60
As of 8/1/2018 Report prepared by NHDOT - Bureau of Planning and Community Assistance BRIDGE AID PROGRAM STATUS REPORT With Bridge Detail

BRIDGE AID PROGRAM STATUS REPORT As of … · Red List: FSR: WT: No Outlet:Yes 18.4 03P No ... Robbins Brook, Br. #098/128 (Municipal ... Red List: FSR: WT: No Outlet:Yes 46.7 E2

Embed Size (px)

Citation preview

As of 8/1/2018

Report prepared by NHDOT - Bureau of Planning and Community Assistance

BRIDGE AID PROGRAM

STATUS REPORT

With Bridge Detail

FiscalYear: 2010 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

Emergency Repair, West Bath Road over Ammonoosuc River (Village Covered Bridge), Br. #137/095 (Force Acct DOT-Br. Maint)

$0.00 $25,024.74 $6,256.19$31,280.93Bath

14439C

Complete/Final Audit

10/15/2010

Repair completed 2/2010-FVRemarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, West Road over Hoyt Brook, Br. #098/114 (Municipal Managed Project)

$0.00 $428,236.23 $107,059.06$535,295.29Bradford

14284

Complete/Final Audit

5/19/2011

Inspected 10/14/10-FV45.4 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Borough Road over Smith River, Br. #130/165 (Municipal Managed Project)

$724,772.99 $647,326.91 $41,036.23$1,413,136.13Bristol

14278A

Complete/Final Audit

5/17/2011

Bristol-Hill Project; Inspected 10/28/10-FV9.6 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, River Road over Mascoma River, Br. #123/126 (Municipal Managed Project)

$286,478.03 $273,008.55 $20,505.80$579,992.38Canaan

14446

Complete/Final Audit

1/30/2014

Cap=100% Const/Federal+State 60/40 [also see A project]--Inspected 8/31/10-FV25.2 BRC Remarks:Red List: FSR: WT: No Outlet: NoYes

Emergency Repair, River Road over Mascoma River, Phase I, Br. #123/126 (Force Acct DOT-Br. Maint)

$0.00 $109,500.17 $30,800.57$140,300.74Canaan

14446A

Complete/Final Audit

10/4/2011

Bailey Bridge installation completed 1/16/07; Removal completed 9/23/10-FV25.2 BRC Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, High Haith Road over Squam Lake Channel, Br. #126/139 (Municipal Managed Project)

$0.00 $467,231.16 $23,309.78$490,540.94Center Harbor

15403

Complete/Final Audit

12/21/2010

100% SAB for Construction; Inspected 9/1/10-FV3.3 06 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Fling Road over Clay Brook, Br. #155/062 (Municipal Managed Project)

$0.00 $518,431.91 $44,295.47$562,727.38Charlestown

13534

Complete/Final Audit

3/15/2013

Construction=100% SAB+5%(Cap)- Bridge Inspection 7/14/11-FV38.6 06 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Rehabilitation, Columbia Covered Bridge over Connecticut River, Br. #077/140 (Force Acct DOT-Br. Maint)

$0.00 $200,349.11 $0.00$200,349.11Columbia

13815

Complete/Final Audit

2/7/2011

Columbia-Lemington,VT project; completed 6/17/20100.0 06 Remarks:Red List: FSR: WT: No Outlet: NoYes

Emergency Repair, Sewalls Falls Road over Merrimack River, Br. #070/117 (Force Acct DOT-Br. Maint)

$0.00 $169,094.74 $42,273.69$211,368.43Concord

12838

Complete/Awaiting Audit

(See also 12004)-Waiting payment from City0.0 14 Remarks:Red List: FSR: WT: No Outlet: NoYes

FY 2010 Page 1

(Page 2 of 46)Report Date: 8/1/2018 7:36:00 AM

With Bridge Detail

FiscalYear: 2010 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

Bridge Replacement, Sandown Road over Exeter River, Br. #047/126 (Municipal Managed Project)

$0.00 $479,347.61 $18,385.75$497,733.36Danville

13535

Complete/Final Audit

10/11/2012

100% Construction w/SAB funds -Bridge Inspected 1/11/11-FV38 10 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Fordway Road over Beaver Brook, Br. #056/084 (Municipal Managed Project)

$611,455.66 $537,974.07 $32,584.24$1,182,013.97Derry

13650

Complete/Final Audit

4/12/2011

Inspected 11/30/10-FV72.6 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Area Road over Poor Farm Brook, Br. #147/138

$567,000.00 $589,709.90 $0.00$1,209,637.38Gilford $52,927.48

15626

Complete/Final Audit

10/31/2011

Gunstock Commissioners on behalf of the County; Inspected 8/19/11-FV45.7 NPR Remarks:Red List: FSR: WT: No Outlet: NoYes

Other, NHRR over Drakeside Road, Br. #163/121(Closed) (Force Acct DOT-Br. Maint)

$0.00 $16,737.01 $0.00$16,737.01Hampton

15813

Complete/Final Audit

3/19/2010

Bridge Removal-FVN/A NPR Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Pleasant Valley Road over Bunnell Brook, Arthur White Bridge, Br. #223/062 (Municipal Managed Project)

$0.00 $221,166.56 $10,074.00$231,240.56Lancaster

12796

Complete/Final Audit

11/24/2009

Inspected 9/11/09-FV18.4 03P Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Rehabilitation, Gates Road over Robbins Brook, Br. #098/128 (Municipal Managed Project)

$0.00 $114,458.22 $28,614.55$143,072.77Marlborough

14939

Complete/Final Audit

4/6/2011

Inspection Date 9/28/10-FV71.8 NPR Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Lyndeborough Road over South Branch Piscataquog River, Br. #064/056 (Municipal Managed Project)

$0.00 $854,778.90 $136,290.35$991,069.25New Boston

14247

Complete/Final Audit

11/10/2010

Inspected 11/10/10-FV33.2 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

Emergency Repair, Mill Pond Road over Little River, Br. #204/082(Washed out) (Force Acct DOT-Br. Maint)

$0.00 $50,704.82 $22,809.48$73,514.30Nottingham

14943

Complete/Final Audit

11/3/2009

April 2007 Flood Event; BB Installed 12/6/07; inspected 7/23/08Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Garden Road over Little River, Br. #118/053 (Municipal Managed Project)

$308,700.00 $233,021.13 $6,805.28$548,526.41Plaistow

14390

Complete/Final Audit

4/1/2015

Cap=100% Construction/Federal+State Inspected 12/1/10-FV29 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Rehabilitation, NH 1A over Sagamore Creek, Br. #198/034 (Municipal Managed Project)

$0.00 $192,386.00 $48,096.50$240,482.50Portsmouth

14493A

Complete/Final Audit

3/9/2011

Temp Repair completed 5/24/10-FV50.5 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

FY 2010 Page 2

(Page 3 of 46)Report Date: 8/1/2018 7:36:00 AM

With Bridge Detail

FiscalYear: 2010 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

Bridge Replacement, Durand Road over Carlton Brook, Br. #140/067 (Municipal Managed Project)

$145,828.64 $159,914.79 $15,673.93$321,417.36Randolph

14386

Complete/Final Audit

9/4/2013

Cap=100% Construction/Federal+State (60/40); Inspected 8/12/10-FV46.7 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Lawrence Road over Spicket River, Br. #113/070 (Municipal Managed Project)

$774,068.87 $666,502.52 $37,614.15$1,478,185.54Salem

15593

Complete/Final Audit

12/17/2013

100% Construction/Federal+State - Inspected 3/22/11-FV57.5 13 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Mountain Road over Blackwater River, Pingree Bridge, Br. #095/135 (Municipal Managed Project)

$0.00 $1,142,578.87 $187,382.11$1,329,960.98Salisbury

14626A

Complete/Final Audit

2/28/2012

Inspected 12/8/10 >>Add 14626 to final payment-FV13.7 03F Remarks:Red List: FSR: WT: No Outlet: NoYes

Emergency Repair, Phase I: Northwood-Bow Lake Road over Brook, Br. #085/040 (Municipal Managed Project)

$0.00 $13,566.84 $3,391.72$49,562.68Strafford $32,604.12

15502

Complete/Final Audit

6/30/2009

FEMA Disaster 8/11/08; Inspected 10/15/08-FV46.2 159 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Rehabilitation, High Street over Melvin River, Br. #141/068 (Force Acct DOT-Br. Maint)

$0.00 $176,081.17 $44,020.29$220,101.46Tuftonboro

15291

Complete/Final Audit

11/12/2009

Completed 5/1/0940.9 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Emergency Repair, Phase I: Connors Mill Road over Schoodac Brook, Br. #194/172 (Force Acct DOT-Br. Maint)

$0.00 $37,858.72 $11,444.68$49,303.40Warner

14519

Complete/Final Audit

11/30/2009

May 06 Rain Event - FEMA (Bailey Bridge removed 4/9/09 )27 NPR Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Rehabilitation, Phase II: Saunders Hill Road over Baker River, Br. #142/096 (Municipal Managed Project)

$226,800.00 $433,637.11 $86,372.30$746,809.41Wentworth

14517A

Complete/Final Audit

8/13/2013

Cap=100% Construction/Federal+State Inspected 11/24/10-FV29.2 06 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, River Road North over Aldrich Brook, Br. #107/163 (Municipal Managed Project)

$0.00 $56,023.88 $14,005.97$70,029.85Westmoreland

15590

Complete/Final Audit

7/19/2011

Inspected 10/9/08-FV39.0 06 Remarks:Red List: FSR: WT: No Outlet: NoYes

FY 2010 Page 3

(Page 4 of 46)Report Date: 8/1/2018 7:36:00 AM

With Bridge Detail

FiscalYear: 2010 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

FY 2010 Programmed Total

FY 2009 Balance $0.00 $6,538,415.71

$11,000,000.00 $6,804,000.00

$3,645,104.19 $8,814,651.65 $1,019,102.09

FY 2010 Appropriation

FY 2010 Funds Available $11,000,000.00 $13,342,415.71

Minus FY 2010 Programmed Total $6,998,481.77 $10,161,438.07

$4,001,518.23 $3,180,977.65Sub-total

($4,001,518.23)

$0.00

$0.00 $3,180,977.65FY 2010 Balance

$13,564,389.52

State Adjustment:App includes $6.8 M Bond; Federal Adjustment: App includes $7 M ARRA-related Funds

Federal Adjustment:Federal share used on other State bridges since State share sufficient to meet requests for aid in 2010.

$85,531.60

Number of Projects for FY 2010 By Funding Source

Funding or Managed By Tally

Federal/State 1

Federal/State/Municipal 4

Federal/State/Municipal/Other 1

Federal/State/Other 1

State 1

State/Municipal 18

State/Municipal/Other 1

27Total Number of projects

Managed By Tally

Number of Projects for FY 2010 By Managing Lead

Force Acct DOT-Br. Maint 6

Municipality 20

Other 1

27Total Number of projects

FY 2010 Page 4

(Page 5 of 46)Report Date: 8/1/2018 7:36:00 AM

With Bridge Detail

FiscalYear: 2011 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

Bridge Replacement, Places Mill Road over Sunset Lake Outlet, Br. #098/178 (Municipal Managed Project)

$0.00 $430,830.73 $75,478.16$506,308.89Alton

14239

Complete/Final Audit

12/13/2012

Br. Insp. 9/14/11-FV32.1 03P Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Rehabilitation, River Street over Squam River, Br. #101/073 (Municipal Managed Project)

$0.00 $385,920.80 $96,480.20$482,401.00Ashland

14262

Complete/Final Audit

1/3/2012

Br. Inspection 12/8/11-FV40.9 105 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Fremont Road over Towle Brook, Br. #147/100 (Municipal Managed Project)

$0.00 $314,430.55 $78,607.64$393,038.19Chester

13696

Complete/Final Audit

11/1/2012

Br. Inspection 12/14/11-FV21.6 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Tasker Hill Road over Pequawket Pond, Br. #182/066 (Municipal Managed Project)

$0.00 $368,885.70 $57,052.70$425,938.40Conway

15300

Complete/Final Audit

3/31/2011

Bridge Inspected 9/29/10-FV40.6 10 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, South Avenue over Shield Brook, Br. #066/092 (Municipal Managed Project)

$0.00 $314,273.60 $78,568.40$392,842.00Derry

13651

Complete/Final Audit

11/29/2011

Bridge Inspection 9/19/11-FV58.3 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Wiswall Road over Lamprey River, Br. #070/072, 069/072 (Municipal Managed Project)

$466,413.78 $454,749.40 $65,952.20$1,721,157.29Durham $734,041.91

14453

Complete/Final Audit

6/22/2011

May 2006 Rain Event - FEMA&OEM; Inspected 12/2/10-FV20.9 15 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Bay Road over Cocheco River, Br. #060/144 (Municipal Managed Project)

$0.00 $314,806.59 $53,026.15$367,832.74Farmington

15677

Complete/Final Audit

9/30/2010

Bridge Inspection 9/30/10-FV40.8 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Phase II: Mill Brook Road over Mill Brook, Br. #162/139 (Municipal Managed Project)

$0.00 $332,601.47 $78,355.35$410,956.82Grafton

13373A

Complete/Final Audit

2/27/2012

FY10>11-Bridge Inspection 10/20/11-FV19.4 NPR Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, High Street over North River, Br. #063/045 (Municipal Managed Project)

$0.00 $1,117,113.36 $166,934.34$1,284,047.70Lee

14842

Complete/Final Audit

10/17/2012

Bridge Inspected 2/21/12-FV55.9 NPR Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Rehabilitation, Old Mill Road over Oyster River, Br. #116/130 (Force Acct DOT-Br. Maint)

$0.00 $94,542.71 $23,635.68$118,178.39Lee

14843

Complete/Final Audit

4/22/2011

BM Completion Date 11/9/10-FV99.0 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

FY 2011 Page 1

(Page 6 of 46)Report Date: 8/1/2018 7:36:00 AM

With Bridge Detail

FiscalYear: 2011 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

Bridge Replacement, Stearns Brook Road over Stearns Brooks, Br. #254/038 (Force Acct DOT-Br. Maint)

$0.00 $25,838.09 $6,459.52$32,297.61Milan

20814

Complete/Final Audit

5/6/2014

DOT to install Bailey Br purchased by Town. BM completed 7/5/11-Pay Rec'd 8/11/14-FV21.9 03P Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Village Road over Andrew Brook, Br. #120/078 (Municipal Managed Project)

$0.00 $601,826.34 $93,065.33$694,891.67Newbury

14916

Complete/Final Audit

3/2/2012

Br. Inspected 12/20/11-FV31.8 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Sutton Road over Ring Brook, Br. #138/072 (Municipal Managed Project)

$0.00 $699,673.87 $114,816.12$814,489.99Newbury

14917

Complete/Final Audit

2/11/2013

Br. Inspected 12/20/11-FV49.3 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Reed's Farm Road over Brook, Br. #167/148 (Municipal Managed Project)

$0.00 $97,060.27 $24,265.07$121,325.34Newport

15597

Complete/Final Audit

6/2/2011

Town Force Acct Used; Inspected 8/10/10-FV79.9 NPR Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Rehabilitation, Phase II: Northwood-Bow Lake Road over Brook, Br. #085/040 (Municipal Managed Project)

$0.00 $341,497.44 $55,537.66$397,035.10Strafford

15502A

Complete/Final Audit

4/12/2011

Inspected 12/20/10-FV46.2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Other, Main Street, Thompson Covered Bridge, Br. #093/124 (Municipal Managed Project)

$514,940.65 $169,805.79 $62,170.40$746,916.84Swanzey

14195

Complete/Final Audit

1/30/2014

Fed Historic Br; Fire protection system & center pier rehab; Completed 10/22/10-FV13.6 03P Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Rehabilitation, Water Street over Johns River, Br. #106/106 (Municipal Managed Project)

$0.00 $22,944.72 $5,736.18$28,680.90Whitefield

15732

Complete/Final Audit

10/2/2013

Only Paying PE-FV37.6 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

FY 2011 Page 2

(Page 7 of 46)Report Date: 8/1/2018 7:36:01 AM

With Bridge Detail

FiscalYear: 2011 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

FY 2011 Programmed Total

FY 2010 Balance $0.00 $3,180,977.65

$8,000,000.00 $6,804,000.00

$981,354.43 $6,086,801.43 $1,136,141.10

FY 2011 Appropriation

FY 2011 Funds Available $8,000,000.00 $9,984,977.65

Minus FY 2011 Programmed Total $4,000,000.00 $7,012,227.21

$4,000,000.00 $2,972,750.44Sub-total

($4,000,000.00)

$0.00

$0.00 $2,972,750.44FY 2011 Balance

$8,938,338.87

State Adjustment:App includes $6.8 M Bond; Federal Adjustment: App includes $4 M ARRA-related Funds

Federal Adjustment:Federal share used on other State bridges since State share sufficient to meet requests for aid in 2011.

$734,041.91

Number of Projects for FY 2011 By Funding Source

Funding or Managed By Tally

Federal/State/Municipal 1

State/Municipal 17

State/Municipal/Other 1

19Total Number of projects

Managed By Tally

Number of Projects for FY 2011 By Managing Lead

Force Acct DOT-Br. Maint 2

Municipality 17

19Total Number of projects

FY 2011 Page 3

(Page 8 of 46)Report Date: 8/1/2018 7:36:01 AM

With Bridge Detail

FiscalYear: 2012 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

Bridge Replacement, Reed Road over West Alton Brook, Br. #078/275 (Municipal Managed Project)

$0.00 $400,968.30 $100,242.08$501,210.38Alton

20403

Complete/Final Audit

7/27/2012

Bid Stage for Contract #2-Br. Inspected 12/20/11 Contract #3-FV56.0 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Old North Branch Road over North Branch River, Br. #130/149 (Municipal Managed Project)

$488,380.13 $519,423.17 $48,459.09$1,056,262.39Antrim

14944

Complete/Final Audit

12/30/2014

Cap=100% Construction/Federal+State (+5%) Br. Inspected 1/11/12-FV38.0 06 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Water Street over Great Brook, Br. #178/069 (Municipal Managed Project)

$0.00 $303,557.87 $75,889.47$379,447.34Antrim

15350

Complete/Final Audit

2/15/2012

Bridge Inspected 10/07/10-FV40.9 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Rehabilitation, Phase II: West Bath Road over Ammonoosuc River (Village Covered Bridge), Br. #137/095 (Municipal Managed Project)

$0.00 $832,563.62 $208,141.85$3,360,705.47Bath $2,320,000.00

14439

Complete/Final Audit

5/4/2018

Inspected 9/8/14-FV0.0 03P Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Rehabilitation, Prospect Street over Ammonoosuc River, Br. #071/137 (Municipal Managed Project)

$0.00 $701,048.07 $193,512.02$894,560.09Bethlehem

14228

Complete/Final Audit

1/22/2013

Br. Insp. 12/15/11-FV27 15 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Rehabilitation, Blair Road over Pemigewasset River; Blair Covered Bridge, Br. #117/076 (Municipal Managed Project)

$0.00 $864,197.22 $151,288.24$2,738,992.98Campton $1,723,507.52

12407

Complete/Final Audit

3/2/2015

Nat'l Historic Cov Br Preservation Program 80% Other; 20% = 80% SAB-20% Town (PO) Br. Inspected 7/30/14-FV16.3 03P Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Rehabilitation, Washburn Road over Mohawk River, Br. #188/063 (Municipal Managed Project)

$0.00 $49,200.00 $12,300.00$61,500.00Colebrook

21385

Complete/Final Audit

7/10/2012

Br. Inspection 12/13/11-FV16.6 06 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Davis Road over Smith River, Br. #123/104 (Municipal Managed Project)

$0.00 $352,968.54 $53,346.24$406,314.78Grafton

14627

Complete/Final Audit

3/12/2012

Bridge Inspected 12/16/11 For Estimate this project in ProMIS is under14621-FV30.3 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Church Street over Beaver Brook, Br. #140/075 (Municipal Managed Project)

$0.00 $0.00 $0.00$0.00Keene

15345

Complete/Final Audit

5/12/2014

Project is being reprogram to Keene 2934047.9 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

FY 2012 Page 1

(Page 9 of 46)Report Date: 8/1/2018 7:36:01 AM

With Bridge Detail

FiscalYear: 2012 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

Bridge Rehabilitation, Mount Orne Road over Connecticut River; Mount Orne Covered Bridge, Br. #039/105 (Force Acct DOT-Br. Maint)

$0.00 $124,577.12 $31,144.28$155,721.40Lancaster

15924

Complete/Final Audit

7/22/2013

FV2.0 Y Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Rehabilitation, Millbrook Road over Mill Brook, Br. #084/147 (Force Acct DOT-Br. Maint)

$0.00 $63,281.52 $15,820.38$79,101.90Landaff

20251

Complete/Final Audit

1/11/2012

BM completed 10/13/11-FV41 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Emergency Repair, Phase I: Loon Mountain Road over East Br Pemigewasset River, Br. #212/151 (Force Acct DOT-Br. Maint)

$0.00 $165,090.50 $60,340.04$844,519.90Lincoln $619,089.36

16400

Complete/Final Audit

11/13/2013

FEMA funds for 2 temporary bridges (Phase II=#22292)2.0 NPR Remarks:Red List: FSR: WT: No Outlet: NoYes

Historic Preservation, River Road over Clay Brook; Edgell Covered Bridge, Br. #069/190 (Force Acct DOT-Br. Maint)

$0.00 $104,693.52 $26,173.38$130,866.90Lyme

14235

Complete/Final Audit

5/31/2013

21.1 03P Remarks:Red List: FSR: WT: No Outlet: NoYes

Other, Perkins Road over B&M Railroad, Br. #119/074(Closed) (Force Acct DOT-Br. Maint)

$0.00 $60,000.00 $0.00$60,000.00Madbury

15773

Under Design

Bridge Removal 12/0932.0 BRC Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Rehabilitation, Kelley Street over B&MRR/Piscataquog River, Br. #119/045 (Municipal Managed Project)

$4,103,048.47 $494,400.70 $54,352.26$5,249,079.65Manchester $597,278.22

15390

Complete/Final Audit

12/30/2014

Federal+SAB; Br. Inspected 10/01/12-FV87.4 NPR Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Morse Loop Road over Brook, Br. #170/024 (Municipal Managed Project)

$0.00 $41,748.80 $10,437.20$52,186.00Sutton

15346

Complete/Final Audit

6/17/2011

Town closed road & discontinued project-FV53.5 10 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Old Westport Road over Wheelock Brook, Br. #133/163 (Municipal Managed Project)

$0.00 $339,894.26 $55,718.07$395,612.33Winchester

15317

Complete/Final Audit

2/29/2012

Br. Insp. 7/18/11-FV49.8 106 Remarks:Red List: FSR: WT: No Outlet: NoYes

FY 2012 Page 2

(Page 10 of 46)Report Date: 8/1/2018 7:36:01 AM

With Bridge Detail

FiscalYear: 2012 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

FY 2012 Programmed Total

FY 2011 Balance $0.00 $2,972,750.44

$4,000,000.00 $6,804,000.00

$4,591,428.60 $5,417,613.22 $1,097,164.60

FY 2012 Appropriation

FY 2012 Funds Available $4,000,000.00 $9,776,750.44

Minus FY 2012 Programmed Total $0.00 $6,653,679.10

$4,000,000.00 $3,123,071.33Sub-total

($4,000,000.00)

$0.00

$0.00 $3,123,071.33FY 2012 Balance

$16,366,081.51

Federal Adjustment:Federal share used on other State bridges since State share sufficient to meet requests for aid in 2012.

$5,259,875.10

Number of Projects for FY 2012 By Funding Source

Funding or Managed By Tally

State 1

State/Municipal 15

State/Municipal/Other 3

19Total Number of projects

Managed By Tally

Number of Projects for FY 2012 By Managing Lead

Force Acct DOT-Br. Maint 5

Municipality 14

19Total Number of projects

FY 2012 Page 3

(Page 11 of 46)Report Date: 8/1/2018 7:36:01 AM

With Bridge Detail

FiscalYear: 2013 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

Bridge Replacement, Depot Street over Relief, Br. #181/071 (Municipal Managed Project)

$0.00 $249,767.46 $62,441.87$312,209.33Antrim

14940

Complete/Final Audit

8/4/2017

FV94.7 NPR Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Depot Street over Contoocook River Overflow, Br. #183/071 (Municipal Managed Project)

$0.00 $428,748.70 $107,187.18$535,935.88Antrim

14941

Complete/Final Audit

6/4/2015

Br. Inspected 11/5/13-FV63.5 8 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Depot Street over Relief, Br. #181/071 (Municipal Managed Project)

$0.00 $249,767.46 $69,738.40$319,505.86Antrim

15349A

Complete/Final Audit

6/4/2015

Br. Inspected 11/5/13--FV47.0 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Rehabilitation, Phase II: Depot Street over Contoocook River, Br. #184/071 (Municipal Managed Project)

$0.00 $916,609.62 $233,771.64$1,150,381.26Antrim

15349A

Complete/Final Audit

4/2/2015

Antrim-Bennington Project; PO #400343836 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Rehabilitation, Chester Turnpike over Murray Brook, Br. #120/149 (Municipal Managed Project)

$0.00 $243,868.66 $60,967.17$363,729.58Auburn $58,893.75

15512

Complete/Final Audit

7/10/2012

April 2007 Flood; Town Force Account - Inspected 11/30/1064.9 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Cross Road over Gunnison Brook, Br. #105/129 (Municipal Managed Project)

$0.00 $344,910.86 $86,227.72$431,138.58Goshen

16112

Complete/Final Audit

8/26/2013

Br. Inspected 8/1/2013-FV40.9 10 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Rehabilitation, South Merrimack Road over Witch Brook, Br. #122/164 (Municipal Managed Project)

$0.00 $249,199.98 $62,300.00$311,499.98Hollis

14897

Complete/Final Audit

7/10/2012

Inspected 12/6/07-FV37.8 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Spring Street over Beaver Brook, Br. #140/078 (Municipal Managed Project)

$0.00 $85,114.71 $21,278.67$106,393.38Keene

14441

Complete/Final Audit

1/16/2014

Only paying PE and ROW. City withdrew construction-FV48.8 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Wire Road over Baboosic Brook, Br. #098/174 (Municipal Managed Project)

$0.00 $828,074.16 $207,018.55$1,035,092.71Merrimack

15839

Complete/Final Audit

9/16/2013

Inspected 6/27/13-FV86.3 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Emerson Way over Widow Harris Brook, Br. #114/108 (Municipal Managed Project)

$0.00 $406,066.26 $101,516.56$507,582.82Salem

14881

Complete/Final Audit

1/2/2013

Br. Insp. 3/23/11-FV23.9 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

FY 2013 Page 1

(Page 12 of 46)Report Date: 8/1/2018 7:36:01 AM

With Bridge Detail

FiscalYear: 2013 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

Bridge Replacement, Providence Hill Road over Providence Hill Brook, Br. #120/155 (Municipal Managed Project)

$0.00 $94,206.84 $23,551.71$117,758.55Salem

20225

Complete/Final Audit

5/30/2013

Only paying PE--Br. Inspection 10/15/13-FV52.8 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Cobble Hill Road over California Brook, Br. #082/115 (Municipal Managed Project)

$0.00 $1,180,838.16 $295,209.54$1,476,047.70Swanzey

14918

Complete/Final Audit

2/28/2014

PO #4002971; Inspected 12/3/13-FV46.4 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Warmac Road over Perry Brook, Br. #135/068 (Municipal Managed Project)

$0.00 $451,088.82 $112,772.20$563,861.02Swanzey

15348

Complete/Final Audit

2/28/2014

PO 4002970 Br. Inspected 12/3/13-FV39.8 BRC Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Putnam Road over Brook & Brook Overflow, Br. #116/139, 117/138 (Municipal Managed Project)

$0.00 $26,400.00 $6,600.00$33,000.00Temple

14937

Complete/Final Audit

10/18/2012

Engr Study only. Town closed project and substituted another-FV32.2 6 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Stage Road over Little Sugar River; Phase I&II, Br. #035/074 (Municipal Managed Project)

$0.00 $0.00 $0.00$0.00Unity

14248

Complete/Final Audit

4/13/2012

October 2005 Rain Event-Project completed without DOT funding-FV39.3 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Evans Road over South Branch Baker River, Br. #136/053 (Municipal Managed Project)

$0.00 $487,227.95 $121,806.99$609,034.94Wentworth

14516

Complete/Final Audit

1/27/2014

Br. Inspected 9/17/13-FV46.5 NPR Remarks:Red List: FSR: WT: No Outlet: NoYes

FY 2013 Page 2

(Page 13 of 46)Report Date: 8/1/2018 7:36:01 AM

With Bridge Detail

FiscalYear: 2013 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

FY 2013 Programmed Total

FY 2012 Balance $0.00 $3,123,071.33

$4,000,000.00 $6,804,000.00

$0.00 $6,241,889.64 $1,572,388.20

FY 2013 Appropriation

FY 2013 Funds Available $4,000,000.00 $9,927,071.33

Minus FY 2013 Programmed Total $1,595,421.60 $11,978,199.41

$2,404,578.40 ($2,051,128.08)Sub-total

($2,404,578.40)

$0.00

$0.00 ($2,051,128.08)FY 2013 Balance

$7,873,171.59

Federal Adjustment:Federal share used on other State bridges since State share sufficient to meet requests for aid in 2013.

$58,893.75

Number of Projects for FY 2013 By Funding Source

Funding or Managed By Tally

Federal/State/Municipal 1

State/Municipal 19

State/Municipal/Other 1

21Total Number of projects

Managed By Tally

Number of Projects for FY 2013 By Managing Lead

Municipality 21

21Total Number of projects

FY 2013 Page 3

(Page 14 of 46)Report Date: 8/1/2018 7:36:02 AM

With Bridge Detail

FiscalYear: 2014 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

Bridge Replacement, Crawley Falls Road over Exeter River, Br. #073/065 (Municipal Managed Project)

$0.00 $916,457.49 $229,114.38$1,145,571.87Brentwood

15277

Complete/Final Audit

7/25/2016

FY2010>12>13-Br. Inspected 10/29/14-FV32.4 15 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, New Boston Road over Powwow River, Br. #116/113 (Municipal Managed Project)

$0.00 $331,802.14 $82,950.53$414,752.67Kingston

14973

Complete/Final Audit

7/31/2013

Inspected 5/7/09-FV62.8 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Manchester Street over Pennichuck Reservoir, Br. #120/026 (Municipal Managed Project)

$0.00 $1,875,047.03 $666,005.34$2,541,052.37Nashua

13964

Complete/Final Audit

2/6/2017

Merrimack-Nashua project (Nashua is managing)-Br. Inspect 9/10/15-FV27.1 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Willow Street over Beaver Brook, Br. #105/069 (Municipal Managed Project)

$0.00 $1,524,504.80 $381,126.20$1,982,752.00Pelham $77,121.00

26762

Under Construction

56 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Fay Martin Road over Tully Brook, Br. #160/071 (Municipal Managed Project)

$0.00 $452,335.20 $93,093.62$545,428.82Richmond

21190

Complete/Final Audit

11/5/2013

Br. Inspected 7/24/13-FV43.1 10 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Teague Drive over Spicket River, Br. #095/175 (Municipal Managed Project)

$0.00 $87,092.20 $21,773.05$108,865.25Salem

27202

Complete/Final Audit

3/3/2015

ROW+CON is non-participating-FVRemarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Plummer Road over Hermit Brook, Br. #148/156 (Municipal Managed Project)

$0.00 $228,204.35 $57,051.09$285,255.44Sanbornton

16081

Complete/Final Audit

12/10/2013

Town replaced without Bridge Aid. SAB paid for Engr Study only-FV14.6 06 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Cross Road over Town Line Brook, Br. #071/099 (Municipal Managed Project)

$0.00 $380,293.42 $95,073.36$475,366.78Sharon

15513

Complete/Final Audit

11/28/2014

Br. Inspection 10/1/2014-FV66.5 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Rehabilitation, Dufour Road over South Branch Baker River, Br. #162/072 (Municipal Managed Project)

$0.00 $317,040.00 $79,260.00$396,300.00Wentworth

14518

Complete/Awaiting Audit

Br. Inspection 8/27/1441.0 06 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Rehabilitation, Broad Brook Road over Broad Brook, Br. #070/106 (Municipal Managed Project)

$0.00 $330,921.51 $66,141.58$397,063.09Winchester

15316

Complete/Final Audit

1/5/2015

Br. Inspected 11/18/14-FV25.4 10 Remarks:Red List: FSR: WT: No Outlet: YesYes

FY 2014 Page 1

(Page 15 of 46)Report Date: 8/1/2018 7:36:02 AM

With Bridge Detail

FiscalYear: 2014 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

FY 2014 Programmed Total

FY 2013 Balance $0.00 ($2,051,128.08)

$4,000,000.00 $6,804,000.00

$0.00 $6,443,698.14 $1,771,589.15

FY 2014 Appropriation

FY 2014 Funds Available $4,000,000.00 $4,752,871.92

Minus FY 2014 Programmed Total $0.00 $6,828,380.57

$4,000,000.00 ($2,075,508.65)Sub-total

($4,000,000.00)

$0.00

$0.00 ($2,075,508.65)FY 2014 Balance

$8,292,408.29

Federal Adjustment:Federal share used on other State bridges since State share sufficient to meet requests for aid in 2014.

$77,121.00

Number of Projects for FY 2014 By Funding Source

Funding or Managed By Tally

State/Municipal 15

State/Municipal/Other 2

17Total Number of projects

Managed By Tally

Number of Projects for FY 2014 By Managing Lead

Municipality 17

17Total Number of projects

FY 2014 Page 2

(Page 16 of 46)Report Date: 8/1/2018 7:36:02 AM

With Bridge Detail

FiscalYear: 2015 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

Bridge Replacement, Manchester Road over Beaver Brook, Br. #134/100 (Municipal Managed Project)

$0.00 $1,010,489.66 $252,622.42$1,329,826.08Amherst $66,714.00

20242

Complete/Final Audit

2/13/2017

Br. Inspected 4/1/16-FV40.5 10 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Rehabilitation, Old Candia Road over Maple Falls Brook, Br. #088/159 (Municipal Managed Project)

$0.00 $267,867.58 $66,966.90$334,834.48Auburn

15657

Complete/Final Audit

9/20/2014

Br. Inspection 12/09/12-FV35.1 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Rehabilitation, River Street over Saco River, Br. #109/113 (Municipal Managed Project)

$0.00 $143,931.19 $35,982.80$719,655.97Bartlett $539,741.98

22893

Complete/Final Audit

3/3/2017

Br Inspected 8-4-16-FV87.0 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

Other, West Street (Old 3-B) over Merrimack River, Br. #132/085 (Municipal Managed Project)

$0.00 $240,058.98 $60,014.74$300,073.72Boscawen

15281

Complete/Final Audit

3/27/2015

Boscawen-Canterbury Bridge Removal Project-FVN/A BRC Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Breezy Hill Road over Warner River, Br. #161/145 (Municipal Managed Project)

$0.00 $1,153,884.19 $288,471.06$1,442,355.25Bradford

15857

Complete/Final Audit

5/8/2017

FY2016>2018; SB367>2015 offered-Br. Inspected 8/30/16-FV32.4 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Goose Pond Road over Goose Pond Brook, Br. #087/092 (Municipal Managed Project)

$0.00 $498,647.12 $124,661.78$623,308.90Canaan

14952

Complete/Final Audit

4/14/2016

Br. Inspected 12/12/14-FV39.8 6 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Meriden Hill Road over Lyman Brook, Br. #054/032 (Municipal Managed Project)

$0.00 $0.00 $0.00$0.00Columbia

29388

Complete/Final Audit

1/5/2015

Project is canceled33.9 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Juniper Hill Road over Brennan Brook, Br. #093/087 (Municipal Managed Project)

$0.00 $400,201.38 $100,050.35$500,251.73Francestown

15762

Complete/Final Audit

2/8/2016

Br. Inspected 10/20/15-FV48.8 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Woodward Hill Road over Brennan Brook, Br. #121/077 (Municipal Managed Project)

$0.00 $506,913.68 $126,728.42$633,642.10Francestown

15764

Complete/Final Audit

2/8/2016

Br. Inspected 10/20/15-FV41.0 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Second NH Turnpike over So. Br. Piscataquog River, Br. #125/077 (Municipal Managed Project)

$0.00 $682,308.82 $170,577.21$852,886.03Francestown

22892

Complete/Final Audit

1/3/2014

Br. Inspected 10/10/14-FV40.8 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

FY 2015 Page 1

(Page 17 of 46)Report Date: 8/1/2018 7:36:02 AM

With Bridge Detail

FiscalYear: 2015 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

Bridge Replacement, Pelham Road over Second Brook, Br. #129/092(Tentative) (Municipal Managed Project)

$0.00 $622,821.70 $155,705.44$778,527.14Hudson

16175

Complete/Final Audit

8/20/2018

Br. Inspected 1/4/16 - PO 4005738-1Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Phase II: Loon Mountain Road over East Br Pemigewasset River, Br. #212/151 (Municipal Managed Project)

$0.00 $1,679,436.10 $419,859.02$8,105,194.14Lincoln $6,005,899.02

22292

Under Construction

FEMA funds. PO #4003795, L2 (See also #16400) - TempBr Rental=$1600/month2 NPR Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Jennison Road over Hartshorn Brook, Br. #099/150 (Municipal Managed Project)

$0.00 $470,080.88 $117,520.22$599,246.87Milford $11,645.77

22372

Complete/Final Audit

12/29/2016

[Steel beam rental monthly@$270.83/month] Br. Inspected 11/19/1539.4 NPR Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Jones Crossing over Souhegan River, Br. #062/138(Closed) (Municipal Managed Project)

$0.00 $122,689.54 $30,672.39$153,361.93Milford

29509

Complete/Final Audit

11/28/2016

Bridge Removal - No A&B phases-FVN/A BRC Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Riverdale Road over Mid Branch Piscataquog River, Br. #131/147 (Municipal Managed Project)

$0.00 $739,208.76 $184,802.19$924,010.95New Boston

22352

Complete/Final Audit

8/21/2017

Br. Inspected 11/23/15 -FV100.0 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Paradise Road over Sugar River, Br. #177/117(Closed) (Municipal Managed Project)

$0.00 $39,016.77 $9,754.19$48,770.96Newport

14969

Complete/Final Audit

9/29/2014

Bridge Closed; Town canceled project 9/25/14-FV16.4 BRC Remarks:Red List: FSR: WT: No Outlet: YesYes

Bridge Replacement, Indian Pond Road over Bean Brook, Br. #108/075(New) (Municipal Managed Project)

$0.00 $69,919.69 $17,479.92$301,161.53Piermont $213,761.92

27450

Complete/Awaiting Audit

FEMA-State paying Construction ONLYRemarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Cluffs Crossing over Policy Brook, Br. #094/060 (Municipal Managed Project)

$0.00 $666,235.31 $166,558.83$832,794.14Salem

15592

Complete/Final Audit

8/11/2014

Bridge Inspection Approved 9/29/10-FV65.7 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Pelham Road over Porcupine Brook, Br. #058/074(New) (Municipal Managed Project)

$0.00 $287,702.59 $71,925.65$359,628.24Salem

15596

Complete/Final Audit

9/4/2014

Br. Insp. 3/22/11-FVRemarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, North Main Street over Widow Harris Brook, Br. #115/115 (Municipal Managed Project)

$0.00 $553,394.25 $138,348.57$691,742.82Salem

15772

Complete/Final Audit

8/11/2014

Inspected 3/23/11-FV52.4 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

FY 2015 Page 2

(Page 18 of 46)Report Date: 8/1/2018 7:36:02 AM

With Bridge Detail

FiscalYear: 2015 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

Bridge Replacement, Town Farm Road over Spicket River, Br. #118/116 (Municipal Managed Project)

$0.00 $1,078,943.48 $269,735.88$1,384,623.21Salem $35,943.85

15988

Complete/Final Audit

4/10/2017

PO 4003611-Br. Inspected 6/28/16-FV27.9 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

Other, Lawrence Road over Spicket River (Municipal Managed Project)

$0.00 $25,038.90 $6,259.72$31,298.62Salem

25121

Complete/Final Audit

3/4/2015

FEMA LOMR Prep for Project #15593 [PE, ROW, & Const were done in #15593]-FVRemarks:Red List: FSR: WT: No Outlet:

Bridge Replacement, First Crown Point Road over Big River, Br. #069/164 (Municipal Managed Project)

$0.00 $497,630.05 $76,851.71$574,481.76Strafford

24213

Complete/Final Audit

12/2/2015

Br. Inspected 6/29/15-FV52.8 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Lower Main Street over Sugar River, Br. #094/100 (Municipal Managed Project)

$0.00 $391,175.65 $97,793.91$488,969.56Sunapee

15836

Complete/Final Audit

9/26/2016

FY17>15 PO 4005745-1-Br. Inspected 3/31/16-FV24 06 Remarks:Red List: FSR: WT: No Outlet: NoYes

Other, Sawyers Crossing Covered Bridge, Br. #136/143 (Municipal Managed Project)

$0.00 $127,616.33 $18,944.08$146,560.41Swanzey

14196

Complete/Final Audit

1/23/2015

PO#400247-Line 1 for all phases-FV21.8 03P Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Converse Road over Whiting Brook, Br. #110/141 (Municipal Managed Project)

$0.00 $449,830.84 $71,669.21$521,500.05Temple

24178

Complete/Final Audit

12/1/2015

Br. Inspected 7/29/15-FV47.4 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Old Cheshire County Rd over Spring Brook, Br. #205/098 (Municipal Managed Project)

$0.00 $375,368.57 $93,876.16$469,244.73Unity

22977

Complete/Final Audit

12/17/2014

Br. Inspected 8/8/14-FV41.0 NPR Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Bartlett Loop Road over Willow Brook, Br. #177/127 (Municipal Managed Project)

$0.00 $275,908.73 $68,977.19$344,885.92Warner

27650

Complete/Final Audit

7/25/2016

Br. Inspected 12/4/15-FV40.9 BRC Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Peaslee Road over Piscataquog River, Br. #125/141 (Municipal Managed Project)

$0.00 $993,215.76 $155,856.94$1,149,072.70Weare

14339

Complete/Final Audit

3/16/2015

Br. Inspected 10/29/15-FV29.6 104 Remarks:Red List: FSR: WT: No Outlet: NoYes

FY 2015 Page 3

(Page 19 of 46)Report Date: 8/1/2018 7:36:02 AM

With Bridge Detail

FiscalYear: 2015 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

FY 2015 Programmed Total

FY 2014 Balance $0.00 ($2,075,508.65)

$4,000,000.00 $14,800,000.00

$0.00 $14,369,536.50 $3,398,666.90

FY 2015 Appropriation

FY 2015 Funds Available $4,000,000.00 $12,724,491.35

Minus FY 2015 Programmed Total $2,665,646.00 $9,703,972.29

$1,334,354.00 $3,020,519.06Sub-total

($1,334,354.00)

$0.00

$0.00 $3,020,519.06FY 2015 Balance

$24,641,909.94

Federal Adjustment:Federal share used on other State bridges since State share sufficient to meet requests for aid in 2015.

$6,873,706.54

Number of Projects for FY 2015 By Funding Source

Funding or Managed By Tally

Federal/State/Municipal 1

State/Municipal 17

State/Municipal/Other 3

21Total Number of projects

Managed By Tally

Number of Projects for FY 2015 By Managing Lead

Force Acct DOT-Br. Maint 1

Municipality 20

21Total Number of projects

FY 2015 Page 4

(Page 20 of 46)Report Date: 8/1/2018 7:36:02 AM

With Bridge Detail

FiscalYear: 2016 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

Bridge Rehabilitation, Shaker Road over Pumping Station Brook, Br. #098/062 (Force Acct DOT-Br. Maint)

$0.00 $63,944.83 $15,986.21$79,931.04Belmont

14285

Complete/Final Audit

12/21/2015

73.0 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Rehabilitation, 12th Street over Androscoggin River, Br. #256/087 (Municipal Managed Project)

$0.00 $493,976.58 $123,494.15$617,470.73Berlin

15793

Complete/Awaiting Audit

Br. Inspected 8/7/14-Awaiting FV94.7 NPR Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Charcoal Road over Charcoal Brook, Br. #085/103 (Municipal Managed Project)

$0.00 $855,004.56 $213,751.15$1,123,509.21Dublin $54,753.50

15684

Complete/Final Audit

2/21/2017

Ln 1-Br. Inspected 10/13/16-FV28.6 104 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Roberts Road over Snow Brook, Br. #078/114 (Municipal Managed Project)

$0.00 $617,922.75 $154,480.69$772,403.44Eaton

15997

Complete/Final Audit

4/24/2017

FV39.7 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, McGaw Bridge Road over Baboosic Brook, Br. #116/137 (Municipal Managed Project)

$0.00 $1,591,131.98 $397,783.00$1,995,426.18Merrimack $6,511.20

13923

Complete/Final Audit

10/27/2017

FY12>17 per Town request-FV28.3 20 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Bean Road over Baboosic Brook, Br. #072/155 (Municipal Managed Project)

$0.00 $1,213,056.78 $303,264.20$1,516,320.98Merrimack

29736

Complete/Final Audit

9/18/2017

Transdate 10-23-14-FV86.8 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Deerfield Road over Back Creek, Br. #102/085(New) (Municipal Managed Project)

$0.00 $75,350.94 $18,837.74$265,188.68Nottingham $171,000.00

15720

Complete/Final Audit

8/27/2015

Former culvert -FEMA-Inspection Date 8-25-10; PO #4000912-Line 2-FV86.0 NPR Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Union Road over Nubanusit River, Br. #057/108 (Municipal Managed Project)

$0.00 $1,463,626.51 $365,906.63$1,829,533.14Peterborough

14935

Complete/Final Audit

8/7/2017

FV21.0 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

FY 2016 Page 1

(Page 21 of 46)Report Date: 8/1/2018 7:36:03 AM

With Bridge Detail

FiscalYear: 2016 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

FY 2016 Programmed Total

FY 2015 Balance $0.00 $3,020,519.06

$4,000,000.00 $6,804,000.00

$0.00 $6,374,014.93 $1,593,503.77

FY 2016 Appropriation

FY 2016 Funds Available $4,000,000.00 $9,824,519.06

Minus FY 2016 Programmed Total $0.00 $4,582,972.45

$4,000,000.00 $5,241,546.61Sub-total

($4,000,000.00)

$0.00

$0.00 $5,241,546.61FY 2016 Balance

$8,199,783.40

Federal Adjustment:Federal share used on other State bridges since State share sufficient to meet requests for aid in 2016.

$232,264.70

Number of Projects for FY 2016 By Funding Source

Funding or Managed By Tally

State/Municipal 4

State/Municipal/Other 2

6Total Number of projects

Managed By Tally

Number of Projects for FY 2016 By Managing Lead

Municipality 6

6Total Number of projects

FY 2016 Page 2

(Page 22 of 46)Report Date: 8/1/2018 7:36:03 AM

With Bridge Detail

FiscalYear: 2017 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

Bridge Replacement, Morrill Hill Road over Elbow Brook, Br. #127/106 (Municipal Managed Project)

$0.00 $520,843.20 $130,210.80$651,054.00Andover

14573

Under Construction

41.0 10 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Rehabilitation, Wallace Road over Riddle Brook, Br. #130/117 (Municipal Managed Project)

$0.00 $223,064.42 $55,766.10$278,830.52Bedford

20000

Complete/Final Audit

8/8/2016

Br. Insp. 5/2/11-FV72.8 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Whittier Street over Cocheco River, Br. #111/132 (Municipal Managed Project)

$2,665,646.00 $300,000.00 $741,411.50$4,056,627.50Dover $349,570.00

15402

Under Construction

PE+ROW SAB 80/20 CON MOBRR 80/202 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Echo Valley Farm Road over Griffin Brook, Br. #156/103 (Municipal Managed Project)

$0.00 $324,821.19 $81,205.30$406,026.49EPSOM

15766

Complete/Final Audit

6/29/2018

FV47.2 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Rehabilitation, String Bridge Road over Squamscott River, Br. #102/074, 103/074 (Municipal Managed Project)

$0.00 $1,022,265.60 $255,566.40$1,454,582.00Exeter $176,750.00

15399

Complete/Awaiting Audit

71.8 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Rehabilitation, Melendy Road over First Brook, Br. #114/083 (Municipal Managed Project)

$0.00 $0.00 $0.00$0.00Hudson

13353

Complete/Final Audit

6/30/2016

Substituted with project 40940-FVRemarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Buffalo Road over Unnamed Brook, Br. #128/073(6/12/06) (Municipal Managed Project)

$0.00 $63,244.40 $15,811.10$316,222.01Rumney $237,166.51

26504

Complete/Final Audit

10/11/2017

FEMA funding-FV18.8 12 Remarks:Red List: FSR: WT: No Outlet: NoYes

FY 2017 Page 1

(Page 23 of 46)Report Date: 8/1/2018 7:36:03 AM

With Bridge Detail

FiscalYear: 2017 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

FY 2017 Programmed Total

FY 2016 Balance $0.00 $5,241,546.61

$4,000,000.00 $6,804,000.00

$2,665,646.00 $2,454,238.81 $1,279,971.20

FY 2017 Appropriation

FY 2017 Funds Available $4,000,000.00 $12,045,546.61

Minus FY 2017 Programmed Total $0.00 $4,290,833.60

$4,000,000.00 $7,754,713.01Sub-total

($4,000,000.00)

$0.00

$0.00 $7,754,713.01FY 2017 Balance

$7,163,342.52

Federal Adjustment:Federal share used on other State bridges since State share sufficient to meet requests for aid in 2017.

$763,486.51

Number of Projects for FY 2017 By Funding Source

Funding or Managed By Tally

State/Municipal 5

5Total Number of projects

Managed By Tally

Number of Projects for FY 2017 By Managing Lead

Municipality 5

5Total Number of projects

FY 2017 Page 2

(Page 24 of 46)Report Date: 8/1/2018 7:36:03 AM

With Bridge Detail

FiscalYear: 2018 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

Bridge Replacement, Hillside Avenue over Dead River, Br. #232/066 (Municipal Managed Project)

$0.00 $593,381.23 $148,345.31$747,512.54Berlin $5,786.00

15792

Bid Stage

Totals provided by HEB-Awaiting Notice of Award55.3 C3 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Rehabilitation, Dunklee Road over Bow Bog Brook, Br. #182/113 (Municipal Managed Project)

$0.00 $384,160.00 $96,040.00$480,200.00Bow

40346

Under Design

Tran date 4/10/1545.0 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Breezy Hill Road over Massasecum River, Br. #170/129(Closed) (Municipal Managed Project)

$0.00 $0.00 $0.00$0.00Bradford

16106

Complete/Final Audit

12/9/2015

Project Cancelled15.3 BRC Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Old Route 110 over Upper Ammonoosuc River, Br. #042/043 (Municipal Managed Project)

$0.00 $1,472,040.00 $368,010.00$1,840,050.00Dummer

15815

Under Construction

46.1 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Rehabilitation, Belknap Mountain Road over Gunstock Brook, Br. #184/098 (Municipal Managed Project)

$0.00 $71,677.64 $17,919.41$89,597.05Gilford

15890

Complete/Final Audit

8/28/2017

Br. Inspection 4/15/11; PO #4003779-1-FVRemarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Spring Road Culvert over Mount Crescent Brook, Br. #027/112(Culvert) (Municipal Managed Project)

$0.00 $260,953.13 $72,099.44$602,506.00Gorham $269,453.43

41396

Bid Stage

Replacement of culvert-FEMA-SAB starts at PD-Awaiting AwardRemarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Rehabilitation, Bypassed Historic over Merrimack River (Lilac Bridge), Br. #083/150 (Municipal Managed Project)

$0.00 $700,000.00 $175,000.00$875,000.00Hooksett

29655

Under Construction

Bridge demolitionN/A BRC Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Rehabilitation, County Road over Second Brook, Br. #126/083 (Municipal Managed Project)

$0.00 $0.00 $0.00$0.00Hudson

13354

Complete/Final Audit

Moved from FY06>FY08>10>13>16>18 Replace with new project 40940-FV49.9 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Rehabilitation, Central Street over First Brook, Br. #110/086 (Municipal Managed Project)

$0.00 $0.00 $0.00$0.00Hudson

40940

Complete/Final Audit

Trans date 5/5/16-Project did not use SAB-FV54.3 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

FY 2018 Page 1

(Page 25 of 46)Report Date: 8/1/2018 7:36:03 AM

With Bridge Detail

FiscalYear: 2018 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

Bridge Replacement, NH 12 over Beaver Brook, Br. #137/059 (Municipal Managed Project)

$0.00 $1,973,129.21 $493,282.30$2,466,411.51Keene

26505

Bid Stage

51.9 NPR Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, NH 10 (Winchester Street) over Ash Swamp Brook, Br. #118/051 (Municipal Managed Project)

$0.00 $852,000.00 $213,000.00$1,065,000.00Keene

29340

Under Design

31.4 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Rehabilitation, US 4 & NH 10 Over Mascoma River, Br. #120/115 (Municipal Managed Project)

$0.00 $1,103,515.66 $275,878.92$1,379,394.58Lebanon

14552

Bid Stage

76.0 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Rehabilitation, Oak Street over Sugar River, Br. #103/136 (Municipal Managed Project)

$1,595,421.60 $320,000.00 $478,855.40$2,394,277.00Newport

16109

Bid Stage

PE and ROW=SAB MOBRR=Con only;47.1 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Barton Road Bridge over Eastman Brook, Br. #092/103 (Municipal Managed Project)

$0.00 $304,548.09 $76,137.02$380,685.11Piermont

16193

Complete/Final Audit

11/26/2017

Br. Inspection 9/10/12; PO #4001792-FV88.0 NPR Remarks:Red List: FSR: WT: No Outlet: NoNo

FY 2018 Programmed Total

FY 2017 Balance $0.00 $7,754,713.01

$4,000,000.00 $13,608,000.00

$1,595,421.60 $8,035,404.96 $2,414,567.80

FY 2018 Appropriation

FY 2018 Funds Available $4,000,000.00 $21,362,713.01

Minus FY 2018 Programmed Total $0.00 $7,468,786.05

$4,000,000.00 $13,893,926.96Sub-total

($4,000,000.00)

$0.00

$0.00 $13,893,926.96FY 2018 Balance

$12,320,633.79

Federal Adjustment:Federal share used on other State bridges since State share sufficient to meet requests for aid in 2018.

$275,239.43

Number of Projects for FY 2018 By Funding Source

Funding or Managed By Tally

State/Municipal 14

State/Municipal/Other 1

15Total Number of projects

Managed By Tally

Number of Projects for FY 2018 By Managing Lead

Municipality 15

15Total Number of projects

FY 2018 Page 2

(Page 26 of 46)Report Date: 8/1/2018 7:36:03 AM

With Bridge Detail

FiscalYear: 2019 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

Bridge Replacement, Horace Greeley Road over Pulpit Brook, Br. #060/158 (Municipal Managed Project)

$0.00 $1,202,540.40 $300,635.10$1,503,175.50Amherst

20231

Bid Stage

Awaiting Notice of Award54.3 NPR Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, New Boston Rd over Beaver Brook, Br. #109/090 (Municipal Managed Project)

$0.00 $0.00 $0.00$0.00Amherst

20243

Complete/Final Audit

Project Canceled61.6 NPR Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Mallego Road over Mallego Brook, Br. #139/116 (Municipal Managed Project)

$0.00 $993,280.00 $142,600.00$1,241,600.00Barrington $105,720.00

41398

Under Design

45.1 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Rehabilitation, Potato Road over Indian River, Br. #147/055 (Municipal Managed Project)

$0.00 $496,000.00 $124,000.00$620,000.00Canaan

41399

Under Design

48.8 NPR Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Hooksett Turnpike over Bela Brook, Br. #200/015 (Municipal Managed Project)

$0.00 $496,000.00 $124,000.00$620,000.00Concord

15877

Under Design

30.9 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Birchdale Road over Bela Brook, Br. #193/027 (Municipal Managed Project)

$0.00 $496,000.00 $124,000.00$620,000.00Concord

15878

60.0 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Drew Road over Drew Brook, Br. #167/101(New) (Municipal Managed Project)

$0.00 $241,903.09 $60,475.77$302,378.86Derry

16118

Complete/Awaiting Audit

Culvert Replaced w/Bridge; Inspected 7/22/11; PO #4001105-Awaiting FVRemarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, North Shore Road over Tributary I to Beaver Lake Outlet, Br. #099/129(New) (Municipal Managed Project)

$0.00 $326,962.40 $81,740.60$408,703.00Derry

41400

Under Design

Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Ossipee Lake Road over Danforth Bay Outlet, Br. #115/074 (Municipal Managed Project)

$0.00 $444,260.00 $111,065.00$555,325.00Freedom

15987

Under Design

48.7 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Rehabilitation, Old Lakeshore Road over Gunstock River, Br. #106/099 (Municipal Managed Project)

$0.00 $340,000.00 $85,000.00$425,000.00Gilford

21107

Under Design

21.7 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

FY 2019 Page 1

(Page 27 of 46)Report Date: 8/1/2018 7:36:03 AM

With Bridge Detail

FiscalYear: 2019 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

Bridge Replacement, Stage Road over Brook, Br. #106/041 (Municipal Managed Project)

$0.00 $616,606.40 $154,151.60$770,758.00Gilmanton

16232

Under Design

40.4 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Stage Road over Nighthawk Hollow Brook, Br. #122/041 (Municipal Managed Project)

$0.00 $740,000.00 $185,000.00$925,000.00Gilmanton

16233

Under Design

50.1 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, South Road over Minnewawa Brook, Br. #061/060 (Municipal Managed Project)

$0.00 $630,079.60 $157,519.90$787,599.50Harrisville

16114

Bid Stage

38.5 06 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Clark Pond Road over Clark Brook, Br. #147/109(Closed) (Municipal Managed Project)

$0.00 $138,000.00 $34,500.00$690,000.00Haverhill $517,500.00

41724

Under Negotiations

Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Rehabilitation, Valley Cross Road over Wildcat Brook, Br. #153/066 (Municipal Managed Project)

$0.00 $692,800.00 $173,200.00$866,000.00Jackson

40808

Under Negotiations

52.4 12 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Roxbury Street over Beaver Brook, Br. #140/077 (Municipal Managed Project)

$0.00 $663,200.00 $165,800.00$829,000.00Keene

15854

Under Design

18.6 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, NH 12A over BMRR, Br. #062/117 (Municipal Managed Project)

$6,144,000.00 $28,000.00 $1,543,000.00$7,715,000.00Lebanon

13558A

Under Design

MOBRR and SABRemarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Goffs Falls Road over B&MRR, Br. #118/092(func obsol) (Municipal Managed Project)

$0.00 $1,380,000.00 $345,000.00$1,725,000.00Manchester

15401

Under Design

FY201852.5 NPR Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Bedford Road over Baboosic Brook, Br. #113/159 (Municipal Managed Project)

$3,324,988.00 $370,364.80 $923,838.20$4,619,191.00Merrimack

15841

Under Design

MOBRR Capped88 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Sand Hill Road over Brook, Br. #154/129 (Municipal Managed Project)

$0.00 $80,000.00 $20,000.00$100,000.00Newport

20006

43.6 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

FY 2019 Page 2

(Page 28 of 46)Report Date: 8/1/2018 7:36:04 AM

With Bridge Detail

FiscalYear: 2019 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

Bridge Replacement, Bow Lake Road over Shelburne Brook, Br. #095/113 (Municipal Managed Project)

$0.00 $444,000.00 $111,000.00$555,000.00Northwood

41397

Under Design

26.7 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Shaw Road over Kelly Brook, Br. #089/135 (Municipal Managed Project)

$0.00 $468,240.00 $117,060.00$585,300.00Pittsfield

14972

Under Design

75.5 NPR Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Westville Road over Little River, Br. #122/072 (Municipal Managed Project)

$0.00 $822,449.10 $205,612.27$1,108,061.37Plaistow $80,000.00

23117

Bid Stage

71.9 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, South Policy Street over Porcupine Brook, Br. #083/062 (Municipal Managed Project)

$0.00 $512,571.19 $128,987.18$748,994.04Salem $107,435.67

15989

Complete/Awaiting Audit

Br. Inspected 2/14/1236.6 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Rehabilitation, Quaker Whiteface Road over Whiteface River, Br. #203/138 (Municipal Managed Project)

$0.00 $434,169.60 $108,542.40$542,712.00Sandwich

16014

Bid Stage

PO #400379337.2 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Huckins Road over Brook, Br. #125/090 (Municipal Managed Project)

$0.00 $244,000.00 $61,000.00$305,000.00Strafford

14790

97.0 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Rehabilitation, Rabbitt Hollow Road over Perry Brook, Br. #120/072

$0.00 $530,800.00 $132,700.00$663,500.00Swanzey

41696

Awaiting Town Action

85.8 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Rehabilitation, Covered Bridge Road over Mill Brook, Br. #183/107 (Municipal Managed Project)

$0.00 $537,560.80 $134,390.20$671,951.00Thornton

15938

Under Construction

43.5 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Rehabilitation, Hazen Road over Johns River, Br. #159/098 (Municipal Managed Project)

$0.00 $140,000.00 $35,000.00$175,000.00Whitefield

16025

40.5 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Rehabilitation, King Brook Road over King Brook, Br. #074/060 (Municipal Managed Project)

$0.00 $240,000.00 $60,000.00$300,000.00Wilton

15767

Under Design

41.0 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

FY 2019 Page 3

(Page 29 of 46)Report Date: 8/1/2018 7:36:04 AM

With Bridge Detail

FiscalYear: 2019 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

Bridge Replacement, Castle Hill Road over Beaver Brook, Br. #057/051 (Municipal Managed Project)

$0.00 $640,000.00 $160,000.00$800,000.00Windham

41632

Under Design

38.8 10 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Pleasant Valley Road over Heath Brook, Br. #116/072 (Municipal Managed Project)

$0.00 $885,345.60 $221,336.40$1,106,682.00Wolfeboro

40617

Bid Stage

38.6 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

FY 2019 Programmed Total

FY 2018 Balance $0.00 $13,893,926.96

$4,000,000.00 $6,804,000.00

$9,468,988.00 $16,275,132.98 $6,331,154.62

FY 2019 Appropriation

FY 2019 Funds Available $4,000,000.00 $20,697,926.96

Minus FY 2019 Programmed Total $8,004,988.00 $15,046,727.09

($4,004,988.00) $5,651,199.87Sub-total

$0.00

$0.00

($4,004,988.00) $5,651,199.87FY 2019 Balance

$32,885,931.27

Federal Adjustment:Exceeded Appropriation, Balance Forward to 2020.

$810,655.67

Number of Projects for FY 2019 By Funding Source

Funding or Managed By Tally

Federal/State/Municipal 1

State/Municipal 28

State/Municipal/Other 1

30Total Number of projects

Managed By Tally

Number of Projects for FY 2019 By Managing Lead

Municipality 29

Not Applicable to Date 1

30Total Number of projects

FY 2019 Page 4

(Page 30 of 46)Report Date: 8/1/2018 7:36:04 AM

With Bridge Detail

FiscalYear: 2020 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

Bridge Replacement, West Street over Great Brook, Br. #173/075 (Municipal Managed Project)

$0.00 $717,879.60 $179,469.90$906,670.50Antrim $9,321.00

29468

Under Construction

44.7 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Hannah Nutter Road over Big River, Br. #149/073 (Municipal Managed Project)

$0.00 $840,320.00 $210,080.00$1,050,400.00Barnstead

16020

Under Design

81.9 NPR Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Cider Mill Road over McQuade Brook, Br. #079/128 (Municipal Managed Project)

$0.00 $543,507.20 $135,876.80$679,384.00Bedford

21193

Under Construction

MJ Estimate64.5 NPR Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Catesby Lane over McQuade Brook, Br. #102/098(New) (Municipal Managed Project)

$0.00 $480,000.00 $120,000.00$600,000.00Bedford

21684

Under Negotiations

Culvert replacementRemarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Church Street over Tioga River, Br. #103/072 (Municipal Managed Project)

$0.00 $97,600.00 $24,400.00$122,000.00Belmont

22872

Awaiting Town Action

Town Repair Bridge/Town will replace in 202068.3 NPR Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, North Pembroke Road over Soucook River, Br. #183/156(J-Owned) (Municipal Managed Project)

$0.00 $520,000.00 $130,000.00$650,000.00Concord

14841A

Under Design

Concord-Pembroke Project55.9 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, So. New Boston Road over So. Br. Piscataquog River, Br. #149/058 (Municipal Managed Project)

$0.00 $1,069,600.00 $267,400.00$1,337,000.00Francestown

15765

Under Design

FY 2016>2047.4 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Crystal Lake Road over Nelson Brook, Br. #174/094 (Municipal Managed Project)

$0.00 $1,257,600.00 $314,400.00$1,572,000.00Gilmanton

16234

Under Design

50.8 NPR Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Rehabilitation, Bunker Hill Road over Needle Shop Brook, Br. #140/099 (Municipal Managed Project)

$0.00 $265,000.00 $70,000.00$335,000.00Hill

41661

Under Negotiations

58.7 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Academy Street over Durkee Brook, Br. #121/037 (Municipal Managed Project)

$0.00 $540,000.00 $135,000.00$675,000.00Laconia

26706

Under Negotiations

37.7 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

FY 2020 Page 1

(Page 31 of 46)Report Date: 8/1/2018 7:36:04 AM

With Bridge Detail

FiscalYear: 2020 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

Bridge Replacement, Townhouse Road over Northeast Pond, Br. #168/152 (Municipal Managed Project)

$0.00 $560,000.00 $140,000.00$1,400,000.00Milton $700,000.00

40658

Under Negotiations

Owned by Milton, NH and ME DOT, NHDOT managing9.1 BRC Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Coon Brook Road over South Branch Sugar River, Br. #147/036 (Municipal Managed Project)

$0.00 $471,135.20 $117,783.80$588,919.00Newport

29763

Under Construction

Substituted w/ #14969-Awaiting Notice of Award73.0 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Main Street over Contoocook River, Br. #092/089 (Municipal Managed Project)

$4,000,000.00 $501,600.00 $1,125,400.00$5,627,000.00Peterborough

14933

Under Design

Also see #14772A15.0 15 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Wellington Road over Converseville Brook, Br. #154/069 (Municipal Managed Project)

$0.00 $584,000.00 $146,000.00$730,000.00Rindge

22652

In Process

69.6 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Bluff Street Extension over Widow Harris Brook, Br. #116/116 (Municipal Managed Project)

$0.00 $646,724.00 $161,681.00$808,405.00Salem

20228

Bid Stage

PO#400360638.4 NPR Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Bluff Street over Hittytity Brook, Br. #094/119 (Municipal Managed Project)

$0.00 $83,035.90 $20,758.98$103,794.88Salem

20229

Complete/Final Audit

5/8/2014

Only paying PE. Received Form 4 and Mylars-FV45.6 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Frescoln Road over Rocky Branch, Br. #108/070 (Municipal Managed Project)

$0.00 $616,000.00 $154,000.00$770,000.00Wentworth

40648

59.5 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

FY 2020 Page 2

(Page 32 of 46)Report Date: 8/1/2018 7:36:04 AM

With Bridge Detail

FiscalYear: 2020 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

FY 2020 Programmed Total

FY 2019 Balance ($4,004,988.00) $5,651,199.87

$4,000,000.00 $6,804,000.00

$4,000,000.00 $9,794,001.90 $3,452,250.48

FY 2020 Appropriation

FY 2020 Funds Available ($4,988.00) $12,455,199.87

Minus FY 2020 Programmed Total $0.00 $6,072,835.90

($4,988.00) $6,382,363.97Sub-total

$0.00

$0.00

($4,988.00) $6,382,363.97FY 2020 Balance

$17,955,573.38

Federal Adjustment:Exceeded Appropriation, Balance Forward to 2021.

$709,321.00

Number of Projects for FY 2020 By Funding Source

Funding or Managed By Tally

State/Municipal 10

State/Municipal/Other 1

11Total Number of projects

Managed By Tally

Number of Projects for FY 2020 By Managing Lead

Municipality 11

11Total Number of projects

FY 2020 Page 3

(Page 33 of 46)Report Date: 8/1/2018 7:36:04 AM

With Bridge Detail

FiscalYear: 2021 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

Bridge Rehabilitation, Hill Road over Darby Brook, Br. #059/134 (Municipal Managed Project)

$0.00 $184,000.00 $46,000.00$230,000.00Alstead

40649

27.1 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Rehabilitation, Drewsville Road over Darby Brook, Br. #058/132 (Municipal Managed Project)

$0.00 $136,000.00 $34,000.00$170,000.00Alstead

40650

Under Negotiations

72.9 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Jenkins Road over McQuade Brook, Br. #136/066(New) (Municipal Managed Project)

$0.00 $117,479.82 $29,369.95$146,849.77Bedford

21685

Complete/Final Audit

12/4/2013

Culvert replacement - Br. Inspection 1/15/2013Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Rehabilitation, Harvey Swell Road over East Branch, Br. #190/109 (Municipal Managed Project)

$0.00 $177,549.60 $44,387.40$221,937.00Colebrook

40651

Under Design

69.9 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Bear Rock Road over West Branch Mohawk River, Br. #167/120 (Municipal Managed Project)

$0.00 $457,573.60 $114,393.40$571,967.00Colebrook

40652

Under Design

40.9 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Province Road over South Branch of Baker River, Br. #156/053(New) (Municipal Managed Project)

$0.00 $184,000.00 $46,000.00$920,000.00Dorchester $690,000.00

42092

New BridgeRemarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Martin Road over Piscassic River, Br. #155/133 (Municipal Managed Project)

$0.00 $416,000.00 $104,000.00$520,000.00Fremont

23793

Under Design

Transdate 7/6/201116.1 15 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Rehabilitation, Nutting Road over Contoocook River, Br. #159/094 (Municipal Managed Project)

$0.00 $540,000.00 $135,000.00$675,000.00Jaffrey

41401

Under Negotiations

46.2 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Nute Road over Bellamy River, Br. #056/072 (Municipal Managed Project)

$0.00 $592,000.00 $148,000.00$740,000.00Madbury

24226

Under Design

38.9 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Rehabilitation, Ramp E (Canal St) over BMRR, Br. #107/071 (Municipal Managed Project)

$0.00 $340,000.00 $85,000.00$425,000.00Manchester

24211

Transdate9/11/1274 NPR Remarks:Red List: FSR: WT: No Outlet: NoNo

FY 2021 Page 1

(Page 34 of 46)Report Date: 8/1/2018 7:36:04 AM

With Bridge Detail

FiscalYear: 2021 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

Bridge Rehabilitation, Salmon Street EB over RD, BMRR, Merrimack River Ramp-Amoskeag Bridge, Br. #107/072 (Municipal Managed Project)

$0.00 $508,000.00 $127,000.00$635,000.00Manchester

24212

Under Negotiations

Transdate 9/11/1267.6 NPR Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Rehabilitation, Queen City Bridge (US 3, NH 3A) over I-293, BMRR, Merrimack River, Br. #151/065 (Municipal Managed Project)

$4,680,000.00 $520,000.00 $1,300,000.00$6,500,000.00Manchester

28336

Under Design

MOBRR Funded 80% Fed 20% City73.8 NPR Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Archertown Road over Jacobs Brook, Br. #080/120 (Municipal Managed Project)

$0.00 $992,000.00 $248,000.00$1,240,000.00Orford

41151

Under Design

49.2 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Shannon Road over Providence Hill Brook, Br. #122/160 (Municipal Managed Project)

$0.00 $91,517.86 $22,879.46$114,397.32Salem

26486

Complete/Final Audit

5/28/2014

Br. Inspected 10/30/14-FV66.7 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Christian Hill Road over NHRR, Br. #098/122 (Municipal Managed Project)

$0.00 $1,280,000.00 $320,000.00$1,600,000.00Swanzey

41403

16.0 03P Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Stage Coach Road over Burton Pond Outlet, Br. #086/142 (Municipal Managed Project)

$0.00 $171,600.00 $42,900.00$214,500.00Wilton

26201

29.2 03P Remarks:Red List: FSR: WT: No Outlet: NoYes

FY 2021 Page 2

(Page 35 of 46)Report Date: 8/1/2018 7:36:05 AM

With Bridge Detail

FiscalYear: 2021 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

FY 2021 Programmed Total

FY 2020 Balance ($4,988.00) $6,382,363.97

$4,000,000.00 $6,804,000.00

$4,680,000.00 $6,707,720.88 $2,846,930.21

FY 2021 Appropriation

FY 2021 Funds Available $3,995,012.00 $13,186,363.97

Minus FY 2021 Programmed Total $0.00 $6,628,203.02

$3,995,012.00 $6,558,160.95Sub-total

$0.00

$0.00

$3,995,012.00 $6,558,160.95FY 2021 Balance

$14,924,651.09 $690,000.00

Number of Projects for FY 2021 By Funding Source

Funding or Managed By Tally

State/Municipal 14

State/Municipal/Other 1

15Total Number of projects

Managed By Tally

Number of Projects for FY 2021 By Managing Lead

Municipality 14

Not Applicable to Date 1

15Total Number of projects

FY 2021 Page 3

(Page 36 of 46)Report Date: 8/1/2018 7:36:05 AM

With Bridge Detail

FiscalYear: 2022 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

Bridge Replacement, Comstock Road over Darby Brook, Br. #046/141 (Municipal Managed Project)

$0.00 $744,000.00 $186,000.00$930,000.00Alstead

40661

52.2 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Mont Vernon Rd over Ceasars Brook, Br. #112/071 (Municipal Managed Project)

$0.00 $732,000.00 $183,000.00$915,000.00Amherst

40654

Under Design

86.0 NPR Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Craig Road over Brook, Br. #117/093 (Municipal Managed Project)

$0.00 $176,000.00 $44,000.00$220,000.00Antrim

14942

Under Negotiations

FY13>14>2249.9 15 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Griffin Mill Road over Maple Falls Brook, Br. #095/127 (Municipal Managed Project)

$0.00 $240,000.00 $60,000.00$300,000.00Auburn

29316

Under Negotiations

20.5 10 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Rehabilitation, Greenhill Rd over Isinglass River, Br. #109/162 (Municipal Managed Project)

$0.00 $1,597,821.60 $399,455.40$1,997,277.00Barrington

26722

Under Design

69.1 C2 Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Beals Road over Baboosic Brook, Br. #105/055 (Municipal Managed Project)

$0.00 $672,908.92 $168,227.23$841,136.15Bedford

24217

Under Design

Need design exception letter35.8 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Lashua Road over Macoma River, Br. #122/136 (Municipal Managed Project)

$0.00 $0.00 $0.00$0.00Canaan

26703

Transdate 4/26/13-Replaced with new project23.90 06 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Clark Pond Road over Clark Pond Brook, Br. #101/152 (Municipal Managed Project)

$0.00 $285,444.00 $71,361.00$356,805.00Canaan

26704

Transdate 4/26/13Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Rehabilitation, Pleasant Street over Mohawk River, Br. #050/099 (Municipal Managed Project)

$0.00 $320,000.00 $80,000.00$400,000.00Colebrook

40655

88.4 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Province Road over Bucks Brook, Br. #151/055 (Municipal Managed Project)

$0.00 $136,000.00 $34,000.00$680,000.00Dorchester $510,000.00

42091

FEMA55.4 06 Remarks:Red List: FSR: WT: No Outlet: NoYes

FY 2022 Page 1

(Page 37 of 46)Report Date: 8/1/2018 7:36:05 AM

With Bridge Detail

FiscalYear: 2022 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

Bridge Replacement, George Street over Beaver Brook, Br. #142/092 (Municipal Managed Project)

$0.00 $552,000.00 $138,000.00$690,000.00Keene

40653

Under Negotiations

26.6 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Court Street over Durkee Brook, Br. #113/036 (Municipal Managed Project)

$0.00 $640,000.00 $160,000.00$800,000.00Laconia

40656

Under Design

53.1 NPR Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Trues Brook Road over Bloods Brook, Br. #066/059 (Municipal Managed Project)

$0.00 $1,035,931.80 $258,982.95$1,294,914.75Lebanon

24221

Under Design

31 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Rehabilitation, Old Bridge Street over Beaver Brook, Br. #109/081 (Municipal Managed Project)

$0.00 $756,000.00 $189,000.00$945,000.00Pelham

29450

Under Design

37.7 10 Remarks:Red List: FSR: WT: No Outlet: NoYes

Repair/Replacement of Bridge, Tully Brook Road over Tully Brook, Br. #155/066 (Municipal Managed Project)

$0.00 $520,000.00 $130,000.00$650,000.00Richmond

29056

Once we receive est. from Br. Design, send est. to Town-Sent to BD 2/27/1476.63 15 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Buffalo Road over Brook, Br. #093/082 (Municipal Managed Project)

$0.00 $360,000.00 $90,000.00$450,000.00Rumney

27162

52.8 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Rehabilitation, Crane Hill Road over Gale River, Br. #202/128 (Municipal Managed Project)

$0.00 $692,000.00 $173,000.00$865,000.00Sugar Hill

24218

Under Design

Estimated FY12 Update Est. 3/22/1234.5 6 Remarks:Red List: FSR: WT: No Outlet: NoYes

FY 2022 Page 2

(Page 38 of 46)Report Date: 8/1/2018 7:36:05 AM

With Bridge Detail

FiscalYear: 2022 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

FY 2022 Programmed Total

FY 2021 Balance $0.00 $6,558,160.95

$4,000,000.00 $6,804,000.00

$0.00 $9,460,106.32 $2,365,026.58

FY 2022 Appropriation

FY 2022 Funds Available $4,000,000.00 $13,362,160.95

Minus FY 2022 Programmed Total $0.00 $9,460,106.32

$4,000,000.00 $3,902,054.63Sub-total

$0.00

$0.00

$4,000,000.00 $3,902,054.63FY 2022 Balance

$12,335,132.90 $510,000.00

Number of Projects for FY 2022 By Funding Source

Funding or Managed By Tally

State/Municipal 16

State/Municipal/Other 1

17Total Number of projects

Managed By Tally

Number of Projects for FY 2022 By Managing Lead

Municipality 17

17Total Number of projects

FY 2022 Page 3

(Page 39 of 46)Report Date: 8/1/2018 7:36:05 AM

With Bridge Detail

FiscalYear: 2023 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

Bridge Replacement, Thornton Ferry Rd over Beaver Brook, Br. #145/106 (Municipal Managed Project)

$0.00 $1,320,000.00 $330,000.00$1,650,000.00Amherst

40657

Under Design

85.9 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Rehabilitation, Grist Mill Hill Road over Indian River, Br. #172/070 (Municipal Managed Project)

$0.00 $400,000.00 $100,000.00$500,000.00Canaan

41406

Under Design

71.0 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Rehabilitation, Washington Street over Swift River, Br. #164/063 (Municipal Managed Project)

$0.00 $1,360,000.00 $340,000.00$1,700,000.00Conway

41402

94.8 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Potter Road over Snow Brook, Br. #058/130 (Municipal Managed Project)

$0.00 $344,000.00 $86,000.00$430,000.00Eaton

41404

Under Design

Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, NH 120 Parking Lot, ped over NHRR(ABD), Br. #121/117 (Municipal Managed Project)

$0.00 $897,280.00 $224,320.00$1,121,600.00Lebanon

24222

66.1 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, US 3 over Baboosic Brook, Br. #118/135 (Municipal Managed Project)

$0.00 $2,656,000.00 $664,000.00$3,320,000.00Merrimack

29174

Under Negotiations

50.9 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Tucker Mill Road over Mid Br Piscataquog River, Br. #087/150 (Municipal Managed Project)

$0.00 $460,000.00 $115,000.00$575,000.00New Boston

15505

FY 2013>2389 NPR Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Clothespin Bridge Road over Blackwater River, Br. #121/103 (Municipal Managed Project)

$0.00 $1,476,000.00 $369,000.00$1,845,000.00Webster

40810

Under Negotiations

41.2 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

FY 2023 Page 1

(Page 40 of 46)Report Date: 8/1/2018 7:36:06 AM

With Bridge Detail

FiscalYear: 2023 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

FY 2023 Programmed Total

FY 2022 Balance $0.00 $3,902,054.63

$4,000,000.00 $6,804,000.00

$0.00 $8,913,280.00 $2,228,320.00

FY 2023 Appropriation

FY 2023 Funds Available $4,000,000.00 $10,706,054.63

Minus FY 2023 Programmed Total $0.00 $8,913,280.00

$4,000,000.00 $1,792,774.63Sub-total

$0.00

$0.00

$4,000,000.00 $1,792,774.63FY 2023 Balance

$11,141,600.00

Number of Projects for FY 2023 By Funding Source

Funding or Managed By Tally

State/Municipal 8

8Total Number of projects

Managed By Tally

Number of Projects for FY 2023 By Managing Lead

Municipality 8

8Total Number of projects

FY 2023 Page 2

(Page 41 of 46)Report Date: 8/1/2018 7:36:06 AM

With Bridge Detail

FiscalYear: 2024 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

Bridge Replacement, Lawrence Road over Blackwater River, Br. #098/093 (Municipal Managed Project)

$0.00 $1,948,000.00 $487,000.00$2,435,000.00Andover

41407

Under Design

47.8 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Page Road over Bela Brook, Br. #065/140 (Municipal Managed Project)

$0.00 $708,240.00 $177,060.00$885,300.00Bow

24223

Under Design

52.5 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Rehabilitation, Bond Street over Nissitissit River, Br. #088/074 (Municipal Managed Project)

$0.00 $352,000.00 $88,000.00$440,000.00Brookline

41408

Under Negotiations

71.7 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Rehabilitation, Mount Orne Road over Connecticut River; Mount Orne Covered Bridge, Br. #039/105 (Municipal Managed Project)

$0.00 $240,000.00 $60,000.00$300,000.00Lancaster

22192

Under Construction

Completed repairs in March 20122.0 BRC Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Freshet Road over Johnson Creek, Br. #160/086 (Municipal Managed Project)

$0.00 $480,000.00 $120,000.00$600,000.00Madbury

41462

Under Negotiations

73.0 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Rehabilitation, Salmon Street WB over RD, BMRR, Merrimack River-Amoskeag Bridge, Br. #106/072 (Municipal Managed Project)

$0.00 $420,000.00 $105,000.00$525,000.00Manchester

24206

Transdate9/11/201267.2 NPR Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Brooklyn Street over Roaring Brook, Br. #108/114(Closed) (Municipal Managed Project)

$0.00 $126,055.55 $31,513.89$157,569.44Northumberland

14234

Complete/Final Audit

4/4/2017

Project cancelled-did not move forward with construction-FV37 BRC Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Lull Road over Peacock Brook, Br. #082/045 (Municipal Managed Project)

$0.00 $236,000.00 $59,000.00$295,000.00Weare

14338

Under Design

54.2 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

FY 2024 Page 1

(Page 42 of 46)Report Date: 8/1/2018 7:36:06 AM

With Bridge Detail

FiscalYear: 2024 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

FY 2024 Programmed Total

FY 2023 Balance $0.00 $1,792,774.63

$0.00 $0.00

$0.00 $4,510,295.55 $1,127,573.89

FY 2024 Appropriation

FY 2024 Funds Available $0.00 $1,792,774.63

Minus FY 2024 Programmed Total $0.00 $4,912,620.80

$0.00 ($3,119,846.17)Sub-total

$0.00

$0.00

$0.00 ($3,119,846.17)FY 2024 Balance

$5,637,869.44

Number of Projects for FY 2024 By Funding Source

Funding or Managed By Tally

State/Municipal 8

8Total Number of projects

Managed By Tally

Number of Projects for FY 2024 By Managing Lead

Municipality 8

8Total Number of projects

FY 2024 Page 2

(Page 43 of 46)Report Date: 8/1/2018 7:36:06 AM

With Bridge Detail

FiscalYear: 2025 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

Bridge Replacement, Old Canaan Road over Spruce Brook, Br. #052/059(New) (Municipal Managed Project)

$0.00 $528,380.80 $132,095.20$660,476.00Barrington

41410

Under Negotiations

Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Birchdale Road over White Brook, Br. #092/136 (Municipal Managed Project)

$0.00 $686,442.80 $171,610.70$858,053.50Bow

24225

Under Construction

69.7 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Center Street over Harry Brook, Br. #129/116 (Municipal Managed Project)

$0.00 $636,000.00 $159,000.00$795,000.00Goffstown

41597

84.9 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Old County Farm Road over Blood Brook, Br. #060/118 (Municipal Managed Project)

$0.00 $176,000.00 $44,000.00$220,000.00Wilton

15768

Sent to Bridge Design 5/3/165.3 03F Remarks:Red List: FSR: WT: No Outlet: NoYes

FY 2025 Programmed Total

FY 2024 Balance $0.00 ($3,119,846.17)

$0.00 $0.00

$0.00 $2,026,823.60 $506,705.90

FY 2025 Appropriation

FY 2025 Funds Available $0.00 ($3,119,846.17)

Minus FY 2025 Programmed Total $0.00 $176,000.00

$0.00 ($3,295,846.17)Sub-total

$0.00

$0.00

$0.00 ($3,295,846.17)FY 2025 Balance

$2,533,529.50

Number of Projects for FY 2025 By Funding Source

Funding or Managed By Tally

State/Municipal 1

1Total Number of projects

Managed By Tally

Number of Projects for FY 2025 By Managing Lead

Municipality 1

1Total Number of projects

FY 2025 Page 1

(Page 44 of 46)Report Date: 8/1/2018 7:36:06 AM

With Bridge Detail

FiscalYear: 2026 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

Bridge Replacement, River Road over Bow Bog Brook, Br. #184/127 (Municipal Managed Project)

$0.00 $728,240.00 $182,060.00$910,300.00Bow

24224

Under Design

96.8 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Phase I & II: Shaker Blvd over Knox River, Br. #120/115 (Municipal Managed Project)

$0.00 $240,000.00 $60,000.00$300,000.00Enfield

13592

Moved from FY02>04>08>10>11>12>2631.8 NPR Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Rehabilitation, US 3 (Elm Street) over B&MRR, Br. #144/075 (Municipal Managed Project)

$0.00 $640,000.00 $160,000.00$800,000.00Manchester

15837

63.2 NPR Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Gregg Mill Road over South Branch Piscataquog River, Br. #132/138 (Municipal Managed Project)

$0.00 $620,000.00 $155,000.00$775,000.00New Boston

14771

FY 2012>14>2662.4 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

FY 2026 Programmed Total

FY 2025 Balance $0.00 ($3,295,846.17)

$0.00 $0.00

$0.00 $2,228,240.00 $557,060.00

FY 2026 Appropriation

FY 2026 Funds Available $0.00 ($3,295,846.17)

Minus FY 2026 Programmed Total $0.00 $2,228,240.00

$0.00 ($5,524,086.17)Sub-total

$0.00

$0.00

$0.00 ($5,524,086.17)FY 2026 Balance

$2,785,300.00

Number of Projects for FY 2026 By Funding Source

Funding or Managed By Tally

State/Municipal 4

4Total Number of projects

Managed By Tally

Number of Projects for FY 2026 By Managing Lead

Municipality 4

4Total Number of projects

FY 2026 Page 1

(Page 45 of 46)Report Date: 8/1/2018 7:36:06 AM

With Bridge Detail

FiscalYear: 2027 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

Bridge Replacement, Hartshorn Road over Hartshorn Brook, Br. #102/165

$0.00 $532,000.00 $133,000.00$665,000.00Milford

42087

Under Negotiations

97.0 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

FY 2027 Programmed Total

FY 2026 Balance $0.00 ($5,524,086.17)

$0.00 $0.00

$0.00 $532,000.00 $133,000.00

FY 2027 Appropriation

FY 2027 Funds Available $0.00 ($5,524,086.17)

Minus FY 2027 Programmed Total $0.00 $0.00

$0.00 ($5,524,086.17)Sub-total

$0.00

$0.00

$0.00 ($5,524,086.17)FY 2027 Balance

$665,000.00

FY 2027 Page 1

(Page 46 of 46)Report Date: 8/1/2018 7:36:06 AM

With Bridge Detail

Bridge Estimates Issued to Municipalities - Awaiting Town Action to Raise Funds and Request Construction Aid 152 Projects Awaiting Town Action

PROJECT NAMEPROJ #

DESCRIPTION / IMPROVEMENT CURRENT ESTIMATE

FEDERAL SHARE

STATE SHARE TOWN / CITY SHARE

TRANDATE

Bridge Replacement, Grout Hill Road over Cold River, Br. #147/067

Acworth $0.00 $480,000.00 $120,000.00$600,000.002 Projects

2/24/2005

Bridge Replacement, Allen Road over Cold River, Br. #164/114

$0.00 $900,000.00 $225,000.00$1,125,000.005/26/2017

Bridge Replacement, Drake Hill Road over Meadow Brook, Br. #213/094

Albany $0.00 $603,200.00 $150,800.00$754,000.001 Project

7/1/2023

Bridge Replacement, Brock Road over Brock Brook, Br. #100/116

Alexandria $0.00 $280,000.00 $70,000.00$350,000.001 Project

8/7/2002

Bridge Replacement, Hill Road over Bradley Brook, Br. #104/078

Andover $0.00 $196,000.00 $49,000.00$245,000.005 Projects

7/30/1996

Bridge Rehabilitation, Last Street over Sucker Brook, Br. #216/139

$0.00 $116,000.00 $29,000.00$145,000.007/30/1996

Bridge Replacement, Hoyt Road over Sucker Brook, Br. #197/146(Closed)

$0.00 $120,000.00 $30,000.00$150,000.007/30/1996

Repair/Replacement of Bridge, Tucker Mountain Road over Sucker Brook, Br. #180/147

$0.00 $140,000.00 $35,000.00$175,000.007/30/1996

Bridge Replacement, Taunton Hill Road over Mountain Brook, Br. #125/129

$0.00 $180,000.00 $45,000.00$225,000.007/30/1996

Bridge Replacement, Auburn-Preston Brook Culvert on Raymond Road, Br. #118/136(New)

Auburn $0.00 $196,000.00 $49,000.00$245,000.001 Project

3/19/1998

22872

Bridge Replacement, Church Street over Tioga River, Br. #103/072(Municipal Managed Project)

Belmont

1 Project

7/1/2019

Page 1 of 11Printed: 8/1/2018 7:37:10 AM Awaiting Town Action

PROJECT NAMEPROJ #

DESCRIPTION / IMPROVEMENT CURRENT ESTIMATE

FEDERAL SHARE

STATE SHARE TOWN / CITY SHARE

TRANDATE

Bridge Replacement, Johnson Hill Road over West Branch Brook, Br. #104/141

Bradford $0.00 $260,000.00 $65,000.00$325,000.004 Projects

9/14/2004

Bridge Replacement, Blaisdell Lake Road over stream, Br. #168/165, 168/162

$0.00 $344,000.00 $86,000.00$430,000.009/14/2004

Bridge Replacement, West (Meadow) Road over Hoyt Brook, Br. #098/117

$0.00 $240,000.00 $60,000.00$300,000.006/23/2009

Bridge Replacement, Water Street over West Branch Brook, Br. #126/150

$0.00 $704,000.00 $176,000.00$880,000.005/26/2017

Bridge Replacement, Dupaw Gould Road over Lancy Brook, Br. #065/085

Brookline $0.00 $896,000.00 $224,000.00$1,120,000.001 Project

5/26/2017

Bridge Replacement, Miclon Road over Conner Brook, Br. #112/116

Campton $0.00 $276,000.00 $69,000.00$345,000.002 Projects

7/20/2000

Bridge Replacement, Miclon Road over Conner Brook, Br. #114/121

$0.00 $296,000.00 $74,000.00$370,000.007/20/2000

Repair/Replacement of Bridge, Transfer Station Road over Orange Brook, Br. #191/080

Canaan $0.00 $452,000.00 $113,000.00$565,000.001 Project

7/1/2020

Bridge Replacement, Chestnut Flat Road over Little Sugar River, Br. #071/115(CLOSED)

Charlestown $0.00 $420,000.00 $105,000.00$525,000.001 Project

11/17/1998

Bridge Rehabilitation, Plains Road over Sugar River, Br. #091/118

Claremont $0.00 $508,000.00 $127,000.00$635,000.002 Projects

5/26/2017

Bridge Replacement, Myrtle Street over Concord-Claremont R W, Br. #123/090

$0.00 $916,000.00 $229,000.00$1,145,000.005/31/2017

Bridge Replacement, Little Blakely Road over Mohawk River, Br. #125/069

Colebrook $0.00 $332,000.00 $83,000.00$415,000.001 Project

12/4/2002

Repair/Replacement of Bridge, Bungy Road over East Branch Summers Stream, Br. #228/109

Columbia $0.00 $220,000.00 $55,000.00$275,000.002 Projects

11/30/1999

Repair/Replacement of Bridge, Meriden Hill Road over Lyman Brook, Br. #054/032

$0.00 $508,000.00 $127,000.00$635,000.009/18/2013

Bridge Replacement, Clark Camp Road over Mill Brook, Br. #151/122

Cornish $0.00 $280,000.00 $70,000.00$350,000.001 Project

10/8/2008

Page 2 of 11Printed: 8/1/2018 7:37:10 AM Awaiting Town Action

PROJECT NAMEPROJ #

DESCRIPTION / IMPROVEMENT CURRENT ESTIMATE

FEDERAL SHARE

STATE SHARE TOWN / CITY SHARE

TRANDATE

Bridge Replacement, Hurlburt Road over Brook, Br. #125/130

Dalton $0.00 $260,000.00 $65,000.00$325,000.001 Project

10/18/2011

Bridge Replacement, Phase II: Forbes Mountain Road over Wild Meadow Brook, Br. #103/100

Danbury $0.00 $700,000.00 $175,000.00$875,000.001 Project

5/30/2006

Repair/Replacement of Bridge, NH 28 (Rockingham Road) over Tributary G to Beaver Brook, Br. #078/090(New)

Derry $0.00 $548,000.00 $137,000.00$685,000.003 Projects

8/24/2012

Bridge Replacement, North High Street over Shields Brook, Br. #053/110(New)

$0.00 $588,000.00 $147,000.00$735,000.008/24/2012

Bridge Replacement, North Shore Road over Taylor Brook, Br. #163/080(New)

$0.00 $390,701.60 $97,675.40$488,377.007/1/2017

Bridge Replacement, Durham Point Road over Crommet Creek, Br. #150/065

Durham $0.00 $684,000.00 $171,000.00$855,000.001 Project

10/14/2003

Bridge Rehabilitation, Granite Road over South River, Br. #166/082

Effingham $0.00 $480,000.00 $120,000.00$600,000.002 Projects

6/25/2008

Bridge Replacement, Stevens Road over Brook, Br. #181/072

$0.00 $336,000.00 $84,000.00$420,000.006/25/2008

Bridge Replacement, Boy's Camp Road over Bicknell Brook, Br. #172/112

Enfield $0.00 $640,000.00 $160,000.00$800,000.001 Project

12/9/2004

Repair/Replacement of Bridge, Main Street over Lamprey River, Br. #109/055

Epping $0.00 $520,000.00 $130,000.00$650,000.002 Projects

7/1/2010

Bridge Replacement, Blake Road over Lamprey River, Br. #059/054

$0.00 $844,000.00 $211,000.00$1,055,000.007/6/2010

Bridge Replacement, Cass Road over Little Suncook River, Br. #128/120, 128/121

Epsom $0.00 $524,000.00 $131,000.00$655,000.002 Projects

5/9/2002

Bridge Replacement, River Road over Deer Brook, Br. #065/072

$0.00 $460,000.00 $115,000.00$575,000.0011/10/2010

Bridge Rehabilitation, Phase II: Templeton Turnpike over Priest Brook, Br. #147/054

Fitzwilliam $0.00 $276,000.00 $69,000.00$345,000.001 Project

6/30/2003

Page 3 of 11Printed: 8/1/2018 7:37:10 AM Awaiting Town Action

PROJECT NAMEPROJ #

DESCRIPTION / IMPROVEMENT CURRENT ESTIMATE

FEDERAL SHARE

STATE SHARE TOWN / CITY SHARE

TRANDATE

Bridge Replacement, Old County Road over Collins Brook, Br. #091/142

Francestown $0.00 $740,000.00 $185,000.00$925,000.001 Project

5/30/2017

Bridge Rehabilitation, Scribner Road over Exeter River, Br. #106/076

Fremont $0.00 $468,000.00 $117,000.00$585,000.001 Project

7/6/2011

Bridge Replacement, MummeryRoad East over Cold Brook, Br. #083/090

Goshen $0.00 $528,000.00 $132,000.00$660,000.001 Project

5/30/2017

Bridge Rehabilitation, Wild Meadows Road over Brook, Br. #210/107(Municipal Managed Project)

Grafton $0.00 $368,000.00 $92,000.00$460,000.001 Project

10/26/2011

Bridge Replacement, Olde Farm Road over Skinner Brook, Br. #107/113

Grantham $0.00 $796,000.00 $199,000.00$995,000.004 Projects

7/30/2008

Bridge Replacement, Olde Farms Road over Sawyer Brook, Br. #083/108

$516,000.00 $0.00 $129,000.00$645,000.007/30/2008

Bridge Rehabilitation, Miller Pond Rd/Skinner Brook, Br. #105/128

$0.00 $96,000.00 $24,000.00$120,000.007/30/2008

Bridge Replacement, Frye Lane over Stony Brook, Br. #108/147

$0.00 $320,000.00 $80,000.00$400,000.007/6/2010

Repair/Replacement of Bridge, Wilton Road over Souhegan River, Br. #075/114

Greenville $0.00 $2,576,000.00 $644,000.00$3,220,000.001 Project

7/17/2013

Bridge Replacement, Old Stage Road over Taylor River, Br. #086/123(CLOSED)

Hampton $0.00 $332,000.00 $83,000.00$415,000.001 Project

10/25/1995

Bridge Replacement, Mill Road over Moose Brook, Br. #121/116(CLOSED)

Hancock $0.00 $216,000.00 $54,000.00$270,000.003 Projects

9/9/1998

Bridge Replacement, Middle Road over Small Brook, Br. #107/074

$0.00 $68,000.00 $17,000.00$85,000.003/2/2007

Bridge Replacement, Old Dublin Rd #62 over Hosley Brook, Br. #095/090(Municipal Managed Project)

$0.00 $524,000.00 $131,000.00$655,000.0011/29/2011

Bridge Rehabilitation, School House Lane over Mink Brook, Br. #108/066

Hanover $0.00 $80,000.00 $20,000.00$100,000.001 Project

5/6/1998

Page 4 of 11Printed: 8/1/2018 7:37:10 AM Awaiting Town Action

PROJECT NAMEPROJ #

DESCRIPTION / IMPROVEMENT CURRENT ESTIMATE

FEDERAL SHARE

STATE SHARE TOWN / CITY SHARE

TRANDATE

Bridge Replacement, Bunker Hill Road over Needle Shop Brook

Hill $0.00 $596,000.00 $149,000.00$745,000.001 Project

5/31/2017

Bridge Replacement, Stowe Mountain Road over Shedd Brook, Br. #053/103(New)

Hillsborough $0.00 $872,000.00 $218,000.00$1,090,000.002 Projects

7/1/2019

Bridge Replacement, Bog Road (Melody Rd) over Sand Brook, Br. #152/095

$0.00 $776,000.00 $194,000.00$970,000.007/16/2013

Bridge Replacement, Stickney Hill Road over Boutwell Mill Brook, Br. #178/039

Hopkinton $0.00 $392,000.00 $98,000.00$490,000.002 Projects

7/1/2020

Bridge Rehabilitation, East Penacook Road over Blackwater River, Br. #134/166

$0.00 $480,000.00 $120,000.00$600,000.005/31/2017

Bridge Replacement, Dundee Road over Mill Brook, Br. #198/046

Jackson $0.00 $468,000.00 $117,000.00$585,000.003 Projects

7/22/2004

Bridge Rehabilitation, Wilson Road over Great Brook, Br. #157/079

$0.00 $420,000.00 $105,000.00$525,000.005/11/2009

Bridge Rehabilitation, Melloon Road over Wildcat Brook, Br. #135/122

$0.00 $280,000.00 $70,000.00$350,000.005/11/2009

Bridge Replacement, Beaver Street over Beaver Brook, Br. #140/079(Municipal Managed Project)

Keene $0.00 $524,000.00 $131,000.00$655,000.001 Project

7/1/2018

Bridge Rehabilitation, Messer Street over Winnpesaukee River, Br. #122/058

Laconia $0.00 $760,000.00 $190,000.00$950,000.002 Projects

8/18/2010

Bridge Replacement, Hilliard Road over Pickerel Cove Brook, Br. #112/147(New)

$0.00 $448,800.00 $96,000.00$544,800.001/7/2024

Bridge Replacement, McGary Hill Road over Otter Brook, Br. #218/076

Lancaster $0.00 $240,000.00 $60,000.00$300,000.001 Project

11/3/2005

Bridge Rehabilitation, Riverside Drive over Mascoma River, Br. #154/113

Lebanon $0.00 $655,520.00 $163,880.00$819,400.001 Project

5/26/2017

Page 5 of 11Printed: 8/1/2018 7:37:11 AM Awaiting Town Action

PROJECT NAMEPROJ #

DESCRIPTION / IMPROVEMENT CURRENT ESTIMATE

FEDERAL SHARE

STATE SHARE TOWN / CITY SHARE

TRANDATE

Bridge Replacement, Schrenk Road over Cold Brook, Br. #117/156

Lempster $0.00 $224,000.00 $56,000.00$280,000.003 Projects

6/17/1996

Bridge Replacement, Mountain Road over Ashuelot River, Br. #148/067

$0.00 $640,000.00 $160,000.00$800,000.0011/10/2010

Bridge Replacement, Keyes Hollow Road over Cold River, Br. #055/151

$0.00 $540,000.00 $135,000.00$675,000.0011/10/2010

Bridge Replacement, East Madison Road over Frost Brook, Br. #111/082

Madison $0.00 $552,000.00 $138,000.00$690,000.001 Project

1/21/2011

Bridge Replacement, Bodwell Road over Cohas Brook, Br. #209/155

Manchester $0.00 $696,000.00 $174,000.00$870,000.001 Project

11/1/2012

Bridge Replacement, Lewis Road over Ashuelot River, Br. #104/039

Marlow $0.00 $580,000.00 $145,000.00$725,000.001 Project

12/6/2005

Bridge Rehabilitation, US 3 over Souhegan River - Chamberlain Bridge, Br. #116/120

Merrimack $0.00 $172,000.00 $43,000.00$215,000.001 Project

7/1/2017

Bridge Replacement, Ridge Road over Jones Brook, Br. #082/109

Middleton $0.00 $360,000.00 $90,000.00$450,000.002 Projects

11/20/1998

Bridge Replacement, Silver Street Road over Outlet of Sunrise Lake, Br. #058/033

$0.00 $292,000.00 $73,000.00$365,000.0011/20/1998

Bridge Replacement, Mason Road over Great Brook, Br. #089/106

Milford $0.00 $548,000.00 $137,000.00$685,000.001 Project

5/26/2017

Bridge Replacement, Hopper Road over Salmon Falls River, Br. #064/167

Milton $0.00 $360,000.00 $90,000.00$450,000.004 Projects

11/13/1998

Bridge Rehabilitation, Church Street over Salmon Falls River, Br. #077/163

$0.00 $404,000.00 $101,000.00$505,000.0011/23/1998

Bridge Replacement, Allen Hastings Way over Jones Brook, Br. #104/109(Closed)

$0.00 $312,000.00 $78,000.00$390,000.0011/13/1998

Bridge Replacement, Winding Road over Lyman Brook, Br. #190/101

$0.00 $864,000.00 $216,000.00$1,080,000.005/30/2017

Bridge Replacement, Murdough Hill Road over brook, Br. #073/098

Nelson $0.00 $288,000.00 $72,000.00$360,000.001 Project

9/9/1998

Page 6 of 11Printed: 8/1/2018 7:37:11 AM Awaiting Town Action

PROJECT NAMEPROJ #

DESCRIPTION / IMPROVEMENT CURRENT ESTIMATE

FEDERAL SHARE

STATE SHARE TOWN / CITY SHARE

TRANDATE

Bridge Rehabilitation, Coolidge Woods Road over Blake Brook, Br. #055/074

New Hampton $0.00 $180,000.00 $45,000.00$225,000.003 Projects

12/26/2006

Bridge Replacement, Coolidge Woods Road over Wallace Brook, Br. #035/051

$0.00 $344,000.00 $86,000.00$430,000.0011/8/2006

Bridge Replacement, Brook Road over Blake Brook, Br. #061/069

$0.00 $380,000.00 $95,000.00$475,000.0012/14/2009

Bridge Replacement, Mountain Road over Andrew Brook, Br. #094/080

Newbury $0.00 $212,000.00 $53,000.00$265,000.003 Projects

9/4/1998

Bridge Replacement, Mountain Road over unnamed brook, Br. #078/039

$0.00 $132,000.00 $33,000.00$165,000.009/4/1998

Bridge Replacement, Mountain Road over Andrew Brook, Br. #100/090

$0.00 $260,000.00 $65,000.00$325,000.009/4/1998

Bridge Replacement, New Road over Boston and Maine RR, Br. #130/083

Newfields $0.00 $672,000.00 $168,000.00$840,000.001 Project

10/19/2011

Bridge Replacement, Greenwood Road over Dodge Brook, Br. #097/139(Closed)

Newport $0.00 $300,000.00 $75,000.00$375,000.001 Project

12/26/2006

Repair/Replacement of Bridge, Old Canterbury Road over Narrows Brook, Br. #045/100

Northwood $0.00 $104,000.00 $26,000.00$130,000.001 Project

5/26/2017

Repair/Replacement of Bridge, Town Road #100 over Archertown Brook, Br. #114/113(Culvert)

Orford $0.00 $611,200.00 $152,800.00$764,000.002 Projects

5/24/2018

Bridge Replacement, Grimes Hill Road over Indian Pond Brook, Br. #120/173

$0.00 $456,000.00 $114,000.00$570,000.005/31/2017

Bridge Replacement, Bean Mountain Road over Lovell River, Br. #075/262(Force Acct DOT-Br. Maint)

Ossipee $0.00 $80,000.00 $20,000.00$100,000.003 Projects

5/28/1999

Bridge Replacement, Paddy Acre Road over Brook, Br. #147/233

$0.00 $152,000.00 $38,000.00$190,000.009/11/2002

Bridge Replacement, Valley Road over Dan Hole River, Br. #123/233

$0.00 $204,000.00 $51,000.00$255,000.005/14/2004

Bridge Replacement, Moeckel Road over Golden Brook, Br. #124/131(CLOSED)

Pelham $0.00 $268,000.00 $67,000.00$335,000.001 Project

8/8/2000

Page 7 of 11Printed: 8/1/2018 7:37:11 AM Awaiting Town Action

PROJECT NAMEPROJ #

DESCRIPTION / IMPROVEMENT CURRENT ESTIMATE

FEDERAL SHARE

STATE SHARE TOWN / CITY SHARE

TRANDATE

Bridge Rehabilitation, Buck Street over Hartford Brook, Br. #182/106

Pembroke $0.00 $140,000.00 $35,000.00$175,000.001 Project

12/20/2005

Bridge Rehabilitation, Cate Street over Hodgson Brook, Br. #198/107

Portsmouth $0.00 $260,000.00 $65,000.00$325,000.005 Projects

9/18/2000

Bridge Rehabilitation, Woodbury Ave over Hodgson Brook, Br. #204/101

$0.00 $228,000.00 $57,000.00$285,000.009/20/2000

Repair/Replacement of Bridge, Pierces Island Road over Little Harbor, Br. #241/069

$0.00 $2,000,000.00 $500,000.00$2,500,000.0011/28/2000

Repair/Replacement of Bridge, Maplewood Ave over North Mill Road, Br. #231/103

$0.00 $880,000.00 $220,000.00$1,100,000.0011/2/2000

Bridge Rehabilitation, Coakley Road over Hodgson Brook, Br. #191/110

$0.00 $132,000.00 $33,000.00$165,000.009/18/2000

29055

Bridge Replacement, Whipple Hill Road over Roaring Brook, Br. #065/083(Municipal Managed Project)

Richmond $0.00 $892,000.00 $223,000.00$1,115,000.001 Project

7/1/2020

Bridge Rehabilitation, Converseville Road over Converseville Brook, Br. #153/073

Rindge $0.00 $180,000.00 $45,000.00$225,000.001 Project

10/3/2003

Repair/Replacement of Bridge, Rochecter Neck Road over Isinglass River, Br. #225/139

Rochester $0.00 $0.00 $0.00$0.001 Project

5/31/2017

Bridge Replacement, Old Mill Lane over Rollins Brook, Br. #090/052

Rollinsford $0.00 $772,000.00 $193,000.00$965,000.001 Project

5/30/2017

Bridge Replacement, Old Route 25 over Creamery Brook, Br. #076/087(6/12/06)

Rumney $0.00 $300,000.00 $75,000.00$375,000.005 Projects

1/30/2007

Bridge Rehabilitation, Old Route 25 over Emerald Brook, Br. #100/060

$0.00 $80,000.00 $20,000.00$100,000.003/2/2007

Bridge Replacement, East Rumney Road over Brook, Br. #202/100(6/12/06)

$0.00 $240,000.00 $60,000.00$300,000.001/30/2007

Bridge Replacement, Old Route 25 over Stewart Brook, Br. #077/085(6/12/06)

$0.00 $308,000.00 $77,000.00$385,000.001/30/2007

Bridge Rehabilitation, Sand Hill Road over Baker River, Br. #079/092

$0.00 $200,000.00 $50,000.00$250,000.002/4/2009

Page 8 of 11Printed: 8/1/2018 7:37:12 AM Awaiting Town Action

PROJECT NAMEPROJ #

DESCRIPTION / IMPROVEMENT CURRENT ESTIMATE

FEDERAL SHARE

STATE SHARE TOWN / CITY SHARE

TRANDATE

Repair/Replacement of Bridge, Bridge Street over Spicket River, Br. #115/097(Municipal Managed Project)

Salem

1 Project

Bridge Replacement, Chapman Road over Patterson Brook, Br. #219/072

Sanbornton $0.00 $280,000.00 $70,000.00$350,000.001 Project

6/23/2009

Bridge Rehabilitation, Durgin Bridge Road over Cold River, Br. #226/119

Sandwich $0.00 $64,000.00 $16,000.00$80,000.002 Projects

11/20/2009

Bridge Rehabilitation, Basket Street over Bearcamp River, Br. #157/101

$0.00 $160,000.00 $40,000.00$200,000.005/16/2011

Bridge Rehabilitation, Whitehall Road over Powwow River, Br. #099/062

South Hampton $0.00 $204,000.00 $51,000.00$255,000.002 Projects

10/5/1999

Bridge Replacement, Hilldale Ave over Powwow River, Br. #069/066

$0.00 $1,260,000.00 $315,000.00$1,575,000.005/30/2017

Bridge Replacement, Star Lake Road over Star Lake Outlet, Br. #092/052

Springfield $0.00 $260,000.00 $65,000.00$325,000.003 Projects

7/7/2008

Bridge Replacement, George Hill Road over Gove Brook, Br. #071/138

$0.00 $300,000.00 $75,000.00$375,000.007/7/2008

Bridge Rehabilitation, George Hill Road over Bog Brook, Br. #064/152

$0.00 $140,000.00 $35,000.00$175,000.007/7/2008

Bridge Replacement, Barn Door Gap Road over Big River, Br. #057/135

Strafford $0.00 $940,000.00 $235,000.00$1,175,000.001 Project

5/30/2017

Bridge Replacement, Tetu Road over Stratford Bog Brook, Br. #124/086

Stratford $0.00 $228,000.00 $57,000.00$285,000.001 Project

3/15/2005

Bridge Replacement, Joslyn Road over Merriam Brook, Br. #090/090

Surry $0.00 $552,000.00 $138,000.00$690,000.001 Project

7/6/2010

41696

Bridge Rehabilitation, Rabbitt Hollow Road over Perry Brook, Br. #120/072

Swanzey

1 Project

7/1/2018

Page 9 of 11Printed: 8/1/2018 7:37:12 AM Awaiting Town Action

PROJECT NAMEPROJ #

DESCRIPTION / IMPROVEMENT CURRENT ESTIMATE

FEDERAL SHARE

STATE SHARE TOWN / CITY SHARE

TRANDATE

Bridge Replacement, Chocura Lake Road over Chocura Lake Outlet, Br. #069/157(Municipal Managed Project)

Tamworth $0.00 $360,000.00 $90,000.00$450,000.002 Projects

12/30/1998

Bridge Rehabilitation, Bryant Road over Mill Brook, Br. #145/118

$0.00 $180,000.00 $45,000.00$225,000.0012/30/1998

Bridge Replacement, Powers Road over Blood Brook, Br. #107/117

Temple $0.00 $368,000.00 $92,000.00$460,000.002 Projects

11/3/2008

Bridge Replacement, North Road over Brook, Br. #110/143

$0.00 $432,000.00 $108,000.00$540,000.0011/4/2008

Bridge Replacement, Sodom Road over Melvin River, Br. #134/089

Tuftonboro $0.00 $188,000.00 $47,000.00$235,000.002 Projects

5/30/2017

Bridge Replacement, Tuftonboro Neck Road over Winter Harbor, Br. #241/099

$0.00 $724,000.00 $181,000.00$905,000.005/31/2017

Bridge Replacement, Neal Mine Road over Little Sugar River, Br. #062/046

Unity $0.00 $536,000.00 $134,000.00$670,000.005 Projects

7/1/2013

Bridge Rehabilitation, Cold Pond Rd over Little Suger River, Br. #092/040

$0.00 $284,000.00 $71,000.00$355,000.007/5/2011

Bridge Replacement, South Slack Rd over Little Sugar River, Br. #101/046

$0.00 $580,000.00 $145,000.00$725,000.0010/31/2012

Bridge Replacement, Quaker City Rd over Little Suger River, Br. #086/039

$0.00 $584,000.00 $146,000.00$730,000.0010/31/2012

Bridge Replacement, Stage Road over Little Sugar River(Municipal Managed Project)

$0.00 $820,000.00 $205,000.00$1,025,000.0010/31/2012

Bridge Rehabilitation, Canal Road over Great East Lake Outlet, Br. #186/118(Municipal Managed Project)

Wakefield $0.00 $360,000.00 $90,000.00$450,000.003 Projects

2/19/2010

Bridge Replacement, Old Walefield Road over Pine Brook, Br. #096/032

$0.00 $756,000.00 $189,000.00$945,000.001/21/2011

Bridge Replacement, Maple Street over Branch River, Br. #290/064

$0.00 $704,000.00 $176,000.00$880,000.008/1/2013

Page 10 of 11Printed: 8/1/2018 7:37:12 AM Awaiting Town Action

PROJECT NAMEPROJ #

DESCRIPTION / IMPROVEMENT CURRENT ESTIMATE

FEDERAL SHARE

STATE SHARE TOWN / CITY SHARE

TRANDATE

Bridge Replacement, Wentworth Road over Houghton Brook, Br. #213/076

Walpole $0.00 $308,000.00 $77,000.00$385,000.001 Project

10/13/2003

Bridge Replacement, Breezy Point Road over Baker River, Br. #154/122

Warren $0.00 $500,000.00 $125,000.00$625,000.002 Projects

6/27/2000

Bridge Replacement, Studio Road over Brook, Br. #134/100

$0.00 $212,000.00 $53,000.00$265,000.006/27/2000

Bridge Replacement, Smith Pond Road over Shedd Brook, Br. #180/046(Municipal Managed Project)

Washington $0.00 $456,000.00 $114,000.00$570,000.001 Project

11/29/2011

Repair/Replacement of Bridge, West Branch Road over Mad River, Br. #126/123(Municipal Managed Project)

Waterville Valley $0.00 $360,000.00 $90,000.00$450,000.001 Project

1/21/2011

Bridge Replacement, Rowentown Road over Rocky Branch, Br. #111/068

Wentworth $0.00 $636,000.00 $159,000.00$795,000.001 Project

7/1/2019

Bridge Rehabilitation, Makinen Road over Mill Brook, Br. #151/125

Westmoreland $0.00 $380,000.00 $95,000.00$475,000.004 Projects

3/8/2006

Bridge Replacement, Spofford Road over Partridge Brook, Br. #138/038

$0.00 $248,000.00 $62,000.00$310,000.001/4/2006

Bridge Replacement, South Village Road over Mill Brook, Br. #167/120

$0.00 $220,000.00 $55,000.00$275,000.003/8/2006

Bridge Replacement, River Road South over Partridge Brook, Br. #089/100

$0.00 $1,040,000.00 $260,000.00$1,300,000.001/21/2011

Bridge Replacement, Frye Mill Road over Burton Pond Outlet, Br. #080/145

Wilton $0.00 $252,000.00 $63,000.00$315,000.001 Project

3/2/2007

Bridge Replacement, Bridge Street over Ashuelot River, Br. #122/096

Winchester $0.00 $800,000.00 $200,000.00$1,000,000.002 Projects

9/15/2004

Bridge Replacement, Burt Hill Road over Pouchaug Brook, Br. #081/022

$0.00 $704,000.00 $176,000.00$880,000.007/1/2021

152 Projects Awaiting Town Action $516,000.00 $66,317,421.60 $16,692,155.40$83,525,577.00EstimateTotal For

Page 11 of 11Printed: 8/1/2018 7:37:13 AM Awaiting Town Action

PROJECT NAME DESCRIPTION / IMPROVEMENT REMARKS

REQUESTS FOR ESTIMATES - WORK IN PROGRESS

Sent to BD 10/20/14-Est.send to PCA dated 11/6/14Repair/Replacement of Bridge, Forest Road over Great Brook, Br. #105/035Acworth

Sent to BD 1/25/17Repair/Replacement of Bridge, Brook Road over Joe English Brook, Br. #063/118Amherst

Sent to BD 12/12/17Repair/Replacement of Bridge, Antrim Road over Monadnock Mill Canal, Br. #095/093

Bennington

Sent to BD 2/10/17Repair/Replacement of Bridge, Iron Works Road over Turkey River, Br. #190/067Concord

Sent BD 2/10/17Repair/Replacement of Bridge, Washington Street over Canal Inlet, Br. #048/082Concord

Sent to BD 2/7/17Repair/Replacement of Bridge, Walker Brook Road over Frazier Brook, Br. #178/057

Danbury

Sent to BD 2/7/17Repair/Replacement of Bridge, Bohonnon Road over Wild Meadow Brook, Br. #112/108

Danbury

Req to BD to update estimate on 11/7/14-NDYBridge Replacement, Paulson Road over Brook, Br. #101/125Farmington

Req to BD to update estimate on 11/7/14-NDYBridge Replacement, Sheepboro Road over Berry's River, Br. #142/050Farmington

Sent to BD 3/12/14-Est sent to PCA dated 11/06/14Repair/Replacement of Bridge, Russell Station Road over Rand Brook, Br. #114/062

Francestown

Sent to BD 8/4/17Repair/Replacement of Bridge, Bickford Hill Road over Ham Branch, Br. #055/101Franconia

Sent to BD 12/28/16Repair/Replacement of Bridge, Summit AvenueGilford

Sent to BD 11/10/16Repair/Replacement of Bridge, School House Road over Brook, Br. #151/089Greenfield

Sent to Bridge Design 4/18/16Repair/Replacement of Bridge, Sculptured Rocks Road over Atwell Brook, Br. #123/057

Groton

Sent to BD 9/18/13-Est. sent to PCA dated 11/3/14Repair/Replacement of Bridge, Broad Cove Road over Dolf Brook, Br. #154/136Hopkinton

Page 1 of 3Printed: 8/1/2018 7:37:53 AM

PROJECT NAME DESCRIPTION / IMPROVEMENT REMARKS

REQUESTS FOR ESTIMATES - WORK IN PROGRESS

Sent to Bridge Design 5/13/2016Repair/Replacement of Bridge, NH111 WB over MERRIMACK RIVER, Br. #109/068Hudson

Sent to Bridge Design 5/13/2016Repair/Replacement of Bridge, NH111 EB over MERRIMACK RIVER, Br. #110/068Hudson

Sent to BD 2/1/18Repair/Replacement of Bridge, Summit Road over Black Brook, Br. #091/099Keene

Sent to BD 2/1/18Repair/Replacement of Bridge, Ferry Brook Road over Ferry Brook, Br. #173/135Keene

Sent to BD 2/1/18Repair/Replacement of Bridge, Whitcomb Mills Road over White Brook, Br. #079/080

Keene

Sent to BD 2/1/18Repair/Replacement of Bridge, Church Street over Beaver Brook, Br. #140/075Keene

Sent to BD 2/1/18Repair/Replacement of Bridge, Maple Avenue over Black Brook, Br. #090/101Keene

Sent to BD 2/21/17Repair/Replacement of Bridge, Wilton Road over Souhegan River, Br. #052/135Milford

Sent to BD 2/21/17Repair/Replacement of Bridge, NH Rte 13 (Purgatory Rd) over Souhegan River, Br. #073/154

Milford

Sent to Bridge Design 4/18/16Repair/Replacement of Bridge, Old Canterbury Road over Narrows Brook, Br. #045/100

Northwood

Sent to BD 12/21/17Repair/Replacement of Bridge, Powers Bridge Road over Brook, Br. #091/067Peterborough

Sent to BD 12/21/17Repair/Replacement of Bridge, Morrison Road over Contoocook River, Br. #081/069Peterborough

Sent to BD 12/21/17Repair/Replacement of Bridge, Slab Road over Otter Brook, Br. #132/134Peterborough

Sent to BD 5/4/17Repair/Replacement of Bridge, Colby Hill Road over Bloods Brook, Br. #157/121Plainfield

Sent to BD 1/8/15-NDYRepair/Replacement of Bridge, Portland Street over Wardley Brook, Br. #121/121Rochester

Page 2 of 3Printed: 8/1/2018 7:37:53 AM

PROJECT NAME DESCRIPTION / IMPROVEMENT REMARKS

REQUESTS FOR ESTIMATES - WORK IN PROGRESS

Sent to BD 1/8/15-NDYRepair/Replacement of Bridge, Lowell Street over Willow (Wardley) Brook, Br. #148/121

Rochester

Sent to BD 1/8/15-NDYRepair/Replacement of Bridge, Four Rod Road over Rickers Brook, Br. #114/046Rochester

Sent to BD 2/1/18Repair/Replacement of Bridge, Rye Harbor Road over Brook, Br. #135/075Rye

Sent to BD 4/28/15-Site visit complete, working on est.Repair/Replacement of Bridge, Bradford Road over Wenell Brook, Br. #071/052Sunapee

Sent to Bridge Design 5/3/16Repair/Replacement of Bridge, Temple Road over Blood Brook, Br. #063/105Wilton

Page 3 of 3Printed: 8/1/2018 7:37:53 AM