    COMPANY PROFILEJuly 2012

  • 7/22/2019 BRASS Introduction 2012

    2/23

    WHO WE ARE

    BRASS is a full service engineering

    company established in year 2000

    focused in design of fluid transport

    systems. Its specialty is in slurry transport

    systems, either concentrate or tailings, in

    long distance pipelines.

    Headquartered in San Ramon, California,

    USA, has global presence in Chile, Brazil,

    Peru, China and Philippines.

    July 2012 Presentacin BRASS 2

  • 7/22/2019 BRASS Introduction 2012

    3/23

    WHO WE ARE

    July 2012 Presentacin BRASS 3

  • 7/22/2019 BRASS Introduction 2012

    4/23

    WHO WE ARE

    BRASS worldwide offices are as follows:

    July 2012 Presentacin BRASS 4

    Company Name Location General

    Manager

    BRASS Engineering

    International

    San Ramon,

    California, USA

    Brad L. Ricks

    BRASS Chile S.A. Santiago, Chile Roy G Betinol

    BRASS Beijing Beijing, China George Shou

    BRASS do Brasil Belo Horizonte,Brazil Mauricio Rios

    BRASS Technologies

    Inc.

    Quezon City,

    Philippines

    Fernando

    Sajona

  • 7/22/2019 BRASS Introduction 2012

    5/23

    WHO WE ARE

    BRASS maintains key experts andprofessionals in the industry:

    Brad L. Ricks, PE, MS, over 40 years in

    slurry pipeline design. Roy G. Betinol, PE, +25 years in pipeline

    design

    George Shou, PhD Civil, +25 years in slurry

    pipeline design

    Nara Altmann, PhD Rheology

    Victor Parzyk, PhD Corrosion, NACE 4

    certifiedJuly 2012 Presentacin BRASS 5

  • 7/22/2019 BRASS Introduction 2012

    6/23

    WHO WE ARE

    July 2012 Presentacin BRASS 6

  • 7/22/2019 BRASS Introduction 2012

    7/23

    WHO WE ARE

    Certified with ISO-9001-2000 since 2008 Implemented criteria for ISO-14001 and

    IS0-18001 for certification in 2012.

    Implemented in-house management ofCarbon Footprint both in corporate and in

    project design level.

    July 2012 Presentacin BRASS 7

  • 7/22/2019 BRASS Introduction 2012

    8/23

    OUR PRINCIPLE

    Excel through innovation.

    Quality as a mark of distinction

    Leadership and training as our businesscore

    Equal Opportunity

    July 2012 Presentacin BRASS 8

  • 7/22/2019 BRASS Introduction 2012

    9/23

    OUR COMMITMENT

    Client Satisfaction Adherence to Local and International

    Standards

    Provide the best working environment toour employees

    Reduction of Companys Carbon and

    Water Footprint

    July 2012 Presentacin BRASS 9

  • 7/22/2019 BRASS Introduction 2012

    10/23

    OUR CULTURE & ETHICS

    Cultural Diversity

    Environmental Awareness

    Community Relations Honesty

    Dependability

    July 2012 Presentacin BRASS 10

  • 7/22/2019 BRASS Introduction 2012

    11/23

    OUR BUSINESS

    Engineering and Design of long distancepipeline transport systems.

    Engineering and Design of Filter Plant &

    Terminal Water Management

    Construction Management

    Commissioning and Startup

    Operations Support Services

    Maintenance Support Services

    July 2012 Presentacin BRASS 11

  • 7/22/2019 BRASS Introduction 2012

    12/23

    OUR BUSINESS

    Engineering and Design of long distancepipeline transport systems.

    Scoping and Pre-Feasibility Studies

    Bankable Feasibility Studies EPCM

    Systems Simulation and Modeling

    Pipe Stress Analysis Pipeline Expert Control System

    Leak Detection System

    July 2012 Presentacin BRASS 12

  • 7/22/2019 BRASS Introduction 2012

    13/23

    OUR BUSINESS

    Pipeline Integrated Management System

    Operation Support and Operator Training

    July 2012 Presentacin BRASS 13

  • 7/22/2019 BRASS Introduction 2012

    14/23

    OUR BUSINESS

    Pipeline pigging and Chemical Cleaning

    Laboratory Testing of Slurry Properties

    July 2012 Presentacin BRASS 14

    BEFORE AFTER

  • 7/22/2019 BRASS Introduction 2012

    15/23

    OUR BUSINESS

    Pipeline Systems

    Presentacin BRASS 15

    Concentrate

    Slurry

    Tailings and

    Water Recovery

    July 2012

    Oil Products and

    Gas

    Desalinated

    Seawater

  • 7/22/2019 BRASS Introduction 2012

    16/23

    Concentrate Pipeline Project

    July 2012 16Presentacin BRASS

    ProjectNames

    Type ofEngineering

    Type ofSlurry

    ProjectStatus

    Year PipelineDescription

    El Morro Detailed Copper In

    Progress

    - 198 km., 6 Dia.,

    1 PS, 800k tpa

    Cerro

    Casale

    Detailed Copper Complet

    e

    2011 123 km., 6 Dia.,

    1 PS, 900k tpa

    El

    Pachon

    Feasibility Copper Complet

    e

    2012 125 km., 6 Dia,

    1 PS, 700 tpa

    Collahuas

    i

    Pre-

    Feasibility

    Copper Complet

    e

    2012 200 km., 8 Dia.,

    1 PS, 1,200k tpa

    CAP Detailed Iron In

    Progress

    - 80 km., 10 Dia.,

    1 PS, 1,400k tpa

    Galeno Feasibility Copper Complet

    e

    2011 140 km., 8 Dia.,

    1 PS, 850k tpa

  • 7/22/2019 BRASS Introduction 2012

    17/23

    Concentrate Pipeline Project

    17Presentacin BRASS

    Project

    Names

    Type of

    Engineering

    Type of

    Slurry

    Project

    Status

    Year Pipeline

    Description

    Taconite PFS and FS Iron Bankable

    FS

    2014 650 km, 28-inch,

    22 MTA, cold

    region

    Vale, Brazil Detailed and

    Startup

    Bauxite WIP 2012 Installation of a

    secondary pump

    station at km 250

    Ferrous,

    Brazil

    Basic BFS iron Complet

    e

    2010 450 km,

    Samarco,

    Brazil

    Hydraulic

    Studies

    Iron Complet

    e

    2012 400 km

    MMX,Sepetiba

    Bay

    Conceptual Iron WIP 2012 25 Km

    Gro Mogol

    Ilhus

    Basic Iron WIP 2012 470 km

  • 7/22/2019 BRASS Introduction 2012

    18/23

    Concentrate Pipeline Project

    July 2012 18Presentacin BRASS

    ProjectNames

    Type ofEngineering

    Type ofSlurry

    ProjectStatus

    Year PipelineDescription

    GCT EPC

    (partnered)

    PhosphoGypsu

    mWIP 2014 2 & 2 Slurry lines

    / 2 brine return,

    22 km, 22-inches

    & 20-inch/ 18 &

    20

    Later Conceptual Potash WIP ?? 100 km, 24 MTA,

    30-inch, cold

    region, includes

    slurry prep

    Later Detailed Iron On-hold Later 120 km, MTA, -inch

  • 7/22/2019 BRASS Introduction 2012

    19/23

    Concentrate Pipeline Project

    July 2012 19Presentacin BRASS

    ProjectNames

    Type ofEngineering

    Type ofSlurry

    ProjectStatus

    Year PipelineDescription

    Later PFS Coal WIP ?? 250 km, 40-inch,

    25 MTA, includes

    slurry prep and

    dewatering

    Ramu,

    Papua

    New

    Guinea

    Detailed Nickel Start-up,

    Commer

    cial

    Operatio

    n WIP

    Curr

    ent

    130 km, 24-inch

    LepantoMine,

    Philippine

    s

    Scoping Copper On Hold 2011 65 km,, 6 dia.

  • 7/22/2019 BRASS Introduction 2012

    20/23

    Major Water Pipeline Projects

    July 2012 20Presentacin BRASS

    ProjectNames

    Type ofEngineering

    Type ofWater

    ProjectStatus

    Year PipelineDescription

    El Morro Detailed Desalinate

    d

    In

    Progress

    - 198 km., 30

    Dia., 5 PS, 750

    l/s

    CerroCasale Detailed DeepwellSystem Complete 2010 123 km., 32Dia.,

    1 PS, 900 l/s

    El Pachon Feasibility Process

    Water

    Complete 2012 125 km., 8 Dia,

    3 PS, 50 l/s

    Collahuasi Pre-

    Feasibility

    Desalinate

    d

    Complete 2012 200 km., 44

    Dia.,

    5 PS, 1700 l/s

    CAP Detailed Desalinate

    d

    In

    Progress

    - 80 km., 18 Dia.,

    1 PS, 250 L/S

    Sierra Detailed Seawater In - 140 km., 36

  • 7/22/2019 BRASS Introduction 2012

    21/23

    Major Tailings Pipeline Projects

    July 2012 21Presentacin BRASS

    ProjectNames

    Type ofEngineering

    Type ofWater

    ProjectStatus

    Year PipelineDescription

    Toromoch

    o

    Detailed Fresh

    Water

    Under

    Constructi

    on

    ?? Largest PD

    station in the

    world, 5 km, 30-

    inch, paste

    tailings

  • 7/22/2019 BRASS Introduction 2012

    22/23

    OUR COMPETITIVE ADVANTAGE

    Proven extensive years of experience inthe industry.

    Dedicated Specialists.

    Leading Edge Technology in ProprietaryCalculations, Simulations and Modeling

    Globally situated to respond to clients

    immediate needs

    July 2012 Presentacin BRASS 22

  • 7/22/2019 BRASS Introduction 2012

    23/23

    END

    THANK YOU FOR YOUR ATTENTION

    July 2012 Presentacin BRASS 23