COMPANY PROFILEJuly 2012
7/22/2019 BRASS Introduction 2012
2/23
WHO WE ARE
BRASS is a full service engineering
company established in year 2000
focused in design of fluid transport
systems. Its specialty is in slurry transport
systems, either concentrate or tailings, in
long distance pipelines.
Headquartered in San Ramon, California,
USA, has global presence in Chile, Brazil,
Peru, China and Philippines.
July 2012 Presentacin BRASS 2
7/22/2019 BRASS Introduction 2012
3/23
WHO WE ARE
July 2012 Presentacin BRASS 3
7/22/2019 BRASS Introduction 2012
4/23
WHO WE ARE
BRASS worldwide offices are as follows:
July 2012 Presentacin BRASS 4
Company Name Location General
Manager
BRASS Engineering
International
San Ramon,
California, USA
Brad L. Ricks
BRASS Chile S.A. Santiago, Chile Roy G Betinol
BRASS Beijing Beijing, China George Shou
BRASS do Brasil Belo Horizonte,Brazil Mauricio Rios
BRASS Technologies
Inc.
Quezon City,
Philippines
Fernando
Sajona
7/22/2019 BRASS Introduction 2012
5/23
WHO WE ARE
BRASS maintains key experts andprofessionals in the industry:
Brad L. Ricks, PE, MS, over 40 years in
slurry pipeline design. Roy G. Betinol, PE, +25 years in pipeline
design
George Shou, PhD Civil, +25 years in slurry
pipeline design
Nara Altmann, PhD Rheology
Victor Parzyk, PhD Corrosion, NACE 4
certifiedJuly 2012 Presentacin BRASS 5
7/22/2019 BRASS Introduction 2012
6/23
WHO WE ARE
July 2012 Presentacin BRASS 6
7/22/2019 BRASS Introduction 2012
7/23
WHO WE ARE
Certified with ISO-9001-2000 since 2008 Implemented criteria for ISO-14001 and
IS0-18001 for certification in 2012.
Implemented in-house management ofCarbon Footprint both in corporate and in
project design level.
July 2012 Presentacin BRASS 7
7/22/2019 BRASS Introduction 2012
8/23
OUR PRINCIPLE
Excel through innovation.
Quality as a mark of distinction
Leadership and training as our businesscore
Equal Opportunity
July 2012 Presentacin BRASS 8
7/22/2019 BRASS Introduction 2012
9/23
OUR COMMITMENT
Client Satisfaction Adherence to Local and International
Standards
Provide the best working environment toour employees
Reduction of Companys Carbon and
Water Footprint
July 2012 Presentacin BRASS 9
7/22/2019 BRASS Introduction 2012
10/23
OUR CULTURE & ETHICS
Cultural Diversity
Environmental Awareness
Community Relations Honesty
Dependability
July 2012 Presentacin BRASS 10
7/22/2019 BRASS Introduction 2012
11/23
OUR BUSINESS
Engineering and Design of long distancepipeline transport systems.
Engineering and Design of Filter Plant &
Terminal Water Management
Construction Management
Commissioning and Startup
Operations Support Services
Maintenance Support Services
July 2012 Presentacin BRASS 11
7/22/2019 BRASS Introduction 2012
12/23
OUR BUSINESS
Engineering and Design of long distancepipeline transport systems.
Scoping and Pre-Feasibility Studies
Bankable Feasibility Studies EPCM
Systems Simulation and Modeling
Pipe Stress Analysis Pipeline Expert Control System
Leak Detection System
July 2012 Presentacin BRASS 12
7/22/2019 BRASS Introduction 2012
13/23
OUR BUSINESS
Pipeline Integrated Management System
Operation Support and Operator Training
July 2012 Presentacin BRASS 13
7/22/2019 BRASS Introduction 2012
14/23
OUR BUSINESS
Pipeline pigging and Chemical Cleaning
Laboratory Testing of Slurry Properties
July 2012 Presentacin BRASS 14
BEFORE AFTER
7/22/2019 BRASS Introduction 2012
15/23
OUR BUSINESS
Pipeline Systems
Presentacin BRASS 15
Concentrate
Slurry
Tailings and
Water Recovery
July 2012
Oil Products and
Gas
Desalinated
Seawater
7/22/2019 BRASS Introduction 2012
16/23
Concentrate Pipeline Project
July 2012 16Presentacin BRASS
ProjectNames
Type ofEngineering
Type ofSlurry
ProjectStatus
Year PipelineDescription
El Morro Detailed Copper In
Progress
- 198 km., 6 Dia.,
1 PS, 800k tpa
Cerro
Casale
Detailed Copper Complet
e
2011 123 km., 6 Dia.,
1 PS, 900k tpa
El
Pachon
Feasibility Copper Complet
e
2012 125 km., 6 Dia,
1 PS, 700 tpa
Collahuas
i
Pre-
Feasibility
Copper Complet
e
2012 200 km., 8 Dia.,
1 PS, 1,200k tpa
CAP Detailed Iron In
Progress
- 80 km., 10 Dia.,
1 PS, 1,400k tpa
Galeno Feasibility Copper Complet
e
2011 140 km., 8 Dia.,
1 PS, 850k tpa
7/22/2019 BRASS Introduction 2012
17/23
Concentrate Pipeline Project
17Presentacin BRASS
Project
Names
Type of
Engineering
Type of
Slurry
Project
Status
Year Pipeline
Description
Taconite PFS and FS Iron Bankable
FS
2014 650 km, 28-inch,
22 MTA, cold
region
Vale, Brazil Detailed and
Startup
Bauxite WIP 2012 Installation of a
secondary pump
station at km 250
Ferrous,
Brazil
Basic BFS iron Complet
e
2010 450 km,
Samarco,
Brazil
Hydraulic
Studies
Iron Complet
e
2012 400 km
MMX,Sepetiba
Bay
Conceptual Iron WIP 2012 25 Km
Gro Mogol
Ilhus
Basic Iron WIP 2012 470 km
7/22/2019 BRASS Introduction 2012
18/23
Concentrate Pipeline Project
July 2012 18Presentacin BRASS
ProjectNames
Type ofEngineering
Type ofSlurry
ProjectStatus
Year PipelineDescription
GCT EPC
(partnered)
PhosphoGypsu
mWIP 2014 2 & 2 Slurry lines
/ 2 brine return,
22 km, 22-inches
& 20-inch/ 18 &
20
Later Conceptual Potash WIP ?? 100 km, 24 MTA,
30-inch, cold
region, includes
slurry prep
Later Detailed Iron On-hold Later 120 km, MTA, -inch
7/22/2019 BRASS Introduction 2012
19/23
Concentrate Pipeline Project
July 2012 19Presentacin BRASS
ProjectNames
Type ofEngineering
Type ofSlurry
ProjectStatus
Year PipelineDescription
Later PFS Coal WIP ?? 250 km, 40-inch,
25 MTA, includes
slurry prep and
dewatering
Ramu,
Papua
New
Guinea
Detailed Nickel Start-up,
Commer
cial
Operatio
n WIP
Curr
ent
130 km, 24-inch
LepantoMine,
Philippine
s
Scoping Copper On Hold 2011 65 km,, 6 dia.
7/22/2019 BRASS Introduction 2012
20/23
Major Water Pipeline Projects
July 2012 20Presentacin BRASS
ProjectNames
Type ofEngineering
Type ofWater
ProjectStatus
Year PipelineDescription
El Morro Detailed Desalinate
d
In
Progress
- 198 km., 30
Dia., 5 PS, 750
l/s
CerroCasale Detailed DeepwellSystem Complete 2010 123 km., 32Dia.,
1 PS, 900 l/s
El Pachon Feasibility Process
Water
Complete 2012 125 km., 8 Dia,
3 PS, 50 l/s
Collahuasi Pre-
Feasibility
Desalinate
d
Complete 2012 200 km., 44
Dia.,
5 PS, 1700 l/s
CAP Detailed Desalinate
d
In
Progress
- 80 km., 18 Dia.,
1 PS, 250 L/S
Sierra Detailed Seawater In - 140 km., 36
7/22/2019 BRASS Introduction 2012
21/23
Major Tailings Pipeline Projects
July 2012 21Presentacin BRASS
ProjectNames
Type ofEngineering
Type ofWater
ProjectStatus
Year PipelineDescription
Toromoch
o
Detailed Fresh
Water
Under
Constructi
on
?? Largest PD
station in the
world, 5 km, 30-
inch, paste
tailings
7/22/2019 BRASS Introduction 2012
22/23
OUR COMPETITIVE ADVANTAGE
Proven extensive years of experience inthe industry.
Dedicated Specialists.
Leading Edge Technology in ProprietaryCalculations, Simulations and Modeling
Globally situated to respond to clients
immediate needs
July 2012 Presentacin BRASS 22
7/22/2019 BRASS Introduction 2012
23/23
END
THANK YOU FOR YOUR ATTENTION
July 2012 Presentacin BRASS 23