and omissions are virtually
eliminated, Design & Build contractors have the
responsibility for drawings and specification
development as well as constructing a fully functioning
facility.
Risk Management identifies the Interfacing Agreement
under the Responsibility Matrix as a critical success
factor.
Bridges Southeast Asia – 3 to 4 August 2010
Sustainable Bridge Construction Practices – Case Study: Second Penang Bridge, Malaysia
JAMBATAN KEDUA PTD. LTD. (824573-U)
Wholly owned by Minister of Finance, Incorporated
23
Understanding Fast-Track Construction
Processes of Long Bridge
Interfacing Agreement
The interfacing Agreement has been included in the Contract
Document to define the scope of works at the interfacing
area such as:
Common Access at Main Dredged Channel
Access on the Deck via Pier 0 and Pier 292 from land sides.
Installation of Temporary Inserts for Launching Gantry at
Pier Head Top
Installation of Bearing Plinth
Synchronize Pier Handover and Launching Schedule
Installation of Temporary Fender at the Pier and Pilecap
during Launching
Bridges Southeast Asia – 3 to 4 August 2010
Sustainable Bridge Construction Practices – Case Study: Second Penang Bridge, Malaysia
JAMBATAN KEDUA PTD. LTD. (824573-U)
Wholly owned by Minister of Finance, Incorporated
Launching Programme for SBG
Mob. – Start
Aug 2010 Mob. – Start
Aug 2010
LG 1
LG 2
LG 3
LG 4
Demob. – Jan 13
2 mth for shifting
Demob. – Apr 13
BATU
KAWAN
BATU
MAUNG
P
0
P
24
P
27
P
117
P
118
P
267
P
292
P
268
MA
IN
N
AV
IG
AT
IO
N S
PA
N
LG 3
LG 4
Demob. – Apr 13
Understanding Fast-Track Construction
Processes of Long Bridge
Overall Launching Programme for SBG
24
Bridges Southeast Asia – 3 to 4 August 2010
Sustainable Bridge Construction Practices – Case Study: Second Penang Bridge, Malaysia
JAMBATAN KEDUA PTD. LTD. (824573-U)
Wholly owned by Minister of Finance, Incorporated
Conventional Concept
Design Consultants were appointed for Package 3 and the
works have been tendered for the following purposes: To give the opportunity to local/„Bumiputera‟
Contractor/Consultant to participate in the Second Penang
Bridge Project
Exposure to local Contractor/Consultant in mega project
Transfer of technology
Create job opportunity for local people including
Engineers/Suppliers
Economic development for the benefit to the locals
Understanding Fast-Track Construction
Processes of Long Bridge
25
Bridges Southeast Asia – 3 to 4 August 2010
Sustainable Bridge Construction Practices – Case Study: Second Penang Bridge, Malaysia
JAMBATAN KEDUA PTD. LTD. (824573-U)
Wholly owned by Minister of Finance, Incorporated
Package 3 (Conventional Contract) is divided as follows:
Package 3A – Batu Maung Interchange
o Consultant : PJS Ptd. Ltd.
o Date of Site Possession : 19 May 2010
o Date of Completion : 18 May 2012
o Completion Period : 24 Months
Package 3B – Batu Kawan Expressway
o Consultant : KKJP2 Ptd. Ltd.
o Date of Site Possession : 28 Jun 2010
o Date of Completion : 27 Jan 2013
o Completion Period : 31 Months
Package 3C – Batu Kawan Trumpet Interchange
o Consultant : SSP Ptd. Ltd.
o Date of Site Possession : 19 May 2010
o Date of Completion : 18 Sept Jan 2012
o Completion Period : 28 Months
Other Sub – Packages are to be tendered later
26
Understanding Fast-Track Construction
Processes of Long Bridge
Bridges Southeast Asia – 3 to 4 August 2010
Sustainable Bridge Construction Practices – Case Study: Second Penang Bridge, Malaysia
JAMBATAN KEDUA PTD. LTD. (824573-U)
Wholly owned by Minister of Finance, Incorporated
Appreciating Increasing Environmental
Concerns In Bridge Construction
Bridges Southeast Asia – 3 to 4 August 2010
Sustainable Bridge Construction Practices – Case Study: Second Penang Bridge, Malaysia
JAMBATAN KEDUA PTD. LTD. (824573-U)
Wholly owned by Minister of Finance, Incorporated
Overview Fisheries Industry in Penang
There are 17 fishing villages on the island and 14 fishing
landing point on the main land.
In 2007, marine fisheries catch in Penang amounted to
37,774 tonnes (or about 3.7% over total marine catch in
Peninsular Malaysia) worth RM 218.9 million.
The industry provides livelihood to nearly 3,193 fulltime
fishermen.
Appreciating Increasing Environmental
Concerns In Bridge Construction
28
Bridges Southeast Asia – 3 to 4 August 2010
Sustainable Bridge Construction Practices – Case Study: Second Penang Bridge, Malaysia
JAMBATAN KEDUA PTD. LTD. (824573-U)
Wholly owned by Minister of Finance, Incorporated
Location of Fisheries Landing
Points
Location of Cage Culture
Farms
Location of Cockle Farms
29
Appreciating Increasing Environmental
Concerns In Bridge Construction
Bridges Southeast Asia – 3 to 4 August 2010
Sustainable Bridge Construction Practices – Case Study: Second Penang Bridge, Malaysia
JAMBATAN KEDUA PTD. LTD. (824573-U)
Wholly owned by Minister of Finance, Incorporated
Environmental Monitoring and Auditing (EMA)
Base line data have been established by the respective Package 1
and 2 contractors as referenced data for EMA for dredging and
offshore disposal of spoils, piling, construction machineries and
equipment during the Construction Phase of the Penang Second
Bridge.
Sampling Points for
the Monitoring
Study
Location of Ambient
Environmental
Monitoring Station
Location of Water
Quality Sampling
Works
30
Appreciating Increasing Environmental
Concerns In Bridge Construction
Bridges Southeast Asia – 3 to 4 August 2010
Sustainable Bridge Construction Practices – Case Study: Second Penang Bridge, Malaysia
JAMBATAN KEDUA PTD. LTD. (824573-U)
Wholly owned by Minister of Finance, Incorporated
Scope of dredging activities
The dredging activities have to be carried out due to shallow
water conditions at certain portions of the bridge alignment
which affect the barges movement for piling, pier and launching
activities.
The estimated amount of spoil to be dredged is 11,000,000 m3.
Dredging Works Location of dredge channel
31
Appreciating Increasing Environmental
Concerns In Bridge Construction
Bridges Southeast Asia – 3 to 4 August 2010
Sustainable Bridge Construction Practices – Case Study: Second Penang Bridge, Malaysia
JAMBATAN KEDUA PTD. LTD. (824573-U)
Wholly owned by Minister of Finance, Incorporated
-3.5m ACD
Sea Bed Level
Sea Water
Level
-3.0m ACD
1:5 1:5
1:5
Viaducts
60m 170m 40m
270m
Note:
National Geodetic Vertical Datum (NGVD)
Admiralty Chart Datum (ACD)
(+0.00 NGVD = +1.72m ACD)
C L
Main Dredged Channel
(MDC)
Barges Navigation
Channel (BNC)
CROSS SECTION OF MAIN DREDGED CHANNEL
32
Appreciating Increasing Environmental
Concerns In Bridge Construction
Bridges Southeast Asia – 3 to 4 August 2010
Sustainable Bridge Construction Practices – Case Study: Second Penang Bridge, Malaysia
JAMBATAN KEDUA PTD. LTD. (824573-U)
Wholly owned by Minister of Finance, Incorporated
Package 1: EMA Consultant
R- Sync Technical Resources Ptd. Ltd is appointed as the EMA
Consultant for the monitoring of dredging and offshore disposal
Of spoils during construction phase. The Scope of works cover:
o TSS mapping via satellite imagery
o Marine water quality monitoring at disposal site
o Marine water quality monitoring along transportation on route
o Composition of dredged materials
o Bathymetric survey at disposal site
o Final Environmental Audit
Equipment used:
o Garmin GPS Receiver ( Model GPSMAP 76 CSx) 33
Appreciating Increasing Environmental
Concerns In Bridge Construction
Bridges Southeast Asia – 3 to 4 August 2010
Sustainable Bridge Construction Practices – Case Study: Second Penang Bridge, Malaysia
JAMBATAN KEDUA PTD. LTD. (824573-U)
Wholly owned by Minister of Finance, Incorporated
Disposal Area
Water Quality sampling
location at disposal route
Package 1 : Location of Water Quality Sampling by R-Sync
Ptd Ltd
34
Appreciating Increasing Environmental
Concerns In Bridge Construction
Bridges Southeast Asia – 3 to 4 August 2010
Sustainable Bridge Construction Practices – Case Study: Second Penang Bridge, Malaysia
JAMBATAN KEDUA PTD. LTD. (824573-U)
Wholly owned by Minister of Finance, Incorporated
Package 1: Environmental Monitoring (EM)
Consultant
Dr Nik & Associates Ptd Ltd is appointed to carry out the
environmental monitoring which cover the following scope of
work:
• Environmental Impact Assessment (EIA)
• Environmental Management Plan (EMP)
35
Appreciating Increasing Environmental
Concerns In Bridge Construction
Bridges Southeast Asia – 3 to 4 August 2010
Sustainable Bridge Construction Practices – Case Study: Second Penang Bridge, Malaysia
JAMBATAN KEDUA PTD. LTD. (824573-U)
Wholly owned by Minister of Finance, Incorporated
Water Quality : Comparison data between baseline and
actual for total suspended solids (TSS)
36
Appreciating Increasing Environmental
Concerns In Bridge Construction
Bridges Southeast Asia – 3 to 4 August 2010
Sustainable Bridge Construction Practices – Case Study: Second Penang Bridge, Malaysia
JAMBATAN KEDUA PTD. LTD. (824573-U)
Wholly owned by Minister of Finance, Incorporated
Water Quality Sampling
stations
Activities Location : Batu Kawan
Activities Location : Batu Maung
Package 1 : Location of Water
Quality Sampling by Dr Nik &
Associates Ptd Ltd
37
Appreciating Increasing Environmental
Concerns In Bridge Construction
Bridges Southeast Asia – 3 to 4 August 2010
Sustainable Bridge Construction Practices – Case Study: Second Penang Bridge, Malaysia
JAMBATAN KEDUA PTD. LTD. (824573-U)
Wholly owned by Minister of Finance, Incorporated
Package 2: EIA Consultant
YES Enviro Services Ptd Ltd is appointed to carry out the
EIA monitoring and preparing the reports which cover the
following scope of work: Marine Water Quality during construction of load out jetty
River Water Quality
Air Quality
Noise Level
Discharge from Sedimentation Ponds
Discharge from Septic Tank
38
Appreciating Increasing Environmental
Concerns In Bridge Construction
Bridges Southeast Asia – 3 to 4 August 2010
Sustainable Bridge Construction Practices – Case Study: Second Penang Bridge, Malaysia
JAMBATAN KEDUA PTD. LTD. (824573-U)
Wholly owned by Minister of Finance, Incorporated
At the load out jetty
Sampling location for dredging activity
At the casting yard
Location of sampling
39
Appreciating Increasing Environmental
Concerns In Bridge Construction
Bridges Southeast Asia – 3 to 4 August 2010
Sustainable Bridge Construction Practices – Case Study: Second Penang Bridge, Malaysia
JAMBATAN KEDUA PTD. LTD. (824573-U)
Wholly owned by Minister of Finance, Incorporated
Independent EIA Auditor / Consultant
To ensure the compliance to Department of Environmental
(DOE) requirements, ERE Consulting Group Ptd. Ltd. is
appointed by JKSB as the Independent EIA
Auditor/Consultant for the overall project.
The scopes and objectives of the EIA Auditor are to:
o Check the implementation of environmental mitigation
measures
o Review environmental monthly report
o Review methodology, sampling and testing
o Identify potential environmental issues and recommend
the mitigation measures
40
Appreciating Increasing Environmental
Concerns In Bridge Construction
Bridges Southeast Asia – 3 to 4 August 2010
Sustainable Bridge Construction Practices – Case Study: Second Penang Bridge, Malaysia
JAMBATAN KEDUA PTD. LTD. (824573-U)
Wholly owned by Minister of Finance, Incorporated
Independent Consultant of FIA
Fanli Marine & Consultancy Ptd. Ltd. (Fanli) is appointed by
JKSB as the Independent Consultant to monitor the
Fisheries Impact Assessment (FIA) for this project. Fanli had
earlier completed the base line study in 2007 for the
Fisheries Department.
Fanli scope of works cover:
o To assess on the impact of construction activities on
fishing, cockle farming
o To advise for such measures as necessary
o To propose the mitigation measures
41
Appreciating Increasing Environmental
Concerns In Bridge Construction
Bridges Southeast Asia – 3 to 4 August 2010
Sustainable Bridge Construction Practices – Case Study: Second Penang Bridge, Malaysia
JAMBATAN KEDUA PTD. LTD. (824573-U)
Wholly owned by Minister of Finance, Incorporated
Result of Water Quality in the fisheries landing point
42
Appreciating Increasing Environmental
Concerns In Bridge Construction
Bridges Southeast Asia – 3 to 4 August 2010
Sustainable Bridge Construction Practices – Case Study: Second Penang Bridge, Malaysia
JAMBATAN KEDUA PTD. LTD. (824573-U)
Wholly owned by Minister of Finance, Incorporated
Location of Ambient
Environmental
Monitoring Station
Location of Water
Quality Sampling Works
Implementation of Environmental Monitoring Control
43
Appreciating Increasing Environmental
Concerns In Bridge Construction
Bridges Southeast Asia – 3 to 4 August 2010
Sustainable Bridge Construction Practices – Case Study: Second Penang Bridge, Malaysia
JAMBATAN KEDUA PTD. LTD. (824573-U)
Wholly owned by Minister of Finance, Incorporated
IDENTIFYING ALTERNATIVE
MATERIALS AND COMPOSITES FOR
BRIDGES
Bridges Southeast Asia – 3 to 4 August 2010
Sustainable Bridge Construction Practices – Case Study: Second Penang Bridge, Malaysia
JAMBATAN KEDUA PTD. LTD. (824573-U)
Wholly owned by Minister of Finance, Incorporated
Identifying Alternative Materials
And Composites For Bridges
High Damping Rubber Bearing (HDRB)
i. The Employer‟s Requirement (ER) requires no damage
criteria for a 500 years return period. In addition to this, a
requirement of „no collapse‟ criteria for the most credible
earthquake (2500 years return period) was also introduced.
First Penang Bridge was design on a similar requirement. ii.Based on ICE‟s comments on the detail design, spun piles
at the approach bridge of Package 1 could only cater for the
500 years return period earthquake. No plastic hinge forms
as required for „no collapse‟ criteria of 2500 years return
period.
45
Bridges Southeast Asia – 3 to 4 August 2010
Sustainable Bridge Construction Practices – Case Study: Second Penang Bridge, Malaysia
JAMBATAN KEDUA PTD. LTD. (824573-U)
Wholly owned by Minister of Finance, Incorporated
Identifying Alternative Materials
And Composites For Bridges
HDRB – Cont’d
iii. Considering the current progress of works, it was
decided that a change of bridge bearing system shall be
the best solution. The original Pot Bearing system has to
be replaced with High Damping Rubber Bearing to
provide an effective seismic isolation system.
iv. Environment Friendly Natural Rubber
The Malaysian Rubber Board (MRB) is positioning the
Malaysian rubber industry to be the leader in technology
and environmental conservation.
46
Bridges Southeast Asia – 3 to 4 August 2010
Sustainable Bridge Construction Practices – Case Study: Second Penang Bridge, Malaysia
JAMBATAN KEDUA PTD. LTD. (824573-U)
Wholly owned by Minister of Finance, Incorporated
Identifying Alternative Materials
And Composites For Bridges
High Damping Rubber Bearing (HDRB)
HDRB provide a simple and economical isolation system. It
possesses the low horizontal stiffness needed and are
capable of safely withstanding the large horizontal
displacements imposed during an earthquake. The bearing
was design to meet two set of action as per below:
o SLS non-seismic actions – conformance with BS5400
o SLS non-seismic actions simultaneous with a 2500-
year return period seismic event – conformance with
EN15129
47
Bridges Southeast Asia – 3 to 4 August 2010
Sustainable Bridge Construction Practices – Case Study: Second Penang Bridge, Malaysia
JAMBATAN KEDUA PTD. LTD. (824573-U)
Wholly owned by Minister of Finance, Incorporated
Identifying Alternative Materials
And Composites For Bridges
High Damping Rubber Bearing
(HDRB)
The design of the HDRB is by Tun
Abdul Razak Research Centre (TARRC),
a laboratory of the Malaysian Rubber
Board (MRB). MRB works with the
Andre Rubber Company and W S
Atkins Consulting Engineers to
implement the concept of laminated
rubber bridge bearings in earthquake
engineering in the 70‟s.
48
HDRB –Section
HDRB – Layout
Bridges Southeast Asia – 3 to 4 August 2010
Sustainable Bridge Construction Practices – Case Study: Second Penang Bridge, Malaysia
JAMBATAN KEDUA PTD. LTD. (824573-U)
Wholly owned by Minister of Finance, Incorporated
IMPLEMENTATION OF 4Rs
(RESPECT, REDUCE, REUSE
AND
RE-ENVIROMENT)
Bridges Southeast Asia – 3 to 4 August 2010
Sustainable Bridge Construction Practices – Case Study: Second Penang Bridge, Malaysia
JAMBATAN KEDUA PTD. LTD. (824573-U)
Wholly owned by Minister of Finance, Incorporated
i) Respect
The project is critically monitored on the environmental and
marine ecosystem aspect due to sensitive marine
Environment in the Penang Straits as presented earlier.
Implementation of 4Rs - Respect,
Reduce, Reuse and Re-Environment
50
Bridges Southeast Asia – 3 to 4 August 2010
Sustainable Bridge Construction Practices – Case Study: Second Penang Bridge, Malaysia
JAMBATAN KEDUA PTD. LTD. (824573-U)
Wholly owned by Minister of Finance, Incorporated
Respect (Cont’d)
Minimal Maintenance Design
The structure is design for high durability in marine
environment with concrete cover conforming Eurocode.
High strength concrete with silica fume and PFA cement is
used to give the durability required. The Rapid Chloride
Permeability Test (RCPT) values less than 800 coloumbs at
56 days.
The Embankment is design with 100% primary
consolidation settlement criteria to ensure that the rate of
settlement is not more than 100mm in five years.
Implementation of 4Rs - Respect,
Reduce, Reuse and Re-Environment
51
Bridges Southeast Asia – 3 to 4 August 2010
Sustainable Bridge Construction Practices – Case Study: Second Penang Bridge, Malaysia
JAMBATAN KEDUA PTD. LTD. (824573-U)
Wholly owned by Minister of Finance, Incorporated
ii) Reduce
a) The design construction of precast SBG has been highly
optimized and constructed efficiently to reduce raw
material, energy and cost.
b)The first Penang Bridge used protection island for ship
impact protection. The use of steel fender at the Second
Penang Bridge instead have reduced the impact to the
marine ecosystem.
c)The function of steel fender also act as a formwork for the
pilecap which help to reduce pollution to the marine area.
Implementation of 4Rs - Respect,
Reduce, Reuse and Re-Environment
52
Bridges Southeast Asia – 3 to 4 August 2010
Sustainable Bridge Construction Practices – Case Study: Second Penang Bridge, Malaysia
JAMBATAN KEDUA PTD. LTD. (824573-U)
Wholly owned by Minister of Finance, Incorporated
Precast Segmental Box
Girder (SBG) for the
Superstructure Section
53
View of a completed
segment
Typical Section
Implementation of 4Rs - Respect,
Reduce, Reuse and Re-Environment
Reduce (Cont’d)
Bridges Southeast Asia – 3 to 4 August 2010
Sustainable Bridge Construction Practices – Case Study: Second Penang Bridge, Malaysia
JAMBATAN KEDUA PTD. LTD. (824573-U)
Wholly owned by Minister of Finance, Incorporated
Reduce (Cont’d)
Production Planning for Segmental
Box Girder
Method of casting – Short Line Match-Casting
Concrete volume – 260,000 cu.m Gd 55/20
Steel Reinforcement – 60,000 metric tonne
Weight of each SBG – 65 tonne to100 tonne
Total SBG required – 8,176 numbers
Total moulds – 21 moulds
Daily output – 14 nos/day
Casting Cycle – 3 days/bay
Total casting duration– 28 months
Implementation of 4Rs - Respect,
Reduce, Reuse and Re-Environment
54
Starter Frame
Bridges Southeast Asia – 3 to 4 August 2010
Sustainable Bridge Construction Practices – Case Study: Second Penang Bridge, Malaysia
JAMBATAN KEDUA PTD. LTD. (824573-U)
Wholly owned by Minister of Finance, Incorporated
The view of
Protection Island at
First Penang Bridge
Reduce (cont’d)
Steel Fender - Plan
Steel Fender - Section
Implementation of 4Rs - Respect,
Reduce, Reuse and Re-Environment
55
Bridges Southeast Asia – 3 to 4 August 2010
Sustainable Bridge Construction Practices – Case Study: Second Penang Bridge, Malaysia
JAMBATAN KEDUA PTD. LTD. (824573-U)
Wholly owned by Minister of Finance, Incorporated
iii) Reuse
IBS System
i. Production of 8,176 of precast SBG
ii. Production of 3,336 of Precast Shell
iii.Use of Climbing Form & Travelling
Formwork for Main Navigation piers
and pylon
iv.Production of 63,580 lin.m precast
Parapet
v. Production of 31,790 lin.m precast NJB
56
Implementation of 4Rs - Respect,
Reduce, Reuse and Re-Environment
Bridges Southeast Asia – 3 to 4 August 2010
Sustainable Bridge Construction Practices – Case Study: Second Penang Bridge, Malaysia
JAMBATAN KEDUA PTD. LTD. (824573-U)
Wholly owned by Minister of Finance, Incorporated
iv) Re-Environment
Piles driven become heaven for fish and marine life.
Research by Lund University in Sweden have discovered
that the Oresund Bridge connecting Denmark and
Sweden have improved the Marine Environment in 10
years since it was built.
They found increased of fish activity around the bridge‟s
pillars as well as plenty of other marine life, such as
mussels.
In the Second Penang Bridge, it has attracted the local
prawn “Udang Lipan (Stomatopod Crustacean)” and
other marine life.
57
Implementation of 4Rs - Respect,
Reduce, Reuse and Re-Environment
Bridges Southeast Asia – 3 to 4 August 2010
Sustainable Bridge Construction Practices – Case Study: Second Penang Bridge, Malaysia
JAMBATAN KEDUA PTD. LTD. (824573-U)
Wholly owned by Minister of Finance, Incorporated
Fisheries activities near the work site
Implementation of 4Rs - Respect,
Reduce, Reuse and Re-Environment
“Udang Lipan (Stomatopod Crustacean)” have become popular food
among the visitors at Aman Island, near the Second Penang Bridge
58
Bridges Southeast Asia – 3 to 4 August 2010
Sustainable Bridge Construction Practices – Case Study: Second Penang Bridge, Malaysia
JAMBATAN KEDUA PTD. LTD. (824573-U)
Wholly owned by Minister of Finance, Incorporated
iv) Re-Environment (cont’d)
The Second Penang Bridge project was also designed to
have minimal blocking effect in the Penang Straits in
order to reduce the risk for potentially damaging
changes in the Penang straits composition.
Cut energy use – The Second Penang Bridge will have
negligible impacts on the sensitive environment and will
also reduce air pollution compared to traffic jams at the
First Penang Bridge and usage old ferry transport across
the straits.
Implementation of 4Rs - Respect,
Reduce, Reuse and Re-Environment
59
Bridges Southeast Asia – 3 to 4 August 2010
Sustainable Bridge Construction Practices – Case Study: Second Penang Bridge, Malaysia
JAMBATAN KEDUA PTD. LTD. (824573-U)
Wholly owned by Minister of Finance, Incorporated
Current Piling Activities at Second Penang Bridge
Oresund Bridge - Sweden
Marine life around
the bridge pillars –
Research by Lund
University, Sweden
Implementation of 4Rs - Respect,
Reduce, Reuse and Re-Environment
60
Bridges Southeast Asia – 3 to 4 August 2010
Sustainable Bridge Construction Practices – Case Study: Second Penang Bridge, Malaysia
JAMBATAN KEDUA PTD. LTD. (824573-U)
Wholly owned by Minister of Finance, Incorporated
CONCLUSION REMARKS
61
Despite its implementation in a fast track manner, the
Penang Bridge Second Crossing is being constructed to the
highest quality, considering health, safety, sustainability
and environmental conservation.
The Second Penang Bridge when completed will be the
longest bridge in Malaysia and South East Asia when it
opens for traffic in 2013.
Bridges Southeast Asia – 3 to 4 August 2010
Sustainable Bridge Construction Practices – Case Study: Second Penang Bridge, Malaysia
JAMBATAN KEDUA PTD. LTD. (824573-U)
Wholly owned by Minister of Finance, Incorporated
Thank You
For Your Kind Attention
* JKSB acknowledges the assistance of CHEC & UEMB for the preparation of this presentation.
Bridges Southeast Asia – 3 to 4 August 2010
Sustainable Bridge Construction Practices – Case Study: Second Penang Bridge, Malaysia
JAMBATAN KEDUA PTD. LTD. (824573-U)
Wholly owned by Minister of Finance, Incorporated
SITE PROGRESS PHOTOGRAPH Main Span at P25
Main Span at P26
Bridges Southeast Asia – 3 to 4 August 2010
Sustainable Bridge Construction Practices – Case Study: Second Penang Bridge, Malaysia
JAMBATAN KEDUA PTD. LTD. (824573-U)
Wholly owned by Minister of Finance, Incorporated SITE PROGRESS PHOTOGRAPH
RCD Drilling at P26-12 for Bored Pile
Bridges Southeast Asia – 3 to 4 August 2010
Sustainable Bridge Construction Practices – Case Study: Second Penang Bridge, Malaysia
JAMBATAN KEDUA PTD. LTD. (824573-U)
Wholly owned by Minister of Finance, Incorporated SITE PROGRESS PHOTOGRAPH
Chisel Hammer for P26-06 Bored Pile
Bridges Southeast Asia – 3 to 4 August 2010
Sustainable Bridge Construction Practices – Case Study: Second Penang Bridge, Malaysia
JAMBATAN KEDUA PTD. LTD. (824573-U)
Wholly owned by Minister of Finance, Incorporated SITE PROGRESS PHOTOGRAPH
Section 2 Pile Cap Construction
Bridges Southeast Asia – 3 to 4 August 2010
Sustainable Bridge Construction Practices – Case Study: Second Penang Bridge, Malaysia
JAMBATAN KEDUA PTD. LTD. (824573-U)
Wholly owned by Minister of Finance, Incorporated SITE PROGRESS PHOTOGRAPH
P185 Statnamic Test
Bridges Southeast Asia – 3 to 4 August 2010
Sustainable Bridge Construction Practices – Case Study: Second Penang Bridge, Malaysia
JAMBATAN KEDUA PTD. LTD. (824573-U)
Wholly owned by Minister of Finance, Incorporated SITE PROGRESS PHOTOGRAPH
P267 Pier & Crosshead Concreting
Bridges Southeast Asia – 3 to 4 August 2010
Sustainable Bridge Construction Practices – Case Study: Second Penang Bridge, Malaysia
JAMBATAN KEDUA PTD. LTD. (824573-U)
Wholly owned by Minister of Finance, Incorporated SITE PROGRESS PHOTOGRAPH
Assembly of Launching Girder at Load Out Jetty area
Bridges Southeast Asia – 3 to 4 August 2010
Sustainable Bridge Construction Practices – Case Study: Second Penang Bridge, Malaysia
JAMBATAN KEDUA PTD. LTD. (824573-U)
Wholly owned by Minister of Finance, Incorporated
Pre-assembly of Launching Girders in progress
SITE PROGRESS PHOTOGRAPH
Bridges Southeast Asia – 3 to 4 August 2010
Sustainable Bridge Construction Practices – Case Study: Second Penang Bridge, Malaysia
JAMBATAN KEDUA PTD. LTD. (824573-U)
Wholly owned by Minister of Finance, Incorporated
Movable Cover at Open Casting Yard
SITE PROGRESS PHOTOGRAPH
Bridges Southeast Asia – 3 to 4 August 2010
Sustainable Bridge Construction Practices – Case Study: Second Penang Bridge, Malaysia
JAMBATAN KEDUA PTD. LTD. (824573-U)
Wholly owned by Minister of Finance, Incorporated
Concreting of segment is in progress
SITE PROGRESS PHOTOGRAPH
Bridges Southeast Asia – 3 to 4 August 2010
Sustainable Bridge Construction Practices – Case Study: Second Penang Bridge, Malaysia
JAMBATAN KEDUA PTD. LTD. (824573-U)
Wholly owned by Minister of Finance, Incorporated
73
Understanding Fast-Track Construction
Processes of Long Bridge
SBG Launching Method - Span By Span
Stage 1
Stage 2
Stage 3
Bridges Southeast Asia – 3 to 4 August 2010
Sustainable Bridge Construction Practices – Case Study: Second Penang Bridge, Malaysia
JAMBATAN KEDUA PTD. LTD. (824573-U)
Wholly owned by Minister of Finance, Incorporated
SBG - Overall Planning
Total Marine Bridge Span - 584 spans
Total launching gantry - 4 nos.
Total launching output - 1.5 span/week
Total segments required - 84 nos/week
Plant storage capacity - 750 nos
Plant weekly output - 102 nos/week
Understanding Fast-Track Construction
Processes of Long Bridge
74
Assembly of Trusses
for the Launching
Gantry
Assembly of Box section
for the Launching Gantry
Bridges Southeast Asia – 3 to 4 August 2010
Sustainable Bridge Construction Practices – Case Study: Second Penang Bridge, Malaysia
JAMBATAN KEDUA PTD. LTD. (824573-U)
Wholly owned by Minister of Finance, Incorporated
Overall Project Implementation Programme
Understanding Fast-Track Construction
Processes of Long Bridge
75