    1 Scope

    2 Reference Documents

    3 Health, Safety, and Environment

    4 Key Personnel

    5 Sequence of Operation

    6 Method And Sequence of Work.

    7 Testing and Commissioning Equipment Certification

    8 Attachment

  • 1. Scope:

    1.1 The systems will be Pre-commissioned and Commissioned in accordance with the approved method of statement.

    1.2 Ensure that all permanent wiring has been tested for insulation resistance and continuity prior to connection.

    1.3 Ensure that earthing / grounding arrangements are intact and that leakage currents can be effectively discharged.

    1.4 Ensure that the Booster pump for domestic water systems are properly installed and shall perform as designed and as per requirement.

    2. Reference:

    2.1 The Project Specification

    AEA-1305-WC-M-S57-P99-LBM-0315 : BASEMENT PLANTROOM HVAC BLOW UP DETAILS

    AEA-1305-WC-M-S57-P99-LBM-0315-1 : BASEMENT PLANTROOM HVAC BLOW UP DETAILS

    AEA-1305-WC-M-S57-P99-LBM-0315-2 : BASEMENT PLANTROOM HVAC BLOW UP DETAILS

    RED-1305-WC-PH-S53-P99-SCH-0101 : DOMESTIC HOT&COLD WATER DISTRIBUTION SCHEMATIC SHEET 1 OF 7

    RED-1305-WC-PH-S53-P99-SCH-0102 : DOMESTIC HOT&COLD WATER DISTRIBUTION SCHEMATIC SHEET 2 OF 7

    RED-1305-WC-PH-S53-P99-SCH-0103 : DOMESTIC HOT&COLD WATER DISTRIBUTION SCHEMATIC SHEET 3 OF 7

    RED-1305-WC-PH-S53-P99-SCH-0104 : DOMESTIC HOT&COLD WATER DISTRIBUTION SCHEMATIC SHEET 4 OF 7

    RED-1305-WC-PH-S53-P99-SCH-0105 : DOMESTIC HOT&COLD WATER DISTRIBUTION SCHEMATIC SHEET 5 OF 7

    RED-1305-WC-PH-S53-P99-SCH-0106 : DOMESTIC HOT&COLD WATER DISTRIBUTION SCHEMATIC SHEET 6 OF 7

    2.2 Material Transmittal 2.3 National Standards (CIBSE & ASRHAE) 2.4 Information for Construction Drawings (IFC)

    3. Health, Safety, and Environment:

    3.1 ARMA will operate a strict safety policy. ARMA-ELEKTROPANC recognizes the importance of safety on site and will strictly adhere to the safety requirements for working.

    3.2 A team of experienced and well qualified safety officers will be assigned to implement and control the Health Safety & Environment Plan on site.

    4. Key Personnel:

    4.1 The Contractors T&C for Mechanical/Electrical Group has the overall responsibility for the implementation of this Method of Statement.

    4.2 The Contractors T&C Manager will ensure that the resources are available to carry-out the works as per approved drawings, method of statement, and work as scheduled.

    4.3 The Contractors Site Engineer/Supervisor is responsible to ensure that the work has been carried out as per approved drawings. Method statements and assist inspection.

    4.4 The Contractors commissioning technician/s is responsible to ensure that they are abiding the method of statement to achieve the required data as per equipment schedule and project specification.

    4.5 The Contractor Safety Officer will assist in all issues related to the HSE.

    5. Sequence of Operation

  • Domestic water system booster pumps are located in the ENGINEERING ROOM (0315) serves water to

    guest room hot & cold water. The other one unit booster pump in the Fire room, see sequence of

    adjustment and commissioning activity reports on following pages.

    5.1 FLT 1 Booster pumps will transfer water from the raw water tank, on the passes through sand filter and activated carbon filter to potable water tank. Booster pumps is driven by pressure switch, pressure is 3.0 bar while the start, stop when 4 bars.

    5.2 BP1 booster pumps take water from the potable tank and through the softener and then send it to the domestic system. This booster pump job is to transport water to the domestic use of

    the guestroom. This booster pumps is driven by pressure sensor and frequence converter,

    pressure is kept constant at 7,0 bar. 5.3 BP2 booster pumps take water from the potable tank and through the softener and then send

    it to the domestic system. This booster pump job is to transport water to the domestic use of

    the hotel areas. This booster pumps is driven by pressure sensor and frequence converter,

    pressure is kept constant at 5,0 bar.

    6. Method and Sequence of Work:

    Start- up and Commissioning of Booster Pump units will be carried out by Manufacturer/ Specialist

    supplier. All check sheets and signed reports from the manufacturer shall be collected and attached.

    We will assist their commissioning engineer as required. The main objective is to minimize the risk of injury and damage to personnel and equipment. Electrical test on control panel shall be

    implemented and signed off by supplier or responsible contractor and to be attached on

    commissioning checklist.

    6.1 Pre-Commissioning

    6.1.1 Pump & Motor should be properly mounted, making sure that the base of the unit is permanently supported.

    6.1.2 Proper piping (outlet & inlet), correct foundations and motor mounts must be implemented to minimize external stress on all piping.

    6.1.3 Ensure that all flexible connections are secure. 6.1.4 Lubrication should be observed or implemented as per manufacturers

    recommendation.

    6.1.5 Ensure sufficient feed water supply. Booster should be thoroughly purged of air before start-up.

    6.1.6 Ensure that the piping system pressure leak test, attached on pre-commissioning checklist.

    6.1.7 Ensure that the pump motor power requirements are connected to a suitable electrical supply.

    6.1.8 Ensure that the pump motor is earth or bonded to earthing system. 6.1.9 Pump control panel is properly commissioned by supplier or installer contractor.

    6.1.10 Cables, terminal connections, trunking lines or conduits, cable trays are as per approved materials and installation.

    6.1.11 Ensure that complete installation and start up checks is according to manufacturers written instruction.

    6.1.12 Clean strainer on suction piping. 6.1.13 Verify that each pump is free to rotate by hand. If pump is bound or drags, do not

    operate until cause of trouble is determined and corrected.

    6.2 Commissioning

    6.2.1 Ensure that the entire pre-commissioning checklists are completely done. 6.2.2 Prime the pump by opening suction/discharge valve and prepare pump for operation. 6.2.3 Turn on the power of the pump in AUTO Mode. 6.2.4 Verify that the pump is running in the correct rotation.

  • 6.2.5 Check the charge on the connected cushion tank. It should be the same (or %10 less then) as the operating pressure: 7.00 Bar for the potable water system for BP1

    guestroom, 5,00 bar for BP2 for hotel areasand 3.00 Bar for FLT1 raw water booster.

    Recharge or bleed off air if necessary.

    6.2.6 Close slowly the discharge valve and record the cut off pressure of the FLT1. 6.2.7 Open the discharge valve slowly and then record the cut in pressure of the FLT1. 6.2.8 With the pump running, check the motor current and volts. 6.2.9 For all pumps, check dry protection level.

    6.2.10 Install a temporary bypass line with an isolation valve from the discharge header into the water storage tank (potable or non-potable tank) to which the booster pump set

    under commissioning is connected at the suction side. Isolate the discharge header from the domestic water system.

    6.2.11 Check the operational order of the pumps. For presostat driven FLT1 ;

    6.2.9.1 Switch the booster pump set panel on automatic mode. 6.2.9.2 Open the valve on the bypass line. This would simulate a drop in the system

    pressure and the FLT1 should start.

    6.2.9.3 Note the pressure at the point in which the FLT1 pump1 starts. 6.2.9.4 Because the discharge line is not feeding into the system, a further drop in

    pressure should happen. This would start the FLT1 pump2.

    6.2.9.5 Note the order of activation of the pumps. 6.2.9.6 Slowly close the valve on the bypass line. This should raise system pressure

    and stop all running pumps.

    6.2.9.7 Note the pressure at the point when each pump stops.

    For Frequence Converter driven BP1 and BP2; 6.2.9.8 BP1 and BP2 boosters driven with frequence converters.

    6.2.9.9 For BP1 and BP2, Switch the booster pump set panel on automatic mode. 6.2.9.10 Open the valve on the bypass line. This would simulate a drop in the system

    pressure and BP1 and BP2 should start.

    6.2.9.11 Because the discharge line is not feeding into the system, a further drop in pressure should happen. This would start the second pump, and later third pump.

    6.2.9.12 Note the order of activation of the pumps.

    6.2.12 Repeat 6.2.10 until cyclic changeover function is found to be working properly.

    6.3 Performance Test

    The objectives of the performance test follow:

    6.3.1 To ensure that the Booster pumps are operating automatically as required for system application.

    6.3.2 To ensure that the Booster pumps for Potable and Non-Potable Water Systems are performing according to the design data and specification.

    6.3.3 A representative from each trade shall be available during the performance test as well as one representative minimum from the owner, engineer, and general contractor. The

    trades involved shall include as a minimum Mechanical, electrical, controls, and

    commissioning agent.

    6.4 Temporary Works during Commissioning Stages

    6.4.1 Necessary Permits shall be obtained prior to works. 6.4.2 Location of work to be secured through the use of barricade tapes. Unauthorized

    personnel to be excluded from works location.

  • Testing and Commissioning Equipment Certification The following equipment / tools are to be use during testing and commissioning works:

    Items Equipment Nos. Purpose Certificates

    1 Multi Tester 1 For Testing of Volts

    and Current

    To be provided during

    commissioning stages

    2 Hand Tools (set) 1 Use for related works N/A

    3 Pressure Gauge 2 Use for checking the

    pressure.

    To be provided during

    commissioning stages

    7. Attachment:

    8.1 Booster Pump Pre-Commissioning Checklist 8.2 Booster Pump Pre-Commissioning Punch list 8.3 Booster Pump Commissioning Checklist 8.4 Booster Pump Performance Test Checklist 8.5 Booster Pump Equipment Schedule and Pump Performance Curve 8.6 Riser Diagram Domestic Water 8.7 Material Transmittal Approval

  • 8. Attachments

  • 8.1 Booster Pump Pre-Commissioning Checklist

    BOOSTER PUMP PRE-COMMISSIONING / GUEST ROOMS BOOSTER SET

    MEP CONTRACTOR

    AE ARMA-ELEKTROPANC

    Supervisor

    Site Engineer

    Commissioning Engineer

    Commissioning Manager

    Commissioning Authority Comment/s :

    Elite Commissioning Commissioning Engineer

    CLIENT Comment/s :

    PASHA CONTRUCTION

    Lead Engineer

    Senior MEP Manager

    Contact ARMA ELEKTROPANC Ref. DOMESTIC WATER

    Client PASHA CONSTRUCTION

    Plant Ref. ENGINEERING ROOM (0315)

    Location/ Area Serving GUEST ROOMS BOOSTER SET / COR-3-MVI7004-22/2-T-3-E 22

    Tick Yes if Acceptable; Provide comment if unacceptable Yes No Comment

    General

    Installation is as per manufacturers instructions

    Manufacturers recommended spare parts are provided

    Equipment label permanently affixed

    Pump turns freely

    Pump foundation is level within manufacturers tolerances

    Pumps in place and properly supported

    Isolation valves and piping specialties installed

    Flexible connections check and secure.

    Shaft seal is leak free

    Pump detail checked against the drawings and all devices gages and appurtenances are in place

    Electrical and Controls

    Power isolator is located within site of the unit it controls and labeled

    Pump motor connected to a suitable electrical supply

    All electric cable and terminal connections tight

    Grounding installed for components and unit

    Safeties installed and operational

    Starter overload breakers installed and correct size

    All control devices and wiring complete

    Control system interlocks connected and functional

    Operation of Control switch checked in all positions

    Installation per manufacturers instructions

  • 8.1 Booster Pump Pre-Commissioning Checklist

    BOOSTER PUMP PRE-COMMISSIONING / KITCHEN/LAUNDRY Hotel Areas BOOSTER SET MEP CONTRACTOR

    AE ARMA-ELEKTROPANC

    Supervisor

    Site Engineer

    Commissioning Engineer

    Commissioning Manager

    Commissioning Authority Comment/s :

    Elite Commissioning Commissioning Engineer

    CLIENT Comment/s :

    PASHA CONTRUCTION

    Lead Engineer

    Senior MEP Manager

    Contact ARMA ELEKTROPANC Ref. DOMESTIC WATER

    Client PASHA CONSTRUCTION

    Plant Ref. ENGINEERING ROOM (0315)

    Location/ Area Serving KITCHEN/LAUNDRY Hotel areas BOOSTER SET / COR-3-MVI3204-7,5/2

    Tick Yes if Acceptable; Provide comment if unacceptable Yes No Comment

    General

    Installation is as per manufacturers instructions

    Manufacturers recommended spare parts are provided

    Equipment label permanently affixed

    Pump turns freely

    Pump foundation is level within manufacturers tolerances

    Pumps in place and properly supported

    Isolation valves and piping specialties installed

    Flexible connections check and secure.

    Shaft seal is leak free

    Pump detail checked against the drawings and all devices gages and appurtenances are in place

    Electrical and Controls

    Power isolator is located within site of the unit it controls and labeled

    Pump motor connected to a suitable electrical supply

    All electric cable and terminal connections tight

    Grounding installed for components and unit

    Safeties installed and operational

    Starter overload breakers installed and correct size

    All control devices and wiring complete

    Control system interlocks connected and functional

    Operation of Control switch checked in all positions

    Installation per manufacturers instructions

  • 8.1 Booster Pump Pre-Commissioning Checklist

    BOOSTER PUMP PRE-COMMISSIONING / RAW water Booster set MEP CONTRACTOR

    AE ARMA-ELEKTROPANC

    Supervisor

    Site Engineer

    Commissioning Engineer

    Commissioning Manager

    Commissioning Authority Comment/s :

    Elite Commissioning Commissioning Engineer

    CLIENT Comment/s :

    PASHA CONTRUCTION

    Lead Engineer

    Senior MEP Manager

    Contact ARMA ELEKTROPANC Ref. DOMESTIC WATER

    Client PASHA CONSTRUCTION

    Plant Ref. ENGINEERING ROOM (0315)

    Location/ Area Serving RAW Water BOOSTER SET / CO-2-MVI5203-7.5/2

    Tick Yes if Acceptable; Provide comment if unacceptable Yes No Comment

    General

    Installation is as per manufacturers instructions

    Manufacturers recommended spare parts are provided

    Equipment label permanently affixed

    Pump turns freely

    Pump foundation is level within manufacturers tolerances

    Pumps in place and properly supported

    Isolation valves and piping specialties installed

    Flexible connections check and secure.

    Shaft seal is leak free

    Pump detail checked against the drawings and all devices gages and appurtenances are in place

    Electrical and Controls

    Power isolator is located within site of the unit it controls and labeled

    Pump motor connected to a suitable electrical supply

    All electric cable and terminal connections tight

    Grounding installed for components and unit

    Safeties installed and operational

    Starter overload breakers installed and correct size

    All control devices and wiring complete

    Control system interlocks connected and functional

    Operation of Control switch checked in all positions

    Installation per manufacturers instructions

  • 8.2 Pre- Commissioning Punch List Form

  • 8.3 Booster Pump Commissioning Checklist

    BOOSTER PUMP COMMISSIONING / GUEST ROOMS BOOSTER SET

    MEP CONTRACTOR

    AE ARMA-ELEKTROPANC

    Supervisor

    Site Engineer

    Commissioning Engineer

    Commissioning Manager

    Commissioning Authority Comment/s :

    Elite Commissioning Commissioning Engineer

    CLIENT Comment/s :

    PASHA CONTRUCTION

    Lead Engineer

    Senior MEP Manager

    Contact ARMA ELEKTROPANC Ref. DOMESTIC WATER

    Client PASHA CONSTRUCTION

    Plant Ref. ENGINEERING ROOM (0315)

    Location/ Area Serving GUEST ROOM BOOSTER SET / COR-3-MVI7004-22/2-T-3-E 22 / BP1

    Tick Yes if Acceptable; Provide comment if unacceptable Yes No Comment

    General

    The Control switch properly activates and deactivates the unit

    Pump rotation verified correct

    No unusual noise or vibration

    No leaking apparent around fittings

    Record cut in and cut off pressure of all pumps.

    Specified sequences of operation and operating schedules have been

    implemented with all variations documented.

    Specified point-to-point checks have been completed and documentation

    record submitted for this system.

    Check cushion tank pre-charge. It should be the same ( or %10 less then) as operational pressure (7.00 Bar for potable water system). Bleed or

    recharge as required.

    Install a temporary bypass line with valve from discharge header to non-potable or potable water tank, whichever system is being tested.

    Sequence of operation

    Check and note that the booster set cut in at .. Bar

    Check and note that the booster set cut outs at Bar

    Check that the pumps cut in when the previous main pump has reached

    full speed and line pressure is not restored at 7.00 Bar for potable water system.

    Note order of operation of the pumps

    Repeat until cyclic changeover function is found to be working properly

  • 8.3 Booster Pump Commissioning Checklist

    BOOSTER PUMP COMMISSIONING / GUEST ROOMS BOOSTER SET MEP CONTRACTOR

    AE ARMA-ELEKTROPANC

    Supervisor

    Site Engineer

    Commissioning Engineer

    Commissioning Manager

    Commissioning Authority Comment/s :

    Elite Commissioning Commissioning Engineer

    CLIENT Comment/s :

    PASHA CONTRUCTION

    Lead Engineer

    Senior MEP Manager

    Contact ARMA ELEKTROPANC Ref. DOMESTIC WATER

    Client PASHA CONSTRUCTION

    Plant Ref. ENGINEERING ROOM (0315)

    Location/ Area Serving KITCHEN/LAUNDRY Hotel Areas BOOSTER SET / COR-3-MVI3204-7,5/2 Tick Yes if Acceptable; Provide comment if unacceptable Yes No Comment

    General

    The Control switch properly activates and deactivates the unit

    Pump rotation verified correct

    No unusual noise or vibration

    No leaking apparent around fittings

    Record cut in and cut off pressure of all pumps.

    Specified sequences of operation and operating schedules have been implemented with all variations documented.

    Specified point-to-point checks have been completed and documentation record submitted for this system.

    Check cushion tank pre-charge. It should be the same ( or %10 less then) as operational pressure (5.00 Bar for potable water system). Bleed or recharge as required.

    Install a temporary bypass line with valve from discharge header to non-potable or potable water tank, whichever system is being tested.

    Sequence of operation

    Check and note that the booster set cut in at .. Bar for potable water system

    Check and note that the booster set cuts out at Bar for potable water system

    Check that the pumps cut in when the previous main pump has reached

    full speed and line pressure is not restored at 7.00 Bar for potable water system.

    Note order of operation of the pumps

    Repeat until cyclic changeover function is found to be working properly

  • 8.3 Booster Pump Commissioning Checklist

    BOOSTER PUMP COMMISSIONING / GUEST ROOMS BOOSTER SET MEP CONTRACTOR

    AE ARMA-ELEKTROPANC

    Supervisor

    Site Engineer

    Commissioning Engineer

    Commissioning Manager

    Commissioning Authority Comment/s :

    Elite Commissioning Commissioning Engineer

    CLIENT Comment/s :

    PASHA CONTRUCTION

    Lead Engineer

    Senior MEP Manager

    Contact ARMA ELEKTROPANC Ref. DOMESTIC WATER

    Client PASHA CONSTRUCTION

    Plant Ref. ENGINEERING ROOM (0315)

    Location/ Area Serving RAW Water BOOSTER SET / CO-2-MVI5203-7.5/2 Tick Yes if Acceptable; Provide comment if unacceptable Yes No Comment

    General

    The Control switch properly activates and deactivates the unit

    Pump rotation verified correct

    No unusual noise or vibration

    No leaking apparent around fittings

    Record cut in and cut off pressure of all pumps.

    Specified sequences of operation and operating schedules have been

    implemented with all variations documented.

    Specified point-to-point checks have been completed and documentation

    record submitted for this system.

    Check cushion tank pre-charge. It should be the same ( or %10 less then) as operational pressure (3.00 Bar for RAW water system). Bleed or

    recharge as required.

    Install a temporary bypass line with valve from discharge header to non-potable or potable water tank, whichever system is being tested.

    Sequence of operation

    Check and note that the booster set for pump 1 cut in at .. Bar Cut out at.bar

    Check and note that the booster set for pump 2 cut in at .. Bar Cut out at.bar

    Check that the pumps cut in when the previous main pump has reached

    full speed and line pressure is not restored at 3.00 Bar for raw water system.

    Note order of operation of the pumps

    Repeat until cyclic changeover function is found to be working properly

  • 8.4 Booster Pump Performance Test Checklist

    Contract ARMA ELECTROPANC Ref: DOMESTIC WATER

    Client PASHA CONSTRUCTION

    Plant Reference ENGINEERING ROOM (0315)

    Location/Area serving GUEST ROOM BOOSTER SET / * COR-3-MVI7004-22/2-T-3-E 22

    PU

    MP

    S

    Manufacturer Model No. ART No. Type

    Pump 1 WILO DOMESTIC BOOSTER PUMP

    Pump 2 WILO DOMESTIC BOOSTER PUMP

    Pump 3 WILO DOMESTIC BOOSTER PUMP

    PE

    RF

    OR

    MA

    NC

    E

    PU

    MP

    Design Actual

    Cut in (bar) Cut off (bar) Cut in (bar) Cut off (bar)

    Pump 1

    Pump 2

    Pump 3

    MO

    TO

    R

    Voltage (volts)

    Current (amps)

    Speed (rpm)

    Power (kW)

    Voltage (volts)

    Current (amps)

    Speed (rpm)

    Power (kW)

    Pump 1

    Pump 2

    Pump 3

    *The figure to the left of the slash (/) is for potable water system and that at the right is for non-potable water system.

    Remarks:

    BOOSTER PUMP PERFORMANCE CHECKLIST / GUEST ROOM BOOSTER SET MEP CONTRACTOR

    AE ARMA-ELEKTROPANC

    Supervisor

    Site Engineer

    Commissioning Engineer

    Commissioning Manager

    Commissioning Authority Comment/s :

    Elite Commissioning Commissioning Engineer

    CLIENT Comment/s :

    PASHA CONTRUCTION

    Lead Engineer

    Senior MEP Manager

  • 8.4 Booster Pump Performance Test Checklist

    Contract ARMA ELECTROPANC Ref: DOMESTIC WATER

    Client PASHA CONSTRUCTION

    Plant Reference MECHANICAL ROOM 1 LEVEL-1

    Location/Area serving KITCHEN/LAUNDRY and Hotel Areas BOOSTER SET / *COR-3-MVI3204-7,5/2

    PU

    MP

    S

    Manufacturer Model No. ART No. Type

    Pump 1 WILO DOMESTIC BOOSTER PUMP

    Pump 2 WILO DOMESTIC BOOSTER PUMP

    Pump 3 WILO DOMESTIC BOOSTER PUMP

    PE

    RF

    OR

    MA

    NC

    E

    PU

    MP

    Design Actual

    Cut in (bar) Cut off (bar) Cut in (bar) Cut off (bar)

    Pump 1

    Pump 2

    Pump 3

    MO

    TO

    R

    Voltage (volts)

    Current (amps)

    Speed (rpm)

    Power (kW)

    Voltage (volts)

    Current (amps)

    Speed (rpm)

    Power (kW)

    Pump 1

    Pump 2

    Pump 3

    *The figure to the left of the slash (/) is for potable water system and that at the right is for non-potable water system.

    Remarks:

    BOOSTER PUMP PERFORMANCE CHECKLIST / KITCHEN/LAUNDRY and Hotel Areas BOOSTER SET MEP CONTRACTOR

    AE ARMA-ELEKTROPANC

    Supervisor

    Site Engineer

    Commissioning Engineer

    Commissioning Manager

    Commissioning Authority Comment/s :

    Elite Commissioning Commissioning Engineer

    CLIENT Comment/s :

    PASHA CONTRUCTION

    Lead Engineer

    Senior MEP Manager

  • 8.4 Booster Pump Performance Test Checklist

    Contract ARMA ELECTROPANC Ref: DOMESTIC WATER

    Client PASHA CONSTRUCTION

    Plant Reference MECHANICAL ROOM 1 LEVEL-1

    Location/Area serving KITCHEN/LAUNDRY and Hotel Areas BOOSTER SET / CO-2-MVI5203-7.5/*

    PU

    MP

    S

    Manufacturer Model No. ART No. Type

    Pump 1 WILO DOMESTIC BOOSTER PUMP

    Pump 2 WILO DOMESTIC BOOSTER PUMP

    Pump 3 WILO DOMESTIC BOOSTER PUMP

    PE

    RF

    OR

    MA

    NC

    E

    PU

    MP

    Design Actual

    Cut in (bar) Cut off (bar) Cut in (bar) Cut off (bar)

    Pump 1

    Pump 2

    MO

    TO

    R

    Voltage (volts)

    Current (amps)

    Speed (rpm)

    Power (kW)

    Voltage (volts)

    Current (amps)

    Speed (rpm)

    Power (kW)

    Pump 1

    Pump 2

    *The figure to the left of the slash (/) is for potable water system and that at the right is for non-potable water system.

    Remarks:

    BOOSTER PUMP PERFORMANCE CHECKLIST / RAW Water BOOSTER SET MEP CONTRACTOR

    AE ARMA-ELEKTROPANC

    Supervisor

    Site Engineer

    Commissioning Engineer

    Commissioning Manager

    Commissioning Authority Comment/s :

    Elite Commissioning Commissioning Engineer

    CLIENT Comment/s :

    PASHA CONTRUCTION

    Lead Engineer

    Senior MEP Manager

  • 8.5 Booster Pump Schedule and Performance Curve

    Presented as additional files.

  • 8.6 Riser Diagram Domestic Water

    Presented as additional files.

  • 8.7 Material Transmittal Approval

    Presented as additional files.

  • Head

    Efficiency

    NPSH-values

    Shaft power P2

    MVI 7004

    MVI 7004

    MVI 7004

    MVI 7004

    5101520253035404550556065707580859095

    100105110[m]

    204060

    [%]

    246

    [m]

    51015

    [kW]

    0 10 20 30 40 50 60 70 80 90 100 110 [m/h]

    1

    Requested dataFlowHeadFluidFluid temperatureDensityKinematic viscosityVapor pressure

    m/hm

    Ckg/dmmm /sbar

    Pump dataMakeTypePumpe typePressure ratingMin. fluid temperatureMax. fluid tem perature

    WILOMVI 7004 PN16 3~

    CC

    Hydraulic data (duty point)FlowHead

    m/hm

    Speed 1/m in2950

    Materials / Shaft seal

    Dimensions per pump

    Suction sideDischarge sideWeight

    Motordata per Motor/Pump/Rated power P2Nominal speedRated voltageMax. currentDegree of protection

    kg

    kW1/m in

    A

    16DN100 / PNDN100 / PN 16214

    2900

    IP 55

    22

    Water, pure

    0,99821,001

    6779,2

    20

    Single head pum pPN 16

    82,973,4

    37,5

    0,1

    Pump baseImpellersStage cham bersPressure casing

    EN-GJL 250 KTL beschichtet/covered1.44011.4404

    EN-GJL 250 KTL beschichtet/covered

    1.4301

    H 1446h2 927 M 370X 248K 8x19

    mm

    Perm itted voltage to lerance +/- 10%

    3~400 V, Hz

    -15120

    Item no. of standard version 4071175

    System : High pressure centrifugal pump

    kWShaft power P2 21,7NPSH 4,59 m

    50

    Shaft 1.4404Seals EPDMMechanica l sea l Wolfram carbide/graphit

    MVI 7004 PN16 3~

    Minimum Efficiency Index (MEI) >=0,10

    Reserves to change any technical data. 3.1.13 - 01.09.2013 (Build 29)Software version 01.01.2013data statusUser group TR

    PhoneFax

    Customer

    Customer no.

    Contact

    Project

    Care of

    Date

    Project no.

    2014-05-17 Page 1 / 1

    Position no.

    Location

  • Head

    Efficiency

    NPSH-values

    Shaft power P2

    MVI 3203

    MVI 3203

    MVI 3203

    MVI 3203

    48

    12162024283236404448525660

    [m]

    102030405060

    [%]

    4

    8

    [m]

    1234

    [kW]

    0 4 8 12 16 20 24 28 32 36 40 44 48 [m/h]

    1

    Requested dataFlowHeadFluidFluid temperatureDensityKinematic viscosityVapor pressure

    m/hm

    Ckg/dmmm /sbar

    Pump dataMakeTypePumpe typePressure ratingMin. fluid temperatureMax. fluid tem perature

    WILOMVI 3203/ PN16 3~

    CC

    Hydraulic data (duty point)FlowHead

    m/hm

    Speed 1/m in2900

    Materials / Shaft seal

    Dimensions per pump

    Suction sideDischarge sideWeight

    Motordata per Motor/Pump/Rated power P2Nominal speedRated voltageMax. currentDegree of protection

    kg

    kW1/m in

    A

    16DN65 / PNDN65 / PN 1688

    2900

    IP 55

    5,5

    Water, pure

    0,99821,001

    3527

    20

    Single head pum pPN 16

    29,140,8

    10,6

    0,1

    Pump baseImpellersStage cham bersPressure casing

    Cast iron1.43011.4301

    Cast iron

    1.4301

    H 814h2 486 M 220X 160K 4x18

    mm

    Perm itted voltage to lerance +/- 10%

    >5,5 kW

    Y Anlauf

    W2

    W1V1U1V2U2

    L3

    L3

    L2

    L2

    L1

    L1

    3 ~ 230 V

    3 ~ 400 V W2W1V1U1V2U2

    3~400 V, Hz

    -15120

    Item no. of standard version 4035904

    System : High pressure centrifugal pump

    kWShaft power P2 4,94NPSH 3,33 m

    50

    Shaft 1.4404Seals EPDMMechanica l sea l Wolfram carbide/graphit

    MVI 3203/ PN16 3~

    Minimum Efficiency Index (MEI) >=0,10

    Reserves to change any technical data. 3.1.13 - 01.09.2013 (Build 29)Software version 01.01.2013data statusUser group TR

    PhoneFax

    Customer

    Customer no.

    Contact

    Project

    Care of

    Date

    Project no.

    2014-05-17 Page 1 / 1

    Position no.

    Location

  • Head

    Shaft power P2

    Efficiency

    NPSH-values

    Helix 1603

    Helix 1603

    Helix 1603

    Helix 1603

    2468

    10121416182022242628303234363840

    [m]

    0,81,21,6

    [kW]

    102030405060

    [%]

    1234567

    [m]

    0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 [m/h]

    1

    Requested dataFlowHeadFluidFluid temperatureDensityKinematic viscosityVapor pressure

    m/hm

    Ckg/dmmm /sbar

    Pump dataMakeTypePumpe typePressure ratingMin. fluid temperatureMax. fluid tem perature

    WILOHelix V 1603-1/16/E/400-50

    CC

    Hydraulic data (duty point)FlowHead

    m/hm

    Speed 1/m in2900

    Materials / Shaft seal

    Dimensions per pump

    Suction sideDischarge sideWeight

    Motordata per Motor/Pump/Rated power P2Nominal speedRated voltageMax. currentDegree of protection

    kg

    kW1/m in

    A

    16G2 / PNG2 / PN 1641

    2900

    IP 55

    2,2

    Water, pure

    0,99821,001

    3014,14

    20

    Single head pum pPN 16

    14,632,1

    4,5

    0,1

    Pump housingImpellersStage housingShaft

    1.43011.43071.4307

    1.4301

    1.4301

    H 779H2 512X 149 M 193

    mm

    Perm itted voltage to lerance +/- 10%

    3~400 V, Hz

    -20120

    Item no. of standard version 4162638

    System : High pressure centrifugal pump

    kWShaft power P2 1,98NPSH 1,26 m

    50

    O 'R ing EPDM

    Helix V 1603-1/16/E/400-50

    Minimum Efficiency Index (MEI) >=0,70

    Reserves to change any technical data. 3.1.13 - 01.09.2013 (Build 29)Software version 01.01.2013data statusUser group TR

    PhoneFax

    Customer

    Customer no.

    Contact

    Project

    Care of

    Date

    Project no.

    2014-05-17 Page 1 / 1

    Position no.

    Location

  • Head

    Efficiency

    NPSH-values

    Shaft power P2

    MVI 7001

    MVI 7001

    MVI 7001

    MVI 7001

    2468

    10121416182022242628

    [m]

    204060

    [%]

    246

    [m]

    1234

    [kW]

    0 10 20 30 40 50 60 70 80 90 100 110 [m/h]

    1

    Requested dataFlowHeadFluidFluid temperatureDensityKinematic viscosityVapor pressure

    m/hm

    Ckg/dmmm /sbar

    Pump dataMakeTypePumpe typePressure ratingMin. fluid temperatureMax. fluid tem perature

    WILOMVI 7001 PN16 3~

    CC

    Hydraulic data (duty point)FlowHead

    m/hm

    Speed 1/m in2950

    Materials / Shaft seal

    Dimensions per pump

    Suction sideDischarge sideWeight

    Motordata per Motor/Pump/Rated power P2Nominal speedRated voltageMax. currentDegree of protection

    kg

    kW1/m in

    A

    16DN100 / PNDN100 / PN 16106

    2900

    IP 55

    5,5

    Water, pure

    0,99821,001

    16,567,68

    20

    Single head pum pPN 16

    72,118,7

    10,6

    0,1

    Pump baseImpellersStage cham bersPressure casing

    EN-GJL 250 KTL beschichtet/covered1.44011.4404

    EN-GJL 250 KTL beschichtet/covered

    1.4301

    H 867h2 539 M 220X 160K 8x19

    mm

    Perm itted voltage to lerance +/- 10%

    3~400 V, Hz

    -15120

    Item no. of standard version 4071163

    System : High pressure centrifugal pump

    kWShaft power P2 4,97NPSH 3,62 m

    50

    Shaft 1.4404Seals EPDMMechanica l sea l Wolfram carbide/graphit

    MVI 7001 PN16 3~

    Minimum Efficiency Index (MEI) >=0,10

    Reserves to change any technical data. 3.1.13 - 01.09.2013 (Build 29)Software version 01.01.2013data statusUser group TR

    PhoneFax

    Customer

    Customer no.

    Contact

    Project

    Care of

    Date

    Project no.

    2014-05-17 Page 1 / 1

    Position no.

    Location