7/27/2019 BOQ Erode
1/640
7/27/2019 BOQ Erode
2/640
7/27/2019 BOQ Erode
3/640
13 Schedule G2 1117485 0.11
14 Schedule G3 501096 0.05
15 Schedule H1 836503 0.08
16 Schedule H2 651888 0.07
7/27/2019 BOQ Erode
4/640
18 Schedule I2 13317065 1.33
19 Schedule I3 4017902 0.40
7/27/2019 BOQ Erode
5/640
21 Schedule I5 3058201 0.31
22 Schedule I6 776180 0.08
23 Schedule I7 622254 0.06
24 Schedule I8 636378 0.06
7/27/2019 BOQ Erode
6/640
28 Schedule K2 29078765 2.91
29 Schedule L 2754857 0.28
30 Schedule M 24722041 2.47
520016920 52.00
7/27/2019 BOQ Erode
7/640
Description of Work including all labour charges etc complete as per standard
specification
Sewer collection system for veerappanchatram, ScheduleNo.A2,
Earth work excavating and depositing on bank with initial lead of 10m and initial
lift of 2 mts in Hard Stiff Clay, Hard Read Earth under water, light black cotton soil,
sandy loam and ordinary soil de-watering wherever necessary and as directed by
the E
Schedule No: B2 Name of Work: Road Restoration work for
VeerappanChathiramMunicipality Road restoration
for House Service Connections - The trenches are backfilled after laying sewers
and the trench portion of the road shall be restored as per IRC standard. The
trench portion shall be excavated upto 20 cm depth and to be filled with PCC 1
Schedule No: B2 Name of Work: Road Restoration work for
VeerappanChathiramMunicipality Road restoration
for House Service Connections - The trenches are backfilled after laying sewers
and the trench portion of the road shall be restored as per IRC standard. The
trench portion shall be excavated upto 20 cm depth and to be filled with PCC 1
Schedule no C1 Name of Work: Construction of Pumping Station PS2 at Erode
Open well excavation complying with relevant clause of T.N.S.S. and with a lead
of 10mts in Hard stiff clay, stiff Black cotton soil, hard red earth, shales, murram,
gravel, stoney earth and earth mixed with small size boulders and hard gravely
soil ,de-watering wherever necessary and as directed by the Engineer-in charge.
7/27/2019 BOQ Erode
8/640
Schedule No: D,Name of Work: Construction of Lift Station at Erode.
Open well excavation complying with relevant clause of T.N.S.S. and with a lead
of 10mts in Hard stiff clay,stiff Black cotton soil, hard red earth, shales, murram,
gravel, stoney earth and earth mixed with small size boulders and hard gravelysoil ,de-wa
Schedule No: E1 Name of Work: Laying of Pumping main from
PumpingStationsofErode.A.CIVILWORKS
Earth work excavating and depositing on bank with initial lead of 10m and initial
lift of 2 mts in Hard Stiff Clay Hard Red Earth under water,light black cotton
soil,sandy loam and ordinary soil de-watering wherever necessary including all
labour charges
Schedule No: E2,Name of Work: Laying of Pumping main from Pumping Stations
of Veerappan Chathiram Earth work excavating and
depositing on bank with initial lead of 10m and initial lift of 2 mts in Hard Stiff Clay
Hard Red Earth under water,light black cotton soil,sandy loam and ordinary soil
including refilling de-watering wherever necessary including
Schedule No: E3,A.CIVIL WORKS,Name of Work: Laying of Pumping main from
Lift Stations ofErode Earth work
excavating and depositing on bank with initial lead of 10m and initial lift of 2 mts in
Hard Stiff Clay Hard Red Earth under water,light black cotton soil,sandy loam and
ordinary soil de-watering wherever necessary including all labour charges
Schedule No: F Construction of Bell Mouth Chamber at Erode Earth work
excavating and depositing on bank with initial lead of 10m and initial lift of 2 mts in
Hard Stiff Clay Hard Read Earth under water,light black cotton soil,sandy loam
and ordinary soil de-watering wherever necessary including all labour charges
7/27/2019 BOQ Erode
9/640
Schedule No: G2,A.Civil WorksName of Work: Construction of Control Room 6.00
x 8.50m for Erode Pumping station Earthwork excavation in
hard stiff clay, stiff black cotton red earth, Shales muram, gravel strongearth andearth mixed with boulders and hard stiff gravel, soil as per SS20B with initial lead
of 10M and lift of 2 metre in all soils 0 to 1 M & 1 to 2M b
Schedule No: G3, Name of Work: Construction of Control Room 6.00 x 4.00 m for
Veerappan Chathiram Pumping stationEarthwork excavation in hard stiff clay, stiff
black cotton red earth, Shales muram, gravel strongearth and earth mixed with
boulders and hard stiff gravel, soil as per SS20B with initial lead of 10M and lift
of 2 metre in all soils 0 to 1 M & 1 to 2M below GL including all labour charges
etc. complete as per standard specifications
Schedule No: H1,Name of Work:Construction of Compound wall for Sewage
Pumping Station at Erode Earth work excavating and depositing on bank with
initial lead of 10m and initial lift of 2 mts in Hard Stiff Clay Hard Read Earth underwater, light black cotton soil, sandy loam and ordinary soil (0-2m) including all
labour charges etc. complete as per standard specifications
Schedule No: H2 Name of Work: Construction of compound wall for Sewage
Pumping Station at Veerappan Chathiram Municipality
Earth work excavating and depositing on bank with initial lead of 10m and initial
lift of 2 mts in Hard Stiff Clay Hard Read Earth under water,light black cotton
soil,sandy loam and ordinary soil (0-2m) including all labour charges etc.complete as per standard specifications
Schedule No: I1,MECHANCIAL ITEMS,Name of Work:Providing Mechanical &
Electrical Installation for, Pumpingstation PS2 Supply, delivery, fixing, testing
7/27/2019 BOQ Erode
10/640
Schedule No: I2, MECHANCIAL ITEMS,Name of Work:Providing Mechanical &
Electrical Installation PS3 Supply, delivery, fixing,
testing and commissioning of submersible monoblock, nonclog type having thefollowing duty of pump capacity. The pump shall be capable of handling 100 mm
size solids. Double mechanical seals shall be provided. Pumpsets shall have
(subject to tolerance as per the applicable standards). Protection against increase
in stator winding temperature, bearing temperature, leakage in stator housing and
terminal box shall be provided. Class of insulation shall be F. The degree of
protection.The motor shall be supplied with suitable flat submersible copper cable
. The pumpset shall be supplied with guide rail system with guide pipe of length
suitable to the system, duck foot elbow etc. complete as per standard
specifications
Name of Work:Providing Mechanical & Electrical Installation, PUMPING
STATION - PS 4,Schedule No: I3,MECHANICAL ITEMS,Supply, delivery, fixing,
testing and commissioning of submersible monoblock, nonclog type having thefollowing duty of pump capacity. The pump shall be capable of handling 100 mm
size solids. Double mechanical seals shall be provided. Pumpsets shall have
Protection against increase in stator winding temperature, bearing temperature,
leakage in stator housing and terminal box shall be provided. Class of insulation
shall be F. The degree of protection shall be IP68 as per IS:4961. Motors shall be
suitable The motor shall be supplied with suitable flat submersible copper cable
of length 10m.The pumpset shall be supplied with guide rail system with guidepipe of length suitable to the system ,duck foot elbow.and motor control panel with
all suitable protect
PUMPING STATION - PS5, MECHANCIAL ITEMS,Schedule No: I4, Supply,
7/27/2019 BOQ Erode
11/640
Schedule No: I 5, PUMPING STATION - PS 8,MECHANCIAL ITEMS,Supply,
delivery, fixing, testing and commissioning of submersible monoblock, nonclog
type having the following duty of pump capacity. The pump shall be capable ofhandling 100 mm size solids. Double mechanical seals shall be provided.
Pumpsets shall have Protection against increase in stator winding temperature,
bearing temperature, leakage in stator housing and terminal box shall be
provided. Class of insulation shall be F. The degree of protection shall be IP68 as
per IS:4961. Motors shall be suitable The motor shall be supplied with suitable
flat submersible copper cable of length 10m.The pumpset shall be supplied with
guide rail system with guide pipe of length suitable to the system ,duck foot
elbow.and motor control panel with all suitable protect
Schedule No: I 6, LIFT STATION - LS1,MECHANICAL ITEMS, Supply, delivery,
fixing, testing and commissioning of submersible monoblock, nonclog type having
the following duty of pump capacity. The pump shall be capable of handling 100
mm size solids. Double mechanical seals shall be provided. Pumpsets shall have
Schedule No: I7, MECHANICAL ITEMS,LIFT STATION - LS2,Supply, delivery,
fixing, testing and commissioning of submersible monoblock, nonclog type having
the following duty of pump capacity. The pump shall be capable of handling 100
mm size solids. Double mechanical seals shall be provided. Pumpsets shall have
LIFT STATION - LS3,Schedule No: I8Supply, delivery, fixing, testing andcommissioning of submersible monoblock, nonclog type having the following duty
of pump capacity. The pump shall be capable of handling 100 mm size solids.
Double mechanical seals shall be provided. Pumpsets shall have
7/27/2019 BOQ Erode
12/640
Schedule No: K2,Name of Work: House Service connection of Veerappan
Chathiram Municipality Sewer Connections to Houses (upto Property
Boundary) : Supplying, laying, jointing, and testing of 110/160 mm dia PVC pipe
including earthwork excavation for trenches in hard stiff clay, stiff black cotton,hard red earth, shales, morrums, gravel, stony e
Schedule No: L,Civil Works,Name of Work: Construction of Community Toilet in
Erode Corporation, Earthwork excavation in hard stiff clay, stiff black cotton red
earth, Shales muram, gravel stoney earth and earth mixed with boulders and hard
stiff gravel, soil as per SS20B with initial lead of 10M and lift of 2 metre in all
soils 0 to 1 M & 1 to 2M
Schedule No: M,Name of Work: Construction of Bridge and Approach
road.Earthwork excavation and depositing on bank with an initial lead of 10 m and
initial lift of 2 m in hard stiff clay, stiff black cotton, hard red earth, shales, murrum,
gravel, stoney earth and earth mixed with small size bouldersand hard gravelly
soil SS
7/27/2019 BOQ Erode
13/640
Figures Words
1
Description of Work including all labour
charges etc complete as per standard
specification
1.1 0 - 1 m depth 84509.801 m
3(one
cubic meter)92.00 Rupees Ninety Two Only 7774901.60
1.2 1 - 2 m depth 23222.571 m
3(one
cubic meter)92.00 Rupees Ninety Two Only 2136476.44
1.3
Earth work excavating and depositing on
bank with initial lead of 10m and initial lift
of 2 mts in Hard Stiff ClayHard Read Earth
under water,light black cotton soil,sandy
loam and ordinary soil de-watering
wherever necessary and as directed by the
Engi
1.4 2 - 3 m depth 3993.131 m
3(one
cubic meter)104.00
Rupees One Hundred
Four Only415285.52
Tender Inviting Authority: COMMISSIONER ERODE CITY MUNICIPAL CORPORATION
Name of Work: PROVIDING UGSS TO ERODE ZONE-2,3,4 AND 5 AND VEERAPPANCHATHIRAM ZONE-8 AREA, PROVIDINGSEWAGE COLLECTION PUMPING STATIONS AND PUMPING MAIN.
Contract No: UGSS/7587/2010 dated: 10.12.2010
Bidder Name:
SCHEDULE OF WORKS
Sl No. Description of Work Quantity Units
RATE In Figures To be entered by
the Bidder
Rs. P Amount (Rs)
7/27/2019 BOQ Erode
14/640
1.5 3 - 4 m depth 965.101 m
3(one
cubic meter)104.00
Rupees One Hundred
Four Only100370.40
1.6 4 - 5 m depth 30.361 m3 (one
cubic meter)115.00
Rupees One Hundred
Fifteen Only3491.40
2
Earth work excavation and depositing on
bank with initial lead of 10m and initial lift
of 2 mts in Soft Disintegrated Rock, laterite,
soft rock or kankar not requiring blasting
including all labour charges etc., complete
as per standard specification.
2.1 1 - 2 m depth 18049.811 m
3(one
cubic meter)230.00
Rupees Two Hundred
Thirty Only4151456.30
2.2 2 - 3 m depth 8384.011 m
3(one
cubic meter)253.00
Rupees Two Hundred
Fifty Three Only2121154.53
2.3 3 - 4 m depth 3234.861 m
3(one
cubic meter)253.00
Rupees Two Hundred
Fifty Three Only818419.58
2.4 4 - 5 m depth 774.301 m
3(one
cubic meter)316.00
Rupees Three Hundred
Sixteen Only244678.80
2.5 5 - 6 m depth 58.391 m
3(one
cubic meter)316.00
Rupees Three Hundred
Sixteen Only18451.24
3
Earth work excavating and depositing on
bank with initial lead of 10m and initial lift
of 2 mts in Medium Rock and Dense
Medium Roack which does not require
blasting including all labour charges etc.,
complete as per standard specification.
3.1 2 - 3 m depth 1442.721 m
3(one
cubic meter)403.00
Rupees Four Hundred
Three Only581416.16
3.2 3 - 4 m depth 1536.141 m
3(one
cubic meter)403.00
Rupees Four Hundred
Three Only619064.42
7/27/2019 BOQ Erode
15/640
3.3 4 - 5 m depth 685.371 m
3(one
cubic meter)460.00
Rupees Four Hundred
Sixty Only315270.20
3.4 5 - 6 m depth 72.20 1 m3 (one
cubic meter)575.00 Rupees Five Hundred
Seventy Five Only41515.00
4
Hard rock excavation by wedging,
chiselling and trimming to propoer shape
where blasting is prohibated and depositing
on bank with initial lead of 10m and initial
l ift of 2 mts including all labour charges
etc., complete as per standard specification.
4.1 3 - 4 m depth 853.701 m
3(one
cubic meter)748.00
Rupees Seven Hundred
Forty Eight Only638567.60
4.2 4 - 5 m depth 421.691 m
3(one
cubic meter)863.00
Rupees Eight Hundred
Sixty Three Only363918.47
4.3 5 - 6 m depth 71.871 m
3(one
cubic meter)863.00
Rupees Eight Hundred
Sixty Three Only62023.81
5
Providing shoring & strutting with
sheet piles /wooden piles & planks, with
necessary support for excavation beyond
depth of 2.00m, including de-watering,
cost of sheet pile/ wooden piles, plank &
other materials, removing shoring and
strutting after the
5.1 2 - 2.5 m depth
5.2 200 mm dia 9907.501 m
2
(one Square
meter)
69.00 Rupees Sixty Nine Only 683617.50
7/27/2019 BOQ Erode
16/640
5.3 250 mm dia 915.001 m
2
(one Square
meter)
69.00 Rupees Sixty Nine Only 63135.00
5.4 300 mm dia 249.501 m
2
(one Square
meter)
69.00 Rupees Sixty Nine Only 17215.50
5.5 350 mm dia 137.501 m
2
(one Square
meter)
69.00 Rupees Sixty Nine Only 9487.50
5.6 400 mm dia 28.001 m
2
(one Square
meter)
69.00 Rupees Sixty Nine Only 1932.00
5.7 450 mm dia 164.501 m
2
(one Square
meter)
69.00 Rupees Sixty Nine Only 11350.50
5.8 500 mm dia 50.001 m
2
(one Square
meter)
81.00 Rupees Eighty One Only 4050.00
5.9 600 mm dia 226.001 m
2
(one Square
meter)
81.00 Rupees Eighty One Only 18306.00
5.10 2.5 - 3.0 m depth
5.11 200 mm dia 6198.601 m
2
(one Square
meter)
81.00 Rupees Eighty One Only 502086.60
5.12 250 mm dia 857.801 m
2
(one Square
meter)
81.00 Rupees Eighty One Only 69481.80
7/27/2019 BOQ Erode
17/640
5.13 300 mm dia 351.601 m
2
(one Square
meter)
81.00 Rupees Eighty One Only 28479.60
5.14 350 mm dia 333.001 m
2
(one Square
meter)
81.00 Rupees Eighty One Only 26973.00
5.15 400 mm dia 108.001 m
2
(one Square
meter)
92.00 Rupees Ninety Two Only 9936.00
5.16 500 mm dia 343.201 m
2
(one Square
meter)
92.00 Rupees Ninety Two Only 31574.40
5.17 3.0 - 3.5 m depth
5.18 200 mm dia 2534.701 m
2
(one Square
meter)
81.00 Rupees Eighty One Only 205310.70
5.19 250 mm dia 371.201 m
2
(one Square
meter)
81.00 Rupees Eighty One Only 30067.20
5.20 300 mm dia 336.701 m
2
(one Square
meter)
81.00 Rupees Eighty One Only 27272.70
5.21 350 mm dia 319.901 m
2
(one Square
meter)
81.00 Rupees Eighty One Only 25911.90
5.22 450 mm dia 56.001 m
2
(one Square
meter)
92.00 Rupees Ninety Two Only 5152.00
7/27/2019 BOQ Erode
18/640
5.23 500 mm dia 53.901 m
2
(one Square
meter)
92.00 Rupees Ninety Two Only 4958.80
5.24 600 mm dia 12.601 m
2
(one Square
meter)
92.00 Rupees Ninety Two Only 1159.20
5.25 3.5 - 4.0 m depth
5.26 200 mm dia 2796.001 m
2
(one Square
meter)
92.00 Rupees Ninety Two Only 257232.00
5.27 250 mm dia 738.401 m
2
(one Square
meter)
92.00 Rupees Ninety Two Only 67932.80
5.28 300 mm dia 92.001 m
2
(one Square
meter)
92.00 Rupees Ninety Two Only 8464.00
5.29 350 mm dia 72.801 m
2
(one Square
meter)
92.00 Rupees Ninety Two Only 6697.60
5.30 450 mm dia 67.201 m
2
(one Square
meter)
92.00 Rupees Ninety Two Only 6182.40
5.31 4.0 - 4.5 m depth
5.32 200 mm dia 543.601 m
2
(one Square
meter)
92.00 Rupees Ninety Two Only 50011.20
5.33 250 mm dia 23.401 m
2
(one Square
meter)
92.00 Rupees Ninety Two Only 2152.80
5.34 4.5 - 5.0 m depth
7/27/2019 BOQ Erode
19/640
5.35 200 mm dia 181.001 m
2
(one Square
meter)
92.00 Rupees Ninety Two Only 16652.00
5.36 250 mm dia 180.001 m
2
(one Square
meter)
92.00 Rupees Ninety Two Only 16560.00
6
Supply of riversand filling and compacting
in trenches for laying sewer pipes wherever
required as directed by the Engineer in-
charge including dewatering wherever
necessary and all labour charges etc.,
complete as per standard specification.
12001.501 m
3(one
cubic meter)690.00
Rupees Six Hundred
Ninety Only8281035.00
7.1 upto 1.5m depth 393.131 m
3(one
cubic meter)690.00
Rupees Six Hundred
Ninety Only271259.70
7.2 1.5-4.5 m depth 238.521 m
3(one
cubic meter)759.00
Rupees Seven Hundred
Fifty Nine Only181036.68
8
Supplying, Laying and Jointing of SW
Pipes of following diameters in
cementmortar 1:1.5using SRC
cemnt(1SRCcement:1.5 river sand) and
hemp yarn (IS 4127:1983) to the required
alignment and slope as indicated indrawing/design and hydraulically testing of
the pipe
8.1 0 - 2 m depth (200 mm dia) 79647.001 M (one
meter)354.00
Rupees Three Hundred
Fifty Four Only28195038.00
8.2 0 - 2 m depth (250 mm dia) 968.001 M (one
meter)549.00
Rupees Five Hundred
Forty Nine Only531432.00
7/27/2019 BOQ Erode
20/640
8.3 2 - 3 m depth (200 mm dia) 10216.001 M (one
meter)390.00
Rupees Three Hundred
Ninety Only3984240.00
8.4 2 - 3 m depth (300 mm dia) 516.001 M (one
meter)964.00
Rupees Nine Hundred
Sixty Four Only497424.00
8.5 3 - 3.5 m depth (200 mm dia) 2469.001 M (one
meter)390.00
Rupees Three Hundred
Ninety Only962910.00
8.6 2 - 3 m depth (250 mm dia) 566.001 M (one
meter)603.00
Rupees Six Hundred
Three Only341298.00
8.7 3 - 3.5 m depth (250 mm dia) 258.001 M (one
meter)603.00
Rupees Six HundredThree Only
155574.00
8.8 3 - 3.5 m depth (300 mm dia) 509.001 M (one
meter)964.00
Rupees Nine Hundred
Sixty Four Only490676.00
8.9 0 - 2 m depth (300 mm dia) 635.001 M (one
meter)876.00
Rupees Eight Hundred
Seventy Six Only556260.00
9
Supplying, lowering, laying & Jointing
to the site of work, RCC - NP3 class (IS)in standard length of 2.5 m length with
socket and spigot pipes of following
diameters as per relevant BIS specification,
manufactured with sulphate resistent
cement
9.1 0 - 2 m depth (350 mm dia) 165.001 M (one
meter)1969.00
Rupees One Thousand
Nine Hundred Sixty Nine
Only
324885.00
7/27/2019 BOQ Erode
21/640
9.2 0 - 2 m depth (500 mm dia) 25.001 M (one
meter)2950.00
Rupees Two Thousand
Nine Hundred Fifty Only73750.00
9.3 3 - 4 m depth (200 mm dia) 2094.001 M (one
meter)926.00
Rupees Nine Hundred
Twenty Six Only1939044.00
9.4 3 - 4 m depth (300 mm dia) 183.001 M (one
meter)1485.00
Rupees One Thousand
Four Hundred Eighty
Five Only
271755.00
9.5 4 - 5 m depth (200 mm dia) 3069.001 M (one
meter)926.00
Rupees Nine Hundred
Twenty Six Only2841894.00
9.6 4 - 5 m depth (250 mm dia) 317.00 1 M (onemeter)
1103.00 Rupees One ThousandOne Hundred Three Only
349651.00
9.7 4 - 5 m depth (300 mm dia) 270.001 M (one
meter)1485.00
Rupees One Thousand
Four Hundred Eighty
Five Only
400950.00
9.8 4 - 5 m depth (400mm dia) 90.001 M (one
meter)2271.00
Rupees Two Thousand
Two Hundred Seventy
One Only
204390.00
9.9 5 - 6 m depth (200 mm dia) 289.001 M (one
meter)926.00
Rupees Nine Hundred
Twenty Six Only267614.00
9.10 5 - 6 m depth (300 mm dia) 132.001 M (one
meter)1485.00
Rupees One Thousand
Four Hundred Eighty
Five Only
196020.00
9.11 3 - 4 m depth (250 mm dia) 517.001 M (one
meter)1054.00
Rupees One Thousand
Fifty Four Only544918.00
7/27/2019 BOQ Erode
22/640
9.12 2 - 3 m depth (350 mm dia) 339.001 M (one
meter)1456.00
Rupees One Thousand
Four Hundred Fifty Six
Only
493584.00
9.13 2 - 3 m depth (450 mm dia) 47.001 M (one
meter)2519.00
Rupees Two Thousand
Five Hundred Nineteen
Only
118393.00
9.14 2 - 3 m depth (500 mm dia) 110.001 M (one
meter)2950.00
Rupees Two Thousand
Nine Hundred Fifty Only324500.00
9.15 2 - 3 m depth (600 mm dia) 126.001 M (one
meter)4108.00
Rupees Four Thousand
One Hundred Eight Only517608.00
9.16 3 - 4 m depth (350 mm dia) 474.00 1 M (onemeter)
1969.00 Rupees One ThousandNine Hundred Sixty Nine
Only
933306.00
9.17 3 - 4 m depth (400 mm dia) 28.001 M (one
meter)2271.00
Rupees Two Thousand
Two Hundred Seventy
One Only
63588.00
9.18 3 - 4 m depth (450 mm dia) 173.001 M (one
meter)2519.00
Rupees Two Thousand
Five Hundred Nineteen
Only
435787.00
9.19 3 - 4 m depth (500 mm dia) 205.001 M (one
meter)2950.00
Rupees Two Thousand
Nine Hundred Fifty Only604750.00
9.20 3 - 4 m depth (600 mm dia) 9.001 M (one
meter)4108.00
Rupees Four Thousand
One Hundred Eight Only36972.00
9.21 4 - 5 m depth (350 mm dia) 294.001 M (one
meter)1969.00
Rupees One Thousand
Nine Hundred Sixty Nine
Only
578886.00
7/27/2019 BOQ Erode
23/640
9.22 4 - 5 m depth (450 mm dia) 102.001 M (one
meter)2519.00
Rupees Two Thousand
Five Hundred Nineteen
Only
256938.00
9.23 5 - 6 m depth (250 mm dia) 67.001 M (one
meter)1103.00
Rupees One Thousand
One Hundred Three Only73901.00
9.24 5 - 6 m depth (350 mm dia) 151.001 M (one
meter)1969.00
Rupees One Thousand
Nine Hundred Sixty Nine
Only
297319.00
9.25 5 - 6 m depth (450 mm dia) 112.001 M (one
meter)2519.00
Rupees Two Thousand
Five Hundred Nineteen
Only
282128.00
9.26 5 - 6 m depth (600 mm dia) 10.00 1 M (onemeter)
4108.00 Rupees Four ThousandOne Hundred Eight Only
41080.00
7/27/2019 BOQ Erode
24/640
10
construction of drop manholes of differentdepths as per type design/drawing on sewer
lines and provided with tight fit ting FRC
manhole covers and frames of 600 mm dia.,
of approved make and provision of
encapsulated PVC foot rests. The manhole
shall be of brick work(with approved
country killn burnt bricks of size 8 3/4" x
4 1/4 " x 2 1/4 " and using sulphateresisting
Cement) .In CM 1:3 and plastered with CM
1:3 using Src cement , 20mm thick inside
and 12mm thick outside as per type design.Benching and channeling should be
provided in the manhole and suiltable
diameter pipes for house service connection
( not exceeding 6 nos for each man hole) to
be left in the manholes as directed by the
engg incharge . The rate shall include
earthwork backfilling and removal of
surplus earth and depositing within 500 m.
dewatering whereever necessary ,
barricading provision of danger lights andincluding all labour charges etc complete as
per standard specification
10.1 0 - 1 m depth 1580.001 No (One
Number)18400.00
Rupees Eighteen
Thousand Four Hundred
Only
29072000.00
7/27/2019 BOQ Erode
25/640
10.2 1 - 1.5 m depth 1573.001 No (One
Number)22540.00
Rupees Twenty Two
Thousand Five Hundred
Forty Only
35455420.00
10.3 1.5 - 2 m depth 394.001 No (One
Number)26680.00
Rupees Twenty Six
Thousand Six Hundred
Eighty Only
10511920.00
10.4 2 - 2.5 m depth 229.001 No (One
Number)30820.00
Rupees Thirty Thousand
Eight Hundred Twenty
Only
7057780.00
10.5 2.5 - 3 m depth 167.001 No (One
Number)37375.00
Rupees Thirty Seven
Thousand Three Hundred
Seventy Five Only
6241625.00
10.6 3 - 3.5 m depth 157.001 No (One
Number)43470.00
Rupees Forty Three
Thousand Four Hundred
Seventy Only
6824790.00
10.7 3.5 - 4 m depth 109.001 No (One
Number)49565.00
Rupees Forty Nine
Thousand Five Hundred
Sixty Five Only
5402585.00
10.8 4 - 4.5 m depth 76.001 No (One
Number)55660.00
Rupees Fifty Five
Thousand Six Hundred
Sixty Only
4230160.00
10.9 4.5 - 5 m depth 30.00 1 No (OneNumber)
61755.00
Rupees Sixty One
Thousand Seven Hundred
Fifty Five Only
1852650.00
10.10 5 - 5.5 m depth 17.001 No (One
Number)67850.00
Rupees Sixty Seven
Thousand Eight Hundred
Fifty Only
1153450.00
10.11 5.5 - 6.0 m depth 1.001 No (One
Number)73945.00
Rupees Seventy Three
Thousand Nine Hundred
Forty Five Only
73945.00
7/27/2019 BOQ Erode
26/640
11
construction of drop manholes of differentdepths as per type design/drawing on sewer
lines and provided with tight fit ting FRC
manhole covers and frames of 600 mm dia.,
of approved make and provision of
encapsulated PVC foot rests. The manhole
shall be of brick work(with approved
country killn burnt bricks of size 8 3/4" x
4 1/4 " x 2 1/4 " and using sulphateresisting
Cement) .In CM 1:3 and plastered with CM
1:3 using Src cement , 20mm thick inside
and 12mm thick outside as per type design.Benching and channeling should be
provided in the manhole and suiltable
diameter pipes for house service connection
( not exceeding 6 nos for each man hole) to
be left in the manholes as directed by the
engg incharge . The rate shall include
earthwork backfilling and removal of
surplus earth and depositing within 500 m.
dewatering whereever necessary ,
barricading provision of danger lights andincluding all labour charges etc complete as
per standard specification
11.1 1 - 1.5 m depth 64.001 No (One
Number)22540.00
Rupees Twenty Two
Thousand Five Hundred
Forty Only
1442560.00
7/27/2019 BOQ Erode
27/640
11.2 1.5 - 2 m depth 33.001 No (One
Number)26680.00
Rupees Twenty Six
Thousand Six Hundred
Eighty Only
880440.00
11.3 2 - 2.5 m depth 23.001 No (One
Number)30820.00
Rupees Thirty Thousand
Eight Hundred Twenty
Only
708860.00
11.4 2.5 - 3 m depth 15.001 No (One
Number)37375.00
Rupees Thirty Seven
Thousand Three Hundred
Seventy Five Only
560625.00
11.5 3 - 3.5 m depth 7.001 No (One
Number)43470.00
Rupees Forty Three
Thousand Four Hundred
Seventy Only
304290.00
11.6 3.5 - 4 m depth 9.001 No (One
Number)49565.00
Rupees Forty Nine
Thousand Five Hundred
Sixty Five Only
446085.00
11.7 4 - 4.5 m depth 12.001 No (One
Number)55660.00
Rupees Fifty Five
Thousand Six Hundred
Sixty Only
667920.00
11.8 4.5 - 5 m depth 4.001 No (One
Number)61755.00
Rupees Sixty One
Thousand Seven Hundred
Fifty Five Only
247020.00
11.9 5 - 5.5 m depth 3.00 1 No (OneNumber)
67850.00
Rupees Sixty Seven
Thousand Eight Hundred
Fifty Only
203550.00
11.10 5.5 - 6.0 m depth 1.001 No (One
Number)73945.00
Rupees Seventy Three
Thousand Nine Hundred
Forty Five Only
73945.00
7/27/2019 BOQ Erode
28/640
12
Disposal of surplus earth including
loading, conveyance within a distance of
5km and spreading including all labour
charges etc., complete as per standard
specification and as directed by the
Engineer in charge.
3689.50 1 m
3
(onecubic meter) 58.00 Rupees Fifty Eight Only 213991.00
13
Refilling the trenches with excavated earth
including all labour charges etc., complete
as per standard specification.
143231.101 m
3(one
cubic meter)17.00 Rupees Seventeen Only 2434928.70
14
upp y, e very, ay ng, o n ng an es ng
of 200m dia. PVC (4KSC Working
pressure) pipe across Storm water drain /
Water course including all materialcharges and labour charges etc., complete as
er standard s ecification.
2096.001 M (one
meter)230.00
Rupees Two Hundred
Thirty Only482080.00
15 4 - 5 m depth (250 mm dia) 110.001 No (One
Number)288.00
Rupees Two Hundred
Eighty Eight Only31680.00
16
Labour for Open cutting road for laying
water mains or sewer for BT
Roads(250mm) including all labour charges
etc., complete as per standard specification.
16212.311 m
3(one
cubic meter)403.00
Rupees Four Hundred
Three Only6533560.93
17
Labour for cutting open road for laying
water mains or sewer for WBM
Roads(75mm thick) including all labour
charges etc., complete as per standard
s ecification.
556.881 m
3(one
cubic meter)288.00
Rupees Two Hundred
Eighty Eight Only160381.44
18
Labour for cutting open road for laying
water mains or sewer for Concerete
Roads(150mm thick) including all labour
charges etc., complete as per standard
specification.
8565.991 m
3(one
cubic meter)920.00
Rupees Nine Hundred
Twenty Only7880710.80
7/27/2019 BOQ Erode
29/640
19 3 - 4 m depth (450 mm dia) 1436.791 m
3(one
cubic meter)920.00
Rupees Nine Hundred
Twenty Only1321846.80
20
trench for laying the pipe line with
casuarina post at 1.52m c/c ( 8 to10 cmdia
and 1.52 m height ) verticals, painting the
vertical posts in different colours, tieing
with coir rope, fixing danger flags, dangerlights , reflectors including watching during
night for 1 Meter and all material charges
and labour charges etc., complete as per
210364.001 M (one
meter)
23.00Rupees Twenty Three
Only
4838372.00
Total in Figures 216846770.22
Total in Words
Rupees Twenty One Crores Sixty Eight Lakh Forty Six Thousand Seven Hundred
Seventy And Twenty Two Paise Only
7/27/2019 BOQ Erode
30/640
7/27/2019 BOQ Erode
31/640
21.2 1 - 2 m depth 1731.55
1m3
(One cubic
Meter)
92.00 Rupees Ninety Two Only
22
Earth work excavating anddepositing on bank with initial
lead of 10m and initial lift of 2
mts in Hard Stiff Clay, Hard
Read Earth under water,light
black cotton soil, sandy loam
and ordinary soil de-watering
wherever necessary including
all labour charg
22.1 2 - 3 m depth 432.89
1m3
(One cubicMeter)
104.00Rupees One Hundred
Four Only
22.2 3 - 4 m depth 100.25
1m3
(One cubic
Meter)
104.00Rupees One Hundred
Four Only
23
Earth work excavation and
depositing on bank with initial
lead of 10m and initial lift of 2
mts in Soft Disintegrated Rock,
laterite, soft rock or kankar not
requiring blasting including alllabour charges etc., complete as
per standard specification
23.1 1 - 2 m depth 432.89
1m3
(One cubic
Meter)
173.00Rupees One Hundred
Seventy Three Only
7/27/2019 BOQ Erode
32/640
23.2 2 - 3 m depth 601.52
1m3
(One cubic
Meter)
253.00Rupees Two Hundred
Fifty Three Only
23.3 3 - 4 m depth 503.65
1m3
(One cubic
Meter)
253.00Rupees Two Hundred
Fifty Three Only
23.4 4 - 5 m depth 145.73
1m3
(One cubic
Meter)
316.00Rupees Three Hundred
Sixteen Only
23.5 5 - 6 m depth 15.71
1m3
(One cubic
Meter)
316.00Rupees Three Hundred
Sixteen Only
24
Earth work excavating and
depositing on bank with initial
lead of 10m and initial lift of 2
mts in Medium Rock and Dense
Medium Roack which does not
require blasting including all
labour charges etc., complete as
per standard specification
24.1 2 - 3 m depth 200.51
1m3
(One cubicMeter)
414.00
Rupees Four Hundred
Fourteen Only
24.2 3 - 4 m depth 209.85
1m3
(One cubic
Meter)
414.00Rupees Four Hundred
Fourteen Only
7/27/2019 BOQ Erode
33/640
24.3 4 - 5 m depth 242.88
1m3
(One cubic
Meter)
518.00Rupees Five Hundred
Eighteen Only
24.4 5 - 6 m depth 39.26
1m3
(One cubic
Meter)
518.00Rupees Five Hundred
Eighteen Only
25
Hard rock excavation by
wedging, chiselling and
trimming to propoer shape
where blasting is prohibated and
depositing on bank with initial
lead of 10m and initial lift of 2
mts including all labour charges
etc., complete as per standard
specification
25.1 3 - 4 m depth 41.971m
3
(One cubic
Meter)
748.00Rupees Seven Hundred
Forty Eight Only
25.2 4 - 5 m depth 97.15
1m3
(One cubic
Meter)
863.00Rupees Eight Hundred
Sixty Three Only
25.3 5 - 6 m depth 23.56
1m3
(One cubicMeter)
863.00
Rupees Eight Hundred
Sixty Three Only
7/27/2019 BOQ Erode
34/640
26
Providing shoring & strutting
with sheet piles /wooden piles &
planks, with necessary support
for excavation beyond depth of2.00m, including de-watering,
cost of sheet pile/ wooden piles,
plank & other materials,
removing shoring and strutting
after the
26.1 2 - 2.5 m depth
26.2 200 mm dia 500.00
1 m2
(One Square
meter)
92.00 Rupees Ninety Two Only
26.3 2.5 - 3.0 m depth
26.4 200 mm dia 96.00
1 m2
(One Square
meter)
92.00 Rupees Ninety Two Only
26.5 3.0 - 3.5 m depth
26.6 200 mm dia 32.90
1 m2
(One Square
meter)
92.00 Rupees Ninety Two Only
26.7 3.5 - 4.0 m depth
26.8 200 mm dia 24.001 m
2
(One Square
meter)
92.00 Rupees Ninety Two Only
26.9 250 mm dia 49.60
1 m2
(One Square
meter)
92.00 Rupees Ninety Two Only
7/27/2019 BOQ Erode
35/640
26.10 4.0 - 4.5 m depth
26.11 200 mm dia 31.95
1 m2
(One Square
meter)
92.00 Rupees Ninety Two Only
26.12 250 mm dia 90.90
1 m2
(One Square
meter)
92.00 Rupees Ninety Two Only
26.13 300 mm dia 56.25
1 m2
(One Square
meter)
92.00 Rupees Ninety Two Only
26.14 350 mm dia 5.00
1 m2
(One Square
meter)
92.00 Rupees Ninety Two Only
26.15 4.5 - 5.0 m depth
26.16 200 mm dia 44.00
1 m2
(One Square
meter)
92.00 Rupees Ninety Two Only
26.17 250 mm dia 11.00
1 m2
(One Square
meter)
92.00 Rupees Ninety Two Only
26.18 300 mm dia 54.50
1 m2
(One Square
meter)
92.00 Rupees Ninety Two Only
7/27/2019 BOQ Erode
36/640
27
Supply of river sand filling and
compacting in trenches for
laying sewer pipes wherever
required including all labourcharges and including
dewatering wherever necessary
etc., complete as per standard
specification and as directed by
the Engineer in-charg
497.871m
3
(One cubic
Meter)
690.00Rupees Six Hundred
Ninety Only
28
Providing Bed concrete for
laying stone ware sewer pipes
wherever required as directed by
the Engineer in charge in Plain
Cement Concrete 1:4:8 (1cement: 4 river sand: 8 blue
granite metal) using 40 mm and
below ISS HBG, including
shuttering, compacting
28.1 upto 1.5m depth 11.21
1m3
(One cubic
Meter)
2972.00
Rupees Two Thousand
Nine Hundred Seventy
Two Only
28.2 1.5-4.5 m depth 15.00
1m3
(One cubic
Meter)
3566.00
Rupees Three Thousand
Five Hundred Sixty Six
Only
7/27/2019 BOQ Erode
37/640
29
Supplying, Laying and
Jointing of SW Pipes of
following diameters in cement
mortar 1:1.5 (1cement:1.5 riversand) and hemp yarn (IS
4127:1983) to the required
alignment and slope as indicated
in drawing/design and
hydraulically testing of the pipe
line.
29.1 0-2m Depth
29.2 200 mm dia 2680.001 m (One
meter)302.00
Rupees Three Hundred
Two Only
29.3 2.0-3.0 m Depth29.4 200 mm dia 580.00
1 m (One
meter)333.00
Rupees Three Hundred
Thirty Three Only
29.5 3.0-3.5 m Depth
29.6 200 mm dia 47.001 m (One
meter)333.00
Rupees Three Hundred
Thirty Three Only
7/27/2019 BOQ Erode
38/640
30
Supplying, Lowering, Laying
and Jointing of RCC - NP3 in
standard length of 2.5 m length
with socket and spigot pipes of
following diameters as per
relevant BIS specification,
manufactured with sulphate
resistent cement and coated with
12 mm thick SRC to resist
sulphate attack including cost of
rubber gasket including all
labour charges etc., complete as
per standard specification
30.1 3.00-4.00 m Depth
30.2 200 mm dia 30.001m (One
meter)926.00
Rupees Nine Hundred
Twenty Six Only
30.3 250mmdia 62.001m( One
meter)1103.00
Rupees One Thousand
One Hundred Three Only
30.4 4.00-5.00 m Depth
30.5 200 mm dia 159.001m( One
meter)938.00
Rupees Nine Hundred
Thirty Eight Only
30.6 250mmdia 224.001m( One
meter) 958.00Rupees Nine Hundred
Fifty Eight Only
30.7 300 mm dia 234.001m( One
meter)1485.00
Rupees One Thousand
Four Hundred Eighty
Five Only
7/27/2019 BOQ Erode
39/640
30.8 5.00-6.00 m Depth
30.9 250mmdia 115.001m( One
meter)958.00
Rupees Nine Hundred
Fifty Eight Only
30.10 300 mm dia 225.001m( One
meter)1485.00
upees ne ousan
Four Hundred Eighty
31 Null
31.1 Null
31.2 Null
31.3 Null
31.4 Null
31.5 Null
31.6 Null
7/27/2019 BOQ Erode
40/640
31.7 Null
32 Null
32.1 Null
32.2 Null
32.3 Null
32.4 Null
32.5 Null
32.6 Null
32.7 Null
33Construction of manholes ofdifferent depths as per type
design/drawing on sewer line
33.1 0 - 1 m depth 45.001No (One
Number)18400.00
Rupees Eighteen
Thousand Four Hundred
Only
7/27/2019 BOQ Erode
41/640
33.2 1 - 1.5 m depth 57.001No (One
Number)22540.00
Rupees Twenty Two
Thousand Five Hundred
Forty Only
33.3 1.5 - 2 m depth 28.001No (One
Number)26680.00
Rupees Twenty SixThousand Six Hundred
Eighty Only
33.4 2 - 2.5 m depth 9.001No (One
Number)30820.00
Rupees Thirty Thousand
Eight Hundred Twenty
Only
33.5 2.5 - 3 m depth 2.001No (One
Number)37375.00
Rupees Thirty Seven
Thousand Three Hundred
Seventy Five Only
33.6 3 - 3.5 m depth 2.001No (One
Number)
43470.00
Rupees Forty Three
Thousand Four Hundred
Seventy Only
33.7 3.5 - 4 m depth 7.001No (One
Number)49565.00
Rupees Forty Nine
Thousand Five Hundred
Sixty Five Only
33.8 4 - 4.5 m depth 15.001No (One
Number)55660.00
Rupees Fifty Five
Thousand Six Hundred
Sixty Only
33.9 4.5 - 5 m depth 8.001No (One
Number)61755.00
Rupees Sixty One
Thousand Seven Hundred
Fifty Five Only
33.10 5 - 5.5 m depth 7.001No (One
Number)67850.00
Rupees Sixty SevenThousand Eight Hundred
Fifty Only
34
Construction of drop manholes
of different depths as per type
desi n/drawin on sewer lines
7/27/2019 BOQ Erode
42/640
34.1 1.5 - 2 m depth 2.001No (One
Number)26680.00
Rupees Twenty Six
Thousand Six Hundred
Eighty Only
34.2 2.5 - 3 m depth 1.00 1No (OneNumber)
37375.00Rupees Thirty Seven
Thousand Three Hundred
Seventy Five Only
34.3 3.5 - 4 m depth 1.001No (One
Number)49565.00
Rupees Forty Nine
Thousand Five Hundred
Sixty Five Only
34.4 4 - 4.5 m depth 1.001No (One
Number)55660.00
Rupees Fifty Five
Thousand Six Hundred
Sixty Only
34.5 4.5- 5 m depth 2.001No (One
Number)
61755.00
Rupees Sixty One
Thousand Seven Hundred
Fifty Five Only
35
Disposal of surplus earth
including loading , conveyance
within a distance of 5km and
162.84
1m3
(One cubic
Meter)
58.00 Rupees Fifty Eight Only
36
Refilling the trenches with
excavated earth including all
labour charges etc., complete as
7987.641m
3
(One cubic
Meter)
17.00 Rupees Seventeen Only
37
Supply, delivery, laying,
jointing and testing of 200m
dia. PVC ( 4KSC Working
35.001 m (One
meter)270.00
Rupees Two Hundred
Seventy Only
38
Providing ventilating shaft
including all material charges
and labour charges etc.,
5.00 1No (OneNumber)
6739.00 Rupees Six ThousandSeven Hundred Thirty
Nine Only
7/27/2019 BOQ Erode
43/640
39
Labour for cutting open road for
laying water mains or sewer for
BT Roads(250mm) including all
labour charges etc., complete asper standard specification
613.46
1m3
(One cubic
Meter)
403.00Rupees Four Hundred
Three Only
40
Labour for cutting open road for
laying water mains or sewer for
WBM Roads(75mm thick)
including all labour charges etc.,
complete as per standard
specification
49.95
1m3
(One cubic
Meter)
288.00Rupees Two Hundred
Eighty Eight Only
41
Labour for cutting open road for
laying water mains or sewer for
Concerete Roads(150mm thick)
including all labour charges etc.,
complete as per standard
specification
5.261m
3
(One cubic
Meter)
920.00Rupees Nine Hundred
Twenty Only
42
Providing the end concrete at all
manholes with PCC 1:3:6 using
40 mm gauge hard broken stone
jelly for plain cement concrete
works including laying in layers
of not more than 15cm thick
including ramming curing , etc
complete to proper shape to
support t
60.00
1m3
(One cubic
Meter)
3338.00
Rupees Three Thousand
Three Hundred Thirty
Eight Only
7/27/2019 BOQ Erode
44/640
43
Barrication work along one side
of the trench for laying the pipe
line with casuarina post at 1.52
m c/c ( 8 to 10 cm dia and 1.52
m height ) verticals, painting the
vertical posts in different
colours, t ieing with coir rope,
fixing danger flags, danger l
8732.001 m (One
meter) 23.00Rupees Twenty Three
Only
Total in Figures 10810258.94
Total in Words Rupees One Crore Eight Lakh Ten Thousand Two Hundred Fifty
7/27/2019 BOQ Erode
45/640
321429.60
PROVIDING
Amount (Rs)
7/27/2019 BOQ Erode
46/640
159302.60
45020.56
10426.00
74889.97
7/27/2019 BOQ Erode
47/640
152184.56
127423.45
46050.68
4964.36
83011.14
86877.90
7/27/2019 BOQ Erode
48/640
125811.84
20336.68
31393.56
83840.45
20332.28
7/27/2019 BOQ Erode
49/640
46000.00
8832.00
3026.80
2208.00
4563.20
7/27/2019 BOQ Erode
50/640
2939.40
8362.80
5175.00
460.00
4048.00
1012.00
5014.00
7/27/2019 BOQ Erode
51/640
343530.30
33316.12
53490.00
7/27/2019 BOQ Erode
52/640
809360.00
193140.00
15651.00
7/27/2019 BOQ Erode
53/640
27780.00
68386.00
149142.00
214592.00
347490.00
7/27/2019 BOQ Erode
54/640
110170.00
334125.00
7/27/2019 BOQ Erode
55/640
828000.00
7/27/2019 BOQ Erode
56/640
1284780.00
747040.00
277380.00
74750.00
86940.00
346955.00
834900.00
494040.00
474950.00
7/27/2019 BOQ Erode
57/640
7/27/2019 BOQ Erode
58/640
247224.38
14385.60
4839.20
200280.00
7/27/2019 BOQ Erode
59/640
200836.00
Eight And Ninety Four Paise Only
7/27/2019 BOQ Erode
60/640
Figures Words
44 ScheduleNo:B1,
Road restoration for House
Service Connections - The
trenches are backfilled after
laying sewers and the trench
portion of the road shall be
restored as per IRC standard.
The trench portion shall be
excavated upto 20 cm depthand to be filled with PCC 1
73324.80
1m2
( One Squre
meter)
115.00Rupees One Hundred
Fifteen Only8432352.00
45 Earth work excavating and
depositing on bank with initial
lead of 10m and initial lift of 2
mts in Hard Stiff Clay Hard
Read Earth under water, light
black cotton soil,sandy loam
and ordinary soil de-watering
wherever necessary and as
directed by the Eng
14664.96
1m3
( One Cubic
meter)
92.00 Rupees Ninety Two Only 1349176.32
Sl No. Description of Work Quantity Units
RATE In Figures To be entered by the
Bidder
Rs. P Amount (Rs)
Tender Inviting Authority: COMMISSIONER ERODE CITY MUNICIPAL CORPORATION
Name of Work: PROVIDING UGSS TO ERODE ZONE-2,3,4 AND 5 AND VEERAPPANCHATHIRAM ZONE-8 AREA, PROVIDING
SEWAGE COLLECTION PUMPING STATIONS AND PUMPING MAIN.
Contract No: UGSS/7587/2010 dated: 10.12.2010
Bidder Name:
SCHEDULE OF WORKS
7/27/2019 BOQ Erode
61/640
46 Road restoration for sewer
system - The trenches are
backfilled after laying sewers
and the trench portion of theroad shall be restored as per
IRC standard. The trench
portion shall be excavated upto
30 cm depth and to be filled
with filling sand up to
84714.301m2
( One Squre
meter)
115.00Rupees One Hundred
Fifteen Only9742144.50
47 Earth work excavating and
depositing on bank with initial
lead of 10m and initial lift of 2
mts in Hard Stiff Clay Hard
Read Earth under water,lightblack cotton soil,sandy loam
and ordinary soil de-watering
wherever necessary and as
directed by the Engi
25414.29
1m3
( One Cubicmeter)
92.00 Rupees Ninety Two Only 2338114.68
48 Road restoration for Pumping
mains from Pumping stations of
Erode with CC - The trenches
are backfilled after laying
sewers and the trench portion of
the road shall be restored as perIRC standard. The trench
portion shall be excavated upto
20 cm depth a
6880.00
1m2
( One Squre
meter)
115.00Rupees One Hundred
Fifteen Only791200.00
49 Null
7/27/2019 BOQ Erode
62/640
50 Road restoration for Pumping
mains from Lift Stations of
Erode with CC- The trenches
are backfilled after layingsewers and the trench portion of
the road shall be restored as per
IRC standard. The trench
portion shall be excavated upto
20 cm depth and
1580.001m2
( One Squre
meter)
115.00Rupees One Hundred
Fifteen Only181700.00
Total in Figures 22834687.50Total in Words Rupees Two Crores Twenty Eight Lakh Thirty Four Thousand Six Hundred Eighty Seven And Fifty Paise Only
7/27/2019 BOQ Erode
63/640
Figures Words
51
Schedule No: B2 Name of
Work: Road Restoration
work for
VeerappanChathiramMunicip
ality
Road restoration for House
Service Connections - The
trenches are backfilled after
laying sewers and the trench
portion of the road shall berestored as per IRC standard.
The trench portion shall be
excavated upto 20 cm depth
and to be filled with PCC 1
62784.00
1m2
( One Squre
meter)
115.00Rupees One Hundred
Fifteen Only7220160.00
Sl No. Description of Work Quantity Units
RATE In Figures To be entered by
the Bidder
Rs. P Amount (Rs)
Tender Inviting Authority: COMMISSIONER ERODE CITY MUNICIPAL CORPORATION
Name of Work: PROVIDING UGSS TO ERODE ZONE-2,3,4 AND 5 AND VEERAPPANCHATHIRAM ZONE-8 AREA, PROVIDING
SEWAGE COLLECTION PUMPING STATIONS AND PUMPING MAIN.
Contract No: UGSS/7587/2010 dated: 10.12.2010
Bidder Name:
SCHEDULE OF WORKS
7/27/2019 BOQ Erode
64/640
52
Earth work excavating and
depositing on bank with initial
lead of 10m and initial lift of 2
mts in Hard Stiff Clay Hard
Read Earth under water,lightblack cotton soil,sandy loam
and ordinary soil de-watering
wherever necessary and as
directed by the Engi
12556.80
1m3
( One Cubicmeter)
92.00 Rupees Ninety Two Only 1155225.60
53
Road restoration for sewer
system - The trenches are
backfilled after laying sewers
and the trench portion of the
road shall be restored as per
IRC standard. The trenchportion shall be excavated upto
30 cm depth and to be filled
with filling sand up to
10278.80
1m2
( One Squre
meter)
115.00Rupees One Hundred
Fifteen Only1182062.00
54
Earth work excavating and
depositing on bank with initial
lead of 10m and initial lift of 2
mts in Hard Stiff Clay Hard
Read Earth under water,light
black cotton soil,sandy loam
and ordinary soil de-watering
wherever necessary and as
directed by the Engi
3083.64
1m3
( One Cubic
meter)
92.00 Rupees Ninety Two Only 283694.88
R d t ti f P i
7/27/2019 BOQ Erode
65/640
55
Road restoration for Pumping
mains from Pumping stations of
Surampatti with CC - The
trenches are backfilled after
laying sewers and the trenchportion of the road shall be
restored as per IRC standard.
The trench portion shall be
excavated upto 20 cm de
1470.00
1m2
( One Squremeter)
115.00Rupees One Hundred
Fifteen Only 169050.00
Total in Figures 10010192.48
Total in Words Rupees One Crore Ten Thousand One Hundred Ninety Two And Forty Eight Paise Only
7/27/2019 BOQ Erode
66/640
Figures Words
Sl No. Description of Work Quantity Units
RATE In Figures To be entered by
the Bidder
Rs. P
Tender Inviting Authority: COMMISSIONER ERODE CITY MUNICIPAL CORPORATION
Name of Work: PROVIDING UGSS TO ERODE ZONE-2,3,4 AND 5 AND VEERAPPANCHATHIRAM ZONE-8 AREA,
SEWAGE COLLECTION PUMPING STATIONS AND PUMPING MAIN.
Contract No: UGSS/7587/2010 dated: 10.12.2010
Bidder Name:
SCHEDULE OF WORKS
Schedule no C1 Name of
7/27/2019 BOQ Erode
67/640
56
Schedule no C1 Name of
Work: Construction of
Pumping Station PS2 at
Erode Open well excavation
complying with relevant clauseof T.N.S.S. and with a lead of
10mts in Hard stiff clay, stiff
Black cotton soil, hard red
earth, shales, murram, gravel,
stoney earth and earth mixed
with small size boulders and
hard gravely soil ,de-watering
wherever necessary and as
directed by the Engineer-in
charge. The rate shall includebarricading, putting up road
diversion boards and providing
red light signal during night and
all labour charges etc. complete
as per standard specification and
as directed by the Engineer in
charge.
56.1 0m - 2 m Depth 1235.191m3 (One
Cubic meter)92.00 Rupees Ninety Two Only
56.2 2m - 4 m Depth 299.591m3 (One
Cubic meter) 104.00Rupees One Hundred
Four Only
56.3 4m - 6 m Depth 199.191m3 (One
Cubic meter)115.00
7/27/2019 BOQ Erode
68/640
57
Open well excavation complying
with relevant clause of T.N.D.S.S.
and with a lead of 10mts in soft
disintegrated rock, laterite, softrock or kankar not requiring
blasting de-watering wherever
necessary and the rate including all
labour charges etc. complete as per
standard specification and as
directed by the Engineer in charge
57.1 0m - 2 m Depth 199.191m3 (One
Cubic meter)173.00
Rupees One Hundred
Seventy Three Only
58
Open well excavation complying
with relevant clause of T.N.D.S.S.
and with a lead of 10mts in soft
disintegrated rock,laterite,soft rock
or kankar not requiring blasting de-
watering wherever necessary and
the rate including all labour
charges etc. complete as per
standard specification and as
directed by the Engineer in charge
58.1 2m - 4 m Depth 279.761m3 (One
Cubic meter)207.00
Rupees Two Hundred
Seven Only
7/27/2019 BOQ Erode
69/640
59
Open well excavation complying
with relevant clause of T.N.S.S.
and with a lead of 10mts in
medium dense rock requiringblasting, de-watering wherever
necessary and the rate including all
labour charges etc.complete as per
standard specification and as
directed by the Engineer in charge
59.1 2m - 4 m Depth 535.901m3 (One
Cubic meter)414.00
Rupees Four Hundred
Fourteen Only
59.2 4m - 6 m Depth 68.131m3 (One
Cubic meter)518.00
Rupees Five Hundred
Eighteen Only
59.3 6m - 8 m Depth 15.181m3 (One
Cubic meter)647.00
Rupees Six Hundred
Forty Seven Only
60
Open well excavation complying
with relevant clause of T.N.S.S.
and with a lead of 10mts in
medium dense rock requiring
blasting, de-watering wherever
necessary and the rate including all
labour charges etc. complete as per
standard specification and asdirected by the Engineer in charge
60.1 2m - 4 m Depth 184.391m3 (One
Cubic meter)414.00
Rupees Four Hundred
Fourteen Only
60.2 4m - 6 m Depth 798.171m3 (One
Cubic meter)518.00
Rupees Five Hundred
Eighteen Only
60.3 6m - 8 m Depth 102.181m3 (One
Cubic meter)647.00
Rupees Six Hundred
Forty Seven Only
7/27/2019 BOQ Erode
70/640
61
Open well excavation complying
with relevant clause of T.N.S.S.
and with a lead of 10mts in Hard
granite measured in solidincluding blasting and stacking,
de-watering wherever necessary
and the rate including all labour
charges etc. complete as per
standard specification and as
directed by the Engineer in charge
61.1 4m - 6 m Depth 152.881m3 (One
Cubic meter)633.00
Rupees Six Hundred
Thirty Three Only
62
Open well excavation complyingwith relevant clause of T.N.S.S.
and with a lead of 10mts in Hard
granite measured in solid
including blasting and stacking, de-
watering wherever necessary and
the rate including all labour
charges etc. complete as per
standard specification and as
directed by the Engineer in charge
62.1 6m - 8 m Depth 746.541m3 (One
Cubic meter)791.00
Rupees Seven Hundred
Ninety One Only
7/27/2019 BOQ Erode
71/640
63
Open well excavation complying
with relevant clause of T.N.S.S.
and with a lead of 10mts in Hard
granite measured in solidincluding blasting and stacking,
de-watering wherever necessary
including all labour charges etc.
complete as per standard
specification and as directed by the
Engineer in charge
63.1 8m -10 m Depth 698.991m3 (One
Cubic meter)988.00
Rupees Nine Hundred
Eighty Eight Only
64
Supply of river sand and filling,spreading, levelling etc complete
in layers of 100mm thick including
cost and conveyance of sand
including all labour charges etc.
complete as per standard
specification and as directed by the
Engineer in charge
11.031m3 (One
Cubic meter)690.00
Rupees Six Hundred
Ninety Only
7/27/2019 BOQ Erode
72/640
65
Providing PCC M10 grade1:4:8
SRC, using 40 mm ISS hard
broken blue granite aggregate
including cost and conveyance ofall materials to site and handling
charges, levelling, compacting,
curing including all labour charges
etc. complete as per standard
specification for foundation
including cost of shuttering.
65.1 0 - 1.5 m Below GL 3.671m3 (One
Cubic meter)3067.00
Rupees Three Thousand
Sixty Seven Only
65.2 1.5- 4.5 m below GL 18.191m3 (One
Cubic meter)3680.00
Rupees Three Thousand
Six Hundred Eighty Only
65.3 4.5-9.0 m below GL 71.641m3 (One
Cubic meter)3987.00
Rupees Three Thousand
Nine Hundred Eighty
Seven Only
66
Providing PCC M15grade, using
20 mm ISS hard broken blue
granite aggregate including cost
and conveyance of all materials to
site and handling charges,
levelling, compacting, curing
including all labour charges etc.
complete as per standard
specifications for Ogee fall
including cost of shuttering.
19.491m3 (One
Cubic meter)3761.00
Rupees Three Thousand
Seven Hundred Sixty One
Only
Providing PCC M15grade using
7/27/2019 BOQ Erode
73/640
67
Providing PCC M15grade, using
20 mm ISS hard broken blue
granite aggregate including cost
and conveyance of all materials to
site and handling
charges,levelling, compacting,
curing including all labour charges
etc. complete as per standard
specifications for Grit Chamber
corner line
28.981m3 (One
Cubic meter)3761.00
Rupees Three ThousandSeven Hundred Sixty One
Only
68
Providing Centering Props with
cross bracing to the required
height and shuttering (steel/ wood)
as directed by the Engineer incharge, for the following works (IS
456:2000). Tie rods shall be
provided to hold the shuttering in
position wherever required as
directed by the Engineer in charge
including all labour charges etc.
complete as per standard
specifications
68.1 0m - 3.3m above GL
68.2 Side Wall 580.79
1m2
( One Squre
meter)
138.00Rupees One Hundred
Thirty Eight Only
68.3 Column 35.20
1m2
( One Squre
meter)
122.00Rupees One Hundred
Twenty Two Only
1m2R pees T o H ndred
7/27/2019 BOQ Erode
74/640
68.4 3.3-4.3 above G.L 11.04 ( One Squre
meter)
244.00Rupees Two Hundred
Forty Four Only
68.5 4.3-5.3m above GL
68.6 Column 6.16
1m2
( One Squre
meter)
122.00Rupees One Hundred
Twenty Two Only
68.7 0-3.3 m below GL
68.8 Side walls 1748.40
1m2
( One Squre
meter)
122.00Rupees One Hundred
Twenty Two Only
68.9 Column 4.40
1m2
( One Squre
meter)
122.00Rupees One Hundred
Twenty Two Only
68.10 3.3-4.3 m below GL
68.11 Side walls 379.00
1m2
( One Squre
meter)
276.00Rupees Two Hundred
Seventy Six Only
68.12 4.3-5.3 m below GL
68.13 Side wall 329.41
1m2
( One Squre
meter)
276.00Rupees Two Hundred
Seventy Six Only
68.14 5.3-6.3 m below GL
68.15 Side wall 272.78
1m2
( One Squre
meter)
276.00 Rupees Two HundredSeventy Six Only
68.16 6.3-7.3 m below GL
68.17 Side Wall 222.18
1m2
( One Squre
meter)
276.00Rupees Two Hundred
Seventy Six Only
68.18 7.3-8.3 m below GL
1m2Rupees Three Hundred
7/27/2019 BOQ Erode
75/640
68.19 Side Wall 205.50 ( One Squre
meter)
345.00Rupees Three Hundred
Forty Five Only
68.20 8.3-9.3 m below GL
68.21 Side Wall 25.85
1m2
( One Squre
meter)
345.00Rupees Three Hundred
Forty Five Only
69
Providing RCC M30 grade using
20 mm& 10mm ISS hard broken
blue granite aggregate including
cost of material and conveyance of
all materials to site, including
labour charges and other incidental
charges, laying concrete andcuring etc., complete as per
standard specifications excluding
the cost of reinforcements.
69.1 Base slab
69.2 0 - 1.5 m Below GL 6.531m3 (One
Cubic meter)4800.00
Rupees Four Thousand
Eight Hundred Only
69.3 1.5- 4.5 m below GL 79.081m3 (One
Cubic meter)5760.00
Rupees Five Thousand
Seven Hundred Sixty
Only
69.4 4.5-9.0 m below GL 490.601m3 (One
Cubic meter)6240.00
Rupees Six Thousand
Two Hundred Forty Only
69.5 Side walls ( 0-1m )
69.6 0-4.5 m above GL 182.651m3 (One
Cubic meter)5760.00
Rupees Five Thousand
Seven Hundred Sixty
Only
1m3 (One Rupees Six Thousand
7/27/2019 BOQ Erode
76/640
69.7 4.5-9m above GL 27.341m3 (One
Cubic meter)6240.00
Rupees Six Thousand
Two Hundred Forty Only
69.8 0 - 1.5 m Below GL 245.041m3 (One
Cubic meter)4800.00
Rupees Four Thousand
Eight Hundred Only
69.9 1.5- 4.5 m below GL 352.051m3 (One
Cubic meter)5760.00
Rupees Five Thousand
Seven Hundred Sixty
Only
69.10 4.5-9.0 m below GL 379.561m3 (One
Cubic meter)
6240.00Rupees Six Thousand
Two Hundred Forty Only
70
Supplying, fabricating and placing
in position steel reinforcement and
chairs including provision of cover
blocks and wooden wall ways at
intervals. The rate shall include
cost of binding wire, labour,
transportation, cutting, bending,
cranking,welding etc, complete as
per standard specifications and asper directed by Engineer in charge.
261460.001 Kg (One
Kilogram)48.00 Rupees Forty Eight Only
71
loading & unloading, conveyance
within a distance of 2 Km and3355.80
1m3 (One
Cubic meter)58.00 Rupees Fifty Eight Only
2
excavated earth available in layers183
1m3 (One17 00 S O l
7/27/2019 BOQ Erode
77/640
72excavated earth available in layers
of 150 mm thick, watering,1837.75
1m3 (One
Cubic meter)17.00 Rupees Seventeen Only
73
encapsulated with PVC includingall material charges and labour
355.00 1 No (OneNumber)
115.00 Rupees One HundredFifteen Only
74
over one coat of primer coat
including necessary scaffolding etc114.70
1m2
( One Squre
meter)
58.00 Rupees Fifty Eight Only
75
including material charges and all
labour charges etc. complete as per12.00
1 No (One
Number)2875.00
Rupees Two Thousand
Eight Hundred Seventy
Five Only
76
as per IS:13349-1992 with
Thimble mounted rising
20.001 No (One
Number)
61130.00
Rupees Sixty One
Thousand One Hundred
Thirty Only
77
Manhole cover and frame (600
mm dia) including all material3.00
1 No (One
Number)1725.00
Rupees One Thousand
Seven Hundred Twenty
Five Only
78
. .
frame of size 60 x 60 cm including
necessary masonry work and9.00
1 No (One
Number)5750.00
Rupees Five Thousand
Seven Hundred Fifty
Only
79
bricks in cement mortar 1:5 for 23
cm thick wall including curing
79.1 0-4.5m Above GL 34.751m3 (One
Cubic meter)5291.00
Rupees Five ThousandTwo Hundred Ninety One
Only
79.2 4.5-9.0m Above GL 6.651m3 (One
Cubic meter)5751.00
Rupees Five Thousand
Seven Hundred Fifty One
Only
80
20 mm HBG aggregate including
7/27/2019 BOQ Erode
78/640
80gg g g
cost of material and conveyance of
80.1 0-4.5m above GL 27.25 1m3 (OneCubic meter)
4604.00 Rupees Four ThousandSix Hundred Four Only
81
,
thick for inside & outside of wall
including cost and conveyance of346.97
1m2
( One Squre
meter)
117.00Rupees One Hundred
Seventeen Only
82
mm thick in CC 1:2:4 mix using
10mm to 12mm sizes HBG metal48.00
1m2
( One Squre
meter)
94.00 Rupees Ninety Four Only
83
for reinforced cement concrete
works using steel shuttering and
83.1 Sunshade (3.3 - 4.3m) 4.32
1m2
( One Squre
meter)
92.00 Rupees Ninety Two Only
83.2 Roof Slab 4.3-5.3 m Height 150.141m2 ( One
Squre meter)115.00
Rupees One Hundred
Fifteen Only
84
in position MS rounds or RTS
rods for RCC works including cost2730.00
1m2
( One Squre
meter)
4715.00
Rupees Four Thousand
Seven Hundred Fifteen
Only
85
fixing in position Anodised Alu.
Natural colour mat finish with11.52
1m2( One Squre
meter)
4025.00Rupees Four Thousand
Twenty Five Only
86
door with frame (1 x 2.50m)
including all labour charges etc.5.04
1m2 (One
Squre meter)2875.00
Rupees Two Thousand
Eight Hundred Seventy
Five Only
87
windows including priming coat288 00
1 Kg (One75 00
Rupees Seventy Five
7/27/2019 BOQ Erode
79/640
87including all labour charges etc.
288.00Kilogram)
75.00Only
88
lime concrete including allmaterail charges labour charges 6.51 1m3 (OneCubic meter) 1380.00
Rupees One Thousand
Three Hundred EightyOnly
89
of flat tiles of 20cmx20cmx2cm
using CM 1:3 mixed with crude oil67.86
1m2 (One
Squre meter)575.00
Rupees Five Hundred
Seventy Five Only
90
cement paint over one primer coat
including necessary scaffolding394.97
1m2 (One
Squre meter)35.00 Rupees Thirty Five Only
91
PVC 4 KSc pipes for rain water
down pipe with necessary clamps,8.70
1 m (One
meter)173.00
Rupees One Hundred
Seventy Three Only
92
.
windows and gates in postion
incluidng cost of T.W plugs all5.76
1m2 (One
Squre meter)2875.00
Rupees Two Thousand
Eight Hundred Seventy
Five Only
Total in Figures 41653647.91
Total in Words Rupees Four Crores Sixteen Lakh Fifty Three Thousand Six Hundr
7/27/2019 BOQ Erode
80/640
Amount (Rs)
PROVIDING
7/27/2019 BOQ Erode
81/640
113637.48
31157.36
22906.85
7/27/2019 BOQ Erode
82/640
34459.87
57910.32
7/27/2019 BOQ Erode
83/640
221862.60
35291.34
9821.46
76337.46
413452.06
66110.46
7/27/2019 BOQ Erode
84/640
96773.04
590513.14
7/27/2019 BOQ Erode
85/640
690602.12
7610.70
7/27/2019 BOQ Erode
86/640
11255.89
66939.20
285628.68
73301.89
7/27/2019 BOQ Erode
87/640
108993.78
80149.02
4294.40
2693.76
7/27/2019 BOQ Erode
88/640
751.52
213304.80
536.80
104604.00
90917.16
75287.28
61321.68
70897.50
7/27/2019 BOQ Erode
89/640
8918.25
31344.00
455500.80
3061344.00
1052064.00
170601.60
7/27/2019 BOQ Erode
90/640
1176192.00
2027808.00
2368454.40
12550080.00
194636.40
31241.75
7/27/2019 BOQ Erode
91/640
40825.00
6652.31
34500.00
1222600.00
5175.00
51750.00
183862.25
38244.15
7/27/2019 BOQ Erode
92/640
125459.00
40595.49
4512.00
397.44
17266.10
12871950.00
46368.00
14490.00
21600.00
7/27/2019 BOQ Erode
93/640
8983.80
39019.50
13823.95
1505.10
16560.00
ed Forty Seven And Ninety One Paise Only
Tender Inviting Authority: COMMISSIONER ERODE CITY MUNICIPAL CORPORATION
Name of Work: PROVIDING UGSS TO ERODE ZONE-2,3,4 AND 5 AND VEERAPPANCHATHIRAM ZONE-8 AREA,
SEWAGE COLLECTION PUMPING STATIONS AND PUMPING MAIN
7/27/2019 BOQ Erode
94/640
Figures Words
93
Schedule No: C2:Name of
Work:Construction of Pumping
Station PS8 at
VeerappanChathiram
Open well excavation complying
with relevant clause of T.N.S.S.
and with a lead of 10mts in Hard
stiff clay,stiff Black cotton soil,
hard red earth, shales, murram,
gravel, stoney earth and earth
mixed with small size boulders
and hard gravely soil ,de-wa
93.1 0m-2 m Depth 99.121m
3(One
Cubic meter)92.00 Rupees Ninety Two Only
Sl No. Description of Work Quantity Units
RATE In Figures To be entered by
the Bidder
Rs. P
SEWAGE COLLECTION PUMPING STATIONS AND PUMPING MAIN.
Contract No: UGSS/7587/2010 dated: 10.12.2010
Bidder Name:
SCHEDULE OF WORKS
Open well excavation complying
with relevant clause of T.N.S.S.
and with a lead of 10mts in soft
di i t t d k k k t
7/27/2019 BOQ Erode
95/640
94disintegrated rock or kankar not
requiring blasting first depth of 2m (0-2m) including all labour
charges etc. complete as per
standard specification
94.1 0-2 m Depth 92.071m
3(One
Cubic meter)173.00
Rupees One Hundred
Seventy Three Only
95
Open well excavation complying
with relevant clause of T.N.S.S.
and with a lead of 10mts in
medium dense rock requiring
blasting, de-watering wherevernecessary including all labour
charges etc. complete as per
standard specification and as
directed by t
95.1 2-4 m Depth 136.851m
3(One
Cubic meter)414.00
Rupees Four Hundred
Fourteen Only
96
Open well excavation complying
with relevant clause of T.N.S.S.
and with a lead of 10mts in
medium dense rock requiring
blasting, de-watering wherever
necessary including all labour
charges etc. complete as per
standard specification and as
directed by
96.1 4-6 m Depth 63.511m
3(One
Cubic meter)518.00
Rupees Five Hundred
Eighteen Only
Open well excavation complying
7/27/2019 BOQ Erode
96/640
97
Open well excavation complying
with relevant clause of T.N.S.S.and with a lead of 10mts in Hard
granite measured in solid
including blasting and stacking,
de-watering wherever necessary
including all labour charges etc.
complete as per standard specifi
97.1 4-6m Depth 44.681m
3(One
Cubic meter)633.00
Rupees Six Hundred
Thirty Three Only
98
Open well excavation complyingwith relevant clause of T.N.S.S.
and with a lead of 10mts in Hard
granite measured in solid
including blasting and stacking,
de-watering wherever necessary
including all labour charges etc.
complete as per standard specifi
98.1 6-8m Depth 55.721m
3(One
Cubic meter)791.00
Rupees Seven Hundred
Ninety One Only
99
Supply of river sand and filling,
spreading, levelling etc complete
in layers of 100mm thick including
cost and conveyance of sand
including all labour charges etc.
complete as per standard
specification
2.711m
3(One
Cubic meter)690.00
Rupees Six Hundred
Ninety Only
Providing PCC M10 grade, using
40 mm ISS hard broken blue
granite aggregate including cost
and conveyance of all materials to
7/27/2019 BOQ Erode
97/640
100
and conveyance of all materials to
site and handlingcharges,levelling, compacting,
curing etc. complete as per
standard specifications for
foundation including c
100.1 0 - 1.5 m Below GL 0.931m
3(One
Cubic meter)3067.00
Rupees Three Thousand
Sixty Seven Only
100.2 1.5- 4.5 m below GL 2.711m
3(One
Cubic meter)3680.00
Rupees Three Thousand
Six Hundred Eighty Only
100.3 4.5-9.0 m below GL 6.841m
3(One
Cubic meter)3987.00
Rupees Three Thousand
Nine Hundred Eighty
Seven Only
101
Providing PCC M15grade, using
20 mm ISS hard broken blue
granite aggregate including cost
and conveyance of all materials to
site and handling charges,
levelling, compacting, curingetc.complete as per standard
specifications for Ogee fall
including cos
3.381m
3(One
Cubic meter)3761.00
Rupees Three Thousand
Seven Hundred Sixty One
Only
102
Providing PCC M15grade, using
20 mm ISS hard broken blue
granite aggregate including cost
and conveyance of all materials to6 69
1m3(One
3761 00
Rupees Three Thousand
S d d Si O
7/27/2019 BOQ Erode
98/640
102and conveyance of all materials to
site and handlingcharges,levelling, compacting,
curing etc. complete as per
standard specifications
6.691m (One
Cubic meter)
3761.00 Seven Hundred Sixty One
Only
103
Providing steel sheet centering to
the required height and shuttering
(steel/ wood) as directed by the
Engineer in charge, for the
following works (IS 456:2000).
Tie rods shall be provided to hold
the shuttering in position whereverrequired including al
103.1 0-3.30m above GL
103.2 Side wall 113.011m
2(One
Squre meter)138.00
Rupees One Hundred
Thirty Eight Only
103.3 Column 10.561m
2(One
Squre meter)122.00
Rupees One Hundred
Twenty Two Only
103.4 3.30m-4.30 above GL
103.5 Column 5.441m
2(One
Squre meter) 244.00
Rupees Two Hundred
Forty Four Only
103.6 0-3.30m below GL
103.7 Side wall 354.971m
2(One
Squre meter)138.00
Rupees One Hundred
Thirty Eight Only
103.8 Column 1.601m
2(One
Squre meter)244.00
Rupees Two Hundred
Forty Four Only
103.9 3.3-4.3 m below GL
103.10 Side wall 83.781m
2(One
Squre meter)276.00
Rupees Two Hundred
Seventy Six Only
103.11 4.3-5.3 m below GL
1m2
(One Rupees Two Hundred
7/27/2019 BOQ Erode
99/640
103.12 Side wall 42.38
1m (One
Squre meter)276.00
Rupees Two Hundred
Seventy Six Only
103.13 5.3-6.3 m below GL
103.14 Side wall 33.491m
2(One
Squre meter)276.00
Rupees Two Hundred
Seventy Six Only
103.15 6.3-7.3 m below GL
103.16 Side wall 14.301m
2(One
Squre meter)276.00
Rupees Two Hundred
Seventy Six Only
104
Providing RCC M30 grade using
20 mm& 10mm ISS hard broken
blue granite aggregate including
cost of material and conveyance of
all materials to site, including
labour charges and other incidental
charges, laying concrete and
curing etc.,excluding the cos
104.1 Upto 4.5m above GL 23.961m
3(One
Cubic meter)5760.00
Rupees Five Thousand
Seven Hundred Sixty
Only
104.2 4.5m to 9.00m above GL 0.16 1m3 (One
Cubic meter)6240.00 Rupees Six Thousand
Two Hundred Forty Only
104.3 Column 0.161m
3(One
Cubic meter)4800.00
Rupees Four Thousand
Eight Hundred Only
104.4 0 - 1.5 m Below GL 36.991m
3(One
Cubic meter)4800.00
Rupees Four Thousand
Eight Hundred Only
104.5 1.5m to 4.50 below GL 68.601m
3(One
Cubic meter)5760.00
Rupees Five Thousand
Seven Hundred Sixty
Only
13(O Rupees Six Thousand
7/27/2019 BOQ Erode
100/640
104.6 4.5-9.0 m below GL 39.34
1m3(One
Cubic meter) 6240.00
Rupees Six Thousand
Two Hundred Forty Only
105
Supplying, fabricating and placing
in position steel reinforcement and
chairs including provision of cover
blocks and wooden wall ways at
intervals. The rate shall include
cost of binding wire, labour,
transportation, cutting, bending,
cranking,welding
27050.001 Kg
(One
Kilogram)48.00 Rupees Forty Eight Only
106
Disposal of surplus earth including
loading & unloading, conveyance
within a distance of 2 Km and
spreading including all labour
charges etc. complete as per
standard specification as directed
by the Engineer in charge.
360.861m
3(One
Cubic meter)58.00 Rupees Fifty Eight Only
107
Refilling the trenches with suitable
excavated earth available in layers
of 150 mm thick, watering,
ramming & consolidation
including all labour charges etc.
complete as per standard
specification and as directed by the
Departmental Engineer.
131.091m
3(One
Cubic meter)17.00 Rupees Seventeen Only
108
Supply and fixing of CI steps
encapsulated with PVC including
all labour charges etc. complete as
per standard specification
130.001 No (One
Number)115.00
Rupees One Hundred
Fifteen Only
7/27/2019 BOQ Erode
101/640
per standard specification
109
Painting two coats of cement paint
over one coat of primer coat
including necessary scaffolding etc
for outside including all labour
charges etc. complete as per
standard specification
47.741m
2(One
Squre meter)69.00 Rupees Sixty Nine Only
110
Providing and fixing MS Ladder
including material charges and all
labour charges etc. complete as perstandard specifications
3.001 No (One
Number)
2875.00
Rupees Two Thousand
Eight Hundred Seventy
Five Only
111
Providing Sluice Gate as per
IS:13349-1992 with Thimble
mounted rising spindle.(600x600)
including all material charges and
labour charges etc. complete as per
standard specifications
5.001 No (One
Number)17388.00
Rupees Seventeen
Thousand Three Hundred
Eighty Eight Only
112
FRC Manhole cover and frame of
size 600mm dia including allmaterial charges and labour
charges etc. complete as per
standard specifications
1.00 1 No (OneNumber)
5750.00 Rupees Five ThousandSeven Hundred Fifty
Only
113
Providing and fixing L.S.cover and
frame of size 60 x 60 cm including
necessary masonry work and
plastering, etc., complete and all3.00
1 No (One
Number)5750.00
Rupees Five Thousand
Seven Hundred Fifty
Only
7/27/2019 BOQ Erode
102/640
labour charges etc. complete as perstandard specifications
Only
Total in Figures 2798689.34
Total in Words Rupees Twenty Seven Lakh Ninety Eight Thousand Six Hundr
PROVIDING
7/27/2019 BOQ Erode
103/640
9119.04
Amount (Rs)
7/27/2019 BOQ Erode
104/640
15928.11
56655.90
32898.18
7/27/2019 BOQ Erode
105/640
28282.44
44074.52
1869.90
7/27/2019 BOQ Erode
106/640
2852.31
9972.80
27271.08
12693.38
25161.09
7/27/2019 BOQ Erode
107/640
15595.38
1288.32
1327.36
48985.86
390.40
23123.28
11696.88
7/27/2019 BOQ Erode
108/640
9243.24
3946.80
138009.60
998.40
768.00
177552.00
395136.00
245481.60
7/27/2019 BOQ Erode
109/640
1298400.00
20929.88
2228.53
14950.00
7/27/2019 BOQ Erode
110/640
3294.06
8625.00
86940.00
5750.00
17250.00
7/27/2019 BOQ Erode
111/640
ed Eighty Nine And Thirty Four Paise Only
Tender Inviting Authority: COMMISSIONER ERODE CITY MUNICIPAL CORPORATION
Name of Work: PROVIDING UGSS TO ERODE ZONE-2,3,4 AND 5 AND VEERAPPANCHATHIRAM ZONE-8 AREA, PROVIDING
SEWAGE COLLECTION PUMPING STATIONS AND PUMPING MAIN.
Contract No: UGSS/7587/2010 dated: 10.12.2010
7/27/2019 BOQ Erode
112/640
Figures Words
114
Schedule No: D,Name of Work:
Construction of Lift Station at
Erode.
Open well excavation complying
with relevant clause of T.N.S.S.
and with a lead of 10mts in Hard
stiff clay,stiff Black cotton soil,
hard red earth, shales, murram,
gravel, stoney earth and earth
mixed with small size boulders
and hard gravely soil ,de-wa
114.1 0 to 2 m depth 139.961m
3(One
Cubic meter)92.00 Rupees Ninety Two Only 12876.32
Sl No. Description of Work Quantity Units
RATE In Figures To be entered by
the Bidder
Rs. P Amount (Rs)
Bidder Name:
SCHEDULE OF WORKS
115
Open well excavation complying
with relevant clause of T.N.D.S.S.
and with a lead of 10mts in soft
disintegrated rock,laterite,soft rock
or kankar not requiring blasting de
7/27/2019 BOQ Erode
113/640
or kankar not requiring blasting dewatering wherever necessary
including all labour charges etc.
complete as per stan
115.1 0 to 2 m depth 66.021m
3(One
Cubic meter)173.00
Rupees One Hundred
Seventy Three Only11421.46
115.2 2 to 4 m depth 52.821m
3(One
Cubic meter)207.00
Rupees Two Hundred
Seven Only10933.74
115.3 4 to 6 m depth 52.821m
3(One
Cubic meter)
230.00Rupees Two Hundred
Thirty Only
12148.60
116
Open well excavation complying
with relevant clause of T.N.S.S.
and with a lead of 10mts in Hard
granite measured in solid
including blasting and stacking de
watering wherever necessary
including all labour charges etc.
complete as per standard specifica
116.1 0 to 2 m depth 5.28 1m3 (One
Cubic meter)403.00 Rupees Four Hundred
Three Only2127.84
116.2 2 to 4 m depth 121.471m
3(One
Cubic meter)518.00
Rupees Five Hundred
Eighteen Only62921.46
116.3 4 to 6 m depth 71.301m
3(One
Cubic meter)633.00
Rupees Six Hundred
Thirty Three Only45132.90
116.4 6 to 8 m depth 50.701m
3(One
Cubic meter)791.00
Rupees Seven Hundred
Ninety One Only40103.70
Open well excavation complying
with relevant clause of T.