Analisa BOQ

Embed Size (px)

DESCRIPTION

fff

Citation preview

000000000

AAAAAAAAA

Bahan 10 DAFTAR HARGA SATUAN BAHAN DAN UPAH

A. Harga Satuan Bahan

NONAMA BARANGSATUANHARGA SATUAN

1234FINISHING1Amplaslbr2Cat besikg3Cat dasarkg4Cat emcokg5Cat menie besikg6Cat menie kayukg7Cat tembok Decolithkg8Cat tembok Duluxkg9Cat tembok Emcokg10Cat tembok Paragonkg11Cat tembok Toyopaintkg12Cat tembok Vinilexkg13Cat tembok Vinippaintkg14Dempulltr15Kuasbh16Mildzak17Minyak catltr18Plamir kayukg19Plamir tembokkg20Politur dasarltr21Politur ultraltr22Politur vernisltr23Thiner A Bonanzaltr24Thiner B Spesialltr25Masterseal 440Kg

PENUTUP ATAP26Alang-alang panjang 2,4 meterlbr27Alluminium foilm228Asbes Bubunganlbr29Asbes Gelombang 1,80 m x 0,80 m x 5 mmlbr30Asbes Gelombang 2,4 m x 1,05 m x 4 mmlbr31Asbes Rata 2 m x 1 m x 4 mmlbr32Atap metal Toratora 1 x 4 Extram233Atap metal Toratora 1 x 4 Premiumm234Atap metal Toratora 2 x 4 Extram235Atap metal Toratora 2 x 4 Premiumm236Atap metal Toratora 3 x 4 Extram237Atap metal Toratora 3 x 4 Premiumm238Atap metal Toratora 4 x 4 Extram239Atap metal Toratora 4 x 4 Premiumm240Bentala parasbh41Bentala tanah liatbh42Besi profil WF P.6 mkg43Besi profil WF P.12 mkg44Besi stripkg45Bubungan Biasabj46Bubungan Karang Pilang (glazur) isi 3,5/mbj47Bubungan Karang Pilang isi 3,5/mbj48Bubungan Ngalayur isi 3,5/mbj49Bubungan Plentongbj50Bubungan Utama isi 3,5/mbj51Genteng Kanmuri (glazur) isi 14/m2bj52Genteng Kodok Karang Pilang (Bambe) isi 20/m2bj53Genteng Kodok Karang Pilang (Bisma) isi 20/m2bj54Genteng Kodok Karang Pilang (Good Year) isi 20/m2bj55Genteng Morando Abadi isi 18/m2bj56Genteng Morando Jatiwangi isi 18/m2bj57Genteng Morando Ngalayur isi 20/m2bj58Genteng Plentongbj59Genteng plentong dicatbj60Genteng Plentong Jatiwangi isi 24/m2bj61Ijukkg62Ikut celedu parasbh63Ikut celedu tanah liatbh64Murda parasbh65Murda tanah liatbh66Seng BJLS 0,20 gelombanglbr67Seng BJLS 0,25 gelombanglbr68Seng BJLS 0,28 gelombanglbr69Seng BJLS 0,32 gelombanglbr70Seng Plat 3" x 6" BJLS 28lbr71Sirap Jatibh72Tali Ijukkg73Tali pengikat alang-alangikat

PENGGANTUNG74Engsel kupu-kupups75Engsel nylonps76Espagnolethset77Grendel biasabh78Grendel hararobh79Kaca 3 mm beningm280Kaca 5 mm beningm281Kaca 6 mm beningm282Kaca 8 mm beningm283Kaca 10 mm beningm284Kaca 12 mm beningm285Kaca Es/Kapur 3 mmm286Kaca Es/Kapur 5 mmm287Kaca nakodaun88Kaca nako teralis beningm289Kaca ryben 3 mmm290Kaca ryben 5 mmm291Kait angin biasa bh92Kunci pintu TOPbh93Kunci pintu Unionbh94Kunci pintu Vanesabh95Kunci pintu Yalebh96Kunci pintu YURIbh97Kunci slotbh98Kunci tanam 2 slagbh

KAYU DAN PLAFOND99Bambu besar Ukuran 4 mbtg100Bambu sedang Ukuran 4 mbtg101Bambu kecil Ukuran 4 mbtg102Celling teak (0,62 x 2,40) m2lbr103Eternitlbr104Formikalbr105Gedeg kulit kelas Im2106Gypsum Oldlbr107Hard board MDFlbr108Kalsiboard 4,5 mmlbr109Kalsiboard 10 mmlbr110Kayu bekesting m3111Kayu bingkirai m3112Kayu bingkirai papanm3113Kayu dolken (pekerjaan sementara)btg114Kayu jati m30.016162.59500593750115Kayu jati papanm3116Kayu kamper balokm3575000065000006125000117Kayu kamper usuk/rengm3118Kayu kamper papanm3119Kayu kruing balokm3120Kayu kruing usuk/rengm3121Kayu kruing papanm3122Kayu meranti balokm3123Kayu meranti usuk/rengm3124Kayu meranti papanm3125Kayu merbaum3126Kayu merbau papanm30.0127Kayu profilm1128Kayu seseh balokm3129Kayu seseh dolkenm3130Lem Aibondkg131Lem Kayultr132List Gypsum standarm'133Minyak bekistingltr134Multiplek 12 mmlbr135Multiplek 18 mmlbr136Multiplek 6 mmlbr79000137Multiplek 9 mmlbr104200138Plywood 12 mmlbr139Plywood 3 mmlbr140Plywood 4 mmlbr141Plywood 6 mmlbr142Plywood 9 mmlbr143Plywood aluminiumlbr144Teak wood (0,9x2,20) m2lbr145Teak wood (1,20x2,40) m2lbr

KERAMIKIKAD146Ikad (Keramik) Kw. I 10 x 20 cmm2147Ikad (Keramik) Kw. I 20 x 20 cmm2148Ikad (Keramik) Kw. I 20 x 30 cmm2149Ikad (Keramik) Kw. I 30 x 30 cmm2150Ikad (Keramik) Kw. I 40 x 40 cmm2151Ikad (Keramik) Kw. II 10 x 20 cmm2152Ikad (Keramik) Kw. II 20 x 20 cmm2153Ikad (Keramik) Kw. II 20 x 30 cmm2154Ikad (Keramik) Kw. II 30 x 30 cmm2155Ikad (Keramik) Kw. II 40 x 40 cmm2

INESA156Keramik 30 x 30 Kelas I (Onyx Phyrus Ruby Jade, P)m2157Keramik 30 x 30 Kelas I (Onyx Phyrus Ruby Jade, UP)m2158Keramik 30 x 30 Kelas I (Pearl Ghita Cat Eye, P)m2159Keramik 30 x 30 Kelas I (Pearl Ghita Cat Eye, UP)m2160Keramik 30 x 30 Kelas I (Sand Wheat Spruce Clay Charcoal, R)m2161Keramik 40 x 40 Kelas I (Corypha Roystonea Raphia, P)m2162Keramik 40 x 40 Kelas I (Onyx Phyrus Ruby Jade, P)m2163Keramik 40 x 40 Kelas I (Onyx Phyrus Ruby Jade, UP)m2164Keramik 40 x 40 Kelas I (Pearl Ghita Cat Eye, P)m2165Keramik 40 x 40 Kelas I (Pearl Ghita Cat Eye, UP)m2166Keramik 60 x 60 Kelas I (Corypha Roystonea Raphia, P)m2

ESSENZA167Keramik 30 x 30 Kelas I (Black Orchid, Coral Bell, P)m2168Keramik 30 x 30 Kelas I (Black Orchid, Coral Bell, UP)m2169Keramik 30 x 30 Kelas I (Pepper Grey Price Rubert Silver star, P)m2170Keramik 30 x 30 Kelas I (Pepper Grey Price Rubert Silver star, UP)m2171Keramik 40 x 40 Kelas I (Pepper Grey Price Rubert Silver star, P)m2172Keramik 40 x 40 Kelas I (Pepper Grey Price Rubert Silver star, UP)m2173Keramik 60 x 60 Kelas I (Pepper Grey Price Rubert Silver star, P)m2174Keramik Kelas I Domusm2175Keramik Kelas I Granity Imperialim2176Keramik Kelas I Lavagnam2177Keramik Kelas I Mountain Peakm2

GARUDA178Keramik 20 x 20 kelas I Emboss Dasar Mudam2179Keramik 20 x 20 kelas I Emboss Dasar Tuam2180Keramik 20 x 20 kelas I Tesiam2181Keramik 20 x 20 kelas II Emboss Dasar Mudam2182Keramik 20 x 20 kelas II Emboss Dasar Tuam2183Keramik 20 x 20 kelas II Tesiam2184Keramik 20 x 25 kelas I Motif Dasar Mediumm2185Keramik 20 x 25 kelas I Motif Dasar Mudam2186Keramik 20 x 25 kelas I Nuri Darkm2187Keramik 20 x 25 kelas I Polosm2188Keramik 30 x 30 kelas I Granitym2189Keramik 30 x 30 kelas I Motif Embosem2190Keramik 30 x 30 kelas II Granitym2191Keramik 30 x 30 kelas II Motif Embosem2192Keramik 40 x 40 kelas I Motif Dasar Mudam2193Keramik 40 x 40 kelas I Motif Dasar Mudam2194Keramik 40 x 40 kelas I Motif Embosem2195Keramik 40 x 40 kelas I Motif Granity Tuam2196Keramik 40 x 40 kelas I Motif Medium Colorm2197Keramik 40 x 40 kelas I Motif Spesial Colorm2198Keramik 50 x 50 kelas I m2

ROMAN199Keramik 20 x 20 tekstur kasarm2200Keramik 25 x 33 kelas Im2201Keramik 25 x 45 motif halus kelas Im2202Keramik 30 x 30 standardm2203Keramik 30 x 30 kelas I T. 1cmm2204Keramik 20 x 60 kelas I T. 1cmm2205Keramik 20 x 40 kelas I Motif standardm2206Keramik 30 x 60 kelas I Motif Dasar Mudam2207Keramik 40 x 40 kelas I kremm2208Keramik 40 x 40 kelas I whitem2209Keramik 50 x 50 kelas I warna mudam2

PLATINUM210Keramik 25 x 33 kelas I m2211Keramik 25 x 40 kelas IIm2212Keramik 30 x 60 kelas II bulgarim2213Keramik 40 x 40 kelas I brownm2

GRANIT214Granit star white L.60m2215Granit BGYD red L.60m2216Granit crystal pink L. 60m2217Granit mongol black L. 60m2218Granit gold black L. 60m2

GRANITO219Granito Castello Tera 60 x 60m2220Granito Monalisa TD6602 60 x 60m2221Granito Monalisa TD6602 80 x 80m2222Granito Niro FR660IY 60 x 60m2223Granito Essenza Grey 60 x 60m2224Granito Indogress Cristaloom2

MARMER225Marmer cream BA 60 x 60m2226Marmer cream BA 40 x 40m2227Marmer cream BA 30 x 30m2

MOZAIK228Mozaik keramik zehn crystal glass 30 x 30biji229Mozaik batu alam 30 x 30biji

ASIA230Keramik 20 x 30 kelas I warna mudam2231Keramik 30 x 30 kelas I warna mudam2232Keramik 30 x 30 kelas I warna tuam2233Keramik 40 x 40 kelas I warna mudam26.25234Keramik 10 x 20 kelas II m20235Keramik 20 x 20 kelas II m2236Keramik 20 x 30 kelas II m2237Keramik 30 x 30 kelas II m2238Keramik 40 x 40 kelas II m2

MULIA239Keramik 10 x 20 cm kelas Im2240Keramik 20 x 20 cm kelas Im2241Keramik 20 x 30 cm kelas Im2242Keramik 30 x 30 cm kelas Im2243Keramik 40 x 40 cm kelas Im2244Keramik 10 x 20 cm kelas IIm2245Keramik 20 x 20 cm kelas IIm2246Keramik 20 x 30 cm kelas IIm2247Keramik 30 x 30 cm kelas IIm2248Keramik 40 x 40 cm kelas IIm2

SANITAIR249Bak mandi fibre glass 70x70x66 cmbh250Bak mandi keramik 50x50bh251Floor Drain " TOTO TypeTx 1 Bv 1 " Square Flange "bh252Floor drain plastikbh253Floor drain stainless bh254Kloset duduk INA Komplitbh255Kloset duduk Amerika Standarbh256Kloset duduk " TOTO Type AVANTE CW 821 PJ / SW 821JP COMPLITbh257Kloset duduk " TOTO Type AVANTE CW 821J"/ SW 821JP COMPLITbh258Kloset duduk " TOTO Type AVANTE CW 823 J bh259Kloset duduk " TOTO Type CW 660J bh260Kloset duduk " TOTO Type CW 660J / SW 660J COMPLITbh261Kloset duduk " TOTO Type CW 660J / SW 660J COMPLIT WARNAbh262Kloset duduk " TOTO Type CW 660J WARNA COMPLITbh263Kloset duduk " TOTO Type CW 661JT1 BODI COMPLITbh264Kloset duduk " TOTO Type CW 661JT1" / SW 661JP COMPLITbh265Kloset duduk " TOTO Type CW 661JT1" / SW 784JP COMPLITbh266Kloset jongkok " TOTO Type CE 6 COMPLITbh267Kloset jongkok " TOTO Type CE 7 COMPLITbh268Kloset porselin jongkok Kia (standar)bh269Kloset porselin jongkok Ina (standar) bh270Kran biasa bh271Kran SunEibh272Kran TOTO T 205 LCSCbh273Kran TOTO T 205 MCbh274Kran TOTO T 23 B13bh275Kran TOTO T 23 B13V7Nbh276Kran TOTO T 26 - 13bh277Kran TOTO TX 109 LHbh278Penyekat Urinoir " TOTO " Type A 100 "bh279Shower Spray " TOTO Tx 403SPIV ( Pastel Ivory )bh280Soap holder " TOTO " Type S 6 N "bh281Seal tapebh282Urinoir " TOTO U 57 Mbh283Urinoir " TOTO U 57 M BODIbh284Urinoir " TOTO UW 447 JT 1 "bh285Urinoir " TOTO UW 447 JT 1 BODIbh286Urinoir " TOTO UW 447 JT 1,M "bh287Urinoir " TOTO UW 447 JT 1,M "BODIbh288Wastagel KIA Standardbh289Wastagel KIA Warnabh290Wastafel Komplit " TOTO Tx " Type L 521V1A "bh291Wastafel Komplit top Counter" TOTO " Type CERABO LW 523 "bh292Wastafel TYPE Counter /Komplit LW 521 V1A (ex Toto )bh293Wastafel Toto komplit LW631 JW/F segi 4bh294Wastafel Toto LW 352JW/F bulatbh295Wastafel Toto komplit LW645+T6JV5 kotakbh296Wastafel Toto LW248JRbh297Shower TOTO Tx 401SBZbh298Shower TOTO Tx 471SOBRbh299Shower TOTO Tx 471SKBRbh300Shower TOTO Tx 449SMBRbh301 Kloset American standart komplitbh302Kloset American Famousbh303Kloset TOTO komplitbh304Elite cuci piring E - 176bh305Elite cuci piring dobel E - 118bh

PAKU306Paku 10 cmkg307Paku kalsiboardkg308Paku list SQkg309Paku pancing 60 x 230kg310Paku reng/usuk SQkg311Paku sengkg312Paku seng importbj313Paku skrup 1/2"kg314Paku skrup 2"kg315Paku skrup 3.5"kg316Paku sumbat 1/2"kg

PASIR, BATU, KERIKIL, BATA DAN PARAS128571.428571429317Bata gosok ex Tulikupbj318Bata Merah 5 x 11 x 22 cmbj8000007114285.714285714319Batako kelas Ibj178571.428571429320Batu kali /batu bulat 15/20 cmm3138000321Batu karangm34750067916.6666666667322Batu lahar Singarajam3323Batu pecah 5-7 cm (manual)m3150000324Batu pipih Singarajam3325Bata riyan ( abble )bj326Roster Keramikbh327Koral Betonm3328Limestonem3329Paras Batikbh330Paras Buahanbh331Paras Karang Bukitbh332Paras Kerobokan Tebal 5bh333Paras Malem bh334Paras Putih Bukitbh335Batu tulung agungbh336Paras jogja putihbh337Paras Silakarang tebalbh338Paras Silakarang tipisbh339Paras untuk pondasibh278Batu alam RTM hijau 10 x 20 halusm2279Batu alam RTM hijau 20 x 20 halusm2280Batu alam RTS hijau 10 x 20 kasarm2281Batu pilah Jember 30 x 30 m2282Batu pilah Jember 20 x 30 m2283Batu pilah Jember 40 x 40 m2284Batu pilah Singaraja 30 x 30 m2285Batu pilah Singaraja 20 x 20 m2286Batu hitam Jember 5 x 20 halus m2287Batu hitam Jember 20 x 40 halus m2288Batu hitam Jember 15 x 30 halus m2289Batu hitam Singaraja 15 x 30 halus m2290Batu hitam Singaraja 20 x 40 halus m2291Batu AND 60 x 60 abum2292Batu AND 50 x 50 hitamm2293Batu AND 40 x 40 hitam bkrm2294Batu AND 30 x 60 hitam bkrm2295Batu AND 40 x 60 hitam kilapm2296Batu AND 30 x 40 abu SSm2297Batu marmer kuning 10 x 20 m2298Batu marmer kuning PB1 10 x 20 m2299Batu marmer kuning PB2 10 x 20 m2300Batu marmer kuning 15 x 30 m2301Batu kuning serat 30 x 30m2302Batu kuning serat 20 x 30m2303Batu palimanan cirebon 20 x 30m2304Batu palimanan cirebon 20 x 40m2305Batu paras Jogja 60 x 60m2306Batu candi hitam 60 x 60m2307Batu candi hitam 20 x 20m2308Batu candi hitam 30 x 30m2309Batu candi hitam 40 x 40 T.5cmm2310Batu candi hitam 20 x 30m2311Batu Bali green gelombang 20 x 40m2312Batu Bali green kombinasi 20 x 40m2314Batu serayu 20 x 60m2315Pasir betonm3316Pasir pasangm3317Pasir urugm3318Sirtum3319Tanah urugm3320Batu gunung ex karang asembj

PIPA321Pipa Galvanis 1/2"m1322Pipa Galvanis 3/4"m1323Pipa Galvanis 1 1/4"m1324Pipa Galvanis 1 1/2"m1325Pipa Galvanis 1"m1326Pipa Galvanis 1,5 BSAm1327Pipa Galvanis 2"m1328Pipa Galvanis 3"m1329Pipa Maspion AW 1ljr330Pipa Maspion AW 1/2ljr331Pipa Maspion AW 10ljr332Pipa Maspion AW 1-1/2ljr333Pipa Maspion AW 1-1/4ljr334Pipa Maspion AW 12ljr335Pipa Maspion AW 14ljr336Pipa Maspion AW 16ljr337Pipa Maspion AW 2ljr338Pipa Maspion AW 2-1/2ljr339Pipa Maspion AW 3ljr340Pipa Maspion AW 3/4ljr341Pipa Maspion AW 4ljr342Pipa Maspion AW 5ljr343Pipa Maspion AW 6ljr344Pipa Maspion AW 8ljr345Pipa Maspion C 1ljr346Pipa Maspion C 1-1/2ljr347Pipa Maspion C 1-1/4ljr348Pipa Maspion C 2ljr349Pipa Maspion C 2-1/2ljr350Pipa Maspion C 3ljr351Pipa Maspion C 3/4ljr352Pipa Maspion C 4ljr353Pipa Maspion C 5/8ljr354Pipa Maspion D 10ljr355Pipa Maspion D 1-1/2ljr356Pipa Maspion D 1-1/4ljr357Pipa Maspion D 12ljr358Pipa Maspion D 14ljr359Pipa Maspion D 16ljr360Pipa Maspion D 2ljr361Pipa Maspion D 2-1/2ljr362Pipa Maspion D 3ljr363Pipa Maspion D 4ljr364Pipa Maspion D 5ljr365Pipa Maspion D 6ljr366Pipa Maspion D 8ljr

KRAN AIR367TOTO T.30AR13V7Nbh368TOTO T.60Nbh369TOTO TX-116 LIbh370TOTO TX-116 LEBRbh371TOTO TX-101 LBbh

HANDEL PINTU372Gradino Handel Luar HP.6106bh373Gradino Handel Luar HP.99.01bh374Solid HRE 99.14bh375ELT handle pintu dobel P99.62set376ELT handle pintu dobel PR 511.05set377ELT bulat PHB 308SSbh

SEMEN & AIR CAMPURAN BETON378Semen Bosowa 50 kgzak379Semen Gresik 40 kg zak380Semen Gresik 50 kg zak381Semen Tiga Roga 50 kgzak382Semen Tonasa 50 kgzak383Semen warna/semen groutingkg384Air Campuran Betonltr

BESI BETON DAN PAGAR385Besi betonkg386Kawat berduriroll387Kawat beton RRTkg388Pagar BRC asli T.120 diameter 6mmm'389Pagar BRC asli T.150 diameter 6mmm'390Pagar BRC asli T.175 diameter 7mmm'391Pagar BRC asli T.190 diameter 7mmm'392Pagar BRC asli T.90 diameter 6mmm'393Pagar HotDip Galvanized T.120 diameter 6mmm'394Pagar HotDip Galvanized T.150 diameter 7mmm'395Pagar HotDip Galvanized T.175 diameter 7mmm'396Pagar HotDip Galvanized T.190 diameter 7mmm'397Pagar HotDip Galvanized T.90 diameter 6mmm'398Tiang BRC asli T. 120 diameter 1 1/2"bh399Tiang BRC asli T. 150 diameter 2"bh400Tiang BRC asli T. 175 diameter 2"bh401Tiang BRC asli T. 190 diameter 2"bh402Tiang BRC asli T. 90 diameter 1 1/2"bh403Tiang HotDip Galvanized T. 120 diameter 1 1/2"bh404Tiang HotDip Galvanized T. 150 diameter 2"bh405Tiang HotDip Galvanized T. 175 diameter 2"bh406Tiang HotDip Galvanized T. 190 diameter 2"bh407Tiang HotDip Galvanized T. 90 diameter 1 1/2"bh

BAHAN LISTRIK408Saklar (Broco)bh409Stop Kontakbh410Fittingbh411Stekerbh412Coaxial cable 5C - 75 ohm commscofm1413Kabel NYM 3 x 2.5 mm ex. Supremem1414Kabel NYM 4 mmm1415Kabel telephonem1416Lampu pijar 10 Watt (Philip)bh417Lampu pijar 15 Watt (Philip)bh418Lampu pijar 25 Watt (Philip)bh419Lampu TL 10 Watt (10 Watt)bh420Lampu TL 20 Watt (10 Watt)bh421Lampu TL 25 Watt (10 Watt)bh422Pipa clipsal 20 mmbt423Pipa flexible clipsal 20 mmm1424Sock clipsal 20 mmbj425Tee dos clipsal 20 mmbh426Klem clipsal 20 mmbj427Inbow dos plastik clipsal E 157 Pbj

BUIS BETON428Buis beton 10 x 75bh429Buis beton 15 x 75bh430Buis beton 20 x 75bh431Buis beton 25 x 75bh432Buis beton 30 x 75bh433Buis beton 50 x 75bh

PAVING434Paving 10 x 20 cm tebal 6 cm K225m2435Paving 10 x 20 cm tebal 6 cm K350m2436Paving 10 x 20 cm tebal 8 cm K225m2437Paving 10 x 20 cm tebal 8 cm K350m2438Paving 10 x 20 cm tebal 8 cm K425m2439Paving 20 x 20 cm tebal 6 cm K225m2440Paving 20 x 20 cm tebal 6 cm K350m2441Paving 20 x 20 cm tebal 8 cm K225m2442Paving 20 x 20 cm tebal 8 cm K350m2443Paving 20 x 20 cm tebal 8 cm K425m2444Paving 20 x 20 cm tebal 10 cm K225m2445Paving 20 x 20 cm tebal 10 cm K350m2446Paving 20 x 20 cm tebal 10 cm K425m2447Paving Tiga Berlian tebal 6 cm K225m2448Kanstein Bulat (P:50,T:30,La:10,Lb:16 cm K225)m1449Kanstein Jumbo (P:50,L:15,T:30 cm K225)m1450Kanstein Segi Lima Jumbo (P:50,L:15, T:40 cm K225)m1451Grass Block 36 X 54 cm tebal 9 cm K 225m2452Koral Sikatzak/10 kg

LAIN-LAIN453Wall papper 29 x 29lembar454Wall papper 70 x 100lembar455Wall papper 50 x 70lembar456Wall papper 30 x 60lembar457Glass blockbj458Dugul batu hitam 50 x 50 x 200 tempelunit459Dugul batu hitam 60 x 70 x 250 tempelunit460Dugul batu hitam 70 x 70 x 250 tempelunit461Padmasari batu hitam 50 x 50 x 200 tempelunit462Padmasari batu hitam 65 x 75 x 255 tempelunit463Padmasari batu hitam 70 x 70 x 250 tempelunit464Dugul batu hitam 50 x 50 x 200 masiveunit465Dugul batu hitam 60 x 70 x 250 masiveunit466Dugul batu hitam 70 x 70 x 250 masiveunit467Padmasari batu hitam 50 x 50 x 200 masiveunit468Padmasari batu hitam 65 x 75 x 255 masiveunit469Padmasari batu hitam 70 x 70 x 250 tempelunit

&"Arial,Italic" Harga Barang dan Upah &"Arial,Italic"Hal. &P

UpahDAFTAR HARGA SATUAN UPAH

NONAMA BARANGSPESIFIKASISATUANHARGA(Rp.)12345

1MandorHari2Kepala TukangHari3Tukang PoliturHari4Tukang BatuHari5Tukang kayuHari6Tukang BesiHari7Tukang catHari8Tukang galiHari9Tukang ListrikHari10Tukang Pipa/ Tukang LedengHari11Tukang AspalHari12Tukang masak AspalHari13PekerjaHari14Tukang UkirHari15OperatorHari16Pembantu OperatorHari17MekanikHari18Pembantu MekanikHari19Pasang Atap Alang-AlangHari20Pasang Bata Gosok Dua MukaM221Pasang Bata Gosok Satu MukaM222Pasang Batu Paras DiukirM223Pasang Batu Paras Siap DiukirM224Tukang Bongkar BegestingHari

AnalisaDAFTAR ANALISA PEKERJAAN

NOURAIANHARGAHARGAHARGAHARGASATUANUPAHBAHANJUMLAH(Rp)(Rp)(Rp)(Rp)123456IPEKERJAAN PERSIAPAN (SNI 03-2835-2002)11 M1 PAGAR SEMENTARA DARI SENG GELOMBANG TINGGI 2 METER1.2500btgBambu Sedang0.00.02.5000kgSemen Portland0.00.01.2000lbrSeng gelombang 3" - 5"0.00.00.0050m3Pasir Beton0.00.00.0090m3Koral beton0.00.00.0720m3Kayu Meranti Usuk 5/70.00.00.0600kgPaku biasa 2" - 5"0.00.00.4500kgMeni Besi0.00.00.2000ohTukang Kayu0.00.00.4000ohPekerja0.00.00.0200ohKepala Tukang0.00.00.0200ohMandor0.00.0Total :0.00.00.0

21 M1 PENGUKURAN DAN PEMASANGAN BOWPLANK0.0120m3Kayu Usuk Meranti 5/70.00.00.0200kgPaku Biasa 2" - 5"0.00.00.0070m3Kayu Papan Meranti 3/200.00.00.1000ohTukang Kayu0.00.00.1000ohPekerja0.00.00.0100ohKepala Tukang0.00.00.0050ohMandor0.00.0Total :0.00.00.0

31 M2 PEMBUATAN KANTOR SEMENTARA, DENGAN LANTAI PLESTERAN1.2500btgDolken Kayu 8 - 10/4m0.00.00.1800m3Kayu Meranti0.00.00.8500kgPaku Biasa 2" - 5"0.00.01.1000kgBesi Strip0.00.035.0000kgSemen Portland0.00.00.1500m3Pasir Pasang0.00.00.1000m3Pasir Beton0.00.00.1500m3Koral Beton0.00.030.0000bhBata Merah0.00.00.2500lbrSeng Plat0.00.02.0000bhJendela Nako0.00.00.0800m2Kaca Polos0.00.00.1500bhKunci Tanam0.00.00.0600lbrPlywood 4 mm0.00.02.0000ohTukang Kayu0.00.01.0000ohTukang Batu0.00.02.0000ohPekerja0.00.00.3000ohKepala Tukang0.00.00.0500ohMandor0.00.0Total :0.00.00.0

41 M2 PEMBUATAN GUDANG SEMEN DAN ALAT-ALAT1.7000btgBambu Sedang0.00.00.2100m3Kayu Meranti0.00.00.3000kgPaku Biasa 2" - 5"0.00.010.5000kgSemen Portland0.00.00.0300m3Pasir Beton0.00.00.0500m3Koral Beton0.00.01.5000lbrSeng gelombang BJLS 280.00.02.0000ohTukang Kayu0.00.01.0000ohPekerja0.00.00.2000ohKepala Tukang0.00.00.0500ohMandor0.00.0Total :0.00.00.0

51 M2 PEMBUATAN RUMAH JAGA/KONSTRUKSI KAYU3.0000btgBambu Sedang0.00.00.2760m3Kayu Meranti 0.00.00.7000kgPaku biasa 2" - 5"0.00.01.5000lbrSeng gelombang BJLS 280.00.01.5000ohTukang Kayu0.00.01.0000ohPekerja0.00.00.1500ohKepala Tukang0.00.00.0500ohMandor0.00.0Total :0.00.00.0

61 M2 MEMBERSIHKAN LAPANGAN DAN PERATAAN0.1000ohPekerja0.00.00.0500ohMandor0.00.0Total :0.00.0

71 M2 PEMBUATAN BEDENG BURUH1.2500btgBambu Sedang0.00.00.1860m3Kayu Meranti0.00.00.3000kgPaku Biasa 2" - 5"0.00.018.0000kgSemen Portland0.00.00.0300m3Pasir Beton0.00.00.0500m3Koral Beton0.00.01.5000lbrSeng gelombang BJLS 280.00.01.3500lbrPlywood 4 mm0.00.02.0000ohTukang Kayu0.00.01.0000ohPekerja0.00.00.2000ohKepala Tukang0.00.00.0500ohMandor0.00.0Total :0.00.00.0

81 M2 PEMBUATAN BAK ADUKAN UKURAN (40X50X20) CM0.0360m3Kayu Terentang0.00.00.0800kgPaku Biasa 2" - 5"0.00.01.0000btgKaso 5/70.00.00.3000ohTukang kayu0.00.00.0015ohMandor0.00.0Total :0.00.00.0

91 M2 PEMBUATAN STEGGER DARI BAMBU1.0000btgBambu0.00.00.2500kgTali Ijuk0.00.00.0170ohTukang Kayu0.00.00.0020ohPekerja0.00.00.2500ohKepala Tukang0.00.00.0130ohMandor0.00.00.00.00.0

101 M2 PEMBUATAN JALAN SEMENTARA0.1500m3Batu Kali / Batu Bulat 15/200.00.00.0900m3Batu Pecah 5 - 70.00.00.0100m3Pasir Pasang0.00.01.0000ohPekerja0.00.00.0500ohMandor0.00.0Total :0.00.00.0

111 M3 BONGKARAN BETON BERTULANG6.6670ohPekerja0.00.00.3330ohMandor0.00.0Total :0.00.0

121 M3 BONGKARAN DINDING TEMBOK BATA MERAH6.6670ohPekerja0.00.00.0330ohMandor0.00.0Total :0.00.0

IIPEKERJAAN TANAH (SNI 2835 : 2008)11 M3 GALIAN TANAH BIASA DALAM 1 METER0.7500ohPekerja0.00.00.0250ohMandor0.00.0Total :0.00.021 M3 GALIAN TANAH BIASA DALAM 2 METER0.9000ohPekerja0.00.00.0450ohMandor0.00.0Total :0.00.0

31 M3 GALIAN TANAH BIASA DALAM 3 METER1.0500ohPekerja0.00.00.0670ohMandor0.00.0Total :0.00.0

41 M3 GALIAN TANAH KERAS DALAM 1METER1.0000ohPekerja0.00.00.0320ohMandor0.00.0Total :0.00.0

51 M3 GALIAN TANAH CADAS DALAM 1 METER1.5000ohPekerja0.00.00.0600ohMandor0.00.0Total :0.00.0

61 M3 GALIAN TANAH LUMPUR DALAM 1 METER1.2000ohPekerja0.00.00.0450ohMandor0.00.0Total :0.00.0

71 M2 PEKERJAAN STRIPPING SETINGGI 1 METER0.0500ohPekerja0.00.00.0050ohMandor0.00.0Total :0.00.0

81 M3 PEMBUANGAN TANAH SEJAUH 15 METER0.3300ohPekerja0.00.00.0100ohMandor0.00.0Total :0.00.0

91 M3 URUGAN KEMBALIMengurug Kembali 1 m3 galian dihitung dari 1/3 kali dari indeks pekerjaan galian0.0

101 M3 PEMADATAN TANAH ( Per 20 Cm )0.5000ohPekerja0.00.00.0500ohMandor0.00.0Total :0.00.0

111 M3 URUGAN PASIR 1.2000m3Pasir Urug0.00.00.3000ohPekerja0.00.00.0100ohMandor0.00.0Total :0.00.00.0

121 M3 PEMASANGAN LAPISAN IJUK TEBAL 10 CM6.0000m3Ijuk0.00.00.1500ohPekerja0.00.00.0150ohMandor0.00.0Total :0.00.00.0

131 M3 URUGAN SIRTU PADAT Untuk Peninggian Lantai Bangunan1.2000m3Sirtu0.00.00.2500ohPekerja0.00.00.0250ohMandor0.00.0Total :0.00.00.0

141 M3 URUGAN TANAH PILIHAN DIPADATKAN1.2000m3Tanah Urug0.00.00.5000ohPekerja0.00.00.0500ohMandor0.00.0Total :0.00.00.0151 M3 URUGAN LIMESTONE PADAT1.2000m3Limestone0.00.00.2500ohPekerja0.00.00.0250ohMandor0.00.0Total :0.00.00.0IIIPEKERJAAN PONDASI (SNI 2836 : 2008)11 M3 BATU KALI CAMP. 1 PC : 3 PS1.2000m3Batu Kali / Batu Bulat 15/200.00.0202.0000kgSemen Portland0.00.00.4850m3Pasir Pasang0.00.01.5000ohPekerja0.00.00.7500ohTukang Batu 0.00.00.0750ohKepala Tukang0.00.00.0750ohMandor0.00.0Total :0.00.00.0

21 M3 BATU KALI CAMP. 1 PC : 4 PS1.2000m3Batu Kali / Batu Bulat 15/200.00.0163.0000kgSemen Portland0.00.00.5200m3Pasir Pasang0.00.01.5000ohPekerja0.00.00.7500ohTukang Batu 0.00.00.0750ohKepala Tukang0.00.00.0750ohMandor0.00.0Total :0.00.00.0

31 M3 BATU KALI CAMP. 1 PC : 5 PS1.2000m3Batu Kali / Batu Bulat 15/200.00.0136.0000kgSemen Portland0.00.00.5440m3Pasir Pasang0.00.01.5000ohPekerja0.00.00.7500ohTukang Batu 0.00.00.0750ohKepala Tukang0.00.00.0750ohMandor0.00.0Total :0.00.00.0

41 M3 BATU KALI CAMP. 1 PC : 6 PS1.2000m3Batu Kali / Batu Bulat 15/200.00.0117.0000kgSemen Portland0.00.00.5610m3Pasir Pasang0.00.01.5000ohPekerja0.00.00.7500ohTukang Batu 0.00.00.0750ohKepala Tukang0.00.00.0750ohMandor0.00.0Total :0.00.00.0

51 M3 BATU KALI CAMP. 1 PC : 8 PS1.2000m3Batu Kali / Batu Bulat 15/200.00.091.0000kgSemen Portland0.00.00.5840m3Pasir Pasang0.00.01.5000ohPekerja0.00.00.7500ohTukang Batu 0.00.00.0750ohKepala Tukang0.00.00.0750ohMandor0.00.0Total :0.00.00.0

61 M3 PASANGAN PONDASI SIKLOP, 40% BATU KALI0.4800m3Batu Kali / Batu Bulat 15/200.00.0194.0000kgSemen Portland0.00.00.3120m3Pasir Beton0.00.00.4680m3Koral Beton0.00.0126.0000kgBesi Beton0.00.01.8000kgKawat Beton0.00.03.4000ohPekerja0.00.00.8500ohTukang Batu 0.00.00.0850ohKepala Tukang0.00.00.1700ohMandor0.00.00.00.00.0

71 M3 PASANGAN PONDASI SUMURAN DIAMETER 1 M0.4500m3Batu Kali / Batu Bulat 15/200.00.0194.0000kgSemen Portland0.00.00.3120m3Pasir Beton0.00.00.4680m3Koral Beton0.00.02.4000ohPekerja0.00.00.8000ohTukang Batu 0.00.00.0800ohKepala Tukang0.00.00.1190ohMandor0.00.0Total :0.00.00.0

81 M3 PASANGAN BATU KOSONG1.2000m3Batu Kali / Batu Bulat 15/20 15/200.00.00.4320m3Pasir Urug0.00.00.7800ohPekerja0.00.00.3900ohTukang Batu 0.00.00.0390ohKepala Tukang0.00.00.0390ohMandor0.00.0Total :0.00.00.0 SNI 03-2836-200291 M1 PEMBUATAN TIANG PANCANG 35 CM X 35 CM BETON BERTULANG 0.0160m3Pasir Urug0.00.00.0800m3Pasir Beton0.00.00.1250m3Koral Beton 0.00.049.0000kgSemen Portland0.00.034.5000kgBesi Beton0.00.00.7000kgKawat beton0.00.00.0270m3Kayu Bekesting0.00.00.1200kgPaku Reng SQ0.00.00.2000kgPlamir Tembok0.00.00.0900ltMinyak Bekisting0.00.00.8000ohPekerja0.00.00.5000ohTukang Batu0.00.00.0500ohKepala Tukang0.00.00.0400ohMandor0.00.0Total :0.00.00.0101 M1 PEMBUATAN TIANG PANCANG 40 CM X 40 CM BETON BERTULANG 0.0190m3Pasir Urug0.00.00.0940m3Pasir Beton0.00.00.1500m3Koral Beton 0.00.060.5000kgSemen Portland0.00.045.0000kgBesi Beton0.00.00.9000kgKawat beton0.00.00.0320m3Kayu Bekesting0.00.00.1200kgPaku Reng SQ0.00.00.2400kgPlamir Tembok0.00.00.0900ltMinyak Bekisting0.00.01.0000ohPekerja0.00.00.6700ohTukang Batu0.00.00.0670ohKepala Tukang0.00.00.0500ohMandor0.00.0Total :0.00.00.0IVPEKERJAAN DINDING (SNI 6897 : 2008)

11 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 2 PS140.0000bhBata Merah 5 x 11 x 22 cm0.00.043.5000kgSemen Portland0.00.00.0800m3Pasir Pasang0.00.00.6000ohPekerja0.00.00.2000ohTukang Batu 0.00.00.0200ohKepala Tukang0.00.00.0300ohMandor0.00.00.00.00.0

21 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 3 PS140.0000bhBata Merah 5 x 11 x 22 cm0.00.032.9500kgSemen Portland0.00.00.0910m3Pasir Pasang0.00.00.6000ohPekerja0.00.00.2000ohTukang Batu 0.00.00.0200ohKepala Tukang0.00.00.0300ohMandor0.00.00.00.00.0

31 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 4 PS140.0000bhBata Merah 5 x 11 x 22 cm0.00.026.5500kgSemen Portland0.00.00.0930m3Pasir Pasang0.00.00.6000ohPekerja0.00.00.2000ohTukang Batu 0.00.00.0200ohKepala Tukang0.00.00.0300ohMandor0.00.00.00.00.0

41 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 5 PS140.0000bhBata Merah 5 x 11 x 22 cm0.00.022.2000kgSemen Portland0.00.00.1020m3Pasir Pasang0.00.00.6000ohPekerja0.00.00.2000ohTukang Batu 0.00.00.0200ohKepala Tukang0.00.00.0300ohMandor0.00.00.00.00.01.54

51 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 6 PS140.0000bhBata Merah 5 x 11 x 22 cm0.00.018.5000kgSemen Portland0.00.00.1220m3Pasir Pasang0.00.00.6000ohPekerja0.00.00.2000ohTukang Batu 0.00.00.0200ohKepala Tukang0.00.00.0300ohMandor0.00.00.00.00.0

61 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 2 PS70.0000bhBata Merah 5 x 11 x 22 cm0.00.018.9500kgSemen Portland0.00.00.0380m3Pasir Pasang0.00.00.3000ohPekerja0.00.00.1000ohTukang Batu 0.00.00.0100ohKepala Tukang0.00.00.0150ohMandor0.00.00.00.00.0

71 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 3 PS70.0000bhBata Merah 5 x 11 x 22 cm0.00.014.3700kgSemen Portland0.00.00.0400m3Pasir Pasang0.00.00.3000ohPekerja0.00.00.1000ohTukang Batu 0.00.00.0100ohKepala Tukang0.00.00.0150ohMandor0.00.0Total :0.00.00.0

81 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 4 PS70.0000bhBata Merah 5 x 11 x 22 cm0.00.011.5000kgSemen Portland0.00.00.0430m3Pasir Pasang0.00.00.3000ohPekerja0.00.00.1000ohTukang Batu 0.00.00.0100ohKepala Tukang0.00.00.0150ohMandor0.00.0Total :0.00.00.0

91 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 5 PS70.0000bhBata Merah 5 x 11 x 22 cm0.00.09.6800kgSemen Portland0.00.00.0450m3Pasir Pasang0.00.00.3000ohPekerja0.00.00.1000ohTukang Batu 0.00.00.0100ohKepala Tukang0.00.00.0150ohMandor0.00.0Total :0.00.00.0101 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 6 PS70.0000bhBata Merah 5 x 11 x 22 cm0.00.08.3200kgSemen Portland0.00.00.0490m3Pasir Pasang0.00.00.3000ohPekerja0.00.00.1000ohTukang Batu 0.00.00.0100ohKepala Tukang0.00.00.0150ohMandor0.00.0Total :0.00.00.0

111 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 8 PS70.0000bhBata Merah 5 x 11 x 22 cm0.00.06.5000kgSemen Portland0.00.00.0500m3Pasir Pasang0.00.00.3000ohPekerja0.00.00.1000ohTukang Batu 0.00.00.0100ohKepala Tukang0.00.00.0150ohMandor0.00.0Total :0.00.00.0

121 M2 PASANGAN DINDING HOLLOWBLOCK (HB. 10)12.5000bhBatako0.00.07.5000kgSemen Portland0.00.00.0270m3Pasir Pasang0.00.01.9500kgBesi Beton 8 mm0.00.00.3200ohPekerja0.00.00.1000ohTukang Batu 0.00.00.0100ohKepala Tukang0.00.00.0150ohMandor0.00.0Total :0.00.00.0

131 M2 PASANGAN DINDING HOLLOWBLOCK (HB. 10) TANPA BESI12.5000bhBatako0.00.07.5000kgSemen Portland0.00.00.0270m3Pasir Pasang0.00.00.3200ohPekerja0.00.00.1000ohTukang Batu 0.00.00.0100ohKepala Tukang0.00.00.0150ohMandor0.00.0Total :0.00.00.0

141 M2 PASANGAN DINDING TERAWANG/ROSTER (12 x 11 x 24) CM30.0000bhRoster Keramik0.00.011.0000kgSemen Portland0.00.00.0350m3Pasir Pasang0.00.00.3000ohPekerja0.00.00.1000ohTukang Batu 0.00.00.0100ohKepala Tukang0.00.00.0150ohMandor0.00.0Total :0.00.00.0

151 M2 PASANGAN DINDING BEDEG, RANGKA KAYU1.5000m2Bedeg/Bilik Bambu Kelas I0.00.00.0140m3Kayu kamper usuk/reng0.00.00.0120kgPaku Biasa0.00.00.0030m3List Kayu 2/40.00.00.1000ohPekerja0.00.00.0500ohTukang Kayu0.00.00.0050ohKepala Tukang0.00.00.0020ohMandor0.00.0Total :0.00.00.0

VPEKERJAAN PLESTERAN (SNI 2837 : 2008)

11 M2 PLESTERAN CAMP. 1 PC : 1 PS TEBAL 15 MM15.5040kgSemen Portland0.00.00.0160m3Pasir Pasang0.00.00.3000ohPekerja0.00.00.1500ohTukang Batu0.00.00.0150ohKepala Tukang0.00.00.0150ohMandor0.00.0Total :0.00.00.021 M2 PLESTERAN CAMP. 1 PC : 2 PS TEBAL 15 MM10.2240kgSemen Portland0.00.00.0200m3Pasir Pasang0.00.00.3000ohPekerja0.00.00.1500ohTukang Batu0.00.00.0150ohKepala Tukang0.00.00.0150ohMandor0.00.0Total :0.00.00.0

31 M2 PLESTERAN CAMP. 1 PC : 3 PS TEBAL 15 MM7.7760kgSemen Portland0.00.00.0230m3Pasir Pasang0.00.00.3000ohPekerja0.00.00.1500ohTukang Batu0.00.00.0150ohKepala Tukang0.00.00.0150ohMandor0.00.0Total :0.00.00.0

41 M2 PLESTERAN CAMP. 1 PC : 4 PS TEBAL 15 MM6.2400kgSemen Portland0.00.00.0240m3Pasir Pasang0.00.00.3000ohPekerja0.00.00.1500ohTukang Batu0.00.00.0150ohKepala Tukang0.00.00.0150ohMandor0.00.0Total :0.00.00.0

51 M2 PLESTERAN CAMP. 1 PC : 5 PS TEBAL 15 MM5.1840kgSemen Portland0.00.00.0260m3Pasir Pasang0.00.00.3000ohPekerja0.00.00.1500ohTukang Batu0.00.00.0150ohKepala Tukang0.00.00.0150ohMandor0.00.0Total :0.00.00.0

61 M2 PLESTERAN CAMP. 1 PC : 6 PS TEBAL 15 MM4.4160kgSemen Portland0.00.00.0270m3Pasir Pasang0.00.00.3000ohPekerja0.00.00.1500ohTukang Batu0.00.00.0150ohKepala Tukang0.00.00.0150ohMandor0.00.0Total :0.00.00.0

71 M2 PLESTERAN CAMP. 1 PC : 8 PS TEBAL 15 MM3.4560kgSemen Portland0.00.00.0290m3Pasir Pasang0.00.00.3000ohPekerja0.00.00.1500ohTukang Batu0.00.00.0150ohKepala Tukang0.00.00.0150ohMandor0.00.0Total :0.00.00.0

81 M2 PLESTERAN CAMP. 1 PC : 2 PS TEBAL 20 MM13.6320kgSemen Portland0.00.00.0270m3Pasir Pasang0.00.00.4000ohPekerja0.00.00.2000ohTukang Batu0.00.00.0200ohKepala Tukang0.00.00.0220ohMandor0.00.0Total :0.00.00.0

91 M2 PLESTERAN CAMP. 1 PC : 3 PS TEBAL 20 MM10.3680kgSemen Portland0.00.00.0310m3Pasir Pasang0.00.00.4000ohPekerja0.00.00.2000ohTukang Batu0.00.00.0200ohKepala Tukang0.00.00.0220ohMandor0.00.0Total :0.00.00.0

101 M2 PLESTERAN CAMP. 1 PC : 4 PS TEBAL 20 MM8.3200kgSemen Portland0.00.00.0320m3Pasir Pasang0.00.00.4000ohPekerja0.00.00.2000ohTukang Batu0.00.00.0200ohKepala Tukang0.00.00.0220ohMandor0.00.0Total :0.00.00.0111 M2 PLESTERAN CAMP. 1 PC : 5 PS TEBAL 20 MM6.9120kgSemen Portland0.00.00.0350m3Pasir Pasang0.00.00.4000ohPekerja0.00.00.2000ohTukang Batu0.00.00.0200ohKepala Tukang0.00.00.0220ohMandor0.00.0Total :0.00.00.0

121 M2 PLESTERAN CAMP. 1 PC : 6 PS TEBAL 20 MM5.8880kgSemen Portland0.00.00.0360m3Pasir Pasang0.00.00.4000ohPekerja0.00.00.2000ohTukang Batu0.00.00.0200ohKepala Tukang0.00.00.0220ohMandor0.00.0Total :0.00.00.0

131 M2 PLESTERAN SKONING 1 PC : 2 PS, TEBAL 10 MM 0.5000kgSemen Portland0.00.00.0130m3Pasir Pasang0.00.00.0800ohPekerja0.00.00.4000ohTukang Batu0.00.00.0400ohKepala Tukang0.00.00.0040ohMandor0.00.0Total :0.00.00.0

141 M2 PLESTERAN CIPRAT 1 PC : 2 PS4.3200kgSemen Portland0.00.00.0060m3Pasir Pasang0.00.00.3000ohPekerja0.00.00.1000ohTukang Batu0.00.00.0100ohKepala Tukang0.00.00.0150ohMandor0.00.0Total :0.00.00.0

151 M2 FINISHING SIAR PASANGAN DINDING BATA MERAH (=20 M') 3.1080kgSemen Portland0.00.00.1500ohPekerja0.00.00.0750ohTukang Batu0.00.00.0080ohKepala Tukang0.00.00.0080ohMandor0.00.0Total :0.00.00.0

161 M2 FINISHING SIAR PASANGAN DINDING CONBLOCK EKSPOSE (= 8 M') 1.6000kgSemen Portland0.00.00.0700ohPekerja0.00.00.0350ohTukang Batu0.00.00.0040ohKepala Tukang0.00.00.0040ohMandor0.00.0Total :0.00.00.0

171 M2 FINISHING SIAR PASANGAN BATU KALI ADUKAN 1PC : 2 PS 6.3400kgSemen Portland0.00.00.0120m3Pasir Pasang0.00.00.3000ohPekerja0.00.00.1500ohTukang Batu0.00.00.0150ohKepala Tukang0.00.00.0150ohMandor0.00.0Total :0.00.00.0

181 M2 PEKERJAAN ACIAN3.2500zakSemen Portland 50 Kg0.00.00.2000ohPekerja0.00.00.1000ohTukang Labur/Cat0.00.00.0100ohKepala Tukang0.00.00.0100ohMandor0.00.0Total :0.00.00.0VIPEKERJAAN KAYU (SNI 3434 : 2008)1MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA KAYU KELAS I1.1000m3Balok Kayu Kamper0.00.01.2500KgPaku 10 Cm0.00.01.0000KgLem Kayu0.00.07.0000ohPekerja0.00.021.0000ohTukang Kayu0.00.02.1000ohKepala Tukang0.00.00.3500ohMandor0.00.0Total :0.00.00.0

2MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA KAYU KELAS II/III1.2000m3Balok Kayu kruing0.00.01.2500KgPaku 10 Cm0.00.01.0000KgLem Kayu0.00.06.0000ohPekerja0.00.018.0000ohTukang Kayu0.00.01.8000ohKepala Tukang0.00.00.3000ohMandor0.00.0Total :0.00.00.0

3MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP STANDAR KAYU KELAS II0.0400m3Papan Kayu Kamper0.00.00.0500KgPaku 5-7 Cm0.00.00.3500ohPekerja0.00.01.0500ohTukang Kayu0.00.00.1050ohKepala Tukang0.00.00.0180ohMandor0.00.0Total :0.00.00.0

4MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP SEDERHANA KAYU KELAS III0.0400m3Papan Kayu Kruing0.00.00.0500KgPaku 5-7 Cm0.00.00.3500ohPekerja0.00.01.0500ohTukang Kayu0.00.00.1050ohKepala Tukang0.00.00.0180ohMandor0.00.0Total :0.00.00.0

5MEMBUAT DAN MEMASANG 1 M2 DAUN PINTU PANEL KAYU KELAS I/II0.0400m3Papan Kayu Kamper0.00.00.5000KgLem Kayu0.00.01.0000ohPekerja0.00.03.0000ohTukang Kayu0.00.00.3000ohKepala Tukang0.00.00.0500ohMandor0.00.0Total :0.00.00.05aMEMBUAT DAN MEMASANG 1 M2 DAUN PINTU PANEL KAYU KELAS I/II KOMBINASI KACA BEVEL

0.0250m3Papan Kayu Kamper0.00.00.5000KgLem Kayu0.00.00.5000m2Kaca 5 mm bevel0.00.01.0000ohPekerja0.00.03.0000ohTukang Kayu0.00.00.3000ohKepala Tukang0.00.00.0500ohMandor0.00.0Total :0.00.00.0

5bMEMBUAT DAN MEMASANG 1 M2 DAUN PINTU PANEL + KULIT JERUK KAYU KELAS I/II

0.0350m3Papan Kayu Kamper0.00.00.5000KgLem Kayu0.00.01.0000m2Lapis Kulit jeruk0.00.01.0000ohPekerja0.00.03.0000ohTukang Kayu0.00.00.3000ohKepala Tukang0.00.00.0500ohMandor0.00.0Total :0.00.00.0

6MEMBUAT DAN MEMASANG 1 M2 PINTU , KAYU KELAS I/II0.0240m3Papan Kayu Kamper0.00.00.3000KgLem Kayu0.00.00.8000ohPekerja0.00.02.4000ohTukang Kayu0.00.00.2400ohKepala Tukang0.00.00.0400ohMandor0.00.0Total :0.00.00.06aMEMBUAT DAN MEMASANG 1 M2 JENDELA KACA, KAYU KELAS I/II

0.0129m3Papan Kayu Kamper0.00.00.7500m2Kaca 5 mm0.00.00.3000KgLem Kayu0.00.00.8000ohPekerja0.00.02.4000ohTukang Kayu0.00.00.2400ohKepala Tukang0.00.00.0400ohMandor0.00.0Total :0.00.00.0

7MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA JALUSI, KAYU KELAS I/II0.0640m3Papan Kayu Kamper0.00.00.5000KgLem Kayu0.00.01.0000ohPekerja0.00.03.0000ohTukang Kayu0.00.00.3000ohKepala Tukang0.00.00.0500ohMandor0.00.0Total :0.00.00.08MEMBUAT 1 M2 DAUN PINTU PLYWOOD RANGKAP RANGKA TERTUTUP, KAYU KELAS II (Lebar Sampai 90 Cm)0.0250m3Papan Kayu Kamper0.00.00.0300KgPaku 1-2,5 Cm0.00.00.5000KgLem Kayu0.00.01.0000LbrPlywood 4 mm 0.00.01.0000ohPekerja0.00.03.0000ohTukang Kayu0.00.00.3000ohKepala Tukang0.00.00.0500ohMandor0.00.0Total :0.00.00.08aMEMBUAT 1 M2 DAUN PINTU TEAKWOOD RANGKAP RANGKA TERTUTUP, KAYU KELAS II (Lebar Sampai 90 Cm)

0.0250m3Papan Kayu Kamper0.00.00.0300KgPaku 1-2,5 Cm0.00.00.5000KgLem Kayu0.00.01.0000LbrTeak wood ( 0,9 x 2,2 ) m20.00.01.0000ohPekerja0.00.03.0000ohTukang Kayu0.00.00.3000ohKepala Tukang0.00.00.0500ohMandor0.00.0Total :0.00.00.0

9MEMBUAT 1 M2 DAUN PINTU PLYWOOD RANGKAP RANGKA EXPOSE, KAYU KELAS I/II 0.0256m3Papan Kayu Kamper0.00.00.0300KgPaku 1-2,5 Cm0.00.00.5000KgLem Kayu0.00.01.0000LbrPlywood 4 mm0.00.00.8000ohPekerja0.00.02.4000ohTukang Kayu0.00.00.2400ohKepala Tukang0.00.00.0400ohMandor0.00.0Total :0.00.00.0

10MEMASANG 1 M2 JALUSI KUSEN, KAYU KELAS I/II 0.0600m3Papan Kayu Kamper0.00.00.1500KgPaku 1-2,5 Cm0.00.00.6700ohPekerja0.00.02.0000ohTukang Kayu0.00.00.2000ohKepala Tukang0.00.00.3350ohMandor0.00.0Total :0.00.00.0

11MEMBUAT 1 M2 TEAKWOOD RANGKAP RANGKA EXPOSE, KAYU KELAS I0.0256m3Papan Kayu Kamper0.00.00.0300KgPaku 1-2,5 Cm0.00.00.5000KgLem Kayu0.00.01.0000LbrTeakwood 4 mm uk 90x220 cm0.00.00.8000ohPekerja0.00.02.4000ohTukang Kayu0.00.00.2400ohKepala Tukang0.00.00.0400ohMandor0.00.0Total :0.00.00.0

12MEMBUAT 1 M2 TEAKWOOD RANGKAP LAPIS FORMIKA RANGKA EXPOSE, KAYU KELAS II0.0250m3Papan Kayu Kamper0.00.00.0300KgPaku 1-2,5 Cm0.00.00.8000KgLem Kayu0.00.01.0000LbrTeakwood 4 mm uk 90x220 cm0.00.00.5000LbrFormika0.00.00.8000ohPekerja0.00.02.4000ohTukang Kayu0.00.00.2400ohKepala Tukang0.00.00.0400ohMandor0.00.0Total :0.00.00.0

13MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA KONVENSIONAL, KAYU KELAS I,II,III Bentang 6 M' 1.1000m3Balok Kayu Kamper0.00.015.0000KgBesi Strip Tebal 5 cm0.00.05.6000KgPaku 12 Cm0.00.04.0000ohPekerja0.00.012.0000ohTukang Kayu0.00.01.2000ohKepala Tukang0.00.00.2000ohMandor0.00.0Total :0.00.00.0

14MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA EXPOSE, KAYU KELAS I1.2000m3Balok Kayu Kamper0.00.015.0000KgBesi Strip Tebal 5 cm0.00.05.6000KgPaku 12 Cm0.00.06.7000ohPekerja0.00.020.1000ohTukang Kayu0.00.02.0100ohKepala Tukang0.00.00.3350ohMandor0.00.0Total :0.00.00.0

15MEMASANG 1 M3 KONSTRUKSI GORDENG, KAYU KELAS II1.1000m3Balok Kayu Kamper0.00.015.0000KgBesi Strip Tebal 5 cm0.00.03.0000KgPaku 12 Cm0.00.02.4000ohPekerja0.00.07.2000ohTukang Kayu0.00.00.7200ohKepala Tukang0.00.00.1200ohMandor0.00.0Total :0.00.00.0

16MEMASANG 1 M2 RANGKA ATAP GENTENG KERAMIK, KAYU KELAS II0.0140m3Kaso-Kaso ( 5 x 7 ) Cm0.00.00.0036m3Reng ( 2 x 3 ) Cm0.00.00.2500KgPaku 5 Cm dan 10 Cm0.00.00.1000ohPekerja0.00.00.1000ohTukang Kayu0.00.00.0100ohKepala Tukang0.00.00.0050ohMandor0.00.0Total :0.00.00.016aMEMASANG 1 M2 USUK KAYU KAMPER EXPOSE

0.0140m3Kaso-Kaso ( 5 x 7 ) Cm0.00.00.2500KgPaku 5 Cm dan 10 Cm0.00.00.1000ohPekerja0.00.00.1000ohTukang Kayu0.00.00.0100ohKepala Tukang0.00.00.0050ohMandor0.00.0Total :0.00.00.017MEMASANG 1 M2 RANGKA ATAP GENTENG BETON, KAYU KELAS II0.0140m3Kaso-Kaso ( 5 x 7 ) Cm0.00.00.0072m3Reng ( 2 x 3 ) Cm0.00.00.2500KgPaku 5 Cm dan 10 Cm0.00.00.1000ohPekerja0.00.00.1000ohTukang Kayu0.00.00.0100ohKepala Tukang0.00.00.0050ohMandor0.00.0Total :0.00.00.017aMEMASANG 1 M2 RANGKA ATAP GENTENG , KAYU KELAS II

0.0072m3Reng ( 2 x 3 ) Cm0.00.00.2500KgPaku 5 Cm dan 10 Cm0.00.00.1000ohPekerja0.00.00.1000ohTukang Kayu0.00.00.0100ohKepala Tukang0.00.00.0050ohMandor0.00.0Total :0.00.00.018MEMASANG 1 M2 RANGKA ATAP SIRAP, KAYU KELAS II0.1650m3Balok Kayu Kamper0.00.00.2000KgPaku 5 Cm dan 10 Cm0.00.00.1200ohPekerja0.00.00.1200ohTukang Kayu0.00.00.0120ohKepala Tukang0.00.00.0060ohMandor0.00.0Total :0.00.00.0

19MEMASANG 1 M2 RANGKA LANGIT-LANGIT (50 X 100), KAYU KELAS II/III0.0154m3Kaso-Kaso ( 5 x 7 ) Cm0.00.00.2000KgPaku 7 Cm dan 10 Cm0.00.00.1500ohPekerja0.00.00.3000ohTukang Kayu0.00.00.0300ohKepala Tukang0.00.00.0750ohMandor0.00.0Total :0.00.00.0

20MEMASANG 1 M2 RANGKA LANGIT-LANGIT (60 X 60) CM, KAYU KELAS II/III0.0163m3Kaso-Kaso ( 5 x 7 ) Cm0.00.00.2500KgPaku 7 Cm dan 10 Cm0.00.00.2000ohPekerja0.00.00.3000ohTukang Kayu0.00.00.0300ohKepala Tukang0.00.00.0100ohMandor0.00.0Total :0.00.00.0

21MEMASANG 1 M' LISPLANK UKURAN (2 X 20) CM, KAYU KELAS I/II0.0108m3Papan Kayu Kamper0.00.00.1000KgPaku 5 Cm dan 7 Cm0.00.00.1000ohPekerja0.00.00.2000ohTukang Kayu0.00.00.0200ohKepala Tukang0.00.00.0050ohMandor0.00.0Total :0.00.00.0

22MEMASANG 1 M' LISPLANK UKURAN (3 X 30) CM, KAYU KELAS I/II0.0110m3Papan Kayu Kamper0.00.00.0500KgPaku 5 Cm dan 7 Cm0.00.00.1000ohPekerja0.00.00.2000ohTukang Kayu0.00.00.0200ohKepala Tukang0.00.00.0050ohMandor0.00.0Total :0.00.00.022aMEMASANG 1 M' LISPLANK UKURAN (3 X 15) CM, KAYU KELAS I/II

0.0055m3Papan Kayu Kamper0.00.00.0500KgPaku 5 Cm dan 7 Cm0.00.00.1000ohPekerja0.00.00.2000ohTukang Kayu0.00.00.0200ohKepala Tukang0.00.00.0050ohMandor0.00.0Total :0.00.00.022bMEMASANG 1 M' LISPLANK UKURAN (3 X 10) CM, KAYU KELAS I/II

0.0037m3Papan Kayu Kamper0.00.00.0500KgPaku 5 Cm dan 7 Cm0.00.00.1000ohPekerja0.00.00.2000ohTukang Kayu0.00.00.0200ohKepala Tukang0.00.00.0050ohMandor0.00.0Total :0.00.00.0

23MEMASANG 1 M2 RANGKA DINDING PEMISAH (60 X 120) CM, KAYU KELAS II/III0.0280m3Balok Kayu Kamper0.00.00.1500KgPaku 5 Cm dan 7 Cm0.00.00.1500ohPekerja0.00.00.4500ohTukang Kayu0.00.00.0450ohKepala Tukang0.00.00.0080ohMandor0.00.0Total :0.00.00.0

24MEMASANG 1 M2 RANGKA DINDING PEMISAH TEAKWOOD RANGKAP, RANGKA KAYU KELAS II0.0280m3Balok Kayu Kamper0.00.00.1500KgPaku 5 Cm dan 7 Cm0.00.00.8600LbrTeakwood 4 mm uk 90x220 cm0.00.00.5600KgLem Kayu0.00.00.1500ohPekerja0.00.00.4500ohTukang Kayu0.00.00.0450ohKepala Tukang0.00.00.0080ohMandor0.00.0Total :0.00.00.0

25MEMASANG 1 M2 RANGKA DINDING PEMISAH PLYWOOD RANGKAP, RANGKA KAYU KELAS II0.0280m3Balok Kayu Kamper0.00.00.1500KgPaku 5 Cm dan 7 Cm0.00.00.8600LbrPlywood tebal 4 mm uk 120 x 240 cm0.00.00.5600KgLem Kayu0.00.00.2000ohPekerja0.00.00.6000ohTukang Kayu0.00.00.0600ohKepala Tukang0.00.00.0100ohMandor0.00.0Total :0.00.00.025aMEMASANG 1 M2 RANGKA DINDING PEMISAH KALSYBOARD 10 MM RANGKAP,RANGKA METAL STUD

3.0000m3Rangka metal stud0.00.00.2200KgPaku skrup0.00.00.8600LbrKalsyboard ( 120x240x10)0.00.00.2000ohPekerja0.00.00.6000ohTukang Kayu0.00.00.0600ohKepala Tukang0.00.00.0100ohMandor0.00.0Total :0.00.00.025bMEMASANG 1 M2 RANGKA DINDING PEMISAH GYPSUM 9 MM RANGKAP,RANGKA METAL STUD

3.0000m3Rangka metal stud0.00.00.2200KgPaku skrup0.00.00.8600LbrGypsum ( 120x240x9)0.00.00.2000ohPekerja0.00.00.6000ohTukang Kayu0.00.00.0600ohKepala Tukang0.00.00.0100ohMandor0.00.0Total :0.00.00.0

26MEMASANG 1 M2 LAMBRIZIRING DARI PAPAN KAYU KELAS I0.0070m3Papan Kayu Kamper0.00.00.1000KgPaku 5 Cm dan 10 Cm0.00.00.1500KgPaku Skrup 10 cm0.00.00.6000ohPekerja0.00.01.8000ohTukang Kayu0.00.00.1800ohKepala Tukang0.00.00.0300ohMandor0.00.0Total :0.00.00.0

27MEMASANG 1 M2 LAMBRIZIRING DARI PLYWOOD UKURAN (120 X 240) CM0.4000LbrPlywood tebal 4 mm uk 120 x 240 cm0.00.00.0500KgPaku 1 Cm dan 2.5 Cm0.00.00.0250ohPekerja0.00.00.0750ohTukang Kayu0.00.00.0080ohKepala Tukang0.00.00.0010ohMandor0.00.0Total :0.00.00.0

VIIPEKERJAAN BETON ( SNI 7394:2008)1MEMBUAT 1 M BETON MUTU f'C= 7,4 Mpa (K100), Slump (12 2)cm, w/c = 0,87247.0000kgSemen Portland0.00.0869.0000kgPasir Beton0.00.0999.0000kgKoral Beton0.00.0215.0000ltAir0.00.01.6500ohPekerja0.00.00.2750ohTukang Batu0.00.00.0280ohKepala Tukang0.00.00.0830ohMandor0.00.00.00.00.0

2MEMBUAT 1 M BETON MUTU f'C= 9,8 Mpa (K125), Slump (12 2)cm, w/c = 0,78276.0000kgSemen Portland0.00.0828.0000kgPasir Beton0.00.01,012.0000kgKoral Beton0.00.0215.0000ltAir0.00.01.6500ohPekerja0.00.00.2750ohTukang Batu0.00.00.0280ohKepala Tukang0.00.00.0830ohMandor0.00.0Total :0.00.00.0

3MEMBUAT 1 M BETON MUTU f'C= 12,2 Mpa (K150), Slump (12 2)cm, w/c = 0,72299.0000kgSemen Portland0.00.0799.0000kgPasir Beton0.00.01,017.0000kgKoral Beton0.00.0215.0000ltAir0.00.01.6500ohPekerja0.00.00.2750ohTukang Batu0.00.00.0280ohKepala Tukang0.00.00.0830ohMandor0.00.0Total :0.00.00.0

4MEMBUAT 1 M BETON MUTU f'C= 14,5 Mpa (K175), Slump (12 2)cm, w/c = 0,66326.0000kgSemen Portland0.00.0760.0000kgPasir Beton0.00.01,029.0000kgKoral Beton0.00.0215.0000ltAir0.00.01.6500ohPekerja0.00.00.2750ohTukang Batu0.00.00.0280ohKepala Tukang0.00.00.0830ohMandor0.00.0Total :0.00.00.0

5MEMBUAT 1 M BETON MUTU f'C= 16,9 Mpa (K200), Slump (12 2)cm, w/c = 0,61352.0000kgSemen Portland0.00.0731.0000kgPasir Beton0.00.01,031.0000kgKoral Beton0.00.0215.0000ltAir0.00.01.6500ohPekerja0.00.00.2750ohTukang Batu0.00.00.0280ohKepala Tukang0.00.00.0830ohMandor0.00.0Total :0.00.00.06MEMBUAT 1 M BETON MUTU f'C= 19,3 Mpa (K225), Slump (12 2)cm, w/c = 0,58371.0000kgSemen Portland0.00.0698.0000kgPasir Beton0.00.01,047.0000kgKoral Beton0.00.0215.0000ltAir0.00.01.6500ohPekerja0.00.00.2750ohTukang Batu0.00.00.0280ohKepala Tukang0.00.00.0830ohMandor0.00.0Total :0.00.00.07MEMBUAT 1 M BETON MUTU f'C= 21,7 Mpa (K250), Slump (12 2)cm, w/c =0,56384.0000kgSemen Portland0.00.0692.0000kgPasir Beton0.00.01,039.0000kgKoral Beton0.00.0215.0000ltAir0.00.01.6500ohPekerja0.00.00.2750ohTukang Batu0.00.00.0280ohKepala Tukang0.00.00.0830ohMandor0.00.0Total :0.00.00.08MEMBUAT 1 M BETON MUTU f'C= 24,0 Mpa (K275), Slump (12 2)cm, w/c =0,53406.0000kgSemen Portland0.00.0684.0000kgPasir Beton0.00.01,026.0000kgKoral Beton0.00.0215.0000ltAir0.00.01.6500ohPekerja0.00.00.2750ohTukang Batu0.00.00.0280ohKepala Tukang0.00.00.0830ohMandor0.00.0Total :0.00.00.09MEMBUAT 1 M BETON MUTU f'C= 26,4 Mpa (K300), Slump (12 2)cm, w/c =0,52413.0000kgSemen Portland0.00.0681.0000kgPasir Beton0.00.01,021.0000kgKoral Beton0.00.0215.0000ltAir0.00.01.6500ohPekerja0.00.00.2750ohTukang Batu0.00.00.0280ohKepala Tukang0.00.00.0830ohMandor0.00.0Total :0.00.00.010MEMBUAT 1 M BETON MUTU f'C= 28,8 Mpa (K325), Slump (12 2)cm, w/c =0,49439.0000kgSemen Portland0.00.0670.0000kgPasir Beton0.00.01,006.0000kgKoral Beton0.00.0215.0000ltAir0.00.01.6500ohPekerja0.00.00.2750ohTukang Batu0.00.00.0280ohKepala Tukang0.00.00.0830ohMandor0.00.0Total :0.00.00.011MEMBUAT 1 M BETON MUTU f'C= 31,2 Mpa (K350), Slump (12 2)cm, w/c =0,48448.0000kgSemen Portland0.00.0667.0000kgPasir Beton0.00.01,000.0000kgKoral Beton0.00.0215.0000ltAir0.00.01.6500ohPekerja0.00.00.2750ohTukang Batu0.00.00.0280ohKepala Tukang0.00.00.0830ohMandor0.00.0Total :0.00.00.0

12PEMBESIAN 10 KG DENGAN BESI POLOS ATAU BESI ULIR10.5000kgBesi Beton (Polos/ Ulir)0.00.00.1500kgKawat Beton0.00.00.0700ohPekerja0.00.00.0700ohTukang Besi0.00.00.0070ohKepala Tukang0.00.00.0040ohMandor0.00.0Total :0.00.00.012aPEMBESIAN 1 KG DENGAN BESI POLOS ATAU BESI ULIRTotal :0.00.00.0

131 M2 PASANG BEKISTING UNTUK PONDASI0.0400m3Kayu Kelas III0.00.00.3000kgPaku Biasa 5' - 10'0.00.00.1000ltrMinyak Bekisting0.00.00.5200ohPekerja0.00.00.2600ohTukang Kayu0.00.00.0260ohKepala Tukang0.00.00.0260ohMandor0.00.0Total :0.00.00.0

141 M2 PASANG BEKISTING UNTUK SLOOF0.0400m3Kayu Kelas III0.00.00.3000kgPaku Biasa 5' - 10'0.00.00.1000ltrMinyak Bekisting0.00.00.5200ohPekerja0.00.00.2600ohTukang Kayu0.00.00.0260ohKepala Tukang 0.00.00.0260ohMandor0.00.0Total :0.00.00.0

151 M2 PASANG BEKISTING UNTUK KOLOM0.0400m3Kayu Kelas III0.00.00.4000kgPaku Biasa 5' - 12'0.00.00.2000ltrMinyak Bekisting0.00.00.0150m3Kayu Usuk 4/60.00.00.3500lbrPlywood 9 mm0.00.02.0000btgDolken Kayu 8" - 10"/4 m0.00.00.6600ohPekerja0.00.00.3300ohTukang Kayu0.00.00.0330ohKepala Tukang0.00.00.0330ohMandor0.00.0Total :0.00.00.015a1 M2 PASANG BEKISTING UNTUK KOLOM0.0400m3Kayu Kelas III0.00.00.4000kgPaku Biasa 5' - 12'0.00.00.2000ltrMinyak Bekisting0.00.00.0150m3Kayu Usuk 4/60.00.00.3500lbrPlywood 9 mm0.00.00.6600ohPekerja0.00.00.3300ohTukang Kayu0.00.00.0330ohKepala Tukang0.00.00.0330ohMandor0.00.0Total :0.00.00.0

161 M2 PASANG BEKISTING UNTUK BALOK0.0400m3Kayu Kelas III0.00.00.4000kgPaku Biasa 5' - 12'0.00.00.2000ltrMinyak Bekisting0.00.00.0180m3Kayu Usuk 4/60.00.00.3500lbrPlywood 9 mm0.00.02.0000btgDolken Kayu 8" - 10"/4m0.00.00.6600ohPekerja0.00.00.3300ohTukang Kayu0.00.00.0330ohKepala Tukang0.00.00.0330ohMandor0.00.0Total :0.00.00.016a1 M2 PASANG BEKISTING UNTUK BALOK0.0400m3Kayu Kelas III0.00.00.4000kgPaku Biasa 5' - 12'0.00.00.2000ltrMinyak Bekisting0.00.00.0180m3Kayu Usuk 4/60.00.00.3500lbrPlywood 9 mm0.00.00.3100m2Scafolding0.00.00.6600ohPekerja0.00.00.3300ohTukang Kayu0.00.00.0330ohKepala Tukang0.00.00.0330ohMandor0.00.0Total :0.00.00.0171 M2 PASANG BEKISTING UNTUK LANTAI0.0400m3Kayu Kelas III0.00.00.4000kgPaku Biasa 5' - 12'0.00.00.2000ltrMinyak Bekisting0.00.00.0150m3Kayu Usuk 4/60.00.00.3500lbrPlywood 9 mm0.00.06.0000btgDolken Kayu 8" - 10"/4m0.00.0 0.6600ohPekerja0.00.00.3300ohTukang Kayu0.00.00.0330ohKepala Tukang0.00.00.0330ohMandor0.00.0Total :0.00.00.017a1 M2 PASANG BEKISTING UNTUK LANTAI0.0400m3Kayu Kelas III0.00.00.4000kgPaku Biasa 5' - 12'0.00.00.2000ltrMinyak Bekisting0.00.00.33602150540.0150m3Kayu Usuk 4/60.00.00.3400lbrPlywood 9 mm0.00.01.0000m2Scafolding0.00.02.9760.6600ohPekerja0.00.00.3300ohTukang Kayu0.00.00.0330ohKepala Tukang0.00.00.0330ohMandor0.00.0Total :0.00.00.017b1 M2 PASANG BEKISTING UNTUK PLAT PERAFET / MEJA PANTRY0.0400m3Kayu Kelas III0.00.00.4000kgPaku Biasa 5' - 12'0.00.00.2000ltrMinyak Bekisting0.00.00.0150m3Kayu Usuk 4/60.00.00.3500lbrPlywood 9 mm0.00.00.6600ohPekerja0.00.00.3300ohTukang Kayu0.00.00.0330ohKepala Tukang0.00.00.0330ohMandor0.00.0Total :0.00.00.0181 M2 PASANG BEKISTING UNTUK DINDING0.0300M3Kayu Kelas III0.00.00.4000KgPaku Biasa 5' - 12'0.00.00.2000LtrMinyak Bekisting0.00.00.0200M3Kayu Usuk 4/60.00.00.3500LbrPlywood 9 mm0.00.03.0000BtngDolken Kayu 8" - 10"/4m0.00.04.0000BhFormite/penjaga jarak bekisting/spacer0.00.00.6600OhPekerja0.00.00.3300OhTukang Kayu0.00.00.0330OhKepala Tukang0.00.00.0330OhMandor0.00.00.00.00.0

191 M2 PASANG BEKISTING UNTUK TANGGA0.0300m3Kayu Kelas III0.00.00.4000kgPaku Biasa 5' - 12'0.00.00.1500ltrMinyak Bekisting0.00.00.0150m3Kayu Usuk 4/60.00.00.3500lbrPlywood 9 mm0.00.02.0000btgDolken Kayu 8" - 10"/4m0.00.00.6600ohPekerja0.00.00.3300ohTukang Kayu0.00.00.0330ohKepala Tukang0.00.00.0330ohMandor0.00.0Total :0.00.00.019a1 M2 PASANG BEKISTING UNTUK TANGGA0.0300m3Kayu Kelas III0.00.00.4000kgPaku Biasa 5' - 12'0.00.00.1500ltrMinyak Bekisting0.00.00.0150m3Kayu Usuk 4/60.00.00.3500lbrPlywood 9 mm0.00.01.0000m2Scafolding0.00.00.6600ohPekerja0.00.00.3300ohTukang Kayu0.00.00.0330ohKepala Tukang0.00.00.0330ohMandor0.00.0Total :0.00.00.0

201 M2 PASANG JEMBATAN UNTUK PENGECORAN BETON0.0264m3Kayu Kelas III (Papan)0.00.00.6000kgPaku Biasa 5' - 12'0.00.00.5000btgDolken Kayu 8" - 10"/4m0.00.00.1500ohPekerja0.00.00.0500ohTukang Kayu0.00.00.0050ohKepala Tukang 0.00.00.0080ohMandor0.00.0Total :0.00.00.0

211 M3 MEMBUAT PONDASI BETON BERTULANG (150 KG BESI + BEKISTING)0.2000m3Kayu Kelas III0.00.01.5000kgPaku Biasa 5' - 12'0.00.00.4000ltrMinyak Bekisting0.00.0157.0000kgBesi Beton0.00.02.2500kgKawat Beton0.00.0336.0000kgSemen Portland0.00.00.5400m3Pasir Beton0.00.00.8100m3Koral Beton0.00.05.3000ohPekerja0.00.00.2750ohTukang Batu0.00.01.3000ohTukang Kayu0.00.01.0500ohTukang Besi0.00.00.2620ohKepala Tukang0.00.00.2650ohMandor0.00.0Total :0.00.00.0

221 M3 MEMBUAT SLOOF BETON BERTULANG (200 KG + BEKISTING)0.2700m3Kayu Kelas III0.00.02.0000kgPaku Biasa 5' - 12'0.00.00.6000ltrMinyak Bekisting0.00.0210.0000kgBesi Beton0.00.03.0000kgKawat Beton0.00.0336.0000kgSemen Portland0.00.00.5400m3Pasir Beton0.00.00.8100m3Koral Beton0.00.05.6500ohPekerja0.00.00.2750ohTukang Batu0.00.01.5600ohTukang Kayu0.00.01.4000ohTukang Besi0.00.00.3230ohKepala Tukang0.00.00.2830ohMandor0.00.0Total :0.00.00.0

231 M3 MEMBUAT KOLOM BETON BERTULANG (300 KG BESI + BEKISTING)0.4000m3Kayu Kelas III0.00.04.0000kgPaku Biasa 5' - 12'0.00.02.0000ltrMinyak Bekisting0.00.0315.0000kgBesi Beton0.00.04.5000kgKawat Beton0.00.0336.0000kgSemen Portland0.00.00.5400m3Pasir Beton0.00.00.8100m3Koral Beton0.00.00.1500m3Kayu Kelas II balok0.00.03.5000lbrPlywood 9 mm0.00.020.0000btgDolken Kayu 8" /4 m0.00.07.0500ohPekerja0.00.00.2750ohTukang Batu0.00.01.6500ohTukang Kayu0.00.02.1000ohTukang Besi0.00.00.4030ohKepala Tukang0.00.00.3530ohMandor0.00.0Total :0.00.00.0

241 M3 MEMBUAT BALOK BETON BERTULANG (200 KG BESI + BEKISTING)0.3200m3Kayu Kelas III0.00.03.2000kgPaku Biasa 5' - 12'0.00.01.6000ltrMinyak Bekisting0.00.0210.0000kgBesi Beton0.00.03.0000kgKawat Beton0.00.0336.0000kgSemen Portland0.00.00.5400m3Pasir Beton0.00.00.8100m3Koral Beton0.00.00.1400m3Kayu Kelas II balok0.00.02.8000lbrPlywood 9 mm0.00.016.0000btgDolken Kayu 8" /4 m0.00.06.3500ohPekerja0.00.00.2750ohTukang Batu0.00.01.6500ohTukang Kayu0.00.01.4000ohTukang Besi0.00.00.3330ohKepala Tukang0.00.00.3180ohMandor0.00.0Total :0.00.00.0251 M3 MEMBUAT PLAT BETON BERTULANG (150 KG BESI + BEKISTING0.3200m3Kayu Kelas III0.00.03.2000kgPaku Biasa 5' - 12'0.00.01.6000ltrMinyak Bekisting0.00.0157.5000kgBesi Beton0.00.02.2500kgKawat Beton0.00.0336.0000kgSemen Portland0.00.00.5400m3Pasir Beton0.00.00.8100m3Koral Beton0.00.00.1200m3Kayu Kelas II balok0.00.02.8000lbrPlywood 9 mm0.00.032.0000btgDolken Kayu 8" /4 m0.00.05.3000ohPekerja0.00.00.2750ohTukang Batu0.00.01.3000ohTukang Kayu0.00.01.0500ohTukang Besi0.00.00.2650ohKepala Tukang0.00.00.2650ohMandor0.00.00.00.00.0261 M3 MEMBUAT DINDING BETON BERTULANG (150 KG BESI + BEKISTING)0.2400m3Kayu Kelas III0.00.03.2000kgPaku Biasa 5' - 12'0.00.01.6000ltrMinyak Bekisting0.00.0157.0000kgBesi Beton0.00.02.2500kgKawat Beton0.00.0336.0000kgSemen Portland0.00.00.5400m3Pasir Beton0.00.00.8100m3Koral Beton0.00.00.1600m3Kayu Kelas II balok0.00.02.8000lbrPlywood 9 mm0.00.024.0000btgDolken Kayu 8" /4 m0.00.05.3000ohPekerja0.00.00.2750ohTukang Batu0.00.01.3000ohTukang Kayu0.00.01.0500ohTukang Besi0.00.00.2620ohKepala Tukang0.00.00.2650ohMandor0.00.00.00.00.0271 M3 MEMBUAT DINDING BETON BERTULANG (200 KG BESI + BEKISTING)0.2500m3Kayu Kelas III0.00.03.0000kgPaku Biasa 5' - 12'0.00.01.2000ltrMinyak Bekisting0.00.0210.0000kgBesi Beton0.00.03.0000kgKawat Beton0.00.0336.0000kgSemen Portland0.00.00.5400m3Pasir Beton0.00.00.8100m3Koral Beton0.00.00.1050m3Kayu Kelas II balok0.00.02.5000lbrPlywood 9 mm0.00.014.0000btgDolken Kayu 8" /4 m0.00.05.6500ohPekerja0.00.00.2750ohTukang Batu0.00.01.5600ohTukang Kayu0.00.01.4000ohTukang Besi0.00.00.3230ohKepala Tukang0.00.00.2830ohMandor0.00.00.00.00.0

281 M1 MEMBUAT KOLOM PENGUAT BETON BERTULANG (11 X 11 CM)0.0020m3Kayu Kelas III0.00.00.0100kgPaku Biasa 5' - 12'0.00.03.0000kgBesi Beton0.00.00.0450kgKawat Beton0.00.04.0000kgSemen Portland0.00.00.0060m3Pasir Beton0.00.00.0090m3Koral Beton0.00.00.1800ohPekerja0.00.00.0200ohTukang Batu0.00.00.0200ohTukang Kayu0.00.00.0200ohTukang Besi0.00.00.0060ohKepala Tukang0.00.00.0090ohMandor0.00.0Total :0.00.00.0291 M1 MEMBUAT KOLOM PENGUAT BETON BERTULANG (10 X 15 CM)0.0030m3Kayu Kelas III0.00.00.0200kgPaku Biasa 5' - 12'0.00.03.6000kgBesi Beton0.00.00.0500kgKawat Beton0.00.05.5000kgSemen Portland0.00.00.0090m3Pasir Beton0.00.00.0150m3Koral Beton0.00.00.2970ohPekerja0.00.00.0330ohTukang Batu0.00.00.0330ohTukang Kayu0.00.00.0330ohTukang Besi0.00.00.0100ohKepala Tukang0.00.00.0150ohMandor0.00.0Total :0.00.00.0301 M2 PEKERJAAN BESI BETON WIREMESH BRC TYPE M51.1500m2Besi Beton wiremesh M50.00.01.0000lsUpah setting & penempatan0.00.0Total :0.00.00.0311 M2 PEKERJAAN BESI BETON WIREMESH BRC TYPE M61.1500m2Besi Beton wiremesh M60.00.01.0000lsUpah setting & penempatan0.00.0Total :0.00.00.0321 M2 PEKERJAAN BESI BETON WIREMESH BRC TYPE M71.1500m2Besi Beton wiremesh M70.00.01.0000lsUpah setting & penempatan0.00.0Total :0.00.00.033PASANG BAUT BAJA HTB A325 16 MM1.0000bhBaut HTB A325 + mur & ring0.00.01.0000lsupah pasang baut0.00.0Total :0.00.00.034PASANG BAUT BAJA 12 MM1.0000bhBaut Baja + mur & ring0.00.01.0000lsupah pasang baut0.00.0Total :0.00.00.035PASANG ANGKUR D 19 MM PANJANG 50 CM1.0000bhbesi dim 19 mm panjang 50 cm0.00.01.0000lsupah pasang angkur0.00.0Total :0.00.00.0

VIIIPEKERJAAN PENUTUP ATAP (SNI 03-3436-2002)11 M2 PEKERJAAN ATAP GENTENG PLENTONG25.0000bhGenteng Plentong0.00.020.0000BHGenteng kodok karang pilang ( setara Good year )0.00.00.1500ohPekerja0.00.00.0600ohTukang Kayu0.00.00.0060ohKepala Tukang0.00.00.0080ohMandor0.00.0Total :0.00.00.01a1 M2 PEKERJAAN ATAP GENTENG KODOK KARANG PILANGTotal :0.00.00.021 M2 PEKERJAAN ATAP GENTENG PLENTONG DI CAT25.0000bhGenteng Plentong Dicat0.00.00.1500ohPekerja0.00.00.0600ohTukang Kayu0.00.00.0060ohKepala Tukang 0.00.00.0080ohMandor0.00.0Total :0.00.00.0

31 M1 PASANG BUBUNGAN GENTENG PLENTONG3.5000bhBubungan Plentong0.00.04.0000bhBubungan Karang pilang isi 4/m'0.00.08.0000kgSemen Portland0.00.00.0320m3Pasir Pasang0.00.00.4000ohPekerja0.00.00.2000ohTukang Kayu0.00.00.0200ohKepala Tukang0.00.00.0020ohMandor0.00.0Total :0.00.00.03a1 M1 PASANG BUBUNGAN GENTENG KARANG PILANGTotal :0.00.00.041 M2 PASANG ATAP GENTENG ASBES GELOMBANG 1.8 M X 0.92 M X 5 MM0.7500lbrAsbes Gelombang 1.8 mx0.92mx5mm0.00.00.1200kgPaku Pancing 60 x 2300.00.00.1400ohPekerja0.00.00.0700ohTukang Kayu0.00.00.0070ohKepala Tukang Kayu0.00.00.0070ohMandor0.00.0Total :0.00.00.0

51 M1 PASANG BUBUNGAN STEL GELOMBANG 0.92 M2.4000lbrBubungan Stel Gelombang0.00.06.0000kgPaku Skrup 3,5"0.00.00.0840ohPekerja0.00.00.1250ohTukang Kayu0.00.00.0130ohKepala Tukang0.00.00.0040ohMandor0.00.0Total :0.00.00.061 M2 PEKERJAAN ATAP SIRAP60.0000bhGenteng Sirap0.00.00.2000kgPaku Biasa 1/2" - 1"0.00.00.1660ohPekerja0.00.00.2500ohTukang Kayu0.00.00.0250ohKepala Tukang0.00.00.0080ohMandor0.00.0Total :0.00.00.0

71 M2 PEKERJAAN ATAP NOK SIRAP0.4000lbrSeng plat 3" x 6" BJLS 280.00.00.0600kgPaku biasa 1/2" - 1"0.00.00.0500kgPaku biasa 2" - 5"0.00.00.0040m3Kayu papan 3 cm0.00.00.1250ohPekerja0.00.00.2500ohTukang kayu0.00.00.0250ohKepala Tukang0.00.00.0080ohMandor0.00.0Total :0.00.00.0

81 M2 PASANG ATAP ALANG-ALANG 3 M16.5000lbrAlang - alang0.00.00.5000glgTali pengikat0.00.00.2000ohPekerja0.00.00.0100ohMandor0.00.0Total :0.00.00.0

91 M2 PEKERJAAN ATAP SENG GELOMBANG0.7000lbrSeng Gelombang 3" x 6" BJLS 280.00.00.0200kgPaku Biasa 1/2" - 1"0.00.00.1200ohPekerja0.00.00.0600ohTukang Kayu0.00.00.0060ohKepala Tukang 0.00.00.0060ohMandor0.00.0Total :0.00.00.0

101 M2 PASANGAN LAPISAN ALUMINIUM FOIL1.0500m2Aluminium Foil0.00.00.1500ohPekerja0.00.00.0500ohTukang Kayu0.00.00.0050ohKepala Tukang 0.00.00.0080ohMandor0.00.0Total :0.00.00.0

111 M1 PASANG NOK SENG GELOMBANG0.3000lbrSeng Plat 3" x 6" BJLS 280.00.00.0400kgPaku biasa 1/2" - 1"0.00.00.1500ohPekerja0.00.00.0700ohTukang Kayu0.00.00.0080ohKepala Tukang 0.00.00.0060ohMandor0.00.0Total :0.00.00.0

IXPEKERJAAN LANGIT - LANGIT (SNI 2839-2008)1MEMASANG 1 M2 LANGIT-LANGIT ASBES SEMEN, TEBAL 4 MM, 5 MM DAN 6 MM1.1000lbrAsbes semen0.00.00.0100kgPaku Biasa 1/2" - 1"0.00.00.0300ohPekerja0.00.00.0700ohTukang Kayu0.00.00.0070ohKepala Tukang 0.00.00.0040ohMandor0.00.0Total :0.00.00.0

21 M2 PASANG LANGIT-LANGIT TRIPLEKS 120X240 CM/6MM0.3750lbrTRIPLEKS0.00.00.0300kgPaku Biasa 1/2" - 1"0.00.00.1000ohPekerja0.00.00.1000ohTukang Kayu0.00.00.0100ohKepala Tukang 0.00.00.0050ohMandor0.00.0Total :0.00.00.0

31 M2 PASANG LANGIT-LANGIT LAMBRIZIRING0.0150m3Kayu Papan 0.00.00.0100kgPaku Biasa 1/2" - 1"0.00.00.8000ohPekerja0.00.00.8000ohTukang Kayu0.00.00.0800ohKepala Tukang 0.00.00.0400ohMandor0.00.0Total :0.00.00.0

41 M1 PASANG LIST LANGIT-LANGIT KAYU PROFIL1.0500m1List Kayu Profil0.00.00.1000kgPaku list SQ0.00.00.0500ohPekerja0.00.00.0500ohTukang Kayu0.00.00.0050ohKepala Tukang 0.00.00.0030ohMandor0.00.0Total :0.00.00.0

51 M2 PASANG LANGIT-LANGIT ASBES + RANGKA0.0120m3Kamper Usuk 4/6 cm0.00.00.0600kgPaku Biasa 2" - 5"0.00.01.1000lbrAsbes0.00.00.1800ohPekerja0.00.00.3200ohTukang Kayu0.00.00.0320ohKepala Tukang0.00.00.0090ohMandor0.00.0Total :0.00.00.0

61 M2 PASANG LANGIT-LANGIT GYPSUM BOARD UKURAN (1200X2400X9) MM0.1100kgPaku Sekrup0.00.00.3640lbrGypsum Board (120x240x9)0.00.00.3640lbrKalsyboard (120x240x4,5)0.00.00.1000ohPekerja0.00.00.0500ohTukang Kayu0.00.00.0050ohKepala Tukang0.00.00.0050ohMandor0.00.0Total :0.00.00.04.3752.4000m'Hollow galvalum 4x40.00.03.3000m'Hollow galvalum 2x40.00.06a1 M2 PASANG LANGIT-LANGIT GYPSUM BOARD UKURAN (1200X2400X9) MM RANGKA HOLLOW GALVALUM0.00.0

6b1 M2 PASANG LANGIT-LANGIT KALSYBOARD UKURAN (1200X2400X4,5) MM RANGKA HOLLOW GALVALUM0.00.0

71 M2 PASANG LANGIT-LANGIT KALSIBOARD 4.5 MM0.1100kgPaku Sekrup0.00.00.3640lbrKalsiboard 4.5 mm0.00.00.1000ohPekerja0.00.00.0500ohTukang Kayu0.00.00.0050ohKepala Tukang0.00.00.0050ohMandor0.00.0Total :0.00.00.081 M' PASANG LIST PLAPOND GYPSUM 2/6 CM1.1000m1List Plapond Gypsum 25/250.00.01.1000m1List Plapond Gypsum 9/90.00.01.1000m1List Plapond Gypsum 7/70.00.01.1000m1List Plapond Gypsum 2/60.00.00.0020kgPaku Gypsum0.00.00.0200ohTukang Kayu0.00.00.0020ohKepala Tukang Kayu0.00.00.0500ohPekerja0.00.00.0050ohMandor0.00.0List Plapond Gypsum 2/6Total :0.00.00.08aList Plapond Gypsum 25/250.08bList Plapond Gypsum 9/90.08cList Plapond Gypsum 7/70.0

XPEKERJAAN SANITASI ( SNI 2002 )1MEMASANG 1 BUAH KLOSET DUDUK/MONOBLOK1.0000bhKloset duduk/ monoblok0.00.06% x harga klosetPerlengkapan0.03.3000ohPekerja0.00.01.1000ohTukang batu0.00.00.0010ohKepala Tukang0.00.00.1600ohMandor0.00.0Total :0.00.00.0

2MEMASANG 1 BUAH KLOSET JONGKOK PORSELIN1.0000bhKloset jongkok porselen0.00.06.0000kgSemen Portland0.00.00.0100m3Pasir Pasang0.00.01.0000ohPekerja0.00.01.5000ohTukang batu0.00.01.5000ohKepala Tukang0.00.00.1600ohMandor0.00.0Total :0.00.00.0

3MEMASANG 1 BUAH URINOIR1.0000bhUrinoir0.00.06% x harga UrinPerlengkapan0.06.0000kgSemen Portland0.00.00.0100m3Pasir Pasang0.00.01.0000ohPekerja0.00.01.0000ohTukang batu0.00.00.1000ohKepala Tukang0.00.00.1000ohMandor0.00.0Total :0.00.00.0

4MEMASANG 1 BUAH WASHTAFEL Wastafel TYPE Counter /Komplit LW 521 V1A (ex Toto ) 1.0000bhWashtafel0.00.012% x harga wastPerlengkapan0.06.0000kgSemen Portland0.00.00.0100m3Pasir Pasang0.00.01.2000ohPekerja0.00.01.4500ohTukang batu0.00.00.1500ohKepala Tukang0.00.00.1000ohMandor0.00.0Total :0.00.00.0

5MEMASANG 1 BUAH BAK MANDI FIBREGLASS, VOLUME 0,30 M31.0000bhBak Fibreglass0.00.018% x harga wastPerlengkapan0.01.8000ohPekerja0.00.02.7000ohTukang batu0.00.00.5400ohKepala Tukang0.00.00.1100ohMandor0.00.0Total :0.00.00.0

6MEMASANG 1 M1 PIPA GALVANIS f 0,5" - 1 "1.2000m1Pipa galvanis0.00.035% x harga pipaPerlengkapan0.00.0540ohPekerja0.00.00.0900ohTukang Pipa0.00.00.0090ohKepala Tukang0.00.00.0270ohMandor0.00.0Total :0.00.00.0

7MEMASANG 1 M1 PIPA GALVANIS f 1,5" - 3"1.2000M'Pipa galvanis0.00.035% x harga pipaPerlengkapan0.00.1080OhPekerja0.00.00.1800OhTukang Pipa0.00.00.0180OhKepala Tukang0.00.00.0054OhMandor0.00.0Total :0.00.00.0

8MEMASANG 1 M1 PIPA PVC TYPE AW f 0,5" 1.2000m1Pipa PVC0.00.035% x harga pipaPerlengkapan0.00.0360ohPekerja0.00.00.0600ohTukang Pipa0.00.00.0060ohKepala Tukang0.00.00.0018ohMandor0.00.0Total :0.00.00.08aMEMASANG 1 M1 PIPA PVC TYPE AW f 0,75"1.2000m1Pipa PVC0.00.035% x harga pipaPerlengkapan0.00.0360ohPekerja0.00.00.0600ohTukang Pipa0.00.00.0060ohKepala Tukang0.00.00.0018ohMandor0.00.0Total :0.00.00.08bMEMASANG 1 M1 PIPA PVC TYPE AW f 1" 1.2000m1Pipa PVC0.00.035% x harga pipaPerlengkapan0.00.0360ohPekerja0.00.00.0600ohTukang Pipa0.00.00.0060ohKepala Tukang0.00.00.0018ohMandor0.00.0Total :0.00.00.0

9MEMASANG 1 M1 PIPA PVC TYPE AW f 2"1.2000m1Pipa PVC0.00.035% x harga pipaPerlengkapan0.00.0540ohPekerja0.00.00.0900ohTukang Pipa0.00.00.0090ohKepala Tukang0.00.00.0027ohMandor0.00.0Total :0.00.00.0

10MEMASANG 1 M1 PIPA PVC TYPE AW f 3" 1.2000m1Pipa PVC0.00.035% x harga pipaPerlengkapan0.00.0810ohPekerja0.00.00.1350ohTukang Pipa0.00.00.0135ohKepala Tukang0.00.00.0041ohMandor0.00.0Total :0.00.00.010aMEMASANG 1 M1 PIPA PVC TYPE AW f 4"1.2000m1Pipa PVC0.00.035% x harga pipaPerlengkapan0.00.0810ohPekerja0.00.00.1350ohTukang Pipa0.00.00.0135ohKepala Tukang0.00.00.0041ohMandor0.00.0Total :0.00.00.0

11MEMASANG 1 BUAH KRAN f 0,75" ATAU 0,5"1.0000bhKran air0.00.00.0250bhSeal tape0.00.00.0100ohPekerja0.00.00.1000ohTukang Pipa0.00.00.0100ohKepala Tukang0.00.00.0050ohMandor0.00.0Total :0.00.00.0

XIPEKERJAAN BESI DAN ALUMINIUM (SNI 7393:2008)11 KG PASANG RANGKA ATAP BAJA1.1500kgBesi Profil WF0.00.00.0060ohPekerja0.00.00.0600ohTukang besi0.00.00.0060ohKepala Tukang0.00.00.0003ohMandor0.00.0Total :0.00.00.0

21 M2 PASANG JENDELA NAKO1.1000m2Rangka + Kaca Nako0.00.010.0000bhPaku biasa 1 cm - 2,5 cm0.00.07.0000m'Besi strip0.00.00.2000ohPekerja0.00.00.2000ohTukang besi0.00.00.0200ohKepala Tukang0.00.00.0010ohMandor0.00.0Total :0.00.00.0

31 M1 PASANG TALANG DATAR, SENG BJLS 281.0500lbrSeng plat0.00.00.0150kgPaku biasa 0,5" - 1" 0.00.00.0190m3Kayu papan kelas II/III0.00.00.1500ohPekerja0.00.00.4000ohTukang besi0.00.00.0250ohKepala Tukang0.00.00.0013ohMandor0.00.0Total :0.00.00.0

XIIPEKERJAAN KUNCI DAN KACA (SNI 2002)11 BH PASANG KUNCI PINTU UTAMA SETARA SOLID1.0000bhKunci tanam biasa Setara Solid0.00.00.0100ohPekerja0.00.00.5000ohTukang besi0.00.00.0100ohKepala Tukang0.00.00.0050ohMandor0.00.0Total :0.00.00.01a1 BH PASANG KUNCI PINTU BIASA SETARA SOLID1.0000bhKunci tanam biasa0.00.00.0100ohPekerja0.00.00.5000ohTukang besi0.00.00.0100ohKepala Tukang0.00.00.0050ohMandor0.00.0Total :0.00.00.0

21 PS PASANG ENGSEL PINTU SETARA SOLID1.0000psEngsel pintu0.00.00.0150ohPekerja0.00.00.1500ohTukang besi0.00.00.0150ohKepala Tukang0.00.00.0008ohMandor0.00.0Total :0.00.00.0

31 PS PASANG ENGSEL JENDELA SETARA SOLID1.0000psEngsel jendela0.00.00.0100ohPekerja0.00.00.1000ohTukang besi0.00.00.0100ohKepala Tukang0.00.00.0005ohMandor0.00.0Total :0.00.00.0

41 BH PASANG KAIT ANGIN SETARA SOLID1.0000psKait angin0.00.00.0150ohPekerja0.00.00.1500ohTukang besi0.00.00.0150ohKepala Tukang0.00.00.0008ohMandor0.00.0Total :0.00.00.0

51 BH PASANG KUNCI SLOT1.0000bhKunci slot0.00.00.0200ohPekerja0.00.00.2000ohTukang besi0.00.00.0200ohKepala Tukang0.00.00.0010ohMandor0.00.0Total :0.00.00.0

61 M2 PASANG KACA, TEBAL 5 MM1.1000bhKaca 5 mm0.00.00.0150ohPekerja0.00.00.1500ohTukang besi0.00.00.0150ohKepala Tukang0.00.00.0008ohMandor0.00.0Total :0.00.00.0

71 BH PASANGAN ESPAGNOLET1.0000bhEspagnolet0.00.00.0150ohPekerja0.00.00.1500ohTukang besi0.00.00.0150ohKepala Tukang0.00.00.0008ohMandor0.00.0Total :0.00.00.0

81 BH PASANGAN HENDLE PINTU1.0000bhEspagnolet0.00.00.0150ohPekerja0.00.00.1500ohTukang besi0.00.00.0150ohKepala Tukang0.00.00.0008ohMandor0.00.0Total :0.00.00.0

XIIIPEK. PENUTUP LANTAI DAN DINDING (SNI 7395:2008)

11 M2 PASANG LANTAI KERAMIK 30 X 30 CM11.8700bhKeramik 30 x 30 cm0.00.010.0000kgSemen Portland0.00.00.0450m3Pasir Pasang0.00.01.5000kgSemen warna/semen grouting0.00.00.7000ohPekerja0.00.00.3500ohTukang batu0.00.00.0350ohKepala Tukang0.00.00.0350ohMandor0.00.0Total :0.00.00.01a1 M2 PASANG LANTAI KERAMIK 40 X 40 CM6.256.5625bhKeramik 40 x 40 cm6.5625bhKeramik 40 x 40 cm Anti Slip10.0000kgSemen Portland0.0450m3Pasir Pasang6.251.5000kgSemen warna/semen grouting0.7000ohPekerja0.3500ohTukang batu0.0350ohKepala Tukang0.0350ohMandorTotal :1 M2 PASANG LANTAI KERAMIK 40 X 40 CM ANTI SLIPTotal :

21 M2 PASANG LANTAI KERAMIK 20 X 20 CM26.5000bhKeramik 20 x 20 cm0.00.010.4000kgSemen Portland0.00.00.0450m3Pasir Pasang0.00.026.251.6200kgSemen warna/semen grouting0.00.00.7000ohPekerja0.00.00.3500ohTukang batu0.00.00.0350ohKepala Tukang0.00.00.0350ohMandor0.00.0Total :0.00.00.0

31 M1 PASANG PLIN KERAMIK 10 X 30 CM1.3000bhKeramik 30 x 30 cm0.00.01.1400kgSemen Portland0.00.00.0030m3Pasir Pasang0.00.00.1000kgSemen warna/semen grouting0.00.00.0900ohPekerja0.00.00.0900ohTukang batu0.00.00.0090ohKepala Tukang0.00.00.0050ohMandor0.00.0Total :0.00.00.03a1 M1 PASANG PLIN KERAMIK 10 X 40 CM0.7500bhKeramik 40 x 40 cm0.00.01.1400kgSemen Portland0.00.00.0030m3Pasir Pasang0.00.00.1000kgSemen warna/semen grouting0.00.00.0900ohPekerja0.00.00.0900ohTukang batu0.00.00.0090ohKepala Tukang0.00.00.0050ohMandorTotal :ERROR:#VALUE!Total :ERROR:#VALUE!0.0ERROR:#VALUE!

41 M2 PASANG DINDING KERAMIK 20 X 20 CM26.5000bhKeramik 20 x 20 cm0.00.09.3000kgSemen Portland0.00.00.0180m3Pasir Pasang0.00.01.9400kgSemen warna/semen grouting0.00.00.9000ohPekerja0.00.00.4500ohTukang batu0.00.00.0450ohKepala Tukang0.00.00.0450ohMandor0.00.0Total :0.00.00.04a1 M2 PASANG DINDING KERAMIK 20 X 25 CM17.5000bhKeramik 20 x 25 cm0.00.09.3000kgSemen Portland0.00.0200.0180m3Pasir Pasang0.00.01.9400kgSemen warna/semen grouting0.00.00.9000ohPekerja0.00.00.4500ohTukang batu0.00.00.0450ohKepala Tukang0.00.00.0450ohMandorTotal :ERROR:#VALUE!Total :ERROR:#VALUE!0.0ERROR:#VALUE!4b1 M2 PASANG DINDING KERAMIK 40 X 40 CM MOTIF KAYU10.0000bhKeramik 40 x 40 cm0.00.00.0450kgSemen Portland0.00.0200.0180m3Pasir Pasang0.00.01.9400kgSemen warna/semen grouting0.00.00.9000ohPekerja0.00.00.4500ohTukang batu0.00.00.0450ohKepala Tukang0.00.00.0450ohMandorTotal :ERROR:#VALUE!Total :ERROR:#VALUE!0.0ERROR:#VALUE!

51 M2 PASANG BATU ALAM 30 X 30 CM11.8700bhBatu alam 30 x 30 cm0.00.010.0000kgSemen Portland0.00.00.0450m3Pasir Pasang0.00.01.5000kgSemen warna/semen grouting0.00.00.7000ohPekerja0.00.00.3500ohTukang batu0.00.00.0350ohKepala Tukang0.00.00.0350ohMandorTotal :ERROR:#VALUE!Total :ERROR:#VALUE!0.0ERROR:#VALUE!

61 M1 PASANG PLIN KAYU 2 X 10 CM0.0030m3Papan Kayu Kelas II0.00.00.0500kgPaku sekrup 3,5'0.00.00.1200ohPekerja0.00.00.1200ohTukang kayu0.00.00.0120ohKepala Tukang0.00.00.0060ohMandor0.00.0Total :0.00.00.0

XIVPEKERJAAN PENGECATAN (SNI 2002)11 M2 PENGECATAN BIDANG KAYU BARU (1 LAPIS PLAMIR,1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)0.2000kgCat meni0.00.00.1500kgDempul0.00.00.1700kgCat dasar0.00.00.2600kgCat Penutup 2x0.00.00.0700ohPekerja0.00.00.0090ohTukang cat0.00.00.0060ohKepala Tukang0.00.00.0025ohMandor0.00.0Total :0.00.00.0

21 M2 PENGECATAN BIDANG KAYU DENGAN VERNIS0.1500kgVernis0.00.00.0500kgDempul0.00.00.1000lbrAmplas0.00.00.0100bhKuas0.00.00.1600ohPekerja0.00.00.1600ohTukang cat0.00.00.0160ohKepala Tukang0.00.00.0025ohMandor0.00.0Total :0.00.00.031 M2 PENGECATAN TEMBOK BARU (1 LAPIS PLAMIR, 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP) EX. VINILEX0.1000kgPlamir0.00.00.1000kgCat dasar0.00.00.2600kgCat Penutup 2x0.00.00.0200ohPekerja0.00.00.0630ohTukang cat0.00.00.0063ohKepala Tukang0.00.00.0025ohMandor0.00.0Total :0.00.00.0

41 M2 PENGECATAN TEMBOK LAMA (1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)0.1200kgCat dasar0.00.00.1800kgCat Penutup 2x0.00.00.0280ohPekerja0.00.00.0420ohTukang cat0.00.00.0042ohKepala Tukang0.00.00.0025ohMandor0.00.0Total :0.00.00.0

51 M2 PENGECATAN PERMUKAAN BAJA DENGAN MENI BESI0.1000kgMeni besi0.00.00.0100lbrKuas0.00.00.0200ohPekerja0.00.00.2000ohTukang cat0.00.00.0200ohKepala Tukang0.00.00.0100ohMandor0.00.0Total :0.00.00.0

61 M2 PENGECATAN PERMUKAAN BAJA, 1 LAPIS DENGAN CAT BESI0.3000kgCat besi0.00.00.0060ohPekerja0.00.00.0600ohTukang cat0.00.00.0120ohKepala Tukang0.00.00.0060ohMandor0.00.0Total :0.00.00.0

71 M2 PELABURAN BIDANG KAYU DENGAN POLITUR0.5220ltrPolitur0.00.02.0000lbrAmplas0.00.00.0600ohPekerja0.00.00.0600ohTukang cat0.00.00.0160ohKepala Tukang0.00.00.0025ohMandor0.00.0

Total :0.00.00.07a1 M2 PEKERJAAN POLITURAN ULTRAN0.1500ltrPolitur dasar ( ultran penetran )0.00.00.3720ltrPolitur finish ( ultran lasur )0.00.00.1500kgClear ( natural / dop )0.00.02.0000lbrAmplas0.00.00.0100bhKuas0.00.00.0600ohPekerja0.00.00.0600ohTukang cat0.00.00.0160ohKepala Tukang0.00.00.0025ohMandor0.00.0Total :0.00.00.081 M2 PEKERJAAN WATERPROFING1.0000KgMasterseal 4400.00.00.0400ohPekerja0.00.00.0400ohTukang cat0.00.00.0160ohKepala Tukang0.00.00.0040ohMandor0.00.0

Total :0.00.00.0

XVPEKERJAAN TETEMPELAN STYLE BALI

11 M2 PASANGAN BATA GOSOK 2 MUKA110.0000bhBata Gosok0.00.08.4000kgSemen 50 Kg0.00.0Upah Kerja ( Lumpsum)0.00.0Total :0.00.00.0

21 M2 PASANGAN PARAS KEROBOKAN 1 MUKA13.7500bhParas Kerobokan0.00.08.4000kgSemen 50 Kg0.00.0Upah Kerja ( Lumpsum)0.00.0Total :0.00.00.02a1 M2 PASANGAN BATU TULUNG AGUNG 1 MUKA13.7500bhBatu tulung agung0.00.08.4000kgSemen 50 Kg0.00.0Upah Kerja ( Lumpsum)0.00.0Total :0.00.00.02b1 M2 PASANGAN BATU BALI GREEN 1 MUKA13.7500bhBatu bali green0.00.08.4000kgSemen 50 Kg0.00.0Upah Kerja ( Lumpsum)0.00.0Total :0.00.00.02c1 M2 PASANGAN PARAS JOGJA PUTIH 1 MUKA13.7500bhParas jogja putih0.00.08.4000kgSemen 50 Kg0.00.0Upah Kerja ( Lumpsum)0.00.0Total :0.00.00.02d1 M2 PASANGAN BATU TULUNG AGUNG 2 MUKA2.7000m2Batu tulung agung0.00.00.2950m3Pek. Beton pengresek, K.1000.00.00.0450m3Ring balok0.00.02.7000m2Pek. Coating anti lumut0.00.0Total :0.00.00.0

31 M2 PASANGAN BATA GOSOK 1 MUKA55.0000bhParas Kerobokan0.00.04.2000kgSemen 50 Kg0.00.0Upah Kerja ( Lumpsum)0.00.0Total :0.00.00.0

41 M2 PASANGAN PARAS 1 MUKA18.3333bhBatu paras0.00.04.2000kgSemen 50 Kg0.00.0Upah Kerja ( Lumpsum)0.00.0Total :0.00.00.0

51 M2 PASANGAN PARAS + BATA GOSOK 1 MUKA55.0000bhBata gosok0.00.04.4917bhBatu paras0.00.05.2500kgSemen 50 Kg0.00.0Upah Kerja ( Lumpsum)0.00.0Total :0.00.00.0

61 M2 PASANGAN BATA GOSOK DIUKIR55.0000bhBata gosok0.00.04.2000kgSemen 50 Kg0.00.0Upah Kerja ( Lumpsum)0.00.0Total :0.00.00.0

71 M2 PASANGAN PARAS DIUKIR18.3333bhBatu paras0.00.04.2000kgSemen 50 Kg0.00.0Upah Kerja ( Lumpsum)0.00.0Total :0.00.00.0

81 M2 PASANGAN PARAS + BATA GOSOK DIUKIR55.0000bhBata gosok0.00.04.4917bhBatu paras0.00.05.2500kgSemen 50 Kg0.00.0Upah Kerja ( Lumpsum)0.00.0Total :0.00.00.091 M2 PASANGAN PARAS JOGJA PUTIH 1 MUKA DIUKIR13.7500bhParas jogja putih0.00.08.4000kgSemen 50 Kg0.00.0Upah Kerja ( Lumpsum)0.00.0Total :0.00.00.0101 M2 TEMPELAN BATU GUNUNG ( EX KARANGASEM )20.0000BjBj Batu gunung0.00.02.4000kgZak semen 50 kg0.00.0Upah Kerja ( Lumpsum)0.00.00.00.00.0111 UNIT PEMBUATAN PAPAN NAMA KANTOR 1.9600M3Pek.galian Tanah Pondasi0.00.00.00.1225M3Pek.Pasir Urug0.00.00.00.4900M3Pek. Batu Kosong0.00.00.01.4131M3Pek. Pondasi Batu kali 1 : 50.00.00.00.1725M3Pek. Beton Pengresek K.1750.00.00.02.0000bhPilar Padurakse ex. Batu tulung agung0.00.00.02.7459M2Pek.Batu tulung agung0.00.00.00.9500M2Pek.Paras jogja Putih0.00.00.01.8370m2Granit hitam0.00.00.01.8370m2 Ongkos kerja (memotong dan memahat)0.00.00.01.0000lsOngkos pasang0.00.00.0Total :0.00.00.011a1 UNIT PEMBUATAN ALING ALING 1.9600M3Pek.galian Tanah Pondasi0.00.00.00.1225M3Pek.Pasir Urug0.00.00.00.4900M3Pek. Batu Kosong0.00.00.01.4131M3Pek. Pondasi Batu kali 1 : 50.00.00.00.1725M3Pek. Beton Pengresek K.1750.00.00.02.0000bhPilar Padurakse ex. Batu tulung agung0.00.00.05.2259M2Pek.Batu tulung agung0.00.00.00.9500M2Pek.Paras jogja Putih0.00.00.0Total :0.00.012I UNIT CANDI BENTAR EX. BATU KARANG ASEM TINGGI 2,50M0.532m3Beton tumbuk ( pengeresek ) K.1750.00.00.113m3Beton kolom K.2250.00.044.4444444444177.77777777780.617109.688888888916.088KgPek. Pembesian kolom fe = 143 kg0.00.0297.2962962963148.64814814810.22232.999888888915.241m2Tempelan batu gunung ex karangasem0.00.0142.68877777781.000unitSteger0.00.00.0

13I UNIT CANDI BENTAR EX. BATU TULUNG AGUNG TINGGI 4,25 M0.9580m3Beton tumbuk ( pengeresek ) K.1750.00.00.1913m3Beton kolom K.2250.00.027.349KgPek. Pembesian kolom fe = 143 kg0.00.027.7930m2Pek.Batu tulung agung0.00.02.3700m2Pek.Paras jogja Putih0.00.01.0000unitSteger0.00.00.013.a1 UNIT CANDI BENTAR, T= 4,00 M62.7750m2Batu Tulung Agung0.00.00.00.3218m3Pek. Beton kolom 15/15 cm, K.2250.00.00.068.5328kgPek. Besi kolom 12/12 cm ( Fe = 213 kg/m3 )0.00.00.08.1000m3Pek. Beton pengresek, K.1000.00.00.062.7750m2Pek. Coating anti lumut style bali0.00.00.00.0

141 UNIT PEKERJAAN PINTU PAGAR TYPE 122.6000m1Piva Galvanis 1 1/4"0.00.013.1600m1Piva Galvanis 1"0.00.049.5504kgBesi kotak 10/100.00.020.0000bhBesi tuang motif tombak0.00.020.0000bhBesi tuang motif spiral0.00.0120.0000bhBesi tuang motif lingkaran0.00.00.0689m3Papan bingkirai 0.00.030.0000bhKawat las0.00.01.0000setEngsel Piva0.00.08.7800m1Plat siku0.00.04.3900m1Plat strip0.00.080.0000bhbout 0.00.01.0000bhkunci0.00.06.6000ohTukang las0.00.00.6600ohKepala tukang las0.00.01.2000ohPekerja0.00.00.0800ohmandor0.00.06.4600m2Pengecatan besi0.00.06.2900m2Polituran0.00.00.00.00.0151 UNIT PEKERJAAN PINTU PAGAR TYPE 27.6500m1Piva Galvanis 1"0.00.02.1595kgBesi kotak 10/100.00.03.0000bhBesi tuang motif tombak0.00.018.0000bhBesi tuang motif lingkaran0.00.00.0064m3Papan bingkirai 0.00.010.0000bhKawat las0.00.02.0000bhEngsel Piva0.00.01.0000bhGrendel besi0.00.01.6200m1Plat siku0.00.00.8100m1Plat setrip0.012.0000bhbout 0.00.02.5000ohTukang las0.00.00.2500ohKepala tukang las0.00.00.6600ohPekerja0.00.00.0600ohmandor0.00.00.9900m2Pengecatan besi0.00.00.6400m2Polituran0.00.00.00.00.0

161 UNIT PEKERJAAN PADMASARI0.8500m3Galian tanah pondasi0.00.00.0800m3Urugan pasir0.00.00.3200m3Pasangan batu kosong0.00.00.9000m3Pasangan batu kali0.00.00.2805m3Urugan tanah kembali0.00.01.7950m2Plesteran0.00.01.7950m2Acian0.00.05.3900m2Tempelan batu gunung ex karangasem0.00.04.0000bhKarang gajah0.00.016.0000bhKarang simbar0.00.04.0000bhKarang tapel0.00.01.0000bhUlon0.00.02.0000bhTabing ulon motif naga0.00.01.0000bhKarang garuda 0.00.01.0000bhkarang wisnu0.00.01.0000bhKarang angsa0.00.015.8200kgPek. Pembesian kolom fe = 113 Kg0.00.00.1400m3Beton kolom K.2250.00.02510088.80.2500m3Beton tumbuk ( pengeresek ) K.1750.00.0167.6666666667108.983333333324.19430.0112.9943

171 UNIT PEKERJAAN PENUNGGU KARANG0.7300m3Galian tanah pondasi0.00.00.1200m3Urugan pasir0.00.00.2400m3Pasangan batu kosong0.00.00.6100m3Pasangan batu kali0.00.00.2920m3Urugan tanah kembali0.00.00.2420m2Plesteran0.00.00.2420m2Acian0.00.03.8500m2Tempelan batu gunung ex karangasem0.00.04.0000bhKarang gajah0.00.04.0000bhikut celedu0.00.01.0000bhmurda0.00.024.0000bhKarang simbar0.00.028.0000bhKarang tapel0.00.00.0563m3Beton kolom K.2250.00.044.4444444444177.7777777778109.68888888897.8750KgPek. Pembesian kolom fe = 140 Kg0.00.0297.2962962963133.783333333329.69990.3200m3Beton tumbuk ( pengeresek ) K.1750.00.0139.38878888890.0

181 UNIT PEKERJAAN PILAR PADURAKSA ( EX BATU TULUNG AGUNG )0.0371m3Beton kolom K.2250.00.05.1975KgPek. Pembesian kolom fe = 188 Kg0.00.044.4444444444177.7777777778109.68888888891.5200m3Beton tumbuk ( pengeresek ) K.1750.00.0297.2962962963133.783333333329.69992.3688m2Tempelan paras ex batu tulung agung0.00.0139.38878888890.0616m2Tempelan paras jogja0.00.016.0000bhKarang simbar0.00.08.0000bhKarang tapel0.00.01.0000bhMurda0.00.04.0000bhIkut celedu0.00.00.0

191 M1 PEKERJAAN TEMBOK PARAS ( EX TULUNG AGUNG )0.0400m3Beton tumbuk ( pengeresek ) K.1750.00.04.6134m2Tempelan paras ex batu tulung agung0.00.00.1200m2Tempelan paras jogja0.00.00.0

201 UNIT PEKERJAAN PILAR PADURAKSA ( BATU GUNUNG EX KARANGASEM )0.0371m3Beton kolom K.2250.00.05.1975KgPek. Pembesian kolom fe = 188 Kg0.00.01.5200m3Beton tumbuk ( pengeresek ) K.1750.00.02.4304m2Tempelan batu gunung ex karangasem0.00.016.0000bhKarang simbar0.00.08.0000bhKarang tapel0.00.01.0000bhMurda0.00.04.0000bhIkut celedu0.00.00.0

20.a1 UNIT PEKERJAAN PADURAKSAT, = 2.10 M( EX BATU TULUNG AGUNG )5.5100m2Batu Tulung Agung0.00.00.0164m3Pek. Beton kolom 12/12 cm, K.2250.00.03.4843kgPek. Besi kolom 12/12 cm ( Fe = 213 kg/m3 )0.00.00.3213m3Pek. Beton pengresek, K.1000.00.01.0000bhMurda0.00.05.5100m2Pek. Coating anti lumut0.00.00.0

211 M1 PEKERJAAN TEMBOK ( BATU GUNUNG EX KARANGASEM )0.0400m3Beton tumbuk ( pengeresek ) K.1750.00.04.7334m2Tempelan batu gunung ex karangasem0.00.00.0

XVIPEKERJAAN LANDSCAPE

11 M2 PASANGAN PAVING BETON 10/20 CM TEBAL 6 CM K 2251.0000m2Paving 10 x 20 cm tebal 8 cm K2250.00.00.1000m3Pasir urug0.00.00.2500ohTukang Batu0.00.00.0250ohKepala Tukang0.00.00.5000ohPekerja0.00.00.0250ohMandor0.00.0Total :0.00.00.02Paving 10 x 20 cm tebal 6 cm K3500.00.00.00.03Paving 10 x 20 cm tebal 8 cm K2250.00.00.00.04Paving 10 x 20 cm tebal 8 cm K3500.00.00.00.05Paving 10 x 20 cm tebal 8 cm K4250.00.00.00.06Paving 20 x 20 cm tebal 6 cm K2250.00.00.00.07Paving 20 x 20 cm tebal 6 cm K3500.00.00.00.08Paving 20 x 20 cm tebal 8 cm K2250.00.00.00.09Paving 20 x 20 cm tebal 8 cm K3500.00.00.00.010Paving 20 x 20 cm tebal 8 cm K4250.00.00.00.011Paving 20 x 20 cm tebal 10 cm K2250.00.00.00.012Paving 20 x 20 cm tebal 10 cm K3500.00.00.00.013Paving 20 x 20 cm tebal 10 cm K4250.00.00.00.014Paving Tiga Berlian tebal 6 cm K2250.00.00.00.0

151 M2 PASANGAN GRASS BLOCK1.0000m2Grass Block0.00.00.0690m3Pasir Urug0.00.00.5000ohTukang Batu0.00.00.0500ohKepala Tukang0.00.01.0000ohPekerja0.00.00.0500ohMandor0.00.0Total :0.00.00.0

161 M2 PASANGAN KORAL SIKAT1.5000zakKoral Sikat0.00.09.2800zakSemen0.00.00.2000m3Pasir pasang0.00.00.2500ohTukang Batu0.00.00.0100ohKepala Tukang0.00.00.6250ohPekerja0.00.00.0310ohMandor0.00.0Total :0.00.00.0171 M1 KANSTEIN BULAT (50 x 30 x 10 ) CM K2251.0000m1Kanstein Bulat(P:50,T:30,La:10,Lb:16 cm K2250.00.00.4500zakSemen 50 Kg0.00.00.0023m3Pasir Pasang0.00.00.3500ohTukang Batu0.00.00.0350ohKepala Tukang0.00.00.9500ohPekerja0.00.00.0950ohMandor0.00.0Total :0.00.00.018Kanstein Jumbo (P:50,L:15,T:30 cm K225)0.00.00.00.019Kanstein Segi Lima Jumbo (P:50,L:15, T:40 cm K225)0.00.00.00.0

201 M2 PENGECATAN KANSTEIN0.2840kgCat0.00.00.0710kgThiner0.00.00.0300ohTukang Cat0.00.00.0030ohKep. Tukang0.00.00.1500ohPekerja0.00.00.0150ohMandor0.00.0Total :0.00.00.0

XVIIPEKERJAAN ELEKTRIKAL

11 TITIK INSTALASI STOP KONTAK, LAMPU, EXHAUST FAN DAN CEILING FAN8.0000m1Kabel NYM 3 x 2.5 mm ex. Supreme0.00.03.0000btPipa Clipsal 20 mm hitam0.00.02.0000bhTee dos clipsal 20 mm hitam0.00.015.0000bjKlem clipsal 20 mm hitam0.00.03.0000bjSock clipsal 20 mm hitam0.00.01.0000bjInbow dos plastik clipsal E 157 P0.00.01.0000ttkBiaya pasang0.00.0Total :0.00.00.0

21 TITIK INSTALASI AC10.0000m1Kabel NYM 3 x 2.5 mm ex. Supreme0.00.03.0000btPipa Clipsal 20 mm hitam0.00.01.0000bhTee dos clipsal 20 mm hitam0.00.015.0000bjKlem clipsal 20 mm hitam0.00.04.0000bjSock clipsal 20 mm hitam0.00.01.0000bjInbow dos plastik clipsal E 157 P0.00.01.0000m1Pipa flexible clipsal 20 mm hitam0.00.01.0000ttkBiaya pasang0.00.00.0Total :0.00.00.0

31 TITIK INSTALASI TELEPHONE25.0000m1Kabel telephone0.00.08.0000btPipa Clipsal 20 mm putih0.00.01.0000bhTee dos clipsal 20 mm putih0.00.025.0000bjKlem clipsal 20 mm putih0.00.05.0000bjSock clipsal 20 mm putih0.00.01.0000bjInbow dos plastik clipsal E 157 P0.00.01.0000ttkBiaya pasang0.00.0Total :0.00.00.0

41 TITIK INSTALASI MATV20.0000m1Coaxial cable 5C-75 ohm commscof0.00.06.0000btPipa Clipsal 20 mm putih0.00.02.0000bhTee dos clipsal 20 mm putih0.00.020.0000bjKlem clipsal 20 mm putih0.00.06.0000bjSock clipsal 20 mm putih0.00.01.0000bjInbow dos plastik clipsal E 157 P0.00.01.0000ttkBiaya pasang0.00.0Total :0.00.00.051 UNIT INSTALASI PENANGKAL PETIR (1 BLITZEM +3 TOMBAK)4.0000bhBlacksem 1"0.00.04.0000bhSok Galvanis 1"0.00.03.0000btGIP Galvanis 1"0.00.042.5000m1Kawat BC 50 mm20.00.06.0000bhKlem Begel 1"0.00.03.0000bhKlem sisir 50 mm20.00.01.0000bhKotak Kontrol 10 cm x 15 cm0.00.01.0000bhPerluv sok 1"0.00.010.0000btPipa Conduit PVC 3/4"0.00.01.0000ls Biaya pasang instalasi 0.00.06.0000m1Biaya pengeboran0.00.0Total :0.00.00.0

61 UNIT MDP UKURAN 900 X 600 X 2501.0000bhMCCB 40A 3P0.00.01.0000bhMCB 25A 3P0.00.02.0000bhMCB16A 1P0.00.09.0000bhMCB10A 1P0.00.04.0000bhMCB 6A 1P0.00.01.0000bhPilot lamp / indikator lamp 220 V0.00.01.0000bhVoltmeter 0 - 500V0.00.03.0000bhAmpere meter 0 - 200A0.00.03.0000bhTravo Arus / CT0.00.01.0000bhselector Volt 7 position0.00.01.0000bhWiring material0.00.01.0000bhBox indoor 900 x 600 x 2500.00.01.0000bhCU bars + asesoris0.00.00.071 UNIT SDP I UKURAN 700 X 500 X 2001.0000bhMCCB 25A 3P0.00.02.0000bhMCB 6A 1P0.00.06.0000bhMCB 10A 1P0.00.07.0000bhMCB 16A 1P0.00.01.0000bhPilot lamp / indikator lamp 220 V0.00.01.0000bhVoltmeter 0 - 500V0.00.03.0000bhAmpere meter 0 - 200A0.00.03.0000bhTravo Arus / CT0.00.01.0000bhselector Volt 7 position0.00.01.0000bhWiring material0.00.01.0000bhBox indoor 700 x 500 x 2000.00.01.0000bhCU bars + asesoris0.00.00.0INSTALASI LISTRIK6Instalasi titik lampu8m'NYM 3 x 2.5 mm20.00.07m'Conduit high impact0.00.03Nosocket 0.00.04Nocleam + Fisher ulir0.00.01LsLabor cost0.00.0Total :0.00.00.07Instalasi titik Saklar10m'NYM 3 x 2.5 mm20.00.09m'Conduit high impact0.00.03Nosocket 0.00.04Nocleam + Fisher ulir0.00.01LsLabor cost0.00.0Total :0.00.00.08Instalasi titik Stop Kontak12m'NYM 3 x 2.5 mm20.00.011m'Conduit high impact0.00.03Nosocket 0.00.05Nocleam + Fisher ulir0.00.01LsLabor cost0.00.0Total :0.00.00.09Instalasi Power AC12m'NYM 3 x 2.5 mm20.00.011m'Conduit high impact0.00.03Nosocket 0.00.00.05Nocleam + Fisher ulir0.00.01LsLabor cost0.00.0Total :0.00.00.010Instalasi Titik Lampu Taman12m'NYY 3 x 2.5 mm20.00.011m'Conduit high impact0.00.03Nosocket 0.00.05Nocleam + Fisher ulir0.00.01LsLabor cost0.028,000Total :0.028,00028,00011Instalasi Power Kabel1m'NYM 4 x 2.5 mm20.00.01m'Conduit high impact0.00.01Nosocket 0.00.01Nocleam + Fisher ulir0.00.01LsLabor cost0.00.0Total :0.00.00.012Instalasi Power Kabel kontrol AC25m'NYM 4 x 2.5 mm20.00.024m'Conduit high impact0.00.07Nosocket 0.00.015Nocleam + Fisher ulir0.00.01LsLabor cost0.00.0Total :0.00.00.013Feeder cable

1m'NYY 4 X10 mm20.00.01m'Bc 6 mm0.00.01Lsmaterial bantu0.00.01LsLabor cost0.00.0Total :0.00.00.014Feeder cable

1m'NYY 4 X6 mm20.00.01m'Bc 6 mm0.00.01Lsmaterial bantu0.00.01LsLabor cost0.00.0Total :0.00.00.015Feeder cable

1m'NYY 4 X16 mm20.00.01m'Bc 16 mm0.00.01Lsmaterial bantu0.00.01LsLabor cost0.00.0Total :0.00.00.016Feeder cable

1m'NYFGBY 4 X 70 mm20.00.01Lsmaterial bantu/Galian0.00.01LsLabor cost0.00.00.0Total :0.00.00.017Feeder cable

1m'NYY 4 X 35 mm20.00.01m'Bc 35 mm0.00.01Lsmaterial bantu0.00.01LsLabor cost0.00.00.0Total :0.00.00.018Feeder cable

1m'NYY 4 X4 mm20.00.01Lsmaterial bantu0.00.01LsLabor cost0.00.00.0Total :0.00.00.019Feeder cable

1m'NYY 3 X2.5 mm20.00.01Lsmaterial bantu0.00.01LsLabor cost0.00.00.0Total :0.00.00.020Panel MDP

1unitBox Panel0.00.01LotKomponen0.00.01setArde Pentanahan0.00.01setMaterial Bantu0.00.01UnitLabour CostTotal :0.00.00.021PP.LT -1

1unitBox Panel0.00.01LotKomponen0.00.01setArde Pentanahan0.00.01UnitLabour CostTotal :0.00.00.022PP LT-2

1unitBox Panel0.00.01LotKomponen0.00.01setArde Pentanahan0.00.01UnitLabour CostTotal :0.00.00.023SDP -2

1unitBox Panel0.00.01LotKomponen0.00.01setArde Pentanahan0.00.01UnitLabour CostTotal :0.00.00.024DP-AC

1unitBox Panel0.00.01LotKomponen0.00.01setArde Pentanahan0.00.01UnitLabour CostTotal :0.00.00.025DP-Transfer Pump

1unitBox Panel0.00.01LotKomponen0.00.01setArde Pentanahan0.00.01UnitLabour CostTotal :0.00.00.026C0S (100A)

1unitCOS0.00.01setMaterial bantu0.00.01UnitLabour CostTotal :0.00.00.027Saklar Tunggal1Bh1 way 1 gang switch /engkel0.00.01Bhbok mk0.00.01BhLabor cost0.0

Total :0.00.00.028Saklar Serie1Bh1 way 2 gang switch /Serie0.00.01Bhbok mk0.00.01BhLabor cost

Total :0.00.00.029Saklar Tukar1Bh1 way 2 gang switch /engkel0.00.0 1Bhbok mk0.00.01BhLabor cost

Total :0.00.00.030Saklar Triple1Bh1 way 3 gang switch /Serie0.00.01Bhbok mk0.00.01BhLabor cost

Total :0.00.00.031Stop Kontak1BhStop Kontak0.00.01Bhbok mk0.00.01BhLabor cost

Total :0.00.00.032Stop Kontak double1BhStop Kontak0.00.01Bhbok mk0.00.01BhLabor cost

Total :0.00.00.033Stop Kontak AC1BhStop Kontak0.00.01Bhbok mk0.00.01BhLabor cost

Total :0.00.00.0

ARMATURE34 Lampu TBS 218 W ICM2 2 x TLD 18 W

1Bh TBS 218 W ICM2 2 x TLD 18 W0.00.01BhMaterial bantu0.00.01bhLabour cost

Total :0.00.00.035Down Light 1X Genie 11 W FBS 10/118-E27 220-240V1BhFBS 10 /118 E 27 220-240 V0.00.01BhMaterial bantu0.00.01bhLabour cost

Total :0.00.00.036Down light 1 x 18 W FBH 058 1.18I1BhFBH 058 118 W0.00.01BhMaterial bantu0.00.01bhLabour cost

Total :0.00.00.037Down Light FBS 110 G 14 GENIE 14 W CDES1BhDown Light FBS 110 G 14 GENIE 14 W CDES0.00.02BhMaterial bantu0.00.01bhLabour cost0.0

Total :0.00.00.038Down Light 1 x PLC 26 W FBH 145 1126 I H1BhDown Light 1 x PLC 26 W FBH 145 1126 I H0.00.01BhMaterial bantu0.00.01bhLabour cost

Total :0.00.00.039Down Light 1 x PLC 18 W FBH 145 118W I WH0.01BhDown Light 1 x PLC 18 W FBH 145 118W I WH0.00.01BhMaterial bantu0.00.01bhLabour cost

Total :0.00.00.040Lampu Dinding Tangga1BhFWG 300 Nikel, E 27 1 x Genie 18 W0.00.01BhMaterial bantu0.00.01bhLabour cost

Total :0.00.00.041TMS 012 118 Batten 2x TLD 18 Watt w1BhTMS 012 118 Batten 1 x TLD 18 Watt w0.00.01BhMaterial bantu0.00.01bhLabour cost

Total :0.00.00.042TMS 012 118 Batten 1 x TLD 18 Watt w1BhTMS 012 118 Batten 1 x TLD 18 Watt w0.00.01BhMaterial bantu0.00.01bhLabour cost

Total :0.00.00.043Lampu pond 50 12 V LP50003 FT1BhLampu pond 50 12 V LP5 003 FT0.00.01BhMaterial bantu0.00.01bhLabour costTotal :0.00.00.044Down Light Halogen 50W 12 V QBS 0581BhDown Light Halogen 50W 12 V MR 11 0.00.01BhMaterial bantu0.00.01bhLabour costTot